Venting the system<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
NOTE<br />
Hot fluids and hot vapour may occur.<br />
Fluid with air<br />
Flow direction<br />
Aerated fluid<br />
Venting valve<br />
Blowhole<br />
Air/fluid<br />
1. Route the blowhole (5) to the collector.<br />
2. Open the venting valve°(4).<br />
The separated air is drained from the vessel.<br />
3. Close the valve as soon as fluid <strong>com</strong>es out of the<br />
pipe.<br />
Operation and maintenance<br />
For safety reasons the fluid must be able to run out of<br />
the safety valve during the heating process.<br />
Do not close the safety valve.<br />
Check the unit before restarting it when the safety<br />
valve has been deployed (normally only occurs at start<br />
up).<br />
Problem free operation is only possible with open ball<br />
valves (position 0°. See section Start-up and inspection<br />
on page 14.<br />
Maintenance intervals<br />
When<br />
Flow meter can no longer<br />
be read off.<br />
Fault in the circulation<br />
pump.<br />
Activity<br />
Drain, flush and fill the system.<br />
Replace the circulation<br />
pump.<br />
GB<br />
15