6.2. feed valves<br />
Before doing any boiler control, the boiler must be out of service. If steam plant has more boilers then boiler in question must be<br />
isolated from fuel and steam.<br />
Talk with engineers about procedures for inner and outer inspection of the boiler, important items which have to be discussed about<br />
are:<br />
– deposits on the heating surfaces which reduce heat transfer causing burning of the pipe sometimes<br />
– corrosion occurrence<br />
– wear or damage of the boiler armature (cocks, valves, safety valves, level indicators etc.)<br />
– generally condition of the surfaces where hot gases are passing through.<br />
If the boiler is in service from time to time, it is possible that safety valve is not inspected. But during periodical inspection and<br />
cleaning valves have to be opened and inspected. Safety valve must be checked on the proper releasing pressure by authorised<br />
surveyor. The mechanism for manual pressure release must be also checked. Check all passings on the level indicators and blow<br />
them with compressed air if necessary.<br />
13. ELECTRICAL DISTRIBUTION SYSTEM AND HIS MAINTENANCE<br />
TASKS<br />
SERIAL<br />
NUMBER<br />
OF THE<br />
SHIP<br />
DATE<br />
TASK DONE<br />
DUTY<br />
OFFICER<br />
CHIEF ENG.<br />
SIGNATURE<br />
REMARKS<br />
1. Make drawings of electrical<br />
distribution from generator to<br />
last user, marking:<br />
– breakers<br />
– switches<br />
– trafos<br />
– fuses<br />
– feed voltage<br />
– shore connection<br />
– emergency switchboard<br />
2. Isolate and turn off generator,<br />
and take all precautions<br />
3. Make routine test and<br />
maintenance of:<br />
3.1. breakers<br />
3.2. motor starters<br />
3.3. revolution counter<br />
3.4. electrical motor<br />
3.5. generators<br />
3.6. lighting<br />
3.7. battery<br />
3.8. alarms<br />
Isolate power circuit, block it and<br />
put some warning, record it in