16.11.2013 Views

model za procenu troškova i vremena izgradnje gradskih ...

model za procenu troškova i vremena izgradnje gradskih ...

model za procenu troškova i vremena izgradnje gradskih ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

MODEL ZA PROCENU TROŠKOVA I VREMENA IZGRADNJE GRADSKIH SAOBRAĆAJNICA<br />

Cheng, M.Y., Wu, Y.W., Construction Conceptual Cost Estimates Using Support Vector<br />

Machine, 22 nd International Symposium on Automation and Robotics in Construction<br />

ISARC 2005, Ferrara, Italy, September 11-14, 2005, pp. 1-5<br />

Feng, W.F., Zhu, W.J., Zhou, Y.G., The Application of Genetic Algorithm and Neural<br />

Network in Construction Cost Estimate, Proceedings of the Third International<br />

Symposium on Eletronic Commerce and Security Workshop ISECS 10, Guangzhou, P.R.<br />

China, July 29-31, 2010, pp. 151-155<br />

Feng, L., Xin-Zheng, W., The Study of the Usage of Cost-significant Theory and Neural<br />

Network in Project Cost Estimation, Intelligent Systems and Applications, 2009, ISA<br />

2009, Wuhan, P.R. China, May 23-24, 2009, pp. 1-4<br />

Horner, R.M., McKay, K.J., Saket, M.M., Cost-significance in Estimating and Control,<br />

Symposium Organi<strong>za</strong>tion in Construction, Opatija, Croatia, April 16-18, 1986, pp.571-585<br />

Kong, F., Wu, X.J., Cai, L.Y., A Novel Approach Based on Support Vector Machine to<br />

Forecasting the Construction Project Cost, International Symposium on Computational<br />

Intelligence and Design, vol. 1, Wuhan, China, October 17-18, 2008a, pp. 21-24<br />

Kong, F., Wu, X., Cai, L., Application of RS-SVM in Construction Proejcts Cost<br />

Forecasting, 4 th International Conference on Wireless Communications, Networking and<br />

Mobile Computing, 2008. WiCOM '08, Dalian, China, October 12-14, 2008b, pp. 1-4<br />

Peško, I., Ćirović, G., Mučenski, V., Tepić, Ž., Dražić, J., Trivunić, J., Analysis and<br />

Preparation of Data in Neural Networks Calculation Stage for The Purpose of Creating<br />

Business Proposals, 10 th OTMC Conferenceon Organi<strong>za</strong>tion, Technology, Management<br />

and Economy – Book of Abstracts, Sibenik, Croatia, September 1-2, 2011<br />

ČASOPISI<br />

AbouRizk, S.M., Babey, G.M., Karumanasseri, G., Estimating the Cost of Capital<br />

Projects: an Empirica Study of Accuracy Levels for Municipal Government Projects,<br />

Canadian Journal of Civil Engineering, 29, 2002, pp. 653-661<br />

Adeli, H., Wu, M., Regulari<strong>za</strong>tion Neural Network for Construction Cost Estimation,<br />

Journal of Construction Engineering and Management, january/february, 1998, pp. 18-24<br />

Adeli, H., Neural Networks in Civil Engineering: 1989-2000, Computer-Aided Civil and<br />

Infrastructure Engineering, 16, 2001, pp. 126-142<br />

Aibinu, A.A., Pasco, T., The Accuracy of Pre-Tender building Cost Estimates in Australia,<br />

Construction Management and Economics, december, 2008, pp.1257-1269<br />

Al-Tabtabai, H., Alex, A.P., Tantash, M., Preliminary Cost Estimation of Highway<br />

Construction Using Neural Networks, Cost Engineering, 41 (3),1999, pp. 19-24<br />

Albino, V., Garavelli, A.C., A Neural Network Applicationn to Subcontractor Rating in<br />

Construction Firms, International Journal of Project Management, 16 (1), 1998, pp. 9-14<br />

Alex, D.P., Hussein, M.A., Bouferguene, A., Fernando. S., Artificial Neural Network<br />

Model for Cost Estimation: City of Edmonton’s Water and Sewer Installation Services,<br />

Journal of Construction Engineering and Management © ASCE, july, 2010, pp. 745-756<br />

Arafa, M., Alqedra, M., Early Stage Cost Estimation of Buildings Construction Projects<br />

using Artificial Neural Networks, Journal of Artificial Intelligence, 4 (1), 2011, pp. 63-75<br />

Literatura 141 Igor Peško

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!