Prezentacija obrađivača projekta Katastra malih vodotoka ...

Prezentacija obrađivača projekta Katastra malih vodotoka ... Prezentacija obrađivača projekta Katastra malih vodotoka ...

11.07.2015 Views

final workshop – presentation of the results and registryhandoverPodgorica, 26.10.2012Ing. Filip Čejka

final workshop – presentation of the results and registryhandoverPodgorica, 26.10.2012Ing. Filip Čejka


SUBMITTERPROJECT COORDINATORCONSULTANCY SHPPProjectteamCONSULTANCY, DATAGIS ISSUES, DATA, ITREGISTRY DEVELOPMENTFIELD MEASUREMENTCONSULTANCY SHPP


Project objectives— 4 TASKS TO BE FULFILLED— TASK 1: Identification of water streams in individualmunicipalities— TASK 2: Hydrology study of small rivers— TASK 3: Determination of the location for SHPP onsmall rivers— TASK 4: Dissemination of the assignment results


Works performed so far...— Task 1 – Identification of water streams in individual municipalities— Kick-off meeting – Podgorica 31.3.2011— Series of workshops— Definition of the necessary data and information sources— Evaluation and selection of streams— Evaluation and verification of the measurement methodology— FINISHED— Task 2 – Hydrology study of small rivers— Field measurement on selected streams— Finished on 31.5.2012— Handover of correlation study 07/2012 -> delay of the dataevaluation


Mthodology SWECO - Hydroprojekt— Locality— Steepness of the profile section— accumulation— Technical-economic evaluation of the locality –windows based simulation modelling application— Input data – hydraulic parameters, financial parameters,— Optimisation of the power generation parameters— Turbine type— Economic parameters— Prefeasibility study


Methodology - SISTEM— Odabir lokacija mašinske zgrade i vodozahvata— Mašinska zgrada— Infrastruktura (prilazni putevi, udaljenost od mreže...)— Vodozahvat— Energetski potencijal <strong>vodotoka</strong>— Uzdužni profil <strong>vodotoka</strong>— Vrijednosti protoka na pojedinim dionicama <strong>vodotoka</strong>— Odabir instalisanog protoka— stepen instalisanosti od 0.9 do 1.5.— trajanje instalisanog protoka od 25 % do 30 % u toku godine.— Precnik cjevovoda— brzina strujanja vode u cjevovodu treba da bude manja od 2m/s i— da ukupni gubici energije u cjevovodu ne pređu 5% odvrijednosti bruto pada.


Methodology - SISTEM— Tip turbine


Comparison of the resultsSWECOHydroprojektSISTEMStream ID Stream ID Units 0064_1 0064municipality: opstina: KOLASIN KOLASINstream: vodotok: Simov potok Simov potokannual gross energy potential: Bruto godišnji energetski potencijal GWh 3.815 3.31springizvox - coordinate: x - koordinata: 42.882883 42.882883y - coordinate: y - koordinata: 19.294650 19.294650z - coordinate: z - koordinata: m a.s.l. 965.2 992.0mouthušćex - coordinate: x - koordinata: 42.881233 42.874900y - coordinate: y - koordinata: 19.294233 19.292633z - coordinate: z - koordinata: m a.s.l. 706.8 725.0inflowvodozahvatx - coordinate: x - koordinata: 42.880812 42.881706y - coordinate: y - koordinata: 19.294729 19.294532z - coordinate: z - koordinata: m a.s.l. 898 940SHPPmHEx - coordinate: x - koordinata: 42.874468 42.875234y - coordinate: y - koordinata: 19.292625 19.293027z - coordinate: z - koordinata: m a.s.l. 707 745


