13.07.2015 Views

User Manual - Data Migration - DK - Energinet.dk

User Manual - Data Migration - DK - Energinet.dk

User Manual - Data Migration - DK - Energinet.dk

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Brugermanual – <strong>Data</strong>migreringVersion 1.0.4Dato 13. april 2012Error Code Validation File Type Error Messagemigration area.DM-208Metering point in the METERDATA file hasnot been delivered in ALL_CONNECTION fileyet (or has been deleted in the past).METERDATAMetering point in the METERDATA file has not beendelivered in ALL_CONNECTION file or has been deleted. The records for thismetering point will be rejected.DM-209DM-211DM-213DM-214No MASTERDATA available for this meteringpoint between start and end date of meterdata.Metering point is not yet present, thereforeit cannot be deleted.The metering grid area of a metering pointmust belong to the correct grid operator.The metering point has been delivered byanother grid operator.METERDATADELETE_CONNECTIONDELETE_CONNECTIONDELETE_CONNECTIONNo MASTERDATA available for between start and enddate of meter data. The records delivered in the METERDATA file for thismetering point will be rejected.**Metering point is not yet present, therefore it cannot bedeleted.Metering grid area for metering point doesn't belong to grid operator .***The metering point has been delivered by another gridoperator .DM-216 The start time for meter data is mandatory. METERDATA Meter data start time is missing for metering point .DM-217 The end time for meter data is mandatory. METERDATA Meter data end time is missing for metering point .DM-218The meter data number of values for a timeserie doesn't match the meter readingMETERDATAThe meter data number of values for a time series doesn't match the meterreading occurrence for metering point .occurrence of the master dataDM-219The quantity status for meter data ismandatory.METERDATAMeter data quantity status is missing for metering point .DM-220The quantity status for meter data hasdomain values 56 (Estimated), E01(Registered).The energy quantity for meter data ismandatory.METERDATAMeter data quantity status for metering point has wrong value (outside domain).DM-221METERDATAMeter data energy quantity is missing for metering point.DM-223 Overlap in meter data periods is not allowed METERDATA Meter data record for MeteringPoint and isDM-224The end time for meter data cannot be inthe future.METERDATArejected. There is already a record present with an overlapping period.The end time for meter data record for MeteringPoint and start time is rejected. The end time is in thefuture.side 51 af 60

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!