GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH MINISTRY OF COMMUNICATION ROADS AND HIGHWAYS DEPARTMENT Maintenance and Rehabilitation Needs Report of 2012 – 2013 for RHD Paved Roads HDM Circle, RHD November, 2012

GOVERNMENT OF THE PEOPLE’S REPUBLIC OF<br />

BANGLADESH<br />

MINISTRY OF COMMUNICATION<br />

ROADS AND HIGHWAYS DEPARTMENT<br />

<strong>Maintenance</strong> <strong>and</strong> <strong>Rehabilitation</strong> <strong>Needs</strong> <strong>Report</strong><br />

of 20<strong>12</strong> – 2013 for RHD Paved Roads<br />

HDM Circle, RHD<br />

November, 20<strong>12</strong>


PREFACE<br />

The <strong>Annual</strong> <strong>Maintenance</strong> <strong>and</strong> <strong>Rehabilitation</strong> <strong>Needs</strong> <strong>Report</strong> is the flagship publication of HDM<br />

circle. This is the 13 th <strong>Maintenance</strong> <strong>and</strong> <strong>Rehabilitation</strong> needs report prepared from the HDM-4<br />

output. The RMMS database <strong>and</strong> the HDM-4 model have been utilized to derive yearly<br />

maintenance periodic budget dem<strong>and</strong> for RHD. By this analysis, the time <strong>and</strong> location of<br />

maintenance requirement for the RHD Road network has been identified <strong>and</strong> prioritized in<br />

accordance with NPV/Cost ratio. Socio-economic <strong>and</strong> political factors, not considered in this<br />

analysis, are extremely important in prioritizing maintenance treatments. It is hoped that this<br />

approach will be adopted in future years. The list of on-going projects has been prepared after<br />

collecting those from concerned offices. Projects, which are in progress <strong>and</strong> not completed<br />

before the start of roughness survey have been kept out of the HDM analysis to avoid<br />

duplication in the maintenance program <strong>and</strong> to find out actual immediate dem<strong>and</strong>s. However,<br />

few segments already completed or ongoing may appear in the HDM output because those were<br />

not reported by the field offices before the HDM run <strong>and</strong> hence were not excluded.<br />

Finally, the officers of HDM Circle must be appreciated for their relentless effort in publishing<br />

this report.<br />

Mr. Md. Jawed Alam<br />

Superintending Engineer (Addl Charge)<br />

HDM Circle<br />

Roads & Highways Department


Executive Summary<br />

The <strong>Annual</strong> <strong>Maintenance</strong> <strong>and</strong> <strong>Rehabilitation</strong> <strong>Needs</strong> <strong>Report</strong> illustrates the required investments<br />

for maintenance of the whole road network of Roads & Highways Department. The Highway<br />

Development <strong>and</strong> Management (HDM-4) Model (HDM-4 software), mainly an economic tool,<br />

has been used to project the total maintenance need of RHD Road network <strong>and</strong> also to select<br />

<strong>and</strong> prioritize maintenance work on the basis of NPV/Cost ratio. For this purpose, the analysis<br />

has been carried out in the two sequences. . Firstly, All roads have been analyzed to assess the<br />

overall long-term maintenance need of the RHD road network. The overall maintenance need<br />

has been found to be 70,913.82 million taka for the year 20<strong>12</strong>-2013, 20099.14 million taka for<br />

the year 2013-2014, 13322.68 million taka for the year 2014-2015 <strong>and</strong> 11470.38 million taka<br />

for the year 2015-2016 <strong>and</strong> 10358.24 million taka for the year 2016-2017. It is evident from the<br />

analysis that, the investment needs tend to decrease considerably provided that the first year<br />

requirements are met fully. So, efforts should be given to maximize the first year maintenance<br />

in order to minimize backlogs. Secondly ongoing projects, which are in progress <strong>and</strong> were not<br />

completed before the start of Roughness survey, have been excluded from the HDM run to<br />

project the immediate maintenance requirement <strong>and</strong> it has been projected to be 39791.33<br />

million taka. Since the prioritization of projects using NPV/Cost favors the more heavily<br />

trafficked roads, Zilla roads will not have priority for maintenance <strong>and</strong> rehabilitation works due<br />

to their low traffic volume. So, a separate prioritization process has been adopted for the<br />

recovery of zilla roads as suggested by the Road Master Plan.<br />

iii


Table of Contents<br />

Sl. No. Content Page no.<br />

Executive Summary<br />

iii<br />

Chapter 1: Introduction 01<br />

1.1 Introduction 01<br />

1.2 Objectives of the Analysis 02<br />

1.3 Methodology 02<br />

1.3.1 The Data of RMMS Database 02<br />

1.3.2 Road User Cost Data 02<br />

1.3.3 Unit Cost of Work <strong>and</strong> <strong>Maintenance</strong> St<strong>and</strong>ard 02<br />

1.3.4 HDM 4 Export Tool 02<br />

1.3.5 Analysis <strong>and</strong> Presentation 02<br />

1.4 Scope <strong>and</strong> Limitations 02<br />

1.5 Road <strong>and</strong> Bridge Asset Management System 02<br />

1.6 <strong>Needs</strong> <strong>Report</strong> Output 03<br />

Chapter 2: Current Network Condition 04<br />

2.1 The RHD Road Network 04<br />

Chapter 3: HDM 4 Program Analysis 09<br />

3.1 Principles of Life Cycle Analysis 09<br />

3.2 Description of Treatments 09<br />

3.3 <strong>Maintenance</strong> Strategies 11<br />

3.4 Unit cost 13<br />

Chapter 4: Results of HDM 4 Analysis 15<br />

4.1 Field validation of Result 15<br />

4.2 Network Result (Unconstrained) 15<br />

4.3 Dem<strong>and</strong> Excluding Ongoing Projects 17<br />

4.4 Pavement Strengthening 19<br />

4.5 Overall <strong>Needs</strong> 20<br />

Chapter 5: Findings <strong>and</strong> Recommendation 22<br />

5.1 Major Findings 22<br />

5.2 Recommendations <strong>23</strong>


List of Tables<br />

Table 1.1: RHD road network<br />

Table 1.2: Lengths of roads included in the HDM analysis<br />

Table 2.1: RHD Road Network length surveyed for roughness survey 20<strong>12</strong>.<br />

Table 2.2: Qualitative Descriptors of IRI Values<br />

Table 2.3: Overall RHD Road Network condition (Survey 20<strong>12</strong>) (data in km)<br />

Table 2.4: Road condition of National Highways based on IRI (Survey 20<strong>12</strong>) (data in km)<br />

Table 2.5: Road condition of Regional Highways based on IRI (Survey 20<strong>12</strong>) (in km)<br />

Table 2.6: Road condition of Zilla Roads based on IRI (Survey 20<strong>12</strong>) (data in km)<br />

Table 3.1: <strong>Maintenance</strong> <strong>and</strong> rehabilitation treatments <strong>and</strong> assumptions used in HDM<br />

Table 3.2: Compound maintenance st<strong>and</strong>ards for HDM-4 programme analysis in 20<strong>12</strong>-13<br />

Table 3.3: Unit costs of treatment<br />

Figure 4.1: Total unconstrained dem<strong>and</strong> of capital works for next five years (2013-17)<br />

Table 4.2: Total capital works dem<strong>and</strong>s (Mill Tk) for the next five years.<br />

Table 4.3: Periodic maintenance dem<strong>and</strong> (Mill Tk) for the next five years.<br />

Table 4.4: Partial reconstruction dem<strong>and</strong> (Mill Tk) for the next five years<br />

Table 4.5: Full reconstruction dem<strong>and</strong> (Mill Tk) for the next five years<br />

Table 4.6: Routine maintenance dem<strong>and</strong> (Mill Tk) for the next five years<br />

Table 4.7: Lengths of different work category in all classes of roads (Km)<br />

Table 4.8 Capital dem<strong>and</strong> of National/Regional Roads 20<strong>12</strong>-13 (excluding ongoing<br />

projects)<br />

Table 4.8 Funding needs of Zilla roads networks for 20<strong>12</strong>-13 (excluding ongoing<br />

projects) in Million taka.<br />

Table 4.10: Required Length of different Road Class for Capital works in next five<br />

years (Excluding ongoing Works)<br />

Table 4.11 Overall <strong>Maintenance</strong> <strong>Needs</strong> by category<br />

Table 4.<strong>12</strong>: Overall <strong>Maintenance</strong> <strong>Needs</strong> by category for National <strong>and</strong> Regional roads<br />

(in million taka)<br />

Table 4.13: Overall <strong>Maintenance</strong> <strong>Needs</strong> by category for Zilla roads (in million taka)<br />

Table 5.1: Overall <strong>Maintenance</strong> <strong>Needs</strong> 2013-2017<br />

Table 5.2: Immediate <strong>Maintenance</strong> <strong>Needs</strong> 20<strong>12</strong>-13


List of Figures<br />

Figure 2.1: Average network roughness by road classes in different years<br />

Figure 2.2: Average Roughness of Road Network in different years<br />

Figure 2.3 Road condition of National Highways based on IRI values (Survey: 20<strong>12</strong>).<br />

Figure 2.4: Road condition of Regional Highways based on IRI values (Survey: 20<strong>12</strong>).<br />

Figure 2.5: Road condition of Zilla Road based on IRI values (Survey: 20<strong>12</strong>).<br />

Figure 4.1: Unconstrained dem<strong>and</strong> of capital works for the next five years.<br />

Figure 4.2: Zone wise capital needs of National <strong>and</strong> Regional Highways in 20<strong>12</strong>-13<br />

(excluding ongoing projects) in Million Taka.<br />

Figure 4.3: Zone wise capital needs of Zilla Roads (excluding ongoing projects) in<br />

Million Taka.<br />

Figure 4.4: Decreasing trend of length of roads that requires treatment (Excluding<br />

Ongoing Projects)<br />

Appendices<br />

Appendix A:<br />

Appendix B:<br />

Appendix C:<br />

Appendix D:<br />

Appendix E:<br />

Appendix F:<br />

Appendix G:<br />

1st Year Unconstrained Capital Works for National <strong>and</strong> Regional<br />

Highways sorted by NPV/Cost . (Excluding ongoing projects)<br />

1st Year Unconstrained Periodic Works for National <strong>and</strong> Regional<br />

Roads. (Excluding ongoing projects)<br />

1st Year Unconstrained <strong>Rehabilitation</strong> Works for National <strong>and</strong> Regional<br />

Highways sorted by Zone <strong>and</strong> Division. (Excluding ongoing projects)<br />

Zilla Road Recovery Programme by Zone <strong>and</strong> Division. (Excluding<br />

ongoing projects)<br />

1st Year Unconstrained Periodic works of Zilla Roads sorted by Zone<br />

<strong>and</strong> Division. (Excluding ongoing projects)<br />

Recurrent Costs by Zone <strong>and</strong> Division.<br />

Analysis of the roads sections included in the Emergency <strong>Rehabilitation</strong><br />

of Damaged Roads Project.


CHAPTER 1: INTRODUCTION<br />

1.1 Overview<br />

RHD is the road authority in Bangladesh which is responsible for the management of major road<br />

network that includes National Highways, Regional Highways <strong>and</strong> Zilla Roads. Total RHD paved<br />

road network is around 18,250 km (86 % of total length) of which 3,476.55 km is National Highway,<br />

4,105 km is Regional Highway <strong>and</strong> the rest 10,666 km is Zilla Roads. Proper <strong>Maintenance</strong> <strong>and</strong><br />

management of these assets is a fundamental requirement which is vital to the national economy. For<br />

optimization of the fund disbursement to maintain this road network RHD has been using the<br />

Highway Development <strong>and</strong> Management (HDM-4) Model (HDM-4 software) as an economic tool<br />

since 1999-2000. Since then, a Road <strong>Maintenance</strong> <strong>and</strong> <strong>Rehabilitation</strong> <strong>Needs</strong> <strong>Report</strong> (MRNR) is<br />

published every year to asses 5-year investment plan to meet acceptable levels of service provision for<br />

the RHD road network. The current <strong>Maintenance</strong> <strong>and</strong> <strong>Rehabilitation</strong> <strong>Needs</strong> <strong>Report</strong> of 20<strong>12</strong>-13 is a<br />

continuation of the process.<br />

This year’s analysis has been carried out on about 17,494 km of paved National, Regional <strong>and</strong> Zilla<br />

roads. All roads have been analysed to assess the overall long-term maintenance need of the RHD<br />

road network. Ongoing projects, however, have been excluded from the HDM analysis to project the<br />

immediate maintenance requirement. Few segments either completed or ongoing may appear in the<br />

HDM outputs because they were not reported by concerned offices before the HDM analysis.<br />

The outputs from HDM-4 are based on the Road <strong>Maintenance</strong> <strong>and</strong> Management System (RMMS)<br />

database of RHD. This report provides recommendations for Managers <strong>and</strong> Engineers in RHD to<br />

improve the road network in a cost effective manner.<br />

Table 1.1: RHD Road Network<br />

Road Class<br />

Number<br />

Of Roads<br />

Total Length<br />

(Km)<br />

Paved Length<br />

(Km)<br />

Unpaved Length<br />

(Km)<br />

Not<br />

Surveyed<br />

(Km)<br />

National Highway 71 3,537.91 3476.55 <strong>12</strong>.26 49.20<br />

Regional<br />

Highway<br />

<strong>12</strong>1 4,278.08 4104.27 84.63 89.17<br />

Zilla Roads 641 13,637.75 10,665.93 1706.94 <strong>12</strong>64.88<br />

Total 833 21,453.74 18,246.75 1803.73 1403.26<br />

Table 1.2: Length of roads included in the analysis<br />

Network Name<br />

Analyzed length (km)<br />

All Roads<br />

Analyzed length (km) Excluding<br />

ongoing projects<br />

National Highways 3489.019 1757.95<br />

Regional Highways 4006.56 1479.16<br />

Zilla Roads 9998.746 3766.96<br />

Total 17494.325 7004.07<br />

1


1.2 Objectives of the analysis:<br />

The main objectives of this analysis are:<br />

• To project the total maintenance need of RHD Road network.<br />

• To select <strong>and</strong> prioritize the maintenance works based on NPV over financial cost ratio.<br />

• To develop a 5-year investment plan to meet acceptable levels of service provision for the<br />

RHD network.<br />

• To provide a database for preparing RAMS map that combines all relevant information <strong>and</strong><br />

shows decision makers where they can most effectively allocate funds for maintenance <strong>and</strong><br />

rehabilitation.<br />

• To provide recommendations for Managers <strong>and</strong> Engineers in RHD to improve the road<br />

network in a cost effective manner.<br />

1.3 Methodology:<br />

Data required for the analysis are mainly primary in nature <strong>and</strong> obtained through field surveys.<br />

1.3.1 The data of RMMS Database:<br />

The data of RMMS database is the fundamental input to HDM 4 analysis.<br />

In 2004, RHD undertook a major survey of its network covering around 15,000 km of roads. The<br />

survey was comprehensive <strong>and</strong> included a full inventory, current condition (including deflection<br />

measurements), pavement structure <strong>and</strong> traffic flows. In 2006 further surveys were undertaken,<br />

originally intended to complete the remaining 5,000 kilometres that were not surveyed in 2004. Only<br />

around 2,000 km of Zilla Roads omitted in 2004 were surveyed <strong>and</strong> around 1,500 km of National<br />

Roads were re-surveyed. This year (20<strong>12</strong>) a comprehensive Road Roughness Survey was conducted<br />

by the Data Collection Division of HDM Circle. The Roughness Survey of this year conducted by the<br />

HDM Circle is one of the critical inputs to HDM 4 analysis. Roughometer III was used to obtain<br />

roughness data.<br />

Last year’s Road Condition data, Traffic volume etc were used in the analysis as the Road Condition<br />

Survey <strong>and</strong> Classified Traffic Count Survey were not undertaken in 2011-<strong>12</strong>.<br />

1.3.2 Road User Cost Data:<br />

The Road User Cost (RUC) data were provided by the Economic Circle of RHD <strong>and</strong> since the RUC<br />

survey was not conducted last year, previous year’s data were used in the analysis.<br />

1.3.3 Unit cost of work <strong>and</strong> maintenance st<strong>and</strong>ard:<br />

The same maintenance st<strong>and</strong>ard set previously was used in the analysis. The unit cost of work was<br />

obtained from RHD Schedule of Rates, 2011.<br />

2


1.3.4 HDM 4 Export Tool:<br />

The HDM 4 export tool, mainly a software used to make the data of RMMS database useable by the<br />

Highway Development <strong>and</strong> Management Software (HDM 4).<br />

1.3.5 Analysis <strong>and</strong> presentation:<br />

After analysis of data by HDM 4 software, the result obtained is presented in tabular <strong>and</strong> graphical<br />

form.<br />

1.4 Scope <strong>and</strong> Limitation:<br />

All the unpaved roads were excluded from the analysis. Some road lengths could not be analysed due<br />

to non-availability of road condition data. Besides, the present version of the HDM 4 software that<br />

RHD has been using for a long time (Version- 1.3) is not capable of doing the socio-economic<br />

analysis <strong>and</strong> hence the socio-economic variables are excluded from the analysis.<br />

1.5 Road <strong>and</strong> Bridge Asset Management System:<br />

Since 2005-06 maintenance programme, RHD introduced a new procedure which streamlined the<br />

planning of its maintenance <strong>and</strong> rehabilitation works, to support their responsibility to actively<br />

manage the nation’s network of roads <strong>and</strong> bridges. Each year this system is being further improved<br />

<strong>and</strong> developed in order to improve the selection <strong>and</strong> prioritisation of maintenance works.<br />

“RAMS”, short for Road <strong>and</strong> Bridge Asset Management System, brings together all RHD’s current<br />

databases <strong>and</strong> analytical procedures. The final output of RAMS is the RAMS Map: a single GISbased<br />

map for each Division which combines all relevant information <strong>and</strong> shows decision makers<br />

where they can most effectively allocate funds for maintenance <strong>and</strong> rehabilitation.<br />

The strength of the RAMS Map is its simplicity. It presents information in a highly visual, graphical<br />

format <strong>and</strong> uses a minimal set of symbols <strong>and</strong> colours. RAMS relies on output from the Bridge<br />

<strong>Maintenance</strong> Management System (BMMS), HDM, <strong>and</strong> therefore the data in RMMS. The quality of<br />

the RAMS Output is therefore heavily dependent on the quality of the data included in these<br />

databases. It should be noted that this <strong>Maintenance</strong> <strong>Needs</strong> <strong>Report</strong> deals only with the needs of roads<br />

<strong>and</strong> road pavements <strong>and</strong> does not address needs for bridges <strong>and</strong> structures.<br />

1.6 <strong>Needs</strong> <strong>Report</strong> Output:<br />

This report presents the results of HDM-4 analysis for National, Regional <strong>and</strong> Zilla road networks.<br />

None of this work is improvement or development work – it is simply the work required to restore the<br />

existing road network to its original condition. It should therefore be classified as maintenance work<br />

<strong>and</strong> funded 100% through the Revenue Budget.<br />

<strong>Rehabilitation</strong> is referred to as “backlog maintenance” as it is the result of under-investment in<br />

maintenance in the past. Separate budget sub-codes should be assigned for routine maintenance,<br />

periodic maintenance <strong>and</strong> rehabilitation in order that monitoring of expenditure can be effectively<br />

carried out. The road network maintenance <strong>and</strong> rehabilitation needs for National, Regional <strong>and</strong> Zilla<br />

Road Networks are presented in Appendix A to E. Recurrent costs of the whole road network has<br />

been shown in Appendix-F.<br />

It must be stressed, however, that HDM-4 is not a design tool. The Road Asset Management System<br />

(RAMS) approach emphasizes that the nominal treatment recommended in the output must be<br />

confirmed <strong>and</strong> detailed through a more comprehensive survey, investigation <strong>and</strong> design process.<br />

3


CHAPTER 2: CURRENT NETWORK CONDITION.<br />

2.1 The RHD Road Network:<br />

Table 2.1 shows the extent of the roads covered by the roughness surveys carried out in early 20<strong>12</strong>.<br />

About 13,000 km of road (71% of paved roads) were surveyed. Table 2.1 shows the surveyed lengths<br />

of different zones under RHD <strong>and</strong> Figure 2.1 gives the Average Roughness of Roads in last five years<br />

<strong>and</strong><br />

Table 2.1: Road Networks Lengths Surveyed for Roughness<br />

Figure 2.1: Average Roughness of different classes of Roads in different years<br />

IRI<br />

Survey Year<br />

4


It is found that the National road roughness has decreased from International Roughness Index 6.05 to<br />

5.24, Regional road roughness has increased from IRI 3.47 to 6.38 <strong>and</strong> Zilla roads roughness has<br />

decreased from 8.41 to 7.87 indicating an overall improvement of the road network.<br />

The road condition can be grossly categorized into descriptive b<strong>and</strong>s based on roughness. These<br />

categories are shown in table 2.2. Different ranges are adopted for each road class to reflect their<br />

relative importance <strong>and</strong> the level of service that should be expected from each road class.<br />

Table 2.2: Qualitative descriptors of IRI values<br />

National Highway Regional Highway Zila Road<br />

IRI Values<br />

Good 0 – 3.9 0 – 4.9 0 – 5.9<br />

Fair 4.0 – 5.9 5.0 – 6.9 6.0 – 7.9<br />

Poor 6.0 – 7.9 7.0 – 8.9 8.0 – 9.9<br />

Bad 8.0 – 9.9 9.0 – 10.9 10.0 – 11.9<br />

Very Bad ≥10.0 ≥11.0 ≥<strong>12</strong>.0<br />

Based on the above categories, following tables <strong>and</strong> figures show the network condition by Zone <strong>and</strong><br />

road class.<br />

Table 2.3: Overall RHD Road Network condition (Survey 20<strong>12</strong>) (data in km)<br />

Good Fair Poor Bad Very Bad<br />

Road<br />

Length % Length % Length % Length % Length %<br />

National 1010.49 30.70 1,<strong>23</strong>6.22 41.19 502.46 15.69 336.14 9.43 62.90 3.00<br />

Regional 746.44 18.02 1,550.07 45.69 895.29 25.61 248.49 8.45 80.56 2.<strong>23</strong><br />

Zilla Road 1098.90 11.99 2,413.38 38.86 1,711.78 27.82 939.45 18.16 152.76 3.19<br />

Total 2855.83 21.99 5199.670 40.04 3109.522 <strong>23</strong>.95 1524.074 11.74 296.22 2.28<br />

Figure 2.2: Average Roughness of Road Network in different years<br />

5


Table 2.4: Road condition of All Roads based on IRI (Survey 20<strong>12</strong>) (data in km)<br />

RHD zone Good Fair Poor Bad Very Bad<br />

Dhaka 915.33 984.29 579.58 89.53 2.15<br />

Comilla 91.34 327.44 446.50 362.01 81.34<br />

Chittagong 0.00 255.76 588.48 275.25 31.90<br />

Gopalganj 115.24 388.00 <strong>12</strong>8.15 119.82 0.00<br />

Rangpur 790.68 1011.79 441.54 135.71 0.00<br />

Rajshahi 561.<strong>12</strong> 597.08 274.34 61.75 11.30<br />

Khulna 71.74 582.74 347.98 289.57 132.43<br />

Barisal <strong>12</strong>9.47 409.99 217.79 190.43 37.09<br />

Sylhet 180.92 642.58 85.17 0.00 0.00<br />

Figure 2.3: Condition of National Highways based on IRI (Survey 20<strong>12</strong>)<br />

<strong>12</strong>00<br />

1000<br />

Good Fair Poor Bad Very Bad<br />

Length (Km)<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Dhaka<br />

Comilla<br />

Chittagong<br />

Gopalganj<br />

Rangpur<br />

Rajshahi<br />

Khulna<br />

Barisal<br />

Sylhet<br />

Zones<br />

6


Table 2.5: Road condition of Regional Highways based on IRI (Survey 20<strong>12</strong>) (data in km)<br />

Zone Good Fair Poor Bad Very Bad<br />

Dhaka 338.25 <strong>23</strong>1.91 195.26 65.73 0.00<br />

Comilla 0.00 153.60 77.59 19.00 10.84<br />

Chittagong 0.00 <strong>23</strong>.75 186.07 85.72 31.90<br />

Gopalganj 0.00 81.00 <strong>23</strong>.34 39.05 0.00<br />

Rangpur 85.74 106.29 97.85 0.00 0.00<br />

Rajshahi 117.30 206.93 103.05 17.00 0.00<br />

Khulna 44.98 361.30 145.86 22.00 37.81<br />

Barisal 113.<strong>23</strong> 96.39 40.98 0.00 0.00<br />

Sylhet 46.94 288.90 25.30 0.00 0.00<br />

Figure 2.4: Road condition of Regional Highways based on IRI (Survey 20<strong>12</strong>)<br />

400<br />

350<br />

Good Fair Poor Bad Very Bad<br />

Length of Road (Km)<br />

300<br />

250<br />

200<br />

150<br />

100<br />

50<br />

0<br />

Dhaka<br />

Comilla<br />

Chittagong<br />

Gopalganj<br />

Rangpur<br />

Zones<br />

Rajshahi<br />

Khulna<br />

Barisal<br />

Sylhet<br />

7


Table 2.6: Road condition of Zilla Roads based on IRI (Survey 20<strong>12</strong>) (data in km)<br />

Zone Good Fair Poor Bad Very Bad<br />

Dhaka 296.09 445.32 328.06 <strong>23</strong>.79 0.00<br />

Comilla 56.77 44.03 319.74 293.77 29.62<br />

Chittagong 0.00 93.47 227.64 117.93 0.00<br />

Gopalganj <strong>12</strong>.62 250.26 78.80 80.78 0.00<br />

Rangpur 489.44 701.03 281.24 31.83 0.00<br />

Rajshahi 201.08 344.50 161.29 18.36 11.30<br />

Khulna 8.76 84.77 94.73 182.55 90.41<br />

Barisal 16.<strong>23</strong> 214.88 160.42 190.43 21.43<br />

Sylhet 17.92 <strong>23</strong>5.<strong>12</strong> 59.87 0.00 0.00<br />

Figure 2.5: Road condition of Zilla Roads based on IRI (Survey 20<strong>12</strong>)<br />

Good Fair Poor Bad Very Bad<br />

Length of Roads (Km)<br />

800<br />

700<br />

600<br />

500<br />

400<br />

300<br />

200<br />

100<br />

0<br />

Dhaka Comilla Chittagong Gopalganj Rangpur Rajshahi Khulna Barisal Sylhet<br />

Zones<br />

8


CHAPTER 3: HDM-4 PROGRAMME ANALYSIS<br />

3.1 Principles of Life Cycle Analysis.<br />

The life cycle analysis in HDM-4 predicts the pavement conditions (performance), the required<br />

treatments <strong>and</strong> costs <strong>and</strong> benefits over a specified period (in this case 20 years) under a user-defined<br />

maintenance strategy. The costs used in this analysis include cost of capital investment, maintenance<br />

costs <strong>and</strong> vehicle operating costs.<br />

The costs of two scenarios are compared:<br />

- The “do minimum maintenance” scenario (either routine maintenance or a “holding strategy”).<br />

- The “with maintenance” scenario.<br />

Details of treatments considered in Bangladesh can be seen in Table 3.1. <strong>Maintenance</strong> strategies were<br />

set for these treatments based on road condition, traffic <strong>and</strong> roughness data for different classes of<br />

roads (see Table 3.2). Holding strategy has been included (see Table 3.2), which means that DBST /<br />

carpeting has to be provided instead of going for higher treatment if there is shortage of funds to keep<br />

the roads at maintainable condition. DBST was considered for National <strong>and</strong> Regional roads <strong>and</strong><br />

carpeting for Zilla roads.<br />

The benefits <strong>and</strong> costs of the above scenarios are compared for a HDM-4 life cycle analysis of 20<br />

years. The Net Present Value (NPV)/costs were utilized to prioritize treatment options at a <strong>12</strong>%<br />

discount rate. NPV/cost was chosen to obtain maximum benefits as it produces highest benefits when<br />

there is crisis in funding.<br />

3.2 Description of Treatments:<br />

The HDM analysis considers a number of treatments representing the most commonly used types of<br />

maintenance work items in Bangladesh. Table 3.1 provides details of these treatments <strong>and</strong> the<br />

assumptions made for HDM.<br />

9


Table 3.1: <strong>Maintenance</strong> <strong>and</strong> rehabilitation treatments <strong>and</strong> assumptions used in HDM<br />

Routine<br />

<strong>Maintenance</strong>:<br />

Periodic<br />

<strong>Maintenance</strong>:<br />

Off-pavement works:<br />

Patching<br />

Crack Sealing<br />

Preparatory Patching<br />

Includes all regular works along a road such as maintaining<br />

shoulders, roadside vegetation control, cleaning side drains <strong>and</strong><br />

pipe culverts, maintenance of signs <strong>and</strong> signals.<br />

Repair of potholes based on a st<strong>and</strong>ard pothole unit of 0.01m 3 per<br />

pothole. The quantity of pothole repairing shall not be more than<br />

1% of the total surface.<br />

Sealing to cracks using Seal Coat/Fog Seal. It assumes a<br />

maximum in any one kilometre of 5% area affected.<br />

Patching potholes <strong>and</strong> regulating surface irregularities prior to<br />

undertaking the treatments like DBST or DBS Overlay. Should<br />

not be more than 2% of the total quantity of overlay for National<br />

roads <strong>and</strong> maximum of 5% for Regional roads.<br />

Preparatory Edge Repair Allows for restoring pavement edges that have been damaged by<br />

vehicles leaving the road to drive onto the shoulder prior to<br />

undertaking the treatments like DBST or DBS Overlay.<br />

DBST<br />

Applying two layers of surface treatments on the prepared road<br />

surface. The total thickness has been specified as 25mm. This is<br />

applied in medium to highly trafficked road. Life expectancy<br />

assumed to be 3 years.<br />

Bituminous Carpeting This is a 40 mm thick manual overlay used in low trafficked<br />

roads in place of dense bituminous overlay. Life expectancy has<br />

been taken as 2 to 4 years.<br />

Overlay Machine laid premixed dense bituminous surfacing overlay 50 –<br />

80 mm thick used in medium to highly trafficked roads.<br />

Carefully controlled overlay may be applied in response to badly<br />

damaged road surface or high roughness so as to obtain a<br />

predefined roughness level (2.5 to 3 IRI). Life expectancy<br />

assumed to be 5 years.<br />

<strong>Rehabilitation</strong> Partial Reconstruction Reconstruction of the upper pavement layers following<br />

scarification of the existing damaged surface <strong>and</strong> re-compaction.<br />

Normally a 150-200 mm crushed aggregate base with a dense<br />

bituminous surfacing of between 75 <strong>and</strong> 195mm, depending on<br />

traffic level. This is a treatment to overcome higher roughness or<br />

higher levels of surface cracking resulting from delayed<br />

maintenance. Life expectancy should be 10 years prior to major<br />

periodic maintenance. Full design of the pavement must be<br />

undertaken prior to treatment. Shoulder rehabilitation would also<br />

be provided where necessary.<br />

Holding<br />

Treatment<br />

Complete<br />

Reconstruction<br />

A major reconstruction on the existing alignment <strong>and</strong> within the<br />

same overall dimension limits. The road is not widened. The<br />

pavement must be fully designed prior to construction <strong>and</strong><br />

shoulder rehabilitation provided where necessary. Life<br />

expectancy should be 10 years before major periodic<br />

maintenance. Applied where there are extremely high levels of<br />

roughness <strong>and</strong> extensive cracking.<br />

DBST triggered when rehabilitation is required but budget<br />

constraints do not permit the preferred treatment. Expected to<br />

last for 3 years<br />

10


3.3 <strong>Maintenance</strong> Strategies:<br />

Table 3.2 shows the compound maintenance st<strong>and</strong>ards adopted for HDM analysis for the different<br />

classes of roads. These st<strong>and</strong>ards are based on experience <strong>and</strong> analysis of road conditions in<br />

Bangladesh, <strong>and</strong> are considered to be a reliable basis for HDM-4 to estimate economic performance of<br />

the network. Final treatment designs must be separately established.<br />

Compound maintenance st<strong>and</strong>ards have been modified slightly, but are similar to the previous years’<br />

st<strong>and</strong>ards. The slight modification relates to the introduction of a DBST in the holding strategy of<br />

National <strong>and</strong> Regional roads when the roughness will exceed <strong>12</strong> IRI under all damage percentage <strong>and</strong><br />

traffic volumes. Similarly, carpeting was introduced in the holding strategy of Zilla roads for<br />

roughness greater than <strong>12</strong> IRI.<br />

Corridor roads (N1, N2, N3, N4, N5, N6, N7 <strong>and</strong> N8) were given higher priority <strong>and</strong> hence they were<br />

analyzed separately as they accommodate the major share of traffic <strong>and</strong> will be the part of the Asian<br />

Highway Network in the near future. Hence, periodic maintenance was considered at 4 IRI. The other<br />

National highways, Regional highways <strong>and</strong> Zilla roads were considered for periodic maintenance at 5,<br />

5.5 <strong>and</strong> 6 IRI respectively. “Holding maintenance strategy” was considered to maintain roads using<br />

DBST when funding is limited <strong>and</strong> higher treatments cannot be provided. Application of DBST can<br />

then delay further road deterioration.<br />

Table 3.2 : Compound maintenance st<strong>and</strong>ards for HDM-4 programme analysis in 2011-<strong>12</strong><br />

Holding St<strong>and</strong>ard without Reconstruction for National <strong>and</strong> Regional Roads<br />

Roughness<br />

Range (IRI)<br />

All Damage<br />

(%)<br />

Traffic Range (MT-AADT)<br />

100 - 1999 2000 - 3999 4000 - 5999 6000 - 9999 > 10000<br />

<strong>12</strong>.00 All DBST 25mm<br />

Holding St<strong>and</strong>ard with Reconstruction for National <strong>and</strong> Regional Roads<br />

Roughness<br />

Range (IRI)<br />

All Damage<br />

(%)<br />

Traffic Range (MT-AADT)<br />

100 - 1999 2000 - 3999 4000 - 5999 6000 - 9999 > 10000<br />

<strong>12</strong>.00 All<br />

Full Recon<br />

110mm<br />

Full Recon<br />

135mm<br />

Full Recon 150mm<br />

Full Recon<br />

180mm<br />

Full Recon<br />

195mm<br />

11


Holding St<strong>and</strong>ard with Reconstruction for Zilla Roads<br />

Roughness<br />

Range (IRI)<br />

All Damage<br />

(%)<br />

Traffic Range (MT-AADT)<br />

100 - 999 1000-1999 2000-2999 3000-3999 >4000<br />

0 -10% Routine Routine Routine Routine Routine<br />

30% Carpet 40mm<br />

Carpet 40mm<br />

> <strong>12</strong>.00 All Full Rec 75mm<br />

Compound <strong>Maintenance</strong> St<strong>and</strong>ards for National Corridor Roads<br />

Roughness<br />

Range (IRI)<br />

Cracking<br />

Range (%)<br />

Traffic Range (MT-AADT)<br />

100 - 1999 2000 - 3999 4000 - 5999 6000 - 9999 > 10000<br />

< 4.0<br />

< 25% Routine<br />

>= 25% DBST 25mm Overlay 50mm<br />

4.00 - < 7.00 All<br />

Overlay 50mm Overlay 80mm<br />

Overlay 50mm<br />

7.00 - < 9.00 All Overlay 60mm Overlay 80mm<br />

9.00 - < <strong>12</strong>.00 All Rehab <strong>12</strong>0mm Rehab 140mm<br />

Rehab<br />

150mm<br />

Rehab 180<br />

Rehab 195mm<br />

> <strong>12</strong>.00 All<br />

Full Rec<br />

<strong>12</strong>0mm<br />

Full Rec 140mm<br />

Full Recon<br />

150mm<br />

Full Recon<br />

180mm<br />

Full Recon<br />

195mm<br />

Compound <strong>Maintenance</strong> St<strong>and</strong>ards for Other National Roads<br />

Roughness Range<br />

(IRI)<br />

Cracking<br />

Range (%)<br />

Traffic Range (MT-AADT)<br />

100 - 1999 2000 - 3999 4000 - 5999 6000 - 9999 > 10000<br />

< 5.0<br />

< 25% Routine<br />

>= 25% DBST 25mm Overlay 50mm<br />

5.00 - < 7.00 All<br />

Overlay 50mm<br />

Overlay 50mm<br />

7.00 - < 9.00 All Overlay 60mm<br />

Overlay 80mm<br />

9.00 - < <strong>12</strong>.00 All Rehab 110mm Rehab 135mm<br />

Rehab<br />

150mm<br />

Rehab 180 mm<br />

Rehab 195mm<br />

> <strong>12</strong>.00 All<br />

Full Recon<br />

110mm<br />

Full Recon<br />

135mm<br />

Full Recon<br />

150mm<br />

Full Recon<br />

180mm<br />

Full Recon<br />

195mm<br />

<strong>12</strong>


Compound <strong>Maintenance</strong> St<strong>and</strong>ards for Regional Roads<br />

Roughness Range<br />

(IRI)<br />

Cracking<br />

Range (%)<br />

Traffic Range (MT-AADT)<br />

100 - 1999 2000 - 2999 3000 - 3999 4000 - 4999 > 5000<br />

< 5.5.0<br />

< 25% Routine<br />

>= 25% DBST 25mm<br />

5.50 - < 7.00 All Overlay 50mm<br />

7.00 - < 9.00 All Overlay 50mm Overlay 60mm<br />

Overlay 60mm<br />

9.00 - < <strong>12</strong>.00 All Rehab 110mm Rehab 135mm Rehab 150mm<br />

> <strong>12</strong>.00 All<br />

Full Recon<br />

110mm<br />

Full Recon 135mm<br />

Full Recon 150mm<br />

Compound <strong>Maintenance</strong> St<strong>and</strong>ards for Zilla Roads<br />

Roughness Range<br />

(IRI)<br />

Cracking<br />

Range (%)<br />

Traffic Range (MT-AADT)<br />

100-999 1000-1999 2000-2999 3000-3999 >4000<br />

< 6.0<br />

< 25% Routine<br />

>= 25% Seal 15mm Carpet 40mm<br />

Overlay<br />

50mm<br />

6.0 - < 7.00 All<br />

7.00 - < 9.00 All<br />

Carpet 40mm<br />

Overlay<br />

50mm<br />

9.00 - < <strong>12</strong>.00 All Rehab- 75mm<br />

> <strong>12</strong>.00 All Full Rec 75mm<br />

3.4 Unit Costs.<br />

Table 3.3 shows the unit cost of different work prepared in accordance with the RHD Schedule of<br />

Rates 2011.<br />

Table 3.3` Unit costs of Treatment.<br />

Work Class Work Type Predominant Activity Fin Cost (Tk) Unit<br />

Routine <strong>Maintenance</strong> Outside Carriageway<br />

50,000 Per Km<br />

Routine<br />

Periodic<br />

Routine<br />

<strong>Maintenance</strong><br />

Resurfacing<br />

Patching Potholes 1,272 Per m 2<br />

Crack Sealing 189 Per m 2<br />

Edge Repair 1,272 Per m 2<br />

Seal Coat 15 mm 189 Per m 2<br />

DBST 300 Per m 2<br />

Asphalt Mix Bituminous Carpeting 40mm 641 Per m 2<br />

13


Resurfacing Overlay 40 mm 598 Per m 2<br />

Overlay 50 mm 740 Per m 2<br />

Overlay 60 mm 883 Per m 2<br />

Overlay 80 mm 1,168 Per m 2<br />

Overlay 100 mm 1,454 Per m 2<br />

Overlay <strong>12</strong>0 mm 1,739 Per m 2<br />

Partial Reconstruction 75 mm 2,294 Per m 2<br />

Partial Reconstruction 100 mm 2,651 Per m 2<br />

Partial Reconstruction 110 mm 2,793 Per m 2<br />

<strong>Rehabilitation</strong><br />

Partial<br />

Reconstruction<br />

Partial Reconstruction <strong>12</strong>0 mm 2,936 Per m 2<br />

Partial Reconstruction 135 mm 3,424 Per m 2<br />

Partial Reconstruction 140 mm 3,495 Per m 2<br />

Partial Reconstruction 150 mm 3,638 Per m 2<br />

Partial Reconstruction 180 mm 4,340 Per m 2<br />

Partial Reconstruction 195 mm 4,554 Per m 2<br />

Full Reconstruction 75 mm 3,498 Per m 2<br />

Full Reconstruction 100 mm 3,770 Per m 2<br />

Full Reconstruction 110 mm 3,9<strong>12</strong> Per m 2<br />

Full Reconstruction <strong>12</strong>0 mm 4,055 Per m 2<br />

Reconstruction Full Reconstruction Full Reconstruction 135 mm 4,329 Per m 2<br />

Full Reconstruction 140 mm 4,614 Per m 2<br />

Full Reconstruction 150 mm 4,757 Per m 2<br />

Full Reconstruction 180 mm 5,459 Per m 2<br />

Full Reconstruction 195 mm 5,673 Per m 2<br />

14


CHAPTER 4: RESULTS OF HDM-4 ANALYSIS.<br />

4.1 Analysis Procedure:<br />

The analysis was carried out in the following sequences.<br />

• Run all roads to obtain the overall funding needs. This will also allow a comparison between<br />

last years results to get a picture of overall changes in network condition.<br />

• Remove all segments currently ongoing <strong>and</strong> run HDM-4 to get the immediate funding needs<br />

for the year 20<strong>12</strong>-2013.<br />

4.2 Network Results (Unconstrained):<br />

Like the previous years, HDM-4 analysis was carried out for all road networks to get the overall<br />

picture of needs. This has produced a detailed work programme for the full 20-years analysis period.<br />

However, only the first five years should be considered when estimating the future funding needs due<br />

to the uncertainty about future conditions <strong>and</strong> availability of funds.<br />

The unconstrained capital cost of initial 5 years for all analyzed road lengths are given in figure 4.1<br />

below. Here, the total five years cost for capital works; i.e. periodic maintenance, partial <strong>and</strong> full<br />

reconstruction, is 100,9<strong>12</strong>.88 million taka wherein the average dem<strong>and</strong> per year is around 20,000<br />

million taka.<br />

Figure 4.1: Total unconstrained dem<strong>and</strong> of capital works for next five years (2013-17).<br />

15


Table 4.2: Total Capital works dem<strong>and</strong>s for the next five years (in Million Taka)<br />

Road Class 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

National 27196.31 2536.10 1419.72 642.71 404.94 32199.79<br />

Regional 17709.46 <strong>23</strong>93.43 1015.28 778.28 686.50 22582.96<br />

Zilla <strong>23</strong>559.21 9987.60 5417.93 4194.02 2971.37 46130.13<br />

Total 68464.99 14917.14 7852.93 5615.01 4062.81 1009<strong>12</strong>.88<br />

Table 4.3: Periodic <strong>Maintenance</strong> Dem<strong>and</strong>s (Million Taka) for the Next Five Years<br />

Road Class 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

National 9073.52 <strong>23</strong>01.84 1418.<strong>12</strong> 609.79 404.94 13808.20<br />

Regional 5870.20 1709.11 1010.64 777.19 481.25 9848.38<br />

Zilla 7773.04 856.50 1592.19 <strong>12</strong>41.26 517.68 11980.67<br />

Total 22716.76 4867.45 4020.95 2628.24 1403.87 35637.26<br />

Table 4.4: Partial Reconstruction Dem<strong>and</strong>s (Million Taka) for the Next Five Years<br />

Road Class 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

National 6275.30 <strong>23</strong>4.27 1.61 32.92 0.00 6544.10<br />

Regional 3955.68 567.50 4.64 1.09 205.25 4734.15<br />

Zilla 11787.57 9055.95 3789.51 2862.75 2221.17 29716.94<br />

Total 22018.55 9857.72 3795.75 2896.76 2426.42 40995.20<br />

Table 4.5: Full Reconstruction Dem<strong>and</strong>s (Million Taka) for the Next Five Years<br />

Road Class 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

National 11847.49 0.00 0.00 0.00 0.00 11847.49<br />

Regional 7883.59 116.83 0.00 0.00 0.00 8000.42<br />

Zilla 3998.59 75.15 36.22 90.02 <strong>23</strong>2.53 4432.51<br />

Total <strong>23</strong>729.68 191.98 36.22 90.02 <strong>23</strong>2.53 24280.42<br />

16


Table 4.6: Routine <strong>Maintenance</strong> Dem<strong>and</strong>s (Million Taka) for the Next Five Years<br />

Road Class<br />

National<br />

Regional<br />

Zilla<br />

Total<br />

20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

305.<strong>12</strong> 721.61 729.83 763.39 801.75 3321.70<br />

422.62 996.76 1006.67 1080.82 1160.84 4667.72<br />

1721.09 3463.62 3733.26 4011.15 4332.83 17261.95<br />

2448.83 5181.99 5469.76 5855.36 6295.42 25251.37<br />

Tables 4.2 to 4.6 shows the class wise (Capital works <strong>and</strong> Routine <strong>Maintenance</strong> costs) dem<strong>and</strong><br />

required for the first five years of analysis. Analyzed length for 20<strong>12</strong>-13 analysis is 17,494.33 Km<br />

against 18,17.7 Km of 2011-<strong>12</strong>, 17,482 Km of 2010-11, 16,821 km of 2009-10 <strong>and</strong> 16,924 km in<br />

2008-09 analysis. All sets of figures are from analyses including ongoing projects.<br />

Table 4.7: Lengths of different work category in all classes of roads (Km)<br />

Road Class Treatment Type 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17<br />

National<br />

Highways<br />

Regional<br />

Highways<br />

Zilla<br />

Roads<br />

Periodic <strong>Maintenance</strong><br />

1970.87 489.88 241.75 170.69 107.44<br />

Partial Reconstruction<br />

346.73 16.40 0.10 1.94 0.00<br />

Full Reconstruction<br />

483.91 0.00 0.00 0.00 0.00<br />

National H. Total<br />

2801.51 506.28 241.85 172.63 107.44<br />

Periodic <strong>Maintenance</strong><br />

25<strong>23</strong>.48 570.17 314.38 301.87 218.46<br />

Partial Reconstruction<br />

321.10 47.79 0.64 0.10 25.03<br />

Full Reconstruction<br />

489.49 8.40 0.00 0.00 0.00<br />

Regional H. Total<br />

3334.07 626.36 315.02 301.97 243.49<br />

Periodic <strong>Maintenance</strong> 4627.57 491.11 881.19 728.86 364.49<br />

Partial Reconstruction 2000.82 1513.82 614.36 488.75 381.54<br />

Full Reconstruction 431.92 8.85 4.10 10.26 26.86<br />

Zilla Road Total 7060.31 2013.78 1499.65 <strong>12</strong>27.87 772.89<br />

Gr<strong>and</strong> Total 13195.89 3146.42 2056.52 1702.47 11<strong>23</strong>.82<br />

4.3 Dem<strong>and</strong> excluding ongoing projects:<br />

List of ongoing projects were collected from concerned authorities <strong>and</strong> also the list of ongoing works<br />

of the previous year was collected. Ongoing segments were then excluded from HDM run <strong>and</strong><br />

remaining sections were analysed separately. This was done to avoid duplication of the current year’s<br />

maintenance programme <strong>and</strong> to ascertain the actual immediate need of capital budget.<br />

17


Table 4.8 Capital dem<strong>and</strong> of National/Regional Roads 20<strong>12</strong>-13 (excluding on- going projects)<br />

(million taka)<br />

Zone Periodic Partial Recon Full Recon Total<br />

Barisal<br />

456.91 875.44 978.18 <strong>23</strong>10.53<br />

Chittagong<br />

872.70 1059.42 <strong>23</strong>35.29 4267.40<br />

Comilla<br />

527.71 429.73 1390.54 <strong>23</strong>47.97<br />

Dhaka<br />

3179.07 1045.91 <strong>12</strong>60.77 5485.75<br />

Gopalgonj<br />

167.33 <strong>12</strong>9.17 428.80 725.30<br />

Khulna<br />

1089.90 807.17 2750.26 4647.34<br />

Rajshahi<br />

<strong>12</strong>84.55 808.99 288.47 <strong>23</strong>82.02<br />

Rangpur<br />

1888.27 1039.13 406.60 3334.00<br />

Sylhet<br />

682.18 79.79 580.72 1342.68<br />

Total 10148.62 6274.75 10419.63 26842.99<br />

Figure 4.2: Zone wise capital needs of National <strong>and</strong> Regional Highways in year 20<strong>12</strong>-13<br />

18


Table 4.9: Funding <strong>Needs</strong> of Zilla Roads Networks for 20<strong>12</strong>-2013 (Excluding Ongoing Projects)<br />

(million taka)<br />

Zone Periodic Partial Recon Full Recon Gr<strong>and</strong> Total<br />

Barisal<br />

Chittagong<br />

Comilla<br />

Dhaka<br />

Gopalgonj<br />

Khulna<br />

Rajshahi<br />

Rangpur<br />

Sylhet<br />

Total<br />

485.79 194.27 70.42 750.48<br />

385.14 690.84 180.21 <strong>12</strong>56.19<br />

678.35 882.95 326.88 1888.18<br />

210.10 1589.03 330.06 2<strong>12</strong>9.18<br />

93.60 41.34 2.61 137.55<br />

589.29 591.20 258.39 1438.87<br />

428.<strong>23</strong> 620.17 137.31 1185.71<br />

734.81 1357.17 <strong>12</strong>7.31 2219.30<br />

93.47 <strong>12</strong>8.17<br />

0.0<br />

221.65<br />

3698.78 6095.14 1433.19 1<strong>12</strong>27.11<br />

Figure 4.3: Zone wise capital needs of Zilla Road Network in year 2011-20<strong>12</strong><br />

4.4 Pavement Strengthening:<br />

The 2008-09 <strong>Needs</strong> <strong>Report</strong> included an evaluation of the requirements for strengthening of national<br />

roads, based on RMMS deflection data. This was intended to highlight the issue of inherent weakness<br />

of many roads in Bangladesh. The treatments proposed were indicative. It was not intended that any<br />

work of this nature should be carried out without undertaking a detailed survey <strong>and</strong> investigation<br />

19


Table 4.10: Required Length of different Road Class for Capital works in next five years<br />

(Excluding ongoing Works)<br />

(in Km)<br />

Road Class Treatment Type 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17<br />

Periodic <strong>Maintenance</strong> 1367.8 283.44 186.59 96.29 68.81<br />

National<br />

Highways<br />

Partial Reconstruction 214.97 7.81 0.1 1.94 0<br />

Full Reconstruction 228.15 0 0 0 0<br />

National H. Total 1810.92 291.25 186.69 98.<strong>23</strong> 68.81<br />

Periodic <strong>Maintenance</strong> 1627.89 379.79 215.49 160.89 146.55<br />

Regional<br />

Highways<br />

Partial Reconstruction 194.8 30.48 0.64 0.1 25.03<br />

Full Reconstruction 296.75 8.4 0 0 0<br />

Regional H. Total 2119.44 418.67 216.13 160.99 171.58<br />

Periodic <strong>Maintenance</strong> 2143.7 2<strong>23</strong>.36 473.43 399.96 173.36<br />

