09.01.2015 Views

Manual utilizator Slope - GeoStru Software

Manual utilizator Slope - GeoStru Software

Manual utilizator Slope - GeoStru Software

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

NORMATIVE 46<br />

5.The design seismic inertia forces F H and F V acting on the ground mass, for<br />

the horizontal and vertical directions respectively, in pseudo-static analyses<br />

shall be taken as:<br />

F H<br />

= 0,5<br />

S W<br />

F V<br />

= ± 0,5 F H<br />

if the ratio a vg<br />

/a g<br />

is greater than 0,6<br />

F V<br />

= ± 0,33 F H<br />

if the ratio a vg<br />

/a g<br />

is not greater than 0,6.<br />

Where:<br />

is the ratio of the design ground acceleration on type A<br />

ground, a g<br />

, to the acceleration of gravity g;<br />

a vg<br />

a g<br />

is the design ground acceleration in the vertical direction;<br />

is the design ground acceleration for type A ground;<br />

S is the soil parameter of EN 1998-1:2004, 3.2.2.2;<br />

W<br />

is the weight of the sliding mass.<br />

A topographic amplification factor for a g shall be taken into account according<br />

to 4.1.3.2 (2).<br />

6. A limit state condition shall then be checked for the least safe potential slip<br />

surface.<br />

7. The serviceability limit state condition may be checked by calculating the<br />

permanent displacement of the sliding mass by using a simplified dynamic model<br />

consisting of a rigid block sliding against a friction force on the slope. In this<br />

model the seismic action should be a time history representation in accordance<br />

with 2.2 and based on the design acceleration without reductions.<br />

8. Simplified methods, such as the pseudo-static simplified methods mentioned<br />

in (3) to (6) in this subclause, shall not be used for soils capable of developing<br />

high pore water pressures or significant degradation of stiffness under cyclic<br />

loading.<br />

9. The pore pressure increment should be evaluated using appropriate tests. In<br />

© <strong>GeoStru</strong> <strong>Software</strong>-<strong>Slope</strong> 8.0.1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!