26.03.2015 Views

pravilnik o zvanjima i ovlašćenjima o osposobljenosti pomoraca

pravilnik o zvanjima i ovlašćenjima o osposobljenosti pomoraca

pravilnik o zvanjima i ovlašćenjima o osposobljenosti pomoraca

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

182<br />

temperatures, and<br />

flow of liquids for<br />

normal work<br />

8. Adjust and/or inform<br />

superiors of unusual<br />

events and write<br />

down the records<br />

9. Shift local/manual<br />

command of the<br />

device on<br />

remote/automatic<br />

control and vice<br />

versa<br />

10. Make the indication<br />

diagrams<br />

11. Measure the<br />

indicated power –<br />

determine the<br />

average indicate<br />

pressure and<br />

compare it with other<br />

cylinders<br />

12. Make the indication<br />

diagrams without<br />

fuel<br />

13. Write down the<br />

report<br />

14. Change from<br />

economic power to<br />

full power<br />

15. Clean the both sides<br />

of the turbo charger<br />

in work<br />

16. Check exhaust of<br />

the collector<br />

17. Perform the routine<br />

control<br />

17.1. cooling water of the<br />

engine<br />

17.2. lubricating oil<br />

17.3. fuel<br />

10. MAIN ENGINE MAINTENANCE<br />

TASKS<br />

SERIAL<br />

NUMBER<br />

OF THE<br />

SHIP<br />

DATE<br />

TASK DONE<br />

DUTY<br />

OFFICER<br />

CHIEF ENG.<br />

SIGNATURE<br />

REMARKS<br />

1. Use turning gear, put warning<br />

symbols, take all safety<br />

measures<br />

2. Inspect the crankcase and

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!