SECTION 7 - MAINTENANCE

INTRODUCTION

The reliability of any stand-alone product or control system is

affected by the maintenance of the equipment. ABB recommends

that all equipment users practice a preventive maintenance program

that will keep the equipment operating at an optimum level.

Maintenance personnel should be familiar with the Type AV positioner

and have experience working with process control applications

that use pneumatic positioners.

WARNING

System maintenance must be performed only by qualified

personnel and only after securing the equipment controlled

by the circuit. Altering or removing components from an

active circuit may upset the controlled process leading to

personnel injury and equipment damage.

PREVENTIVE MAINTENANCE SCHEDULE

Table 7-1 is the preventive maintenance schedule and checklist

for Type AV positioners. The table lists the preventive maintenance

tasks in groups according to their specified maintenance

interval. The maintenance intervals are recommendations and

may vary depending on the location environment and the air quality

of the positioner. As a minimum, these recommended maintenance

tasks should be performed during an extended process

shutdown.

Some tasks in Table 7-1 are self-explanatory. Instructions for tasks

that require further explanation are covered under PREVENTIVE

MAINTENANCE PROCEDURES.

Table 7-1. Preventive Maintenance Schedule

Interval

Preventive Maintenance Tasks

(months)

Check and tighten all wiring connections. 12

Clean or replace supply air filter.

Clean or replace manifold filters. Refer to procedure.

INTRODUCTION

7 - 1