Mentenanta Conductelor de Transport Gaze Naturale - Transgaz
Mentenanta Conductelor de Transport Gaze Naturale - Transgaz
Mentenanta Conductelor de Transport Gaze Naturale - Transgaz
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
esearch report 372/2001<br />
173. * * * Assistance technique dans la transposition <strong>de</strong> la directive sur le controle<br />
<strong>de</strong>s acci<strong>de</strong>nts majeurs en cause <strong>de</strong>s canalisations – DRA 15. Operation B :<br />
Mesures comensatoires pour controles les acci<strong>de</strong>nts dus aux agressions par<br />
travaux <strong>de</strong> tiers, INERIS – Direction <strong>de</strong>s risques acci<strong>de</strong>ntels / Unite<br />
« Evaluation <strong>de</strong>s risques », Rapport d’etu<strong>de</strong> nr. 28658/21.02.2005<br />
174. * * * Black-Diamond Composite Wrap For Pipelines, Sizes: 2- through 60-<br />
inch, Bends/Elbows, Tees, T. D. Will. Inc.,Bulletin No. 5300.002.01, July 2004<br />
175. * * * Clock Spring – The fast economical solution for permanent pipeline<br />
repair, Catalog 2006<br />
176. * * * Composite solution for piping and structures: Perma Wrap, Weld Wrap,<br />
Plug-n Wrap, Auto Wrap, Wrap Max, Wrap Master Inc., Catalog 2005<br />
177. * * * Defect assessment in pipelines, Curs organizat <strong>de</strong> Entreprise Training<br />
International, Budapesta, 2002<br />
178. * * * Failure analysis & weld repair of natural gas pipeline, Kevin Kennedy<br />
& Associates, Report 2005<br />
179. * * * Focus on safety and environment, A comparative analysis of pipeline<br />
performance 2000 – 2003, National Energy Board – NEB, canada, march 2005<br />
180. * * * Grouted Tee TM Connection, A complete solution for pipeline<br />
intervention, Advantica, 2005<br />
181. * * * Integrity Management Program Delivery Or<strong>de</strong>r DTRS56/02/D/70038,<br />
Dent Study, Final report, November 2004<br />
182. * * * Oklahoma State University operational maintenance plan for gas<br />
pipelines, august, 2004<br />
183. * * * Onshore pipeline quantified risk assessment, Allseas Construction<br />
Contractors, Corrib field <strong>de</strong>velopment project, Contract nr. 101.24.14 / 2002<br />
184. * * * Overseas and Australian statistics for gas transmission and distribution<br />
inci<strong>de</strong>nts, Office of Gas Safety, january 2004<br />
185. * * * Pipeline acci<strong>de</strong>nt report. UGI Utilities, Inc. Natural gas distribution<br />
pipeline explosion and fire Allentown, Pennsylvania, june 9, 1994, National<br />
<strong>Transport</strong>ation Safety Board, Washington D.C., 1996<br />
186. * * * 14 C-2. Pipeline rehabilitation. Statemi<strong>de</strong> Urban Design & Specification<br />
– SUDAS, 2005<br />
187. * * * 49 CFR 192 - <strong>Transport</strong>ation Of Hazardous Liquids By Pipeline U.S.<br />
Department Of <strong>Transport</strong>ation, 2006<br />
188. * * * 49 CFR 195 - <strong>Transport</strong>ation Of Natural And Other Gas By Pipeline:<br />
Minimum Fe<strong>de</strong>ral Safety Standards<br />
189. * * * Pipeline maintenance. Materials and Equipment, National Center for<br />
Construction, Education & Research – NCCER, Gainesville, 2006<br />
190. * * * Pipeline maintenance and repair, Environmental Protection Agency<br />
USA, Technology Transfer Workshop, Villahermosa, Mexic, april, 2006<br />
191. * * * Pipeline product loss inci<strong>de</strong>nts, 2 nd Report of the UKOPA Fault<br />
database Management Group 1961 – 2000, june 2002<br />
192. * * * Rehabilitation of corro<strong>de</strong>d pipelines and pipes with FibaRoll, Catalog<br />
FibaRoll / FTi Ltd, 2006<br />
NTMC ___________________________________________________________________________ pag. 155