CAPITALIZAÇÃO SOCIAL(28 <strong>de</strong> fevereiro <strong>de</strong> 2012)•Ações circulantes: 104,510,000•Opções: 5,228,000(Preço médio do exercício CA$2.88)•Warrants: 47,459,000 *(Preço médio do exercício CA$3.72)* Cada cinco (5) warrants registrados ou não na bolsa dão ao dono o direito <strong>de</strong> compraruma (1) ação ordinária na Empresa.DiretoresJohn Blake: Presi<strong>de</strong>nte e Principal Oficial ExecutivoPeter Mah: Vice Presi<strong>de</strong>nte <strong>de</strong> OperaçõesDuane Lo: Diretor FinanceiroTitus Haggan: Vice-presi<strong>de</strong>nte <strong>de</strong> Pesquisa MineralMarcel <strong>de</strong> Groot: Presi<strong>de</strong>nte do Conselho e DiretorLuis Baertl: DiretorTom O’Neil: DiretorSteven Krause: DiretorKeith Hulley: DiretorProprietáriosDiretores e empregados: 13.65%3www.LunaGold.com


www.LunaGold.comUBICACIÓN ESTRATÉGICA


5www.LunaGold.com


2012 EM FOCOPrimeiro trimestreSegundo trimestreTerceiro trimestreQuarto trimestreSondagem profundaabaixo do recurso do<strong>de</strong>posito <strong>de</strong> Piaba:i<strong>de</strong>ntificar e <strong>de</strong>limitarzonas mineralizadas <strong>de</strong>alto teor.Concluir Fase 2 doestudo “scoping” para aexpansão da produção:visando produzir até300,000 onças <strong>de</strong> ouropor anoAvançar os estudos daFase 2 até uma avaliaçãoeconômica preliminar(PEA)Concluir Fase 2 do PEA eaumentar produção até100,000 oncas <strong>de</strong> Au/ano“run rate”Geração <strong>de</strong> alvos: LunaGreenfieldsConcluir Fase 1 doestudo “scoping” para aexpansão da produção:visando produzir 100,000onças <strong>de</strong> ouro por ano apartir <strong>de</strong> 2013Iniciar programa <strong>de</strong>sondagem no projetoLuna GreenfieldsDefinir novos alvos <strong>de</strong>sondagem no projeto<strong>Aurizona</strong> visandoaumento <strong>de</strong> recursos8www.LunaGold.com


MINA DE OURO AURIZONA• 800 empregos diretas• Estimativa <strong>de</strong> recursos <strong>de</strong> ouro totalizam 3,17Moz Medidos e Indicados e 0.72 Moz Inferidos• Meta <strong>de</strong> produção para 2012: 60,000 oz <strong>de</strong> Au• Meta <strong>de</strong> custo <strong>de</strong> produção para 2012: US$750por onça.• Conclusão do estudo scoping da expansão <strong>de</strong><strong>Aurizona</strong> programado para o segundo trimestre<strong>de</strong> 2012• A meta da Exploração é <strong>de</strong>finir ainda melhor asestruturas mineralizadas em <strong>Aurizona</strong>, além <strong>de</strong>fazer sondagem profunda para incrementar osrecursos <strong>de</strong> ouro do projeto.9www.LunaGold.com


