4. Installation et montage - Kessel

4. Installation et montage - Kessel 4. Installation et montage - Kessel

31.07.2015 Views

7. Maintenance7.2 Compressor maintenanceCaution: Before the start of any maintenance work, themains plug must be unplugged.Note: Please note the details in the compressor operationsdiaryFilter cleaning every three months1. Unscrew the attachment screw on the filter lid.2. Detach/undo the filter lid.3. Remove the filter. Release any dust by knocking the filteragainst something. If it is heavily soiled, clean the filterwith a neutral detergent, afterwards rinse with water andallow to dry in the shade.4. Refit the cleaned filter such that the finer honeycombstructure is located on the bottom side! Press the filter lidback into place by exerting pressure from above.5. Fasten the filter lid with the screw.Caution! Do not use any solvents to clean the filter, asthis may lead to damage.In general, the following must be checked:- Is any air flowing from the air outlet?- Can any abnormal noises or vibrations be heard?- Is the compressor's temperature normal or possiblyexcessive?- Does the mains power supply cable exhibit any damage?7.3 Diagnosis and faultsIn case of complaints, please first of all refer to chapter 10"Malfunctions and Remedial Measures".If it is nevertheless not possible to eliminate a fault, separatethe plant from the power supply and contact one of ourdealers or after-sales service technicians. When doing so,communicate details of the components (rating plate) andfaults as detailed as possible.Warning:Do not put the plant back into operation before a possiblefault has been eliminated. Do not undertake any further attemptsat repairing the plant yourself! Repairs must be carriedout by qualified personnel. If you have any queries in respectof service work, please contact one of our dealers orafter-sales service technicians.Spare partsPlease use exclusively original parts.Failure to do so may lead to malfunctions or defects on thecompressor.Observe the separate installation and operating instructionswith regard to maintaining the normal service intervals for thecompressor. You can obtain a spare parts list from the aftersalesservice of KESSEL.120

7. MaintenanceControl settings INNO-CLEAN +Compressor typeCLASS CEL 100 EL 150 EL 200 EL 250Timer Designation time EW4 EW6 EW8 EW10 EW 12 EW14 EW16 EW18 EW20 EW22 EW24 EW26 EW28 EW30T1 Feeding M:S 8:00 12:00 16:00 20:00 16:00 20:00 24:00 20:00 24:00 28:00 22:00 26:00 30:00 34:00T2 Denitrification time H:M 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T3 Nitrification time H:M 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00T4 Economy phase H:M 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00T5 Sedimentation time H:M 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20T6 Interval denitrification M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T7 Aeration economy phase M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T8 Interval economy phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 13:00 15:00 13:00 10:00 8:00T9 Aeration nitrification M:S 3:00 6:00 7:30 10:30 7:30 10:30 15:00 10:30 15:00 15:00 15:00 15:00 15:00 15:00T10 Interval economy phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T11 Aeration economy phase M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T12 Time manual operation aeration M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T13 Time manual operation feeding M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T14 Time man. Oper. clear water extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T15 Time manual operation sludge extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T16 Alarm clear water extraction H:M 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00T17 Holiday phase H:M 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00T18 Aeration holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T19 Interval holiday phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T20 Refeeding holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T21 Sludge extraction M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T22 Normal phase H:M 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00T23 Run-down time M:S 0:00 4:00 0:00 4:00 4:00 3:00 4:00 3:00 4:00 4:00 3:00 4:00 3:00 4:00T24 Overload M:S 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00T25 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T26 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T27 H:M 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00C1 Phase change constant 12 12 12 12 12 12 12 12 12 12 12 12 12 12C2 Underload constant 4 4 4 4 4 4 4 4 4 4 4 4 4 4CF Correction factor constant 110 110 110 110 110 110 110 110 110 110 110 110 110 110F1 Energy constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1F2 Water level constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1Water level min 80 80 80 80 80 80 80 80 80 80 80 80 80 80Water level max 150 150 150 150 150 150 150 150 150 150 150 150 150 150Aeration time 63 108 135 158 135 158 180 158 180 204 180 204 225 240Compressor typeCLASS DEL 100 EL 150 EL 200 EL 250Timer Designation time EW4 EW6 EW8 EW10 EW 12 EW14 EW16 EW18 EW20 EW 22 EW24 EW26 EW28 EW30T1 Feeding M:S 8:00 12:00 16:00 20:00 16:00 20:00 24:00 20:00 24:00 28:00 22:00 26:00 30:00 34:00T2 Denitrification time H:M 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:30 0:30T3 Nitrification time H:M 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:30 1:30T4 Economy phase H:M 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00T5 Sedimentation time H:M 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20T6 Interval denitrification M:S 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50T7 Aeration economy phase M:S 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10T8 Interval economy phase M:S 15:00 15:00 5:00 0:10 7:30 5:00 0:10 5:00 2:00 0:10 2:00 0:10 2:00 0:10T9 Aeration nitrification M:S 8:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T10 Interval economy phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T11 Aeration economy phase M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T12 Time manual operation aeration M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T13 Time manual operation feeding M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T14 Time man. Oper. clear water extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T15 Time manual operation sludge extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T16 Alarm clear water extraction H:M 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00T17 Holiday phase H:M 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00T18 Aeration holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T19 Interval holiday phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T20 Refeeding holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T21 Sludge extraction M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T22 Normal phase H:M 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00T23 Run-down time M:S 0:00 4:00 0:00 4:00 4:00 3:00 4:00 3:00 4:00 4:00 3:00 4:00 3:00 4:00T24 Overload M:S 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00T25 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T26 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T27 H:M 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00C1 Phase change constant 12 12 12 12 12 12 12 12 12 12 12 12 12 12C2 Underload constant 4 4 4 4 4 4 4 4 4 4 4 4 4 4 C2 < C1CF Correction factor constant 110 110 110 110 110 110 110 110 110 110 110 110 110 110F1 Energy constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1F2 Water level constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1Water level min 80 80 80 80 80 80 80 80 80 80 80 80 80 80Water level max 150 150 150 150 150 150 150 150 150 150 150 150 150 150Aeration time 90 135 180 225 160 180 225 180 200 225 200 225 240 270121

