13.07.2015 Views

zbornik radova (.pdf 11,5 MB) - Hrvatsko društvo inženjera sigurnosti

zbornik radova (.pdf 11,5 MB) - Hrvatsko društvo inženjera sigurnosti

zbornik radova (.pdf 11,5 MB) - Hrvatsko društvo inženjera sigurnosti

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

municipality with enlarged authority and the region. [4] In the picture 3 you can see the result of therisk mapping.Na obrázku 3 je zobrazen výsledek mapování rizik.Picture 3. The distribution of the risk lavel in the Moravian-Silesian regionThe risk in the map they are marked by the colours from too low (dark green), across low (lightgreen), middle (yellow) to high (orange) and too high (red).The choice of the schoolsWith using of the risk mapping there were identified concrete extraordinary events oremergency situations in the Moravian-Silesian region. For the purpose of the project there werechosen and selected dominant risks. From the point of view of the solving problems and with regard totheir meaning there were chosen the most important of them, they are: the release of the dangerous substances from flood subjects classed into the group B in accordance with Act nr. 59/2006 Sb. , subjects classed into the group A in accordance with Act nr. 59/2006 Sb., for thisgroup there are made emergency card (EC), subjects for which is made the emergency card (e.g. winter stadium) (EC), cistern during the transport on the main railway and road networks, natural• Q5 flood level,278M&S 8(2013)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!