ESTIMATIVA DE RECURSOS E RESERVAS DE AURIZONAESTIMATIVA DE RECURSOS MINERAIS DE AURIZONA, 8 DE DEZEMBRO 2011Deposit Classification Kt Au g/t Au oz.Measured 10,782 1.13 391,000Piaba Pit Constrained (1)Indicated 62,939 1.28 2,596,000Measured and Indicated 73,721 1.26 2,987,000Inferred 2,469 1.47 117,000Measured 0 0.00 ,000Piaba Un<strong>de</strong>rground (2)Indicated 2,738 1.29 113,000Measured and Indicated 2,738 1.29 113,000Inferred 10,901 1.56 547,000Measured 0 0.00 ,000Tatajuba (3)Indicated 1,554 1.31 66,000Measured and Indicated 1,554 1.31 66,000Inferred 1,859 0.94 56,000TotalClassification Kt Au g/t Au oz.Measured 10,782 1.13 391,000Indicated 67,231 1.28 2,775,000Measured and Indicated 78,013 1.26 3,166,000Inferred 15,229 1.47 720,000Notes:1 Piaba pit constrained resources are reported at a cutoff gra<strong>de</strong> of 0.30 g/t Au insi<strong>de</strong> a pit optimization shell based on a gold price of US$1500 per ounce.2 Piaba un<strong>de</strong>rground resources are reported at a cutoff gra<strong>de</strong> of 0.75 g/t Au outsi<strong>de</strong> the pit optimization shell. The cutoff gra<strong>de</strong> has been calculated at a gold price of US$1500 per ounce.3 The Tatajuba resources are not constrained by a pit optimization shell and are stated at a cutoff gra<strong>de</strong> of 0.30 g/t Au.Block dimensions are 10m x 10m in the xy plane and 3m on the z axis. Piaba database consists of 69,578 meters consisting of 335 diamond drill holes and 142 reverse circulation holes and 374 auger drill holes. Tatajuba database consists of4,740 meters in 45 diamond drill holes. 25g/t Au capping at Piaba and 10 g/t Au capping at Tatajuba.Mineral resources that are not mineral reserves do not have a <strong>de</strong>monstrated economic viability.There may be political, environmental, legal and other risks that may materially affect the mineral resource estimate disclosed in this reserves and resources statement.The in<strong>de</strong>pen<strong>de</strong>nt QP responsible for the preparation of the mineral resource estimate and who has reviewed this resources and reserves statement is Leah Mach, CPG, of the Denver office of SRK Consulting (U.S.), Inc.Mineral reserves are fully inclu<strong>de</strong>d in the mineral resources.ESTIMATIVA DE RESERVAS MINERAIS DE AURIZONA, 13 DE JULHO 2010Deposit Classification Kt Au g/t Au oz.<strong>Aurizona</strong> Proven and Probable 17,167 1.36 731,000<strong>Aurizona</strong> Notes - Mineral resources that are not mineral reserves do not have <strong>de</strong>monstrated economic viability. Leah Mach, Eric Olin and Bret Swanson of SRK Consulting are the qualified persons ("QP") un<strong>de</strong>r NI 43-101 who have prepared the resources and reserves estimates contained in this presentation. All of the QP's are in<strong>de</strong>pen<strong>de</strong>nt of the Company as <strong>de</strong>fined un<strong>de</strong>r NI 43-101. For additional information with respect to theassumptions and parameters related to the technical information disclosed herein, refer to the Report. The full NI 43-101 Technical Report dated September 1, 2010 can be found at www.sedar.com.10www.LunaGold.com


1www.LunaGold.com


AURIZONA – DEPOSITO DE PIABA, SEÇÃO LONGITUDINALCLASSIFICAÇÃO DE RECURSOS MINERAISWSW2300WENE1500E3,800 mMineral Resources ClassificationMeasuredIndicatedInferredRESOURCE BLOCK GOLD GRADE11www.LunaGold.com


AURIZONA – DEPOSITO DE PIABA, SEÇÃO LONGITUDINALTEORES DO MODELO DE BLOCOWSW2300WENE1500E3,800 mRESOURCE BLOCK GOLD GRADE12www.LunaGold.com


AURIZONA – DEPÓSITO DE PIABAGERAÇÃO DE ALVOS PARA SONDAGEM PROFUNDA (BM > 2.0 G/T AU)WSWENE2000W 1500W 1000W 500W 000 500E 1000E- 550 mUS$ 1,500/ OzCava- 750 mWest ZoneCentral ZoneEast ZoneAu > 3.0 g/t2.0 < Au > 3.0 g/tFiltered Block Mo<strong>de</strong>lAu > 2.0 g/t (Drill Intervals)Planned Holeswww.LunaGold.com


AURIZONA – DEPÓSITO DE PIABASONDAGEM PROFUNDAWSWENE- 550 m- 750 mAu > 3.0 g/t1.0 < Au > 3.0 g/t0.80 < Au > 1.0 g/tFuros em andamento0.50 < Au > 0.8 g/t0.30 < Au > 0.5 g/t15www.LunaGold.com


DEFINIÇÃO DE RECURSOS DE AURIZONASELEÇÃO DE RESULTADOS DAS SONDAGENS RECENTES13.00 m a 33.63 g/t <strong>de</strong> Au incluíndo 4.00 m a 104.83 g/t <strong>de</strong> Au(Publicado no dia 7 <strong>de</strong> novembro <strong>de</strong> 2011)50.00 m a 3.87 g/t <strong>de</strong> Au incluíndo 7.00 m a 8.47 g/t <strong>de</strong> Au e1.00 m a 53.30 g/t <strong>de</strong> Au(Publicado no dia 7 <strong>de</strong> novembro <strong>de</strong> 2011)44.00 m a 4.94 g/t <strong>de</strong> Au, incluíndo 5.00 m a 30.51 g/t <strong>de</strong> Au(Publicado no dia 28 <strong>de</strong> junho <strong>de</strong> 2011)55.00 m a 4.15 g/t <strong>de</strong> Au, incluindo 17.00 m a 7.80 g/t <strong>de</strong> Au(Publicado no dia 18 <strong>de</strong> abril <strong>de</strong> 2011)1www.LunaGold.com


