15.04.2013 Views

ANEXO I – ESPECIFICAÇÕES - BRb

ANEXO I – ESPECIFICAÇÕES - BRb

ANEXO I – ESPECIFICAÇÕES - BRb

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Montante (a)<br />

CONCORRÊNCIA DIRAT/CPLIC 007/2006 6<br />

Descrição<br />

TABELA "Z" - TARIFAS PROFISSIONAIS DE MANUTENÇÃO<br />

Pintor Pedreiro Chaveiro<br />

Indic. Custo Indic. Custo Indic. Custo Indic. Custo Indic. Custo<br />

Regime 44/sem 574,20 44/sem 574,20 44/sem 574,20 44/sem 420,20 44/sem 3.500,00<br />

Reserva Técnica 15% 86,13 15% 86,13 15% 86,13 15% 63,03 15% 525,00<br />

Encargos sociais 72% 472,43 72% 472,43 72% 472,43 72% 345,72 72% 2.879,66<br />

Total (a ): 1.132,76 1.132,76 1.132,76 828,95 6.904,66<br />

Montante (b)<br />

Treinamento *: 700,00 58,33 700,00 58,33 950,00 79,17 950,00 79,17 700,00 58,33<br />

Uniformização **: 280,00 23,33 280,00 23,33 280,00 23,33 280,00 23,33 280,00 23,33<br />

Ferramentas ***: 180,00 7,50 223,00 9,29 0,00 0,00 0,00 0,00 0,00 0,00<br />

EPI ****: 160,00 13,33 160,00 13,33 160,00 13,33 160,00 13,33 160,00 13,33<br />

Vale transporte *****: 6,00 90,00 6,00 90,00 6,00 90,00 6,00 90,00 6,00 90,00<br />

Alimentação/ticket *****: 7,50 112,50 7,50 165,00 7,50 165,00 7,50 165,00 7,50 165,00<br />

Ferramentas de Uso Geral 7.980,00 33,25 7.980,00 33,25 7.980,00 33,25 7.980,00 33,25 7.980,00 33,25<br />

Serviços emergenciais:<br />

Serviços especializados:<br />

Outros:<br />

Total (b) : 338,25 392,54 404,08 404,08 383,25<br />

Total (a) + (b) : 1.471,01 1.525,30 1.536,84 1.233,04 7.287,91<br />

Taxa de Administração<br />

X <strong>–</strong> Taxa de Adm (c)=% X (a+b) 5% 73,55 5% 76,27 5% 76,84 5% 61,65 5% 364,40<br />

Lucro (d) =% X (a+b) 20% 294,20 20% 305,06 20% 307,37 20% 246,61 20% 1.457,58<br />

Subtotal (st1) = (c)+(d) : 367,75 381,33 384,21 308,26 1.821,98<br />

Total = (a)+(b)+(c)+(d) : 1.838,76 1.906,63 1.921,05 1.541,30 9.109,89<br />

Impostos sobre G:<br />

Auxiliar de<br />

Manutenção<br />

PIS : 5% 91,94 5% 95,33 5% 96,05 5% 77,06 5% 455,49<br />

COFINS : 2,33% 42,84 2,33% 44,42 2,33% 44,76 2,33% 35,91 2,33% 212,26<br />

ISS : 5% 91,94 5% 95,33 5% 96,05 5% 77,06 5% 455,49<br />

IRRF : 1,50% 27,58 1,50% 28,60 1,50% 28,82 1,50% 23,12 1,50% 136,65<br />

Outros: 0,00 0,00 0,00 0,00 0,00<br />

Total dos impostos (I): 254,30 263,69 265,68 213,16 1.259,90<br />

Total mensal (I) + (G) : 2.093,06 2.170,31 2.186,74 1.754,46 10.369,79<br />

* : Treinamento anual valor máximo<br />

** : Prever jogo de uniformes a cada 6 meses (bota, calça, camisa)<br />

*** : Caixa de ferramentas prevista especificações durabilidade de 2 anos<br />

**** EPI : (Capacete, luvas, cintos, óculos, protetores auriculares)<br />

***** Plantão 12 x 36 (15 dias mês), Outros 22 dias em média<br />

Ferramentas de Uso Geral, estão sendo distribuídas nas tarifas dos profissionais de operação, durabilidade de 24 meses<br />

X-Nesta taxa deve ser prevista taxa de remuneração para atividades de RH, compras, Almoxarifado, Administração;<br />

Engenheiro<br />

Eletricista

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!