TANAP PROJESİ / TANAP PROJECT<br />
RAKAMLARLA<br />
TANAP PROJESİ<br />
TANAP PROJECT<br />
BY NUMBERS<br />
31m 3<br />
milyar billion<br />
23 m 3<br />
milyar billion 2026<br />
16m 3<br />
milyar billion 2023<br />
2018<br />
TANAP’IN YILLIK TAŞIMA KAPASİTESİ<br />
ANNUAL TRANSPORT CAPACITY OF TANAP<br />
BIN METREKÜP GAZIN TAŞINMA MALIYETI<br />
TRANSPORT COST FOR A THOUSAND CUBIC<br />
METERS OF GAS<br />
$11-13 $9.6<br />
YILDA<br />
PER YEAR<br />
$1.6-3.3<br />
MILYAR BILLION<br />
İTHAL EDİLEN DOĞAL GAZIN MALİYET DÜŞÜŞÜ<br />
COST DECREASE OF IMPORTED NATURAL GAS<br />
TÜRKİYE’NİN TANAP İLE KAZANACAĞI YILLIK GELİR<br />
ANNUAL INCOME TO BE GENERATED BY TANAP FOR TURKEY<br />
$632-783<br />
MİLYON MILLION<br />
$9.5<br />
MILYAR BILLION<br />
TÜRKİYE’NİN TANAP İLE KAZANACAĞI TOPLAM GELİR<br />
TOTAL INCOME TO BE GENERATED BY TANAP FOR TURKEY<br />
İŞLETME MALİYETİ BAŞKA, YATIRIM<br />
MALİYETİ BAŞKA<br />
TANAP ve BOTAŞ’ın taşıma maliyetinde<br />
yapılan karşılaştırmada bir yanlış anlaşılma<br />
olduğu ortada. TANAP ile taşınacak<br />
gaza Eskişehir çıkışında bin metreküp<br />
için 79 dolar, Edirne çıkışında ise 102 dolar<br />
iletim bedeli ödenecek. BOTAŞ, kendi<br />
mevcut altyapısını kullanarak gazı taşırsa,<br />
maliyeti 11-13 dolar olacağı için aradaki fark<br />
BOTAŞ’a ek maliyet getiriyor. Ancak bu<br />
hesabın bir de başka yüzü var. BOTAŞ’ın<br />
bu gazı taşıyabilecek kapasitesi zaten bulunmazken<br />
TANAP’ın yatırım maliyeti de<br />
bu hesabın içinde yer alıyor. Eğer yatırım<br />
maliyetini hesaba katmazsak TANAP<br />
ile taşınan doğal gazın maliyeti 9,6 dolar<br />
oluyor. Görüldüğü gibi, Türkiye, doğal<br />
gazı TANAP vasıtası ile maliyetinin çok<br />
daha altında taşıma fırsatı yakaladı. Yani,<br />
BOTAŞ, TANAP dolayısıyla zarara maruz<br />
kalmayacak, iddia edilenin aksine, taşıma<br />
maliyetlerinden tasarruf etmiş olacak.<br />
Öte yandan belirtmek gerekir ki TANAP<br />
düşünüldüğü gibi pahalı bir proje değil.<br />
TANAP’ın yatırım maliyetlerini, 1990’lı<br />
ve 2000’li yılların başındaki boru hatlarının<br />
yapım maliyetleri ile kıyaslamak<br />
yine yanlış bir sonuca götürüyor. Dünya<br />
emtia ve enerji fiyatlarındaki değişiklikler,<br />
yıllara göre projelerin maliyetini de değiştiren<br />
önemli faktörler. Zira BP tarafından<br />
daha 2011 yılında yapılan bir hesaba göre,<br />
Nabucco’nun toplam maliyetinin, tahminlerin<br />
çok üzerinde, yaklaşık olarak 20<br />
DÜNYA EMTIA VE<br />
ENERJI<br />
FIYATLARINDAKI<br />
DEĞIŞIKLIKLER,<br />
YILLARA GÖRE<br />
PROJELERIN<br />
MALIYETINI DE<br />
DEĞIŞTIRİYOR.<br />
CHANGES IN <strong>WORLD</strong><br />
COMMODITY AND<br />
ENERGY PRICES<br />
CHANGE PROJECT<br />
COSTS BY YEARS.<br />
13, and the difference means additional<br />
cost for BOTAS. But there is more to this<br />
calculation than that. BOTAS does not<br />
have sufficient capacity to transport this<br />
volume of gas, and TANAP’s investment<br />
cost is also included in this calculation. If<br />
we rule out the investment cost, TANAP’s<br />
transport cost will be $9.6 per thousand<br />
bcm of gas. As seen, Turkey has seized<br />
the chance to transport natural gas<br />
with much lower costs via TANAP. This<br />
means BOTAS will not face any loss with<br />
TANAP, rather it will save on transport<br />
costs.<br />
On the other hand, it should be emphasized<br />
that TANAP is not as costly as<br />
thought. Comparing TANAP’s investment<br />
costs with other pipeline construction<br />
costs of 1990s and 2000s is misleading.<br />
Changes in world commodity and energy<br />
prices are important factors that change<br />
project costs by years. According to an<br />
estimation by BP in 2011, total cost of<br />
Nabucco would be much higher than initial<br />
expectations, around $20 billion. If<br />
construction of a 3200-km pipeline costs<br />
$20 billion, then a 1850-km pipeline would<br />
cost $11.6 billion. When the inflation difference<br />
in the period after 2011 is taken<br />
into consideration, it becomes obvious<br />
that the construction cost of the TANAP<br />
project is not as high as claimed. On the<br />
contrary, it turns out to be cheaper than<br />
many other projects.<br />
When the TANAP project’s investment<br />