Pressure Meter: Testo AG Germany<br />

Model: Testo 521 Serial Number: 01362781/709<br />

Sound Meter: Brüel & Kjær Precision Sound Level Meter Octave<br />

Analyzer<br />

Model: Typr 2215 Serial Number: 866138<br />

Air Speed Meter: Alnor Compuflow Thermo-Anemometer<br />

Model: GGA-65P Serial Number: 900181<br />

Methodology and Procedure<br />

Figure 2. Pressure meter<br />

The first steps of the experiment were the calibration and performance measuring of the<br />

equipment and instrumentation. Fan speeds and air flow performance were tested to<br />

establish the range of the equipment. The tests conducted on the ducts are limited to<br />

seven liters per second and twelve liters per second, to meet the indoor air quality<br />

requirements.<br />

The configuration of the ducts includes three parts: a three meter duct, a two meter duct<br />

connected with a 90 degree right angle elbow joint, and a one meter duct connected with<br />

a 90 degree boot joint. The entire system was put together and joints attached with duct<br />

tape. For the experiment, two sizes of ducts are to be compared. The large area duct and<br />

the small area duct have a cross sectional area of 3456 mm 2 and 2016 mm 2 respectively.<br />

For the pressure tests, four holes<br />

were drilled into the ducts to hold<br />

pressure taps. The first hole was<br />

drilled in the three meter duct 30<br />

centimeters from the inlet. The<br />

second pressure was set 15<br />

centimeters from the outlet of the<br />

three meter duct which then<br />

follows the 90 degree right angle<br />

elbow joint. The third hole is<br />

situated 15 centimeters from the<br />

outlet of the two meter duct, which<br />

then follows the 90 degree boot<br />

joint. Finally, a pressure tap was<br />

drilled 15 centimeters from the<br />

outlet of the one meter duct. The<br />

reason behind the dimensions of<br />

the pressure taps is to obtain a high<br />

level of laminar flow for appro-<br />

priate pressure measurements.<br />

Length 3<br />

Length 2<br />

Length 1<br />

Figure 3. Laboratory room with duct system setup<br />

Bilaga 5 sid 2 (6)<br />