gives the building c<strong>om</strong>mittee an opportunity to assess the<br />
need for supervision and inspection.<br />
When a building notice is received, the c<strong>om</strong>mittee shall<br />
pr<strong>om</strong>ptly convene a consultative meeting unless this is<br />
evidently unnecessary. At the consultative meeting an<br />
examination shall be made of such issues as the planning<br />
of the works and the measures for inspection, supervision<br />
and other control which are necessary in order that the<br />
building or civil engineering works may be assumed to<br />
c<strong>om</strong>ply with the requirements of society.<br />
At the time of the consultative meeting or as soon as<br />
possible thereafter, the building c<strong>om</strong>mittee shall, unless<br />
this is evidently unnecessary, c<strong>om</strong>e to a decision regarding<br />
an inspection schedule for the works. It is primarily the<br />
responsibility of the building owner to set out what<br />
inspection and verification he considers necessary to<br />
confirm that the technical requirements have been<br />
c<strong>om</strong>plied with. The building c<strong>om</strong>mittee shall determine<br />
whether the inspection proposed by the building owner is<br />
sufficient and shall approve or reject the inspection<br />
schedule, and shall specify any additional inspections,<br />
notifications and documentation which in the opinion of<br />
the c<strong>om</strong>mittee are necessary. In this respect, the c<strong>om</strong>mittee<br />
will be primarily guided by the c<strong>om</strong>petence of the<br />
building owner, the nature and c<strong>om</strong>plexity of the project,<br />
and the scope and quality of the in-house control system<br />
of the building owner.<br />
When the inspection schedule has been decided on, it is<br />
the responsibility of the building owner to ensure that it is<br />
c<strong>om</strong>plied with. To aid him in this respect, the building<br />
owner shall normally have appointed a quality assurance<br />
supervisor. The quality assurance supervisor shall assist<br />
the building owner, be present at consultative meetings<br />
and inspections and also in other respects ensure that the<br />
inspection schedule is c<strong>om</strong>plied with. A number of quality<br />
assurance supervisors may be appointed to oversee<br />
different parts of a project. In such a case, one of them<br />
shall coordinate their work.<br />
When the building owner has met his obligations in<br />
accordance with the inspection schedule and the building<br />
c<strong>om</strong>mittee has not found it necessary to intervene as<br />
supervisory authority, the c<strong>om</strong>mittee shall issue a c<strong>om</strong>pletion<br />
certificate.<br />
If the building c<strong>om</strong>mittee finds that the building owner<br />
has failed to satisfy all the conditions necessary for the<br />
issue of a c<strong>om</strong>pletion certificate, the c<strong>om</strong>mittee shall<br />
without undue delay decide to what extent use of the<br />
building shall be permissible until such time as the failure<br />
has been remedied.<br />
The supervision and inspection system described above<br />
is intended not only to ensure that the technical requirements<br />
in the BVL have been c<strong>om</strong>plied with in the project,<br />
but also that the project agrees with the building permit, if<br />
a permit is required, and with the detailed development