Zilla<br />

Roads<br />

Partial Reconstruction 1030 751.28 283.83 194.73 193.55<br />

Full Reconstruction 151.96 0.5 0.8 1.8 0<br />

Zilla Road Total 3325.66 975.14 758.06 596.49 366.91<br />

Gr<strong>and</strong> Total 7256.02 1685.06 1160.88 855.71 607.3<br />

Figure 4.4: Decreasing trend of length of roads that requires treatment (in Km)<br />

followed by an engineering design. The latest road condition surveys have provided up to date<br />

deflection data for the RHD network, although the frequency of measurement is not sufficient to base<br />

detailed design on. It is suggested that before initiating any strengthening work, the design has to be<br />

done according to the current pavement condition (deflection) of the respective road.<br />

4.5 Overall <strong>Needs</strong>:<br />

The initial run of HDM, including ongoing projects, is indicative of the longer-term needs of the<br />

network. Roads excluded from the run on the ground works on them are currently in progress or<br />

20


ecently completed, will require periodic maintenance before the end of the five year period <strong>and</strong> thus<br />

the five-year plan should be based on the “All Roads” HDM Output.<br />

Table 4.11: Overall <strong>Maintenance</strong> <strong>Needs</strong> by Work Category (Million Taka)<br />

Work Type 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

Routine <strong>Maintenance</strong> 2448.83 5181.99 5469.76 5855.36 6295.42 25251.37<br />

Periodic <strong>Maintenance</strong> 22716.76 4867.45 4020.95 2628.24 1403.87 35637.26<br />

Partial Recon 22018.55 9857.72 3795.75 2896.76 2426.42 40995.20<br />

Full Recon <strong>23</strong>729.68 191.98 36.22 90.02 <strong>23</strong>2.53 24280.42<br />

Total 70913.82 20099.14 13322.68 11470.38 10358.24 <strong>12</strong>6164.3<br />

The Road Master Plan makes a strong case for separating the assessment of Zilla roads from that of<br />

National <strong>and</strong> Regional Roads. It can be seen from Tables 4.11 <strong>and</strong> 4.<strong>12</strong> that the needs of Zilla Roads<br />

are predominantly rehabilitation <strong>and</strong> reconstruction, hence the proposal in RMP for a “Zilla Road<br />

Recovery Programme”. In the past two years, no Zilla roads have featured in the PMP because the<br />

prioritization using NPV/C favours more heavily trafficked roads. It is therefore important that a<br />

separate prioritization process is adopted for Zilla Roads.<br />

The results of the HDM analysis show that, in the first five years, the budget dem<strong>and</strong> for Zilla Roads<br />

is higher than that for National <strong>and</strong> Regional Roads. The overall figures translate into a need to invest<br />

more in Zilla Roads over the next five years. It is therefore strongly recommended that separate<br />

budget provision is made for Zilla Roads for the next five years.<br />

Table 4.<strong>12</strong>: Overall <strong>Maintenance</strong> <strong>Needs</strong> by Work Category for National <strong>and</strong> Regional Roads (Million<br />

Taka)<br />

Work Type 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

Routine <strong>Maintenance</strong> 727.74 1718.37 1736.50 1844.21 1962.59 7989.42<br />

Periodic <strong>Maintenance</strong> 14943.72 4010.94 2428.75 1386.98 886.19 <strong>23</strong>656.59<br />

Partial Recon 10<strong>23</strong>0.98 801.77 6.25 34.01 205.25 1<strong>12</strong>78.25<br />

Full Recon 19731.08 116.83 0.00 0.00 0.00 19847.91<br />

Total 45633.52 6647.91 4171.5 3265.2 3054.03 62772.17<br />

Table 4.13: Overall <strong>Maintenance</strong> <strong>Needs</strong> by Work Category for Zilla Roads (Million Taka)<br />

Work Type 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

Routine <strong>Maintenance</strong> 1721.09 3463.62 3733.26 4011.15 4332.83 17261.95<br />

Periodic <strong>Maintenance</strong> 7773.04 856.50 1592.19 <strong>12</strong>41.26 517.68 11980.67<br />

Partial Recon 11787.57 9055.95 3789.51 2862.75 2221.17 29716.94<br />

Full Recon 3998.59 75.15 36.22 90.02 <strong>23</strong>2.53 4432.51<br />

Total 25280.29 13451.22 9151.18 8205.18 7304.21 63392.07<br />

21


CHAPTER 5: FINDINGS AND RECOMMENDATIONS<br />

5.1 Major Findings:<br />

• The overall or total maintenance needs for the coming five years are:<br />

Table 5.1: Overall <strong>Maintenance</strong> <strong>Needs</strong> for the next five years (2013-2017) in Million Taka<br />

Year 20<strong>12</strong>-13 2013-14 2014-15 2015-16 2016-17 TOTAL<br />

Total 70913.82 20099.14 13322.68 11470.38 10358.24 <strong>12</strong>6164.3<br />

• The immediate maintenance need for the year 20<strong>12</strong>-13 is:<br />

Table 5.2: Immediate <strong>Maintenance</strong> <strong>Needs</strong> 20<strong>12</strong>-2013 (Million Taka)<br />

Routine<br />

<strong>Maintenance</strong><br />

Periodic<br />

<strong>Maintenance</strong><br />

<strong>Maintenance</strong> Backlog<br />

Partial<br />

Reconstruction<br />

Full<br />

Reconstruction<br />

Total<br />

Need<br />

1721.22 13847.4 1<strong>23</strong>69.89 11852.82 39791.33<br />

• The overall maintenance needs for National <strong>and</strong> Regional Highways as well as for Zilla roads<br />

have decreased in comparison to the previous year’s analysis indicating an overall<br />

improvement.<br />

22


5.2 Recommendations:<br />

• Since HDM-4 is basically an economic tool for selection <strong>and</strong> prioritisation of road<br />

maintenance options, Field visits <strong>and</strong> design verification must be undertaken before finalising<br />

treatment option.<br />

• It is evident from the analysis that, the investment needs tend to decrease considerably<br />

provided that the first year requirements are met completely. So, efforts should be given to<br />

maximize the first year maintenance in order to minimize backlogs.<br />

• Routine maintenance has to be done properly <strong>and</strong> should be the first budget priority.<br />

• Since the prioritisation of projects using NPV/Cost favours the more heavily trafficked roads,<br />

adoption of a separate prioritisation process for zilla roads is recommended.<br />

• Small contracts should be avoided in the maintenance programme to improve quality of<br />

works.<br />

(Munmun Biswas)<br />

Asssistant Engineer<br />

HDM Operation Division<br />

(Mahmudul Islam Khan)<br />

Sub Divisional Engineer (C.C.)<br />

Data Collection Sub Division<br />

(Md. Arshad Ali)<br />

HDM Specialist<br />

(A K Mohhammad Fazlul Karim)<br />

Executive Engineer<br />

(Addl Charge)<br />

HDM Operation Division<br />

(Md. Jawed Alam)<br />

Superintending Engineer, RHD<br />

(Addl Charge)<br />

HDM Circle<br />

<strong>23</strong>


Appendix-A<br />

1st Year Unconstrained Capital Works for National<br />

<strong>and</strong> Regional Highways sorted by NPV/Cost.<br />

(Excluding ongoing projects)


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 002.60-002.70 S 0.10 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.349 40.02 17.62<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 002.80-004.10 S 1.30 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 4.531 38.79 215.19<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 006.30-006.50 S 0.20 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.697 38.<strong>12</strong> 31.61<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 006.60-006.80 S 0.20 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.792 33.73 33.74<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 001.90-002.50 S 0.60 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 2.106 33.50 81.76<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 004.20-004.70 S 0.50 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 1.743 31.24 66.66<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 005.60-005.90 S 0.30 21334 Regional DBST 25mm @ 25% Crk 2013 0.415 28.79 42.73<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 004.90-005.40 S 0.50 21334 Regional DBST 25mm @ 25% Crk 2013 0.692 27.90 67.67<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 001.30-001.40 S 0.10 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.436 27.67 13.63<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 000.01-000.06 L 0.05 30316 Regional DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>4 27.65 10.78<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 022.60-0<strong>23</strong>.00 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 1.910 26.05 56.27<br />

Comilla Feni N104 Feni-Noakhali Road Km 002.50-002.60 S 0.10 1<strong>23</strong>76 National Overlay 50mm @ IRI 5 2013 0.303 25.99 11.59<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 097.26-097.30 S 0.04 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 0.147 25.68 4.50<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 021.80-022.20 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 1.910 24.14 52.14<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 033.58-033.65 R 0.06 16426 National Overlay 50mm @ IRI 4 2013 0.217 22.30 9.26<br />

Comilla Feni N104 Feni-Noakhali Road Km 011.40-011.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.461 22.11 <strong>12</strong>.<strong>12</strong><br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 006.90-007.50 S 0.60 8310 Regional Overlay 60mm @ IRI 5.5-9 2013 2.102 22.09 55.26<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 000.06-000.71 S 0.64 30316 Regional DBST 25mm @ 25% Crk 2013 1.928 21.98 137.15<br />

Dhaka Dhaka N302 Tongi-Ashulia-Zerabo-EPZ Road Km 000.00-006.50 S 6.50 21914 National Overlay 80mm @ IRI 5-9 2013 53.556 21.80 1441.83<br />

Dhaka Narayanganj N105 Madanpur-Joydevpur Km 006.50-006.60 S 0.10 9061 National Overlay 50mm @ IRI 5-7 2013 0.214 21.52 6.02<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 074.35-075.15 S 0.80 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 3.753 21.31 104.56<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 000.01-000.06 R 0.05 30316 Regional DBST @ Traff >6000 2013 0.142 21.26 9.93<br />

Comilla Feni N104 Feni-Noakhali Road Km 000.40-000.70 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.383 20.86 32.62<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 058.95-059.00 L 0.05 11451 National Overlay 80mm @ IRI 4-9 2013 0.257 20.51 6.45<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 058.95-059.00 R 0.05 11451 National Overlay 80mm @ IRI 4-9 2013 0.257 20.51 6.45<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 0<strong>12</strong>.90-013.00 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.477 20.44 10.58<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 219.48-219.78 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 20.41 43.78<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 434.54-439.41 S 4.87 11451 National Overlay 80mm @ IRI 4-9 2013 24.267 20.36 587.78<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 001.90-002.20 S 0.30 17870 Regional Overlay 60mm @ IRI 5.5-9 2013 2.<strong>12</strong>8 20.25 56.96<br />

Dhaka Gazipur R303 Tongi By-Pass Road Km 000.60-000.70 S 0.10 10199 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 20.20 9.04<br />

Comilla Laxmipur R143 Maijdi-Ch<strong>and</strong>raganj Road Km 015.50-015.52 S 0.02 5722 Regional Overlay 60mm @ IRI 5.5-9 2013 0.067 20.15 1.40<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 015.30-016.10 S 0.80 11451 National Overlay 80mm @ IRI 5-9 2013 3.997 19.92 88.08<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 020.70-020.90 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.518 19.69 <strong>12</strong>.48<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 0<strong>23</strong>.60-027.80 S 4.20 11451 National Overlay 80mm @ IRI 5-9 2013 20.570 19.66 447.43<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 013.70-014.00 S 0.30 11451 National Overlay 50mm @ IRI 5 2013 0.908 19.62 24.18<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 298.78-300.48 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 9.459 19.58 226.76<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 029.89-030.<strong>12</strong> R 0.22 9061 National Overlay 50mm @ IRI 4-7 2013 0.524 19.46 16.48<br />

Dhaka Dhaka N302 Tongi-Ashulia-Zerabo-EPZ Road Km 017.44-017.55 S 0.11 18611 National Overlay 80mm @ IRI 5-9 2013 0.816 19.37 19.53<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 078.55-078.75 S 0.20 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 19.36 33.74<br />

Dhaka Gazipur R505 Nabinagar-Kaliakoir Road Km 014.00-015.83 S 1.83 17384 Regional DBST @ Traff >6000 2013 3.381 19.30 229.48<br />

Dhaka Narayanganj R201 Tarabo-Demraghat Road Km 000.00-002.<strong>12</strong> S 2.<strong>12</strong> 19185 Regional Overlay 60mm @ IRI 5.5-9 2013 8.720 19.18 270.49<br />

Appendix-A: Page:1 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 013.10-013.50 S 0.40 11451 National Overlay 50mm @ IRI 5 2013 1.211 18.97 31.17<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 029.44-030.24 S 0.80 11451 National Overlay 80mm @ IRI 5-9 2013 4.807 18.91 1<strong>12</strong>.25<br />

Dhaka Gazipur N4 Joydebpur-Jamalpur Road Km 021.47-026.75 S 5.28 19452 National Overlay 80mm @ IRI 4-9 2013 33.074 18.46 828.26<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 072.19-072.34 S 0.15 11451 National Overlay 80mm @ IRI 5-9 2013 0.714 18.39 20.94<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 045.58-045.99 S 0.41 11451 National Overlay 80mm @ IRI 5-9 2013 2.072 18.37 44.11<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 174.38-174.58 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.251 18.32 31.10<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 017.70-027.40 S 9.70 17148 National Overlay 50mm @ IRI 4 2013 37.960 18.25 <strong>12</strong>49.48<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 036.28-037.78 R 1.50 11451 National Overlay 80mm @ IRI 4-9 2013 9.013 18.25 203.11<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 049.94-050.84 S 0.90 9061 National Overlay 60mm @ IRI 7-9 2013 3.081 18.21 69.66<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 038.00-038.20 S 0.20 10253 National Overlay 80mm @ IRI 5-9 2013 0.924 18.20 17.90<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 075.45-078.55 S 3.10 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 18.704 18.13 418.59<br />

Khulna Satkhira N715 Benapole Town Old Section Km 004.20-004.40 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.685 17.99 16.37<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 062.75-062.95 S 0.20 9061 National Overlay 50mm @ IRI 5-7 2013 0.574 17.95 13.02<br />

Khulna Jessore N707 Jessore Town Old Section Km 001.40-001.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.510 17.91 14.78<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 041.54-041.64 R 0.10 16426 National Overlay 50mm @ IRI 4 2013 0.343 17.82 9.00<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 148.62-148.72 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.551 17.80 15.87<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 016.30-017.20 S 0.90 11451 National Overlay 80mm @ IRI 5-9 2013 5.037 17.71 104.57<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 040.99-041.19 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 17.59 26.82<br />

Rangpur Bogra N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 164.<strong>12</strong>-174.36 S 10.<strong>23</strong> 10530 National Overlay 80mm @ IRI 4-9 2013 62.667 17.56 1492.52<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 228.86-228.96 S 0.10 11451 National DBST @ Traff >6000 2013 0.210 17.45 16.76<br />

Khulna Satkhira N715 Benapole Town Old Section Km 003.60-004.00 S 0.40 9061 National Overlay 60mm @ IRI 7-9 2013 1.369 17.44 31.74<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 153.46-153.56 S 0.10 9061 National Overlay 60mm @ IRI 7-9 2013 0.311 17.37 7.93<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 091.96-092.46 S 0.50 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 1.556 17.36 31.30<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 009.30-009.40 L 0.10 11451 National DBST @ Traff >6000 2013 0.183 17.34 14.49<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 014.90-015.20 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.432 17.28 26.84<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 145.42-145.52 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.477 17.26 13.32<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 405.10-405.20 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.494 17.22 10.75<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 102.22-102.42 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.202 17.21 28.06<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 077.14-077.24 S 0.10 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 0.617 17.19 14.40<br />

Comilla Feni N104 Feni-Noakhali Road Km 002.80-005.10 S 2.30 1<strong>12</strong>25 National Overlay 80mm @ IRI 5-9 2013 10.980 17.18 218.59<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 074.60-077.20 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 16.051 17.04 337.77<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 001.50-001.70 S 0.20 21334 Regional DBST @ Traff >6000 2013 0.346 16.98 18.33<br />

Khulna Satkhira N715 Benapole Town Old Section Km 004.80-005.00 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.685 16.94 16.01<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 033.65-041.54 S 7.89 16426 National Overlay 50mm @ IRI 4 2013 30.875 16.87 939.24<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 019.30-021.20 S 1.90 11451 National Overlay 80mm @ IRI 5-9 2013 9.071 16.81 165.27<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 063.10-063.20 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.302 16.80 6.33<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 305.08-305.78 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.860 16.78 81.83<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 041.78-041.88 S 0.10 10253 National Overlay 80mm @ IRI 5-9 2013 0.461 16.77 8.38<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 029.89-030.<strong>12</strong> L 0.22 9061 National Overlay 50mm @ IRI 4-7 2013 0.617 16.73 16.69<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 072.44-072.66 S 0.22 11451 National Overlay 80mm @ IRI 5-9 2013 1.081 16.73 28.48<br />

Rajshahi Natore N502 Bogra -Natore Road Km 044.26-045.26 S 1.00 9061 National Overlay 60mm @ IRI 7-9 2013 3.510 16.72 70.73<br />

Appendix-A: Page:2 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 064.40-065.10 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.522 16.70 50.11<br />

Khulna Jhenaidah N703 Jhenaidah Town Old Section Km 003.40-003.47 S 0.07 11451 National Overlay 80mm @ IRI 5-9 2013 0.336 16.68 7.08<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 039.90-040.00 S 0.10 10253 National Overlay 80mm @ IRI 5-9 2013 0.477 16.68 8.63<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 080.25-080.55 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.852 16.63 41.78<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 303.08-303.38 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 16.60 37.17<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 014.10-014.60 S 0.50 11451 National Overlay 80mm @ IRI 5-9 2013 2.387 16.55 42.84<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 072.85-073.15 S 0.30 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 1.408 16.49 32.76<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 027.80-030.00 S 2.20 11451 National Overlay 80mm @ IRI 5-9 2013 10.503 16.49 206.03<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 303.98-304.18 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.152 16.49 24.27<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 085.25-086.25 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 6.091 16.41 141.05<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 063.97-064.11 R 0.14 11669 National Overlay 50mm @ IRI 4 2013 0.545 16.41 16.<strong>12</strong><br />

Comilla Feni N104 Feni-Noakhali Road Km 008.60-009.20 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 2.766 16.39 59.25<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 059.45-059.55 S 0.10 9061 National Overlay 50mm @ IRI 5-7 2013 0.287 16.38 6.76<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 006.70-010.40 S 3.70 11451 National Overlay 80mm @ IRI 5-9 2013 22.<strong>23</strong>2 16.38 446.09<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 304.68-304.88 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.152 16.33 26.35<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 314.58-315.17 S 0.59 11451 National Overlay 80mm @ IRI 4-9 2013 3.222 16.32 68.71<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 313.38-314.48 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 5.976 16.<strong>23</strong> <strong>12</strong>6.80<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km 142.55-144.98 S 2.43 11451 National Overlay 80mm @ IRI 4-9 2013 14.601 16.18 291.72<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 048.24-048.94 S 0.70 9061 National Overlay 60mm @ IRI 7-9 2013 2.396 16.17 53.07<br />

Comilla Feni N104 Feni-Noakhali Road Km 010.40-010.60 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 0.922 16.01 18.08<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 069.20-069.40 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.721 15.99 14.11<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 000.20-001.70 S 1.50 17870 Regional DBST @ Traff >6000 2013 4.261 15.98 263.76<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 048.79-049.17 S 0.38 11451 National Overlay 80mm @ IRI 5-9 2013 2.352 15.97 46.38<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 061.35-062.45 S 1.10 9061 National Overlay 50mm @ IRI 5-7 2013 3.158 15.96 74.25<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 064.00-064.20 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.604 15.96 <strong>12</strong>.41<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 014.30-016.00 S 1.70 11451 National Overlay 80mm @ IRI 5-9 2013 10.215 15.84 198.25<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 199.68-200.38 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.457 15.82 69.08<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 090.36-091.76 S 1.40 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 4.356 15.79 81.83<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 200.48-200.68 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.103 15.72 21.90<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 037.88-039.13 R 1.25 11451 National Overlay 80mm @ IRI 4-9 2013 7.511 15.70 145.57<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 052.76-052.87 L 0.11 <strong>12</strong>877 National Overlay 80mm @ IRI 4-9 2013 0.685 15.69 13.28<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 013.90-014.00 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.601 15.60 10.60<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 088.56-090.26 S 1.70 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 5.290 15.59 98.14<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 039.89-039.99 S 0.10 11451 National DBST @ Traff >6000 2013 0.185 15.56 13.19<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 086.35-087.64 S 1.29 11451 National Overlay 80mm @ IRI 4-9 2013 7.876 15.52 165.84<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 022.49-0<strong>23</strong>.49 S 1.00 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.030 15.51 39.22<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 000.50-003.70 S 3.20 11451 National Overlay 80mm @ IRI 5-9 2013 19.228 15.48 364.54<br />

Dhaka Gazipur N4 Joydebpur-Jamalpur Road Km 017.27-019.47 S 2.20 16227 National Overlay 80mm @ IRI 4-9 2013 17.<strong>23</strong>9 15.44 410.38<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 065.30-065.80 S 0.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.511 15.42 29.02<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 028.84-029.14 S 0.30 11451 National DBST @ Traff >6000 2013 0.541 15.40 38.09<br />

Khulna Jessore N707 Jessore Town Old Section Km 001.60-003.40 S 1.80 11451 National Overlay 80mm @ IRI 5-9 2013 11.157 15.40 264.75<br />

Appendix-A: Page:3 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rangpur Bogra R545 Bogra-Joypurhat Road Km 000.70-007.30 S 6.60 7933 Regional DBST @ Traff >6000 2013 8.901 15.39 442.<strong>23</strong><br />

Khulna Jessore N7 Dauladia-Mongla Road Km 150.32-150.72 S 0.40 9061 National Overlay 50mm @ IRI 4-7 2013 1.044 15.35 25.55<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 0<strong>23</strong>.27-0<strong>23</strong>.87 S 0.60 5572 Regional Overlay 60mm @ IRI 5.5-9 2013 1.867 15.31 36.11<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 003.60-004.10 S 0.50 11451 National DBST @ Traff >6000 2013 1.050 15.29 73.41<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 219.08-219.48 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.338 15.24 43.59<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 084.95-085.25 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.827 15.15 37.55<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 035.18-036.08 R 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 5.452 15.06 101.36<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 001.20-001.70 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.6<strong>12</strong> 15.03 29.66<br />

Dhaka Munshiganj R8<strong>12</strong> Fatullah -Mawa Road Km 008.83-010.22 S 1.39 13225 Regional Overlay 60mm @ IRI 5.5-9 2013 4.798 15.01 <strong>12</strong>0.25<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 030.<strong>12</strong>-033.47 S 3.36 15267 National Overlay 80mm @ IRI 4-9 2013 20.730 14.97 437.96<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 102.42-103.92 S 1.50 11451 National Overlay 80mm @ IRI 4-9 2013 9.013 14.89 182.02<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 071.70-072.20 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.802 14.83 31.79<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 046.20-048.55 S 2.35 11451 National Overlay 80mm @ IRI 4-9 2013 14.103 14.82 258.10<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 181.52-185.62 S 4.10 11451 National Overlay 50mm @ IRI 4 2013 16.042 14.82 454.52<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 0<strong>23</strong>.95-024.15 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 14.81 <strong>12</strong>.81<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 1<strong>12</strong>.<strong>12</strong>-113.60 S 1.48 11451 National Overlay 80mm @ IRI 4-9 2013 8.911 14.79 162.73<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 218.18-218.48 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 14.78 36.30<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 204.28-206.<strong>23</strong> L 1.95 11451 National Overlay 80mm @ IRI 4-9 2013 10.760 14.74 252.88<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 086.25-086.35 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.609 14.72 <strong>12</strong>.17<br />

Comilla Feni N104 Feni-Noakhali Road Km 009.30-009.80 S 0.50 11451 National Overlay 80mm @ IRI 5-9 2013 2.305 14.72 42.87<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 005.40-005.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.510 14.72 9.82<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 153.66-153.96 S 0.30 9061 National Overlay 50mm @ IRI 4-7 2013 0.783 14.71 18.37<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 013.27-014.74 S 1.47 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.032 14.68 90.44<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 047.44-048.24 S 0.80 9061 National Overlay 60mm @ IRI 7-9 2013 2.738 14.66 53.37<br />

Rangpur Bogra N502 Bogra -Natore Road Km 030.86-032.00 S 1.14 9061 National Overlay 60mm @ IRI 7-9 2013 3.899 14.64 75.86<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 225.28-225.58 S 0.30 11451 National DBST @ Traff >6000 2013 0.771 14.64 51.60<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 002.30-002.60 S 0.30 24928 National DBST @ Traff >6000 2013 0.630 14.64 41.58<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 046.69-048.09 S 1.40 11451 National Overlay 80mm @ IRI 5-9 2013 7.594 14.55 139.65<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 029.49-029.69 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 14.55 11.14<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 226.38-226.78 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.799 14.52 50.17<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 009.40-0<strong>12</strong>.40 R 3.00 11451 National Overlay 50mm @ IRI 4 2013 <strong>12</strong>.<strong>12</strong>0 14.48 316.39<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 096.56-096.66 S 0.10 5536 Regional DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>5 14.47 6.24<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 032.24-036.94 S 4.70 11451 National Overlay 50mm @ IRI 5 2013 17.908 14.46 386.17<br />

Khulna Jessore N706 Jessore -Benapole Road Km 036.63-037.91 R 1.28 11451 National Overlay 80mm @ IRI 5-9 2013 7.877 14.46 175.58<br />

Dhaka Narayanganj N2 Dhaka-Sylhet-Jaflong Road Km 000.00-000.13 L 0.13 21762 National Overlay 50mm @ IRI 4 2013 0.391 14.44 8.33<br />

Dhaka Narayanganj N2 Dhaka-Sylhet-Jaflong Road Km 000.00-000.13 R 0.13 21762 National Overlay 50mm @ IRI 4 2013 0.391 14.44 8.33<br />

Khulna Jessore N706 Jessore -Benapole Road Km 036.63-037.91 L 1.28 11451 National Overlay 80mm @ IRI 5-9 2013 7.877 14.44 175.28<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 284.76-286.26 S 1.50 11451 National Overlay 80mm @ IRI 4-9 2013 9.260 14.42 181.19<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 029.21-040.18 S 10.97 4887 Regional Overlay 50mm @ IRI 5-7 2013 30.756 14.42 591.37<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 0<strong>12</strong>.25-013.27 L 1.02 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.161 14.39 55.71<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 278.48-278.78 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.432 14.39 32.45<br />

Appendix-A: Page:4 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 030.24-032.24 S 2.00 11451 National Overlay 80mm @ IRI 5-9 2013 <strong>12</strong>.018 14.37 213.28<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 047.02-050.<strong>12</strong> S 3.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.611 14.37 186.72<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 027.49-027.65 R 0.15 11451 National Overlay 80mm @ IRI 4-9 2013 0.945 14.37 16.76<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 079.85-080.25 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.469 14.36 48.10<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 303.48-303.88 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.305 14.35 46.29<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 001.30-001.80 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.743 14.34 31.58<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 100.52-102.22 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 10.215 14.34 198.74<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 010.70-013.30 S 2.60 11451 National Overlay 80mm @ IRI 5-9 2013 15.6<strong>23</strong> 14.33 274.21<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 014.20-014.60 S 0.40 11451 National DBST @ Traff >6000 2013 0.741 14.32 47.10<br />

Khulna Jessore N708 Jessore Town Old Section Km 000.00-000.20 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.202 14.31 25.33<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 130.81-137.61 S 6.80 9061 National Overlay 50mm @ IRI 4-7 2013 18.918 14.27 436.54<br />

Dhaka Narayanganj N105 Madanpur-Joydevpur Km 006.60-014.34 S 7.74 11451 National Overlay 50mm @ IRI 5 2013 27.890 14.20 676.13<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 006.00-006.20 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.136 14.15 20.31<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 087.64-090.79 S 3.15 11451 National Overlay 80mm @ IRI 4-9 2013 19.077 14.05 350.49<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 046.19-046.29 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.510 14.02 9.04<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 054.55-054.91 L 0.36 8983 National Overlay 50mm @ IRI 4-7 2013 0.942 14.02 21.68<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 054.55-054.91 R 0.36 8983 National Overlay 50mm @ IRI 4-7 2013 0.942 14.02 21.68<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 042.82-051.75 S 8.93 13453 National Overlay 50mm @ IRI 4 2013 34.946 14.01 882.80<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 036.75-039.78 S 3.03 11451 National DBST @ Traff >6000 2013 8.460 13.97 540.48<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 085.70-088.80 S 3.10 11451 National Overlay 80mm @ IRI 4-9 2013 19.138 13.94 361.89<br />

Rangpur Joypurhat R550 Mokamtala-Joypurhat Road Km 024.<strong>12</strong>-025.02 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.081 13.91 52.47<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 018.58-018.78 R 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 13.90 29.80<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 098.76-099.46 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.396 13.89 40.74<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 099.66-101.26 S 1.60 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 5.477 13.88 88.10<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 084.35-084.95 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 3.655 13.87 71.55<br />

Comilla Feni N104 Feni-Noakhali Road Km 010.00-010.30 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.383 13.86 <strong>23</strong>.48<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 074.30-074.50 S 0.20 11451 National DBST @ Traff >6000 2013 0.371 13.86 22.64<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 003.70-006.70 S 3.00 11451 National Overlay 80mm @ IRI 5-9 2013 18.026 13.85 305.74<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 085.66-088.06 S 2.40 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 8.215 13.81 131.44<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 013.30-013.90 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 3.605 13.79 60.92<br />

Dhaka Gazipur R303 Tongi By-Pass Road Km 000.90-001.40 S 0.50 10199 Regional DBST 25mm @ 25% Crk 2013 0.677 13.78 30.09<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 045.35-047.05 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 10.215 13.73 190.22<br />

Rangpur Bogra N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 161.37-164.<strong>12</strong> S 2.75 11451 National Overlay 80mm @ IRI 4-9 2013 16.536 13.73 367.01<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 174.58-175.38 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 5.005 13.72 84.77<br />

Khulna Jessore N707 Jessore Town Old Section Km 005.70-005.90 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.103 13.70 22.48<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 041.54-041.64 L 0.10 16426 National Overlay 50mm @ IRI 4 2013 0.369 13.66 8.43<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 067.90-069.10 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.408 13.63 <strong>12</strong>4.65<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 070.45-071.55 S 1.10 9061 National Overlay 50mm @ IRI 5-7 2013 3.158 13.61 63.90<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 443.44-443.84 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 1.975 13.60 39.96<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 278.89-279.29 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.469 13.59 41.45<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 104.82-105.32 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.004 13.56 66.86<br />

Appendix-A: Page:5 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Dhaka N302 Tongi-Ashulia-Zerabo-EPZ Road Km 006.50-017.44 S 10.94 15146 National Overlay 80mm @ IRI 5-9 2013 86.522 13.55 1447.53<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 040.40-040.80 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 2.404 13.52 47.87<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 027.65-029.85 S 2.21 11451 National Overlay 80mm @ IRI 4-9 2013 13.637 13.51 250.00<br />

Barisal Patuakhali N8 Dhaka -Patuakhali Road Km 187.22-187.82 S 0.60 9061 National Overlay 60mm @ IRI 7-9 2013 2.054 13.50 40.25<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 220.48-222.98 S 2.50 11451 National Overlay 80mm @ IRI 4-9 2013 19.981 13.45 331.83<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 171.18-171.48 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.852 13.44 33.78<br />

Rajshahi Pabna N604 Pabna Town Old Section Km 003.40-007.57 S 4.17 11451 National Overlay 80mm @ IRI 5-9 2013 28.791 13.43 477.28<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 041.68-041.85 S 0.17 11451 National Overlay 80mm @ IRI 4-9 2013 1.034 13.41 22.41<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 047.20-050.04 S 2.83 11451 National Overlay 80mm @ IRI 5-9 2013 15.600 13.40 310.79<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km 145.73-149.67 S 3.94 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>23</strong>.657 13.40 391.28<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 042.28-042.68 S 0.40 10253 National Overlay 80mm @ IRI 5-9 2013 2.<strong>12</strong>0 13.39 33.78<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 067.40-068.60 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.324 13.38 67.02<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 283.78-284.28 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 2.881 13.37 53.95<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 182.98-183.08 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.630 13.37 14.62<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 015.30-015.40 R 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 13.36 10.00<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 095.58-095.98 S 0.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.369 13.32 <strong>23</strong>.04<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 096.36-097.96 S 1.60 4887 Regional DBST @ Traff 4000-6000 2013 2.174 13.27 107.92<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 074.24-074.54 S 0.30 1<strong>23</strong>30 National DBST @ Traff >6000 2013 0.556 13.24 33.65<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 081.36-081.76 S 0.40 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 13.<strong>23</strong> 20.99<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 017.30-018.60 S 1.30 11451 National Overlay 80mm @ IRI 5-9 2013 7.276 13.22 1<strong>12</strong>.70<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 095.46-096.46 S 1.00 5536 Regional DBST 25mm @ 25% Crk 2013 1.<strong>23</strong>5 13.18 56.05<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 447.44-447.64 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.988 13.14 19.29<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 069.25-070.45 S 1.20 9061 National Overlay 60mm @ IRI 7-9 2013 4.107 13.<strong>12</strong> 77.53<br />

Rangpur Bogra N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 174.36-201.28 S 26.93 20036 National Overlay 80mm @ IRI 4-9 2013 161.798 13.<strong>12</strong> 3272.90<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 144.11-146.30 S 2.19 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.757 13.<strong>12</strong> 270.52<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 042.37-042.47 S 0.10 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 13.11 5.67<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 084.64-085.24 S 0.60 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 2.349 13.08 58.74<br />

Dhaka Tangail N403 Mirzapur Town old Section Km 000.00-004.00 S 4.00 11451 National DBST @ Traff >6000 2013 7.2<strong>12</strong> 13.07 431.<strong>12</strong><br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 069.90-071.00 S 1.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.324 13.06 55.89<br />

Barisal Patuakhali N8 Dhaka -Patuakhali Road Km 187.82-189.<strong>12</strong> S 1.30 9061 National Overlay 50mm @ IRI 4-7 2013 3.732 13.06 77.73<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 087.94-092.14 S 4.20 11451 National Overlay 80mm @ IRI 4-9 2013 25.928 13.05 477.72<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 099.09-100.59 S 1.50 6524 National Overlay 50mm @ IRI 4-7 2013 4.478 13.04 101.40<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 188.63-190.50 S 1.87 8158 National Overlay 50mm @ IRI 4-7 2013 7.313 13.04 182.21<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 025.10-025.40 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.385 13.02 18.78<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 073.60-073.80 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 13.02 19.36<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 084.34-084.54 S 0.20 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 13.00 21.77<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 043.92-047.02 S 3.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.899 13.00 148.84<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 006.20-006.72 S 0.52 9061 National DBST @ Traff >6000 2013 0.706 <strong>12</strong>.98 30.11<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km 113.60-117.22 S 3.62 11451 National Overlay 80mm @ IRI 4-9 2013 21.734 <strong>12</strong>.94 381.62<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 016.20-016.30 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.601 <strong>12</strong>.93 11.44<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 150.82-153.06 S 2.24 9061 National Overlay 50mm @ IRI 4-7 2013 5.846 <strong>12</strong>.91 114.77<br />

Appendix-A: Page:6 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 010.70-011.00 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.852 <strong>12</strong>.91 29.26<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 022.20-026.00 S 3.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 10.909 <strong>12</strong>.91 187.77<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 176.58-176.88 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.901 <strong>12</strong>.89 34.58<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 048.65-049.03 L 0.38 11451 National Overlay 80mm @ IRI 4-9 2013 2.195 <strong>12</strong>.89 34.33<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 048.65-049.03 R 0.38 11451 National Overlay 80mm @ IRI 4-9 2013 2.195 <strong>12</strong>.89 34.33<br />

Rangpur Joypurhat R550 Mokamtala-Joypurhat Road Km 025.02-028.<strong>12</strong> S 3.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.899 <strong>12</strong>.83 146.98<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 060.<strong>12</strong>-060.22 S 0.10 7248 National Overlay 50mm @ IRI 4-7 2013 0.381 <strong>12</strong>.79 8.78<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 041.40-041.58 S 0.18 10253 National Overlay 50mm @ IRI 5 2013 0.539 <strong>12</strong>.78 9.34<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 055.40-055.80 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.469 <strong>12</strong>.75 38.89<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 038.70-039.40 S 0.70 10253 National Overlay 80mm @ IRI 5-9 2013 3.509 <strong>12</strong>.75 47.62<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 035.37-035.47 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 <strong>12</strong>.71 5.04<br />

Khulna Magura N7 Dauladia-Mongla Road Km 089.61-089.71 S 0.10 7850 National Overlay 50mm @ IRI 4-7 2013 0.381 <strong>12</strong>.68 9.24<br />

Khulna Jessore N707 Jessore Town Old Section Km 006.10-006.76 S 0.66 11451 National Overlay 80mm @ IRI 5-9 2013 3.656 <strong>12</strong>.67 68.25<br />

Dhaka Gazipur R303 Tongi By-Pass Road Km 000.20-000.30 S 0.10 10199 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 <strong>12</strong>.66 6.33<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 309.18-309.88 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.872 <strong>12</strong>.65 72.85<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 055.80-055.82 S 0.02 3362 Regional DBST 25mm @ 25% Crk 2013 0.018 <strong>12</strong>.65 0.65<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 000.00-001.20 S 1.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.382 <strong>12</strong>.64 57.00<br />

Dhaka Gazipur N4 Joydebpur-Jamalpur Road Km 019.67-021.37 S 1.70 16574 National Overlay 80mm @ IRI 4-9 2013 10.915 <strong>12</strong>.64 203.11<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 059.20-059.30 S 0.10 11451 National DBST @ Traff >6000 2013 0.185 <strong>12</strong>.60 9.63<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 038.31-038.41 S 0.10 3636 Regional Overlay 50mm @ IRI 5-7 2013 0.277 <strong>12</strong>.58 4.34<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 095.06-095.26 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.272 <strong>12</strong>.57 <strong>12</strong>.48<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 052.76-052.87 R 0.11 8987 National Overlay 50mm @ IRI 4-7 2013 0.319 <strong>12</strong>.56 5.76<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 019.10-019.90 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.939 <strong>12</strong>.55 76.56<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km 117.22-118.02 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.807 <strong>12</strong>.54 92.94<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 107.22-108.<strong>12</strong> S 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 4.815 <strong>12</strong>.53 96.20<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 026.08-034.88 R 8.80 11451 National Overlay 80mm @ IRI 4-9 2013 54.471 <strong>12</strong>.52 925.03<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 035.50-035.74 S 0.24 11451 National Overlay 80mm @ IRI 5-9 2013 1.620 <strong>12</strong>.52 25.04<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 089.76-089.86 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 <strong>12</strong>.52 5.48<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 046.10-046.40 S 0.30 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.064 <strong>12</strong>.46 16.76<br />

Khulna Satkhira N715 Benapole Town Old Section Km 007.30-009.50 S 2.20 9061 National Overlay 50mm @ IRI 5-7 2013 6.316 <strong>12</strong>.46 <strong>12</strong>5.49<br />

Khulna Magura N7 Dauladia-Mongla Road Km 083.21-085.51 S 2.30 7850 National Overlay 50mm @ IRI 4-7 2013 8.764 <strong>12</strong>.45 196.76<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 005.40-005.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.568 <strong>12</strong>.45 9.98<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 035.18-035.68 L 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.046 <strong>12</strong>.44 51.40<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 200.78-201.08 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.654 <strong>12</strong>.43 29.28<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 204.28-206.<strong>23</strong> R 1.95 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.847 <strong>12</strong>.42 258.09<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 005.70-006.40 S 0.70 11451 National DBST @ Traff >6000 2013 1.262 <strong>12</strong>.42 65.53<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 059.55-061.35 S 1.80 9061 National Overlay 60mm @ IRI 7-9 2013 6.161 <strong>12</strong>.41 105.51<br />

Dhaka Gazipur R303 Tongi By-Pass Road Km 000.00-000.10 S 0.10 10199 Regional DBST 25mm @ 25% Crk 2013 0.136 <strong>12</strong>.40 5.22<br />

Khulna Magura N7 Dauladia-Mongla Road Km 097.61-097.91 S 0.30 7850 National Overlay 50mm @ IRI 4-7 2013 1.143 <strong>12</strong>.38 27.05<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 044.78-045.48 S 0.70 11451 National Overlay 80mm @ IRI 5-9 2013 4.488 <strong>12</strong>.36 68.48<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.40-0<strong>23</strong>.50 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.349 <strong>12</strong>.36 5.89<br />

Appendix-A: Page:7 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 033.58-033.65 L 0.06 9032 National DBST 25mm @ 25% Crk 2013 0.071 <strong>12</strong>.33 2.91<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 008.40-009.30 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.282 <strong>12</strong>.29 51.28<br />

Comilla Feni N104 Feni-Noakhali Road Km 005.30-005.90 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 2.864 <strong>12</strong>.28 44.46<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 403.60-403.80 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.988 <strong>12</strong>.26 18.20<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 004.10-004.90 S 0.80 11451 National Overlay 50mm @ IRI 5 2013 3.048 <strong>12</strong>.25 67.34<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 078.44-079.54 S 1.10 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 4.306 <strong>12</strong>.25 90.01<br />

Dhaka Dhaka N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 017.70-017.81 R 0.11 9061 National Overlay 50mm @ IRI 4-7 2013 0.290 <strong>12</strong>.25 4.34<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 002.30-005.40 S 3.10 4887 Regional DBST @ Traff 4000-6000 2013 4.043 <strong>12</strong>.<strong>23</strong> 176.86<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 176.98-179.48 S 2.50 11451 National Overlay 80mm @ IRI 4-9 2013 16.195 <strong>12</strong>.22 279.27<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 185.62-187.02 S 1.40 8158 National Overlay 50mm @ IRI 4-7 2013 5.480 <strong>12</strong>.21 <strong>12</strong>0.62<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 033.55-036.75 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 25.839 <strong>12</strong>.20 427.71<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 082.64-084.14 S 1.50 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 9.260 <strong>12</strong>.20 182.65<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 171.78-171.98 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 <strong>12</strong>.19 21.24<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 088.80-090.00 S 1.20 11451 National DBST @ Traff >6000 2013 2.2<strong>23</strong> <strong>12</strong>.14 133.22<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 026.00-029.00 S 3.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 9.709 <strong>12</strong>.14 144.29<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 251.94-254.84 S 2.90 11451 National Overlay 80mm @ IRI 4-9 2013 15.826 <strong>12</strong>.13 270.95<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 036.94-040.14 S 3.20 11451 National Overlay 80mm @ IRI 5-9 2013 19.228 <strong>12</strong>.11 315.98<br />

Khulna Magura N702 Jessore -Magura Road Km 035.89-038.59 S 2.70 11451 National Overlay 80mm @ IRI 5-9 2013 16.224 <strong>12</strong>.11 256.84<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 148.45-148.55 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.601 <strong>12</strong>.10 10.26<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 034.20-035.30 S 1.10 11451 National Overlay 80mm @ IRI 5-9 2013 7.425 <strong>12</strong>.09 110.81<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 090.26-091.36 S 1.10 4887 Regional DBST @ Traff 4000-6000 2013 1.494 <strong>12</strong>.04 67.32<br />

Khulna Magura N7 Dauladia-Mongla Road Km 090.11-092.21 S 2.10 7850 National Overlay 50mm @ IRI 4-7 2013 8.319 <strong>12</strong>.03 191.26<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 173.18-174.38 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.507 <strong>12</strong>.00 <strong>12</strong>2.17<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 002.60-005.30 S 2.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 9.242 11.98 <strong>12</strong>8.34<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 042.60-042.70 S 0.10 3362 Regional Overlay 50mm @ IRI 5-7 2013 0.198 11.96 2.82<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 009.30-009.40 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.593 11.95 9.61<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 190.50-190.80 S 0.30 8158 National Overlay 50mm @ IRI 4-7 2013 1.174 11.95 26.82<br />

Rajshahi Pabna N604 Pabna Town Old Section Km 000.00-001.90 S 1.90 11451 National Overlay 80mm @ IRI 5-9 2013 <strong>12</strong>.699 11.92 186.98<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 011.80-011.90 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.313 11.92 5.68<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.90-024.10 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.551 11.92 9.27<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 279.39-280.09 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.321 11.91 63.53<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 227.56-227.76 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.399 11.88 20.53<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 002.60-005.30 S 2.70 11451 National DBST @ Traff >6000 2013 4.868 11.88 241.67<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 447.14-447.44 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.482 11.87 25.05<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.10-013.40 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 11.85 13.14<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 108.48-109.00 L 0.52 11451 National Overlay 80mm @ IRI 4-9 2013 3.210 11.84 46.94<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 108.48-109.00 R 0.52 11451 National Overlay 80mm @ IRI 4-9 2013 3.210 11.84 46.94<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 006.70-009.00 R 2.30 8665 National Overlay 50mm @ IRI 4-7 2013 9.448 11.82 201.32<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 098.19-098.29 S 0.10 6524 National Overlay 50mm @ IRI 4-7 2013 0.313 11.82 5.80<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 217.66-219.36 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 9.795 11.79 184.21<br />

Rajshahi Natore N502 Bogra -Natore Road Km 056.76-062.81 S 6.05 9061 National DBST @ Traff >6000 2013 8.731 11.79 311.70<br />

Appendix-A: Page:8 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 016.57-016.80 S 0.<strong>23</strong> 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.855 11.79 <strong>12</strong>.41<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 038.59-038.99 S 0.40 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.394 11.77 22.44<br />

Khulna Jessore N706 Jessore -Benapole Road Km 0<strong>23</strong>.20-024.10 S 0.90 7314 National Overlay 50mm @ IRI 5-7 2013 3.288 11.75 65.95<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 003.80-004.50 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.010 11.75 35.64<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 028.99-029.00 S 0.01 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.108 11.74 1.24<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 218.48-218.58 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.584 11.72 9.59<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 216.08-216.68 S 0.60 11451 National DBST @ Traff >6000 2013 0.948 11.71 51.73<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 027.49-027.65 L 0.15 9061 National Overlay 50mm @ IRI 4-7 2013 0.431 11.70 7.26<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 013.80-014.10 S 0.30 11451 National DBST @ Traff >6000 2013 0.556 11.69 28.83<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 254.94-255.14 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.103 11.67 18.18<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 005.30-005.60 S 0.30 13468 National Overlay 80mm @ IRI 5-9 2013 1.432 11.65 24.57<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 404.10-404.30 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.988 11.59 16.17<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 284.58-285.68 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.175 11.59 97.93<br />

Khulna Magura N7 Dauladia-Mongla Road Km 085.61-087.21 S 1.60 7850 National Overlay 50mm @ IRI 4-7 2013 6.096 11.59 <strong>12</strong>7.45<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 014.80-015.30 S 0.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.566 11.59 27.72<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 057.92-059.72 S 1.80 11451 National Overlay 80mm @ IRI 4-9 2013 11.646 11.58 182.95<br />

Rajshahi Natore N502 Bogra -Natore Road Km 041.86-043.36 S 1.50 9061 National Overlay 50mm @ IRI 5-7 2013 4.306 11.56 78.43<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 227.08-227.46 S 0.38 11451 National Overlay 80mm @ IRI 4-9 2013 2.680 11.56 38.24<br />

Khulna Jessore N707 Jessore Town Old Section Km 003.50-004.30 S 0.80 11451 National Overlay 80mm @ IRI 5-9 2013 4.4<strong>12</strong> 11.54 75.02<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 092.86-093.66 S 0.80 5536 Regional DBST 25mm @ 25% Crk 2013 0.988 11.53 39.24<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 040.10-040.70 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.811 11.53 24.19<br />

Dhaka Kishoreganj R364 Battoli - Kishoreganj Road Km 003.00-003.10 S 0.09 3019 Regional DBST @ Traff 2000-4000 2013 0.0<strong>23</strong> 11.50 1.07<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 217.88-218.18 S 0.30 11451 National DBST @ Traff >6000 2013 0.526 11.50 29.68<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 0<strong>12</strong>.50-0<strong>12</strong>.70 S 0.20 11451 National DBST @ Traff >6000 2013 0.371 11.49 18.89<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 016.40-017.00 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 3.605 11.47 58.38<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 026.03-026.43 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.211 11.47 19.38<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 458.76-468.26 S 9.50 11451 National Overlay 80mm @ IRI 4-9 2013 46.918 11.46 758.96<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.30-001.40 S 0.10 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.287 11.45 4.38<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 048.49-048.79 S 0.30 11451 National DBST @ Traff >6000 2013 0.548 11.43 28.67<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 276.19-276.99 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.939 11.38 82.80<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 062.78-064.38 S 1.60 4283 Regional Overlay 50mm @ IRI 5-7 2013 4.593 11.38 69.70<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 154.36-154.46 S 0.10 9061 National DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>4 11.36 4.47<br />

Khulna Satkhira N715 Benapole Town Old Section Km 006.10-007.20 S 1.10 9061 National Overlay 50mm @ IRI 5-7 2013 3.158 11.32 57.02<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 090.02-100.52 S 10.50 7507 National Overlay 50mm @ IRI 4-7 2013 40.007 11.31 864.81<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 028.00-028.84 S 0.84 10730 National Overlay 80mm @ IRI 5-9 2013 5.071 11.30 70.75<br />

Dhaka Dhaka N105 Madanpur-Joydevpur Km 018.00-027.84 S 9.84 113<strong>12</strong> National DBST @ Traff >6000 2013 17.750 11.29 916.57<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 010.48-011.36 S 0.88 6578 Regional Overlay 60mm @ IRI 5.5-9 2013 2.886 11.28 36.81<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 210.48-211.18 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.688 11.27 47.02<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 206.<strong>23</strong>-211.26 S 5.03 11451 National Overlay 80mm @ IRI 4-9 2013 34.9<strong>23</strong> 11.25 635.40<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 055.56-055.66 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 11.<strong>23</strong> 5.40<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.00-001.10 S 0.10 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.287 11.22 4.30<br />

Appendix-A: Page:9 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Gazipur N4 Joydebpur-Jamalpur Road Km 000.00-017.27 S 17.27 15927 National Overlay 80mm @ IRI 4-9 2013 114.575 11.22 1743.44<br />

Dhaka Dhaka R8<strong>12</strong> Fatullah -Mawa Road Km 000.00-008.83 S 8.83 13225 Regional DBST @ Traff >6000 2013 11.930 11.17 604.91<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 013.90-016.10 S 2.20 11451 National Overlay 80mm @ IRI 5-9 2013 13.219 11.16 208.29<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 009.10-010.50 S 1.40 9061 National Overlay 60mm @ IRI 7-9 2013 4.182 11.16 68.43<br />

Khulna Satkhira N715 Benapole Town Old Section Km 005.30-005.40 S 0.10 9061 National DBST @ Traff >6000 2013 0.136 11.15 4.15<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 097.96-098.76 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.297 11.14 32.92<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 170.48-171.08 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 3.704 11.14 58.21<br />

