rozdzielnice dwujęzyczne

05.04.2022 Views

AneksAppendix6Index wordPageIndex wordPageaccessories 85air circulation See ventilationbusbar 7compartment 10, 38connection 36inspection 106mounting 82plating 80rated current 7surface treatment 7system 10, 11transport 35busbars 8contactcheck 80, 107, 108,109clearance 75grease 76, 77, 85greasing 76installation 79opening Compare contact clearance 75plating 80plug-in modules 18withdrawable modules 22conversionof withdrawable module compartment 70current, rated 7cablecompartment 8connection 41, 42, 43, 44connection sets 41connection unit 14, 22, 43, 46,70entry from bottom 39number per phase 42spare parts 83, 84capacitance measurement 92certificates See test certificatescheck See also inspectionafter erection 49during commissioning and maintenance 89of contact system 74on delivery 33check list See inspection listcircuit breakercable connection 44connection 17, 41, 42fixed type 27inspections 108, 109packing and transport 26, 27, 29reset 55, 57commissioningof reactive power compensation modules 89of switchgear 49condapter 21earthing connection 71inspection 75spare part 83conductorconnection of protective c. 35, 48inspection 108 107neutral 47protective 34, 47protective and neutral 10, 35damageduring transport 31, 33mechanical d. 81of contact plating 74of contacts 80of enclosure 106of paintwork 81degree of protection 6, 48, 60designmechanical 8standard modules 17disconnectable modulescheck 108construction 19inspection 107maintenance 65operation 50packing and transport 28spare parts 82distanceto wall 37distribution bar 10arrangement 13contacting 20cover 70, 83design 8, 10in metal separation wall 15in multi function separator 14inspection 75rated current 7enclosure 8feedercheck of incoming or outgoing f. 109incoming 17116MNS DTR / MNS Service

AneksAppendix6Index wordPageIndex wordPagefixed modules 16, 17, 50floorcut-outs 33, 38false f. 39, 40, 60foundation 31, 33, 39, 40frame 8base f. 39connection 34spare parts 82standard screws 86transport f. 24modulesdisconnectable See disconnectablemodulesfixed See fixed modulesplug-in See plug-in modulesrailable See railable moduleswithdrawable See withdrawable modulesmultifunction separator 10, 14neutral bar 10, 12, 16, 35neutral conductor 47greasingcontacts 76, 85, 107,108fuse links 77incoming feeder 17, 53inspection 75list 101, 106of contact system 80, 107of the switchgear system 101instrument panel 17, 20, 22, 54,56insulation resistancemeasurement 94, 107interlocklubrication 78, 107interlockingof module doors 23isolated position 50, 52, 54, 57,58lifting anglesremoval 35load break switch 18, 53connection 41, 42, 44lubricant 78maintenance 60, 100, 101frequency per installation category 101intervals 99, 101list 106of reactive power compensation modules 89preventive m. 99measuring logreactive power compensation 97module types 16operating handle see also switch handle 56, 58packingof circuit breakers 27of switchboards 24, 25of components 26paintworkrepair 81plug-in modules 18cable connection 43check 108inspection 107maintenance 64operation 50packing and transport 28spare parts 82power lossmaximum admittable effective p. 61, 62reduction factors 63 63protective bar 10, 12, 16, 35protective conductor See conductor 47railable modules 83check 108construction 19inspection 107maintenance 66operation 50packing and transport 28replacement 65spare parts 83reactive power compensation systemcommissioning 89measuring log 97MNS DTR / MNS Service 117

Aneks

Appendix

6

Index word

Page

Index word

Page

accessories 85

air circulation See ventilation

busbar 7

compartment 10, 38

connection 36

inspection 106

mounting 82

plating 80

rated current 7

surface treatment 7

system 10, 11

transport 35

busbars 8

contact

check 80, 107, 108,

109

clearance 75

grease 76, 77, 85

greasing 76

installation 79

opening Compare contact clearance 75

plating 80

plug-in modules 18

withdrawable modules 22

conversion

of withdrawable module compartment 70

current, rated 7

cable

compartment 8

connection 41, 42, 43, 44

connection sets 41

connection unit 14, 22, 43, 46,

70

entry from bottom 39

number per phase 42

spare parts 83, 84

capacitance measurement 92

certificates See test certificates

check See also inspection

after erection 49

during commissioning and maintenance 89

of contact system 74

on delivery 33

check list See inspection list

circuit breaker

cable connection 44

connection 17, 41, 42

fixed type 27

inspections 108, 109

packing and transport 26, 27, 29

reset 55, 57

commissioning

of reactive power compensation modules 89

of switchgear 49

condapter 21

earthing connection 71

inspection 75

spare part 83

conductor

connection of protective c. 35, 48

inspection 108 107

neutral 47

protective 34, 47

protective and neutral 10, 35

damage

during transport 31, 33

mechanical d. 81

of contact plating 74

of contacts 80

of enclosure 106

of paintwork 81

degree of protection 6, 48, 60

design

mechanical 8

standard modules 17

disconnectable modules

check 108

construction 19

inspection 107

maintenance 65

operation 50

packing and transport 28

spare parts 82

distance

to wall 37

distribution bar 10

arrangement 13

contacting 20

cover 70, 83

design 8, 10

in metal separation wall 15

in multi function separator 14

inspection 75

rated current 7

enclosure 8

feeder

check of incoming or outgoing f. 109

incoming 17

116

MNS DTR / MNS Service

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!