<strong>CCR</strong> Ponte<br />

Activity<br />

Size of the project<br />

Positive impact<br />

Negative impact<br />

Activity<br />

Size of the project<br />

Positive impact<br />

Negative impact<br />

Construction of suspended pull-off areas on the Rio-Niterói Bridge<br />

Two suspended pull-off areas in operation, 80 meters long and 4.7 meters wide; one on the side toward Rio de Janeiro<br />

and the other toward Niterói.<br />

Improved safety and traffic flow, providing parking for support vehicles, making their action more agile in the case of<br />

an accident, as well as removing vehicles involved in accidents more quickly, consequently minimizing traffic backups.<br />

Natural traffic upsets during the construction phase.<br />

Construction of rubber defense mechanisms on the “dolphins” protecting the pillars of the Rio-Niterói<br />

Bridge<br />

Located on the main span and the secondary spans of the Rio-Niterói Bridge, the “dolphins” are masses of concrete<br />

that protect the pillars against strikes by boats.<br />

The main function of the rubber defense mechanisms is to protect boats in case they strike them, minimizing the impact<br />

and reducing the possibility of the accident causing an oil spill in Guanabara Bay.<br />

Natural traffic upsets during the construction phase.<br />

<strong>CCR</strong> AutoBAn, <strong>CCR</strong> ViaOeste and <strong>CCR</strong> NovaDutra<br />

Activity<br />

Construction of pedestrian overpasses totally adapted to the regulation regarding accessibility for the<br />

handicapped (NBR 9050/04)<br />

Size of the project Nine units: two on <strong>CCR</strong> AutoBAn, one on <strong>CCR</strong> NovaDutra, and six on <strong>CCR</strong> ViaOeste.<br />

Impactos positivos Improved conditions for comfort and safety for pedestrians to circulate and cross the highway, and services for the<br />

physically handicapped, to meet the needs of the bordering community.<br />

Negative impact Traffic upsets during the construction phase.<br />

Activity<br />

Construction of service roads on the highways of the concessionaires<br />

Size of the project Construction of 18 km of service roads, 12 km of which on <strong>CCR</strong> AutoBAn, 4 km on <strong>CCR</strong> NovaDutra, and 2 km on <strong>CCR</strong><br />

ViaOeste.<br />

Positive impact Improved safety, comfort and traffic flow for users of the highways in urban areas, separating local traffic from through<br />

traffic. These changes meet the requests of the city governments and, consequently, of local inhabitants.<br />

Negative impact Traffic upsets during the construction phase.<br />

<strong>CCR</strong> AutoBAn, <strong>CCR</strong> ViaOeste, <strong>CCR</strong> NovaDutra and <strong>CCR</strong> RodoNorte<br />

Activity<br />

Construction of bus stops<br />

Size of the project New bus stops with shelter, located on both sides of the nine pedestrian overpasses built build by the <strong>CCR</strong> AutoBAn,<br />

<strong>CCR</strong> ViaOeste, and <strong>CCR</strong> NovaDutra concessionaires, besides 18 new stops with shelter along the BR-376/PR, of the<br />

<strong>CCR</strong> RodoNorte concessionaire.<br />

Positive impact Improved safety conditions for the circulation of buses and comfort and safety for pedestrians, meeting the needs of<br />

the bordering community.<br />

Negative impact Traffic upsets during the construction phase.<br />

Activity<br />

Construction of an interchange where the Anhanguera, Bandeirantes, and Dom Pedro highways come<br />

together<br />

Size of the project Complex of five new viaducts and ramps, around km 103 of Anhanguera Highway, by the <strong>CCR</strong> AutoBAn concessionaire.<br />

Positive impact Improved safety, comfort and traffic flow at the intersection of three of the most important highways in the State of<br />

São Paulo, mainly for the users from bordering districts (local community).<br />

Negative impact Traffic upsets during the construction phase.<br />

<strong>CCR</strong> RodoNorte<br />

Activity<br />

Size of the project<br />

Positive impact<br />

Negative impact<br />

Restoration of pavement by the <strong>CCR</strong> RodoNorte concessionaire, with the use of ecological asphalt<br />

Rebuilding the structure of the pavement and applying a layer of asphalt made with rubber from old tires, at 61 km of<br />

the BR-376 that connects Ponta Grossa to Apucarana, in the State of Paraná.<br />

Recycling materials that are difficult to dump (old tires), as well as obtaining pavement with better safety conditions<br />

(adherence) for highway users, and greater comfort (less noise) for the bordering community.<br />

Traffic upsets during the construction phase.<br />

55