Grenland Group ASA
Grenland Group ASA
Grenland Group ASA
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Fabrikasjon av subsea template/manifolds<br />
V/Runar Rugtvedt – <strong>Grenland</strong> <strong>Group</strong> <strong>ASA</strong><br />
Seminar – Subsea Produksjonsanlegg<br />
Ingeniørenes hus, 9. mars 2006
<strong>Grenland</strong> <strong>Group</strong> <strong>ASA</strong>
Business Areas<br />
• Oil & Gas Division<br />
• Marine & Process Solutions<br />
• Offshore Modules<br />
• Subsea<br />
• Maintenance, Modification & Operation<br />
• Offshore Products<br />
• Process & Industry Division<br />
• Aluminium Smelters<br />
• Landbased Industry
Harstad<br />
Karmøy<br />
Stavanger<br />
<br />
<br />
<br />
<br />
<br />
Oslo<br />
Drammen<br />
Tønsberg<br />
Sandefjord<br />
Langesund<br />
Stathelle<br />
Skien<br />
Porsgrunn<br />
Notodden<br />
<strong>Grenland</strong> <strong>Group</strong> <strong>ASA</strong><br />
GG locations<br />
GG representative offices<br />
<br />
<br />
Mexico<br />
Houston<br />
Aberdeen <br />
<br />
<br />
Szczecin, Poland<br />
Spain <br />
Qatar<br />
<br />
India<br />
<br />
Kuala Lumpur<br />
<br />
Korea<br />
Ningbo, China<br />
<br />
Brasil
<strong>Group</strong> Capacities<br />
Engineering & Procurement Resources<br />
Personnel Resources:<br />
55<br />
45<br />
35<br />
25<br />
15<br />
5<br />
-5<br />
Piping & Arrangement<br />
Electrical, Instrumentation, Telecom<br />
Project Managers<br />
Process Design<br />
Drilling<br />
Structural & Marine Technology<br />
Procurement & Project Adm.<br />
Safety & Outfitting<br />
Mechanical & Hydraulics<br />
Total Employees: 900<br />
Administration 20<br />
Engineers; Ph.D, M.Sc., B.Sc. 250<br />
Fabrication/Project management 30<br />
Fabrication & installation labour 600
Houston<br />
Sandefjord<br />
Kuala Lumpur<br />
Stavanger<br />
Engineering<br />
• Studies<br />
• Feasibility<br />
• Conceptual<br />
• FEED<br />
• Basic and Detail<br />
Engineering<br />
• Process<br />
• Piping Arrangement / 3D<br />
• Electrical & Instrument<br />
• Structural & Marine<br />
• Technical Safety / HSE<br />
• Riser & Mooring Analysis<br />
• Management<br />
• Project Management<br />
• Procurement<br />
• Site Supervision<br />
• Commissioning<br />
• AsIs®<br />
• 3D Laser Scanning<br />
• AIMS Data Management
Main Fabrication<br />
Yards, Norway<br />
Langesund<br />
Tønsberg<br />
Skudeneshavn
Oil & Gas<br />
Deliverables<br />
• Topside Modules<br />
• Drilling Topsides<br />
• Process Packages<br />
• Utility Packages<br />
• Production/Offloading<br />
Systems<br />
• Subsea Installations
Offshore Products<br />
P007 Multi Service Vessel<br />
Deep Drill 7500<br />
HiWay ® Crew Transfer System<br />
BLAFRO ®<br />
Heave Arrestor<br />
Burner Boom<br />
Minox Deox System
Ongoing projects - Oil & Gas Division<br />
• Subsea ( Tønsberg/<strong>Grenland</strong>)<br />
T<br />
• Tordis Separation Station<br />
• Tyrihans Field-<br />
• 5 template/manifold systems<br />
• Oseberg Delta<br />
• Vigdis Extention<br />
• Ormen Lange Well Jumper<br />
• Various FMC projects<br />
• Loading Bouy - Alvheim 520 tons<br />
• Loading Bouy – KMZ- Bergesen 500 tonn<br />
• Loading Bouy- Volve, refurbishment
Ongoing projects - Oil & Gas Division<br />
• Offshore Modules (Tønsberg/<strong>Grenland</strong>)<br />
• Alvheim Topside- Pipe Prefabrication<br />
• Minox Technology ,<br />
• Deoxygenation Package– Agbami, , Nigeria<br />
• Epcon Offshore- Produced Water Cleaning Packages<br />
• Bariel Alpha<br />
• Alba North<br />
• Brae
Ongoing projects - Oil & Gas Division<br />
• Marine & Process Solutions<br />
<strong>Grenland</strong> Framnæs<br />
( Sandefjord/Tønsberg)<br />
nsberg)<br />
• KMZ- Bergesen World Wide/Kanfa<br />
• Separatiom module<br />
M10<br />
• Gas Compression module<br />
M60<br />