Comparison of the resultsHydrological dataHidrološki podaciwatershed: sliv: Moraca Moracawatersheed area: površina sliva: km 2 2.44 2.26stream length: dužina <strong>vodotoka</strong>: m 913 941precipitation (2011 - 2012) padavine (2011-2012) mm/year 1586.1 1586.1long-term average annualprecipitation: dugorične prosječne padavine: mm/year 2150.9 2149.403average yearly discharge: srednji godišnji protok: m 3 /s 0.151 0.151maximal discharge: maksimalni ispust: m 3 /s 1.01 1.010specific discharge: specifični ispust: l/s/km 2 61.85 66.81Power generationProizvodnja energijeoutflow elevation: nadmorska visina izliva: m a.s.l. 707 740pressure head: visina pritiska: m 191 195net pressure head: neto visina pritiska: m 181.5 184.58pipeline / channel cijevovod/kanal pipelinepipeline length: dužina cijevovoda: m 680 741SHPP designed input flow rate: projektovani protok mHE: m 3 /s 0.138 0.29installed output: instalisana snaga: kW 218.2 434yearly output: godišnja proizvodnja: MWh 764.7 1723.375hydropower potential of the stream: energetski potencijal <strong>vodotoka</strong>: kW 436 3284.462use of energy potential: iskorišćenost energetskog potencijala: % 50.06% 52.06570997suggested turbine type: preporučeni tip turbine: Pelton/Turgo Pelton


Comparison of the resultsEconomic dataEkonomski podaciestimated investment: procijenjena investicija: € 533821 868000estimated maintenance cost: procijenjeni troškovi održavanja: €/year 6406 5000actual electricity purchase price:stvarna otkupna cijena električneenergije: €/MWh 104.4 104.47net present value: trenutna neto vrijednost: € 1173856internal rate of return: interni povratak investicije: % 14payback period: otplatni period: years 7.0 5.7


Accuracy of the results— Prefeasibility study— Not suitable for the detailedtechnical design— Additional measurement andcalculation has to be performedbefore the construction phase


Selected streams


Bijelo poljeDuren potokRakitska rijekaCelinska rijekaRijeka BrzavaPotrcka rijekaZekica rijekaKostenicka rijekaTuravski potokMirasev potokPecarski potokRijeka KicavnicaPepica rijekaBoljaninska rijekaOrahovacka rijekaVoljavacka rijekaBistrica-MajstorovinaBIJELO POLJECancelled - not measured for the wholeperiodTotal 15


MojkovacMOJKOVACJakovacka rijekaMisnica potokRijeka LjevakRijeka LjevakRijeka RavnjakTvrdi potokGojakovacki potokDrobnjacki ljevakRijeka PozarTotal 9


PljevlaPLJEVLJARijeka BreznicaRijeka KamenicaTrnovska rijekaLeverska rijekaKozicka rijekaPodborovska rijekaKrzavska rijekaRijeka JugosticaGotovuska rijekaPotok DorasnicaOdzacko vreloproxyproxyproxycancelled - low flow rateannual gross energy potential above 15GWhcancelled - low flow ratecancelled - low flow rateRijeka MaocnicaTotal 8


PlavPLAVHotska rijekaMeteska rijekaKadrica potokBijeli potokcancelled - not measured forthe whole periodTotal 3


NiksicNIKSICRijeka Boljasnicacancelled - lowhydropotentialTotal 0


BeraneBERANEMakva-BudimskaMala rijekaPopcaRadmanska rijekaTrpeskaVrbnicka rijekaVinicka rijekaVitlijes potokDapsicka rijekaTotal 9


KolašinRijeka SkrbusaVeljebrdski potokRijeka BistricaBukovi potokPecka rijekaKOLASINVrelo LjucanskoRzacki potokVelika PjescanicaBistricaDulovacki potokSlatinska rijekaSimov potokRijeka PlasnicaPotok Dubocnjakannual gross energy potentialabove 15 GWhnot measured for the wholeperiodTotal 12


AndrijevicaANDRIJEVICAMojanska rijekaannual gross energypotential above 15 GWhDesna rijekaRijeka BradavacUmski potokObzovicki potokStitska rijekaPisevska rijekaVođenicki potokSeremetski potokTotal 8


RožajeROZAJERijeka ZupanicaBogajska rijekaMoraca i BjeluhaRijeka BjeluhaRijeka IbaracTotal 5


ŠavnikSAVNIKRijeka SkakavicaRijeka GrabovicaTotal 2


Registry— http://shpp-registry-montenegro.eu— 10 municipal logins— Streams of the selected municipality


Ing. Filip ČejkaVODNÍ ZDROJE, a.s.cejka@vodnizdroje.cz