31.07.2015 Views

4. Installation et montage - Kessel

4. Installation et montage - Kessel

4. Installation et montage - Kessel

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. Commissioning Display/indicator panel Movement keys/direction keys for guidanc<strong>et</strong>hrough the program menu Enter key/OK key Back key/ESC key Pilot lamp indicating readiness for operation Pilot lamp for malfunction message Mains power supply cable Mains connection compressor Connection compressed air sensor Connection options for external signalgenerator Connection for valve block Connecting sock<strong>et</strong> for floating contactInstruction / hand-overThe chapter "Saf<strong>et</strong>y instructions" must be heeded! (p. 2)Both chambers of the plant must be filled UP with clear waterto a height of 1.20 m.Commissioning is carried out by a specialised firm or by an authorisedKESSEL agent (at an additional charge).The following persons should be present for the hand-over:- Person authorised to perform the acceptance on behalf of thebuilding owner- Specialised firmIn addition, we recommend the participation of operating personnel/operator,waste disposal contractor0.SystemstartstartSystem Systemdiagnose diagnostic0.1 Sprache LanguagedeutschfranzösischGermanenglischFrenchEnglish0.2 Datum/UhrzeitDate/TimeOverview instruction:5. 1. Making the plant ready for operation5. 2. Checking the plant5. 3. Instruction based on the installation and operating instructions5. <strong>4.</strong> Drawing up the handover certificate. (see chapter 13)Once the instruction is compl<strong>et</strong>ed, the plant must be madeready for operation.0.3 Klassen ClassesCDDatum Date01.01.2009 Uhrzeit12:00 01.01.02009 Time12:000.4 Nenngrößen Nominal SizeEW4EW6EW8EW10…EW245.1 Making the plant ready for operationPrior to commissioning, the plant must be compl<strong>et</strong>ely cleaned(including inl<strong>et</strong>s and drains); solids and coarse particles mustbe removed.1.5 Systeminfo informationTime: Uhrzeit: 20:45 20:45Floater: Schwimmer: S1 S1S2Events Ereignisse: Main power N<strong>et</strong>zausfall failureNormalphase114

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!