7. MaintenanceControl s<strong>et</strong>tings INNO-CLEAN +Compressor typeCLASS CEL 100 EL 150 EL 200 EL 250Timer Designation time EW4 EW6 EW8 EW10 EW 12 EW14 EW16 EW18 EW20 EW22 EW24 EW26 EW28 EW30T1 Feeding M:S 8:00 12:00 16:00 20:00 16:00 20:00 24:00 20:00 24:00 28:00 22:00 26:00 30:00 34:00T2 Denitrification time H:M 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T3 Nitrification time H:M 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00T4 Economy phase H:M 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00T5 Sedimentation time H:M 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20T6 Interval denitrification M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T7 Aeration economy phase M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T8 Interval economy phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 13:00 15:00 13:00 10:00 8:00T9 Aeration nitrification M:S 3:00 6:00 7:30 10:30 7:30 10:30 15:00 10:30 15:00 15:00 15:00 15:00 15:00 15:00T10 Interval economy phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T11 Aeration economy phase M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T12 Time manual operation aeration M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T13 Time manual operation feeding M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T14 Time man. Oper. clear water extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T15 Time manual operation sludge extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T16 Alarm clear water extraction H:M 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00T17 Holiday phase H:M 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00T18 Aeration holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T19 Interval holiday phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T20 Refeeding holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T21 Sludge extraction M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T22 Normal phase H:M 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00T23 Run-down time M:S 0:00 4:00 0:00 4:00 4:00 3:00 4:00 3:00 4:00 4:00 3:00 4:00 3:00 4:00T24 Overload M:S 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00T25 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T26 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T27 H:M 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00C1 Phase change constant 12 12 12 12 12 12 12 12 12 12 12 12 12 12C2 Underload constant 4 4 4 4 4 4 4 4 4 4 4 4 4 4CF Correction factor constant 110 110 110 110 110 110 110 110 110 110 110 110 110 110F1 Energy constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1F2 Water level constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1Water level min 80 80 80 80 80 80 80 80 80 80 80 80 80 80Water level max 150 150 150 150 150 150 150 150 150 150 150 150 150 150Aeration time 63 108 135 158 135 158 180 158 180 204 180 204 225 240Compressor typeCLASS DEL 100 EL 150 EL 200 EL 250Timer Designation time EW4 EW6 EW8 EW10 EW 12 EW14 EW16 EW18 EW20 EW 22 EW24 EW26 EW28 EW30T1 Feeding M:S 8:00 12:00 16:00 20:00 16:00 20:00 24:00 20:00 24:00 28:00 22:00 26:00 30:00 34:00T2 Denitrification time H:M 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:45 0:30 0:30T3 Nitrification time H:M 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:15 1:30 1:30T4 Economy phase H:M 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00 2:00T5 Sedimentation time H:M 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20 1:20T6 Interval denitrification M:S 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50 14:50T7 Aeration economy phase M:S 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10 0:10T8 Interval economy phase M:S 15:00 15:00 5:00 0:10 7:30 5:00 0:10 5:00 2:00 0:10 2:00 0:10 2:00 0:10T9 Aeration nitrification M:S 8:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T10 Interval economy phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T11 Aeration economy phase M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T12 Time manual operation aeration M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T13 Time manual operation feeding M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T14 Time man. Oper. clear water extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T15 Time manual operation sludge extraction M:S 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00 5:00T16 Alarm clear water extraction H:M 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00 01:00T17 Holiday phase H:M 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00 8:00T18 Aeration holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T19 Interval holiday phase M:S 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00 15:00T20 Refeeding holiday phase M:S 1:00 1:30 2:00 2:30 2:00 2:30 3:00 2:30 3:00 3:30 3:00 3:30 4:00 4:30T21 Sludge extraction M:S 2:00 3:00 4:00 5:00 4:00 5:00 6:00 5:00 6:00 7:00 6:00 7:00 8:00 9:00T22 Normal phase H:M 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00 6:00T23 Run-down time M:S 0:00 4:00 0:00 4:00 4:00 3:00 4:00 3:00 4:00 4:00 3:00 4:00 3:00 4:00T24 Overload M:S 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00 10:00T25 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T26 M:S 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00T27 H:M 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00 0:00C1 Phase change constant 12 12 12 12 12 12 12 12 12 12 12 12 12 12C2 Underload constant 4 4 4 4 4 4 4 4 4 4 4 4 4 4 C2 < C1CF Correction factor constant 110 110 110 110 110 110 110 110 110 110 110 110 110 110F1 Energy constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1F2 Water level constant 1 1 1 1 1 1 1 1 1 1 1 1 1 1Water level min 80 80 80 80 80 80 80 80 80 80 80 80 80 80Water level max 150 150 150 150 150 150 150 150 150 150 150 150 150 150Aeration time 90 135 180 225 160 180 225 180 200 225 200 225 240 270121

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!