ANALIZA RADA SISTEMA ZA TRANSPORT UGLJA NA<br />

POVRŠINSKOM KOPU „ĈUBRIĆ“ RMU „BANOVIĆI“ BiH<br />

SYSTEM ANALYSIS FOR COAL TRANSPORTATION<br />

SURFACE MINE „ĈUBRIĆ“, RMU „BANOVIĆI“ BiH<br />

Edin Lapandić 1 , Eniz Laĉić 2 , Amir Brigić 2 , Ekrem Bektašević 3 , Admir Softić 4<br />

1 – JP Elektroprivreda BiH d.d. Sarajevo,2 – RMU Banovići, Banovići, BiH, 3 – „BBM“ Vareš doo Vareš,<br />

BiH,4 – Ministarstvo vanjske trgovine i ekonomskih odnosa BiH<br />

ABSTRAKT<br />

Pošto je površinski kop „Ĉubrić― u završnoj fazi eksploatacije uglja, i nije u mogućnosti da obezbijedi ni pribliţno<br />

kontinuitet proizvodnje uglja koji zahtijeva kapacitet transportnog sistema, nameće se pitanje ekonomske opravdanosti rada<br />

transportnog sistema za ugalj. Ugalj iz površinskog kopa „Ĉubrić― do ţeljeznice se transportuje transporterima sa gumenom<br />

trakom koji ĉine jedinstven tehnološki i transportni sistem. Pretovar u ţeljezniĉke vagone se obavlja u mjestu Draganja<br />

odakle se postojećim rudniĉkim ţeljezniĉkim saobraćajem transportuje do Separacije. Planirana izgradnja termoelektrane u<br />

Banovićima zahtijevat će ozbiljnije povećanje proizvodnje uglja u površinskoj eksploataciji, što će se ogledati u promjeni<br />

naĉina transporta kako otkrivke tako i uglja. U projektnim rješenjima površinskih kopova sjevernog dijela Banovićkog<br />

basena (površinski kopovi „Turija― i „Grivice―) gdje će se u budućnosti obavljati eksploatacija uglja površinskim putem,<br />

oprema sa transportnog sistema koji je instalisan na potezu „Ĉubrić – Draganja―, već je našla svoje mjesto. Uzmemo li u<br />

obzir smanjenu i nekontinuiranu proizvodnju uglja sa pomenutog kopa koja se prevozi transportnim sistemom, ozbiljno<br />

dolazi u pitanje rentabilnost rada istog posebno sa aspekta kapaciteta. U radu je izvršena tehniĉka analiza rada transportnog<br />

sistema za prevoz uglja od površinskog kopa „Ĉubrić― do pretovarnog postrojenja „Draganja―, na osnovu koje su date dalje<br />

smjernice i predloţen alternativni naĉin transporta uglja.<br />

Kljuĉne rijeĉi: transportni sistem, tehniĉka analiza, površinski kop.<br />

ABSTRACT<br />

Open pit „Ĉubrić― in the final phase exploatation of coal. It is therefore not able to provide even close to the continuity of<br />

coal production, which requires transportation system capacity. Here we find the answer to the question of economic<br />

feasibility of coal transportation system. Coal from the open pit „Ĉubrić― to the railroad transported by belt conveyor, which<br />

consists of a unique technology and transportation system. Transshipment of railway wagons is done in Draganja. The<br />

existing mine is transported by rail traffic „Draganja― to separation. The planned construction of power plants in Banovici<br />

will require serious increase in coal production in surface mining. In this case we have to change modes of transport of<br />

overburden and coal. The design solutions of surface mines (open pit, „Turija― and „Grivice―) where they will perform in<br />

the future through surface coal mining equipment is moved to the transport system that is installed on the move „Ĉubrić –<br />

Draganja―. The work was performed technical analysis of transportation systems for the transportation of coal from the<br />

open pit „Ĉubrić― to the object „Draganja―. Based on the analysis provided further guidance and suggested an alternative<br />

way to transport coal.<br />

Key words: transportation systems, technical analysis, open pit.<br />

1. UVOD<br />

Osnovna problematika površinske eksploatacije jeste što efikasnija eksploatacija kroz povećanje produktivnosti<br />

sistema, povećanje profitabilnosti, smanjenje troškova po jedinici proizvoda i dr. [7]. Visoki transportni troškovi,<br />

kao i kompleksnost transportnih sistema, zahtjevaju pravilan i efikasan izbor, racionalnu strukturu transportnih<br />

sistema u funkciji vremenske i prostorne promjenljivosti posebno u ovako specifiĉnom sluĉaju [7]. Navedeni<br />

razlozi nas navode da traţimo nove metode i tehnike smanjenja troškova i povećanje produktivnosti<br />

diskontinuiranih sistema, kako bi odrţali ekonomiĉnu eksploataciju mineralnih sirovina.<br />

Prema Malbašiću [7] ekonomija je esencijalni partner tehnici u svakoj fazi rudarenja, i traţi razmišljanje na<br />

ekonomski naĉin. To ne znaĉi samo ekonomiziranje naĉina izvoĊenja rudarskih radova, već podrazumjeva i<br />

najekonomiĉniji naĉin ostvarenja rudarskih projekata.<br />

127