06.03.2014 Views

GASSTRANSPORT FRA NORGE TIL EUROPA -Transport of ... - NTNU

GASSTRANSPORT FRA NORGE TIL EUROPA -Transport of ... - NTNU

GASSTRANSPORT FRA NORGE TIL EUROPA -Transport of ... - NTNU

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Fag TPG 4140 NATURGASS<br />

<strong>NTNU</strong><br />

Gasstransport fra Norge til Europa<br />

1<br />

Hans Jørgen Dahl, dr.ing<br />

Pr<strong>of</strong>essor II - <strong>NTNU</strong><br />

Forskningssjef - Gassco AS<br />

hjd@gassco.no<br />

07.09.2006<br />

1<br />

6-Sep-06<br />

H. J. Dahl


Tema<br />

• Introduksjon<br />

• <strong>Transport</strong>systemet<br />

• Eier og operatør rollen<br />

• Regler for bruk av transportsystemet<br />

• Driftserfaringer<br />

2<br />

2<br />

6-Sep-06<br />

H. J. Dahl


Verdikjeder for naturgass<br />

Våtgass<br />

Gass<br />

prosessering<br />

Gasstransportsystemet<br />

Salgsgass<br />

(Rør, LNG,CNG)<br />

Terminal<br />

Kraftverk<br />

Hushold.<br />

Induistri<br />

Petrokjemi<br />

Fuel<br />

NGL<br />

3<br />

Gass<br />

reformering<br />

Service<br />

Bioprotein<br />

Syncrude<br />

Metanol<br />

Ammoniakk<br />

Synfuel Kjemikalier Kjemisk<br />

industri<br />

Fuel<br />

Olefiner(MTBE,<br />

MTO, GTO)<br />

Kjemisk<br />

industri<br />

3<br />

6-Sep-06<br />

H. J. Dahl


Definisjoner<br />

Metan CH 4<br />

Etan C 2<br />

H 6<br />

Natur<br />

gass<br />

Propan C 3<br />

H 8<br />

iso-Butan i-C 4<br />

H 10<br />

normal Butan 4n-C 4<br />

H 10<br />

LPG<br />

NGL<br />

Nafta<br />

Kondensat<br />

4<br />

6-Sep-06<br />

Våtgass (rikgass)<br />

Gassen består stort sett av metan, etan og LPG, men har innslag av nafta og kondensat.<br />

Dette gjør at gassen har et duggpunkt som vil medføre kondensering ved normale betingelser.<br />