Comilla Feni N104 Feni-Noakhali Road Km 007.40-008.50 S 1.10 11451 National Overlay 80mm @ IRI 5-9 2013 5.315 11.13 74.74<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 447.64-458.76 S 11.<strong>12</strong> 11451 National Overlay 80mm @ IRI 4-9 2013 54.924 11.<strong>12</strong> 961.75<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 048.65-051.25 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 15.6<strong>23</strong> 11.11 245.01<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 093.86-095.16 S 1.30 5536 Regional DBST @ Traff 4000-6000 2013 1.606 11.11 53.<strong>12</strong><br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 041.64-042.60 S 0.96 16426 National Overlay 50mm @ IRI 4 2013 3.762 11.10 71.27<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 024.70-025.93 S 1.<strong>23</strong> 4285 Regional Overlay 60mm @ IRI 7-9 2013 4.436 11.08 67.63<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 067.65-067.95 S 0.30 4484 Regional Overlay 50mm @ IRI 5-7 2013 0.861 11.03 14.35<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 005.20-005.50 S 0.30 6578 Regional Overlay 60mm @ IRI 5.5-9 2013 0.896 11.00 10.68<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 007.40-008.30 S 0.90 6<strong>23</strong>8 Regional Overlay 60mm @ IRI 5.5-9 2013 3.310 10.99 44.56<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 005.70-006.60 S 0.90 11451 National Overlay 80mm @ IRI 5-9 2013 5.334 10.99 79.50<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.80-001.90 S 0.10 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.287 10.98 4.20<br />

Dhaka Manikganj R505 Nabinagar-Kaliakoir Road Km 000.00-009.10 S 9.10 13534 Regional Overlay 60mm @ IRI 5.5-9 2013 43.154 10.97 754.09<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 002.50-002.85 S 0.35 11451 National DBST @ Traff >6000 2013 0.503 10.93 22.83<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 029.89-029.99 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 10.90 5.30<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 400.60-402.00 S 1.40 11451 National Overlay 80mm @ IRI 4-9 2013 6.914 10.90 1<strong>12</strong>.06<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 017.60-020.83 S 3.<strong>23</strong> 11451 National Overlay 80mm @ IRI 5-9 2013 19.408 10.89 298.22<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 187.43-188.53 S 1.10 8158 National Overlay 50mm @ IRI 4-7 2013 4.306 10.88 89.59<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 211.38-213.18 S 1.80 11451 National Overlay 80mm @ IRI 4-9 2013 9.482 10.88 145.64<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 008.80-009.00 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 10.88 8.42<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 001.80-002.00 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.585 10.86 9.26<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 026.75-036.49 S 9.74 11451 National Overlay 50mm @ IRI 4 2013 38.164 10.85 706.77<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 291.08-292.18 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 5.885 10.85 94.97<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 083.92-090.02 S 6.10 11451 National Overlay 80mm @ IRI 4-9 2013 36.654 10.85 561.28<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 051.75-051.89 L 0.14 8987 National Overlay 50mm @ IRI 4-7 2013 0.402 10.83 5.95<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 051.75-051.89 R 0.14 8987 National Overlay 50mm @ IRI 4-7 2013 0.402 10.83 5.95<br />

Dhaka Dhaka N105 Madanpur-Joydevpur Km 027.84-028.00 S 0.16 <strong>12</strong>144 National Overlay 80mm @ IRI 5-9 2013 0.937 10.82 <strong>12</strong>.52<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 029.83-029.93 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.361 10.82 4.92<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 099.66-100.86 S 1.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.445 10.81 47.93<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 115.94-131.24 S 15.30 9332 National Overlay 50mm @ IRI 4-7 2013 59.894 10.80 1104.10<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 013.86-013.96 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.349 10.80 5.42<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 051.50-051.60 S 0.10 3362 Regional Overlay 50mm @ IRI 7-9 2013 0.198 10.80 2.55<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 276.88-277.08 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.955 10.79 15.48<br />

Khulna Magura N7 Dauladia-Mongla Road Km 075.31-075.41 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.766 10.78 13.34<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 311.28-3<strong>12</strong>.98 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 9.<strong>23</strong>5 10.76 140.25<br />

Appendix-A: Page:10 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 036.80-036.90 S 0.10 10253 National Overlay 50mm @ IRI 5 2013 0.292 10.75 3.74<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 048.56-049.56 S 1.00 4887 Regional DBST @ Traff 4000-6000 2013 1.482 10.73 60.37<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 2<strong>23</strong>.26-2<strong>23</strong>.56 S 0.30 9684 National Overlay 50mm @ IRI 4-7 2013 1.096 10.71 22.45<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 077.44-078.34 S 0.90 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 3.5<strong>23</strong> 10.68 64.<strong>23</strong><br />

Khulna Khulna N709 Khulna City By-Pass Road Km 017.00-018.00 R 1.00 11451 National DBST @ Traff >6000 2013 1.507 10.68 77.03<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 017.00-018.00 L 1.00 11451 National DBST @ Traff >6000 2013 1.507 10.68 77.03<br />

Dhaka Manikganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 057.46-065.56 S 8.10 11451 National Overlay 80mm @ IRI 4-9 2013 45.909 10.67 578.22<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 190.28-193.88 S 3.60 11451 National Overlay 80mm @ IRI 4-9 2013 19.261 10.67 305.66<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 224.18-225.28 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 8.357 10.67 110.09<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 195.28-195.58 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.457 10.66 22.11<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 050.<strong>12</strong>-051.72 S 1.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.593 10.65 62.98<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 015.30-015.40 L 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 10.65 7.97<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 034.70-034.77 S 0.07 4887 Regional DBST @ Traff 4000-6000 2013 0.104 10.64 4.31<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 100.89-102.59 S 1.70 6524 National Overlay 50mm @ IRI 4-7 2013 4.969 10.63 93.78<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 140.75-141.07 S 0.32 9332 National DBST 25mm @ 25% Crk 2013 0.593 10.63 26.34<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 019.70-020.20 S 0.50 4887 Regional DBST @ Traff 4000-6000 2013 0.498 10.63 17.77<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 028.15-040.65 S <strong>12</strong>.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 35.884 10.61 507.86<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 052.65-052.85 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.272 10.60 9.47<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 010.90-011.10 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.597 10.59 9.39<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 084.56-085.56 S 1.00 5536 Regional DBST 25mm @ 25% Crk 2013 1.359 10.59 51.44<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 005.00-005.20 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.136 10.58 15.19<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 302.58-302.98 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.371 10.57 36.89<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 009.90-009.91 S 0.01 6<strong>23</strong>8 Regional DBST 25mm @ 25% Crk 2013 0.021 10.56 0.83<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 009.30-017.20 S 7.90 11451 National Overlay 80mm @ IRI 5-9 2013 47.469 10.54 705.84<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 017.10-020.65 S 3.55 4887 Regional DBST @ Traff 4000-6000 2013 5.510 10.53 220.34<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 205.18-205.78 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 5.136 10.53 73.38<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 275.58-276.58 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 4.782 10.52 71.64<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 273.59-274.49 S 0.90 11451 National Overlay 50mm @ IRI 4 2013 3.5<strong>23</strong> 10.51 63.20<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 148.55-149.25 S 0.70 11451 National DBST @ Traff >6000 2013 1.262 10.51 67.63<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 010.00-011.20 S 1.20 6330 Regional DBST @ Traff >6000 2013 1.630 10.49 61.18<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 274.69-275.39 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.321 10.47 55.85<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 104.02-1<strong>12</strong>.<strong>12</strong> S 8.10 11451 National Overlay 80mm @ IRI 4-9 2013 48.671 10.47 690.94<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 216.78-217.08 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 10.46 28.28<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 228.76-228.86 S 0.10 11451 National Overlay 50mm @ IRI 4 2013 0.444 10.46 7.92<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 003.10-004.60 S 1.50 11315 National Overlay 50mm @ IRI 5 2013 4.549 10.46 70.06<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 028.99-054.78 S 25.79 3806 Regional Overlay 50mm @ IRI 7-9 2013 50.746 10.44 733.91<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 066.85-067.15 S 0.30 4484 Regional Overlay 50mm @ IRI 5-7 2013 0.861 10.43 11.19<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 073.55-074.15 S 0.60 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.511 10.43 108.22<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 004.50-004.60 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.198 10.42 3.16<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 005.90-006.10 S 0.20 13468 National DBST @ Traff >6000 2013 0.278 10.40 13.86<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 140.65-143.85 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 19.228 10.38 281.79<br />

Appendix-A: Page:11 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 017.60-017.70 S 0.10 17174 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 10.36 <strong>23</strong>.81<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 108.89-109.38 S 0.48 4887 Regional DBST @ Traff 4000-6000 2013 0.658 10.35 25.47<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 003.90-005.60 S 1.70 6<strong>23</strong>8 Regional Overlay 60mm @ IRI 5.5-9 2013 6.030 10.35 83.27<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km <strong>12</strong>2.92-<strong>12</strong>5.72 S 2.80 11451 National Overlay 80mm @ IRI 4-9 2013 16.825 10.34 281.40<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 000.00-000.10 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.8<strong>23</strong> 10.33 13.11<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 059.82-068.65 S 8.82 13569 National Overlay 80mm @ IRI 4-9 2013 54.480 10.32 866.32<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 003.30-003.60 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 10.31 <strong>12</strong>.27<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 281.18-283.58 S 2.40 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.<strong>12</strong>9 10.31 176.50<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 068.<strong>12</strong>-078.52 S 10.39 11451 National Overlay 80mm @ IRI 4-9 2013 62.449 10.31 873.07<br />

Sylhet Sylhet R281 Rajnagar-Charkhai Road Km 071.52-082.76 S 11.24 4887 Regional Overlay 50mm @ IRI 5-7 2013 31.261 10.29 414.17<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 053.95-054.25 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.408 10.29 15.33<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 000.90-004.00 S 3.10 11451 National DBST @ Traff >6000 2013 5.590 10.28 262.89<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 085.44-087.74 S 2.30 11451 National Overlay 80mm @ IRI 4-9 2013 14.199 10.27 205.88<br />

Dhaka Munshiganj R8<strong>12</strong> Fatullah -Mawa Road Km 0<strong>12</strong>.82-018.82 S 6.00 8882 Regional Overlay 60mm @ IRI 5.5-9 2013 21.0<strong>23</strong> 10.27 354.36<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 003.70-005.40 R 1.70 8665 National Overlay 50mm @ IRI 4-7 2013 6.513 10.26 <strong>12</strong>7.74<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 013.00-013.10 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.783 10.25 17.34<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 244.34-244.44 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.658 10.25 10.40<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 064.98-065.08 S 0.10 4283 Regional DBST @ Traff 4000-6000 2013 0.136 10.24 4.98<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 282.46-284.66 S 2.20 11451 National Overlay 80mm @ IRI 4-9 2013 13.581 10.22 195.86<br />

Dhaka Narayanganj R111 Signboard -Narayanganj Road Km 000.00-003.20 S 3.20 15970 Regional DBST 25mm @ 25% Crk 2013 6.0<strong>23</strong> 10.22 228.52<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 115.02-116.<strong>12</strong> S 1.10 6605 National Overlay 50mm @ IRI 4-7 2013 3.290 10.22 61.13<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 042.68-042.98 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.852 10.22 26.70<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 044.38-044.78 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 4.260 10.22 53.74<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 092.06-095.06 S 3.00 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.6<strong>12</strong> 10.20 113.06<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.60-013.80 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 10.18 8.17<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 0<strong>12</strong>.40-013.98 S 1.58 9061 National DBST @ Traff >6000 2013 1.884 10.17 71.54<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 028.70-029.00 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 10.16 13.64<br />

Khulna Magura N7 Dauladia-Mongla Road Km 065.02-069.02 S 4.00 7248 National Overlay 50mm @ IRI 4-7 2013 16.682 10.16 305.70<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 243.14-243.34 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.185 10.16 17.73<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 001.30-001.80 S 0.50 9061 National Overlay 60mm @ IRI 7-9 2013 1.789 10.16 26.64<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 045.90-046.00 S 0.10 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 0.355 10.15 5.35<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 015.80-019.00 S 3.20 6330 Regional Overlay 60mm @ IRI 5.5-9 2013 10.953 10.14 136.06<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 026.90-027.33 S 0.43 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.2<strong>23</strong> 10.14 18.91<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 037.10-038.00 S 0.90 10253 National Overlay 50mm @ IRI 5 2013 2.631 10.13 32.65<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 179.58-182.88 S 3.30 11451 National Overlay 80mm @ IRI 4-9 2013 20.915 10.<strong>12</strong> 342.32<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 147.05-148.25 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.211 10.<strong>12</strong> 107.46<br />

Khulna Magura N7 Dauladia-Mongla Road Km 092.31-097.51 S 5.20 7850 National Overlay 50mm @ IRI 4-7 2013 19.813 10.11 382.99<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 070.88-071.02 S 0.14 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.396 10.11 6.48<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 055.70-056.30 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.816 10.11 29.58<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 005.00-005.20 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.672 10.11 9.92<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 051.75-051.95 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 10.10 9.76<br />

Appendix-A: Page:<strong>12</strong> of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 221.96-2<strong>23</strong>.06 S 1.10 9684 National Overlay 50mm @ IRI 4-7 2013 4.019 10.07 77.39<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 053.40-053.50 S 0.10 9061 National Overlay 60mm @ IRI 7-9 2013 0.336 10.04 5.01<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 016.73-022.91 S 6.18 4579 Regional DBST @ Traff 4000-6000 2013 7.744 10.04 258.77<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 292.28-294.88 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 13.740 10.03 205.01<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 008.30-009.20 S 0.90 11451 National Overlay 80mm @ IRI 5-9 2013 5.334 10.03 72.54<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 054.91-058.95 S 4.04 11451 National Overlay 80mm @ IRI 4-9 2013 24.953 10.01 352.55<br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 003.00-003.10 S 0.10 9061 National Overlay 60mm @ IRI 7-9 2013 0.342 10.01 5.08<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 051.26-053.76 S 2.50 4887 Regional DBST @ Traff 4000-6000 2013 3.705 10.01 140.75<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 000.50-000.70 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.306 10.00 <strong>12</strong>.16<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 002.10-002.20 S 0.10 24928 National Overlay 50mm @ IRI 5 2013 0.444 9.99 6.52<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 004.10-004.20 S 0.10 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 9.98 17.88<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 008.00-0<strong>12</strong>.90 S 4.90 11451 National DBST @ Traff >6000 2013 8.859 9.98 404.32<br />

Khulna Magura N7 Dauladia-Mongla Road Km 069.42-070.32 S 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 5.408 9.97 79.39<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 039.09-039.49 S 0.40 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.394 9.96 19.17<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 083.86-084.06 S 0.20 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 0.685 9.96 9.32<br />

Rangpur Bogra N502 Bogra -Natore Road Km 008.10-008.80 S 0.70 5705 National DBST @ Traff 4000-6000 2013 0.951 9.94 34.14<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 090.00-094.00 S 4.00 11451 National Overlay 80mm @ IRI 4-9 2013 26.241 9.93 415.75<br />

Khulna Magura N7 Dauladia-Mongla Road Km 098.01-100.31 S 2.30 7850 National Overlay 50mm @ IRI 4-7 2013 8.764 9.91 166.05<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 214.68-215.78 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.918 9.90 100.89<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 439.41-443.44 S 4.03 11451 National Overlay 80mm @ IRI 4-9 2013 19.903 9.90 293.06<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 095.26-096.36 S 1.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.158 9.90 40.<strong>23</strong><br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 043.14-048.66 S 5.52 11451 National Overlay 80mm @ IRI 5-9 2013 33.144 9.89 444.88<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 011.10-0<strong>12</strong>.40 S 1.30 9061 National Overlay 60mm @ IRI 7-9 2013 3.883 9.88 57.62<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 110.72-1<strong>12</strong>.62 S 1.90 6605 National Overlay 50mm @ IRI 4-7 2013 5.911 9.88 106.21<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 0<strong>23</strong>.50-024.10 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 3.605 9.87 48.29<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 070.45-070.65 S 0.20 4484 Regional Overlay 50mm @ IRI 5-7 2013 0.574 9.86 7.05<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 001.70-002.00 S 0.30 10311 National Overlay 80mm @ IRI 5-9 2013 1.185 9.85 10.51<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 255.44-255.54 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.551 9.84 8.16<br />

Khulna Magura N7 Dauladia-Mongla Road Km 087.61-089.51 S 1.90 7850 National Overlay 50mm @ IRI 4-7 2013 7.378 9.84 138.78<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 013.11-013.41 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.437 9.82 16.61<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 033.20-033.50 S 0.30 13490 National DBST @ Traff >6000 2013 0.608 9.82 24.94<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.56-070.66 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.81 5.52<br />

Dhaka Narsingdi N2 Dhaka-Sylhet-Jaflong Road Km 063.97-064.11 L 0.14 8884 National DBST 25mm @ 25% Crk 2013 0.177 9.81 6.26<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 024.15-031.05 S 6.90 4887 Regional DBST @ Traff 4000-6000 2013 9.374 9.80 328.69<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 072.20-073.10 S 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 5.556 9.80 65.62<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 468.26-475.34 S 7.08 11451 National Overlay 80mm @ IRI 4-9 2013 33.174 9.80 483.46<br />

Khulna Magura N7 Dauladia-Mongla Road Km 102.02-102.<strong>12</strong> S 0.10 7850 National Overlay 50mm @ IRI 4-7 2013 0.381 9.80 7.14<br />

Rajshahi Natore N502 Bogra -Natore Road Km 053.16-053.36 S 0.20 6500 National DBST @ Traff >6000 2013 0.272 9.80 9.94<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 000.00-001.30 S 1.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.976 9.79 55.20<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 002.70-002.80 S 0.10 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 9.78 17.53<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 209.08-209.28 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.7<strong>12</strong> 9.78 20.68<br />

Appendix-A: Page:13 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 149.25-157.50 S 8.25 9061 National Overlay 60mm @ IRI 7-9 2013 29.218 9.78 434.91<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 010.70-010.90 S 0.20 4909 Regional DBST @ Traff 4000-6000 2013 0.287 9.75 9.20<br />

Dhaka Sherpur R371 Sherpur-Nakla-Mymensingh Km 034.77-035.20 S 0.43 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.606 9.74 20.62<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 076.48-077.18 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.396 9.74 29.48<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 002.60-002.80 S 0.20 4885 Regional Overlay 60mm @ IRI 7-9 2013 0.685 9.71 8.14<br />

Khulna Jessore N707 Jessore Town Old Section Km 004.60-004.70 S 0.10 11451 National DBST @ Traff >6000 2013 0.165 9.71 7.70<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 006.50-007.70 S 1.20 11451 National Overlay 80mm @ IRI 5-9 2013 7.072 9.70 93.04<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 051.60-051.70 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.361 9.68 5.<strong>23</strong><br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 187.13-187.33 S 0.20 8158 National Overlay 50mm @ IRI 4-7 2013 0.783 9.68 14.49<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 006.50-006.60 S 0.10 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 9.68 17.35<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 062.95-066.05 S 3.10 9061 National Overlay 60mm @ IRI 7-9 2013 10.611 9.66 148.82<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 041.88-042.58 S 0.70 4887 Regional DBST @ Traff 4000-6000 2013 0.968 9.64 36.40<br />

Gopalganj Faridpur N804 Bhanga-Faridpur Road Km 030.20-030.80 S 0.60 11451 National Overlay 50mm @ IRI 5 2013 2.286 9.63 42.09<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 039.78-044.65 S 4.87 11451 National Overlay 80mm @ IRI 4-9 2013 36.270 9.61 430.25<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 082.75-084.35 S 1.60 11451 National Overlay 80mm @ IRI 4-9 2013 9.746 9.61 137.90<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 102.79-103.49 S 0.70 6524 National Overlay 50mm @ IRI 4-7 2013 2.046 9.60 35.73<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 024.89-024.99 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.60 5.39<br />

Rajshahi Natore N602 Natore Town old Section Km 004.89-005.41 S 0.52 11451 National Overlay 80mm @ IRI 5-9 2013 3.249 9.60 42.29<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 052.72-053.02 S 0.30 4331 Regional Overlay 60mm @ IRI 7-9 2013 1.027 9.59 11.72<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.60-030.70 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.58 5.39<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 003.10-003.90 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.639 9.57 36.90<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 309.98-310.98 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 5.482 9.57 78.04<br />

Rangpur Gaib<strong>and</strong>a N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 278.06-279.50 S 1.44 4731 National Overlay 50mm @ IRI 4-9 2013 5.397 9.57 80.64<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 000.90-001.00 R 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.721 9.56 16.09<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.40-030.50 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.56 5.37<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 014.76-014.96 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.585 9.55 9.52<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 003.70-004.00 S 0.30 4885 Regional Overlay 60mm @ IRI 7-9 2013 1.027 9.55 <strong>12</strong>.01<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 000.10-002.50 S 2.40 11451 National DBST @ Traff >6000 2013 4.327 9.55 158.16<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 224.46-224.46 S 0.00 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 0.105 9.54 0.98<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 052.95-053.75 S 0.80 4887 Regional DBST 25mm @ 25% Crk 2013 1.087 9.53 37.05<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 000.00-000.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.143 9.53 4.22<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 080.30-080.70 S 0.40 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 1.494 9.52 24.19<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 008.00-008.70 S 0.70 4887 Regional DBST @ Traff 4000-6000 2013 0.951 9.52 33.09<br />

Rangpur Bogra N502 Bogra -Natore Road Km 027.06-027.46 S 0.40 9061 National Overlay 60mm @ IRI 7-9 2013 1.369 9.51 20.13<br />

Rangpur Bogra N502 Bogra -Natore Road Km 016.90-017.10 S 0.20 5705 National Overlay 50mm @ IRI 5-9 2013 0.574 9.51 7.14<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.80-0<strong>12</strong>.90 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 9.51 4.41<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 066.05-069.25 S 3.20 9061 National Overlay 60mm @ IRI 7-9 2013 10.953 9.51 145.03<br />

Dhaka Kishoreganj N2 Dhaka-Sylhet-Jaflong Road Km 071.71-071.94 S 0.<strong>23</strong> 11451 National Overlay 80mm @ IRI 4-9 2013 1.408 9.50 19.69<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 092.77-092.97 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.685 9.50 9.64<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 244.54-244.84 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.975 9.50 28.92<br />

Rangpur Rangpur N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 306.06-3<strong>23</strong>.96 S 17.90 8871 National Overlay 50mm @ IRI 4-7 2013 67.078 9.50 <strong>12</strong>17.54<br />

Appendix-A: Page:14 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Narayanganj N105 Madanpur-Joydevpur Km 000.00-006.50 S 6.50 9061 National DBST @ Traff >6000 2013 6.583 9.49 270.14<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 033.10-034.93 S 1.83 11451 National Overlay 80mm @ IRI 4-9 2013 11.297 9.49 157.85<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 054.45-056.05 S 1.60 4887 Regional DBST 25mm @ 25% Crk 2013 2.174 9.48 67.79<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 072.65-072.85 S 0.20 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.504 9.44 32.62<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 004.80-004.90 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.177 9.44 1.99<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 118.29-118.39 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.44 5.49<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 075.44-076.94 S 1.50 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 5.872 9.43 82.57<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 024.69-024.79 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.43 5.22<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 300.68-300.88 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.185 9.42 16.45<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 007.00-007.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.358 9.42 5.64<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 026.19-026.29 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.42 5.21<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 192.19-202.22 S 10.03 7406 National Overlay 60mm @ IRI 7-9 2013 41.501 9.41 754.83<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 034.40-034.60 S 0.20 2048 Regional DBST @ Traff 2000-4000 2013 0.153 9.41 5.13<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 074.15-074.35 S 0.20 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.504 9.41 32.54<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 000.00-000.10 S 0.10 9061 National DBST 25mm @ 25% Crk 2013 0.136 9.40 4.38<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 041.20-041.50 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.803 9.40 <strong>23</strong>.91<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 064.86-064.96 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.39 5.37<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 025.30-025.34 S 0.04 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.146 9.39 1.95<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 053.40-053.50 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.298 9.39 4.74<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 074.36-074.46 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.783 9.38 15.87<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 003.90-005.10 S 1.20 6027 Regional DBST @ Traff >6000 2013 1.630 9.37 57.19<br />

Khulna Jessore N708 Jessore Town Old Section Km 001.40-001.60 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.202 9.37 15.27<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 011.50-011.70 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.287 9.35 8.48<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 020.49-021.19 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.305 9.32 34.63<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 277.19-278.79 S 1.60 11451 National Overlay 80mm @ IRI 4-9 2013 9.877 9.32 135.50<br />

Rangpur Bogra N502 Bogra -Natore Road Km 019.90-026.16 S 6.26 9061 National Overlay 60mm @ IRI 7-9 2013 21.859 9.31 295.31<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 064.90-067.50 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 16.051 9.30 184.31<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 045.87-047.07 S 1.20 3019 Regional Overlay 50mm @ IRI 5-7 2013 2.317 9.29 27.21<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 024.61-024.71 S 0.10 3636 Regional Overlay 50mm @ IRI 5-7 2013 0.298 9.29 3.86<br />

Rangpur Bogra N502 Bogra -Natore Road Km 028.26-028.36 S 0.10 9061 National Overlay 50mm @ IRI 5-7 2013 0.287 9.29 4.45<br />

Khulna Magura N7 Dauladia-Mongla Road Km 078.21-082.91 S 4.70 7850 National Overlay 50mm @ IRI 4-7 2013 18.791 9.29 297.82<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 014.16-014.26 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.292 9.29 4.63<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 004.00-004.10 S 0.10 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 9.27 5.13<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 022.29-022.49 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.381 9.27 4.98<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 004.70-004.90 S 0.20 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 9.27 33.21<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 035.00-035.10 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.198 9.26 2.81<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 003.90-004.10 S 0.20 13468 National Overlay 80mm @ IRI 5-9 2013 1.317 9.26 17.96<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 030.61-032.29 S 1.68 4887 Regional DBST @ Traff 4000-6000 2013 2.418 9.26 78.03<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 005.60-006.10 R 0.50 8665 National DBST 25mm @ 25% Crk 2013 0.988 9.25 35.98<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 018.99-020.29 S 1.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.343 9.24 64.62<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 443.84-446.84 S 3.00 11451 National Overlay 80mm @ IRI 4-9 2013 14.890 9.<strong>23</strong> 204.27<br />

Appendix-A: Page:15 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 065.10-065.30 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.722 9.22 9.96<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km 144.98-145.73 L 0.75 11451 National Overlay 80mm @ IRI 4-9 2013 6.198 9.21 70.51<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km 144.98-145.73 R 0.75 11451 National Overlay 80mm @ IRI 4-9 2013 6.198 9.21 70.51<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 025.08-025.88 R 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.873 9.19 63.22<br />

Dhaka Manikganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 051.03-057.46 S 6.43 7636 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.981 9.18 420.88<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 007.70-007.90 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.350 9.17 16.80<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 040.65-043.92 S 3.27 4887 Regional Overlay 50mm @ IRI 5-7 2013 9.379 9.17 <strong>12</strong>0.32<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 014.80-015.30 L 0.50 8665 National Overlay 60mm @ IRI 7-9 2013 2.334 9.17 37.41<br />

Rangpur Rangpur N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 294.48-306.06 S 11.58 4405 National Overlay 50mm @ IRI 4-9 2013 44.017 9.17 630.36<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 049.60-049.70 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.355 9.16 5.25<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 143.01-143.41 S 0.40 9061 National Overlay 60mm @ IRI 7-9 2013 1.319 9.16 18.67<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 2<strong>23</strong>.68-224.18 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.526 9.16 96.08<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 019.60-022.30 L 2.70 11451 National Overlay 80mm @ IRI 4-9 2013 22.758 9.16 336.89<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 030.79-040.88 S 10.09 9061 National Overlay 50mm @ IRI 5-7 2013 28.971 9.15 468.80<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 039.99-040.29 S 0.30 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.083 9.15 15.81<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 027.53-028.13 S 0.60 4887 Regional DBST @ Traff 4000-6000 2013 0.815 9.15 25.07<br />

Comilla Feni N104 Feni-Noakhali Road Km 001.70-002.20 S 0.50 11732 National DBST @ Traff >6000 2013 1.334 9.15 55.80<br />

Rangpur Rangpur N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 3<strong>23</strong>.96-358.07 S 34.11 11451 National Overlay 80mm @ IRI 4-9 2013 207.193 9.<strong>12</strong> 2668.13<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 081.86-081.96 S 0.10 5536 Regional DBST @ Traff 4000-6000 2013 0.136 9.<strong>12</strong> 3.52<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 082.76-083.66 S 0.90 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 3.081 9.<strong>12</strong> 38.42<br />

Dhaka Mymensingh N309 Mymensingh Town By-Pass Road Km 005.16-007.40 S 2.24 11451 National Overlay 80mm @ IRI 5-9 2013 17.724 9.11 197.79<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 001.10-001.20 R 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.721 9.11 15.32<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 0<strong>23</strong>.20-0<strong>23</strong>.98 L 0.78 11451 National Overlay 80mm @ IRI 4-9 2013 7.090 9.10 87.50<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 209.38-210.08 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.391 9.09 49.25<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 056.40-056.90 S 0.50 4887 Regional DBST 25mm @ 25% Crk 2013 0.716 9.08 <strong>23</strong>.78<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 034.04-034.44 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 9.07 20.66<br />

Rangpur Bogra N502 Bogra -Natore Road Km 017.10-019.90 S 2.80 5705 National DBST @ Traff 4000-6000 2013 3.845 9.07 <strong>12</strong>5.95<br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 000.00-003.00 S 3.00 9061 National Overlay 50mm @ IRI 5-7 2013 8.6<strong>12</strong> 9.07 <strong>12</strong>4.61<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 033.54-033.94 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 9.07 20.65<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 034.<strong>23</strong>-037.83 S 3.60 4887 Regional DBST @ Traff 4000-6000 2013 4.891 9.06 148.88<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 192.73-198.03 S 5.30 11451 National Overlay 80mm @ IRI 4-9 2013 32.719 9.03 471.<strong>23</strong><br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 008.00-008.80 S 0.80 4887 Regional DBST @ Traff 4000-6000 2013 1.055 9.02 32.25<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 054.18-062.08 S 7.90 4283 Regional Overlay 50mm @ IRI 5-7 2013 22.679 9.02 272.67<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 265.99-266.99 S 1.00 11451 National Overlay 50mm @ IRI 4 2013 3.915 9.01 52.59<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 211.26-2<strong>12</strong>.92 L 1.66 9061 National Overlay 60mm @ IRI 7-9 2013 5.699 9.01 79.33<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 211.26-2<strong>12</strong>.92 R 1.66 9061 National Overlay 60mm @ IRI 7-9 2013 5.699 9.01 79.33<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 072.30-072.40 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 9.01 5.52<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 056.35-056.65 S 0.30 9061 National Overlay 60mm @ IRI 7-9 2013 1.027 9.00 13.56<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 051.80-052.20 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.211 9.00 17.01<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 218.58-219.08 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.910 9.00 98.22<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 079.74-082.44 S 2.70 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 10.569 8.99 162.11<br />

Appendix-A: Page:16 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 000.10-000.60 S 0.50 4885 Regional Overlay 50mm @ IRI 5-7 2013 1.435 8.98 17.20<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 271.19-271.89 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.321 8.98 47.91<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 011.50-034.73 S <strong>23</strong>.<strong>23</strong> 6578 Regional Overlay 60mm @ IRI 5.5-9 2013 79.668 8.96 789.45<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 034.54-035.94 S 1.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.384 8.96 70.07<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 010.00-010.60 S 0.60 4909 Regional Overlay 60mm @ IRI 7-9 2013 2.166 8.96 28.51<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 054.00-054.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.355 8.94 5.13<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 036.30-041.00 S 4.70 11451 National Overlay 80mm @ IRI 4-9 2013 28.241 8.93 371.24<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 217.26-217.56 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.780 8.92 24.47<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 029.14-029.44 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.803 8.90 19.82<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 002.50-002.60 S 0.10 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 8.89 15.93<br />

Khulna Magura N702 Jessore -Magura Road Km 026.19-026.79 S 0.60 3649 National Overlay 50mm @ IRI 5-9 2013 2.286 8.89 33.64<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 169.50-171.00 S 1.50 9061 National Overlay 60mm @ IRI 7-9 2013 5.134 8.89 70.52<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 169.50-171.00 S 1.50 9061 National Overlay 60mm @ IRI 7-9 2013 5.134 8.89 70.52<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 005.90-006.30 S 0.40 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.328 8.88 63.66<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 051.80-052.30 S 0.50 4887 Regional DBST @ Traff 4000-6000 2013 0.764 8.88 25.60<br />

Dhaka Narayanganj N105 Madanpur-Joydevpur Km 017.54-018.00 S 0.46 11451 National Overlay 80mm @ IRI 5-9 2013 2.740 8.87 30.02<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 000.00-000.01 S 0.01 30316 Regional DBST 25mm @ 25% Crk 2013 0.041 8.87 1.61<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 053.37-053.97 S 0.60 3892 Regional DBST 25mm @ 25% Crk 2013 0.815 8.87 24.07<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 010.30-010.70 S 0.40 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.724 8.87 8.40<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 191.39-191.89 S 0.50 7406 National Overlay 50mm @ IRI 4-7 2013 1.683 8.87 31.80<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 071.10-072.20 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.791 8.86 88.61<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 011.90-013.00 S 1.10 4887 Regional DBST @ Traff 4000-6000 2013 1.494 8.86 47.34<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 053.40-055.60 S 2.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 6.384 8.86 91.52<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 033.89-036.89 S 3.00 4887 Regional DBST 25mm @ 25% Crk 2013 4.076 8.86 131.92<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 000.00-000.20 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 8.85 7.75<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 101.96-103.76 S 1.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 5.167 8.85 74.01<br />

Sylhet Sunamganj R370 Mymensingh -Sunamganj Road Km 072.36-073.29 S 0.93 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.746 8.84 24.03<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 039.59-039.89 S 0.30 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.083 8.84 15.07<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 024.48-025.07 S 0.59 11451 National Overlay 80mm @ IRI 4-9 2013 6.503 8.83 70.92<br />

Rajshahi Natore N502 Bogra -Natore Road Km 046.66-047.16 S 0.50 9061 National DBST @ Traff >6000 2013 0.679 8.83 18.87<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 073.15-073.55 S 0.40 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.007 8.83 61.04<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 243.44-244.04 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 3.556 8.83 46.22<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 015.50-015.90 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.274 8.83 17.10<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 015.50-015.90 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.274 8.83 17.10<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 073.10-073.20 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 8.82 5.41<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 069.08-069.68 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.722 8.82 <strong>23</strong>.41<br />

Dhaka Manikganj R505 Nabinagar-Kaliakoir Road Km 009.10-009.40 S 0.30 17384 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.361 8.80 63.99<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 225.98-226.08 S 0.10 9061 National DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>8 8.80 3.76<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 089.47-091.77 S 2.30 9061 National Overlay 60mm @ IRI 7-9 2013 7.873 8.80 102.72<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 043.20-045.70 S 2.50 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 8.775 8.79 115.96<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 102.66-102.86 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.274 8.79 8.79<br />

Appendix-A: Page:17 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 029.00-029.20 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 8.79 9.87<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 206.08-208.98 S 2.90 11451 National Overlay 80mm @ IRI 4-9 2013 24.825 8.78 307.75<br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 019.45-019.85 S 0.40 7068 National Overlay 50mm @ IRI 5-7 2013 1.148 8.78 15.55<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 041.90-043.30 S 1.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 24.095 8.78 201.99<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 071.02-071.98 S 0.96 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.897 8.77 41.14<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 241.30-243.04 S 1.75 11451 National Overlay 80mm @ IRI 4-9 2013 9.980 8.77 133.04<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 000.00-000.10 S 0.10 17870 Regional DBST @ Traff >6000 2013 0.287 8.76 8.78<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 094.00-097.20 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 19.749 8.76 254.78<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 034.80-036.10 S 1.30 2048 Regional DBST @ Traff 2000-4000 2013 0.995 8.75 31.03<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 143.85-147.05 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 19.228 8.75 247.65<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 037.83-038.11 S 0.28 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.804 8.74 11.24<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 005.40-005.60 S 0.20 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 8.74 31.30<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 045.38-045.48 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.988 8.72 <strong>12</strong>.69<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 041.30-041.60 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.163 8.71 42.96<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 016.06-016.26 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.277 8.71 7.63<br />

Barisal Patuakhali N8 Dhaka -Patuakhali Road Km 180.42-187.22 S 6.80 9061 National Overlay 50mm @ IRI 4-7 2013 19.521 8.70 207.95<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 003.70-003.80 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 8.69 3.40<br />

Rangpur Bogra N502 Bogra -Natore Road Km 028.66-028.86 S 0.20 9061 National Overlay 50mm @ IRI 5-7 2013 0.574 8.68 8.32<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 030.89-030.99 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.136 8.68 4.42<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 072.76-072.86 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.844 8.68 15.51<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 001.20-002.60 S 1.40 11451 National DBST @ Traff >6000 2013 2.524 8.68 108.14<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 014.30-014.40 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 8.67 4.02<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 027.35-033.00 S 5.65 9061 National Overlay 50mm @ IRI 5-7 2013 16.225 8.67 224.36<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 053.34-056.25 S 2.90 9061 National Overlay 60mm @ IRI 7-9 2013 9.940 8.65 <strong>12</strong>6.10<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 025.09-025.19 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 8.65 4.51<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 301.08-302.18 S 1.10 11451 National DBST @ Traff >6000 2013 1.956 8.64 89.29<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 038.07-038.97 S 0.90 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.738 8.64 19.63<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 0<strong>12</strong>.40-0<strong>12</strong>.50 S 0.10 6330 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 8.63 3.01<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 064.50-064.70 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.287 8.62 9.03<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 014.00-014.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.355 8.62 4.94<br />

Dhaka Gazipur N4 Joydebpur-Jamalpur Road Km 021.37-021.47 S 0.10 19452 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 8.61 20.10<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 000.00-000.20 S 0.20 13468 National Overlay 80mm @ IRI 5-9 2013 1.317 8.61 14.00<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.00-007.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.330 8.61 4.53<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 007.35-007.40 S 0.05 6240 Regional DBST @ Traff >6000 2013 0.068 8.60 1.28<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 097.20-106.60 S 9.40 11451 National Overlay 80mm @ IRI 4-9 2013 58.572 8.60 621.79<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 011.20-011.40 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.287 8.59 8.27<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 219.78-219.98 S 0.20 11451 National DBST @ Traff >6000 2013 0.351 8.58 10.36<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 025.90-026.00 S 0.10 3497 Regional Overlay 50mm @ IRI 7-9 2013 0.287 8.58 3.41<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 011.10-011.20 S 0.10 5419 Regional DBST @ Traff 4000-6000 2013 0.138 8.57 4.33<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 202.22-204.28 S 2.06 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.783 8.57 154.60<br />

Khulna Jessore N706 Jessore -Benapole Road Km 024.40-024.70 S 0.30 7314 National Overlay 60mm @ IRI 7-9 2013 1.307 8.57 19.62<br />

Appendix-A: Page:18 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.75-025.47 S 1.72 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.891 8.56 82.82<br />

Rangpur Nilphamari R570 Sayedpur-Nilphamari Road Km 009.40-0<strong>12</strong>.50 S 3.10 3900 Regional Overlay 50mm @ IRI 5-7 2013 8.899 8.56 98.01<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 009.50-010.60 S 1.10 11451 National DBST @ Traff >6000 2013 1.983 8.54 53.26<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 010.50-010.60 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 8.54 3.99<br />

Rangpur Bogra N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 201.28-245.52 S 44.<strong>23</strong> 13193 National Overlay 80mm @ IRI 4-9 2013 269.791 8.54 3250.65<br />

Dhaka Kishoreganj R364 Battoli - Kishoreganj Road Km 000.00-003.00 S 3.00 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 8.911 8.54 73.81<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 032.40-032.90 S 0.50 13564 National Overlay 80mm @ IRI 5-9 2013 2.901 8.53 34.66<br />

Khulna Jessore N707 Jessore Town Old Section Km 001.10-001.20 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.905 8.52 15.73<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 018.60-019.30 S 0.70 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.821 8.52 144.86<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 004.40-006.80 S 2.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 8.514 8.51 117.15<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 042.67-043.10 S 0.43 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.472 8.51 16.37<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 077.06-077.16 S 0.10 15273 National Overlay 50mm @ IRI 5 2013 0.313 8.50 5.16<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 041.37-041.97 S 0.60 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 2.113 8.50 28.29<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 002.40-002.60 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 8.49 8.57<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 049.70-052.57 S 2.87 5397 National Overlay 50mm @ IRI 4-9 2013 10.920 8.49 178.33<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 228.96-229.26 S 0.30 11451 National Overlay 50mm @ IRI 4 2013 1.331 8.49 19.28<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 000.00-000.40 S 0.40 4887 Regional DBST 25mm @ 25% Crk 2013 0.543 8.47 16.83<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 084.36-084.46 S 0.10 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 8.47 4.31<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 039.99-040.99 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 6.173 8.46 64.48<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 014.70-014.80 L 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 8.46 6.85<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 044.05-044.15 S 0.10 7153 National DBST @ Traff >6000 2013 0.180 8.46 7.25<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 013.50-014.10 S 0.60 3292 Regional Overlay 50mm @ IRI 7-9 2013 1.722 8.44 22.64<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 041.94-044.77 S 2.83 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.875 8.43 <strong>12</strong>1.18<br />

Comilla Feni N104 Feni-Noakhali Road Km 014.70-014.80 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.921 8.43 15.69<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 219.98-220.48 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.910 8.42 91.93<br />

Comilla Feni N104 Feni-Noakhali Road Km 0<strong>12</strong>.40-0<strong>12</strong>.70 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.255 8.42 41.99<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 001.00-001.10 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 8.41 17.21<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 052.15-052.55 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.148 8.40 14.71<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 029.10-030.50 S 1.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.228 8.40 72.09<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 280.38-280.78 S 0.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.376 8.40 59.56<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 038.20-038.60 S 0.40 10253 National Overlay 80mm @ IRI 5-9 2013 1.910 8.40 16.31<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.36-069.76 S 0.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.369 8.39 19.19<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 048.15-048.58 S 0.43 11451 National Overlay 80mm @ IRI 4-9 2013 2.590 8.39 26.84<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 013.00-013.50 S 0.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.940 8.39 10.31<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 007.90-008.00 S 0.10 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.183 8.39 1.70<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 041.20-041.30 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 8.38 17.24<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 000.80-000.86 L 0.06 9143 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 0.769 8.38 6.31<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 073.30-074.50 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.481 8.37 61.54<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 091.09-091.29 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.811 8.36 18.69<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 001.50-004.30 S 2.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.473 8.36 143.72<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km <strong>12</strong>7.61-130.71 S 3.10 9061 National Overlay 60mm @ IRI 7-9 2013 10.611 8.36 147.09<br />

Appendix-A: Page:19 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 011.20-011.60 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.148 8.35 15.53<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 170.18-170.38 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 8.35 15.18<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 000.00-000.90 S 0.90 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.785 8.33 20.35<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 053.20-053.30 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 8.30 4.<strong>23</strong><br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 003.50-004.20 S 0.70 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.388 8.30 15.07<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 132.45-138.85 S 6.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>1.752 8.29 1006.60<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 025.29-025.79 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.711 8.29 <strong>23</strong>.29<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 203.58-204.98 S 1.40 11451 National Overlay 80mm @ IRI 4-9 2013 11.985 8.29 140.19<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 007.60-013.80 S 6.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 22.379 8.28 299.78<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 187.49-188.19 S 0.70 7406 National Overlay 50mm @ IRI 4-7 2013 2.415 8.27 37.32<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 049.30-049.50 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.772 8.26 9.45<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 010.70-010.90 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.272 8.25 8.39<br />

Khulna Magura N7 Dauladia-Mongla Road Km 076.11-076.61 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 4.009 8.24 44.81<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 013.20-020.80 S 7.60 11451 National Overlay 80mm @ IRI 5-9 2013 49.608 8.24 554.31<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 245.34-245.84 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.992 8.<strong>23</strong> 50.65<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km <strong>12</strong>6.85-132.05 S 5.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 99.084 8.<strong>23</strong> 813.26<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 114.36-114.46 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 8.<strong>23</strong> 4.08<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 0<strong>23</strong>.05-024.95 S 1.90 5770 Regional Overlay 60mm @ IRI 5.5-9 2013 6.503 8.<strong>23</strong> 67.62<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 009.20-009.30 R 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.609 8.<strong>23</strong> 6.19<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.25-0<strong>23</strong>.55 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 8.22 <strong>12</strong>.87<br />

Comilla Feni N104 Feni-Noakhali Road Km 0<strong>12</strong>.90-014.60 S 1.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 29.780 8.22 <strong>23</strong>2.33<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 081.00-081.10 S 0.10 10297 Regional DBST @ Traff >6000 2013 0.148 8.21 5.75<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 000.80-000.86 R 0.06 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.119 8.20 8.97<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 026.08-034.88 L 8.80 11451 National Overlay 80mm @ IRI 4-9 2013 55.340 8.19 667.51<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 009.60-011.00 S 1.40 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 4.019 8.17 45.96<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 025.64-030.64 S 5.00 4887 Regional DBST @ Traff 4000-6000 2013 7.361 8.17 202.14<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 043.01-044.71 S 1.70 4887 Regional DBST @ Traff 4000-6000 2013 2.225 8.17 68.02<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 006.90-007.00 S 0.10 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.183 8.17 1.83<br />

Dhaka Manikganj R505 Nabinagar-Kaliakoir Road Km 009.40-014.00 S 4.60 17384 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 84.597 8.16 720.74<br />

Rangpur Gaib<strong>and</strong>a R555 Palashbari-Gaib<strong>and</strong>ah Road Km 017.80-021.02 S 3.22 4887 Regional DBST @ Traff 4000-6000 2013 4.374 8.16 119.87<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km <strong>12</strong>9.61-132.71 S 3.10 11451 National Overlay 80mm @ IRI 4-9 2013 18.627 8.15 187.49<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 008.20-008.60 S 0.40 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 8.15 15.75<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 017.29-017.39 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.138 8.15 3.88<br />

Rajshahi Natore N502 Bogra -Natore Road Km 055.96-056.16 S 0.20 6500 National Overlay 50mm @ IRI 5-7 2013 0.574 8.15 7.96<br />

Dhaka Narayanganj N105 Madanpur-Joydevpur Km 014.34-017.54 S 3.20 11451 National Overlay 50mm @ IRI 5 2013 <strong>12</strong>.193 8.14 147.97<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 062.42-065.42 S 3.00 4331 Regional Overlay 60mm @ IRI 7-9 2013 10.272 8.13 111.39<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 068.65-069.05 S 0.40 16332 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.678 8.13 96.20<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 069.25-069.75 S 0.50 16332 National Full Recon 195mm @ IRI <strong>12</strong> 2013 14.598 8.13 <strong>12</strong>0.25<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 065.10-065.90 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.422 8.<strong>12</strong> 33.53<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 071.26-071.46 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 8.11 8.64<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 075.45-086.57 S 11.<strong>12</strong> 3019 Regional Overlay 50mm @ IRI 7-9 2013 22.402 8.11 246.40<br />

Appendix-A: Page:20 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 102.68-108.89 S 6.22 4887 Regional Overlay 50mm @ IRI 5-7 2013 19.986 8.10 244.30<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 021.97-022.17 S 0.20 5572 Regional DBST @ Traff 4000-6000 2013 0.247 8.10 5.77<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 026.00-028.30 S 2.30 4887 Regional DBST @ Traff 4000-6000 2013 3.227 8.10 101.06<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 0<strong>12</strong>.25-013.27 R 1.02 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.742 8.10 53.01<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 030.63-030.73 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.324 8.09 3.75<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 032.52-033.<strong>12</strong> S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.166 8.09 28.33<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 279.18-279.28 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 8.09 17.32<br />

Comilla Feni N104 Feni-Noakhali Road Km 016.90-017.00 S 0.10 9193 National Overlay 50mm @ IRI 5-7 2013 0.303 8.09 4.74<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 002.10-002.60 S 0.50 13468 National Overlay 80mm @ IRI 5-9 2013 3.292 8.09 37.58<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 020.09-021.89 S 1.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.429 8.09 36.25<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 030.63-030.73 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 8.08 4.11<br />

Rajshahi Natore N502 Bogra -Natore Road Km 051.56-052.66 S 1.10 6500 National Overlay 50mm @ IRI 5-7 2013 3.158 8.07 41.22<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 135.17-135.67 S 0.50 101<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.867 8.07 22.65<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 065.42-066.60 S 1.18 4887 Regional DBST @ Traff 4000-6000 2013 1.607 8.07 47.41<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 071.59-071.79 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.627 8.07 28.13<br />

Dhaka Sherpur R460 Jamalpur-Sherpur-Bangaon Road Km 002.50-006.71 S 4.21 4422 Regional Overlay 50mm @ IRI 5-7 2013 <strong>12</strong>.358 8.06 132.86<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 049.90-050.40 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.774 8.06 <strong>23</strong>.<strong>12</strong><br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 133.25-138.15 S 4.90 9332 National Overlay 50mm @ IRI 4-7 2013 19.174 8.06 <strong>23</strong>0.47<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 029.80-030.10 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 8.05 13.37<br />

Rangpur Bogra N502 Bogra -Natore Road Km 010.60-010.80 S 0.20 5705 National Overlay 50mm @ IRI 5-9 2013 0.574 8.05 7.37<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 016.40-016.80 S 0.40 3292 Regional DBST 25mm @ 25% Crk 2013 0.543 8.04 13.41<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 016.51-016.81 S 0.30 3636 Regional Overlay 50mm @ IRI 7-9 2013 0.893 8.04 <strong>12</strong>.00<br />

Comilla Feni N104 Feni-Noakhali Road Km 008.50-008.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 8.03 16.52<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 000.00-001.10 S 1.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.765 8.03 51.43<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 132.97-133.17 S 0.20 101<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 0.747 8.03 9.45<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 021.90-022.00 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 8.03 3.27<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 055.70-056.70 S 1.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.547 8.03 46.06<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 039.67-042.77 S 3.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 5.987 8.03 60.74<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 006.30-006.40 S 0.10 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.183 8.02 1.85<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 003.30-010.20 S 6.90 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 28.771 8.02 294.56<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 000.70-000.90 R 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 8.01 32.79<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 007.20-007.77 S 0.57 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.951 8.01 <strong>23</strong>.24<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 054.16-055.36 S 1.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.758 8.01 44.15<br />

