16.11.2013 Views

model za procenu troškova i vremena izgradnje gradskih ...

model za procenu troškova i vremena izgradnje gradskih ...

model za procenu troškova i vremena izgradnje gradskih ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MODEL ZA PROCENU TROŠKOVA I VREMENA IZGRADNJE GRADSKIH SAOBRAĆAJNICA<br />

Tsering, H.P., Lin, G.F., Tsai, L.K., Chen, P.C., An Enforced Support Vector Machine<br />

Model of Construction Contractor Default Prediction, Automation in Construction, 20,<br />

2011, pp. 1242-1249<br />

Vouk, D., Malus, D., Halkijevic, I., Neural Network in Economic Analyses of wastewater<br />

systems, Expert System with Application, 38, 2011, pp. 10031-10035<br />

Wang, X.Z., Duan, X.C., Liu, J.Y., Application of Neural Network in the Cost Estimation<br />

of Highway Engineering, Journal of Computers, 5 (11), 2010, pp. 1762-1766<br />

Wang, Y.R., Yu, C.Y., Chan, H.H., Predicting Construcction Cost and Schedule Success<br />

Using Artificial Neural Networks Ensemble and Support Vector Machines Classification<br />

Models, International Journal of Project Management, 30, 2012, pp. 470-478<br />

Williams, T.P., Predicting Final Cost for Competitively Bid Construction Projects Using<br />

Regression Models, International Journal of Project Management, 21, 2003, pp. 593-599<br />

Wilmot, C.G., Mei, B., Neural Network Modeling of Highway Construction Cost, Journal of<br />

Construction Engineering and Management © ASCE, july, 2005, pp. 765-771<br />

Yazicioglu, D.A., Regression Model for Interior Design Cost Estimate in Preliminary<br />

Stage, Procedia – Social and Behavioral Sciences. 51, 2012, pp.595-608<br />

Literatura 144 Igor Peško

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!