SHAFTS • Drill and blast • Raise boring • A large diameter (1-3 m) bore is pulled through the shaft GROUNDWATER INFLOW • The inflow rate depends on: • Rock permeability • Groundwater level • Tunnel depth • Groundwater recharge rate • Tunnel dimensions • Typically inflow rates are from 5 to 50 l/min/100 m • Inflow is controlled by grouting Raise bore Posiva Oy/Jussi Partanen 5
NOISE, VIBRATIONS, DUST • Underground construction sites do not emit significant noise to the surface • Venting causes the most significant noise, easy to control with silencers or repositioning of the venting fans • Blasting vibration are controlled blasting length • Dust is mostly retained underground. Dusting to the ground surface is minimal EXAMPLES • Viikinmäki • The water treatment plant in Helsinki. Began operation in 1994. Residential area next to underground facility. • Several underground car parks • In Helsinki: Erottaja, Kamppi, Kluuvi • ONKALO • Underground rock characterisation facility • Ca. 500 m deep • www.posiva.fi • Typically the disturbance caused by undeground facilitys is minimal 6
- Page 103 and 104: 3/4 KESKKOND JA LOODUS 13. Küsisit
- Page 105 and 106: Lia Oolberg Saatja: Raimo Klesment
- Page 107 and 108: LISA 6 Avaliku arutelu protokoll ja
- Page 109 and 110: 3. Planeeringu eskiisi tutvustus 2/
- Page 111 and 112: 4/7 se käigus selgub, et probleem
- Page 113 and 114: 6/7 AU küsimus: Kes teostab ehitus
- Page 116 and 117: 2 PHAJ ehituse eeldused ja valiku p
- Page 118 and 119: Eesti elektrisüsteemi alternatiivi
- Page 120 and 121: Balanseerimisvõimsuste vajadus Rii
- Page 122 and 123: Asukoha alternatiiv II-IV, Aseri ü
- Page 124 and 125: Planeeritud asukoht (variant 1) Muu
- Page 126 and 127: Projekti arendaja: Energiasalv Orga
- Page 128 and 129: Läbindamine eelnevalt kivimimassii
- Page 130 and 131: Lähteandmed Algatatud Jõelähtme
- Page 132 and 133: Küsimused ? 4.07.2011 4
- Page 134 and 135: KESKKONNAMÕJU STRATEEGILINE HINDAM
- Page 136 and 137: KSH PROTSESS Kevad 2010 07.2010 DP
- Page 138 and 139: KSH EKSPERTRÜHM (2) - Kersti Ritsb
- Page 140 and 141: HINNATAKSE VÕIMALIKKU MÕJU JÄRGM
- Page 142 and 143: ALTERNATIIV I - PHAJ MAAPEALSE OSA
- Page 144 and 145: KVALITATIIVNE HINDAMISMETOODIKA (3/
- Page 146 and 147: Mereuuringute lühitutvustus Urmas
- Page 148 and 149: Heljumi jaotus 16. mai 2011 4.07.20
- Page 150 and 151: UNDERGROUND CAVERNS IN GRANITE MUUG
- Page 152 and 153: 1. PREGROUTING • Grouting holes 1
- Page 156 and 157: THANK YOU! QUESTIONS? Q-TABLE Ref:
- Page 158 and 159: METHODS • Rock quality • Seismi
- Page 160 and 161: LISA 7 Hüdroakumulatsioonijaama as
- Page 162 and 163: Maardu hüdroakumulatsioonijaama ee
- Page 164 and 165: EESSÕNA Maardu hüdroakumulatsioon
- Page 166 and 167: Maardu hüdroakumulatsioonijaama ee
- Page 168 and 169: Maardu hüdroakumulatsioonijaama ee
- Page 170 and 171: 1 4 Joonis 1.1. Hüdroakumulatsioon
- Page 172 and 173: Maardu hüdroakumulatsioonijaama ee
- Page 174 and 175: Tabel 1.1 Eesti elektri tarbimiskoo
- Page 176 and 177: Maardu hüdroakumulatsioonijaama ee
- Page 178 and 179: . Maardu hüdroakumulatsioonijaama
- Page 180 and 181: Maardu hüdroakumulatsioonijaama ee
- Page 182 and 183: Maardu hüdroakumulatsioonijaama ee
- Page 184 and 185: Maardu hüdroakumulatsioonijaama ee
- Page 186 and 187: Maardu hüdroakumulatsioonijaama ee
- Page 188 and 189: Maardu hüdroakumulatsioonijaama ee
- Page 190 and 191: Joonis 2.5. Kohtla-Järve vanad poo
- Page 192 and 193: Maardu hüdroakumulatsioonijaama ee
- Page 194 and 195: Maardu hüdroakumulatsioonijaama ee
- Page 196 and 197: Maardu hüdroakumulatsioonijaama ee
- Page 198 and 199: Maardu hüdroakumulatsioonijaama ee
- Page 200 and 201: Maardu hüdroakumulatsioonijaama ee
- Page 202 and 203: Horisontaalne osa Absoluutkõrgus P
SHAFTS<br />
• Drill and blast<br />
• Raise boring<br />
• A large diameter (1-3 m) bore<br />
is pulled through the shaft<br />
GROUNDWATER INFLOW<br />
• The inflow rate depends on:<br />
• Rock permeability<br />
• Groundwater level<br />
• Tunnel depth<br />
• Groundwater recharge rate<br />
• Tunnel dimensions<br />
• Typically inflow rates are from<br />
5 to 50 l/min/100 m<br />
• Inflow is controlled by grouting<br />
Raise<br />
bore<br />
Posiva Oy/Jussi Partanen<br />