Rangpur Bogra N502 Bogra -Natore Road Km 007.50-008.10 S 0.60 5705 National Overlay 50mm @ IRI 5-9 2013 1.722 8.01 20.30<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 014.10-017.10 S 3.00 7088 Regional Overlay 60mm @ IRI 5.5-9 2013 13.069 8.00 140.61<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 278.38-278.48 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 8.00 17.13<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 072.34-072.44 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.297 7.99 17.41<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 018.00-018.80 S 0.80 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 2.888 7.99 37.87<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 043.30-043.50 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.99 32.85<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 049.03-055.40 S 6.37 11451 National Overlay 80mm @ IRI 4-9 2013 43.309 7.98 426.70<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 077.20-085.70 S 8.50 11451 National Overlay 80mm @ IRI 4-9 2013 52.474 7.98 516.84<br />

Appendix-A: Page:21 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 007.30-011.60 S 4.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 14.718 7.98 195.99<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 001.70-002.70 S 1.00 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.775 7.97 19.18<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.40-010.70 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 7.97 13.24<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 141.07-145.55 S 4.48 11451 National Overlay 80mm @ IRI 4-9 2013 27.657 7.96 324.17<br />

Khulna Satkhira N715 Benapole Town Old Section Km 000.00-000.10 S 0.10 9061 National DBST @ Traff >6000 2013 0.136 7.96 4.73<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 030.99-031.99 S 1.00 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.879 7.96 <strong>23</strong>.29<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 063.30-064.00 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.167 7.95 29.38<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 006.40-007.20 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.738 7.94 36.99<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 069.05-069.25 S 0.20 16332 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 7.94 47.00<br />

Comilla Feni N104 Feni-Noakhali Road Km 006.60-006.70 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

Comilla Feni N104 Feni-Noakhali Road Km 005.90-006.00 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

Comilla Feni N104 Feni-Noakhali Road Km 006.10-006.20 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

Comilla Feni N104 Feni-Noakhali Road Km 007.30-007.40 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 145.82-146.42 S 0.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.451 7.94 88.06<br />

Comilla Feni N104 Feni-Noakhali Road Km 0<strong>12</strong>.70-0<strong>12</strong>.90 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.438 7.93 33.05<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 275.49-275.89 S 0.40 11451 National DBST @ Traff >6000 2013 0.741 7.93 26.88<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 047.00-047.70 S 0.70 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 3.<strong>23</strong>2 7.92 36.49<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 004.70-004.80 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 7.90 3.85<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 280.28-280.38 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.90 17.51<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 011.20-0<strong>12</strong>.00 S 0.80 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.378 7.90 13.33<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 006.60-006.90 S 0.30 11451 National DBST @ Traff >6000 2013 0.541 7.90 16.36<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 040.30-041.20 S 0.90 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 16.568 7.90 <strong>12</strong>6.79<br />

Comilla Feni N104 Feni-Noakhali Road Km 009.20-009.30 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 7.89 16.<strong>23</strong><br />

Comilla Feni N104 Feni-Noakhali Road Km 010.30-010.40 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 7.89 16.<strong>23</strong><br />

Comilla Feni N104 Feni-Noakhali Road Km 010.60-010.70 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 7.89 16.<strong>23</strong><br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 021.60-021.80 S 0.20 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 0.685 7.89 5.97<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.70-009.90 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 7.89 8.61<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 072.66-072.76 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.89 17.58<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 132.15-132.35 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.811 7.88 29.95<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 069.75-072.65 S 2.90 15188 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 57.754 7.88 462.78<br />

Khulna Bagerhat R771 Rupsha-Bagerhat Road Km 031.08-031.18 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.186 7.87 2.28<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 041.60-041.90 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.540 7.87 48.54<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 075.15-075.45 S 0.30 151<strong>12</strong> National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.657 7.87 49.16<br />

Comilla Feni N104 Feni-Noakhali Road Km 014.60-014.70 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.367 7.86 17.75<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 009.50-009.80 S 0.30 4909 Regional Overlay 60mm @ IRI 7-9 2013 1.307 7.86 14.10<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 001.70-002.10 S 0.40 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 7.85 16.73<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 080.06-082.33 S 2.27 15273 National DBST @ Traff >6000 2013 3.348 7.84 106.62<br />

Comilla Feni N104 Feni-Noakhali Road Km 016.70-016.90 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 7.84 33.<strong>23</strong><br />

Khulna Khulna R760 Khulna-Satkhira Road Km 020.00-020.30 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.<strong>12</strong>0 7.84 14.00<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 081.40-081.90 S 0.50 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 1.867 7.83 <strong>23</strong>.04<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 067.50-067.90 S 0.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 9.220 7.83 72.25<br />

Appendix-A: Page:22 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 143.42-143.52 S 0.10 5636 National Overlay 50mm @ IRI 4-9 2013 0.287 7.83 4.15<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 279.28-280.28 S 1.00 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.010 7.83 136.59<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 017.55-018.05 S 0.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.435 7.82 20.40<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 105.52-106.82 S 1.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 22.454 7.82 171.54<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 007.20-007.50 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.803 7.82 19.88<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 025.57-026.87 S 1.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.450 7.82 56.<strong>23</strong><br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 053.60-053.80 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.709 7.81 8.84<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.20-031.30 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 7.81 4.00<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 002.90-003.90 S 1.00 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 7.81 42.09<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 059.95-060.55 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.722 7.80 21.74<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 015.71-016.11 S 0.40 3636 Regional Overlay 50mm @ IRI 7-9 2013 1.190 7.80 15.35<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 039.50-039.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.78 17.81<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 079.70-079.80 S 0.10 10297 Regional DBST 25mm @ 25% Crk 2013 0.148 7.78 5.45<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 143.<strong>12</strong>-143.22 S 0.10 5636 National Overlay 50mm @ IRI 4-9 2013 0.287 7.77 4.08<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 132.05-132.15 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.77 17.78<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 132.35-132.45 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.77 17.78<br />

Comilla Feni N104 Feni-Noakhali Road Km 000.70-000.90 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.442 7.76 25.52<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 089.77-091.67 S 1.90 3019 Regional Overlay 50mm @ IRI 5-7 2013 3.669 7.76 35.99<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 064.10-064.30 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.287 7.75 8.<strong>12</strong><br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 003.00-003.40 S 0.40 4885 Regional DBST @ Traff 4000-6000 2013 0.543 7.75 15.76<br />

Comilla Feni N104 Feni-Noakhali Road Km 0<strong>12</strong>.00-0<strong>12</strong>.40 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.875 7.74 64.51<br />

Khulna Jessore N707 Jessore Town Old Section Km 001.50-001.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.74 17.84<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 021.00-021.30 S 0.30 3292 Regional DBST @ Traff 2000-4000 2013 0.408 7.74 <strong>12</strong>.58<br />

Rajshahi Natore R548 Naogaon-Atrai-Natore Road Km 037.29-038.99 S 1.70 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.549 7.73 41.89<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 028.70-029.00 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.<strong>12</strong>0 7.72 15.61<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 061.35-062.95 S 1.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.593 7.72 57.39<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 040.69-040.79 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 7.71 3.40<br />

Comilla Feni N104 Feni-Noakhali Road Km 006.20-006.60 S 0.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.130 7.70 52.09<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 008.70-010.60 S 1.90 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 6.503 7.69 73.06<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 148.82-150.22 S 1.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 25.213 7.69 186.48<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 144.82-145.42 S 0.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 13.176 7.68 95.03<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 003.90-005.00 S 1.10 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.975 7.68 19.17<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 022.60-022.80 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 7.68 7.<strong>23</strong><br />

Khulna Jessore N7 Dauladia-Mongla Road Km 145.52-145.82 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 7.68 49.05<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 004.40-007.50 S 3.10 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 10.611 7.67 133.60<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 076.90-077.50 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.240 7.65 27.73<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 006.90-009.30 S 2.40 3802 National Overlay 50mm @ IRI 5-9 2013 9.145 7.65 111.97<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 0<strong>12</strong>.50-0<strong>12</strong>.90 S 0.40 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.737 7.65 6.70<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 046.70-046.90 S 0.20 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.033 7.64 11.26<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 002.10-002.50 S 0.40 4885 Regional Overlay 60mm @ IRI 7-9 2013 1.369 7.64 <strong>12</strong>.82<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 278.78-279.08 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 7.64 49.<strong>12</strong><br />

Appendix-A: Page:<strong>23</strong> of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 047.16-047.36 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.64 31.42<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 278.18-278.38 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.565 7.64 26.18<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 068.80-068.90 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 7.63 4.55<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 015.20-016.30 S 1.10 3292 Regional Overlay 50mm @ IRI 5-7 2013 3.158 7.63 37.89<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 031.09-032.39 S 1.30 4887 Regional DBST @ Traff 4000-6000 2013 1.766 7.63 50.42<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 116.92-117.22 S 0.30 6605 National Overlay 60mm @ IRI 7-9 2013 1.214 7.61 15.82<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 074.90-075.90 S 1.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.734 7.61 45.93<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km <strong>12</strong>1.32-<strong>12</strong>2.92 S 1.60 6605 National Overlay 50mm @ IRI 4-7 2013 6.013 7.60 90.73<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 103.46-103.56 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 7.60 4.10<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 110.56-110.66 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 7.60 3.58<br />

Comilla Feni N104 Feni-Noakhali Road Km 015.00-016.70 S 1.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 30.460 7.60 220.99<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 046.70-049.10 S 2.40 3362 Regional Overlay 50mm @ IRI 7-9 2013 4.760 7.59 48.99<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 213.18-213.28 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 7.59 18.05<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 213.78-213.88 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 7.59 18.05<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 000.40-000.60 S 0.20 6<strong>23</strong>8 Regional DBST @ Traff >6000 2013 0.282 7.59 8.00<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 053.54-054.02 S 0.48 4331 Regional Overlay 60mm @ IRI 7-9 2013 1.629 7.59 15.40<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 074.84-075.24 S 0.40 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 1.566 7.58 15.67<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 000.00-000.10 S 0.10 11451 National Overlay 50mm @ IRI 5 2013 0.381 7.57 5.86<br />

Rajshahi Pabna N704 Jhenaidah-Dasuria Road Km 070.40-081.39 S 10.99 6607 National Overlay 60mm @ IRI 7-9 2013 50.530 7.57 692.19<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 033.60-039.50 S 5.90 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>9.763 7.55 919.92<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 082.00-082.10 S 0.10 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 0.436 7.54 5.24<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 002.30-003.90 S 1.60 3802 National Overlay 50mm @ IRI 5-9 2013 6.096 7.54 73.57<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 002.90-003.90 S 1.00 5672 Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 7.53 33.69<br />

Khulna Jhenaidah N703 Jhenaidah Town Old Section Km 003.30-003.40 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.53 16.68<br />

Comilla Feni N104 Feni-Noakhali Road Km 006.70-007.30 S 0.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.695 7.53 76.39<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 196.48-196.58 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.297 7.52 16.40<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 071.79-072.19 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.187 7.52 65.55<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 047.07-047.87 S 0.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.545 7.52 18.09<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 0<strong>12</strong>.60-016.50 R 3.90 11451 National Overlay 80mm @ IRI 4-9 2013 27.062 7.52 299.57<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 004.60-005.00 S 0.40 5672 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 7.51 <strong>12</strong>.99<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 138.85-139.05 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.648 7.51 33.31<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 024.42-024.52 S 0.10 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 0.361 7.51 4.32<br />

Comilla Feni N104 Feni-Noakhali Road Km 011.20-011.40 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.50 30.87<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 000.50-001.50 S 1.00 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 7.49 39.95<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 040.28-041.48 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.182 7.49 47.10<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 084.72-084.92 S 0.20 10297 Regional DBST @ Traff >6000 2013 0.296 7.49 9.96<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 049.20-050.00 S 0.80 3362 Regional Overlay 50mm @ IRI 7-9 2013 1.587 7.49 15.53<br />

Dhaka Gazipur N4 Joydebpur-Jamalpur Road Km 019.47-019.67 S 0.20 16227 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 7.49 34.95<br />

Khulna Jessore N706 Jessore -Benapole Road Km 029.40-030.10 S 0.70 7314 National Overlay 60mm @ IRI 7-9 2013 3.311 7.48 43.27<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 019.19-020.09 S 0.90 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.715 7.48 16.21<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 059.30-064.80 S 5.50 11451 National Overlay 80mm @ IRI 4-9 2013 34.497 7.47 318.18<br />

Appendix-A: Page:24 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 070.00-071.20 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.600 7.47 55.54<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 000.90-001.50 S 0.60 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.190 7.47 <strong>12</strong>.53<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 136.97-137.37 S 0.40 101<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.494 7.46 16.95<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 013.80-016.00 S 2.20 4887 Regional DBST 25mm @ 25% Crk 2013 2.989 7.46 83.41<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 026.59-026.69 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.313 7.46 4.04<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 009.20-009.30 L 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.609 7.45 5.60<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 280.78-281.18 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.343 7.45 66.03<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 030.62-031.52 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.305 7.45 39.81<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 030.29-030.39 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 7.44 3.20<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 091.87-094.57 S 2.70 3019 Regional Overlay 50mm @ IRI 7-9 2013 5.214 7.44 50.71<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 072.86-074.36 S 1.50 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 34.159 7.44 240.98<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 132.71-134.51 S 1.80 11451 National Overlay 80mm @ IRI 4-9 2013 10.816 7.44 99.30<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 013.46-013.66 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.697 7.43 7.70<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 030.39-030.69 S 0.30 9061 National DBST 25mm @ 25% Crk 2013 0.408 7.43 <strong>12</strong>.95<br />

Khulna Jessore N707 Jessore Town Old Section Km 001.20-001.40 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 7.42 34.21<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 005.60-005.80 S 0.20 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 0.574 7.42 5.68<br />

Comilla Feni N104 Feni-Noakhali Road Km 009.80-010.00 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.42 30.50<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 0<strong>23</strong>.49-0<strong>23</strong>.79 S 0.30 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.564 7.42 5.46<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 276.58-276.88 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 7.41 47.64<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 197.28-197.38 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.41 16.53<br />

Comilla Feni N104 Feni-Noakhali Road Km 005.10-005.30 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 7.41 31.41<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 007.50-007.70 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.709 7.41 8.96<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 001.30-002.50 R 1.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 24.709 7.41 179.24<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 138.86-139.32 S 0.46 5636 National Overlay 50mm @ IRI 4-9 2013 1.372 7.41 21.65<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 194.48-194.88 S 0.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.290 7.40 52.27<br />

Rajshahi Sirajganj N405 Elenga-Hatikamrul Road Km 036.25-040.81 S 4.56 11451 National DBST @ Traff >6000 2013 8.222 7.40 191.15<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 405.20-408.20 S 3.00 3083 National Overlay 50mm @ IRI 4-9 2013 9.395 7.39 110.79<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 008.00-008.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.138 7.39 3.19<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 194.28-194.48 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 7.38 33.99<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 071.98-073.98 S 2.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 8.613 7.37 91.36<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 055.10-055.21 S 0.11 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.354 7.37 16.37<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 416.07-422.27 S 6.20 3083 National Overlay 50mm @ IRI 4-9 2013 19.417 7.37 242.13<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 146.62-148.02 S 1.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 28.828 7.37 214.19<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 014.70-014.80 R 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 7.36 5.97<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 011.20-014.20 S 3.00 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 8.6<strong>12</strong> 7.36 84.47<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 033.33-034.13 S 0.80 4887 Regional DBST @ Traff 4000-6000 2013 1.087 7.36 29.22<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 117.32-117.72 S 0.40 6605 National Overlay 60mm @ IRI 7-9 2013 1.618 7.35 22.00<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 029.49-030.61 S 1.<strong>12</strong> 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.688 7.35 43.68<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 193.88-194.28 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.047 7.35 62.72<br />

Khulna Magura N7 Dauladia-Mongla Road Km 100.71-101.21 S 0.50 7850 National Overlay 60mm @ IRI 7-9 2013 2.272 7.34 29.15<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 002.60-003.10 S 0.50 24928 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.955 7.34 86.13<br />

Appendix-A: Page:25 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Gopalganj Sariatpur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 019.88-020.18 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 7.34 <strong>12</strong>.02<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 292.18-292.28 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 7.34 17.45<br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 003.10-019.25 S 16.15 7068 National DBST @ Traff >6000 2013 21.941 7.33 6<strong>12</strong>.52<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 074.46-075.96 S 1.50 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 34.859 7.33 243.80<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 107.36-110.46 S 3.10 4887 Regional DBST @ Traff 4000-6000 2013 4.211 7.32 1<strong>12</strong>.66<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 114.56-114.66 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 7.31 3.76<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 003.20-003.30 S 0.10 3019 Regional DBST @ Traff 2000-4000 2013 0.094 7.31 1.96<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 052.80-053.00 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.285 7.31 7.15<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>0.41-<strong>12</strong>0.51 S 0.10 3779 National Overlay 50mm @ IRI 4-9 2013 0.287 7.31 3.44<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 046.40-046.96 S 0.56 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.099 7.30 83.32<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 279.08-279.18 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.29 15.62<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 005.10-028.15 S <strong>23</strong>.05 4887 Regional DBST 25mm @ 25% Crk 2013 31.3<strong>12</strong> 7.29 7<strong>12</strong>.97<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 107.<strong>12</strong>-107.22 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.530 7.29 18.10<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 032.50-033.60 S 1.10 2048 Regional Overlay 50mm @ IRI 5-7 2013 1.780 7.29 15.04<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 108.<strong>12</strong>-108.22 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.530 7.29 18.09<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 007.20-009.40 S 2.20 11451 National DBST @ Traff >6000 2013 3.967 7.28 90.78<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 000.00-030.60 S 30.60 3372 Regional Overlay 50mm @ IRI 7-9 2013 60.053 7.28 662.49<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 1<strong>12</strong>.72-114.<strong>12</strong> S 1.40 6605 National Overlay 50mm @ IRI 4-7 2013 4.019 7.28 54.65<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 130.22-135.52 S 5.30 5636 National Overlay 50mm @ IRI 4-9 2013 17.013 7.28 266.25<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 214.18-214.38 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.983 7.27 34.59<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 116.22-116.82 S 0.60 6605 National Overlay 50mm @ IRI 4-7 2013 1.989 7.27 27.01<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 064.50-065.00 S 0.50 4887 Regional DBST @ Traff 4000-6000 2013 0.716 7.27 19.02<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 010.70-013.50 S 2.80 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 <strong>12</strong>.198 7.26 <strong>12</strong>5.82<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 052.50-053.00 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.711 7.26 19.34<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 032.59-033.79 S 1.20 4887 Regional DBST 25mm @ 25% Crk 2013 1.630 7.26 43.<strong>23</strong><br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 019.25-019.45 S 0.20 7068 National Overlay 60mm @ IRI 7-9 2013 0.685 7.26 7.68<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 036.99-038.49 S 1.50 84<strong>23</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 5.629 7.25 58.67<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 014.80-015.30 R 0.50 8665 National Overlay 60mm @ IRI 7-9 2013 2.334 7.24 31.22<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 1<strong>23</strong>.75-<strong>12</strong>6.85 S 3.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 73.973 7.24 511.11<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 011.80-0<strong>12</strong>.70 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.081 7.24 33.51<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 033.04-033.44 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 7.<strong>23</strong> 15.66<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 051.20-051.40 S 0.20 3362 Regional Overlay 50mm @ IRI 7-9 2013 0.397 7.<strong>23</strong> 3.51<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 064.48-064.68 S 0.20 4283 Regional DBST @ Traff 4000-6000 2013 0.272 7.22 6.30<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 001.20-001.30 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.22 18.<strong>12</strong><br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 005.00-005.20 S 0.20 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.501 7.21 5.46<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 114.42-114.82 S 0.40 6605 National Overlay 50mm @ IRI 4-7 2013 1.148 7.21 15.47<br />

Rangpur Bogra N502 Bogra -Natore Road Km 003.60-004.50 S 0.90 5705 National DBST @ Traff 4000-6000 2013 1.2<strong>23</strong> 7.20 34.26<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 1<strong>23</strong>.01-1<strong>23</strong>.31 S 0.30 3779 National Overlay 50mm @ IRI 4-9 2013 0.861 7.20 9.89<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 000.00-002.40 S 2.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 8.215 7.20 84.<strong>23</strong><br />

Rajshahi Natore R548 Naogaon-Atrai-Natore Road Km 029.58-035.89 S 6.31 3019 Regional DBST @ Traff 2000-4000 2013 6.<strong>23</strong>6 7.20 159.87<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 022.20-022.30 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.20 15.25<br />

Appendix-A: Page:26 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 022.50-022.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.20 15.25<br />

Comilla Feni N104 Feni-Noakhali Road Km 011.70-0<strong>12</strong>.00 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.633 7.19 44.79<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 009.60-009.70 S 0.10 6<strong>23</strong>8 Regional Overlay 60mm @ IRI 5.5-9 2013 0.386 7.19 3.94<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 0<strong>12</strong>.90-013.20 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 7.19 10.55<br />

Comilla Feni N104 Feni-Noakhali Road Km 014.80-015.00 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 7.18 32.89<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 198.08-198.18 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.18 16.01<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 107.02-107.<strong>12</strong> S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.998 7.18 14.37<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 048.75-051.45 S 2.70 4887 Regional DBST @ Traff 4000-6000 2013 3.668 7.16 95.95<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 109.68-116.10 S 6.42 4887 Regional DBST 25mm @ 25% Crk 2013 9.008 7.16 221.66<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 036.49-036.59 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 7.15 16.49<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 007.00-010.00 S 3.00 6330 Regional Overlay 60mm @ IRI 5.5-9 2013 11.557 7.14 104.01<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 058.80-064.20 S 5.40 4887 Regional DBST @ Traff 4000-6000 2013 7.736 7.14 201.76<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 026.11-026.71 S 0.60 3636 Regional DBST @ Traff 2000-4000 2013 0.845 7.<strong>12</strong> 21.34<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 082.20-082.50 S 0.30 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 1.143 7.<strong>12</strong> <strong>12</strong>.22<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 029.82-030.<strong>12</strong> S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 7.<strong>12</strong> 10.59<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 013.50-014.10 S 0.60 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 2.614 7.11 28.37<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 028.<strong>23</strong>-030.13 S 1.90 4887 Regional DBST @ Traff 4000-6000 2013 2.581 7.11 67.05<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 057.10-058.70 S 1.60 4887 Regional DBST @ Traff 4000-6000 2013 2.292 7.10 59.49<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 160.80-169.00 S 8.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 199.182 7.10 1359.27<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 030.83-032.33 S 1.50 4887 Regional DBST @ Traff 4000-6000 2013 2.038 7.10 54.11<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 399.80-400.60 S 0.80 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.752 7.09 101.37<br />

Dhaka Dhaka N3 Dhaka -Mymensingh Road Km 009.10-010.00 L 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.594 7.09 110.21<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 188.77-189.49 S 0.72 7406 National Overlay 50mm @ IRI 4-7 2013 2.532 7.09 36.47<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 146.71-147.11 S 0.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 8.974 7.09 64.37<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 114.46-117.51 S 3.05 3779 National Overlay 50mm @ IRI 4-9 2013 10.<strong>23</strong>0 7.08 117.11<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 022.50-022.80 S 0.30 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.027 7.08 8.04<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 005.90-006.90 S 1.00 4965 Regional Overlay 60mm @ IRI 7-9 2013 3.4<strong>23</strong> 7.08 28.82<br />

Comilla Feni N104 Feni-Noakhali Road Km 006.00-006.10 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.08 15.00<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 022.55-022.95 S 0.40 7837 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 7.07 <strong>12</strong>.<strong>23</strong><br />

Dhaka Dhaka N3 Dhaka -Mymensingh Road Km 009.10-010.00 R 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.594 7.07 109.90<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 148.72-148.82 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.07 18.17<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 148.02-148.<strong>12</strong> S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.07 18.17<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 143.72-143.82 S 0.10 5636 National Overlay 50mm @ IRI 4-9 2013 0.324 7.06 4.27<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 201.08-201.18 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.06 17.73<br />

Comilla Feni N104 Feni-Noakhali Road Km 000.20-000.40 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.06 29.04<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 055.21-057.41 S 2.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 48.301 7.05 321.40<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 039.60-040.00 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.654 7.05 64.58<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 016.60-016.90 R 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.878 7.05 48.49<br />

Dhaka Munshiganj R8<strong>12</strong> Fatullah -Mawa Road Km 010.42-011.32 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.081 7.04 34.59<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 095.98-102.68 S 6.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 21.997 7.04 213.65<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 033.00-033.70 S 0.70 3497 Regional Overlay 50mm @ IRI 7-9 2013 2.010 7.03 <strong>23</strong>.13<br />

Appendix-A: Page:27 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 213.28-213.78 S 0.50 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.457 7.02 83.52<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 017.47-017.77 S 0.30 3571 Regional Overlay 50mm @ IRI 7-9 2013 0.470 7.02 4.82<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km <strong>12</strong>0.65-1<strong>23</strong>.75 S 3.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 73.<strong>12</strong>8 7.01 489.55<br />

Rangpur Bogra N502 Bogra -Natore Road Km 0<strong>12</strong>.30-013.10 S 0.80 5705 National Overlay 50mm @ IRI 5-9 2013 2.297 7.01 20.34<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 0<strong>12</strong>.30-013.36 S 1.06 4887 Regional DBST 25mm @ 25% Crk 2013 1.534 7.00 39.26<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 045.48-045.58 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.00 16.02<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 026.35-027.25 S 0.90 4887 Regional DBST 25mm @ 25% Crk 2013 1.2<strong>23</strong> 6.99 31.22<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 199.58-199.68 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 6.98 15.57<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 022.65-022.85 S 0.20 7068 National Overlay 50mm @ IRI 5-7 2013 0.574 6.98 6.96<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 273.49-273.59 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 6.97 16.27<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 108.22-110.32 S 2.10 6605 National Overlay 50mm @ IRI 4-7 2013 7.<strong>12</strong>5 6.97 92.76<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 0<strong>23</strong>.40-024.40 S 1.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.4<strong>23</strong> 6.97 38.06<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 003.80-004.20 S 0.40 3076 Regional Overlay 50mm @ IRI 7-9 2013 1.169 6.96 13.54<br />

Dhaka Narsingdi R210 Shahepratap-Narsingdi Road Km 000.00-004.73 S 4.73 8494 Regional DBST 25mm @ 25% Crk 2013 8.031 6.95 204.47<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 003.50-003.60 S 0.10 2929 Regional Overlay 50mm @ IRI 7-9 2013 0.198 6.94 1.56<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 045.00-048.25 S 3.25 4887 Regional Overlay 60mm @ IRI 7-9 2013 11.111 6.94 114.63<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 000.60-001.20 S 0.60 4887 Regional DBST 25mm @ 25% Crk 2013 0.815 6.94 16.31<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 024.99-025.09 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 6.93 4.13<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 110.86-1<strong>12</strong>.46 S 1.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.477 6.93 56.45<br />

Khulna Magura N7 Dauladia-Mongla Road Km 076.81-077.31 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 4.815 6.93 45.24<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 142.<strong>12</strong>-142.82 S 0.70 5636 National Overlay 50mm @ IRI 4-9 2013 2.031 6.93 26.95<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 015.20-015.30 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 6.92 14.67<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 004.60-006.30 S 1.70 3802 National Overlay 50mm @ IRI 5-9 2013 6.477 6.91 71.67<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 021.80-022.50 S 0.70 76<strong>12</strong> Regional DBST @ Traff >6000 2013 0.951 6.91 24.02<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 035.09-035.89 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.297 6.91 27.42<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 000.80-000.90 S 0.10 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.198 6.91 1.41<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 000.40-000.70 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.993 6.90 40.05<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 022.18-022.28 S 0.10 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 6.89 2.<strong>12</strong><br />

Khulna Jessore R765 Khulna-Satkhira Road Km 013.30-013.70 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.148 6.88 13.48<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 000.86-000.90 S 0.04 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.985 6.88 6.63<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 020.08-020.18 R 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 6.88 15.87<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 043.50-046.40 S 2.90 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 63.218 6.88 410.41<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 2<strong>12</strong>.92-213.88 S 0.95 11451 National Overlay 80mm @ IRI 4-9 2013 8.332 6.88 80.85<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 004.60-005.40 S 0.80 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 18.872 6.88 1<strong>23</strong>.86<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.30-000.50 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.660 6.87 7.06<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 005.10-008.30 S 3.20 10311 National Overlay 80mm @ IRI 5-9 2013 <strong>12</strong>.643 6.86 78.10<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 195.58-195.88 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.890 6.86 44.86<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 185.28-185.98 S 0.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 16.458 6.86 1<strong>12</strong>.95<br />

Dhaka Narsingdi R310 Joydebpur-Itakhola Road Km 034.73-043.00 S 8.27 4887 Regional Overlay 60mm @ IRI 7-9 2013 28.307 6.86 286.03<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 255.54-255.64 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.86 17.43<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 024.50-024.90 S 0.40 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 6.86 11.17<br />

Appendix-A: Page:28 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rangpur Bogra N502 Bogra -Natore Road Km 002.40-003.60 S 1.20 5705 National Overlay 50mm @ IRI 5-9 2013 3.445 6.85 29.79<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 053.50-055.10 S 1.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 35.564 6.84 228.32<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 002.50-002.80 R 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.84 51.49<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 106.82-107.02 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.068 6.84 33.98<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 004.20-004.30 S 0.10 13468 National DBST @ Traff >6000 2013 0.198 6.83 6.88<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 215.46-215.54 L 0.08 11451 National Overlay 80mm @ IRI 4-9 2013 0.650 6.82 6.53<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 215.46-215.54 R 0.08 11451 National Overlay 80mm @ IRI 4-9 2013 0.650 6.82 6.53<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 005.00-005.20 S 0.20 3076 Regional Overlay 50mm @ IRI 5-7 2013 0.585 6.82 5.84<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.40-008.30 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.969 6.80 31.81<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 048.35-048.55 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 6.80 7.08<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 213.88-214.18 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.474 6.80 48.50<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 074.54-074.74 S 0.20 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 6.80 10.18<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 073.80-074.30 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.087 6.80 24.76<br />

Rangpur Bogra N502 Bogra -Natore Road Km 004.50-004.90 S 0.40 5705 National Overlay 50mm @ IRI 5-9 2013 1.148 6.80 9.28<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 001.40-001.50 S 0.10 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 6.79 15.21<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 003.60-003.70 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.79 17.05<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 146.42-146.62 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.79 34.89<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 039.41-039.91 S 0.50 3636 Regional DBST 25mm @ 25% Crk 2013 0.655 6.79 13.63<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 009.30-009.40 R 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.274 6.78 15.43<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 014.08-014.18 S 0.10 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 6.78 2.09<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 064.80-064.90 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 6.77 19.34<br />

Khulna Magura N7 Dauladia-Mongla Road Km 070.42-071.<strong>12</strong> S 0.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 15.705 6.76 106.18<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 290.58-291.08 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.296 6.76 69.15<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 054.20-055.10 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.193 6.76 34.40<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 021.88-024.18 R 2.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 53.015 6.74 357.64<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 188.29-188.77 S 0.48 7406 National Overlay 50mm @ IRI 4-7 2013 1.665 6.74 22.81<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 201.18-202.08 S 0.90 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 19.694 6.74 132.74<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 215.78-216.08 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.474 6.73 48.02<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 011.80-0<strong>12</strong>.10 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 6.73 10.89<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 060.30-062.30 S 2.00 4887 Regional Overlay 50mm @ IRI 5-7 2013 5.961 6.72 69.25<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 017.80-018.48 R 0.68 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 15.582 6.71 104.58<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 062.25-075.35 S 13.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 44.106 6.71 421.37<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 309.88-309.98 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.628 6.71 17.17<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 059.42-062.42 S 3.00 4331 Regional Overlay 60mm @ IRI 7-9 2013 10.269 6.71 101.45<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 069.10-071.10 S 2.00 11451 National DBST @ Traff >6000 2013 4.910 6.69 173.59<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 220.66-220.76 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.151 6.69 14.35<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 0<strong>23</strong>.70-024.40 S 0.70 76<strong>12</strong> Regional DBST @ Traff >6000 2013 0.951 6.69 <strong>23</strong>.25<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 055.72-060.<strong>12</strong> S 4.40 7248 National DBST @ Traff >6000 2013 7.934 6.69 <strong>23</strong>9.10<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 183.18-185.08 S 1.90 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 44.671 6.68 298.70<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 194.88-195.28 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.187 6.68 58.18<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 040.47-040.57 S 0.10 8774 Regional DBST @ Traff >6000 2013 0.143 6.67 4.09<br />

Appendix-A: Page:29 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 005.60-005.70 S 0.10 3076 Regional Overlay 50mm @ IRI 7-9 2013 0.292 6.66 3.26<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 041.29-043.00 S 1.72 4887 Regional DBST 25mm @ 25% Crk 2013 2.330 6.66 50.35<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 041.77-042.87 S 1.10 22<strong>23</strong> Regional Overlay 50mm @ IRI 5-7 2013 2.584 6.66 21.06<br />

Khulna Jessore N707 Jessore Town Old Section Km 005.90-006.10 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.65 34.11<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 018.80-019.50 S 0.70 4887 Regional DBST @ Traff 4000-6000 2013 0.951 6.65 29.04<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 050.80-051.30 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.795 6.65 20.01<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 068.50-068.60 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.313 6.65 3.65<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 214.38-214.58 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.983 6.64 31.60<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 034.62-034.72 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.367 6.64 4.09<br />

Khulna Jessore N707 Jessore Town Old Section Km 003.40-003.50 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.64 17.02<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 0<strong>23</strong>.79-024.89 S 1.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.485 6.63 39.96<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 144.02-144.72 S 0.70 5636 National Overlay 50mm @ IRI 4-9 2013 2.214 6.63 28.87<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 314.48-314.58 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.569 6.63 16.26<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 042.60-042.90 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.731 6.62 44.60<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 010.70-010.99 S 0.29 11451 National DBST @ Traff >6000 2013 0.5<strong>23</strong> 6.62 10.88<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 148.42-148.62 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.61 34.01<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 010.20-011.10 S 0.90 3181 Regional Overlay 50mm @ IRI 5-7 2013 1.588 6.61 <strong>12</strong>.85<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 036.30-036.70 S 0.40 4116 Regional DBST @ Traff 4000-6000 2013 0.593 6.61 14.51<br />

Khulna Magura N702 Jessore -Magura Road Km 034.49-035.79 S 1.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 29.166 6.61 195.15<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.50-001.70 S 0.20 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.574 6.61 5.73<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 017.27-019.09 S 1.81 3019 Regional Overlay 50mm @ IRI 5-7 2013 3.456 6.60 26.44<br />

Rangpur Bogra N502 Bogra -Natore Road Km 009.10-010.20 S 1.10 5705 National DBST @ Traff 4000-6000 2013 1.494 6.60 36.44<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 004.60-004.70 S 0.10 3076 Regional DBST @ Traff 2000-4000 2013 0.138 6.60 3.24<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 025.27-040.35 S 15.08 6210 National Overlay 50mm @ IRI 4-7 2013 57.447 6.60 534.56<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.60-009.40 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.669 6.60 27.73<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 001.30-003.20 S 1.90 4887 Regional DBST @ Traff 4000-6000 2013 2.581 6.60 49.11<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 000.00-000.80 S 0.80 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.587 6.60 <strong>12</strong>.45<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 022.10-022.<strong>12</strong> S 0.02 5257 Regional DBST 25mm @ 25% Crk 2013 0.034 6.59 0.89<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 021.85-0<strong>23</strong>.95 S 2.10 4887 Regional DBST 25mm @ 25% Crk 2013 2.853 6.59 69.06<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 066.00-066.90 S 0.90 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.725 6.59 32.77<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 188.18-188.88 S 0.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 16.350 6.58 107.67<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 046.96-047.16 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 6.58 27.05<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.90-011.60 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.396 6.57 24.78<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 045.99-046.19 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 6.56 30.05<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 013.50-013.70 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 6.56 27.82<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 007.20-009.10 S 1.90 4887 Regional DBST 25mm @ 25% Crk 2013 1.821 6.56 44.71<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 000.20-000.70 S 0.50 24928 National Overlay 80mm @ IRI 5-9 2013 5.062 6.55 39.14<br />

Dhaka Sherpur R371 Sherpur-Nakla-Mymensingh Km 035.20-035.60 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 6.55 10.67<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 006.80-006.90 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.244 6.55 14.88<br />

Khulna Magura N702 Jessore -Magura Road Km 042.79-042.99 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.55 33.59<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 010.20-010.70 S 0.50 7545 Regional DBST @ Traff >6000 2013 0.865 6.55 22.57<br />

Appendix-A: Page:30 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 039.40-039.60 S 0.20 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.565 6.54 22.28<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 031.67-032.87 S 1.20 4741 Regional Overlay 60mm @ IRI 7-9 2013 4.107 6.54 42.86<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 148.<strong>12</strong>-148.42 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.54 50.45<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 108.46-108.56 S 0.10 3779 National Overlay 50mm @ IRI 4-9 2013 0.287 6.54 2.84<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 103.59-104.99 S 1.40 5901 National Overlay 50mm @ IRI 4-9 2013 5.013 6.54 59.59<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 220.76-220.86 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 6.53 17.39<br />

Comilla Feni N104 Feni-Noakhali Road Km 010.70-011.20 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 8.605 6.53 53.69<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 058.00-059.20 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.408 6.53 52.44<br />

Comilla Feni N104 Feni-Noakhali Road Km 017.10-017.20 S 0.10 9193 National DBST 25mm @ 25% Crk 2013 0.143 6.53 3.89<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 005.40-005.60 S 0.20 <strong>23</strong>43 Regional Overlay 50mm @ IRI 7-9 2013 0.574 6.53 5.11<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 099.87-100.07 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.386 6.53 3.09<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 0<strong>23</strong>.40-0<strong>23</strong>.60 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 6.52 27.64<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 074.50-074.60 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.617 6.52 4.97<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 036.14-036.44 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.940 6.52 10.04<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 036.89-039.99 S 3.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.611 6.52 108.89<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 001.70-003.10 S 1.40 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.011 6.51 24.75<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 006.90-009.50 S 2.60 4965 Regional DBST @ Traff 4000-6000 2013 3.532 6.50 82.17<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 308.98-309.18 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.50 33.05<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 075.24-075.44 S 0.20 1<strong>23</strong>30 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 6.49 30.19<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 022.37-022.77 S 0.40 5572 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.904 6.49 31.48<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 119.82-<strong>12</strong>1.22 S 1.40 6605 National Overlay 50mm @ IRI 4-7 2013 4.626 6.49 56.06<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 000.80-001.50 S 0.70 24928 National Overlay 50mm @ IRI 5 2013 4.151 6.49 36.49<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 021.29-021.39 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.334 6.49 3.74<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 077.48-077.78 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.645 6.48 16.01<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 052.17-052.47 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 6.48 10.37<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 020.78-020.88 R 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 1.152 6.48 11.51<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 035.77-047.57 S 11.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 40.390 6.48 417.21<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 006.80-006.90 S 0.10 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 6.47 14.50<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 079.76-079.86 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.215 6.47 4.89<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 2<strong>23</strong>.66-224.46 S 0.80 9684 National DBST @ Traff >6000 2013 1.383 6.47 45.33<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 057.00-058.40 S 1.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.080 6.47 55.07<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 277.08-278.18 S 1.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 24.835 6.47 152.32<br />

Khulna Magura N7 Dauladia-Mongla Road Km 071.32-073.92 S 2.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 58.331 6.47 377.29<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 005.50-005.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.686 6.46 17.06<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 294.88-295.18 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.46 49.26<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 003.90-004.60 S 0.70 3802 National Overlay 50mm @ IRI 5-9 2013 2.667 6.46 30.07<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 040.90-041.50 S 0.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 13.461 6.46 86.94<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 049.60-051.40 S 1.80 4887 Regional DBST @ Traff 4000-6000 2013 2.757 6.46 67.<strong>12</strong><br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 034.29-034.89 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.054 6.45 20.15<br />

Khulna Magura N702 Jessore -Magura Road Km 028.29-029.49 S 1.20 3649 National Overlay 50mm @ IRI 5-9 2013 4.572 6.45 45.73<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 091.76-097.39 S 5.63 6524 National Overlay 50mm @ IRI 4-7 2013 17.870 6.45 162.66<br />

Appendix-A: Page:31 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km 118.02-<strong>12</strong>4.57 S 6.55 7109 National Overlay 50mm @ IRI 4-7 2013 25.516 6.45 326.38<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.089 6.44 1.61<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 040.00-040.30 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.240 6.44 44.24<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 015.61-017.79 S 2.18 3019 Regional Overlay 50mm @ IRI 7-9 2013 4.100 6.44 32.31<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 021.89-022.29 S 0.40 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.762 6.43 5.31<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 004.35-004.78 S 0.42 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.869 6.43 19.43<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 008.90-009.10 S 0.20 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.365 6.43 3.07<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 141.52-141.92 S 0.40 5636 National Overlay 50mm @ IRI 4-9 2013 1.378 6.43 17.99<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 030.32-032.34 S 2.02 4887 Regional Overlay 60mm @ IRI 7-9 2013 6.921 6.42 70.02<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 422.27-434.54 S <strong>12</strong>.27 3083 National Overlay 50mm @ IRI 4-9 2013 42.083 6.42 381.18<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 032.79-034.09 S 1.30 4887 Regional DBST @ Traff 4000-6000 2013 1.862 6.41 47.82<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 220.86-221.86 S 1.00 9474 National DBST @ Traff >6000 2013 1.729 6.40 56.06<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 075.08-075.38 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 6.40 9.87<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 219.36-219.56 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 6.40 34.05<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 055.30-055.50 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.595 6.39 6.67<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 028.<strong>12</strong>-030.22 S 2.10 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 7.554 6.39 70.13<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 210.38-210.48 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 6.38 15.18<br />

Dhaka Sherpur R460 Jamalpur-Sherpur-Bangaon Road Km 000.70-001.20 S 0.50 4422 Regional Overlay 60mm @ IRI 7-9 2013 1.711 6.38 <strong>12</strong>.08<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 148.21-149.41 S 1.20 6671 National Overlay 50mm @ IRI 4-7 2013 4.698 6.38 54.28<br />

Rangpur Rangpur N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 279.50-285.98 S 6.48 4731 National Overlay 50mm @ IRI 4-9 2013 24.337 6.37 287.60<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 014.20-014.50 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.907 6.37 10.14<br />

Comilla Feni N104 Feni-Noakhali Road Km 002.60-002.80 S 0.20 1<strong>23</strong>76 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 6.37 27.30<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 001.70-001.90 S 0.20 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.155 6.37 25.89<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 001.10-001.40 S 0.30 5672 Regional DBST @ Traff 4000-6000 2013 0.408 6.37 8.67<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 004.30-004.60 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.445 6.36 13.16<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 0<strong>12</strong>.70-013.80 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.791 6.36 50.01<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 073.10-073.60 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.087 6.36 24.<strong>23</strong><br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 001.50-002.10 S 0.60 24928 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.993 6.35 115.21<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 055.80-058.00 S 2.20 11451 National Overlay 80mm @ IRI 4-9 2013 13.581 6.35 105.46<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 003.40-003.50 S 0.10 <strong>23</strong>26 Regional Overlay 50mm @ IRI 7-9 2013 0.183 6.35 1.42<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 305.98-308.98 S 3.00 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 61.774 6.35 389.64<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 210.08-210.18 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 6.33 15.04<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 007.50-010.40 S 2.90 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.325 6.32 92.39<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>0.61-<strong>12</strong>1.61 S 1.00 3779 National Overlay 50mm @ IRI 4-9 2013 2.871 6.32 29.79<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 029.39-030.29 S 0.90 9061 National DBST @ Traff >6000 2013 1.2<strong>23</strong> 6.31 31.71<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 003.40-005.90 S 2.50 4965 Regional Overlay 60mm @ IRI 7-9 2013 8.557 6.31 66.<strong>12</strong><br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 022.30-0<strong>23</strong>.20 L 0.90 11451 National DBST @ Traff >6000 2013 2.445 6.31 76.<strong>12</strong><br />

Khulna Khulna N7 Dauladia-Mongla Road Km 220.06-220.66 S 0.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 16.349 6.30 100.66<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 001.60-003.00 S 1.40 3019 Regional Overlay 50mm @ IRI 5-7 2013 2.777 6.30 20.27<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 025.29-026.09 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.505 6.30 25.88<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 032.39-032.59 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.272 6.30 7.21<br />

Appendix-A: Page:32 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 016.81-021.31 S 4.50 3636 Regional DBST @ Traff 2000-4000 2013 6.336 6.29 133.82<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 036.10-036.20 S 0.10 2048 Regional DBST 25mm @ 25% Crk 2013 0.077 6.29 0.90<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 016.10-017.83 S 1.73 4887 Regional Overlay 60mm @ IRI 7-9 2013 6.460 6.28 62.10<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.80-014.30 R 1.50 8665 National Overlay 50mm @ IRI 4-7 2013 10.217 6.28 <strong>12</strong>2.59<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 031.00-031.50 S 0.50 2048 Regional DBST @ Traff 2000-4000 2013 0.420 6.27 8.65<br />

Dhaka Manikganj R315 Mawna-Nabinagar Road Km 044.80-045.00 S 0.20 2048 Regional Overlay 50mm @ IRI 5-7 2013 0.324 6.27 2.25<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 073.99-097.50 S <strong>23</strong>.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 78.982 6.26 779.21<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 001.10-001.60 S 0.50 6187 Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 6.26 16.88<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 017.49-018.89 S 1.40 4887 Regional DBST 25mm @ 25% Crk 2013 1.950 6.25 48.50<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 003.40-003.60 S 0.20 4885 Regional DBST 25mm @ 25% Crk 2013 0.272 6.24 4.97<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 014.00-014.10 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 6.24 13.22<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 094.57-096.07 S 1.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 2.897 6.<strong>23</strong> 24.47<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 001.30-008.00 S 6.70 4887 Regional DBST @ Traff 4000-6000 2013 8.970 6.<strong>23</strong> 214.62<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 216.68-216.78 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 6.<strong>23</strong> 16.57<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 026.69-027.39 S 0.70 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.315 6.<strong>23</strong> <strong>12</strong>.76<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 139.82-140.92 S 1.10 5636 National Overlay 50mm @ IRI 4-9 2013 3.858 6.<strong>23</strong> 51.66<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 058.60-059.40 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.384 6.22 26.02<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 007.70-008.50 S 0.80 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 2.297 6.21 18.36<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 196.58-197.28 S 0.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.800 6.21 76.98<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 200.38-200.48 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.402 6.20 14.22<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 009.70-010.80 S 1.10 4965 Regional Overlay 60mm @ IRI 7-9 2013 3.765 6.20 27.04<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 108.66-109.16 S 0.50 3779 National Overlay 50mm @ IRI 4-9 2013 1.435 6.19 14.00<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 009.50-009.70 S 0.20 4965 Regional Overlay 50mm @ IRI 5-7 2013 0.574 6.18 4.29<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 000.00-000.30 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.459 6.18 13.22<br />

Dhaka Dhaka R803 Jurain-Abdullahpur Road Km 000.00-026.31 S 26.31 4887 Regional Overlay 60mm @ IRI 7-9 2013 114.616 6.18 1104.93<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 056.06-056.96 S 0.90 4887 Regional DBST 25mm @ 25% Crk 2013 1.334 6.17 27.84<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 057.36-058.16 S 0.80 4887 Regional DBST 25mm @ 25% Crk 2013 1.186 6.17 26.92<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 026.60-028.99 S 2.39 3019 Regional DBST @ Traff 2000-4000 2013 2.317 6.16 49.34<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 005.80-006.20 S 0.40 4885 Regional Overlay 50mm @ IRI 5-7 2013 1.<strong>12</strong>7 6.16 10.48<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 031.82-032.22 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.569 6.15 15.72<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 008.47-015.37 S 6.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 <strong>23</strong>.618 6.15 228.85<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 069.10-069.80 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.192 6.15 <strong>23</strong>.66<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 021.30-021.70 S 0.40 3292 Regional DBST @ Traff 2000-4000 2013 0.543 6.15 10.88<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 019.60-021.70 S 2.10 4887 Regional DBST @ Traff 4000-6000 2013 2.853 6.15 78.72<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 305.78-305.98 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.15 31.<strong>23</strong><br />

Khulna Jessore N707 Jessore Town Old Section Km 004.70-005.70 S 1.00 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 26.081 6.14 157.53<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 217.56-217.66 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 6.14 16.34<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 133.57-134.87 S 1.30 101<strong>12</strong> Regional DBST @ Traff >6000 2013 1.927 6.14 48.91<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 056.25-057.95 S 1.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.819 6.14 54.30<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 000.00-003.30 S 3.30 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 14.458 6.13 109.54<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 081.<strong>12</strong>-081.42 S 0.30 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.579 6.13 4.02<br />

Appendix-A: Page:33 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 402.00-403.60 S 1.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 29.504 6.13 175.15<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 138.15-138.25 S 0.10 9332 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.192 6.<strong>12</strong> 13.60<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 081.76-081.86 S 0.10 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 6.11 8.10<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 0<strong>23</strong>.20-0<strong>23</strong>.98 R 0.78 11451 National Overlay 80mm @ IRI 4-9 2013 10.957 6.11 82.66<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 024.62-027.62 S 3.00 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 10.791 6.11 100.<strong>23</strong><br />

Dhaka Narayanganj N2 Dhaka-Sylhet-Jaflong Road Km 000.13-017.00 S 16.88 18<strong>23</strong>3 National Overlay 50mm @ IRI 4 2013 102.6<strong>12</strong> 6.11 910.82<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 304.88-305.08 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.286 6.10 31.43<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 105.32-105.52 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.621 6.10 33.58<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 024.40-024.50 S 0.10 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.136 6.09 1.94<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 003.40-004.20 S 0.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.420 6.09 10.59<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm <strong>23</strong>3.46-241.30 S 7.83 11451 National Overlay 80mm @ IRI 4-9 2013 92.211 6.08 760.68<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 041.85-044.05 S 2.20 7153 National Overlay 50mm @ IRI 4-7 2013 8.383 6.08 71.07<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 000.00-000.70 R 0.70 11451 National DBST @ Traff >6000 2013 1.527 6.08 47.31<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 141.02-141.42 S 0.40 5636 National Overlay 50mm @ IRI 4-9 2013 1.409 6.07 18.24<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 001.10-001.30 S 0.20 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 6.07 27.20<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 035.74-036.50 S 0.76 10253 National Overlay 50mm @ IRI 5 2013 3.229 6.07 27.63<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 041.00-041.50 S 0.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.986 6.07 8.<strong>12</strong><br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 021.85-022.45 S 0.60 7837 Regional Overlay 60mm @ IRI 5.5-9 2013 2.054 6.07 18.20<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 041.04-041.84 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.987 6.06 26.06<br />

Rajshahi Natore N502 Bogra -Natore Road Km 045.96-046.66 S 0.70 9061 National DBST @ Traff >6000 2013 0.951 6.06 14.97<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 1<strong>12</strong>.56-114.26 S 1.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.880 6.05 47.79<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 275.38-275.58 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.403 6.05 31.84<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 017.00-018.70 S 1.70 3292 Regional DBST @ Traff 2000-4000 2013 2.309 6.04 45.43<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 040.30-040.40 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.04 16.81<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 040.80-040.90 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.04 16.81<br />