Tørrgass<br />

Gassen består stort sett av metan, etan og noe LPG.<br />

Kondensering vil ikke inntreffe ved normale driftsbetingeser.<br />

H. J. Dahl


5<br />

5<br />

6-Sep-06<br />

H. J. Dahl


Scenarios for future gas sales<br />

6<br />

Source: NPD/2003<br />

6<br />

6-Sep-06<br />

H. J. Dahl


7<br />

7<br />

6-Sep-06<br />

H. J. Dahl


Interoperability<br />

8<br />

8<br />

6-Sep-06<br />

H. J. Dahl


Russisk forsyning av gass til Europa<br />

9<br />

9<br />

6-Sep-06<br />

H. J. Dahl


Gassforsyningen<br />

til Europa<br />

kjennetegnes ved:<br />

Utviklingstrekk for gassleveransene<br />

Redusert<br />

egenproduksjon<br />

Økende<br />

avhengighet av<br />

gass fra langtliggende<br />

felt<br />

10<br />

10<br />

Dyrere produksjon<br />

og transport<br />

BB/HJD<br />

6-Sep-06<br />

Source: Gasunie<br />

H. J. Dahl


11<br />

11<br />

6-Sep-06<br />

H. J. Dahl


Norske gassleveranser 2005<br />

12<br />

12<br />

6-Sep-06<br />

H. J. Dahl


Tema<br />

• Introduksjon<br />

• <strong>Transport</strong>systemet<br />

• Eier og operatør rollen<br />

• Regler for bruk av transportsystemet<br />

• Driftserfaringer<br />

13<br />

13<br />

6-Sep-06<br />

H. J. Dahl


Systemet består av<br />

• Rikgass systemer<br />

• Tørrgass systemer<br />

• Behandlingsterminaler<br />

• Ilandføringsterminaler<br />

14<br />

• Stigerørsplattformer<br />

• <strong>Transport</strong><br />

kontrollsenter på<br />

Bygnes<br />

14<br />

6-Sep-06<br />

H. J. Dahl


Rørinspeksjon, reparasjon og modifikasjon<br />

15<br />

15<br />

6-Sep-06<br />

H. J. Dahl


Ormen Lange og Langeled<br />

16<br />

16<br />

6-Sep-06<br />

H. J. Dahl


Markeds- og produksjonsprognoser UK<br />

160<br />

Last year's UKOOA supply estimate<br />

140<br />

Demand Estimate<br />

120<br />

GSm 3 /year (Bcm)<br />

100<br />

80<br />

60<br />

17<br />

40<br />

Latest Latest UKOOA<br />

supply estimate<br />

(preliminary)<br />

20<br />

0<br />

17<br />

6-Sep-06<br />

2000<br />

2005<br />

2010<br />

2015<br />

2020<br />

H. J. Dahl


Langeled, en ny Norsk motorvei for gass til Europa<br />

• Fra Nyhamna til Easington UK<br />

NCS tie-in node<br />

at Sleipner connecting<br />

northern pipeline and<br />

southern pipeline into<br />

the integrated system<br />

18<br />

<br />

1166 km<br />

Northern leg: 42”<br />

Southern leg: 44”<br />

SLEIPNER – EASINGTON<br />

42”<br />

540 Km<br />

Total distance<br />

1166 km<br />

distance 1166 km<br />

18<br />

6-Sep-06<br />

H. J. Dahl


Tema<br />

• Introduksjon<br />

• <strong>Transport</strong>systemet<br />

• Eier og operatør rollen<br />

• Regler for bruk av transportsystemet<br />

• Driftserfaringer<br />

19<br />

19<br />

6-Sep-06<br />

H. J. Dahl


Gassled<br />

20<br />

20<br />

6-Sep-06<br />

H. J. Dahl


Gasscos <strong>of</strong>fentlige og privatresslige rolle<br />

• Gassco en systemoperatør ISO (Independent System Operator)<br />

Kapasitetsadministrasjon<br />

21<br />

Teknisk drift<br />

System drift<br />

Lisens administrasjon<br />

Infrastrukturutvikling<br />

Kommersiell drift<br />

21<br />

6-Sep-06<br />

H. J. Dahl


Gassco’s role as ISO<br />

Gassco is an<br />

Independent System Operator (ISO)<br />

Production<br />

Processing<br />

ISO<br />

22<br />

• Dispatching<br />

• Physical flow monitoring<br />

• Instructing other operators<br />

• Checks nominations<br />

Receiving<br />

22<br />

6-Sep-06<br />

H. J. Dahl


Participants and roles in the Gas Value Chain<br />

Field Operator<br />

Upstream Shipper<br />

Gassco<br />

TSP<br />

23<br />

Downstream Operator<br />

Seller<br />

Downstream shipper<br />

23<br />

WG1<br />

6-Sep-06<br />

Buyer<br />

Technical Service Providers (TSP)<br />

H. J. Dahl


<strong>Transport</strong>planprosessen<br />

Årlig prosess; utarbeidelse av 10-års transportbehov<br />

prognose<br />

Grunnlagsdata<br />

Skipningsplan<br />

24<br />

<strong>Transport</strong>analyser<br />

Konsekvensanalyser<br />

DG 1<br />

Start<br />

mulighetsstudie<br />

24<br />

6-Sep-06<br />

H. J. Dahl


Infrastrukturutvikling – gass i Norge<br />

25<br />

25<br />

6-Sep-06<br />

H. J. Dahl


51 GIE members<br />

26<br />

26<br />

6-Sep-06<br />

H. J. Dahl


Tema<br />

• Introduksjon<br />

• <strong>Transport</strong>systemet<br />

• Eier og operatør rollen<br />

• Regler for bruk av transportsystemet<br />

• Driftserfaringer<br />

27<br />

27<br />

6-Sep-06<br />

H. J. Dahl


Hierarchy <strong>of</strong> source documents<br />

EU directive in natural gas market<br />

EEA agreement<br />

Petroleum Act<br />

Royal Decree<br />

Regulation<br />

Terms and Conditions<br />

