18.05.2014 Views

AVALIAÇÃO DA CONFIABILIDADE COMPOSTA BASEADA EM ...

AVALIAÇÃO DA CONFIABILIDADE COMPOSTA BASEADA EM ...

AVALIAÇÃO DA CONFIABILIDADE COMPOSTA BASEADA EM ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

[42] R.B, Squires, “Economic dispatch of generation directly from power systems<br />

voltages and admittances”. Transactions AIEE, vol. 79, pp. 1235-1244, 1961.<br />

[43] J.D, Weber, “Implementation of a Newton-Based Optimal Power Flow into a<br />

Power System Simulation Environment”. Tese de mestrado, University of<br />

Wisconsin, 1995.<br />

[44] IEEE RTS Task Force of APM Subcommittee, “IEEE Reliability Test System”,<br />

IEEE PAS, vol. 98, no.6, pp. 2047-20654, Nov/Dez 1979.<br />

[45] Pender, T., “UML a Bíblia”, Ed. Campus/Elsevier, 2004.<br />

[46] EWEA, Wind Energy – The Facts, v.1 – Technology – EWEA, 2004.<br />

[47] Christensen, P., Giebel, G., “Availability of Wind Turbines in Remote Places. A<br />

Statistical and a Real-time View”, EWEC, Copenhagen, 2001.<br />

[48] Corotis, R. B., Sigi, A. B., Klein, J., “Probability Models of Wind Velocity and<br />

Magnitude and Persistence”, Solar Energy, v. 20, pp. 483-493, 1978.<br />

[49] Thomann, G. C., Barfield, M. J., “The Time Variation of Wind Speeds and<br />

Windfarm Power Output in Kansas”, IEEE Transactions on Energy Conversion, v.<br />

3, n. 1, pp. 44-49, March 1998.<br />

[50] IEEE RTS Task Force of APM Subcommittee, “IEEE Reliability Test System -<br />

1996”, IEEE PAS, vol. 14, no.3, pp. 1010-1020, August 1999.<br />

[51] Wenyuan, L., Billinton, R., “A Minimum Cost Assessment Method for<br />

Composite Generation and Transmission System Expansion Planning”, IEEE<br />

Transactions on Power System, v.8, n.2, pp.628-635, May 1993.<br />

[52] Amaral, T.S. “Avaliação da Confiabilidade Composta Sob o Enfoque do Bem<br />

Estar Utilizando Simulação Monte Carlo Não-Seqüencial”. Tese de Mestrado,<br />

Programa de Engenharia Elétrica - COPPE, Universidade Federal do Rio de Janeiro,<br />

Março 2008.<br />

[53] Cepel, Programa NH2 – Sistema Computacional para Análise Probabilística e<br />

Avaliação de Confiabilidade de Sistemas Elétricos, Versão 8.0, CEPEL, Rio de<br />

Janeiro, Dezembro 2006.<br />

[54] Borges, C. L. T. ; Falcão, D. M. ; Mello, J. C. O. ; Melo, A. C. G. . Composite<br />

Reliability Evaluation by Sequential Monte Carlo Simulation on Parallel and<br />

142

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!