Khulna Magura N7 Dauladia-Mongla Road Km 070.32-070.42 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.03 16.79<br />

Khulna Magura N7 Dauladia-Mongla Road Km 071.<strong>12</strong>-071.32 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 6.03 33.59<br />

Khulna Magura N7 Dauladia-Mongla Road Km 073.92-074.02 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.03 16.79<br />

Khulna Magura N7 Dauladia-Mongla Road Km 103.62-104.40 S 0.79 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 22.392 6.03 132.33<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 104.42-104.82 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 6.03 67.17<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 041.50-042.60 S 1.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 31.258 6.03 184.64<br />

Rangpur Bogra R545 Bogra-Joypurhat Road Km 0<strong>12</strong>.90-013.90 S 1.00 4887 Regional DBST @ Traff 4000-6000 2013 1.359 6.03 31.47<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 001.50-007.30 S 5.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 16.650 6.03 176.16<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 051.72-052.<strong>12</strong> S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 6.03 32.34<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 137.51-143.61 S 6.10 6306 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.242 6.03 197.52<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 017.60-018.00 S 0.40 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 6.02 8.77<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 115.06-115.86 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.738 6.01 24.74<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 084.87-087.07 S 2.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 4.249 6.01 32.24<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 254.84-254.94 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.00 15.25<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 310.98-311.28 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.708 6.00 44.14<br />

Khulna Jessore N707 Jessore Town Old Section Km 004.30-004.60 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.00 46.15<br />

Appendix-A: Page:34 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 031.03-031.13 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.153 6.00 2.86<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 014.20-016.00 S 1.80 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 5.167 5.99 38.58<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 217.08-217.18 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.764 5.99 16.21<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 078.32-078.52 S 0.20 3019 Regional DBST @ Traff 2000-4000 2013 0.178 5.99 3.13<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 034.97-035.07 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 5.99 1.63<br />

Khulna Magura N7 Dauladia-Mongla Road Km 069.32-069.42 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.98 16.64<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 017.70-018.90 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.481 5.98 40.73<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 019.60-022.30 R 2.70 11451 National Overlay 80mm @ IRI 4-9 2013 24.891 5.98 219.09<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 005.50-005.90 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.109 5.98 51.98<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 006.30-006.90 S 0.60 3802 National Overlay 50mm @ IRI 5-9 2013 2.286 5.98 <strong>23</strong>.58<br />

Khulna Jessore N708 Jessore Town Old Section Km 001.90-002.10 R 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 5.97 27.88<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 016.50-016.60 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.881 5.97 16.84<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 020.98-021.78 R 0.80 11451 National DBST @ Traff >6000 2013 1.940 5.97 61.14<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 219.56-220.06 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.757 5.96 63.87<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 303.38-303.48 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 5.95 15.82<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 304.58-304.68 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 5.95 15.82<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 022.10-0<strong>23</strong>.10 S 1.00 3292 Regional DBST 25mm @ 25% Crk 2013 1.359 5.95 26.56<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 104.40-104.42 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.341 5.94 1.98<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 131.57-132.67 S 1.10 101<strong>12</strong> Regional DBST @ Traff >6000 2013 1.630 5.94 40.03<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 026.49-029.39 S 2.90 4887 Regional DBST @ Traff 4000-6000 2013 3.940 5.94 104.94<br />

Khulna Magura N702 Jessore -Magura Road Km 042.99-043.49 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.419 5.93 62.33<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.90-002.10 S 0.20 4885 Regional DBST @ Traff 4000-6000 2013 0.272 5.93 6.03<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 021.90-022.50 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.722 5.93 17.64<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 016.10-016.20 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.92 16.64<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 016.30-016.40 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.92 16.64<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 103.66-105.94 S 2.29 4887 Regional Overlay 50mm @ IRI 5-7 2013 6.813 5.92 65.28<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 202.08-202.38 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.642 5.92 50.06<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 013.80-013.90 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.91 16.61<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 019.90-020.40 S 0.50 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 5.90 10.95<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 005.80-006.00 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.372 5.90 31.17<br />

Sylhet Sylhet R281 Rajnagar-Charkhai Road Km 068.52-071.52 S 3.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.269 5.90 91.05<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 016.90-017.10 R 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.89 33.67<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 017.70-017.80 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.89 16.84<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 018.48-018.58 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.89 16.84<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 018.78-018.98 R 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.89 33.67<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 019.68-020.08 R 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.678 5.89 67.35<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 021.78-021.88 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.89 16.84<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 042.90-043.32 S 0.42 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.992 5.89 69.15<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 004.10-004.30 S 0.20 4885 Regional Overlay 60mm @ IRI 7-9 2013 0.685 5.89 5.46<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.00-000.10 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.131 5.88 3.33<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km <strong>12</strong>4.57-<strong>12</strong>4.98 S 0.41 7109 National Overlay 60mm @ IRI 7-9 2013 2.582 5.88 26.68<br />

Appendix-A: Page:35 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 079.46-079.56 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.215 5.88 4.44<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km <strong>12</strong>0.09-<strong>12</strong>0.78 S 0.69 4887 Regional DBST @ Traff 4000-6000 2013 0.932 5.87 24.56<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 014.70-017.80 S 3.10 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 11.267 5.87 100.58<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.00-031.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 5.87 3.44<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 024.18-024.28 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.87 16.77<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 024.38-024.47 R 0.09 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.744 5.87 15.77<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 003.30-003.50 S 0.20 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.365 5.86 2.24<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 192.63-192.73 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.85 16.88<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 071.40-071.50 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.148 5.85 3.78<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 037.10-039.30 S 2.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 4.421 5.85 35.06<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 243.34-243.44 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 5.84 16.04<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 118.02-119.62 S 1.60 6605 National Overlay 50mm @ IRI 4-7 2013 5.328 5.84 63.27<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 033.47-033.57 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 5.82 1.53<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 021.15-022.55 S 1.40 7068 National Overlay 60mm @ IRI 7-9 2013 4.792 5.82 43.80<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 007.50-007.70 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.707 5.81 32.49<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 031.40-031.80 S 0.40 3497 Regional DBST @ Traff 2000-4000 2013 0.543 5.81 11.45<br />

Rajshahi Natore N502 Bogra -Natore Road Km 047.16-048.06 S 0.90 9061 National DBST @ Traff >6000 2013 1.2<strong>23</strong> 5.81 18.46<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 002.30-002.40 S 0.10 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.209 5.81 1.29<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.38-016.48 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.099 5.81 1.89<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 000.00-000.30 S 0.30 9769 Regional DBST 25mm @ 25% Crk 2013 0.408 5.81 8.14<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 042.90-045.30 S 2.40 2992 National Overlay 50mm @ IRI 5-9 2013 6.890 5.81 66.51<br />

Khulna Jessore N708 Jessore Town Old Section Km 000.20-001.10 S 0.90 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 25.575 5.81 146.79<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 000.10-000.20 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.80 16.30<br />

Rangpur Rangpur N517 Rangpur Town Old Section Km 000.00-002.50 S 2.50 9<strong>12</strong>6 National DBST @ Traff >6000 2013 4.051 5.80 102.08<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 018.98-019.68 R 0.70 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.437 5.80 116.06<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 187.58-187.68 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.958 5.80 16.80<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 187.88-188.18 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.875 5.80 50.39<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 022.22-0<strong>23</strong>.02 S 0.80 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 2.888 5.79 25.43<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 189.68-190.18 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.679 5.79 67.65<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 025.88-026.08 R 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.761 5.79 32.67<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 185.98-186.28 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.887 5.79 50.39<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 005.60-005.90 S 0.30 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.348 5.79 29.57<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 110.56-110.76 S 0.20 3779 National Overlay 50mm @ IRI 4-9 2013 0.574 5.79 4.96<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 170.17-170.18 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.263 5.78 1.49<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 006.35-006.47 S 0.11 3019 Regional DBST 25mm @ 25% Crk 2013 0.094 5.78 1.50<br />

Dhaka Kishoreganj R2<strong>12</strong> Akdaria -Agarpur Road Km 017.79-022.31 S 4.52 3019 Regional Overlay 50mm @ IRI 7-9 2013 8.489 5.78 61.99<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 216.56-217.26 S 0.70 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 19.892 5.78 1<strong>12</strong>.51<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 040.30-041.00 S 0.70 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.478 5.77 68.72<br />

Khulna Magura N7 Dauladia-Mongla Road Km 074.02-074.62 S 0.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.050 5.76 96.21<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 046.29-046.69 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.654 5.76 52.76<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 182.88-182.98 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.978 5.76 16.80<br />

Appendix-A: Page:36 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 183.08-183.18 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.978 5.76 16.80<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 185.08-185.28 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.956 5.76 33.59<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 000.40-001.20 S 0.80 4887 Regional DBST @ Traff 4000-6000 2013 1.146 5.76 30.83<br />

Comilla Feni N104 Feni-Noakhali Road Km 011.50-011.70 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 5.75 <strong>23</strong>.66<br />

Khulna Magura N7 Dauladia-Mongla Road Km 074.62-075.31 S 0.68 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.<strong>23</strong>6 5.75 113.97<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 005.00-005.10 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.75 16.16<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 038.70-038.80 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.75 15.99<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 197.38-198.08 S 0.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.908 5.74 71.85<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 243.04-243.14 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 5.74 15.75<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 019.00-020.60 S 1.60 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 5.865 5.74 53.61<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 002.60-002.80 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.74 31.92<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 145.65-148.15 S 2.50 6671 National DBST 25mm @ 25% Crk 2013 4.631 5.73 73.00<br />

Gopalganj Faridpur N804 Bhanga-Faridpur Road Km 030.00-030.20 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.73 31.90<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 284.28-284.58 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.175 5.73 45.73<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 001.30-002.70 S 1.40 4965 Regional Overlay 60mm @ IRI 7-9 2013 4.792 5.73 32.65<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 300.88-301.08 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.606 5.73 31.43<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 080.95-081.75 S 0.80 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.440 5.72 105.58<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 007.10-007.20 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.71 15.90<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 020.80-020.82 S 0.02 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.568 5.71 3.18<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 067.10-067.40 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.940 5.71 9.28<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 304.18-304.38 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 5.71 30.39<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 005.40-011.10 S 5.70 5074 Regional DBST 25mm @ 25% Crk 2013 6.800 5.71 131.52<br />

Rangpur Rangpur N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 291.38-294.48 S 3.10 4405 National Overlay 50mm @ IRI 4-9 2013 11.650 5.70 <strong>12</strong>8.26<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 005.00-005.10 S 0.10 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.783 5.70 9.70<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 005.20-005.40 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.372 5.70 30.09<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 066.66-070.40 S 3.74 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 108.375 5.69 604.30<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 035.30-035.40 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.69 15.84<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 017.10-017.70 R 0.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.517 5.69 97.65<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 002.70-003.40 S 0.70 4965 Regional Overlay 50mm @ IRI 5-7 2013 2.010 5.69 14.24<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 022.90-0<strong>23</strong>.30 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.543 5.69 <strong>12</strong>.78<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 009.20-009.30 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 5.69 15.61<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 028.25-028.99 S 0.75 4887 Regional DBST @ Traff 4000-6000 2013 1.015 5.69 25.89<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 021.40-021.60 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.68 31.63<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 153.41-153.51 S 0.10 6671 National Overlay 50mm @ IRI 4-7 2013 0.391 5.68 4.03<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 0<strong>12</strong>.90-013.20 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.68 47.44<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 081.75-082.35 S 0.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.424 5.68 96.94<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 077.98-078.58 S 0.60 4887 Regional DBST @ Traff 4000-6000 2013 1.289 5.68 29.31<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 000.00-000.50 S 0.50 6187 Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 5.67 14.59<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 000.00-000.10 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.67 15.94<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 024.10-024.30 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.66 31.52<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 002.80-003.60 R 0.80 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.865 5.66 113.71<br />

Appendix-A: Page:37 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 000.70-000.90 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.66 31.81<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 004.90-005.00 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.66 15.90<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 004.00-004.10 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.65 15.89<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 002.10-002.20 S 0.10 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.209 5.65 1.28<br />

Dhaka Tangail R506 Aricha -Daulatpur-Tangail Road Km 036.71-038.41 S 1.70 2847 Regional Overlay 50mm @ IRI 7-9 2013 3.549 5.65 26.<strong>23</strong><br />

Khulna Jessore N708 Jessore Town Old Section Km 001.30-001.40 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.65 15.88<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 038.07-039.87 S 1.80 22<strong>23</strong> Regional Overlay 50mm @ IRI 7-9 2013 3.730 5.65 25.82<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 041.50-041.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.65 15.71<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 002.40-003.90 S 1.50 6187 Regional DBST @ Traff >6000 2013 2.038 5.64 44.10<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 081.42-082.62 S 1.20 3019 Regional DBST @ Traff 2000-4000 2013 1.097 5.63 20.29<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 024.28-024.38 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.62 16.06<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 021.70-021.80 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 5.62 11.90<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 000.40-000.50 S 0.10 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.209 5.62 1.30<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 140.45-140.65 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.61 31.54<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 188.88-189.08 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 5.61 32.51<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 190.18-190.28 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.958 5.61 16.26<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 034.80-035.30 S 0.50 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 14.208 5.61 78.04<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 038.50-038.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.61 15.61<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 036.90-037.10 S 0.20 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.442 5.61 18.32<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 279.29-279.39 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 5.60 13.08<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 033.07-033.37 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.408 5.60 6.86<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 002.00-002.30 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.<strong>12</strong>0 5.60 <strong>23</strong>.16<br />

Sylhet Moulavi Bazar R282 Juri-Lathidila Road Km 015.40-015.99 S 0.58 4391 Regional Overlay 60mm @ IRI 7-9 2013 1.274 5.59 8.14<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 006.20-006.50 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.058 5.58 44.<strong>23</strong><br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 041.00-041.20 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.58 31.07<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 007.40-007.80 S 0.40 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.731 5.58 5.33<br />

Rangpur Rangpur N517 Rangpur Town Old Section Km 002.50-002.60 S 0.10 9111 National DBST @ Traff >6000 2013 0.180 5.58 4.44<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 215.54-216.05 S 0.51 11451 National Overlay 80mm @ IRI 4-9 2013 5.258 5.58 41.37<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 054.02-057.72 S 3.70 4331 Regional Overlay 50mm @ IRI 5-7 2013 10.622 5.58 77.73<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 020.82-021.10 S 0.28 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.957 5.57 43.43<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 032.10-033.27 S 1.17 4887 Regional DBST @ Traff 4000-6000 2013 1.589 5.57 39.74<br />

Comilla Feni N104 Feni-Noakhali Road Km 017.30-019.50 S 2.20 9193 National DBST 25mm @ 25% Crk 2013 3.152 5.57 78.39<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 021.49-0<strong>23</strong>.69 S 2.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 7.464 5.57 68.13<br />

Gopalganj Faridpur N804 Bhanga-Faridpur Road Km 030.80-031.10 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.56 46.41<br />

Rangpur Panchgarh N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 446.84-447.14 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.532 5.56 29.80<br />

Khulna Jessore N706 Jessore -Benapole Road Km 032.10-032.90 S 0.80 7314 National Overlay 60mm @ IRI 7-9 2013 3.784 5.56 34.35<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>1.91-<strong>12</strong>2.01 S 0.10 3779 National Overlay 50mm @ IRI 4-9 2013 0.287 5.55 2.92<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 006.30-006.50 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.54 31.15<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 017.20-017.60 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 5.54 61.63<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 042.98-043.08 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.54 15.98<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 222.98-2<strong>23</strong>.18 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.333 5.53 28.80<br />

Appendix-A: Page:38 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 024.50-024.80 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.53 46.15<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 408.20-410.87 S 2.66 3083 National Overlay 50mm @ IRI 4-9 2013 8.340 5.53 64.69<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 001.20-001.50 S 0.30 <strong>23</strong>43 Regional Overlay 50mm @ IRI 7-9 2013 0.940 5.52 8.37<br />

Khulna Magura N702 Jessore -Magura Road Km 035.79-035.89 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.52 15.51<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 025.90-026.30 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 5.52 61.43<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 255.14-255.44 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 5.51 42.02<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 244.04-244.34 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.724 5.51 47.06<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km <strong>12</strong>5.72-<strong>12</strong>9.42 S 3.70 5636 National Overlay 50mm @ IRI 4-9 2013 <strong>12</strong>.263 5.51 137.29<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.90-021.40 S 0.50 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 5.51 10.22<br />

Khulna Magura N7 Dauladia-Mongla Road Km 077.51-078.21 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 6.741 5.50 52.34<br />

Khulna Magura N702 Jessore -Magura Road Km 031.69-034.49 S 2.80 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 79.567 5.50 432.53<br />

Rangpur Bogra N502 Bogra -Natore Road Km 013.30-015.10 S 1.80 5705 National Overlay 50mm @ IRI 5-9 2013 5.167 5.50 38.55<br />

Dhaka Gazipur R303 Tongi By-Pass Road Km 000.10-000.20 S 0.10 10199 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 5.49 9.65<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.80-014.30 L 1.50 8665 National Overlay 50mm @ IRI 4-7 2013 11.486 5.49 <strong>12</strong>0.51<br />

Comilla Feni N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 169.88-170.17 S 0.29 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.496 5.48 45.63<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 031.33-032.86 S 1.53 4887 Regional DBST 25mm @ 25% Crk 2013 2.340 5.48 36.92<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 046.00-047.20 S 1.20 2992 National Overlay 50mm @ IRI 5-9 2013 3.508 5.48 30.56<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 026.19-026.49 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.445 5.48 8.55<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 008.80-008.90 S 0.10 3516 Regional DBST 25mm @ 25% Crk 2013 0.086 5.46 1.04<br />

Dhaka Manikganj R506 Aricha -Daulatpur-Tangail Road Km 006.80-006.90 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.324 5.45 7.18<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 082.44-082.64 S 0.20 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.44 31.31<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 019.27-019.37 S 0.10 3571 Regional Overlay 50mm @ IRI 5-7 2013 0.157 5.44 1.34<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 009.00-009.60 S 0.60 3206 Regional Overlay 50mm @ IRI 7-9 2013 1.879 5.43 17.40<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 278.79-278.89 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.43 15.67<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 004.40-004.70 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.096 5.43 10.86<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 010.47-016.73 S 6.26 5393 Regional Overlay 60mm @ IRI 5.5-9 2013 21.994 5.41 145.40<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 027.20-027.70 S 0.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.940 5.41 8.11<br />

Rajshahi Natore R548 Naogaon-Atrai-Natore Road Km 039.29-040.17 S 0.88 1939 Regional Overlay 50mm @ IRI 7-9 2013 1.835 5.41 <strong>12</strong>.97<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 021.70-027.80 S 6.10 4887 Regional DBST @ Traff 4000-6000 2013 9.055 5.40 152.22<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 020.90-021.00 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 5.39 2.14<br />

Dhaka Munshiganj R813 Muktarpur - Munshiganj Road Km 002.00-002.50 S 0.50 3788 Regional DBST @ Traff 2000-4000 2013 0.445 5.39 8.54<br />

Dhaka Dhaka R1<strong>12</strong> Narayanganj -Rampura Road Km 000.00-017.50 S 17.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 29.229 5.38 254.48<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 302.18-302.58 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.211 5.37 59.00<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 024.90-027.00 S 2.10 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 7.188 5.36 42.59<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 025.15-025.19 S 0.04 9061 National DBST @ Traff >6000 2013 0.050 5.36 2.99<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 195.88-196.48 S 0.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.880 5.35 55.99<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 189.28-189.68 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.834 5.35 61.99<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 081.60-083.00 S 1.40 2707 Regional DBST @ Traff 2000-4000 2013 1.902 5.34 36.61<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 082.35-082.75 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.522 5.34 60.22<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 017.60-017.80 S 0.20 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.397 5.34 3.<strong>12</strong><br />

Rangpur Joypurhat R550 Mokamtala-Joypurhat Road Km 016.00-024.<strong>12</strong> S 8.<strong>12</strong> 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 <strong>23</strong>.316 5.33 169.36<br />

Appendix-A: Page:39 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 011.90-0<strong>12</strong>.10 S 0.20 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.313 5.33 2.04<br />

Barisal Patuakhali R881 Amtali-Kuakata Road Km 032.82-040.70 S 7.87 3019 Regional Overlay 50mm @ IRI 7-9 2013 15.203 5.33 135.15<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 084.92-085.<strong>12</strong> S 0.20 10297 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 5.32 15.83<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 002.90-003.00 S 0.10 1514 Regional Overlay 50mm @ IRI 5-7 2013 0.198 5.31 1.14<br />

Dhaka Dhaka R801 Jurain-Chasara Road Km 000.00-010.00 S 10.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 46.676 5.31 356.74<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 276.99-277.19 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.31 30.63<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 139.05-140.45 S 1.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 39.783 5.31 208.68<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 171.48-171.78 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 5.30 45.50<br />

Dhaka Munshiganj R813 Muktarpur - Munshiganj Road Km 000.40-001.60 S 1.20 3788 Regional DBST @ Traff 2000-4000 2013 1.067 5.30 20.15<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 083.72-084.52 S 0.80 10297 Regional DBST @ Traff >6000 2013 1.186 5.29 26.15<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 036.60-036.90 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.28 44.11<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 000.70-001.20 S 0.50 4887 Regional DBST 25mm @ 25% Crk 2013 0.766 5.28 14.67<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 042.00-042.70 S 0.70 2992 National Overlay 50mm @ IRI 5-9 2013 2.010 5.28 16.69<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 186.28-187.58 S 1.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 38.460 5.28 198.69<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 010.90-011.50 S 0.60 3206 Regional Overlay 50mm @ IRI 7-9 2013 1.879 5.27 16.88<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 018.20-019.20 S 1.00 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 5.27 19.18<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 171.08-171.18 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.26 15.05<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 013.00-013.30 S 0.30 3292 Regional DBST @ Traff 2000-4000 2013 0.408 5.26 6.44<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.20-007.30 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.131 5.26 2.85<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 058.26-058.46 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.296 5.25 3.67<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 200.68-200.78 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.059 5.25 10.59<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 187.68-187.88 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 5.25 30.40<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 043.08-043.68 S 0.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.217 5.24 75.36<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 033.00-036.00 S 3.00 2992 National Overlay 50mm @ IRI 5-9 2013 8.604 5.<strong>23</strong> 59.40<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 144.72-144.82 S 0.10 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 1.835 5.<strong>23</strong> 9.34<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 083.60-084.66 S 1.06 2707 Regional DBST @ Traff 2000-4000 2013 1.437 5.<strong>23</strong> 27.<strong>12</strong><br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 047.95-048.15 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 5.<strong>23</strong> <strong>23</strong>.49<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 229.26-229.76 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 15.674 5.<strong>23</strong> 82.02<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 085.24-085.44 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.<strong>23</strong> 30.19<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 010.60-010.80 S 0.20 1346 Regional DBST @ Traff 100-2000 2013 0.148 5.<strong>23</strong> 2.61<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 035.72-037.97 S 2.24 4887 Regional DBST @ Traff 4000-6000 2013 3.354 5.22 75.66<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 000.00-000.10 S 0.10 3802 National DBST 25mm @ 25% Crk 2013 0.180 5.22 2.82<br />

Rangpur Bogra R545 Bogra-Joypurhat Road Km 007.30-011.30 S 4.00 7130 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 53.946 5.22 276.85<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 153.11-153.21 S 0.10 6671 National DBST @ Traff >6000 2013 0.185 5.22 3.30<br />

Dhaka Sherpur R371 Sherpur-Nakla-Mymensingh Km 055.36-058.36 S 3.00 3786 Regional Overlay 50mm @ IRI 5-7 2013 9.395 5.22 67.64<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 009.00-009.20 R 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.761 5.21 29.38<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 150.22-150.32 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.871 5.20 9.19<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 019.10-019.20 S 0.10 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.198 5.19 1.19<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 007.27-007.47 S 0.20 3571 Regional Overlay 50mm @ IRI 7-9 2013 0.355 5.19 2.50<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 033.60-034.87 S 1.27 4116 Regional Overlay 60mm @ IRI 7-9 2013 4.742 5.19 37.54<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 074.74-074.84 S 0.10 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.18 14.91<br />

Appendix-A: Page:40 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 004.47-014.87 S 10.40 3109 Regional Overlay 50mm @ IRI 7-9 2013 29.313 5.18 226.70<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 217.78-217.88 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.764 5.17 14.00<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 005.60-005.80 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.241 5.17 22.06<br />

Barisal Patuakhali R881 Amtali-Kuakata Road Km 031.42-032.72 S 1.30 3019 Regional Overlay 50mm @ IRI 7-9 2013 2.511 5.17 21.32<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 119.79-119.89 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 5.17 5.38<br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 013.20-013.40 S 0.20 3778 Regional Overlay 50mm @ IRI 7-9 2013 0.626 5.17 4.48<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 284.66-284.76 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.17 14.91<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 000.40-000.50 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.153 5.17 1.93<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 036.19-036.79 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.183 5.16 20.30<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 020.70-022.00 S 1.30 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 4.814 5.16 39.59<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 150.51-161.37 S 10.86 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 244.291 5.16 <strong>12</strong>75.70<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 044.15-046.20 S 2.05 7153 National Overlay 50mm @ IRI 4-7 2013 7.822 5.16 54.70<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 0<strong>23</strong>.40-0<strong>23</strong>.50 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.16 14.35<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 005.90-006.20 S 0.30 3076 Regional DBST @ Traff 2000-4000 2013 0.415 5.15 6.21<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 030.60-033.60 S 3.00 3937 Regional Overlay 50mm @ IRI 5-7 2013 9.395 5.15 83.57<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 021.20-021.60 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.031 5.14 43.60<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 300.48-300.68 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.606 5.13 28.15<br />

Dhaka Kishoreganj N2 Dhaka-Sylhet-Jaflong Road Km 072.04-074.18 S 2.14 10258 National Overlay 80mm @ IRI 4-9 2013 13.2<strong>23</strong> 5.<strong>12</strong> 80.51<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 005.10-005.30 S 0.20 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 5.<strong>12</strong> 21.81<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 004.00-007.20 S 3.20 4887 Regional DBST @ Traff 4000-6000 2013 4.347 5.<strong>12</strong> 97.91<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 198.18-199.58 S 1.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 25.816 5.11 <strong>12</strong>7.88<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 087.74-087.94 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.11 29.21<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 018.80-020.80 S 2.00 3292 Regional DBST 25mm @ 25% Crk 2013 2.717 5.11 49.11<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 021.60-0<strong>23</strong>.20 S 1.60 4406 Regional DBST 25mm @ 25% Crk 2013 2.213 5.11 39.60<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 034.10-034.30 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.10 28.40<br />

Sylhet Moulavi Bazar N208 Moulvibazar-Sylhet Road Km 013.40-030.60 S 17.20 7159 National Overlay 50mm @ IRI 5-7 2013 53.868 5.09 317.42<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 007.90-008.00 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.192 5.08 15.88<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 014.60-014.90 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 5.08 32.29<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 008.30-009.10 S 0.80 9855 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 11.2<strong>23</strong> 5.08 53.92<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 002.50-002.60 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.08 14.26<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 244.44-244.54 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 5.07 15.46<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 047.05-047.25 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 5.07 22.75<br />

Khulna Khulna N709 Khulna City By-Pass Road Km 003.10-003.20 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.07 14.24<br />

Khulna Jhenaidah N703 Jhenaidah Town Old Section Km 002.30-003.30 S 1.00 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.440 5.06 89.78<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 036.20-036.30 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.06 14.08<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 016.97-017.17 S 0.20 3019 Regional DBST 25mm @ 25% Crk 2013 0.180 5.06 2.56<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 037.78-037.88 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.06 14.07<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 000.70-001.30 S 0.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 16.980 5.05 84.84<br />

Khulna Jessore N708 Jessore Town Old Section Km 001.60-001.70 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.931 5.05 14.63<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 022.30-0<strong>23</strong>.20 R 0.90 11451 National DBST @ Traff >6000 2013 3.779 5.04 94.09<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 048.55-048.65 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.244 5.04 11.32<br />

Appendix-A: Page:41 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 030.40-031.00 S 0.60 4887 Regional DBST @ Traff 4000-6000 2013 0.889 5.04 15.06<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 018.00-018.20 S 0.20 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.397 5.04 2.45<br />

Dhaka Manikganj R315 Mawna-Nabinagar Road Km 039.40-043.30 S 3.90 2048 Regional Overlay 50mm @ IRI 5-7 2013 6.310 5.04 28.61<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 022.50-022.80 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 5.03 43.55<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 029.09-029.19 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.178 5.03 3.66<br />

Gopalganj Faridpur N804 Bhanga-Faridpur Road Km 027.70-028.00 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.957 5.03 44.09<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 011.50-011.90 S 0.40 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.626 5.02 4.63<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 020.18-020.78 R 0.60 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.343 5.02 100.04<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 005.10-005.70 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.614 5.02 20.89<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 214.58-214.68 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.410 5.01 16.74<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 031.05-040.43 S 9.38 3155 Regional Overlay 50mm @ IRI 7-9 2013 26.280 5.01 172.21<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 039.89-039.99 S 0.10 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 5.01 9.28<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 084.54-084.64 S 0.10 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.01 14.42<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 021.81-025.78 S 3.96 3019 Regional Overlay 50mm @ IRI 7-9 2013 8.915 5.01 56.42<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 117.79-117.99 S 0.20 2947 Regional DBST @ Traff 2000-4000 2013 0.272 5.01 3.99<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 000.00-018.10 S 18.10 4540 Regional DBST 25mm @ 25% Crk 2013 26.869 5.00 386.80<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 038.49-038.59 S 0.10 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 5.00 8.90<br />

Dhaka Gazipur R303 Tongi By-Pass Road Km 000.30-000.60 S 0.30 10199 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 5.00 26.37<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 170.38-170.48 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.00 14.29<br />

Chittagong Cox's Bazar N110 Link Road-Cox's Bazar Road Km 007.70-008.00 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.693 5.00 47.90<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 191.19-191.39 S 0.20 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.790 5.00 <strong>23</strong>.61<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 179.48-179.58 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.958 4.99 14.47<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 025.17-025.27 S 0.10 5572 Regional DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>4 4.99 1.05<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 003.90-005.40 S 1.50 4887 Regional DBST 25mm @ 25% Crk 2013 2.038 4.99 22.<strong>23</strong><br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 026.81-029.51 S 2.70 3636 Regional DBST 25mm @ 25% Crk 2013 3.801 4.98 60.50<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 070.40-070.70 S 0.30 2707 Regional Overlay 50mm @ IRI 7-9 2013 0.861 4.98 6.38<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 044.39-044.49 S 0.10 1661 Regional DBST @ Traff 100-2000 2013 0.089 4.97 1.45<br />

Dhaka Gazipur N105 Madanpur-Joydevpur Km 040.14-043.14 S 3.00 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 85.250 4.96 418.40<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 0<strong>23</strong>.00-0<strong>23</strong>.20 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 4.96 21.02<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 282.26-282.46 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.96 28.63<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 217.18-217.78 S 0.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 13.092 4.96 64.90<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 006.40-006.60 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 4.95 27.84<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 085.<strong>12</strong>-085.52 S 0.40 10297 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 4.95 29.47<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 010.60-010.70 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.95 13.91<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 030.00-033.00 S 3.00 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 52.000 4.94 245.33<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 226.08-226.18 S 0.10 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.868 4.93 9.04<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>1.61-<strong>12</strong>1.91 S 0.30 3779 National Overlay 50mm @ IRI 4-9 2013 0.861 4.93 7.21<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.50-016.60 S 0.10 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.136 4.92 1.45<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 275.39-275.49 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.92 14.21<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 005.90-007.00 S 1.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.792 4.92 37.56<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 034.88-035.18 R 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.8<strong>23</strong> 4.92 33.55<br />

Appendix-A: Page:42 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 014.00-014.30 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.731 4.91 33.46<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 041.20-041.40 S 0.20 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.565 4.91 16.71<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 176.88-176.98 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.997 4.90 14.39<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 006.40-007.04 S 0.64 3076 Regional DBST 25mm @ 25% Crk 2013 0.885 4.90 15.50<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 027.39-028.49 S 1.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.596 4.88 59.52<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 211.18-211.38 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.983 4.88 <strong>23</strong>.20<br />

Khulna Bagerhat N7 Dauladia-Mongla Road Km 224.46-224.56 S 0.10 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.515 4.87 11.96<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 0<strong>23</strong>.87-025.17 S 1.30 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.265 4.87 100.46<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 097.47-098.37 S 0.90 3019 Regional DBST @ Traff 2000-4000 2013 0.8<strong>23</strong> 4.86 <strong>12</strong>.57<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 057.82-057.92 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.86 11.20<br />

Khulna Magura N702 Jessore -Magura Road Km 038.59-040.49 S 1.90 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 55.397 4.86 265.97<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 003.90-004.10 S 0.20 2929 Regional Overlay 50mm @ IRI 5-7 2013 0.397 4.85 1.96<br />

Sylhet Moulavi Bazar N208 Moulvibazar-Sylhet Road Km 000.00-013.40 S 13.40 <strong>12</strong>587 National Overlay 80mm @ IRI 5-9 2013 67.828 4.85 296.14<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 040.29-040.47 S 0.18 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.453 4.85 16.35<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 157.50-160.80 S 3.30 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 53.047 4.84 246.18<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 303.88-303.98 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.151 4.84 10.38<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 032.60-034.70 S 2.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 6.577 4.84 44.17<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 007.80-008.50 S 0.70 4909 Regional Overlay 50mm @ IRI 5-7 2013 2.558 4.83 21.67<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 079.60-079.70 S 0.10 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 4.83 9.22<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 004.40-004.50 S 0.10 4885 Regional DBST @ Traff 4000-6000 2013 0.136 4.83 1.68<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 018.00-019.40 L 1.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 47.032 4.82 222.09<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 085.52-085.61 S 0.09 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.82 8.75<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 075.58-076.18 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.801 4.82 22.37<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 096.17-097.07 S 0.90 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.790 4.82 10.26<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 283.58-283.78 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 4.82 25.63<br />

Rangpur Bogra N502 Bogra -Natore Road Km 026.16-027.06 S 0.90 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 14.467 4.82 66.90<br />

Dhaka Sherpur R460 Jamalpur-Sherpur-Bangaon Road Km 001.80-002.50 S 0.70 4422 Regional Overlay 60mm @ IRI 7-9 2013 2.396 4.82 <strong>12</strong>.92<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 039.80-039.90 S 0.10 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 4.81 10.25<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 171.98-173.18 S 1.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 27.918 4.81 134.38<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 018.30-018.70 S 0.40 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.626 4.81 4.25<br />

Dhaka Dhaka R504 Hemayetpur-Manikganj Road Km 003.20-004.00 S 0.80 4187 Regional Overlay 60mm @ IRI 7-9 2013 2.803 4.81 20.99<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 018.07-018.27 S 0.20 3571 Regional DBST 25mm @ 25% Crk 2013 0.148 4.81 2.21<br />

Dhaka Sherpur R371 Sherpur-Nakla-Mymensingh Km 035.60-035.90 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.414 4.80 21.49<br />

Khulna Magura N7 Dauladia-Mongla Road Km 069.02-069.32 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.731 4.80 32.29<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 035.30-035.50 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.384 4.80 30.27<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 153.56-153.66 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.871 4.79 8.47<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 044.89-044.99 S 0.10 1661 Regional DBST @ Traff 100-2000 2013 0.089 4.79 1.37<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 039.49-039.59 S 0.10 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.871 4.78 8.71<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 002.00-002.20 S 0.20 2929 Regional Overlay 50mm @ IRI 5-7 2013 0.397 4.78 1.95<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 068.30-069.80 S 1.50 2707 Regional Overlay 50mm @ IRI 7-9 2013 4.306 4.78 30.80<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 001.10-001.30 S 0.20 2929 Regional Overlay 50mm @ IRI 5-7 2013 0.397 4.77 2.09<br />

Appendix-A: Page:43 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 006.30-007.10 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.968 4.77 28.46<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 189.08-189.28 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 4.77 27.64<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 006.80-007.00 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.795 4.76 <strong>12</strong>.88<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km <strong>12</strong>9.42-<strong>12</strong>9.72 S 0.30 5636 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.561 4.76 22.58<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 010.00-0<strong>12</strong>.70 L 2.70 8665 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.958 4.76 194.60<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 079.54-079.74 S 0.20 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.76 27.39<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 271.89-271.99 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.76 13.73<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 083.32-083.37 S 0.05 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.561 4.76 2.53<br />

Comilla Feni N104 Feni-Noakhali Road Km 017.20-017.30 S 0.10 9193 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.170 4.73 9.76<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 087.07-089.57 S 2.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 4.828 4.73 25.81<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km <strong>12</strong>7.15-<strong>12</strong>7.61 S 0.46 3779 National Overlay 50mm @ IRI 4-9 2013 1.309 4.73 7.58<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 190.39-190.59 S 0.20 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.790 4.73 22.33<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 018.80-019.10 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.72 40.88<br />

Dhaka Narayanganj R111 Signboard -Narayanganj Road Km 003.20-006.60 S 3.40 15970 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 60.027 4.72 285.74<br />

Rajshahi Sirajganj R451 Nalka-Sirajganj Road Km 000.00-001.30 S 1.30 4965 Regional Overlay 50mm @ IRI 5-7 2013 3.732 4.72 21.94<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 000.00-000.10 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.72 13.26<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 1<strong>12</strong>.62-1<strong>12</strong>.72 S 0.10 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.71 9.17<br />

Chittagong Cox's Bazar R180 Laharpur-Laboni More Road Km 000.20-000.30 S 0.10 4993 Regional DBST @ Traff 4000-6000 2013 0.148 4.71 2.43<br />

Barisal Patuakhali R881 Amtali-Kuakata Road Km 017.00-018.29 S 1.29 3019 Regional Overlay 50mm @ IRI 5-7 2013 3.497 4.71 27.47<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 143.41-143.51 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.983 4.70 8.86<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 049.26-049.36 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.70 8.72<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 003.40-004.35 S 0.95 3942 Regional Overlay 50mm @ IRI 5-7 2013 3.379 4.70 26.77<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 046.00-046.10 S 0.10 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.70 8.52<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 105.09-107.46 S 2.37 3779 National Overlay 50mm @ IRI 4-9 2013 6.828 4.69 46.41<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 018.50-019.50 S 1.00 5045 Regional Overlay 60mm @ IRI 5.5-9 2013 3.485 4.69 19.27<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 033.60-033.70 S 0.10 2048 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.921 4.68 4.03<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 083.37-084.87 S 1.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 2.897 4.68 14.71<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 266.99-267.09 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.68 13.51<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 191.89-192.19 S 0.30 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.409 4.68 34.29<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 136.62-136.92 S 0.30 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 4.67 26.59<br />

Sylhet Moulavi Bazar R282 Juri-Lathidila Road Km 006.10-009.10 S 3.00 4391 Regional Overlay 60mm @ IRI 7-9 2013 7.095 4.67 37.04<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 013.68-013.78 S 0.10 6240 Regional DBST 25mm @ 25% Crk 2013 0.136 4.66 1.03<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 116.<strong>12</strong>-116.22 S 0.10 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.170 4.66 9.81<br />

Dhaka Gazipur R303 Tongi By-Pass Road Km 000.70-000.90 S 0.20 10199 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 4.65 16.35<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 009.00-009.20 S 0.20 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.397 4.65 2.33<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 403.80-404.10 S 0.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.532 4.65 24.93<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 009.00-009.20 L 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.761 4.65 26.22<br />

Comilla Feni N104 Feni-Noakhali Road Km 017.00-017.10 S 0.10 9193 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.170 4.65 9.59<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 143.61-146.71 S 3.10 6306 National Overlay 50mm @ IRI 4-7 2013 11.8<strong>12</strong> 4.64 87.99<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>5.61-<strong>12</strong>7.15 S 1.54 3779 National Overlay 50mm @ IRI 4-9 2013 4.432 4.64 32.62<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 226.28-226.38 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.6<strong>12</strong> 4.63 <strong>12</strong>.10<br />

Appendix-A: Page:44 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 051.76-051.86 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.63 8.59<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 052.16-052.26 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.63 8.59<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 053.26-053.36 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.63 8.59<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 135.52-135.92 S 0.40 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 7.590 4.63 35.09<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 053.46-053.56 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.62 8.58<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 265.69-265.99 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.62 39.98<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 016.50-016.70 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.61 26.62<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 098.57-099.07 S 0.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.966 4.61 4.59<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 040.56-040.76 S 0.20 4116 Regional Overlay 50mm @ IRI 5-7 2013 0.626 4.60 3.45<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 026.10-026.20 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.096 4.60 1.28<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 143.22-143.42 S 0.20 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 4.60 16.09<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 221.86-221.96 S 0.10 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 4.60 11.77<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>2.71-1<strong>23</strong>.01 S 0.30 3779 National Overlay 50mm @ IRI 4-9 2013 0.861 4.59 6.18<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 035.32-035.62 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.430 4.59 8.<strong>23</strong><br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 028.49-030.29 S 1.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.720 4.59 26.88<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 083.82-084.<strong>12</strong> S 0.30 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.564 4.59 4.32<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 076.94-077.14 S 0.20 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.58 26.39<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 044.71-044.75 S 0.03 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.555 4.58 2.46<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 081.90-082.00 S 0.10 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.038 4.58 9.04<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 054.46-054.56 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.58 8.51<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 054.72-054.82 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.58 8.51<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.20-018.30 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.151 4.58 2.88<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.20-018.30 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.151 4.58 2.88<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 244.84-245.34 S 0.50 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 15.571 4.58 69.80<br />

Dhaka Kishoreganj N2 Dhaka-Sylhet-Jaflong Road Km 071.94-072.04 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.58 13.21<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 029.00-031.40 S 2.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 40.828 4.57 181.67<br />

Dhaka Sherpur R460 Jamalpur-Sherpur-Bangaon Road Km 006.71-015.60 S 8.89 4887 Regional DBST @ Traff 4000-6000 2013 13.456 4.57 263.43<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 004.78-007.80 S 3.03 4909 Regional Overlay 60mm @ IRI 7-9 2013 13.517 4.57 91.22<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 188.19-188.29 S 0.10 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.507 4.57 11.33<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 038.60-038.70 S 0.10 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 4.57 9.73<br />

Comilla Feni N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 169.21-169.38 S 0.17 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.934 4.56 22.03<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 130.71-130.81 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.55 8.90<br />

Khulna Satkhira N715 Benapole Town Old Section Km 002.50-002.60 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.55 8.83<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 082.50-082.60 S 0.10 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 4.55 8.69<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 270.99-271.19 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.54 26.22<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 016.10-016.30 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.294 4.52 <strong>23</strong>.48<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.40-013.60 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 4.52 <strong>12</strong>.40<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 048.09-048.49 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.507 4.52 51.44<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 053.36-053.46 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.52 8.39<br />

Sylhet Sylhet R281 Rajnagar-Charkhai Road Km 061.59-067.22 S 5.63 4682 Regional Overlay 60mm @ IRI 7-9 2013 19.320 4.52 101.15<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 084.52-084.72 S 0.20 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 4.52 17.26<br />

Appendix-A: Page:45 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 007.30-007.50 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.844 4.52 <strong>12</strong>.43<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 017.20-017.30 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.647 4.52 11.73<br />

Comilla Feni N104 Feni-Noakhali Road Km 002.20-002.50 S 0.30 1<strong>23</strong>76 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 4.50 28.94<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 039.50-040.10 S 0.60 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.444 4.50 28.40<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 031.00-032.40 S 1.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.384 4.50 24.04<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 026.49-028.19 S 1.70 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 27.327 4.50 118.50<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 0<strong>12</strong>.40-0<strong>12</strong>.60 R 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.851 4.49 30.15<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 246.74-246.94 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.530 4.49 33.36<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 189.49-189.59 S 0.10 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.507 4.49 11.14<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 007.50-008.00 S 0.50 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.783 4.49 4.44<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 083.00-083.60 S 0.60 2707 Regional DBST @ Traff 2000-4000 2013 0.815 4.48 13.06<br />

Rajshahi Natore N502 Bogra -Natore Road Km 056.16-056.46 S 0.30 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.48 20.75<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 117.29-117.49 S 0.20 2947 Regional DBST 25mm @ 25% Crk 2013 0.272 4.48 2.91<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 2<strong>23</strong>.06-2<strong>23</strong>.26 S 0.20 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.<strong>23</strong>9 4.48 22.92<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 3<strong>12</strong>.98-313.38 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 10.277 4.48 43.90<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 025.29-025.79 S 0.50 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 8.037 4.48 34.68<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 142.82-143.<strong>12</strong> S 0.30 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 4.47 <strong>23</strong>.43<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 084.14-084.34 S 0.20 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.47 25.70<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 006.60-008.30 S 1.70 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 37.617 4.46 168.00<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 004.30-004.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.46 7.95<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 080.02-080.22 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.376 4.46 2.75<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 001.60-001.90 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.459 4.46 5.58<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 059.<strong>12</strong>-059.62 S 0.50 3555 National DBST @ Traff 2000-4000 2013 0.642 4.46 9.90<br />

Dhaka Dhaka N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 000.30-000.40 L 0.10 9159 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.45 <strong>12</strong>.37<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 090.26-090.36 S 0.10 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.636 4.45 6.78<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 135.92-136.62 S 0.70 5636 National DBST @ Traff 4000-6000 2013 1.003 4.45 46.52<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 010.80-011.50 S 0.70 1346 Regional Overlay 50mm @ IRI 5-7 2013 1.096 4.45 5.97<br />

Dhaka Manikganj R315 Mawna-Nabinagar Road Km 044.70-044.80 S 0.10 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.713 4.44 3.08<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 114.82-115.02 S 0.20 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 4.44 17.29<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 015.60-017.80 L 2.20 8665 National Overlay 50mm @ IRI 4-7 2013 17.982 4.44 152.65<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 227.46-227.56 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.309 4.44 14.38<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 096.46-096.56 S 0.10 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.636 4.44 6.76<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 295.18-298.78 S 3.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 70.367 4.43 302.41<br />

Comilla Noakhali R143 Maijdi-Ch<strong>and</strong>raganj Road Km 000.00-000.10 S 0.10 4563 Regional DBST 25mm @ 25% Crk 2013 0.096 4.43 0.73<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 045.48-046.48 S 1.00 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 37.915 4.43 164.03<br />

Khulna Jessore N708 Jessore Town Old Section Km 001.90-002.10 L 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.43 25.58<br />

Rajshahi Natore N502 Bogra -Natore Road Km 036.76-038.96 S 2.20 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 35.365 4.43 150.38<br />

Dhaka Tangail R506 Aricha -Daulatpur-Tangail Road Km 038.41-047.81 S 9.40 3019 Regional Overlay 50mm @ IRI 7-9 2013 19.625 4.43 140.52<br />

Rajshahi Natore N6 Kashinathpur-Natore-Rajshahi Road Km 103.92-104.02 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.244 4.42 9.93<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 134.51-137.51 S 3.00 6306 National Overlay 50mm @ IRI 4-7 2013 11.431 4.42 81.11<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 118.69-118.79 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 4.42 5.93<br />

Appendix-A: Page:46 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 001.50-001.70 S 0.20 6255 Regional Overlay 60mm @ IRI 5.5-9 2013 0.871 4.42 4.89<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 227.76-227.86 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.309 4.41 14.30<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 077.16-079.06 S 1.90 15273 National Full Recon 195mm @ IRI <strong>12</strong> 2013 44.155 4.41 183.86<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.90-016.40 S 2.50 5687 Regional DBST 25mm @ 25% Crk 2013 3.396 4.41 49.36<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 009.70-011.00 S 1.30 1484 Regional Overlay 50mm @ IRI 7-9 2013 2.578 4.41 13.92<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 268.19-268.49 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.41 38.17<br />

Gopalganj Gopalganj N806 Bhatiapara-Kalna Road Km 002.80-003.00 S 0.20 2860 National Overlay 50mm @ IRI 5-9 2013 0.386 4.40 2.79<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 005.30-005.70 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 4.40 49.45<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 017.17-017.27 S 0.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.840 4.39 3.54<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 077.98-078.08 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.39 8.58<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 038.99-039.09 S 0.10 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 4.38 7.80<br />

Rangpur Bogra N502 Bogra -Natore Road Km 028.36-028.66 S 0.30 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.38 20.29<br />

Khulna Jessore N708 Jessore Town Old Section Km 001.10-001.30 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 4.38 19.89<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 025.05-025.15 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.38 8.59<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 025.19-025.29 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.38 8.59<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 026.39-026.49 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.38 8.59<br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 019.90-020.10 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.38 25.26<br />

Khulna Jessore N707 Jessore Town Old Section Km 000.10-001.10 S 1.00 9500 National Full Recon 180mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.<strong>23</strong>8 4.37 98.27<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 013.41-013.71 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.437 4.37 5.48<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 136.92-138.86 S 1.94 5636 National Overlay 50mm @ IRI 4-9 2013 5.879 4.37 <strong>12</strong>5.37<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 143.51-143.61 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.983 4.37 8.<strong>23</strong><br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 014.87-015.96 S 1.09 3109 Regional DBST @ Traff 2000-4000 2013 1.449 4.36 22.68<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 153.51-153.71 S 0.20 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 4.35 <strong>23</strong>.89<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 036.50-036.80 S 0.30 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.540 4.35 26.70<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 008.50-009.30 S 0.80 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 2.297 4.35 <strong>12</strong>.55<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 007.50-007.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 4.35 7.88<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 059.72-059.82 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.34 10.00<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 147.11-150.51 S 3.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 79.984 4.33 350.47<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 006.90-007.20 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 4.33 36.48<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 066.60-068.30 S 1.70 2707 Regional DBST @ Traff 2000-4000 2013 2.309 4.33 29.03<br />

Khulna Jessore N706 Jessore -Benapole Road Km 030.20-030.40 S 0.20 7314 National DBST @ Traff >6000 2013 0.375 4.32 7.51<br />

Khulna Magura N702 Jessore -Magura Road Km 040.49-042.79 S 2.30 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 53.721 4.32 <strong>23</strong>5.11<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 000.10-000.20 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.32 8.44<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 0<strong>12</strong>.10-0<strong>12</strong>.30 S 0.20 1346 Regional DBST @ Traff 100-2000 2013 0.148 4.32 2.15<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 079.80-080.30 S 0.50 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 4.31 41.17<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.06-069.16 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 4.31 5.91<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 080.70-081.00 S 0.30 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.31 24.68<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 000.40-000.50 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.417 4.31 6.14<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 140.91-143.01 S 2.10 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 32.530 4.30 134.03<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 040.57-041.37 S 0.80 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.090 4.30 71.74<br />

Rajshahi Natore N502 Bogra -Natore Road Km 055.66-055.96 S 0.30 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.29 19.57<br />