Appendixes<br />

Shipper Manual Booking Manual<br />

(Principles)<br />

28<br />

Increasing level <strong>of</strong> details<br />

28<br />

6-Sep-06<br />

H. J. Dahl


Two questions related to competition<br />

Is Yes<br />

competition<br />

possible ?<br />

No<br />

Is competition desirable ?<br />

Yes No<br />

The normal<br />

29<br />

case<br />

Barrier to<br />

entry<br />

Cream<br />

skimming<br />

Natural<br />

monopoly<br />

29<br />

6-Sep-06<br />

H. J. Dahl


Basic principles <strong>of</strong> regulating a natural monopoly<br />

Liberalization<br />

– increased<br />

competition<br />

between Sellers<br />

in the Market<br />

Producer (Seller)<br />

30<br />

Pipeline network<br />

Market (Buyers)<br />

Increased<br />

regulation<br />

- on access<br />

rules and<br />

tariff<br />

30<br />

6-Sep-06<br />

H. J. Dahl


Some articles <strong>of</strong> the EU gas directive<br />

• Eligible customers and natural gas undertakings<br />

• Market opening<br />

• Upstream pipeline networks<br />

• Unbundling <strong>of</strong> accounts<br />

• Negotiated tariffs or published tariffs<br />

• Dispute settlement authority<br />

31<br />

31<br />

6-Sep-06<br />

H. J. Dahl


Capacity Products<br />

• LT Long term capacity – Annual strip.<br />

• MT Medium term capacity – Monthly strip.<br />

• ST Short term capacity – Daily and within day.<br />

• MT and ST may also be booked,<br />

32<br />

on a first-come-first-served<br />

(FCFS) basis after closure <strong>of</strong> the booking window & allocations<br />

have been completed.<br />

• A secondary market for capacity<br />

32<br />

6-Sep-06<br />

H. J. Dahl


Booking schedule<br />

33<br />

33<br />

6-Sep-06<br />

H. J. Dahl


Basic elements in the process <strong>of</strong> booking capacity<br />

Welcome View capacities Product selection<br />

34<br />

Selected product<br />

Selected period<br />

Make Booking<br />

34<br />

6-Sep-06<br />

H. J. Dahl


Tariff zones<br />

Tune<br />

Huldra<br />

Oseberg<br />

Kv.b.Troll<br />

Vestp.<br />

Kollsnes<br />

Sture<br />

Gullfaks<br />

"A"<br />

Statfjord<br />

Veslefrikk<br />

Brage<br />

"B"<br />

Mikkel<br />

ÅSG<br />

Norne<br />

Heidrun<br />

Tjellb.<br />

35<br />

Sleipner<br />

St Fergus<br />

Dunkerque<br />

Zeebrügge<br />

EXT:<br />

Extraction<br />

RESL:<br />

Refinement ethane, incl. storage and loading<br />

CSL:<br />

Stabilisation condensate, incl. storage and loading<br />

FE:<br />

Fractionation ethane<br />

FSL:<br />

Fractionation propane/butanes/naphta incl. storage and loading<br />

Heimdal<br />

Z1<br />

Snurrev.<br />

EXT<br />

Grane<br />

Kårstø<br />

Draupner/<br />

Jotun/<br />

Balder<br />

Ek<strong>of</strong>isk<br />

Dornum<br />

Emden<br />

35<br />

ÅT<br />

RESL<br />

CSL<br />

FE<br />

FSL<br />

Draugen<br />

Outside system boundary<br />

Radial entry point<br />

Radial exit point, pay a to b tariff<br />

Rich/dry point, pay extraction tariff<br />

Process exit point, pay fractionation tariff<br />

Dry gas entry point, pay entry tariff<br />

Gas exit point, pay exit tariff<br />

6-Sep-06<br />

H. J. Dahl<br />

"D"<br />

"C"<br />

The Objective:<br />

"Area"<br />

• efficient management <strong>of</strong> the system<br />

• efficient development <strong>of</strong> the system<br />

• simplified commercial structure<br />

• reduced conflicts <strong>of</strong> interest between<br />

companies<br />

• lower tariffs and costs for shippers


Tema<br />

• Introduksjon<br />

• <strong>Transport</strong>systemet<br />

• Eier og operatør rollen<br />

• Regler for bruk av transportsystemet<br />

• Driftserfaringer<br />

36<br />

36<br />

6-Sep-06<br />

H. J. Dahl


Sesongvariasjoner i gassforbruket<br />

Supply<br />

Gass fra lager<br />

<strong>Transport</strong>kap. uten lager<br />

Forbruk<br />

<strong>Transport</strong>kap.med lager<br />

37<br />

Gass til lager<br />

Last faktor: midlere daglig konsum /<br />

spiss dag belastning<br />

Last faktorer:<br />

• Husholdning (UK): Lf 0.25 – 0.4<br />

• Service: Lf 0.4 – 0.5<br />

• Industri: Lf 0.6 – 0.8<br />

• Kraftgen: Lf 0.8 – 0.9 (Base load plants)<br />

Pga. svingningene i gassforbruket og<br />

leveransesikkerhet er det bygget ut stor<br />

lagerkapasitet i Europa. Lagrene er i<br />

uttømte reservoarer, i utvaskede<br />

saltkaverner eller i form av LNG lagring.<br />

Okt Jan April Jul<br />

Okt<br />

37<br />

6-Sep-06<br />

H. J. Dahl


38<br />

Sesongvariasjoner Annual Delivery i gassleveransene<br />

Variations<br />

Ek<strong>of</strong>isk/Valhall Draupner>Norpipe Dunkerk Zeebrugge Emden Dornum Vesterled<br />