• Gas Treatment module<br />
M45<br />
• Flare module<br />
M30<br />
• Engineering of ship modification,<br />
inter module and tie-in<br />
in off systems<br />
- FPSO<br />
• Stena Drill Ship – Topside, Samsung<br />
• Mosvold Drill Ship – Topside, Samsung<br />
• Blackford Dolphin- Fred Olsen Energy<br />
• Statfjord Brannvann, AkerKværner<br />
rner,<br />
• PGS- FPSO modifisering,<br />
• Various projects
Subsea Template /manifold systems<br />
FMC Kongsberg Subsea designs<br />
Manifold<br />
Manifold<br />
Template/manifold<br />
with suction anchors<br />
Host template<br />
CCF - structure<br />
ITS – Integrated template structure
Other subsea structures<br />
SDU- Subsea Distribution units<br />
Subsea Separation Module, FMC/Statoil<br />
Satellite ITS – water injection/FMC<br />
Riser Base, Åsgard, Statoil<br />
Loading Bouy – APL, Arendal<br />
Loading System. APL
Prosjektledelse<br />
• Forespørsel / tilbud<br />
• Intensjonsavtale – LIT<br />
• Teknisk klarifisering, løsninger/materialvalg etc.<br />
• Mottak av spesifikasjoner, tegninger, etc.<br />
• Prosjektplanlegging<br />
•Etablering av prosjektorganisasjon<br />
•Valg av byggesteder<br />
•Fremdriftplaner/ kostplaner<br />
•Ressursallokering, internt<br />
• Kontraktsinngåelse<br />
•Kick-off<br />
• Kundebesøk, SHE – audits, etc.<br />
• Materialinnkjøp<br />
• Underleveranser/ bestillinger<br />
• Mottak av CPI’er ( kundelevert utstyr)<br />
• Produksjonsoppfølging<br />
• Endringsarbeid / avvik<br />
• Levering<br />
• Dokumentasjon
Stålfabrikasjon- Template/manifold strukturer<br />
• Utarbeidelse av produksjonsunderlag, arbeidspakker<br />
• Materialmottak, kontroll<br />
• Kutting / fuging av rør/plater og profiler<br />
•Valsing<br />
• Sammenstilling<br />
• Målekontroll<br />
•Sveising<br />
• NDT - kontroll<br />
• Maskinering<br />
•Underleveranser
Overflatebehandling<br />
• Sandblåsing<br />
• Maling 3-4 strøk ( spec.)<br />
• Kontroll/dokumentasjon<br />
•Touch -up<br />
•Merking<br />
Isolering<br />
•Gummiering (Vikotherm)<br />
•Polybrid ( Polyuretan)
Manifold produksjon<br />
• Bunn- og toppstrukturer prefabrikeres<br />
• Strukturer maskineres<br />
• Strukturer males<br />
•Prefabrikasjon av rør<br />
• Small bore og large bore<br />
Carbon steel, Duplex, superduplex<br />
Inconell cladded carbon<br />
• Montasje av rør og ventiler<br />
• Montasje av sekundærstål<br />
• Tubing, instrumentmontasje<br />
•NDT kontroll<br />
• Punch out
Manifold produksjon – (FAT)<br />
• Flushing/rengjøring<br />
• Trykkprøving<br />
• Pig- verifisering, header pipes<br />
• Funksjonstesting<br />
• Tagging, merking, touch –up<br />
• Mekanisk ferdigmontering<br />
• Kontroll<br />
• Dokumentasjon<br />
• Final punch out
Transport/ handling<br />
• Intern transport<br />
• Ekstern transport<br />
• Design, beregning av sea-fastening<br />
• Sea- fastening<br />
•Sjøtransport
Site integration test ( SIT)<br />
Utføres av kunde<br />
• Testing av komplett utstyr<br />
• Oppkoplingtester<br />
• Funksjonstesting<br />
• Assistanse fra GG<br />
•Fasiliteter<br />
•Personell<br />
•Utstyr<br />
•Kraner, transport
Ormen Lange Project<br />
Kunde: FMC Kongsberg Subsea<br />
Operatør: Norsk Hydro<br />
Fabrikasjon: <strong>Grenland</strong> <strong>Group</strong> <strong>ASA</strong>, Tønsberg<br />
Levering: August 2005<br />
2 stk manifolder 450 tonn pr. stk<br />
2 stk templater 700 tonn pr. stk<br />
1 stk PLET 300 tonn pr. stk<br />
Well - jumpers<br />
Testing
Ormen Lange Project<br />
Levert på tid<br />
Levert på budsjett<br />
Levert på kvalitet<br />
Levert uten skader
Ormen Lange Project<br />
SIT- Site Integration Test<br />
• FMC hovedansvarlig<br />
• Testing av alt utstyr som skal<br />
koples inn på havbunn
Ormen Lange template/manifolds<br />
Utlasting Seafastening Transport Installasjon
Takk for<br />
oppmerksomheten !<br />
www.grenlandgroup.com