Appendix-A: Page:47 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 005.20-005.70 S 0.50 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.064 4.29 47.44<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 030.69-030.79 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.28 8.41<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 026.40-026.50 S 0.10 3292 Regional DBST 25mm @ 25% Crk 2013 0.136 4.28 1.20<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 015.30-015.50 S 0.20 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.313 4.28 1.70<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 005.30-006.20 S 0.90 5179 Regional Overlay 60mm @ IRI 5.5-9 2013 3.848 4.28 25.48<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 021.20-021.40 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.376 4.28 2.69<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 021.70-021.80 S 0.10 1301 Regional Overlay 50mm @ IRI 7-9 2013 0.198 4.28 0.96<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 145.55-145.65 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.28 9.86<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 007.20-007.40 S 0.20 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.272 4.28 <strong>12</strong>.75<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 139.42-139.52 S 0.10 5636 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.618 4.28 7.18<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 134.87-135.17 S 0.30 101<strong>12</strong> Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.414 4.27 18.94<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 304.38-304.58 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.303 4.27 18.32<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 092.97-093.37 S 0.40 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 6.430 4.27 26.36<br />

Khulna Magura N702 Jessore -Magura Road Km 043.49-043.68 S 0.19 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.951 4.27 29.04<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 010.00-0<strong>12</strong>.70 R 2.70 8665 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.958 4.26 174.28<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 056.25-056.35 S 0.10 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 4.26 6.58<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 058.<strong>12</strong>-059.<strong>12</strong> S 1.00 4331 Regional Overlay 50mm @ IRI 5-7 2013 2.871 4.26 15.90<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 086.06-087.16 S 1.10 2707 Regional DBST @ Traff 2000-4000 2013 1.494 4.26 22.52<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 030.40-030.50 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.26 11.84<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 187.33-187.43 S 0.10 8158 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.25 11.81<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 071.50-071.70 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 4.25 <strong>12</strong>.73<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 035.67-035.87 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 4.25 14.92<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 098.37-098.47 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.091 4.25 0.74<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 048.36-048.66 S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.838 4.24 <strong>23</strong>.62<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 003.85-003.95 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.24 8.32<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 302.98-303.08 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 4.<strong>23</strong> 11.60<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 024.35-027.35 S 3.00 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 48.225 4.<strong>23</strong> 195.72<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 054.56-054.72 S 0.17 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.211 4.22 <strong>12</strong>.94<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 275.89-276.19 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.22 36.56<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 077.24-077.44 S 0.20 1<strong>23</strong>30 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 4.22 19.61<br />

Sylhet Sylhet N210 Sylhet Twn By-Pass Road Km 009.40-009.50 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.21 11.84<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 139.32-139.42 S 0.10 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.100 4.21 8.84<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 018.38-018.58 S 0.20 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 0.685 4.21 2.60<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km <strong>12</strong>9.72-130.22 S 0.50 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 10.142 4.21 42.66<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 187.02-187.13 S 0.11 8158 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.143 4.21 13.09<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 030.70-031.00 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 4.21 35.10<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 001.70-001.90 S 0.20 17870 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.459 4.20 31.40<br />

Khulna Satkhira N715 Benapole Town Old Section Km 003.50-003.60 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.20 8.15<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 033.50-034.20 S 0.70 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 22.344 4.20 92.71<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 084.46-084.56 S 0.10 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 4.20 7.07<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 132.67-132.97 S 0.30 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.19 <strong>23</strong>.90<br />

Appendix-A: Page:48 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rajshahi Natore N602 Natore Town old Section Km 003.19-003.59 S 0.40 7<strong>23</strong>7 National Overlay 60mm @ IRI 7-9 2013 2.116 4.19 11.38<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 131.27-131.57 S 0.30 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.19 <strong>23</strong>.88<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 049.77-049.97 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 4.19 11.36<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 004.50-004.60 S 0.10 2897 National Overlay 50mm @ IRI 5-9 2013 0.287 4.18 1.49<br />

Rangpur Bogra N502 Bogra -Natore Road Km 027.46-028.26 S 0.80 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.860 4.18 51.64<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 114.<strong>12</strong>-114.42 S 0.30 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 4.18 24.41<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 050.66-051.06 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.784 4.18 31.04<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 188.53-188.63 S 0.10 8158 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.18 11.60<br />

Barisal Patuakhali N8 Dhaka -Patuakhali Road Km 189.62-202.09 S <strong>12</strong>.48 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 200.535 4.17 801.59<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 404.30-405.10 S 0.80 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.752 4.17 59.62<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 025.89-026.09 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 4.17 11.43<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 2<strong>23</strong>.56-2<strong>23</strong>.66 S 0.10 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 4.17 10.66<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 042.87-042.97 S 0.10 22<strong>23</strong> Regional DBST @ Traff 2000-4000 2013 0.136 4.16 2.09<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 033.30-033.60 S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.950 4.16 <strong>23</strong>.61<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km <strong>23</strong>8.20-<strong>23</strong>8.30 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.15 9.69<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 049.96-050.46 S 0.50 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 9.729 4.15 38.52<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 257.11-257.31 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 4.15 19.37<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 083.42-083.72 S 0.30 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.15 <strong>23</strong>.78<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 002.90-003.00 S 0.10 4885 Regional DBST @ Traff 4000-6000 2013 0.141 4.15 1.43<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 0<strong>23</strong>.20-025.70 S 2.50 3292 Regional DBST @ Traff 2000-4000 2013 3.396 4.15 41.51<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 140.61-140.91 S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.950 4.14 <strong>23</strong>.43<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 078.75-079.85 S 1.10 11497 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 25.355 4.14 106.36<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 077.88-077.98 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.14 8.10<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 092.14-092.44 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.14 35.52<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.40-008.50 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.300 4.14 5.47<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 001.40-001.50 S 0.10 2929 Regional DBST 25mm @ 25% Crk 2013 0.094 4.14 0.71<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 153.06-153.46 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.484 4.14 29.26<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 037.90-039.40 S 1.50 2048 Regional Overlay 50mm @ IRI 5-7 2013 2.427 4.13 10.34<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 089.57-089.77 S 0.20 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.703 4.13 6.74<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 119.62-119.82 S 0.20 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.640 4.<strong>12</strong> 18.68<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 269.59-269.79 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.<strong>12</strong> <strong>23</strong>.77<br />

Rajshahi Natore N502 Bogra -Natore Road Km 043.36-044.26 S 0.90 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 19.638 4.<strong>12</strong> 81.85<br />

Khulna Satkhira N715 Benapole Town Old Section Km 000.40-000.60 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 4.11 15.95<br />

Khulna Satkhira N715 Benapole Town Old Section Km 002.30-002.50 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 4.11 15.95<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 000.10-000.20 S 0.10 17870 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 4.11 15.62<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 013.25-013.55 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 4.10 16.70<br />

Khulna Satkhira N715 Benapole Town Old Section Km 000.10-000.40 S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 4.10 <strong>23</strong>.84<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 280.09-280.56 S 0.47 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 13.576 4.10 54.99<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 048.66-049.26 S 0.60 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.675 4.09 45.58<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 001.20-002.20 S 1.00 1398 Regional Overlay 50mm @ IRI 7-9 2013 1.926 4.09 9.96<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 096.07-096.17 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.091 4.08 0.76<br />

Appendix-A: Page:49 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 080.30-081.00 S 0.70 2707 Regional Overlay 50mm @ IRI 7-9 2013 2.010 4.08 10.86<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 030.29-030.39 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.07 8.00<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 041.58-041.78 S 0.20 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 4.07 16.67<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 055.42-055.82 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.784 4.07 30.<strong>23</strong><br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 098.47-098.57 S 0.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.852 4.07 3.32<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 018.70-018.80 S 0.10 3292 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.266 4.07 5.<strong>12</strong><br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 001.80-003.00 S 1.20 3076 Regional Overlay 50mm @ IRI 7-9 2013 3.508 4.07 17.77<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 079.30-079.90 S 0.60 2707 Regional Overlay 50mm @ IRI 7-9 2013 1.722 4.07 9.29<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 056.<strong>12</strong>-059.<strong>12</strong> S 3.00 3555 National Overlay 50mm @ IRI 5-9 2013 8.142 4.07 43.27<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 005.50-006.30 S 0.80 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 4.07 44.<strong>12</strong><br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 020.97-021.07 S 0.10 3571 Regional DBST 25mm @ 25% Crk 2013 0.074 4.06 0.96<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 033.00-033.30 S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.950 4.06 <strong>23</strong>.06<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 0<strong>12</strong>.20-0<strong>12</strong>.50 S 0.30 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.348 4.06 9.46<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 016.11-016.51 S 0.40 3636 Regional DBST 25mm @ 25% Crk 2013 0.563 4.06 7.25<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 047.57-051.17 S 3.60 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 48.552 4.06 198.32<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 050.46-050.66 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.892 4.06 15.06<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 001.50-002.00 S 0.50 2929 Regional Overlay 50mm @ IRI 7-9 2013 0.992 4.05 5.26<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 010.75-011.95 S 1.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 16.184 4.05 65.87<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 062.45-062.75 S 0.30 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.05 18.73<br />

Rajshahi Natore N502 Bogra -Natore Road Km 039.46-041.46 S 2.00 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 32.150 4.04 <strong>12</strong>4.85<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 043.10-043.20 S 0.10 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 4.04 7.01<br />

Rajshahi Pabna N604 Pabna Town Old Section Km 001.90-003.40 S 1.50 7342 National Overlay 50mm @ IRI 5-7 2013 7.853 4.04 44.<strong>23</strong><br />

Dhaka Munshiganj N8 Dhaka -Patuakhali Road Km 007.40-007.80 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 13.<strong>23</strong>5 4.04 52.84<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 139.52-139.82 S 0.30 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 6.478 4.04 25.85<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 0<strong>12</strong>.40-013.80 S 1.40 1484 Regional Overlay 50mm @ IRI 5-7 2013 2.777 4.04 13.72<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 175.98-176.58 S 0.60 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.051 4.03 56.68<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 131.24-131.25 S 0.01 9332 National Full Recon 180mm @ IRI <strong>12</strong> 2013 0.365 4.03 1.46<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 286.26-286.41 S 0.15 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.550 4.03 14.48<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 011.20-011.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.767 4.03 6.94<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 0<strong>23</strong>.<strong>12</strong>-0<strong>23</strong>.95 S 0.83 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 13.358 4.02 51.59<br />

Rangpur Bogra N514 Bogra (Banani)-Matidali Road Km 007.50-007.91 L 0.41 9159 National DBST @ Traff >6000 2013 1.404 4.02 <strong>23</strong>.59<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.10 6330 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 4.02 6.88<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 093.66-093.86 S 0.20 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.452 4.02 9.59<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 043.32-044.<strong>12</strong> S 0.80 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>23</strong>.849 4.01 95.43<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 008.90-009.30 S 0.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.369 4.01 18.76<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 135.67-136.17 S 0.50 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 4.01 38.08<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 044.<strong>12</strong>-045.02 S 0.90 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 35.665 4.01 139.56<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 002.60-003.10 S 0.50 2929 Regional Overlay 50mm @ IRI 7-9 2013 0.992 4.01 5.39<br />

Rangpur Dinajpur R586 Fulbari Bus St<strong>and</strong>-Dinajpur Road Km 000.00-003.27 S 3.27 6695 Regional DBST 25mm @ 25% Crk 2013 4.735 4.00 58.31<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 079.06-079.16 S 0.10 15273 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.813 4.00 6.92<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 054.10-054.20 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.00 7.22<br />

Appendix-A: Page:50 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Dhaka N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 004.50-004.60 L 0.10 9159 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.00 11.10<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 053.50-053.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.00 7.21<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 051.86-052.16 S 0.30 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.559 3.99 17.56<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 026.11-029.21 S 3.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 40.744 3.98 164.06<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 150.72-150.82 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.871 3.98 7.03<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 002.90-003.10 S 0.20 6255 Regional DBST @ Traff >6000 2013 0.346 3.97 5.31<br />

Rangpur Nilphamari N518 Sayedpur Town Old Section Km 000.20-001.00 S 0.80 4662 National DBST @ Traff 4000-6000 2013 1.284 3.97 19.92<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 001.<strong>23</strong>-001.40 S 0.17 3942 Regional Overlay 50mm @ IRI 5-7 2013 0.603 3.97 3.42<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 245.94-246.17 S 0.<strong>23</strong> 11451 National Overlay 80mm @ IRI 4-9 2013 2.289 3.97 11.11<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 009.40-010.20 S 0.80 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 3.96 43.01<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 014.10-014.20 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.878 3.96 7.30<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 141.42-141.52 S 0.10 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.159 3.96 8.45<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 036.08-036.28 R 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 3.95 22.01<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 140.55-140.75 S 0.20 9332 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 3.95 21.96<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 008.90-009.80 S 0.90 <strong>23</strong>43 Regional Overlay 50mm @ IRI 7-9 2013 2.584 3.95 16.93<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 0<strong>12</strong>.25-013.15 S 0.90 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.138 3.95 48.28<br />

Rajshahi Natore N602 Natore Town old Section Km 002.59-002.89 S 0.30 7<strong>23</strong>7 National DBST @ Traff >6000 2013 0.630 3.95 9.20<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 031.72-031.82 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.494 3.95 6.02<br />

Chittagong Dohazari N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 246.94-247.14 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 2.017 3.95 9.47<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 026.19-026.39 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.95 15.51<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 019.77-020.57 S 0.80 3571 Regional DBST @ Traff 2000-4000 2013 0.594 3.95 7.33<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 0<strong>23</strong>.95-024.35 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.95 30.93<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 116.82-116.92 S 0.10 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.432 3.95 9.40<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 117.22-117.32 S 0.10 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.432 3.95 9.40<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 002.00-002.10 S 0.10 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 3.95 6.<strong>12</strong><br />

Rajshahi Natore N502 Bogra -Natore Road Km 041.46-041.86 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.94 30.84<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 005.05-005.25 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.94 15.49<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 025.79-026.19 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.94 30.92<br />

Rajshahi Natore N502 Bogra -Natore Road Km 054.16-055.66 S 1.50 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 24.1<strong>12</strong> 3.94 89.76<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 027.24-027.44 S 0.20 1096 Regional Overlay 50mm @ IRI 7-9 2013 0.386 3.94 1.76<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 143.61-144.11 S 0.50 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.291 3.93 38.47<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 006.80-006.90 S 0.10 3206 Regional Overlay 50mm @ IRI 7-9 2013 0.313 3.93 2.20<br />

Dhaka Manikganj R315 Mawna-Nabinagar Road Km 044.00-044.70 S 0.70 2048 Regional Overlay 50mm @ IRI 5-7 2013 1.133 3.93 5.<strong>12</strong><br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 091.77-092.77 S 1.00 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 16.075 3.92 60.58<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 080.78-080.98 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.92 15.32<br />

Khulna Magura N7 Dauladia-Mongla Road Km 075.41-076.11 S 0.70 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 25.342 3.92 96.95<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 001.80-002.00 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.92 15.38<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 000.50-000.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 009.30-009.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 010.20-010.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 010.65-010.75 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

Appendix-A: Page:51 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 013.15-013.25 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 225.78-225.98 S 0.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.892 3.92 14.40<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 055.82-056.<strong>12</strong> S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.838 3.91 21.80<br />

Dhaka Mymensingh N3 Dhaka -Mymensingh Road Km 106.60-106.70 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 3.91 11.19<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 041.80-042.00 S 0.20 2992 National Overlay 50mm @ IRI 5-9 2013 0.574 3.91 3.75<br />

Khulna Satkhira N715 Benapole Town Old Section Km 000.60-002.30 S 1.70 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 34.989 3.91 <strong>12</strong>8.96<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 007.10-007.30 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.91 14.19<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 048.37-049.57 S 1.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 16.184 3.91 63.71<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km <strong>12</strong>1.22-<strong>12</strong>1.32 S 0.10 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.432 3.91 9.32<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 213.88-215.46 L 1.58 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 61.544 3.91 <strong>23</strong>4.81<br />

Khulna Khulna N7 Dauladia-Mongla Road Km 213.88-215.46 R 1.58 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 61.544 3.91 <strong>23</strong>4.81<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 007.90-008.00 S 0.10 3206 Regional Overlay 50mm @ IRI 7-9 2013 0.313 3.91 2.15<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 115.44-115.54 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 3.89 11.13<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 010.20-010.60 S 0.40 1346 Regional Overlay 50mm @ IRI 5-7 2013 0.626 3.89 3.27<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 004.90-005.10 S 0.20 1779 Regional Overlay 50mm @ IRI 7-9 2013 0.382 3.89 1.64<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 013.36-013.46 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.89 6.99<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 003.90-004.00 S 0.10 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.89 6.74<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 004.10-004.20 S 0.10 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.89 6.74<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 004.30-004.40 S 0.10 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.89 6.74<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 074.90-075.80 S 0.90 2707 Regional Overlay 50mm @ IRI 7-9 2013 2.584 3.89 <strong>12</strong>.30<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 034.88-035.18 L 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.642 3.88 32.87<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.76-070.96 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.88 10.65<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 003.40-003.80 S 0.40 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.793 3.88 3.77<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 053.56-054.46 S 0.90 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.513 3.88 64.86<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 082.60-083.42 S 0.82 10297 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.020 3.88 47.14<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.15-0<strong>23</strong>.25 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.79<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 019.40-019.60 L 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.785 3.88 29.36<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 019.50-019.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.81<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 018.70-018.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.81<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.66-070.76 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.81<br />

Comilla Brahmanbaria N102 Comilla-Brahmanbaria Road Km 079.16-080.06 S 0.90 15273 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.670 3.88 75.58<br />

Rajshahi Rajshahi N6 Kashinathpur-Natore-Rajshahi Road Km <strong>12</strong>4.98-<strong>12</strong>5.08 S 0.10 7109 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.134 3.87 8.26<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.00-010.10 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.87 5.30<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 017.39-017.49 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.86 6.95<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.06-070.26 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.86 10.59<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 103.49-103.59 S 0.10 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.096 3.86 7.65<br />

Gopalganj Gopalganj N806 Bhatiapara-Kalna Road Km 001.20-002.70 S 1.50 2860 National Overlay 50mm @ IRI 5-9 2013 2.897 3.86 18.37<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 000.10-000.50 S 0.40 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 8.974 3.86 35.06<br />

Khulna Satkhira N715 Benapole Town Old Section Km 002.60-003.50 S 0.90 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 18.5<strong>23</strong> 3.86 67.34<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 052.70-052.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 3.86 6.96<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 082.56-082.76 S 0.20 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.86 13.01<br />

Appendix-A: Page:52 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 025.47-025.57 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.86 6.76<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 026.43-026.81 S 0.38 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.419 3.86 21.<strong>12</strong><br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 055.30-055.40 S 0.10 7248 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.134 3.85 8.19<br />

Rajshahi Natore N502 Bogra -Natore Road Km 038.96-039.46 S 0.50 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.291 3.85 37.66<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 026.09-026.19 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.85 6.77<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 091.67-091.87 S 0.20 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.703 3.85 6.28<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 049.36-049.96 S 0.60 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.675 3.85 42.88<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 102.59-102.79 S 0.20 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.191 3.85 15.25<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 082.10-082.20 S 0.10 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 3.85 8.60<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 044.84-047.44 S 2.60 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 41.795 3.85 154.37<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 026.99-028.89 S 1.90 4887 Regional DBST @ Traff 4000-6000 2013 3.318 3.85 52.78<br />

Khulna Magura N702 Jessore -Magura Road Km 029.49-031.69 S 2.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 49.357 3.84 192.09<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 052.26-053.26 S 1.00 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 19.459 3.84 71.29<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 025.79-025.89 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.84 6.74<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.50-030.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.83 6.73<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 095.16-095.46 S 0.30 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.678 3.83 13.73<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 014.96-015.06 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.83 6.89<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 000.30-000.70 S 0.40 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.793 3.83 3.13<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 035.22-035.32 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.83 7.13<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 011.90-013.70 S 1.80 3206 Regional Overlay 50mm @ IRI 5-7 2013 5.637 3.83 28.67<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 050.17-051.87 S 1.70 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 22.927 3.83 88.27<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 054.82-055.42 S 0.60 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.675 3.82 42.59<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 025.19-025.29 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.71<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 171.00-173.80 S 2.80 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 57.567 3.82 209.83<br />

Comilla Laxmipur R143 Maijdi-Ch<strong>and</strong>raganj Road Km 014.00-014.10 S 0.10 4563 Regional DBST @ Traff 4000-6000 2013 0.090 3.82 0.89<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 005.40-005.50 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.74<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 006.30-006.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.74<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 007.20-007.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.74<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 168.42-169.00 S 0.58 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.937 3.82 43.46<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 171.00-174.20 S 3.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 65.861 3.82 <strong>23</strong>9.65<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 000.30-003.40 S 3.10 1779 Regional Overlay 50mm @ IRI 7-9 2013 5.922 3.82 30.63<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 081.10-081.40 S 0.30 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 3.81 21.85<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 062.15-062.25 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.81 6.72<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 024.99-025.09 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.81 6.70<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 049.14-049.94 S 0.80 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.860 3.81 47.10<br />

Rangpur Gaib<strong>and</strong>a R555 Palashbari-Gaib<strong>and</strong>ah Road Km 014.40-017.80 S 3.40 2956 Regional Overlay 50mm @ IRI 5-7 2013 9.760 3.81 52.08<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.50-008.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.81 6.45<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 043.27-043.47 S 0.20 22<strong>23</strong> Regional DBST @ Traff 2000-4000 2013 0.272 3.81 3.40<br />

Dhaka Dhaka N501 Mirpur Bridge-Dhour Road Km 010.50-010.90 S 0.40 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 5.6<strong>12</strong> 3.80 20.51<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 083.98-087.68 S 3.70 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 76.152 3.80 274.78<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 081.96-082.06 S 0.10 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.80 6.41<br />

Appendix-A: Page:53 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 099.56-099.66 S 0.10 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.80 6.41<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 069.80-070.40 S 0.60 2707 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.80 8.91<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 143.82-144.02 S 0.20 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 3.80 15.39<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 042.70-046.70 S 4.00 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 34.983 3.80 <strong>12</strong>9.69<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 003.75-003.85 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 3.79 7.45<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.30-007.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.79 6.42<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.10-007.20 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.79 6.41<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 059.<strong>12</strong>-059.42 S 0.30 4331 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 3.79 15.<strong>23</strong><br />

Gopalganj Sariatpur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 018.98-019.18 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.78 10.37<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 024.55-025.05 S 0.50 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.291 3.78 37.10<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 025.27-028.37 S 3.10 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 54.562 3.78 201.24<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 092.46-092.86 S 0.40 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.543 3.78 <strong>23</strong>.00<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 036.00-041.80 S 5.80 2992 National Overlay 50mm @ IRI 5-9 2013 16.659 3.77 104.85<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 028.19-029.39 S 1.20 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 24.698 3.77 88.82<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.40-009.50 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.77 6.62<br />

Khulna Magura N7 Dauladia-Mongla Road Km 097.91-098.01 S 0.10 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.77 10.06<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 002.60-003.20 S 0.60 3516 Regional Overlay 50mm @ IRI 7-9 2013 1.159 3.77 5.52<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 084.06-084.36 S 0.30 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.77 19.05<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 006.10-006.20 S 0.10 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 3.77 5.81<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 008.60-008.70 S 0.10 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.76 6.52<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 005.80-007.80 S 2.00 1779 Regional Overlay 50mm @ IRI 7-9 2013 3.821 3.76 18.17<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km <strong>12</strong>2.31-<strong>12</strong>9.61 S 7.30 5355 National Overlay 50mm @ IRI 4-9 2013 27.815 3.76 151.21<br />

Rangpur Bogra N515 Bogra 2nd Town By-Pass Road Km 010.40-010.70 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 3.76 31.69<br />

Rangpur Gaib<strong>and</strong>a R555 Palashbari-Gaib<strong>and</strong>ah Road Km 003.50-007.00 S 3.50 2956 Regional Overlay 50mm @ IRI 5-7 2013 10.048 3.76 51.43<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.30-008.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.75 6.35<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 051.17-052.07 S 0.90 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.138 3.75 45.75<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 004.10-004.40 S 0.30 <strong>23</strong>26 Regional Overlay 50mm @ IRI 5-7 2013 0.548 3.74 2.32<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 044.40-044.50 S 0.10 5607 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.806 3.74 6.33<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 000.60-003.60 S 3.00 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 40.827 3.74 153.66<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 133.15-133.25 S 0.10 9332 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 3.74 10.38<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 133.17-133.57 S 0.40 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 3.74 28.40<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 0<strong>12</strong>.50-0<strong>12</strong>.60 S 0.10 6330 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.74 6.40<br />

Rajshahi Sirajganj N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km <strong>12</strong>2.21-<strong>12</strong>2.31 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 3.73 11.50<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 055.42-055.72 S 0.30 7248 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.195 3.73 29.84<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 055.10-055.30 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.73 13.48<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 030.52-030.62 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.930 3.73 7.08<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 085.56-085.66 S 0.10 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.73 4.95<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 202.38-203.48 S 1.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 42.563 3.73 155.47<br />

Sylhet Sylhet N206 Keean Bridge-Nayarpool Road Km 000.70-000.97 S 0.26 14220 National DBST @ Traff >6000 2013 0.687 3.73 10.42<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 038.09-038.49 S 0.40 1661 Regional DBST @ Traff 100-2000 2013 0.356 3.73 4.59<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.60-009.70 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.73 6.54<br />

Appendix-A: Page:54 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 030.00-030.40 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.593 3.73 6.32<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.90-010.00 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.72 6.54<br />

Khulna Magura N7 Dauladia-Mongla Road Km 089.51-089.61 S 0.10 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.72 9.94<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 008.10-008.20 S 0.10 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.72 6.45<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 049.43-050.63 S 1.20 1661 Regional DBST @ Traff 100-2000 2013 1.067 3.72 13.36<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 114.26-114.36 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.72 5.04<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 049.70-049.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.71 13.40<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 009.50-010.20 S 0.70 3297 Regional Overlay 50mm @ IRI 7-9 2013 2.192 3.71 10.47<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 033.44-033.54 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.71 7.11<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 033.94-034.04 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.71 7.11<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 119.89-<strong>12</strong>0.09 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.71 <strong>12</strong>.88<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 103.56-103.66 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.71 6.44<br />

Khulna Satkhira N715 Benapole Town Old Section Km 005.00-005.30 S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 3.71 21.56<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 034.44-034.54 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.71 7.10<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 000.10-000.40 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 10.791 3.71 39.42<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 053.80-054.00 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.70 13.36<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 117.72-118.02 S 0.30 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.297 3.70 26.46<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 141.92-142.<strong>12</strong> S 0.20 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 4.318 3.70 15.80<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 148.25-148.45 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 3.70 16.80<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 029.00-029.10 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.70 7.<strong>12</strong><br />

Khulna Magura N7 Dauladia-Mongla Road Km 097.51-097.61 S 0.10 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.70 9.87<br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 019.50-019.60 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.70 5.44<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 055.50-055.70 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.69 13.33<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.50-009.60 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.69 5.06<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 045.70-045.90 S 0.20 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.690 3.69 13.25<br />

Rangpur Bogra R545 Bogra-Joypurhat Road Km 000.60-000.70 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.472 3.69 5.04<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 038.74-044.84 S 6.10 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 98.057 3.69 347.16<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 034.52-034.62 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.930 3.69 6.99<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 057.74-057.94 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.335 3.69 <strong>12</strong>.37<br />

Rajshahi Natore N502 Bogra -Natore Road Km 056.46-056.76 S 0.30 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 3.69 21.62<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 143.52-143.72 S 0.20 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 3.775 3.69 13.91<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 003.70-005.50 S 1.80 3516 Regional Overlay 50mm @ IRI 7-9 2013 3.288 3.68 13.70<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 001.00-001.30 S 0.30 6255 Regional Overlay 60mm @ IRI 5.5-9 2013 1.307 3.68 6.13<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 034.72-034.82 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.930 3.68 6.98<br />

Gopalganj Madaripur N8 Dhaka -Patuakhali Road Km 045.57-045.58 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.521 3.68 1.89<br />

Khulna Satkhira N715 Benapole Town Old Section Km 004.00-004.20 S 0.20 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 3.215 3.68 11.37<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 002.85-003.75 S 0.90 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 18.5<strong>23</strong> 3.68 65.02<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 010.30-010.65 S 0.34 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.653 3.68 17.21<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 017.70-018.40 S 0.70 5045 Regional Overlay 60mm @ IRI 5.5-9 2013 2.440 3.68 10.31<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 080.32-080.52 S 0.20 3019 Regional DBST @ Traff 2000-4000 2013 0.178 3.67 2.36<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 020.24-0<strong>23</strong>.34 S 3.10 1096 Regional Overlay 50mm @ IRI 7-9 2013 5.987 3.67 26.16<br />

Appendix-A: Page:55 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Sylhet Sylhet N2 Dhaka-Sylhet-Jaflong Road Km 274.49-274.69 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 3.67 21.20<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 064.00-064.10 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.67 6.78<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 049.20-049.60 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.459 3.67 26.48<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.10-031.20 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.66 6.44<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 203.48-203.58 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.048 3.66 14.48<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 138.35-138.55 S 0.20 9332 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.384 3.66 16.27<br />

Dhaka Manikganj R315 Mawna-Nabinagar Road Km 045.00-048.10 S 3.10 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 22.118 3.66 78.64<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 026.87-027.07 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.81<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 049.57-049.77 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.81<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 049.97-050.17 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.82<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 078.10-078.20 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.66 7.11<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 013.55-013.75 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.81<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 051.06-051.76 S 0.70 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 13.621 3.66 47.51<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 072.40-072.50 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.66 7.11<br />

Khulna Magura N7 Dauladia-Mongla Road Km 082.91-083.21 S 0.30 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.195 3.66 29.28<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 0<strong>23</strong>.30-0<strong>23</strong>.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.66 6.42<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 030.22-030.32 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.65 7.04<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 078.78-080.78 S 2.00 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 41.163 3.65 142.61<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 033.<strong>12</strong>-033.32 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.65 13.31<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 063.<strong>23</strong>-064.<strong>23</strong> S 1.00 1661 Regional DBST @ Traff 100-2000 2013 0.889 3.65 11.21<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 007.10-007.80 S 0.70 3206 Regional Overlay 50mm @ IRI 5-7 2013 2.192 3.65 13.48<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 013.80-014.00 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.756 3.65 13.44<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 022.80-022.90 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.64 6.40<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 065.00-065.10 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.64 6.72<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 058.04-061.17 S 3.14 4887 Regional DBST 25mm @ 25% Crk 2013 5.464 3.64 84.86<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 000.10-000.40 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 3.63 20.30<br />

Rangpur Bogra N502 Bogra -Natore Road Km 015.10-016.90 S 1.80 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 24.276 3.63 86.41<br />

Khulna Satkhira N715 Benapole Town Old Section Km 005.40-006.10 S 0.70 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 14.407 3.63 49.25<br />

Barisal Patuakhali N8 Dhaka -Patuakhali Road Km 177.30-180.42 S 3.<strong>12</strong> 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 64.1<strong>12</strong> 3.63 221.82<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 040.00-040.20 S 0.20 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 3.63 15.45<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 071.70-072.10 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 3.63 21.75<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 013.70-013.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.63 6.37<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 024.79-024.89 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.63 6.37<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 073.20-073.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.63 7.05<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.16-069.36 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.62 <strong>12</strong>.73<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 010.85-011.85 S 1.00 1779 Regional DBST @ Traff 100-2000 2013 0.904 3.62 11.02<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 080.98-083.98 S 3.00 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 61.745 3.62 2<strong>12</strong>.34<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 004.60-004.70 S 0.10 1484 Regional DBST 25mm @ 25% Crk 2013 0.094 3.62 0.77<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 118.39-118.69 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.62 18.86<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 013.20-013.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.62 6.36<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 018.80-018.90 S 0.10 <strong>23</strong>43 Regional Overlay 50mm @ IRI 5-7 2013 0.287 3.62 1.34<br />

Appendix-A: Page:56 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 004.40-007.60 S 3.20 3297 Regional Overlay 50mm @ IRI 7-9 2013 10.021 3.62 42.59<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 004.20-004.30 S 0.10 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.62 6.27<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 050.00-051.20 S 1.20 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 10.495 3.62 37.05<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 053.<strong>12</strong>-053.54 S 0.42 4331 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.718 3.61 20.54<br />

Barisal Patuakhali R881 Amtali-Kuakata Road Km 000.00-011.90 S 11.90 3019 Regional DBST @ Traff 2000-4000 2013 11.111 3.61 154.04<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 041.19-041.29 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.61 6.34<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 050.40-050.80 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.459 3.61 26.07<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 034.09-034.29 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.703 3.61 <strong>12</strong>.93<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.70-0<strong>12</strong>.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.61 6.36<br />

Barisal Barisal N8 Dhaka -Patuakhali Road Km 174.20-177.30 S 3.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 63.844 3.61 219.54<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.55-0<strong>23</strong>.75 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.61 <strong>12</strong>.63<br />

Khulna Magura N7 Dauladia-Mongla Road Km 085.51-085.61 S 0.10 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.60 9.62<br />

Dhaka Narayanganj R113 Madanpur-Sayedpur Road Km 011.20-011.88 S 0.68 5419 Regional DBST 25mm @ 25% Crk 2013 0.804 3.60 6.90<br />

Khulna Satkhira N715 Benapole Town Old Section Km 007.20-007.30 S 0.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 3.60 6.98<br />

Rangpur Bogra N502 Bogra -Natore Road Km 013.10-013.30 S 0.20 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.60 9.51<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 091.76-091.96 S 0.20 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.272 3.59 10.93<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 062.<strong>12</strong>-062.52 S 0.40 3555 National Overlay 50mm @ IRI 5-9 2013 1.211 3.59 6.70<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 048.25-048.35 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.59 6.33<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 0<strong>12</strong>.80-015.20 S 2.40 3297 Regional Overlay 50mm @ IRI 7-9 2013 7.516 3.58 34.66<br />

Khulna Jhenaidah N704 Jhenaidah-Dasuria Road Km 000.40-001.20 S 0.80 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.034 3.58 57.90<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 056.70-057.00 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.624 3.58 19.48<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 011.95-0<strong>12</strong>.25 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.57 18.77<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 030.13-030.<strong>23</strong> S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.57 6.29<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 032.90-033.20 S 0.30 13564 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.576 3.57 33.77<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 035.94-036.14 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.56 13.66<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 003.60-004.90 S 1.30 1779 Regional DBST @ Traff 100-2000 2013 1.175 3.56 14.10<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 010.60-010.70 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.56 6.26<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 035.89-036.19 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.457 3.56 19.09<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 028.30-028.40 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.56 4.83<br />

Khulna Magura R720 Magura-Narail Road Km 028.80-029.10 S 0.30 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.579 3.56 2.53<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 007.30-007.50 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.56 <strong>12</strong>.51<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 140.92-141.02 S 0.10 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.388 3.56 8.43<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 002.90-003.10 S 0.20 <strong>23</strong>26 Regional DBST @ Traff 2000-4000 2013 0.173 3.56 2.02<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 045.02-045.18 S 0.16 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.975 3.56 21.19<br />

Khulna Jessore N706 Jessore -Benapole Road Km 024.80-025.30 S 0.50 7314 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 10.<strong>23</strong>0 3.56 36.06<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 030.73-030.83 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.56 6.28<br />

Barisal Patuakhali R881 Amtali-Kuakata Road Km 032.72-032.82 S 0.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.852 3.55 3.03<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 030.53-030.63 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.55 6.26<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 078.08-078.78 S 0.70 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 14.407 3.55 48.58<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 030.32-030.52 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.898 3.55 10.48<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 056.54-056.64 S 0.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.55 2.78<br />

Appendix-A: Page:57 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 154.46-154.96 S 0.50 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 9.355 3.54 31.32<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 026.49-026.59 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.54 6.79<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 043.68-044.08 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 15.431 3.54 53.52<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 000.30-000.50 S 0.20 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.54 <strong>12</strong>.15<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 1<strong>12</strong>.46-1<strong>12</strong>.56 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.54 6.25<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.48-016.50 S 0.02 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.190 3.54 0.65<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 024.89-024.99 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.54 6.78<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.26-070.56 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.54 18.65<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.76-070.06 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.54 18.64<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.96-071.26 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.54 18.64<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 114.46-114.56 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.54 4.80<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 026.50-026.80 S 0.30 3292 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.798 3.53 13.32<br />

Rangpur Bogra R545 Bogra-Joypurhat Road Km 000.30-000.50 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.207 3.53 7.48<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 065.00-065.10 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.53 6.55<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 047.70-047.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.53 13.51<br />

Khulna Satkhira N715 Benapole Town Old Section Km 004.40-004.80 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.53 27.35<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 030.99-031.09 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.53 6.19<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 053.30-053.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.52 6.22<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 058.70-058.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.52 6.54<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 005.10-005.20 S 0.10 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.570 3.52 5.04<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 005.80-007.70 S 1.90 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 5.454 3.52 <strong>23</strong>.24<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 024.40-024.69 S 0.28 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.<strong>12</strong>8 3.52 17.60<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 026.25-026.35 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.51 6.19<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 069.68-069.78 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.51 6.18<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 002.80-002.90 S 0.10 <strong>23</strong>26 Regional DBST 25mm @ 25% Crk 2013 0.086 3.50 0.56<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 068.60-068.80 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 3.50 10.42<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 076.60-076.70 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.50 5.25<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 016.78-017.08 S 0.30 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.027 3.50 3.24<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 031.77-033.37 S 1.60 22<strong>23</strong> Regional Overlay 50mm @ IRI 5-7 2013 4.593 3.50 24.38<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 088.06-088.56 S 0.50 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.440 3.50 27.60<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 030.50-030.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.50 6.73<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 118.79-119.79 S 1.00 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.993 3.50 60.75<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 022.95-0<strong>23</strong>.05 S 0.10 7837 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.49 6.06<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 056.64-057.74 S 1.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.808 3.49 75.06<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 069.80-070.00 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.49 13.38<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.10-000.30 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.468 3.49 11.82<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 004.70-005.00 S 0.30 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.191 3.49 31.34<br />

Rangpur Bogra N502 Bogra -Natore Road Km 002.30-002.40 S 0.10 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.49 4.61<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 004.10-004.20 S 0.10 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 3.48 10.60<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 058.40-058.60 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.867 3.48 13.11<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 004.30-004.60 S 0.30 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.343 3.48 31.77<br />

Appendix-A: Page:58 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 074.46-074.80 S 0.34 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.172 3.48 20.97<br />

Rajshahi Natore N502 Bogra -Natore Road Km 048.06-051.56 S 3.50 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 56.262 3.48 185.09<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 028.13-028.<strong>23</strong> S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.48 6.13<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 032.33-032.43 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.48 6.13<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 034.13-034.<strong>23</strong> S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.48 6.13<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 071.20-071.40 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.48 13.51<br />

Rangpur Bogra N502 Bogra -Natore Road Km 004.90-007.50 S 2.60 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 35.065 3.48 119.48<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 083.<strong>12</strong>-083.32 S 0.20 3019 Regional DBST 25mm @ 25% Crk 2013 0.183 3.48 1.35<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 002.10-002.50 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.47 27.28<br />

Khulna Magura R720 Magura-Narail Road Km 0<strong>12</strong>.40-0<strong>12</strong>.80 S 0.40 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.689 3.47 2.70<br />

Khulna Jhenaidah N7 Dauladia-Mongla Road Km 110.32-110.72 S 0.40 6605 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 7.599 3.47 26.42<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 017.25-017.55 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.47 18.20<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 003.95-005.05 S 1.10 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 22.640 3.46 74.80<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 072.50-072.90 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 3.46 20.75<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 031.52-031.72 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.783 3.46 <strong>12</strong>.85<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 004.60-004.70 S 0.10 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.459 3.46 8.48<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 100.59-100.89 S 0.30 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.287 3.46 20.55<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 002.70-002.90 S 0.20 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.46 11.99<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 034.89-035.09 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.46 <strong>12</strong>.14<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 074.50-074.90 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 3.45 26.85<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 060.22-060.42 S 0.20 7248 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.463 3.45 18.39<br />

Comilla Noakhali N104 Feni-Noakhali Road Km 041.88-042.28 S 0.40 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.720 3.45 28.24<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 020.60-020.70 S 0.10 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.45 6.42<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 047.36-048.36 S 1.00 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 20.132 3.45 66.07<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 005.50-006.70 S 1.20 3206 Regional DBST @ Traff 2000-4000 2013 1.778 3.45 <strong>23</strong>.75<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 072.90-073.10 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.45 13.40<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 027.95-028.25 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.45 18.22<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 066.90-067.10 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.919 3.44 13.16<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 064.16-064.86 S 0.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 3.44 42.30<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 044.20-044.30 S 0.10 5397 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.388 3.44 8.33<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 045.00-045.10 S 0.10 5397 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.388 3.44 8.33<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 107.26-107.36 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.44 6.07<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 026.29-026.49 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.44 <strong>12</strong>.08<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 228.46-228.76 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.926 3.44 33.43<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 051.60-053.30 S 1.70 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 14.868 3.44 49.93<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 033.<strong>23</strong>-033.33 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.44 6.06<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 071.50-071.70 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.840 3.43 9.86<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 018.70-019.60 S 0.90 1346 Regional Overlay 50mm @ IRI 5-7 2013 1.550 3.43 5.77<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 051.70-051.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.43 6.33<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 052.55-052.65 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.43 6.05<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 056.05-056.25 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.43 <strong>12</strong>.10<br />

Appendix-A: Page:59 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 047.37-048.37 S 1.00 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.993 3.43 60.03<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.10-010.40 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.43 18.06<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 175.38-175.58 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 3.43 19.86<br />

Khulna Jessore N706 Jessore -Benapole Road Km 025.40-026.40 S 1.00 7314 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 20.459 3.43 69.47<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 205.78-206.08 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.145 3.43 40.63<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.70-010.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.43 <strong>12</strong>.03<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 002.20-002.30 S 0.10 24928 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.309 3.42 10.92<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 027.25-027.55 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.42 18.10<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 000.60-000.90 S 0.30 6255 Regional Overlay 60mm @ IRI 5.5-9 2013 1.307 3.42 5.46<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 041.84-041.94 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.42 6.56<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 003.70-003.90 S 0.20 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.228 3.42 20.80<br />

Khulna Jessore N708 Jessore Town Old Section Km 002.10-002.70 R 0.60 3249 National Overlay 50mm @ IRI 5-9 2013 2.349 3.42 11.53<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 064.96-065.16 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.42 <strong>12</strong>.01<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 064.30-064.50 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.41 <strong>12</strong>.61<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 063.90-064.00 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.41 6.29<br />

Dhaka Tangail R506 Aricha -Daulatpur-Tangail Road Km 047.81-053.28 S 5.47 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 80.210 3.41 286.02<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 008.70-008.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.41 11.94<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 022.55-022.65 S 0.10 7068 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 3.41 5.25<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 037.44-037.54 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.41 6.53<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 001.20-001.50 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.594 3.41 18.65<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 059.45-059.95 S 0.50 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.743 3.41 <strong>23</strong>.10<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 015.86-016.06 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 3.40 <strong>12</strong>.25<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.10-030.40 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.40 17.93<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 006.40-006.80 S 0.40 3750 Regional DBST @ Traff 2000-4000 2013 0.543 3.40 5.33<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 022.00-022.10 S 0.10 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.40 6.33<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 022.<strong>12</strong>-022.22 S 0.10 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.40 6.33<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 021.70-021.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.40 11.95<br />

Khulna Magura N7 Dauladia-Mongla Road Km 100.31-100.71 S 0.40 7850 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 8.534 3.40 28.99<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 031.40-035.00 S 3.60 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 33.722 3.40 111.91<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 047.90-049.20 S 1.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 18.999 3.40 65.<strong>23</strong><br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 051.87-052.17 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.40 17.84<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 029.39-029.49 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.39 5.96<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 077.50-077.70 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.39 13.18<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 024.52-024.62 S 0.10 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.39 6.31<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 076.70-076.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.39 13.18<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 083.66-083.86 S 0.20 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.39 11.43<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 075.38-075.58 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.801 3.39 <strong>12</strong>.72<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 078.20-079.60 S 1.40 7103 Regional DBST @ Traff >6000 2013 2.075 3.39 69.29<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 022.45-022.55 S 0.10 7837 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.39 5.87<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.50-020.80 S 0.30 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.408 3.39 4.44<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 071.46-074.46 S 3.00 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 53.980 3.39 178.40<br />

Appendix-A: Page:60 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 027.55-027.95 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 3.38 18.56<br />

Dhaka Jamalpur N4 Joydebpur-Jamalpur Road Km 137.61-140.61 S 3.00 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 46.471 3.38 150.57<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.30-018.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.996 3.38 6.62<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.30-018.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.996 3.38 6.62<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 052.85-052.95 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.38 5.97<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 103.76-103.86 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.38 5.97<br />

Dhaka Sherpur R460 Jamalpur-Sherpur-Bangaon Road Km 001.20-001.80 S 0.60 4422 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.38 6.62<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.20-0<strong>23</strong>.40 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 3.38 <strong>12</strong>.13<br />

Comilla Laxmipur R143 Maijdi-Ch<strong>and</strong>raganj Road Km 018.00-018.80 S 0.80 5722 Regional Overlay 60mm @ IRI 5.5-9 2013 2.240 3.38 7.92<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 078.34-078.44 S 0.10 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 3.37 9.71<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 048.55-048.75 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.37 11.90<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 026.09-026.19 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.37 5.02<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 018.68-019.00 S 0.32 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.092 3.37 3.31<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 033.79-033.89 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.37 5.92<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 030.64-030.74 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.37 6.45<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 032.94-033.04 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.37 6.45<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 002.10-002.30 S 0.20 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.37 11.67<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 032.54-032.64 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.37 6.45<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 045.18-045.38 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.343 3.37 30.70<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 044.05-047.37 S 3.32 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 45.941 3.37 153.13<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 058.55-058.75 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.36 11.86<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 077.70-078.10 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.593 3.36 19.78<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 050.84-053.34 S 2.50 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 40.187 3.36 <strong>12</strong>9.69<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 004.00-004.50 S 0.50 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.992 3.36 4.21<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 081.62-081.72 S 0.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.36 2.69<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 083.<strong>12</strong>-083.22 S 0.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.35 2.69<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 010.40-010.50 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.35 4.60<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 019.50-019.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.35 6.42<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 017.30-017.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.35 5.89<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 004.70-005.50 S 0.80 1484 Regional DBST @ Traff 100-2000 2013 0.751 3.35 8.70<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 051.30-051.60 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 3.34 18.52<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 001.50-001.70 S 0.20 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.34 11.58<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 038.97-039.67 S 0.70 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.961 3.34 19.28<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 009.30-009.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.34 5.92<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 064.<strong>23</strong>-064.33 S 0.10 1661 Regional DBST 25mm @ 25% Crk 2013 0.089 3.34 0.76<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 004.70-004.90 S 0.20 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.409 3.34 1.45<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 025.93-026.03 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.34 6.16<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 011.60-011.80 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.34 11.77<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 062.30-063.30 S 1.00 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 18.648 3.34 60.21<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 004.50-004.70 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.34 11.68<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 136.47-136.97 S 0.50 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 3.33 31.64<br />

Appendix-A: Page:61 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 000.30-000.90 S 0.60 2929 Regional Overlay 50mm @ IRI 5-7 2013 1.190 3.33 4.38<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 002.30-002.70 S 0.40 9769 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 3.33 17.58<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 029.20-029.80 S 0.60 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 3.33 35.08<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 034.60-034.80 S 0.20 2048 Regional DBST @ Traff 2000-4000 2013 0.153 3.33 1.40<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 032.87-033.07 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.33 11.68<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 117.51-119.51 S 2.00 3779 National Overlay 50mm @ IRI 4-9 2013 5.773 3.33 21.71<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 000.90-001.70 S 0.80 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.739 3.32 22.45<br />

Khulna Magura N7 Dauladia-Mongla Road Km 089.71-090.11 S 0.40 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.927 3.32 35.46<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 000.20-000.60 S 0.40 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.457 3.32 40.34<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 030.<strong>12</strong>-030.32 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.31 11.69<br />

Sylhet Sylhet N209 Sylhet Twn By-Pass Road Km 000.20-001.41 S 1.21 4434 National Overlay 50mm @ IRI 5-9 2013 3.170 3.31 9.45<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 033.70-034.40 S 0.70 2048 Regional DBST 25mm @ 25% Crk 2013 0.536 3.31 4.73<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 002.60-003.20 S 0.60 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 18.685 3.31 60.45<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 110.66-110.86 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.31 11.69<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 063.20-063.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.31 6.10<br />

Comilla Noakhali R140 Comilla-Begumganj Road Km 137.37-137.67 S 0.30 101<strong>12</strong> Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.811 3.31 19.50<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 011.60-011.90 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.31 17.44<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 226.78-227.08 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.926 3.31 32.15<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 013.96-014.16 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 3.31 11.89<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.50-0<strong>12</strong>.70 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.31 8.97<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 001.90-002.10 S 0.20 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.228 3.31 20.11<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 005.80-006.50 S 0.70 4082 Regional Overlay 60mm @ IRI 7-9 2013 1.655 3.30 5.98<br />

Khulna Magura N7 Dauladia-Mongla Road Km 102.<strong>12</strong>-103.62 S 1.50 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 40.976 3.30 132.21<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 025.75-026.00 S 0.25 3019 Regional DBST 25mm @ 25% Crk 2013 0.243 3.30 2.28<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 030.74-033.74 S 3.00 1096 Regional Overlay 50mm @ IRI 7-9 2013 5.794 3.30 24.14<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 052.30-052.50 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.30 11.64<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 011.60-011.80 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.30 11.59<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 035.10-037.10 S 2.00 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 31.145 3.29 99.43<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 003.40-003.60 S 0.20 1779 Regional DBST @ Traff 100-2000 2013 0.181 3.29 1.44<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 069.80-069.90 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.29 6.06<br />

Dhaka Sherpur R371 Sherpur-Nakla-Mymensingh Km 055.16-055.36 S 0.20 3786 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.762 3.29 9.15<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 005.10-005.80 S 0.70 1779 Regional DBST @ Traff 100-2000 2013 0.633 3.29 6.54<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 071.55-077.88 S 6.33 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 101.819 3.29 321.20<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 039.87-041.77 S 1.90 22<strong>23</strong> Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 16.005 3.28 49.42<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 035.62-035.72 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.28 6.<strong>12</strong><br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 005.40-005.60 R 0.20 8665 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.987 3.28 19.25<br />

Gopalganj Sariatpur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 019.18-019.88 S 0.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 3.28 40.28<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 003.10-003.20 S 0.10 <strong>23</strong>26 Regional DBST 25mm @ 25% Crk 2013 0.086 3.28 0.56<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 006.50-006.90 S 0.40 4082 Regional Overlay 50mm @ IRI 5-7 2013 0.793 3.27 2.34<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 020.00-020.30 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.531 3.27 11.49<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 009.70-010.30 S 0.60 3206 Regional DBST @ Traff 2000-4000 2013 0.889 3.27 11.91<br />

