FINEXPO EVALUATION<br />
equate with one loan and its corresponding group of activity. The first phase of a project<br />
is the first loan or interest subsidy awarded by FINEXPO. First phase and successive<br />
phase are priority for the sample. For example if the project in the last sample was in<br />
phase 2 (or more) and the phase 1 wasn’t pre-selected the project was withdrawn. On<br />
the contrary, if the project had various phases pre-selected then the file was considered<br />
as priority. If a selection is necessary within theses phases the first phase is a priority.<br />
If this indicator was not clear, the indicator taken was the date of the signature of the<br />
loans or decree. Documents signed in 2008 were removed in order to be sure that the<br />
project has started and did produce some output.<br />
The final sample is made up of 44 files (40% of the portfolio) with the following<br />
distribution:<br />
Table 18: Distribution by instrument<br />
Instrument Total<br />
%<br />
% in<br />
Sample<br />
total<br />
sample<br />
IS 36 33 15 34<br />
ISD 8 7 5 11<br />
D 1 1 1 2<br />
Tied StS 59 55 22 50<br />
Untied StS 4 4 1 2<br />
Total 108 100 44 100<br />
Table 19: Distribution by credit amount<br />
Budget<br />
%<br />
% in<br />
Total<br />
Sample<br />
€ Million<br />
total<br />
sample<br />
< 5 65 60 26 59<br />
5