250<br />

200<br />

150<br />

100<br />

38<br />

Leveranser [MSm³/d]<br />

50<br />

0<br />

01.04.2001<br />

01.05.2001<br />

01.06.2001<br />

01.07.2001<br />

01.08.2001<br />

01.09.2001<br />

01.10.2001<br />

01.11.2001<br />

01.12.2001<br />

01.01.2002<br />

01.02.2002<br />

01.03.2002<br />

01.04.2002<br />

01.05.2002<br />

01.06.2002<br />

01.07.2002<br />

01.08.2002<br />

01.09.2002<br />

01.10.2002<br />

01.11.2002<br />

01.12.2002<br />

01.01.2003<br />

01.02.2003<br />

01.03.2003<br />

01.04.2003<br />

Dato<br />

6-Sep-06 H. J. Dahl


39<br />

Fasediagram for naturgass<br />

CP (kritisk punkt)<br />

C B<br />

(cricondenbar)<br />

Duggpunktsllinjen<br />

39<br />

Trykk<br />

90 %<br />

væske<br />

KokepunktslinjenCP<br />

C T<br />

(cricondenterm)<br />

10 %<br />

væske<br />

Temperatur<br />

6-Sep-06 H. J. Dahl


Kvalitetsaspekter ved naturgassen<br />

40<br />

Sammensetning<br />

brønnsatrøm<br />

Komp. mol %<br />

N2 0.358<br />

CO2 3.259<br />

C1 79.634<br />

C2 6.706<br />

C3 2.790<br />

iC4 0.448<br />

nC4 0.940<br />

iC5 0.329<br />

nC5 0.393<br />

C6 0.508<br />

C7 0.831<br />

C8 0.892<br />

C9 0.519<br />

C10-C11 0.834<br />

C12 0.205<br />

C13 0.345<br />

C14 0.231<br />

C15 0.164<br />

C16-C17 0.293<br />

C18 0.134<br />

C19 0.109<br />

C20 0.008<br />

6-Sep-06<br />

Trykk [barg]<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

Fasediagram for et olje/kondensat reservoar.<br />

0<br />

40<br />

Separatorgass<br />

-100 0 100 200 300 400 500<br />

Temperatur [C]<br />

Brønnstrøm<br />

1.trinns separasjon<br />

Brønnstrøm<br />

Brønnstrømmen i plansjen separeres i en lettolje/<br />

kondensat strøm og en våtgass strøm. Dersom ikke trykket<br />

heves over cricondenbar vil væske kondensere ut. Da må<br />

systemet være designet for flerfasestrømning.<br />

Sammensetning<br />

etter separator<br />

Komp. mol %<br />

N2 0.387<br />

CO2 3.365<br />

C1 84.421<br />

C2 6.734<br />

C3 2.600<br />

iC4 0.387<br />

nC4 0.774<br />

iC5 0.236<br />

nC5 0.267<br />

C6 0.263<br />

C7 0.281<br />

C8 0.193<br />

C9 0.062<br />

C10-C11 0.024<br />

C12 0.001<br />

C13 5.4e-4<br />

C14 6.3e-5<br />

H. J. Dahl


Kvalitetsaspekter ved naturgassen<br />

Salgsgass krav:<br />

WI [MJ/Sm 3 ]<br />

52.8<br />

51.41<br />

48.3<br />

48.14<br />

36.9<br />

Continental spec.<br />

41<br />

UK spec<br />

42.3<br />

38.1<br />

43.7<br />

• Brennverdi<br />

GCV (Gross calorific value)<br />

• Wobbe Index<br />

WI =<br />

GCV<br />

ρ<br />

Kompatibiliteten til en gassbrenner<br />

• CO2 innhold: maks. 2.5 % mol<br />

• Vannduggpunkt: -12 C, 69 barg<br />

GCV [MJ/Sm 3 ]<br />

• Hydrokarbonduggpunkt:<br />

-3 C, 69 barg<br />

41<br />

6-Sep-06<br />

H. J. Dahl


Gassenes brennverdi og leveransekrav<br />

GCV nomination<br />

GCV in MJ/Nm³<br />

Zeebrugge Dunkerque NPT EMS Dornum Vesterled<br />

46<br />

Valhall<br />

± 3.0 %<br />