Appendix-A: Page:62 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 010.30-010.85 S 0.55 1779 Regional Overlay 50mm @ IRI 7-9 2013 1.053 3.27 4.10<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 109.66-110.26 S 0.60 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 7.761 3.27 25.15<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 040.76-040.86 S 0.10 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.27 6.07<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 054.07-054.67 S 0.60 3803 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.27 6.45<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.10-0<strong>12</strong>.50 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 3.26 <strong>23</strong>.03<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 040.79-041.09 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.26 17.20<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.90-017.50 S 0.60 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.815 3.26 8.65<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.70-031.00 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.25 17.14<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.00-013.10 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.25 5.71<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.40-016.50 S 0.10 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.25 5.48<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 084.66-084.76 S 0.10 2707 Regional DBST 25mm @ 25% Crk 2013 0.136 3.25 1.09<br />

Gopalganj Sariatpur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 017.88-018.98 S 1.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.793 3.25 62.79<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 021.19-021.29 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.094 3.25 6.64<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 042.16-042.26 S 0.10 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.25 6.03<br />

Khulna Jessore N7 Dauladia-Mongla Road Km 153.96-154.36 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.484 3.25 22.95<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 064.20-064.50 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 3.24 18.05<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 024.60-024.80 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.24 <strong>12</strong>.42<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 075.90-076.60 S 0.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.740 3.24 44.05<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 014.70-014.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.24 6.19<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.80-013.90 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.24 5.69<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 070.58-070.88 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.<strong>23</strong> 17.11<br />

Khulna Jessore N706 Jessore -Benapole Road Km 025.30-025.40 S 0.10 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 3.<strong>23</strong> 8.21<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 042.47-042.67 S 0.20 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.<strong>23</strong> 11.19<br />

Khulna Jessore N706 Jessore -Benapole Road Km 024.70-024.80 S 0.10 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 3.<strong>23</strong> 8.21<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 030.15-037.00 S 6.85 1346 Regional Overlay 50mm @ IRI 7-9 2013 <strong>12</strong>.866 3.<strong>23</strong> 50.86<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 209.28-209.38 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.048 3.<strong>23</strong> <strong>12</strong>.76<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 010.90-011.20 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.<strong>23</strong> 17.00<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 021.75-021.85 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.<strong>23</strong> 5.68<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 082.62-082.82 S 0.20 3019 Regional DBST 25mm @ 25% Crk 2013 0.183 3.<strong>23</strong> 1.31<br />

Khulna Kushtia N704 Jhenaidah-Dasuria Road Km 061.68-066.66 S 4.97 5419 National DBST @ Traff 4000-6000 2013 9.472 3.22 307.59<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 026.00-026.10 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.158 3.22 3.59<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 026.20-026.30 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.158 3.22 3.59<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 005.50-005.70 S 0.20 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.049 3.22 8.95<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 081.42-081.52 S 0.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.22 2.58<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 081.00-081.60 S 0.60 2707 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.22 7.30<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 001.20-001.40 S 0.20 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.228 3.21 19.52<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 018.80-019.00 S 0.20 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.21 11.94<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 056.90-057.10 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.21 11.91<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 068.90-069.10 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.21 <strong>12</strong>.28<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 014.50-014.70 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.21 11.94<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 004.90-006.35 S 1.45 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 14.684 3.21 45.67<br />

Appendix-A: Page:63 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.50-000.70 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.468 3.20 10.84<br />

Khulna Jessore N708 Jessore Town Old Section Km 001.80-001.87 S 0.07 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.363 3.20 10.49<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 051.95-052.15 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.20 11.29<br />

Dhaka Munshiganj R8<strong>12</strong> Fatullah -Mawa Road Km 011.32-011.52 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.20 11.33<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 042.09-043.99 S 1.90 1661 Regional DBST @ Traff 100-2000 2013 1.816 3.20 19.08<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 100.97-101.57 S 0.60 2269 National Overlay 50mm @ IRI 5-9 2013 1.722 3.20 7.99<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 114.66-115.06 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 3.20 22.57<br />

Gopalganj Faridpur N804 Bhanga-Faridpur Road Km 031.50-032.05 S 0.55 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 17.681 3.20 56.35<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 021.39-021.49 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.<strong>12</strong>0 3.20 6.61<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 022.50-0<strong>23</strong>.20 S 0.70 1301 Regional Overlay 50mm @ IRI 7-9 2013 1.388 3.20 5.61<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 064.20-064.40 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.788 3.20 11.78<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 065.10-065.30 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.788 3.20 11.78<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 042.70-042.90 S 0.20 2992 National DBST @ Traff 2000-4000 2013 0.272 3.19 3.43<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 101.26-101.96 S 0.70 5303 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 3.19 38.28<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 025.34-025.64 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 3.19 18.36<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 065.30-065.80 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.471 3.19 29.55<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 049.50-049.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.028 3.19 6.34<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 0<strong>23</strong>.69-0<strong>23</strong>.79 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.<strong>12</strong>6 3.19 6.61<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 003.40-004.30 S 0.90 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.079 3.19 59.57<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 006.37-006.40 S 0.03 3750 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.506 3.19 1.52<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 056.65-059.45 S 2.80 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 45.010 3.18 137.61<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 064.70-064.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.18 5.90<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 032.22-032.52 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.340 3.18 19.61<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 0<strong>23</strong>.02-0<strong>23</strong>.22 S 0.20 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.18 11.82<br />

Khulna Magura N7 Dauladia-Mongla Road Km 076.61-076.81 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.109 3.17 28.20<br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 007.50-008.10 S 0.60 9769 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 8.092 3.17 25.11<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 001.20-001.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.17 5.59<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 004.60-005.40 S 0.80 4082 Regional DBST @ Traff 4000-6000 2013 0.751 3.17 8.11<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 017.80-018.00 S 0.20 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.860 3.17 11.98<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 045.00-045.10 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.028 3.16 6.29<br />

Khulna Jessore N706 Jessore -Benapole Road Km 024.10-024.40 S 0.30 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.858 3.16 24.14<br />

Sylhet Moulavi Bazar R282 Juri-Lathidila Road Km 000.00-003.00 S 3.00 4388 Regional Overlay 60mm @ IRI 7-9 2013 8.103 3.16 26.59<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 001.40-001.60 S 0.20 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.917 3.16 15.50<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 004.00-004.60 S 0.60 4082 Regional Overlay 60mm @ IRI 7-9 2013 1.419 3.15 4.64<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 053.75-053.95 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.15 11.<strong>12</strong><br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.80-019.37 S 0.57 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 11.375 3.15 35.13<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 411.77-416.07 S 4.30 3083 National Overlay 50mm @ IRI 4-9 2013 13.466 3.14 55.56<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 022.50-022.60 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.14 5.52<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 004.50-005.00 S 0.50 4885 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.461 3.14 19.88<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 003.20-003.70 S 0.50 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 15.571 3.14 47.80<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 033.32-034.52 S 1.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 17.302 3.14 55.36<br />

Appendix-A: Page:64 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 055.14-055.64 S 0.50 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.143 3.14 <strong>12</strong>.30<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 039.99-040.69 S 0.70 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 9.441 3.14 30.13<br />

Khulna Jhenaidah N703 Jhenaidah Town Old Section Km 000.10-001.90 S 1.80 4905 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 24.276 3.14 74.<strong>12</strong><br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 004.20-004.80 S 0.60 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.695 3.14 14.77<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 097.07-097.47 S 0.40 3019 Regional DBST 25mm @ 25% Crk 2013 0.366 3.14 2.42<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 040.18-040.28 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.14 5.61<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm <strong>23</strong>0.26-<strong>23</strong>0.36 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.107 3.13 <strong>12</strong>.57<br />

Rangpur Bogra N502 Bogra -Natore Road Km 028.86-030.86 S 2.00 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 34.313 3.13 103.28<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 030.39-030.89 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.997 3.13 27.52<br />

Rajshahi Natore N602 Natore Town old Section Km 001.09-002.59 S 1.50 7<strong>23</strong>7 National Overlay 50mm @ IRI 5-7 2013 6.561 3.13 24.46<br />

Comilla Brahmanbaria R<strong>12</strong>0 Akhaura Town By-Pass Km 000.00-002.50 S 2.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 44.983 3.13 137.43<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 001.60-001.70 S 0.10 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 3.13 9.51<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 0<strong>23</strong>.80-024.20 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 3.13 <strong>23</strong>.96<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 008.57-008.87 S 0.30 3571 Regional DBST @ Traff 2000-4000 2013 0.222 3.13 1.57<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 0<strong>12</strong>.70-0<strong>12</strong>.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.13 10.98<br />

Dhaka Munshiganj R8<strong>12</strong> Fatullah -Mawa Road Km 010.22-010.42 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.13 11.06<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 204.98-205.18 S 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.392 3.<strong>12</strong> 19.91<br />

Rajshahi Natore N502 Bogra -Natore Road Km 052.66-053.16 S 0.50 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 8.037 3.<strong>12</strong> <strong>23</strong>.72<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 104.36-104.46 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.<strong>12</strong> 5.50<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 090.79-091.09 S 0.30 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.846 3.<strong>12</strong> 38.96<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 046.90-047.00 S 0.10 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.715 3.<strong>12</strong> 8.36<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 005.40-005.80 S 0.40 4082 Regional Overlay 50mm @ IRI 5-7 2013 0.793 3.<strong>12</strong> 2.80<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 091.49-091.59 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.282 3.11 <strong>12</strong>.96<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 014.00-014.20 S 0.20 1484 Regional DBST @ Traff 100-2000 2013 0.188 3.11 1.60<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 057.94-058.04 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.225 3.11 6.78<br />

Rajshahi Natore N502 Bogra -Natore Road Km 045.26-045.96 S 0.70 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 11.252 3.11 33.56<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 011.90-0<strong>12</strong>.00 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.11 5.93<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 082.82-083.<strong>12</strong> S 0.30 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.555 3.11 7.60<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 054.25-054.45 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.10 10.95<br />

Khulna Jessore R765 Khulna-Satkhira Road Km 001.10-001.50 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 3.10 21.79<br />

Rangpur Bogra N514 Bogra (Banani)-Matidali Road Km 008.40-008.67 L 0.27 9159 National DBST @ Traff >6000 2013 0.934 3.10 9.10<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 018.89-018.99 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.094 3.09 6.32<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 024.22-024.42 S 0.20 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.09 11.51<br />

Comilla Comilla R144 Laksam Old Section Km 003.00-003.80 S 0.80 2057 Regional Overlay 50mm @ IRI 7-9 2013 3.132 3.09 16.<strong>12</strong><br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 005.70-008.40 S 2.70 1484 Regional Overlay 50mm @ IRI 7-9 2013 5.989 3.09 <strong>23</strong>.39<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 076.30-079.30 S 3.00 2707 Regional Overlay 50mm @ IRI 7-9 2013 8.6<strong>12</strong> 3.09 35.75<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 042.58-045.71 S 3.13 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 42.994 3.09 134.95<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 000.20-001.30 S 1.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.793 3.09 60.04<br />

Rajshahi Natore N502 Bogra -Natore Road Km 053.36-054.16 S 0.80 6500 National Full Recon 180mm @ IRI <strong>12</strong> 2013 16.465 3.08 47.57<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 076.18-076.48 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.634 3.08 16.83<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 067.10-067.40 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.683 3.07 16.99<br />

Appendix-A: Page:65 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 020.35-021.00 S 0.65 7068 National Full Recon 180mm @ IRI <strong>12</strong> 2013 13.357 3.07 38.78<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.30-032.10 S 0.80 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.395 3.07 43.17<br />

Rangpur Nilphamari N518 Sayedpur Town Old Section Km 001.00-004.00 S 3.00 4662 National Overlay 50mm @ IRI 5-9 2013 9.599 3.07 38.68<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 017.50-017.60 S 0.10 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.06 5.17<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 022.40-022.50 S 0.10 818 Regional DBST @ Traff 100-2000 2013 0.086 3.06 0.95<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.80-020.00 S 1.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.947 3.06 71.73<br />

Khulna Magura N7 Dauladia-Mongla Road Km 087.21-087.61 S 0.40 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.927 3.05 32.51<br />

Dhaka Munshiganj R8<strong>12</strong> Fatullah -Mawa Road Km 011.52-011.92 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 3.05 16.42<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 015.40-015.60 R 0.20 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.314 3.04 13.30<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 071.00-071.10 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.04 5.60<br />

Chittagong Cox's Bazar R180 Laharpur-Laboni More Road Km 002.90-003.00 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.04 5.29<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 003.60-003.80 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.03 10.62<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 072.10-072.30 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.03 11.77<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 010.81-013.11 S 2.30 4048 Regional DBST 25mm @ 25% Crk 2013 3.511 3.03 26.68<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 014.20-016.90 S 2.70 1484 Regional DBST @ Traff 100-2000 2013 2.534 3.03 25.82<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 034.89-038.09 S 3.20 1661 Regional Overlay 50mm @ IRI 7-9 2013 6.531 3.03 26.79<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 037.20-037.30 S 0.10 4116 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.02 4.35<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 029.69-029.89 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.02 8.29<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 040.43-062.15 S 21.72 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 388.717 3.01 1163.53<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 065.80-066.10 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.683 3.01 16.65<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 096.66-097.26 S 0.60 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 3.01 30.47<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 0<strong>23</strong>.18-0<strong>23</strong>.48 S 0.30 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.027 3.01 3.11<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 025.09-025.29 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.01 11.54<br />

Sylhet Sylhet R281 Rajnagar-Charkhai Road Km 058.52-061.59 S 3.07 4682 Regional Overlay 60mm @ IRI 7-9 2013 10.505 3.01 36.56<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 099.07-099.27 S 0.20 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.703 3.01 4.91<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 014.00-014.20 S 0.20 1398 Regional DBST @ Traff 100-2000 2013 0.198 3.01 2.05<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 060.<strong>23</strong>-063.<strong>23</strong> S 3.00 1661 Regional Overlay 50mm @ IRI 7-9 2013 5.637 3.00 21.38<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 027.62-028.<strong>12</strong> S 0.50 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.324 3.00 27.01<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 027.33-027.53 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.00 10.59<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 044.76-045.46 S 0.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.740 3.00 40.39<br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 013.40-018.50 S 5.10 3778 Regional Overlay 50mm @ IRI 5-7 2013 15.972 3.00 59.02<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 003.80-003.90 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.00 5.29<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 000.10-000.40 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.949 3.00 20.26<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 003.20-003.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.00 5.28<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 110.76-113.86 S 3.10 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 40.097 2.99 118.99<br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 019.85-020.25 S 0.40 7068 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 2.99 <strong>23</strong>.29<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 006.30-006.40 S 0.10 818 Regional Overlay 50mm @ IRI 7-9 2013 0.183 2.99 0.65<br />

Chittagong Chittagong N106 Chittagong-Rangamati Road Km 000.60-001.20 S 0.60 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.752 2.98 43.82<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 067.95-068.05 S 0.10 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.98 5.10<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 068.15-068.25 S 0.10 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.98 5.10<br />

Rangpur Kurigram N506 Rangpur-Barobari-Kurigram Road Km 045.30-046.00 S 0.70 2992 National DBST @ Traff 2000-4000 2013 0.951 2.98 11.07<br />

Appendix-A: Page:66 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 058.15-058.55 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 2.97 16.03<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 018.90-020.00 S 1.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.592 2.97 62.95<br />

Rangpur Bogra N510 Bogra Station Road Km 000.00-002.78 R 2.78 13893 National Overlay 50mm @ IRI 5 2013 10.577 2.97 42.19<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 077.18-077.48 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.016 2.97 17.64<br />

Rangpur Bogra N510 Bogra Station Road Km 000.00-002.78 L 2.78 13893 National Overlay 50mm @ IRI 5 2013 10.577 2.97 42.<strong>12</strong><br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 000.20-001.10 S 0.90 5672 Regional DBST 25mm @ 25% Crk 2013 1.2<strong>23</strong> 2.96 10.59<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 1<strong>23</strong>.71-<strong>12</strong>5.61 S 1.90 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 24.575 2.96 72.10<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 064.15-064.25 S 0.10 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.96 5.07<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 068.88-069.08 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.96 10.44<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 058.75-059.45 S 0.70 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 9.441 2.96 28.09<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 017.60-017.70 S 0.10 5045 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.373 2.96 3.98<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 017.80-018.00 L 0.20 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.136 2.95 20.79<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 017.00-017.10 S 0.10 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.95 5.11<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 0<strong>23</strong>.40-025.30 S 1.90 1301 Regional Overlay 50mm @ IRI 7-9 2013 3.768 2.95 13.59<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 001.60-002.40 S 0.80 6187 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 2.94 31.19<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 028.37-031.67 S 3.30 5572 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 44.506 2.94 132.84<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 006.90-007.00 S 0.10 818 Regional Overlay 50mm @ IRI 5-7 2013 0.183 2.93 0.64<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 028.60-028.70 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.92 5.62<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 027.80-027.90 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.92 5.62<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 057.95-058.15 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.92 10.29<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 004.50-007.50 S 3.00 1346 Regional Overlay 50mm @ IRI 5-7 2013 4.885 2.91 19.09<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 006.10-006.70 R 0.60 8665 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.962 2.91 51.14<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 024.90-025.30 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 2.91 17.28<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 056.34-056.54 S 0.20 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.139 2.90 5.66<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 002.60-003.20 S 0.60 818 Regional Overlay 50mm @ IRI 7-9 2013 1.096 2.90 3.78<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 006.70-006.90 S 0.20 818 Regional DBST @ Traff 100-2000 2013 0.173 2.89 1.84<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 009.40-009.46 S 0.06 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.287 2.89 6.58<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 014.68-015.18 S 0.50 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 2.89 5.59<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 015.05-017.00 S 1.95 1779 Regional Overlay 50mm @ IRI 7-9 2013 4.517 2.89 15.96<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 074.70-074.90 S 0.20 2707 Regional Overlay 50mm @ IRI 5-7 2013 0.574 2.89 2.11<br />

Khulna Jessore N706 Jessore -Benapole Road Km 026.40-029.40 S 3.00 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 84.646 2.88 <strong>23</strong>7.06<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 010.00-010.20 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.88 11.01<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 148.15-148.21 S 0.06 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.824 2.88 5.14<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 088.06-089.76 S 1.70 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 22.927 2.88 65.72<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 058.46-058.75 S 0.29 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.791 2.88 16.34<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 081.52-081.62 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.88 2.94<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 011.40-011.50 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 2.88 5.31<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 011.10-011.20 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.951 2.87 2.63<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 042.40-042.60 S 0.20 3792 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.9<strong>23</strong> 2.87 8.22<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 018.08-018.38 S 0.30 6240 Regional DBST @ Traff >6000 2013 0.408 2.87 3.97<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 057.72-058.<strong>12</strong> S 0.40 4331 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 2.87 20.06<br />

Appendix-A: Page:67 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 065.90-066.00 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.422 2.87 4.<strong>12</strong><br />

Comilla Noakhali R142 Begamganj-Ramganj Road Km 024.95-025.25 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.86 15.14<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 032.69-034.89 S 2.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 27.998 2.86 81.50<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 000.30-000.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.028 2.86 5.69<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 046.40-046.70 S 0.30 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.782 2.86 18.94<br />

Rajshahi Natore N502 Bogra -Natore Road Km 032.00-036.76 S 4.76 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 99.058 2.86 269.17<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 053.00-053.40 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.610 2.86 16.<strong>12</strong><br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 009.80-013.20 S 3.40 3778 Regional Overlay 50mm @ IRI 5-7 2013 10.648 2.86 36.89<br />

Barisal Bhola N809 Barishal-Lakshmipur Road Km 024.25-024.55 S 0.30 1488 National DBST @ Traff 100-2000 2013 0.408 2.86 3.74<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 009.70-010.10 S 0.40 3516 Regional DBST @ Traff 2000-4000 2013 0.346 2.85 2.50<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 032.40-032.60 S 0.20 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 2.85 8.49<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 117.99-118.29 S 0.30 3589 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.901 2.85 13.35<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 097.39-098.19 S 0.80 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.962 2.85 49.41<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 059.40-060.30 S 0.90 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 16.783 2.84 46.16<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 031.13-031.33 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 2.84 11.25<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 004.00-004.40 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.83 25.25<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 005.00-008.00 S 3.00 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 40.460 2.83 115.29<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 015.37-016.67 S 1.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.391 2.83 64.25<br />

Rangpur Bogra R545 Bogra-Joypurhat Road Km 013.90-016.00 S 2.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 28.322 2.83 79.71<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 004.70-005.10 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.83 25.22<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 008.90-009.10 S 0.20 818 Regional Overlay 50mm @ IRI 7-9 2013 0.365 2.82 1.26<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 098.29-099.09 S 0.80 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.962 2.82 48.97<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 010.60-010.70 S 0.10 4909 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 2.81 5.24<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 041.48-041.88 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.493 2.81 15.70<br />

Comilla Feni N104 Feni-Noakhali Road Km 001.30-001.70 S 0.40 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 2.81 22.<strong>12</strong><br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 053.76-054.16 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.81 21.60<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 084.<strong>12</strong>-084.22 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.81 2.87<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 177.02-177.<strong>12</strong> S 0.10 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 2.80 7.70<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 004.30-004.50 S 0.20 2897 National Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 2.80 8.61<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 056.30-056.40 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.422 2.80 3.99<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 009.10-009.50 S 0.40 3516 Regional DBST @ Traff 2000-4000 2013 0.346 2.80 2.45<br />

Rangpur Thakurgaon N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 410.87-411.77 S 0.90 3083 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.699 2.79 35.73<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 068.75-068.85 S 0.10 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.79 4.78<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 075.80-076.10 S 0.30 2707 Regional Overlay 50mm @ IRI 5-7 2013 0.861 2.79 3.13<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 030.29-030.99 S 0.70 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.800 2.79 15.51<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 075.35-075.45 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.79 4.99<br />

Sylhet Sylhet R281 Rajnagar-Charkhai Road Km 067.22-068.52 S 1.30 4682 Regional Overlay 50mm @ IRI 5-7 2013 3.732 2.79 13.08<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 161.11-161.21 S 0.10 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 2.79 7.65<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 001.40-002.70 S 1.30 5672 Regional DBST 25mm @ 25% Crk 2013 1.766 2.79 13.33<br />

Rangpur Nilphamari N518 Sayedpur Town Old Section Km 004.00-004.11 S 0.11 4662 National DBST 25mm @ 25% Crk 2013 0.145 2.79 0.92<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 115.86-116.82 S 0.96 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 18.636 2.78 51.21<br />

Appendix-A: Page:68 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 018.00-018.20 S 0.20 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.78 9.38<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 087.68-089.47 S 1.79 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 36.779 2.78 97.07<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 060.55-061.35 S 0.80 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.395 2.78 39.19<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 029.51-029.71 S 0.20 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 2.78 9.00<br />

Barisal Patuakhali R881 Amtali-Kuakata Road Km 011.90-0<strong>12</strong>.00 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.78 2.95<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 026.80-026.90 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.77 4.89<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 067.40-068.50 S 1.09 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.474 2.77 58.06<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 055.60-055.70 S 0.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.422 2.76 3.93<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 036.70-037.20 S 0.50 4116 Regional DBST 25mm @ 25% Crk 2013 0.741 2.76 5.16<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 100.86-102.66 S 1.80 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 24.276 2.76 66.56<br />

Comilla Noakhali R141 Lalmai-Sonaimuri Road Km 034.82-035.22 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.797 2.76 16.27<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 110.46-110.56 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.75 4.86<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 149.41-149.61 S 0.20 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 2.75 15.11<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 064.38-064.48 S 0.10 4283 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.75 4.63<br />

Khulna Jessore N708 Jessore Town Old Section Km 002.10-002.70 L 0.60 3249 National Overlay 50mm @ IRI 5-9 2013 2.349 2.75 9.15<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 013.70-013.80 S 0.10 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.75 4.69<br />

Comilla Comilla R141 Lalmai-Sonaimuri Road Km 0<strong>23</strong>.22-024.22 S 1.00 5257 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 14.222 2.75 39.30<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 022.90-0<strong>23</strong>.00 S 0.10 4540 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.75 5.19<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.50-0<strong>23</strong>.90 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.328 2.75 19.73<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 035.47-035.57 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.74 4.82<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 033.37-033.47 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.74 4.82<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 025.19-026.69 S 1.50 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.428 2.74 32.62<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>0.51-<strong>12</strong>0.61 S 0.10 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 1.744 2.74 4.56<br />

Rangpur Rangpur N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 288.38-291.38 S 3.00 4405 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 52.965 2.74 152.17<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 026.30-026.60 S 0.30 3019 Regional DBST 25mm @ 25% Crk 2013 0.289 2.74 1.68<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.70-004.00 S 3.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 42.887 2.73 119.16<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 035.07-035.37 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.73 14.39<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 062.68-062.78 S 0.10 4283 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.73 4.60<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 036.79-036.99 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 2.73 9.82<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 029.52-029.82 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.73 11.11<br />

Khulna Magura N7 Dauladia-Mongla Road Km 101.21-102.02 S 0.81 7850 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 17.282 2.72 46.98<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 006.90-007.60 S 0.70 4082 Regional DBST @ Traff 4000-6000 2013 0.657 2.72 5.85<br />

Khulna Jessore N706 Jessore -Benapole Road Km 032.90-036.63 S 3.73 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 106.335 2.72 280.77<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 064.33-064.83 S 0.50 1661 Regional DBST @ Traff 100-2000 2013 0.600 2.72 5.49<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 053.00-053.20 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.72 9.59<br />

Dhaka Dhaka R802 Bishwa -Kayetpara Road Km 000.00-004.24 S 4.24 3875 Regional Overlay 50mm @ IRI 7-9 2013 11.181 2.72 36.11<br />

Khulna Magura N702 Jessore -Magura Road Km 026.79-028.29 S 1.50 3649 National Full Recon 135mm @ IRI <strong>12</strong> 2013 32.525 2.71 87.76<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 080.22-080.32 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.71 2.77<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 001.50-002.90 S 1.40 3942 Regional DBST 25mm @ 25% Crk 2013 2.351 2.71 18.63<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 017.10-017.60 S 0.50 5045 Regional DBST 25mm @ 25% Crk 2013 0.692 2.71 6.52<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 055.64-056.14 S 0.50 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.347 2.71 13.19<br />

Appendix-A: Page:69 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 022.17-022.37 S 0.20 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.272 2.70 8.59<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 055.82-055.92 S 0.10 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.70 2.85<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 052.40-052.70 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.<strong>23</strong>7 2.69 11.54<br />

Khulna Jessore N706 Jessore -Benapole Road Km 030.10-030.20 S 0.10 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.844 2.69 7.43<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 001.10-003.40 S 2.30 1346 Regional Overlay 50mm @ IRI 5-7 2013 4.658 2.69 14.52<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 055.36-055.56 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.69 10.35<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 013.66-013.86 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 2.69 9.67<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 014.26-014.76 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.69 24.18<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 019.50-019.90 S 0.40 5045 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.493 2.69 14.48<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 056.14-056.34 S 0.20 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.139 2.69 5.24<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 033.47-035.37 S 1.90 22<strong>23</strong> Regional DBST 25mm @ 25% Crk 2013 2.440 2.68 18.96<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 016.67-027.37 S 10.70 1785 Regional Overlay 50mm @ IRI 7-9 2013 30.717 2.68 97.89<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 017.90-018.00 S 0.10 818 Regional DBST @ Traff 100-2000 2013 0.086 2.68 0.76<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 010.10-010.20 S 0.10 <strong>23</strong>43 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.266 2.68 3.38<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 007.10-007.50 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.375 2.67 17.20<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 021.10-021.50 S 0.40 818 Regional Overlay 50mm @ IRI 7-9 2013 0.731 2.66 2.38<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 073.98-075.08 S 1.10 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 15.051 2.66 39.78<br />

Khulna Magura R720 Magura-Narail Road Km 025.40-025.50 S 0.10 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.193 2.65 0.60<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 099.27-099.87 S 0.60 3019 Regional DBST 25mm @ 25% Crk 2013 0.548 2.65 3.27<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 058.16-058.26 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.64 5.09<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 003.80-004.20 S 0.40 6578 Regional DBST 25mm @ 25% Crk 2013 0.816 2.64 4.87<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 020.30-020.40 S 0.10 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.64 4.58<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 013.75-017.25 S 3.50 4887 Regional DBST @ Traff 4000-6000 2013 4.755 2.64 154.81<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 029.71-029.91 S 0.20 3636 Regional DBST @ Traff 2000-4000 2013 0.282 2.64 2.11<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 014.30-014.70 R 0.40 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 10.498 2.63 27.40<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 011.85-0<strong>12</strong>.35 S 0.50 1779 Regional DBST @ Traff 100-2000 2013 0.452 2.63 3.09<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 031.94-032.34 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.63 20.17<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 017.68-018.08 S 0.40 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 2.63 3.62<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 038.49-038.69 S 0.20 1661 Regional Overlay 50mm @ IRI 5-7 2013 0.376 2.63 1.19<br />

Rajshahi Natore N602 Natore Town old Section Km 003.59-004.89 S 1.30 7<strong>23</strong>7 National Overlay 50mm @ IRI 5-7 2013 5.937 2.62 20.88<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 059.62-060.32 S 0.70 3555 National Overlay 50mm @ IRI 5-9 2013 1.900 2.62 5.74<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.20-0<strong>12</strong>.50 S 0.30 818 Regional DBST @ Traff 100-2000 2013 0.259 2.62 2.42<br />

Khulna Magura N7 Dauladia-Mongla Road Km 092.21-092.31 S 0.10 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 2.61 6.97<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 000.00-003.20 S 3.20 4082 Regional Overlay 60mm @ IRI 7-9 2013 8.324 2.61 <strong>23</strong>.76<br />

Dhaka Manikganj R315 Mawna-Nabinagar Road Km 043.30-044.00 S 0.70 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.994 2.61 <strong>12</strong>.66<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 087.16-087.96 S 0.80 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 2.61 27.97<br />

Rangpur Rangpur N506 Rangpur-Barobari-Kurigram Road Km 020.25-020.35 S 0.10 7068 National DBST @ Traff >6000 2013 0.136 2.60 3.52<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 031.81-032.01 S 0.20 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 2.60 8.42<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 015.60-017.10 S 1.50 1346 Regional Overlay 50mm @ IRI 5-7 2013 2.349 2.59 6.01<br />

Gopalganj Gopalganj N806 Bhatiapara-Kalna Road Km 002.70-002.80 S 0.10 2860 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.59 2.60<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 004.00-007.00 S 3.00 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 38.988 2.59 102.71<br />

Appendix-A: Page:70 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 010.50-010.90 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 2.59 15.41<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 005.70-005.90 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 2.59 11.52<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 020.88-020.98 R 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 2.59 13.73<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 003.60-003.70 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.59 4.56<br />

Gopalganj Gopalganj N806 Bhatiapara-Kalna Road Km 000.00-000.10 S 0.10 2860 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.58 2.59<br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 003.20-009.30 S 6.10 3778 Regional Overlay 50mm @ IRI 5-7 2013 19.103 2.58 58.14<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 091.29-091.39 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.282 2.58 10.74<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 039.24-041.74 S 2.50 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 20.771 2.58 50.61<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 006.70-006.90 S 0.20 3516 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.611 2.58 4.00<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 043.47-044.05 S 0.58 22<strong>23</strong> Regional Overlay 50mm @ IRI 7-9 2013 1.966 2.58 6.21<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 011.70-0<strong>12</strong>.30 S 0.60 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.054 2.57 35.71<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 062.95-063.25 S 0.30 4101 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.57 10.33<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 044.50-045.00 S 0.50 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 7.602 2.57 19.53<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 029.19-029.49 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.066 2.56 17.88<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 052.20-052.40 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 2.56 9.45<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 245.84-245.94 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.769 2.56 11.80<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 001.00-001.40 S 0.40 3516 Regional DBST 25mm @ 25% Crk 2013 0.375 2.55 1.90<br />

Dhaka Munshiganj R813 Muktarpur - Munshiganj Road Km 000.00-000.40 S 0.40 3788 Regional DBST 25mm @ 25% Crk 2013 0.356 2.55 1.80<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 007.77-008.47 S 0.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 2.55 31.19<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 041.97-042.37 S 0.40 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 2.54 17.53<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 008.10-008.40 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.496 2.54 13.52<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 022.85-0<strong>23</strong>.<strong>12</strong> S 0.27 7068 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.324 2.54 10.51<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 020.30-021.20 S 0.90 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.624 2.54 22.26<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 001.90-004.40 S 2.50 3297 Regional Overlay 50mm @ IRI 5-7 2013 7.829 2.54 <strong>23</strong>.70<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 039.91-040.01 S 0.10 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.53 3.90<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 039.31-039.41 S 0.10 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.53 3.90<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 013.50-013.60 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.53 2.60<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 035.97-036.17 S 0.20 1096 Regional Overlay 50mm @ IRI 5-7 2013 0.386 2.53 1.14<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 021.10-021.60 S 0.50 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.53 21.89<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 019.90-020.30 S 0.40 5045 Regional DBST 25mm @ 25% Crk 2013 0.553 2.53 4.82<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 000.00-000.10 S 0.10 6240 Regional DBST 25mm @ 25% Crk 2013 0.143 2.53 0.65<br />

Dhaka Gazipur R301 Tongi-Pachdona Road Km 007.50-008.00 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.52 22.38<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 010.80-011.00 S 0.20 1398 Regional Overlay 50mm @ IRI 5-7 2013 0.418 2.52 1.22<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 007.70-008.30 S 0.60 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 11.660 2.52 28.61<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 021.07-021.97 S 0.90 5261 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.809 2.52 33.07<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 021.40-024.40 S 3.00 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 32.080 2.52 73.66<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 0<strong>12</strong>.00-0<strong>12</strong>.10 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.52 2.59<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 007.20-007.40 S 0.20 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.860 2.52 9.24<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 000.00-004.00 S 4.00 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 53.946 2.52 136.50<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 003.80-004.00 S 0.20 1346 Regional Overlay 50mm @ IRI 5-7 2013 0.397 2.51 1.21<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 003.10-003.40 S 0.30 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.626 2.50 1.77<br />

Appendix-A: Page:71 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 027.74-030.74 S 3.00 1096 Regional Overlay 50mm @ IRI 7-9 2013 5.794 2.50 16.04<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 035.01-035.21 S 0.20 3636 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 2.50 6.33<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 034.00-034.20 S 0.20 3497 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 2.50 6.30<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 014.60-015.00 S 0.40 1398 Regional Overlay 50mm @ IRI 7-9 2013 0.835 2.49 2.41<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 044.85-044.95 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 2.49 4.17<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 038.21-038.31 S 0.10 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.49 3.84<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 038.41-038.51 S 0.10 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.49 3.84<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 070.65-070.95 S 0.30 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.49 <strong>12</strong>.42<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.40-018.80 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.983 2.49 14.97<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 018.40-018.80 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.983 2.49 14.97<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 0<strong>12</strong>.90-013.00 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.49 2.56<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 042.77-045.87 S 3.10 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 26.398 2.49 63.55<br />

Khulna Jhenaidah R748 Chuadanga-Kaliganj Road Km 051.40-051.80 S 0.40 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.081 2.49 15.14<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 010.60-010.70 S 0.10 <strong>23</strong>43 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.266 2.49 3.14<br />

Rangpur Lalmonirhat N506 Rangpur-Barobari-Kurigram Road Km 021.00-021.15 S 0.15 7068 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.108 2.48 7.30<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 070.70-073.30 S 2.60 2707 Regional Overlay 50mm @ IRI 5-7 2013 7.464 2.48 <strong>23</strong>.60<br />

Rangpur Gaib<strong>and</strong>a R585 Gobindagnj-Fulbari-Dinajpur Road Km 000.50-001.10 S 0.60 6187 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 2.47 24.92<br />

Dhaka Gazipur R314 Gafargaon-Mawna Road Km 037.00-042.16 S 5.16 1346 Regional Overlay 50mm @ IRI 7-9 2013 9.692 2.47 27.72<br />

Khulna Chuadanga R747 Kushtia -Chuadanga Road Km 036.44-036.64 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.47 9.45<br />

Gopalganj Faridpur N7 Dauladia-Mongla Road Km 061.02-061.<strong>12</strong> S 0.10 7248 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 2.47 6.57<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 036.91-037.11 S 0.20 3636 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 2.47 6.25<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 067.15-067.65 S 0.50 4484 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.743 2.46 15.78<br />

Dhaka Munshiganj R8<strong>12</strong> Fatullah -Mawa Road Km 011.92-0<strong>12</strong>.82 S 0.90 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 16.194 2.46 39.21<br />

Khulna Magura R720 Magura-Narail Road Km 016.10-017.20 S 1.10 1047 Regional Overlay 50mm @ IRI 7-9 2013 2.<strong>12</strong>4 2.46 6.22<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 035.47-037.37 S 1.90 22<strong>23</strong> Regional DBST 25mm @ 25% Crk 2013 2.581 2.46 19.93<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 013.91-015.71 S 1.80 3636 Regional DBST @ Traff 2000-4000 2013 2.583 2.45 18.02<br />

Chittagong Chittagong N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 208.98-209.08 S 0.10 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.048 2.45 9.68<br />

Barisal Patuakhali R881 Amtali-Kuakata Road Km 016.90-017.00 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.45 2.60<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 051.40-051.50 S 0.10 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.45 2.59<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 008.00-008.20 S 0.20 818 Regional DBST @ Traff 100-2000 2013 0.173 2.44 1.40<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 016.30-016.40 S 0.10 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.44 3.82<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 000.80-000.90 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.44 2.62<br />

Sylhet Sylhet R250 Sylhet-Jakiganj Road Km 086.57-089.68 S 3.<strong>12</strong> 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 42.087 2.44 104.42<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 069.78-070.58 S 0.80 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.395 2.44 34.42<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 030.73-031.03 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.085 2.44 14.48<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 001.20-001.60 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.113 2.44 19.39<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 026.69-026.99 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.596 2.44 18.28<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 000.00-000.20 S 0.20 2929 Regional DBST 25mm @ 25% Crk 2013 0.188 2.44 0.78<br />

Khulna Jessore N706 Jessore -Benapole Road Km 030.40-032.10 S 1.70 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 48.348 2.43 114.<strong>23</strong><br />

Rangpur Bogra R546 Railgate-Shantahar Road Km 000.40-001.10 S 0.70 3283 Regional Overlay 50mm @ IRI 7-9 2013 2.010 2.43 6.52<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 009.40-009.60 S 0.20 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 2.43 9.45<br />

Appendix-A: Page:72 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 056.96-057.36 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.43 18.70<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 030.21-031.81 S 1.60 3636 Regional DBST 25mm @ 25% Crk 2013 2.253 2.43 14.27<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 065.65-065.85 S 0.20 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.43 8.31<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 000.40-000.60 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.43 8.56<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 019.00-019.68 S 0.68 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 2.331 2.42 5.08<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 041.74-055.14 S 13.40 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 143.289 2.42 316.49<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 024.40-027.20 S 2.80 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 29.941 2.42 66.06<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 070.15-070.45 S 0.30 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.42 <strong>12</strong>.20<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 001.90-003.10 S 1.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 27.324 2.42 64.76<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 011.90-0<strong>12</strong>.60 S 0.70 1398 Regional Overlay 50mm @ IRI 5-7 2013 1.461 2.42 3.91<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 007.00-007.20 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 2.42 10.77<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 003.10-003.40 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.593 2.42 14.10<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 053.30-054.00 S 0.70 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.<strong>12</strong>2 2.41 14.42<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 022.00-022.10 S 0.10 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.41 3.77<br />

Comilla Ch<strong>and</strong>pur R140 Comilla-Begumganj Road Km 032.29-032.79 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.487 2.41 22.<strong>23</strong><br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 020.40-021.10 S 0.70 5045 Regional DBST 25mm @ 25% Crk 2013 0.968 2.41 4.81<br />

Chittagong Cox's Bazar R180 Laharpur-Laboni More Road Km 001.60-001.70 S 0.10 4993 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.41 4.43<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 081.72-083.<strong>12</strong> S 1.40 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 14.970 2.41 34.45<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 083.22-083.82 S 0.60 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.416 2.41 14.75<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 007.70-009.50 S 1.80 3297 Regional Overlay 50mm @ IRI 5-7 2013 5.637 2.40 15.80<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 005.60-005.80 S 0.20 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 2.40 8.53<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 078.52-078.92 S 0.40 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.277 2.40 9.82<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 0<strong>23</strong>.00-0<strong>23</strong>.70 S 0.70 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.951 2.40 5.18<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 004.60-005.20 S 0.60 2897 National Full Recon 135mm @ IRI <strong>12</strong> 2013 10.265 2.40 <strong>23</strong>.49<br />

Khulna Satkhira R765 Khulna-Satkhira Road Km 029.99-030.29 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.40 9.87<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 029.93-030.63 S 0.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.351 2.40 31.<strong>12</strong><br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 013.71-013.91 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.860 2.40 9.06<br />

Khulna Magura N7 Dauladia-Mongla Road Km 077.31-077.51 S 0.20 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.109 2.39 21.24<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 020.20-020.70 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.361 2.39 17.02<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 080.52-081.42 S 0.90 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.624 2.39 21.96<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.80-020.90 S 0.10 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.39 4.02<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 015.90-018.20 S 2.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 45.899 2.38 106.95<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 015.90-018.20 S 2.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 45.899 2.38 106.95<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 016.26-017.29 S 1.03 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.383 2.38 44.57<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 001.50-002.30 S 0.80 <strong>23</strong>43 Regional DBST @ Traff 2000-4000 2013 1.186 2.37 8.24<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 004.80-005.00 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.37 8.31<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 015.56-015.86 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.<strong>12</strong>0 2.37 9.96<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 066.65-066.85 S 0.20 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.37 7.88<br />

Dhaka Mymensingh R371 Sherpur-Nakla-Mymensingh Km 018.10-018.30 S 0.20 4540 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.37 8.94<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 152.91-153.11 S 0.20 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 2.36 <strong>12</strong>.95<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 006.80-007.10 S 0.30 37<strong>23</strong> Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.762 2.36 6.22<br />

Appendix-A: Page:73 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 026.71-026.81 S 0.10 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.693 2.36 3.82<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 008.70-009.20 S 0.50 4909 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 8.582 2.36 20.36<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 019.20-019.90 S 0.70 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 2.36 27.81<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 038.84-039.24 S 0.40 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.289 2.36 9.22<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 022.77-0<strong>23</strong>.27 S 0.50 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.179 2.35 18.66<br />

Khulna Jhenaidah R745 Kushtia -Jhenaidah Road Km 105.36-105.56 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.35 8.29<br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 001.40-001.50 S 0.10 1416 Regional DBST @ Traff 100-2000 2013 0.091 2.35 0.48<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 027.20-027.40 S 0.20 1301 Regional Overlay 50mm @ IRI 5-7 2013 0.397 2.35 1.04<br />

Barisal Barisal R870 Barisal-Pirojpur Road Km 000.00-000.10 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.249 2.35 2.40<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 053.97-054.07 S 0.10 3803 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.34 3.58<br />

Khulna Magura R720 Magura-Narail Road Km 013.80-015.90 S 2.10 1047 Regional Overlay 50mm @ IRI 7-9 2013 4.001 2.34 10.86<br />

Sylhet Sylhet N209 Sylhet Twn By-Pass Road Km 000.00-000.20 S 0.20 4434 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.944 2.34 6.35<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 015.06-015.56 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.34 21.05<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 030.<strong>23</strong>-030.53 S 0.30 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.34 9.51<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 025.40-026.00 S 0.60 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.207 2.34 <strong>23</strong>.19<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 000.30-001.10 S 0.80 1398 Regional Overlay 50mm @ IRI 5-7 2013 1.841 2.33 5.45<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.40-020.50 S 0.10 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.33 3.93<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 066.40-066.50 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 2.33 4.30<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 002.60-003.40 S 0.80 5531 Regional Overlay 60mm @ IRI 5.5-9 2013 4.854 2.33 13.79<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 062.08-062.58 S 0.50 4283 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.743 2.33 14.86<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 011.70-011.80 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.33 4.44<br />

Khulna Meherpur R745 Kushtia -Jhenaidah Road Km 064.68-064.88 S 0.20 4283 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.33 7.83<br />

Sylhet Moulavi Bazar R282 Juri-Lathidila Road Km 003.00-006.10 S 3.10 4391 Regional DBST @ Traff 4000-6000 2013 2.910 2.32 17.57<br />

Dhaka Tangail N401 Madhupur-Mymensingh Road Km 000.80-016.00 S 15.20 3417 National DBST 25mm @ 25% Crk 2013 21.175 2.32 110.19<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 036.20-037.90 S 1.70 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.<strong>12</strong>9 2.32 27.35<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 072.20-072.50 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.683 2.31 <strong>12</strong>.80<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 017.20-018.30 S 1.10 1346 Regional Overlay 50mm @ IRI 5-7 2013 1.722 2.31 4.44<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 099.46-099.66 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.31 8.03<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.70-001.80 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.31 3.89<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 008.50-008.70 S 0.20 4909 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 2.31 10.29<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 018.90-019.00 S 0.10 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.699 2.31 3.75<br />

Rangpur Bogra R545 Bogra-Joypurhat Road Km 011.30-0<strong>12</strong>.90 S 1.60 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 28.789 2.30 63.83<br />

Rajshahi Pabna N6 Kashinathpur-Natore-Rajshahi Road Km 040.35-040.45 S 0.10 6210 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.134 2.30 4.79<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 109.38-109.68 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.29 <strong>12</strong>.07<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 000.10-000.20 S 0.10 24928 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.924 2.29 10.58<br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 009.70-009.80 S 0.10 3778 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.381 2.29 3.10<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 022.38-022.98 S 0.60 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 2.054 2.28 4.71<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 033.87-034.17 S 0.30 1096 Regional Overlay 50mm @ IRI 5-7 2013 0.579 2.28 1.52<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 010.90-011.20 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 2.28 <strong>12</strong>.61<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 003.30-003.50 S 0.20 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 2.28 4.89<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 038.99-042.09 S 3.10 1661 Regional Overlay 50mm @ IRI 5-7 2013 5.825 2.27 16.61<br />

Appendix-A: Page:74 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 003.00-003.20 S 0.20 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 2.27 4.88<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 0<strong>12</strong>.80-014.00 S 1.20 1398 Regional Overlay 50mm @ IRI 7-9 2013 2.505 2.27 6.77<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 033.57-034.97 S 1.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 25.191 2.26 55.65<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 004.00-004.40 S 0.40 4488 Regional Overlay 60mm @ IRI 7-9 2013 0.996 2.26 2.25<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 079.<strong>12</strong>-080.02 S 0.90 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.624 2.26 20.77<br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 000.00-000.10 S 0.10 1416 Regional DBST 25mm @ 25% Crk 2013 0.091 2.26 0.35<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 009.90-010.20 S 0.30 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.825 2.26 2.55<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 160.51-160.61 S 0.10 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 2.25 6.18<br />

Gopalganj Faridpur N804 Bhanga-Faridpur Road Km 031.20-031.30 S 0.10 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 2.25 10.33<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 001.00-001.50 S 0.50 4488 Regional Overlay 60mm @ IRI 7-9 2013 1.245 2.24 2.90<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 049.10-049.20 S 0.10 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.24 2.37<br />

Khulna Magura R720 Magura-Narail Road Km 010.50-010.70 S 0.20 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.574 2.24 1.74<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 038.56-038.76 S 0.20 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.24 8.32<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.40-001.50 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.24 3.77<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 007.00-007.40 S 0.40 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.158 2.<strong>23</strong> 8.70<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 010.20-0<strong>12</strong>.80 S 2.60 3297 Regional Overlay 50mm @ IRI 5-7 2013 8.142 2.<strong>23</strong> 19.21<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.28-016.38 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.188 2.22 2.56<br />

Khulna Kushtia R710 Ahaladipur-Kushtia Road Km 051.45-051.75 S 0.30 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.22 11.74<br />

Sylhet Habiganj N2 Dhaka-Sylhet-Jaflong Road Km 153.21-153.41 S 0.20 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 2.22 <strong>12</strong>.17<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 039.30-039.40 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.21 2.32<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 008.00-008.20 S 0.20 3516 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.611 2.21 3.44<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 004.00-004.10 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.21 3.73<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 004.30-004.40 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.21 3.73<br />

Dhaka Narsingdi R301 Tongi-Pachdona Road Km 026.81-029.83 S 3.02 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 57.285 2.21 <strong>12</strong>2.97<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 068.60-069.10 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.471 2.20 20.24<br />

Khulna Magura R720 Magura-Narail Road Km 017.50-018.50 S 1.00 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.931 2.20 5.<strong>12</strong><br />

Khulna Magura R720 Magura-Narail Road Km 029.10-030.10 S 1.00 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.931 2.19 5.10<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 003.60-003.70 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.19 3.69<br />

Khulna Jessore N708 Jessore Town Old Section Km 003.29-004.74 S 1.45 3249 National DBST @ Traff 2000-4000 2013 3.109 2.19 26.59<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 108.56-108.66 S 0.10 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 1.744 2.19 3.64<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 027.00-029.00 S 2.00 5390 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 35.987 2.19 75.89<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 004.40-004.70 S 0.30 4488 Regional DBST @ Traff 4000-6000 2013 0.296 2.18 2.18<br />

Khulna Magura R720 Magura-Narail Road Km 026.90-027.10 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.386 2.18 0.99<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 0<strong>23</strong>.10-0<strong>23</strong>.20 S 0.10 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.18 3.41<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 013.80-014.40 S 0.60 3206 Regional DBST @ Traff 2000-4000 2013 0.889 2.18 5.79<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 019.09-019.19 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.084 2.18 2.24<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 021.70-021.90 S 0.20 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 2.18 6.80<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 031.99-032.69 S 0.70 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.485 2.17 15.43<br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 031.60-040.57 S 8.97 2942 Regional Overlay 50mm @ IRI 7-9 2013 21.499 2.17 52.85<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 035.60-038.70 S 3.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 33.149 2.17 65.68<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 007.00-010.90 S 3.90 2650 National DBST 25mm @ 25% Crk 2013 7.032 2.17 46.30<br />

Appendix-A: Page:75 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Comilla R144 Laksam Old Section Km 003.90-004.50 S 0.60 2057 Regional DBST 25mm @ 25% Crk 2013 1.1<strong>12</strong> 2.17 6.65<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 016.80-017.70 S 0.90 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.666 2.17 37.54<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 031.90-032.40 S 0.50 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.347 2.17 10.56<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 002.70-002.90 S 0.20 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.16 7.46<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 027.70-031.90 S 4.20 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 34.799 2.16 70.98<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 032.43-033.<strong>23</strong> S 0.80 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 2.16 <strong>23</strong>.40<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 000.00-000.10 S 0.10 5672 Regional DBST 25mm @ 25% Crk 2013 0.210 2.16 1.02<br />