PROJETO AURIZONA SONDAGEM BE-FD-COPiaba DepositBoa Esperança TargetFerradura TargetPe Gran<strong>de</strong> TargetAu > 0.3 g/tConceição Target17www.LunaGold.com


Produção <strong>de</strong> ouro (onças)PRODUÇÃO TRIMESTRAL DA MINA AURIZONA EM 2011/201218,000500,00016,000450,00014,00012,00010,0008,0006,0004,0002,000400,000350,000300,000250,000200,000150,000100,00050,000Processamento <strong>de</strong> Minerío TM)-1º T 2º T 3º T 4º T 1º T <strong>de</strong>2012*0* Fechamento da planta para actualizações, reparos e manuntenção.Produção <strong>de</strong> ouro (onças)Processamento <strong>de</strong> minerío (TM)PrimeirotrimestreSegundotrimestreTerceirotrimestreQuartotrimestreTotal <strong>de</strong>20119,209 5,595 13,473 13,620 41,898293,393 210,558 416,822 389,476 1,310,24918www.LunaGold.com


EXPLORAÇÃO MINERAL - LUNA GREENFIELDSControle <strong>de</strong> um novo distrito auríferoBrasileiro totalizando 190.000 ha, comsignificativo potencial para novas<strong>de</strong>scobertasO <strong>Projeto</strong> contém mais <strong>de</strong> 100 evidências <strong>de</strong>antigos trabalhos artesanais <strong>de</strong> lavra <strong>de</strong> ouroPrograma <strong>de</strong> exploração agressivo emandamento com os primeiros alvos <strong>de</strong> ouro já<strong>de</strong>finidosPrevisão <strong>de</strong> início <strong>de</strong> sondagem nos três alvosprincipais no terceiro trimestre <strong>de</strong> 2012No caminho da <strong>de</strong>scoberta <strong>de</strong> um novo<strong>de</strong>pósito <strong>de</strong> ouro > 1Moz1www.LunaGold.com


www.LunaGold.comLUNA GREENFIELDS


www.LunaGold.comOBRIGADO!


ANEXO: FATOS SIGNIFICANTESBENEFICIO FISCAL DA SUDENEA operação <strong>de</strong> <strong>Aurizona</strong> foi aprovada para o benefício fiscal da SUDENE que proporcionou uma redução <strong>de</strong> 75% <strong>de</strong>impostos corporativos para os primeiros 10 anos <strong>de</strong> produção que começou em 2012. Isto da uma taxa efetivo <strong>de</strong>impostos para a operação <strong>Aurizona</strong> <strong>de</strong> 15.5%LINHA DE CRÉDITO WESTLBNo dia 26 <strong>de</strong> julho <strong>de</strong> 2011 a Luna Gold fechou um convênio <strong>de</strong> linha <strong>de</strong> crédito garantida prioritária <strong>de</strong> US$30milhões ( a “Linha”) com a WestLB AG. Esta Linha consta <strong>de</strong> em empréstimo a prazo garantida prioritária <strong>de</strong> US$ 20milhões (o “Empréstimo a Prazo”) e um empréstimo rotativo prioritário <strong>de</strong> US$ 10 milhões (equivalente em Reaisbrasileiros) (a “Linha Rotativa”).O Empréstimo a Prazo é um empréstimo <strong>de</strong> 5 anos com quotas bianuais que começarão no dia 1 <strong>de</strong> julho <strong>de</strong> 2012 eterá uma taxa <strong>de</strong> LIBOR mas 3.625%. A Linha Rotativa será quotizada em Reais brasileiros, vendo no dia 1 <strong>de</strong> julho <strong>de</strong>2014 e terá uma taxa do CDI mais 3.25%. Qualquer compromisso pen<strong>de</strong>nte sob a Linha Rotativa será plenamentequitado na data <strong>de</strong> fechamento no vencimento final.PAGO EM PRODUÇÃO VOLUMÉTRICAA Sandstorm Resources recebe 17% da produção da área <strong>de</strong>finida <strong>de</strong> <strong>Aurizona</strong> a um preço <strong>de</strong> US$400 por onça <strong>de</strong>ouro recebida. Sujeito a um aumento <strong>de</strong> 1% anualmente a partir do terceiro aniversário da data do início da lavracomercial na mina a céu aberto <strong>de</strong> Piaba. A Sandstorm seria obrigado a pagar a contribuição <strong>de</strong> capital pro-rata <strong>de</strong>17% e então paga US$ por onça pela produção subterrânea.2www.LunaGold.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!