User Manual - Data Migration - DK - Energinet.dk
User Manual - Data Migration - DK - Energinet.dk
User Manual - Data Migration - DK - Energinet.dk
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Brugermanual – <strong>Data</strong>migreringVersion 1.0.4Dato 13. april 2012Error Code Validation File Type Error Messagemigration area.DM-208Metering point in the METERDATA file hasnot been delivered in ALL_CONNECTION fileyet (or has been deleted in the past).METERDATAMetering point in the METERDATA file has not beendelivered in ALL_CONNECTION file or has been deleted. The records for thismetering point will be rejected.DM-209DM-211DM-213DM-214No MASTERDATA available for this meteringpoint between start and end date of meterdata.Metering point is not yet present, thereforeit cannot be deleted.The metering grid area of a metering pointmust belong to the correct grid operator.The metering point has been delivered byanother grid operator.METERDATADELETE_CONNECTIONDELETE_CONNECTIONDELETE_CONNECTIONNo MASTERDATA available for between start and enddate of meter data. The records delivered in the METERDATA file for thismetering point will be rejected.**Metering point is not yet present, therefore it cannot bedeleted.Metering grid area for metering point doesn't belong to grid operator .***The metering point has been delivered by another gridoperator .DM-216 The start time for meter data is mandatory. METERDATA Meter data start time is missing for metering point .DM-217 The end time for meter data is mandatory. METERDATA Meter data end time is missing for metering point .DM-218The meter data number of values for a timeserie doesn't match the meter readingMETERDATAThe meter data number of values for a time series doesn't match the meterreading occurrence for metering point .occurrence of the master dataDM-219The quantity status for meter data ismandatory.METERDATAMeter data quantity status is missing for metering point .DM-220The quantity status for meter data hasdomain values 56 (Estimated), E01(Registered).The energy quantity for meter data ismandatory.METERDATAMeter data quantity status for metering point has wrong value (outside domain).DM-221METERDATAMeter data energy quantity is missing for metering point.DM-223 Overlap in meter data periods is not allowed METERDATA Meter data record for MeteringPoint and isDM-224The end time for meter data cannot be inthe future.METERDATArejected. There is already a record present with an overlapping period.The end time for meter data record for MeteringPoint and start time is rejected. The end time is in thefuture.side 51 af 60