45<br />

Ek<strong>of</strong>isk<br />

44<br />

Jotun<br />

Oseberg<br />

±2.5% ±2.5%<br />

42<br />

44.1<br />

± 2.0% ± 2.0%<br />

43<br />

SLØ<br />

SLV<br />

Huldra<br />

43.1<br />

42<br />

41<br />

Sone 7<br />

Sone 2<br />

Troll<br />

42.1 42.1<br />

41.8<br />

42.2<br />

40<br />

42<br />

6-Sep-06<br />

C2001<br />

42.1 42.1<br />

44.3 42.9 42.0<br />

H. J. Dahl


Field locations<br />

Oseberg<br />

Statfjord<br />

Statfjord E/N<br />

Snorre<br />

Vigdis<br />

Gullfaks<br />

Borg<br />

Tordis<br />

Snorre<br />

Vigdis<br />

Veslefrikk<br />

Brage<br />

Huldra<br />

Åsgard B<br />

Mikkel<br />

Norne<br />

Heidrun<br />

Draugen<br />

St. Fergus<br />

Sleipner E<br />

Sleipner W<br />

Sigyn<br />

Gungne<br />

Grane<br />

Heimdal<br />

Huldra<br />

Vale<br />

Skirne<br />

43<br />

Jotun<br />

Balder<br />

Ringhorn<br />

Draupner<br />

Troll<br />

Kollsnes<br />

Naturgass Vest<br />

Kårstø<br />

Rogass<br />

Gasnor<br />

Ek<strong>of</strong>isk<br />

Valhall<br />

Hod<br />

Dornum<br />

43<br />

Dunkerque<br />

Zeebrugge<br />

NGT<br />

EMS/EPT1<br />

Netra/EPT2<br />

H. J. Dahl


Main routings 2006 2006<br />

St. Fergus<br />

44<br />

44<br />

Dunkerque<br />

Zeebrugge<br />

NGT<br />

EMS/EPT1<br />

Dornum<br />

Netra/EPT2<br />

H. J. Dahl


Hydrat<br />

Trykk (bar)<br />

100<br />

Hydratområdet<br />

Hydrat (likevekt) skurve<br />

80<br />

60<br />

40<br />

45<br />

Fasekonvolutt for naturgass<br />

45<br />

20<br />

6-Sep-06<br />

-40 -20<br />

0 20<br />

40<br />

Temperatur (C)<br />

H. J. Dahl


Hydratdannelses kurver for Seipner kondensat<br />

Trykk (bar)<br />

100<br />

15 vekt%<br />

NaCl<br />

15 vekt%<br />

MEOH<br />

15 vekt%<br />

MEG<br />

Rent vann<br />

80<br />

60<br />

46<br />

40<br />

20<br />

46<br />

6-Sep-06<br />

-4 -2<br />

0 2<br />

4<br />

Temperatur (C)<br />

H. J. Dahl


Hvordan unngå hydrat dannelse?<br />

1. Fjerne vann<br />

2. Tilsette inhibitor<br />

47<br />

3. Redusere trykket<br />

4. Tilføre varme<br />

47<br />

6-Sep-06<br />

H. J. Dahl


Hydrat, Sleipner og en kald vinterdag<br />

Trykk (bar)<br />

100<br />

80<br />

60<br />

Hydratkurve<br />

48<br />

Sleipner<br />

Rørledningskarakteristikk ved driftsforhold<br />

40<br />

20<br />

Kårstø<br />

48<br />

6-Sep-06<br />

0<br />

10 20<br />

30 40<br />

50<br />

Temperatur (C)<br />

H. J. Dahl


Holistic approach required in design an<br />

operations!<br />

• Due attention shall be given to:<br />

• Law and regulation<br />

• Economic theory<br />

49<br />

• Technical issues<br />

[From ‘Signs that say what you want them so say ……’<br />

Gillian Wearing. 1992 - 1993, Tate Modern Gallery.<br />

49 - UK passer - bys were asked to write a sign. ]<br />

UNIVERSITY OF SOUTH AUSTRALIA<br />

System Engineering & Evaluation Centre<br />

6-Sep-06<br />

H. J. Dahl

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!