Dhaka Gazipur R315 Mawna-Nabinagar Road Km 032.10-032.50 S 0.40 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.373 2.15 9.21<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 003.70-003.80 S 0.10 6255 Regional DBST @ Traff >6000 2013 0.173 2.15 1.14<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 089.86-090.26 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 2.15 14.92<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 007.40-007.80 S 0.40 818 Regional Overlay 50mm @ IRI 7-9 2013 0.731 2.15 1.94<br />

Gopalganj Rajbari N7 Dauladia-Mongla Road Km 000.10-000.20 S 0.10 7649 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.742 2.14 7.85<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 025.91-026.11 S 0.20 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 2.14 6.92<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 049.03-049.33 S 0.30 1661 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.032 2.13 4.32<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 001.50-001.60 S 0.10 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.13 2.28<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 000.10-000.20 S 0.10 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.13 3.66<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 014.30-014.70 L 0.40 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.533 2.<strong>12</strong> 26.30<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.90-013.00 S 0.10 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.<strong>12</strong> 3.31<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 055.66-056.06 S 0.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.<strong>12</strong> 16.28<br />

Dhaka Narayanganj N1 Dhaka -Comilla -Chittagong-Teknaf RoKm 024.47-024.48 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.311 2.11 0.64<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 102.86-103.46 S 0.60 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 11.660 2.10 <strong>23</strong>.48<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 041.70-042.40 S 0.70 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.541 2.09 13.24<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 037.56-038.56 S 1.00 4116 Regional DBST @ Traff 4000-6000 2013 1.482 2.09 9.75<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 013.70-015.90 S 2.20 818 Regional Overlay 50mm @ IRI 7-9 2013 4.019 2.09 9.72<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 028.89-029.09 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.606 2.08 9.37<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 062.07-064.24 S 2.18 3581 Regional Overlay 50mm @ IRI 5-7 2013 4.831 2.08 10.63<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 016.80-017.00 S 0.20 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 2.08 6.50<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km <strong>12</strong>2.01-<strong>12</strong>2.71 S 0.70 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 9.054 2.08 18.66<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 015.30-015.40 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.08 3.96<br />

Dhaka Munshiganj R813 Muktarpur - Munshiganj Road Km 002.50-004.00 S 1.50 3788 Regional DBST @ Traff 2000-4000 2013 1.752 2.08 9.46<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 018.40-018.50 S 0.10 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.08 3.60<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 005.00-005.30 S 0.30 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.07 10.71<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 015.70-017.00 S 1.30 1363 National DBST @ Traff 100-2000 2013 1.830 2.07 13.99<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 054.00-055.80 S 1.80 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 20.317 2.07 39.30<br />

Rajshahi Rajshahi R685 Rajshahi -Chowmasia Road Km 011.40-011.90 S 0.50 6330 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.997 2.06 17.66<br />

Gopalganj Faridpur N804 Bhanga-Faridpur Road Km 028.90-029.30 S 0.40 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.356 2.06 47.02<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 007.80-007.90 S 0.10 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.06 3.51<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 043.26-043.36 S 0.10 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.06 3.82<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 040.46-040.56 S 0.10 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.05 3.81<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 041.91-042.11 S 0.20 3636 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.440 2.05 5.01<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 000.00-000.10 S 0.10 24928 National DBST @ Traff >6000 2013 0.371 2.05 2.04<br />

Appendix-A: Page:76 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 091.36-092.06 S 0.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 2.05 24.89<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 020.80-020.90 S 0.10 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.05 3.20<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 020.29-020.49 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.188 2.04 8.36<br />

Khulna Magura R720 Magura-Narail Road Km 008.80-009.60 S 0.80 1047 Regional Overlay 50mm @ IRI 7-9 2013 2.297 2.04 5.43<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 041.50-041.70 S 0.20 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 2.04 4.39<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 015.10-015.30 S 0.20 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.620 2.03 3.20<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 009.50-010.30 S 0.80 1363 National DBST @ Traff 100-2000 2013 1.146 2.03 8.57<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 020.70-020.90 S 0.20 818 Regional Overlay 50mm @ IRI 7-9 2013 0.365 2.02 0.82<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 006.20-006.30 S 0.10 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.944 2.02 5.86<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 037.36-037.56 S 0.20 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.01 7.46<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 006.70-006.80 S 0.10 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.00 3.42<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 015.60-016.10 S 0.50 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 2.00 19.11<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 110.26-110.56 S 0.30 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 5.<strong>23</strong>2 2.00 10.00<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 032.01-035.01 S 3.00 3636 Regional DBST 25mm @ 25% Crk 2013 4.157 2.00 22.49<br />

Khulna Magura R720 Magura-Narail Road Km 010.20-010.40 S 0.20 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.574 2.00 1.33<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 004.60-005.50 S 0.90 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 16.040 2.00 30.66<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 009.60-009.70 S 0.10 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.00 3.41<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 119.51-<strong>12</strong>0.41 S 0.90 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 11.641 1.99 <strong>23</strong>.00<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 036.01-036.21 S 0.20 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.99 6.36<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 022.40-022.50 S 0.10 1140 Regional DBST 25mm @ 25% Crk 2013 0.094 1.98 0.39<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 002.70-003.40 S 0.70 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.069 1.98 13.61<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 049.56-051.26 S 1.70 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 33.369 1.98 64.85<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 077.78-077.98 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 1.98 11.07<br />

Gopalganj Faridpur N803 Faridpur Town Old section Km 000.70-000.80 S 0.10 24928 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.788 1.98 8.89<br />

Dhaka Kishoreganj R360 Mymensingh -Bhairab Road Km 045.42-046.82 S 1.40 2693 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 17.722 1.98 35.48<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 034.67-034.87 S 0.20 1096 Regional Overlay 50mm @ IRI 5-7 2013 0.386 1.98 0.88<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 024.71-024.81 S 0.10 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.693 1.97 3.20<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 008.30-008.50 S 0.20 6<strong>23</strong>8 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.041 1.97 5.98<br />

Khulna Magura R720 Magura-Narail Road Km 025.10-025.30 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.386 1.97 0.88<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 003.90-004.00 S 0.10 6255 Regional DBST 25mm @ 25% Crk 2013 0.173 1.97 0.90<br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 004.90-005.41 S 0.51 1416 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.191 1.97 6.05<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 008.70-008.80 S 0.10 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.96 1.91<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 024.91-025.11 S 0.20 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 1.96 6.35<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 007.80-007.90 S 0.10 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.96 1.91<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 010.10-010.20 S 0.10 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.96 1.91<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 004.20-004.50 S 0.30 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 1.96 18.27<br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 000.70-000.90 S 0.20 1416 Regional DBST 25mm @ 25% Crk 2013 0.183 1.95 0.79<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 001.60-007.90 S 6.30 2154 Regional Overlay 50mm @ IRI 7-9 2013 18.086 1.95 52.39<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 104.99-105.09 S 0.10 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 1.411 1.94 2.73<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 002.50-002.60 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.94 3.27<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 034.87-035.00 S 0.13 4116 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.913 1.94 3.62<br />

Appendix-A: Page:77 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 0<strong>12</strong>.40-013.60 S 1.20 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 4.107 1.93 7.15<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 043.66-044.06 S 0.40 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 1.93 14.35<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 009.70-009.90 S 0.20 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 1.93 7.48<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 020.90-021.10 S 0.20 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.91 3.83<br />

Rajshahi Pabna N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 101.10-101.80 S 0.70 1550 National Overlay 50mm @ IRI 4-9 2013 2.667 1.91 6.06<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 005.30-005.60 S 0.30 3<strong>23</strong>4 Regional DBST @ Traff 2000-4000 2013 0.408 1.91 2.28<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 025.70-026.40 S 0.70 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 11.436 1.91 20.85<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 019.98-021.18 S 1.20 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 4.107 1.90 7.85<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 002.80-002.90 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.822 1.90 3.<strong>23</strong><br />

Khulna Khulna R760 Khulna-Satkhira Road Km 020.30-021.70 S 1.40 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 27.481 1.90 51.13<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 011.70-0<strong>12</strong>.10 S 0.40 1484 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.859 1.90 5.51<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 006.20-006.37 S 0.17 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.041 1.90 5.40<br />

Rajshahi Natore R548 Naogaon-Atrai-Natore Road Km 035.89-037.29 S 1.40 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.889 1.89 24.47<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 009.30-009.60 S 0.30 3<strong>23</strong>4 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.798 1.89 7.14<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 076.10-076.30 S 0.20 2707 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.89 5.90<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 001.40-002.40 S 1.00 3516 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 8.654 1.88 15.72<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 017.10-017.20 S 0.10 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.88 1.49<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 001.40-001.80 S 0.40 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.654 1.88 <strong>12</strong>.<strong>12</strong><br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 025.70-026.60 S 0.90 1301 Regional Overlay 50mm @ IRI 5-7 2013 1.785 1.87 3.91<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 013.30-013.40 S 0.10 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.87 1.48<br />

Khulna Magura R720 Magura-Narail Road Km 028.30-028.80 S 0.50 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.966 1.87 2.08<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 021.90-022.00 S 0.10 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.87 2.92<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 034.50-035.00 S 0.50 3497 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.329 1.86 11.74<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 007.60-007.70 S 0.10 3297 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.381 1.86 2.45<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 011.00-011.60 S 0.60 <strong>23</strong>26 Regional DBST 25mm @ 25% Crk 2013 0.519 1.86 2.15<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 021.30-021.40 S 0.10 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.86 2.90<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 109.16-109.66 S 0.50 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 8.721 1.85 15.42<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 055.92-056.42 S 0.50 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.373 1.85 7.89<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 000.80-000.90 S 0.10 818 Regional Overlay 50mm @ IRI 5-7 2013 0.183 1.85 0.38<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 079.56-079.76 S 0.20 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 1.84 10.31<br />

Chittagong Khagrachari R160 Hathazari-Khagrachhari Road Km 040.70-041.00 S 0.30 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.297 1.84 5.80<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 013.30-013.50 S 0.20 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.84 5.76<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 079.90-080.30 S 0.40 2707 Regional DBST 25mm @ 25% Crk 2013 0.543 1.84 2.52<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 079.86-081.36 S 1.50 5210 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 36.755 1.83 64.17<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 009.20-009.70 S 0.50 1484 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.574 1.82 6.62<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 018.74-019.70 S 0.96 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.019 1.82 17.59<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 020.57-020.97 S 0.40 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.82 6.10<br />

Khulna Chuadanga R745 Kushtia -Jhenaidah Road Km 078.58-079.46 S 0.88 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 24.904 1.81 44.36<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 008.40-008.80 S 0.40 3206 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.524 1.80 9.90<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 000.00-000.10 S 0.10 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 1.78 3.<strong>12</strong><br />

Dhaka Tangail R480 Elanga-Bhuanpur Road Km 001.51-016.81 S 15.30 3903 Regional DBST 25mm @ 25% Crk 2013 11.334 1.78 37.59<br />

Appendix-A: Page:78 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jessore N708 Jessore Town Old Section Km 002.90-003.00 L 0.10 3249 National DBST 25mm @ 25% Crk 2013 0.185 1.78 0.71<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 003.20-003.30 S 0.10 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 1.78 1.78<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 013.60-013.68 S 0.08 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.457 1.78 2.37<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 003.10-003.50 S 0.40 2929 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.498 1.78 6.00<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 113.86-114.46 S 0.60 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 10.465 1.77 17.74<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 006.80-006.90 S 0.10 3750 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.650 1.77 2.75<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.10 818 Regional DBST 25mm @ 25% Crk 2013 0.086 1.76 0.33<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 015.40-015.60 L 0.20 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 7.745 1.76 13.84<br />

Rangpur Bogra N514 Bogra (Banani)-Matidali Road Km 003.70-003.78 R 0.08 10992 National Overlay 50mm @ IRI 5 2013 0.585 1.76 1.14<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 011.90-0<strong>12</strong>.00 S 0.10 2154 Regional Overlay 50mm @ IRI 5-7 2013 0.287 1.76 0.62<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 006.47-006.77 S 0.30 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.030 1.76 5.00<br />

Comilla Brahmanbaria N2 Dhaka-Sylhet-Jaflong Road Km 074.18-074.24 S 0.06 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 0.227 1.76 0.55<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 061.47-062.07 S 0.60 3803 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.5<strong>23</strong> 1.75 10.43<br />

Khulna Magura N702 Jessore -Magura Road Km 021.98-025.79 S 3.81 3649 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 63.979 1.75 114.17<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 017.80-019.30 S 1.50 1363 National Overlay 50mm @ IRI 5-9 2013 4.588 1.75 11.84<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 009.20-009.50 S 0.30 4909 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.149 1.75 9.06<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 021.31-021.61 S 0.30 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.079 1.75 8.51<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 116.79-117.29 S 0.50 2947 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.401 1.75 10.25<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 000.60-001.00 S 0.40 4885 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 1.74 9.21<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 018.58-018.68 S 0.10 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.74 2.86<br />

Rangpur Bogra N514 Bogra (Banani)-Matidali Road Km 003.70-003.78 L 0.08 14432 National Overlay 50mm @ IRI 5 2013 0.585 1.74 1.<strong>12</strong><br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 000.00-000.10 S 0.10 3076 Regional DBST 25mm @ 25% Crk 2013 0.138 1.74 0.44<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 014.40-014.50 S 0.10 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 1.74 2.96<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 004.20-004.50 S 0.30 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 1.73 5.58<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 015.78-015.88 S 0.10 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 1.73 2.14<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 014.10-014.30 S 0.20 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.73 5.42<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 007.50-007.60 S 0.10 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.73 2.71<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 008.80-008.90 S 0.10 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.73 2.71<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 026.00-026.10 S 0.10 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.73 2.71<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 011.90-014.30 S 2.40 1363 National Overlay 50mm @ IRI 5-9 2013 7.015 1.73 14.41<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 017.00-017.30 S 0.30 1484 Regional DBST @ IRI><strong>12</strong> 2013 0.282 1.73 3.79<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 055.07-061.47 S 6.40 3803 Regional DBST @ Traff 2000-4000 2013 7.193 1.72 32.19<br />

Khulna Magura R720 Magura-Narail Road Km 005.30-007.40 S 2.10 1047 Regional Overlay 50mm @ IRI 7-9 2013 6.029 1.72 13.00<br />

Gopalganj Sariatpur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.50-017.88 S 1.38 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 15.544 1.72 27.02<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 009.91-010.81 S 0.90 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 22.730 1.72 37.49<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 001.70-002.90 S 1.20 6255 Regional DBST @ IRI><strong>12</strong> 2013 2.075 1.72 33.20<br />

Chittagong Cox's Bazar R180 Laharpur-Laboni More Road Km 002.10-002.30 S 0.20 4993 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.71 5.75<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 006.40-006.50 S 0.10 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.71 1.67<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 000.90-001.00 S 0.10 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.71 1.81<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 005.60-006.50 S 0.90 535 Regional Overlay 50mm @ IRI 7-9 2013 1.738 1.71 4.21<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 000.70-000.80 S 0.10 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.71 1.80<br />

Appendix-A: Page:79 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 013.10-013.30 S 0.20 1346 Regional DBST 25mm @ 25% Crk 2013 0.148 1.71 0.43<br />

Dhaka Tangail N401 Madhupur-Mymensingh Road Km 000.60-000.80 S 0.20 3417 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.222 1.70 5.48<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 015.96-016.97 S 1.01 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.108 1.70 19.41<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 003.10-003.70 S 0.60 6255 Regional DBST @ IRI><strong>12</strong> 2013 1.037 1.70 16.41<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 009.50-009.70 S 0.20 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.70 3.30<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 022.80-0<strong>23</strong>.00 S 0.20 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.70 5.71<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 015.50-015.60 S 0.10 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.69 1.33<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 002.20-002.60 S 0.40 2929 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.498 1.68 5.68<br />

Rajshahi Pabna N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 102.00-106.93 S 4.93 1550 National Overlay 50mm @ IRI 4-9 2013 18.777 1.67 35.47<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 073.30-074.70 S 1.40 2707 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 17.722 1.67 29.48<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 013.00-013.50 S 0.50 818 Regional Overlay 50mm @ IRI 5-7 2013 0.913 1.67 1.87<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 019.37-019.77 S 0.40 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.67 5.57<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 018.27-019.27 S 1.00 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 8.911 1.67 13.93<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 037.07-038.07 S 1.00 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.990 1.66 17.49<br />

Gopalganj Gopalganj N806 Bhatiapara-Kalna Road Km 000.20-001.20 S 1.00 2860 National Full Recon 135mm @ IRI <strong>12</strong> 2013 10.990 1.66 16.69<br />

Rajshahi Pabna N705 Paksey -Iswardi-Dasuria Km 000.00-000.10 S 0.10 2897 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.637 1.66 2.55<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 021.40-021.60 S 0.20 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.66 5.58<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 033.10-033.70 S 0.60 464 Regional Overlay 50mm @ IRI 7-9 2013 1.<strong>12</strong>7 1.65 2.38<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 007.70-008.10 S 0.40 1398 Regional Overlay 50mm @ IRI 7-9 2013 1.148 1.65 2.39<br />

Rajshahi Rajshahi N603 Rajshahi Town By-Pass Road Km 000.10-002.30 S 2.20 3802 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 36.962 1.65 61.98<br />

Khulna Jessore N708 Jessore Town Old Section Km 003.00-003.29 R 0.29 3249 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.006 1.64 8.22<br />

Khulna Magura R720 Magura-Narail Road Km 000.40-000.80 S 0.40 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.148 1.64 2.29<br />

Khulna Magura R720 Magura-Narail Road Km 021.80-022.00 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.386 1.64 0.78<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 004.10-004.40 S 0.30 2929 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.624 1.64 4.15<br />

Khulna Jessore R755 Jessore -Chuknagar Road Km 014.40-015.20 S 0.80 3292 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 10.<strong>12</strong>7 1.64 16.48<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 006.77-007.07 S 0.30 3571 Regional DBST 25mm @ 25% Crk 2013 0.252 1.64 0.77<br />

Khulna Magura R720 Magura-Narail Road Km 027.90-028.00 S 0.10 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 0.696 1.63 1.09<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 009.80-010.00 S 0.20 4909 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 1.62 7.<strong>23</strong><br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 013.40-013.60 S 0.20 1346 Regional DBST 25mm @ 25% Crk 2013 0.148 1.62 0.49<br />

Gopalganj Rajbari R710 Ahaladipur-Kushtia Road Km 029.91-030.21 S 0.30 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.079 1.62 7.89<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 038.70-038.84 S 0.14 3019 Regional DBST @ Traff 2000-4000 2013 0.<strong>12</strong>4 1.62 1.61<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 006.90-007.10 S 0.20 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.62 5.53<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 015.90-016.10 S 0.20 818 Regional DBST @ IRI><strong>12</strong> 2013 0.173 1.62 2.09<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 062.52-064.88 S 2.36 3555 National Full Recon 135mm @ IRI <strong>12</strong> 2013 40.027 1.62 63.49<br />

Rajshahi Pabna N504 Nagarbari -Kashinathpur Road Km 000.20-000.40 S 0.20 2162 National Overlay 50mm @ IRI 5-9 2013 0.762 1.62 1.49<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 117.49-117.79 S 0.30 2947 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.798 1.62 5.82<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 015.98-016.08 S 0.10 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 1.62 2.00<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 003.50-003.70 S 0.20 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.61 3.14<br />

Dhaka Tangail N4 Joydebpur-Jamalpur Road Km 107.46-108.46 S 1.00 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 17.441 1.61 26.81<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 022.28-022.38 S 0.10 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.61 2.64<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 008.00-008.40 S 0.40 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.<strong>12</strong>9 1.61 10.95<br />

Appendix-A: Page:80 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Chittagong R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.60-016.90 S 0.30 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 1.60 8.09<br />

Rangpur Joypurhat R545 Bogra-Joypurhat Road Km 113.77-116.79 S 3.02 2947 Regional DBST 25mm @ 25% Crk 2013 2.764 1.59 9.75<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 006.00-006.30 S 0.30 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.119 1.59 4.65<br />

Khulna Magura R720 Magura-Narail Road Km 0<strong>12</strong>.80-013.80 S 1.00 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.815 1.59 9.67<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 007.60-009.35 S 1.75 4082 Regional DBST @ Traff 4000-6000 2013 1.638 1.59 6.76<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 011.50-011.90 S 0.40 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.<strong>12</strong>9 1.59 10.84<br />

Rangpur Bogra R550 Mokamtala-Joypurhat Road Km 011.00-011.20 S 0.20 3<strong>23</strong>4 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 1.58 3.99<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 019.00-019.10 S 0.10 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.568 1.58 2.37<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 005.20-005.80 S 0.60 4885 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 7.062 1.58 10.90<br />

Barisal Pirojpur R870 Barisal-Pirojpur Road Km 054.67-055.07 S 0.40 3803 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 1.58 9.65<br />

Rajshahi Pabna R604 Tebunia-Hamkuria Road Km 019.60-031.60 S <strong>12</strong>.00 2942 Regional Overlay 50mm @ IRI 5-7 2013 35.388 1.57 66.52<br />

Gopalganj Madaripur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 003.90-004.60 S 0.70 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 1.56 18.87<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 015.50-015.80 S 0.30 1140 Regional DBST @ Traff 100-2000 2013 0.282 1.56 1.41<br />

Rajshahi Natore R548 Naogaon-Atrai-Natore Road Km 038.99-039.29 S 0.30 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.56 5.38<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 008.60-009.30 S 0.70 535 Regional Overlay 50mm @ IRI 7-9 2013 1.352 1.55 2.50<br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 004.50-004.90 S 0.40 1416 Regional DBST @ Traff 100-2000 2013 0.366 1.55 1.38<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 060.32-060.62 S 0.30 3555 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.634 1.55 7.02<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 024.10-025.10 S 1.00 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 13.664 1.55 20.22<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 0<strong>12</strong>.30-0<strong>12</strong>.90 S 0.60 535 Regional Overlay 50mm @ IRI 7-9 2013 1.159 1.54 2.01<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 004.50-005.10 S 0.60 6578 Regional DBST 25mm @ 25% Crk 2013 1.208 1.54 3.92<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 001.40-001.50 S 0.10 3942 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.020 1.53 3.04<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 008.80-009.00 S 0.20 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.53 5.22<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 000.30-000.70 S 0.40 818 Regional Overlay 50mm @ IRI 5-7 2013 0.731 1.53 1.27<br />

Comilla Noakhali R143 Maijdi-Ch<strong>and</strong>raganj Road Km 000.40-001.30 S 0.90 4563 Regional Overlay 50mm @ IRI 5-7 2013 1.898 1.53 2.95<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 004.40-004.80 S 0.40 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.375 1.53 4.40<br />

Khulna Magura N702 Jessore -Magura Road Km 025.79-026.19 S 0.40 3649 National Full Recon 135mm @ IRI <strong>12</strong> 2013 8.673 1.53 13.17<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 003.00-003.80 S 0.80 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.751 1.53 8.80<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 042.97-043.27 S 0.30 22<strong>23</strong> Regional DBST @ Traff 2000-4000 2013 0.408 1.52 1.75<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 003.70-004.00 S 0.30 4082 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.795 1.52 3.92<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 007.07-007.27 S 0.20 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.020 1.51 2.86<br />

Chittagong Chittagong R160 Hathazari-Khagrachhari Road Km 000.00-000.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.173 1.51 0.49<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 000.00-000.60 S 0.60 6255 Regional DBST @ IRI><strong>12</strong> 2013 1.037 1.50 14.52<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 003.20-003.40 S 0.20 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.50 2.91<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.50-0<strong>12</strong>.90 S 0.40 818 Regional Overlay 50mm @ IRI 5-7 2013 0.731 1.50 1.28<br />

Gopalganj Sariatpur R861 Monohar -Shariatpur Road Km 001.10-001.30 S 0.20 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.50 5.05<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 016.90-018.00 S 1.10 1140 Regional Overlay 50mm @ IRI 7-9 2013 2.182 1.50 4.27<br />

Khulna Jessore N708 Jessore Town Old Section Km 002.90-003.00 R 0.10 3249 National DBST 25mm @ 25% Crk 2013 0.185 1.50 0.71<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 004.70-005.00 S 0.30 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.990 1.49 7.24<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 010.40-010.50 S 0.10 1398 Regional Overlay 50mm @ IRI 5-7 2013 0.287 1.49 0.52<br />

Rangpur Bogra N514 Bogra (Banani)-Matidali Road Km 007.50-007.91 R 0.41 10964 National Overlay 50mm @ IRI 5 2013 2.967 1.49 4.78<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 033.84-033.87 S 0.03 1096 Regional DBST @ IRI><strong>12</strong> 2013 0.026 1.49 0.29<br />

Appendix-A: Page:81 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Satkhira R760 Khulna-Satkhira Road Km 037.30-037.36 S 0.05 4116 Regional DBST 25mm @ 25% Crk 2013 0.082 1.48 0.26<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 006.40-006.50 S 0.10 1582 Regional DBST @ Traff 100-2000 2013 0.161 1.48 0.81<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.70-0<strong>12</strong>.80 L 0.10 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.969 1.48 7.27<br />

Dhaka Gazipur N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.70-0<strong>12</strong>.80 R 0.10 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.969 1.48 7.26<br />

Khulna Magura R720 Magura-Narail Road Km 025.50-025.90 S 0.40 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.784 1.48 3.96<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 022.50-022.65 S 0.15 1140 Regional DBST @ Traff 100-2000 2013 0.141 1.47 0.66<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 003.70-005.50 S 1.80 818 Regional Overlay 50mm @ IRI 7-9 2013 3.288 1.47 5.93<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 002.90-003.40 S 0.50 3942 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 7.825 1.47 11.62<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 005.00-006.00 S 1.00 4488 Regional Overlay 50mm @ IRI 5-7 2013 1.983 1.46 3.15<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 003.30-003.50 S 0.20 818 Regional Overlay 50mm @ IRI 5-7 2013 0.365 1.46 0.59<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 003.00-003.80 S 0.80 3076 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 10.311 1.46 15.07<br />

Comilla Ch<strong>and</strong>pur R860 Mostafapur-Ch<strong>and</strong>pur Road Km 063.51-064.16 S 0.65 1<strong>23</strong>9 Regional DBST @ Traff 100-2000 2013 0.879 1.46 3.65<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 000.10-000.30 S 0.20 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 1.45 3.07<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 010.70-011.10 S 0.40 535 Regional Overlay 50mm @ IRI 7-9 2013 0.772 1.45 1.27<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 007.80-010.30 S 2.50 1779 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 24.709 1.45 34.33<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 006.30-007.35 S 1.05 4488 Regional Overlay 50mm @ IRI 5-7 2013 2.083 1.44 3.26<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 0<strong>12</strong>.60-0<strong>12</strong>.80 S 0.20 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.198 1.44 2.21<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 003.60-003.90 S 0.30 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 1.44 4.54<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 006.70-008.00 S 1.30 535 Regional Overlay 50mm @ IRI 7-9 2013 2.511 1.44 5.34<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 002.40-002.60 S 0.20 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.198 1.43 2.95<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 019.40-019.70 S 0.30 1140 Regional DBST @ Traff 100-2000 2013 0.282 1.43 1.25<br />

Rajshahi Pabna R603 Pabna-Paksey (EPZ) Road Km 000.00-001.90 S 1.90 3297 Regional DBST 25mm @ 25% Crk 2013 2.816 1.42 10.92<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 013.60-013.70 S 0.10 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.42 1.<strong>12</strong><br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 026.54-027.24 S 0.70 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.872 1.42 6.92<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 015.88-015.98 S 0.10 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.42 2.33<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.10 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.42 2.32<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 003.40-003.80 S 0.40 5766 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.600 1.42 14.29<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 002.20-002.60 S 0.40 8616 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.918 1.41 20.55<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 019.10-021.30 S 2.20 3497 Regional DBST @ Traff 2000-4000 2013 2.989 1.41 <strong>12</strong>.30<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 003.80-004.20 S 0.40 1398 Regional DBST @ Traff 100-2000 2013 0.543 1.41 2.58<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 007.60-007.90 S 0.30 1582 Regional DBST @ Traff 100-2000 2013 0.482 1.41 2.30<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 009.80-009.90 S 0.10 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.40 2.20<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 001.30-001.40 S 0.10 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.40 1.48<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 038.69-038.99 S 0.30 1661 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.917 1.40 3.86<br />

Dhaka Munshiganj R820 Zinzira-Srinagar Road Km 022.91-026.11 S 3.20 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 35.130 1.40 47.90<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 008.80-008.90 S 0.10 818 Regional DBST 25mm @ 25% Crk 2013 0.086 1.39 0.29<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 000.10-000.30 S 0.20 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.327 1.39 4.50<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 018.70-018.80 S 0.10 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.39 2.17<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 003.40-003.50 S 0.10 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.38 2.16<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 000.20-000.30 S 0.10 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.38 1.45<br />

Rajshahi Naogaon R549 Badalgachhi-Joypurhat Road Km 0<strong>12</strong>.35-015.05 S 2.70 1779 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 26.686 1.38 35.24<br />

Appendix-A: Page:82 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 017.77-018.07 S 0.30 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.673 1.38 3.45<br />

Khulna Magura R720 Magura-Narail Road Km 025.90-026.80 S 0.90 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.738 1.38 2.80<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 027.70-028.10 S 0.40 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 1.38 8.60<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 001.00-001.40 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 1.37 0.95<br />

Khulna Magura R720 Magura-Narail Road Km 027.40-027.90 S 0.50 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.966 1.37 1.53<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 054.43-060.<strong>23</strong> S 5.80 1661 Regional DBST @ Traff 100-2000 2013 5.960 1.37 18.55<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 003.20-003.70 S 0.50 4082 Regional DBST 25mm @ 25% Crk 2013 0.469 1.37 1.36<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 032.50-032.70 S 0.20 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.37 4.27<br />

Khulna Khulna R760 Khulna-Satkhira Road Km 010.30-010.90 S 0.60 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.693 1.36 13.96<br />

Khulna Magura R720 Magura-Narail Road Km 007.50-008.30 S 0.80 1047 Regional Overlay 50mm @ IRI 5-7 2013 2.297 1.36 3.84<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.10 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.36 2.13<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 014.61-015.50 S 0.89 3038 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 13.192 1.36 17.66<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 036.17-037.07 S 0.90 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 6.264 1.36 8.50<br />

Chittagong Rangamati N106 Chittagong-Rangamati Road Km 062.02-062.<strong>12</strong> S 0.10 3555 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.7<strong>23</strong> 1.35 2.28<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 005.90-006.00 S 0.10 818 Regional DBST 25mm @ 25% Crk 2013 0.086 1.35 0.20<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 020.90-021.10 S 0.20 818 Regional DBST @ IRI><strong>12</strong> 2013 0.173 1.34 1.73<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 011.00-011.60 S 0.60 1398 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.515 1.34 6.09<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 005.50-005.90 S 0.40 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.158 1.34 5.20<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 027.44-027.74 S 0.30 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.088 1.34 2.79<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 020.50-022.40 S 1.90 1140 Regional Overlay 50mm @ IRI 7-9 2013 3.768 1.33 5.96<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 007.90-008.00 S 0.10 818 Regional DBST @ Traff 100-2000 2013 0.086 1.33 0.32<br />

Dhaka Kishoreganj R211 Itakhola-Kotiadi Road Km 032.38-044.75 S <strong>12</strong>.37 4153 Regional DBST 25mm @ 25% Crk 2013 14.240 1.33 50.29<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 006.30-007.30 S 1.00 1363 National Overlay 50mm @ IRI 5-9 2013 3.<strong>12</strong>1 1.32 5.20<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 015.00-016.70 S 1.70 1398 Regional DBST @ Traff 100-2000 2013 1.680 1.32 5.42<br />

Chittagong Cox's Bazar R180 Laharpur-Laboni More Road Km 000.00-000.20 S 0.20 4993 Regional DBST 25mm @ 25% Crk 2013 0.296 1.32 0.67<br />

Khulna Magura R720 Magura-Narail Road Km 001.60-001.80 S 0.20 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.574 1.32 1.00<br />

Rajshahi Nawabganj R547 Naogaon-Badalgachhi-Rohonpur Km 100.07-100.66 S 0.59 3019 Regional DBST 25mm @ 25% Crk 2013 0.539 1.32 1.37<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 009.10-009.50 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 1.31 0.90<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 002.30-002.50 S 0.20 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.291 1.30 4.10<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 017.10-017.40 S 0.30 1363 National Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.217 1.30 4.17<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 011.20-0<strong>12</strong>.00 S 0.80 818 Regional Overlay 50mm @ IRI 5-7 2013 1.461 1.29 2.21<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 010.90-011.20 S 0.30 2650 National Full Recon 135mm @ IRI <strong>12</strong> 2013 6.505 1.29 8.35<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 0<strong>23</strong>.34-026.44 S 3.10 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 21.576 1.29 27.85<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 006.10-007.00 S 0.90 1398 Regional Overlay 50mm @ IRI 5-7 2013 2.584 1.28 3.94<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 010.30-011.50 S 1.20 1363 National Overlay 50mm @ IRI 5-9 2013 3.633 1.28 5.75<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 008.00-009.90 S 1.90 1346 Regional Overlay 50mm @ IRI 5-7 2013 6.803 1.28 11.33<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 007.00-007.40 S 0.40 818 Regional DBST @ IRI><strong>12</strong> 2013 0.346 1.28 3.29<br />

Rangpur Dinajpur R585 Gobindagnj-Fulbari-Dinajpur Road Km 084.76-086.06 S 1.30 2707 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 16.456 1.27 20.89<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 010.20-011.10 S 0.90 818 Regional Overlay 50mm @ IRI 5-7 2013 1.644 1.27 2.44<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 022.65-025.00 S 2.35 1140 Regional DBST @ Traff 100-2000 2013 2.229 1.27 9.07<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 045.89-049.03 S 3.14 1661 Regional DBST 25mm @ 25% Crk 2013 2.796 1.27 11.00<br />

Appendix-A: Page:83 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Sylhet Habiganj N204 Jagadishpur-Shaistaganj Km 008.70-009.30 S 0.60 1956 National Overlay 50mm @ IRI 5-9 2013 1.816 1.26 2.58<br />

Comilla Noakhali R143 Maijdi-Ch<strong>and</strong>raganj Road Km 001.30-001.40 S 0.10 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.243 1.26 1.45<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 018.60-019.70 S 1.10 818 Regional DBST @ IRI><strong>12</strong> 2013 0.951 1.26 8.93<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 008.90-008.92 S 0.02 1582 Regional Overlay 50mm @ IRI 5-7 2013 0.054 1.26 0.08<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 025.70-025.90 S 0.20 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.25 3.92<br />

Khulna Magura R720 Magura-Narail Road Km 024.30-024.80 S 0.50 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.368 1.25 2.06<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 005.20-005.70 S 0.50 1514 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.574 1.25 4.44<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 002.30-002.70 S 0.40 535 Regional Overlay 50mm @ IRI 7-9 2013 0.772 1.24 1.06<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 015.00-015.70 S 0.70 1363 National Overlay 50mm @ IRI 5-9 2013 2.083 1.24 3.16<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 034.87-035.97 S 1.10 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 7.656 1.<strong>23</strong> 9.46<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 000.00-000.80 S 0.80 1346 Regional DBST 25mm @ 25% Crk 2013 0.771 1.<strong>23</strong> 2.04<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 017.00-017.66 S 0.66 1398 Regional DBST 25mm @ 25% Crk 2013 0.654 1.<strong>23</strong> 1.68<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 006.20-006.60 S 0.40 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 1.<strong>23</strong> 7.66<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 020.20-020.70 S 0.50 818 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.292 1.22 3.88<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 072.80-073.99 S 1.20 1779 Regional DBST 25mm @ 25% Crk 2013 1.6<strong>23</strong> 1.21 4.19<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 0<strong>23</strong>.48-0<strong>23</strong>.78 S 0.30 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 1.21 4.49<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 004.20-006.00 S 1.80 1398 Regional Overlay 50mm @ IRI 7-9 2013 5.167 1.21 8.09<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 003.30-003.80 S 0.50 1398 Regional Overlay 50mm @ IRI 7-9 2013 1.435 1.20 2.19<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 000.30-000.60 S 0.30 1363 National Overlay 50mm @ IRI 5-9 2013 0.971 1.20 1.47<br />

Comilla Laxmipur R143 Maijdi-Ch<strong>and</strong>raganj Road Km 018.80-019.00 S 0.20 5722 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.944 1.19 3.21<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 007.47-008.57 S 1.10 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.554 1.19 11.80<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 002.20-002.30 S 0.10 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.309 1.19 1.43<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 001.40-002.40 S 1.00 818 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 6.584 1.19 7.55<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 019.70-020.20 S 0.50 818 Regional DBST 25mm @ 25% Crk 2013 0.432 1.19 0.95<br />

Gopalganj Gopalganj N805 Bhanga-Mollahhat Road Km 006.60-007.00 S 0.40 2650 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.720 1.19 8.07<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 016.40-017.70 S 1.30 818 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 8.559 1.18 9.74<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 005.20-005.60 S 0.40 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.654 1.18 7.62<br />

Khulna Jhenaidah N703 Jhenaidah Town Old Section Km 000.00-000.10 S 0.10 4905 National DBST 25mm @ 25% Crk 2013 0.186 1.18 0.45<br />

Khulna Magura R720 Magura-Narail Road Km 022.00-0<strong>23</strong>.40 S 1.40 1047 Regional DBST @ IRI><strong>12</strong> 2013 1.328 1.18 11.65<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 004.90-005.00 S 0.10 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.243 1.18 1.34<br />

Khulna Magura R720 Magura-Narail Road Km 0<strong>23</strong>.40-0<strong>23</strong>.60 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.574 1.17 0.78<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 004.20-004.60 S 0.40 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.654 1.16 7.47<br />

Dhaka Gazipur R311 Joydebpur -Ordinance Factory Km 000.90-001.10 S 0.20 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 1.16 2.43<br />

Khulna Jessore N708 Jessore Town Old Section Km 003.00-003.29 L 0.29 3249 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.006 1.14 5.71<br />

Dhaka Gazipur R313 Mawna-Monohardi Road Km 008.87-017.47 S 8.60 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 76.635 1.14 82.17<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 0<strong>12</strong>.70-013.10 S 0.40 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.241 1.14 3.61<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 027.37-035.77 S 8.40 1785 Regional DBST 25mm @ 25% Crk 2013 11.411 1.14 26.32<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 005.90-006.10 S 0.20 1363 National DBST @ IRI><strong>12</strong> 2013 0.298 1.14 2.61<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 001.10-001.20 S 0.10 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 1.14 1.02<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 002.40-002.90 S 0.50 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.469 1.<strong>12</strong> 4.05<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 035.37-035.47 S 0.10 22<strong>23</strong> Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.<strong>12</strong> 1.73<br />

Appendix-A: Page:84 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 015.18-015.78 S 0.60 6240 Regional DBST @ IRI><strong>12</strong> 2013 0.815 1.<strong>12</strong> 8.28<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 008.60-008.80 S 0.20 1582 Regional Overlay 50mm @ IRI 5-7 2013 0.679 1.<strong>12</strong> 0.90<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 0<strong>12</strong>.30-0<strong>12</strong>.70 S 0.40 1346 Regional DBST 25mm @ 25% Crk 2013 0.296 1.<strong>12</strong> 0.62<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 005.70-005.90 S 0.20 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.327 1.11 3.60<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 001.20-002.80 S 1.60 <strong>23</strong>26 Regional DBST @ IRI><strong>12</strong> 2013 1.383 1.11 13.40<br />

Khulna Narail R720 Magura-Narail Road Km 040.60-040.90 S 0.30 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.861 1.11 1.10<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 064.83-065.33 S 0.50 1661 Regional DBST 25mm @ 25% Crk 2013 0.457 1.11 0.86<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 019.68-019.98 S 0.30 6240 Regional DBST @ IRI><strong>12</strong> 2013 0.408 1.10 4.07<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 021.80-022.50 S 0.70 1301 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.004 1.10 5.54<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 000.00-000.10 S 0.10 2154 Regional DBST 25mm @ 25% Crk 2013 0.141 1.08 0.27<br />

Khulna Magura R720 Magura-Narail Road Km 0<strong>12</strong>.20-0<strong>12</strong>.40 S 0.20 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.163 1.08 1.31<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 009.30-010.00 S 0.70 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.657 1.08 5.44<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 007.50-009.50 S 2.00 1363 National DBST @ Traff 100-2000 2013 2.796 1.07 8.84<br />

Dhaka Tangail N401 Madhupur-Mymensingh Road Km 000.00-000.60 S 0.60 3417 National DBST 25mm @ 25% Crk 2013 1.037 1.07 1.95<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 014.82-015.61 S 0.79 1469 Regional Overlay 50mm @ IRI 7-9 2013 2.268 1.07 2.88<br />

Khulna Bagerhat R772 Bagerhat Town Section Km 000.60-000.63 S 0.03 5300 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.716 1.06 0.71<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 021.18-022.18 S 1.00 6240 Regional DBST @ IRI><strong>12</strong> 2013 1.359 1.06 13.08<br />

Khulna Bagerhat R772 Bagerhat Town Section Km 000.00-000.20 S 0.20 5300 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.776 1.06 4.75<br />

Dhaka Narsingdi R114 Nayapur-Raipura Road Km 025.00-025.75 S 0.75 1140 Regional DBST 25mm @ 25% Crk 2013 0.721 1.06 1.29<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 013.80-014.00 S 0.20 1484 Regional DBST @ IRI><strong>12</strong> 2013 0.188 1.05 1.54<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 007.40-007.50 S 0.10 1514 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 1.05 1.02<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 0<strong>12</strong>.<strong>12</strong>-013.02 S 0.90 1469 Regional Overlay 50mm @ IRI 7-9 2013 2.584 1.05 3.15<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.10 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 1.05 1.04<br />

Dhaka Manikganj N503 Utholi-Aricha Road Km 001.58-003.25 L 1.67 2015 National DBST 25mm @ 25% Crk 2013 2.366 1.04 7.70<br />

Dhaka Manikganj N503 Utholi-Aricha Road Km 001.58-003.25 R 1.67 2015 National DBST 25mm @ 25% Crk 2013 2.366 1.04 7.70<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 019.70-020.50 S 0.80 1140 Regional Overlay 50mm @ IRI 7-9 2013 1.587 1.03 1.98<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 002.20-002.70 S 0.50 1398 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.173 1.03 5.31<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 009.10-011.80 S 2.70 2154 Regional Overlay 50mm @ IRI 5-7 2013 7.751 1.03 9.68<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 006.20-006.40 S 0.20 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.327 1.03 3.33<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 017.70-017.90 S 0.20 818 Regional DBST 25mm @ 25% Crk 2013 0.173 1.02 0.35<br />

Comilla Laxmipur R143 Maijdi-Ch<strong>and</strong>raganj Road Km 013.80-014.00 S 0.20 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.421 1.00 2.<strong>23</strong><br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 022.98-0<strong>23</strong>.18 S 0.20 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.00 3.29<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 015.80-016.90 S 1.10 1140 Regional Overlay 50mm @ IRI 7-9 2013 2.182 1.00 2.64<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 052.07-072.66 S 20.59 1779 Regional DBST 25mm @ 25% Crk 2013 27.977 1.00 57.17<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 000.30-000.90 S 0.60 <strong>23</strong>26 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.944 1.00 4.63<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 009.70-010.10 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 0.99 0.80<br />

Dhaka Gazipur R302 Kaliganj Bazr Road Km 000.30-001.40 S 1.10 3076 Regional DBST 25mm @ 25% Crk 2013 1.560 0.99 2.88<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 017.50-017.60 S 0.10 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 0.99 0.98<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 002.70-002.80 S 0.10 1398 Regional DBST 25mm @ 25% Crk 2013 0.136 0.99 0.24<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 008.20-008.70 S 0.50 818 Regional DBST 25mm @ 25% Crk 2013 0.432 0.98 1.09<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 037.37-038.07 S 0.70 22<strong>23</strong> Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.377 0.97 8.52<br />

Appendix-A: Page:85 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Khagrachari R162 Rangamati -Khagrachhari Road Km 060.26-060.66 S 0.40 <strong>23</strong>7 Regional Overlay 50mm @ IRI 7-9 2013 0.772 0.97 0.98<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 000.60-000.90 S 0.30 1363 National Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.471 0.97 3.36<br />

Khulna Magura R720 Magura-Narail Road Km 001.80-002.40 S 0.60 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.722 0.96 1.96<br />

Khulna Magura R720 Magura-Narail Road Km 025.30-025.40 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.091 0.96 0.66<br />

Rajshahi Pabna N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 101.80-102.00 S 0.20 1550 National Rehab <strong>12</strong>0mm @ IRI 9-<strong>12</strong> 2013 2.893 0.96 2.82<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 011.00-011.10 S 0.10 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 0.96 0.95<br />

Chittagong Khagrachari R162 Rangamati -Khagrachhari Road Km 060.66-062.66 S 2.01 <strong>23</strong>7 Regional DBST @ Traff 100-2000 2013 1.833 0.96 6.09<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 006.40-006.50 S 0.10 818 Regional DBST @ IRI><strong>12</strong> 2013 0.086 0.95 0.61<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 000.00-000.50 S 0.50 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.693 0.95 9.65<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 018.00-019.40 S 1.40 1140 Regional Overlay 50mm @ IRI 5-7 2013 2.777 0.95 3.<strong>12</strong><br />

Barisal Bhola R890 Bhola -Char Manika Road Km 072.66-072.80 R 0.14 1779 Regional DBST 25mm @ 25% Crk 2013 0.183 0.94 0.33<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 009.00-009.42 S 0.42 1469 Regional DBST @ Traff 100-2000 2013 0.568 0.94 1.64<br />

Rajshahi Pabna N504 Nagarbari -Kashinathpur Road Km 000.40-000.50 S 0.10 2162 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.680 0.94 1.55<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 014.30-015.00 S 0.70 1363 National Rehab 110mm @ IRI 9-<strong>12</strong> 2013 7.492 0.92 6.92<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 019.20-021.70 S 2.50 1378 Regional DBST @ IRI><strong>12</strong> 2013 2.347 0.92 16.83<br />

Barisal Jhalokati R870 Barisal-Pirojpur Road Km 033.37-033.47 S 0.10 22<strong>23</strong> Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 0.92 1.42<br />

Khulna Narail R720 Magura-Narail Road Km 038.50-038.70 S 0.20 1047 Regional DBST 25mm @ 25% Crk 2013 0.272 0.92 0.50<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 000.30-000.40 S 0.10 2080 Regional DBST @ IRI><strong>12</strong> 2013 0.168 0.92 1.41<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 018.00-018.60 S 0.60 818 Regional DBST 25mm @ 25% Crk 2013 0.519 0.92 0.81<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 000.40-000.60 S 0.20 535 Regional Overlay 50mm @ IRI 7-9 2013 0.595 0.92 0.65<br />

Rajshahi Pabna N505 Baderhat-Kazirhat Road Km 000.00-002.63 S 2.63 1472 National Overlay 50mm @ IRI 5-9 2013 10.378 0.91 10.92<br />

Rajshahi Pabna R602 Nazirganj -Ferry Ghat Road Km 000.60-000.80 S 0.20 1178 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.944 0.91 1.68<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 022.00-022.40 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 0.91 0.66<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 016.10-016.40 S 0.30 818 Regional DBST 25mm @ 25% Crk 2013 0.259 0.90 0.44<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 011.80-011.90 S 0.10 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.080 0.90 0.94<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 010.50-010.80 S 0.30 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.346 0.90 2.33<br />

Comilla Noakhali R143 Maijdi-Ch<strong>and</strong>raganj Road Km 004.30-004.50 S 0.20 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.486 0.90 2.07<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 008.00-008.60 S 0.60 535 Regional Overlay 50mm @ IRI 5-7 2013 1.159 0.90 1.26<br />

Rajshahi Pabna N504 Nagarbari -Kashinathpur Road Km 004.60-004.70 S 0.10 2162 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.765 0.88 1.52<br />

Dhaka Gazipur R310 Joydebpur-Itakhola Road Km 007.40-010.29 S 2.89 6578 Regional DBST 25mm @ 25% Crk 2013 3.828 0.88 5.47<br />

Gopalganj Gopalganj R850 Tekerhat-Mollahhat Road Km 013.00-013.40 S 0.40 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 0.88 5.52<br />

Comilla Laxmipur R143 Maijdi-Ch<strong>and</strong>raganj Road Km 017.80-018.00 S 0.20 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.670 0.87 2.13<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 052.83-053.13 S 0.30 1661 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.104 0.87 2.72<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 017.24-020.24 S 3.00 882 Regional Overlay 50mm @ IRI 5-7 2013 6.483 0.87 6.79<br />

Gopalganj Rajbari R7<strong>12</strong> Tottipur -Machpara Link Road Km 000.00-002.22 S 2.22 1160 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 22.002 0.87 18.10<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 013.78-014.08 S 0.30 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 0.87 4.27<br />

Comilla Noakhali R143 Maijdi-Ch<strong>and</strong>raganj Road Km 001.40-004.30 S 2.90 4563 Regional DBST 25mm @ 25% Crk 2013 2.758 0.86 4.71<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 013.70-015.10 S 1.40 1346 Regional DBST 25mm @ 25% Crk 2013 1.037 0.86 1.69<br />

Khulna Narail R720 Magura-Narail Road Km 039.30-039.40 S 0.10 1047 Regional DBST 25mm @ 25% Crk 2013 0.136 0.85 0.26<br />

Chittagong Khagrachari R162 Rangamati -Khagrachhari Road Km 056.66-059.76 S 3.10 <strong>23</strong>7 Regional DBST @ Traff 100-2000 2013 2.871 0.84 8.06<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 000.40-001.<strong>23</strong> S 0.83 2080 Regional DBST @ Traff 2000-4000 2013 1.404 0.83 3.40<br />

Appendix-A: Page:86 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Narail R720 Magura-Narail Road Km 041.00-041.30 S 0.30 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.861 0.83 0.84<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 000.10-000.40 S 0.30 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 0.83 4.41<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 009.42-0<strong>12</strong>.<strong>12</strong> S 2.70 1469 Regional DBST @ Traff 100-2000 2013 3.648 0.82 9.67<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 000.80-001.10 S 0.30 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.160 0.82 2.52<br />

Dhaka Narayanganj R114 Nayapur-Raipura Road Km 009.35-015.50 S 6.16 1140 Regional Overlay 50mm @ IRI 5-7 2013 <strong>12</strong>.208 0.81 11.60<br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 000.90-001.40 S 0.50 1416 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.996 0.81 3.84<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 018.20-019.10 S 0.90 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 9.<strong>23</strong>6 0.81 7.22<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 011.60-015.50 S 3.90 2489 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 44.484 0.81 33.79<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 008.70-008.80 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.80 0.72<br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 000.10-000.70 S 0.60 1416 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 5.995 0.80 4.54<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 000.00-001.10 S 1.10 1582 Regional DBST 25mm @ 25% Crk 2013 1.766 0.80 3.24<br />

Chittagong Dohazari R171 Banshkhali -Chunti Road Km 008.60-008.80 S 0.20 1514 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.052 0.80 1.55<br />

Dhaka Narsingdi R2<strong>12</strong> Akdaria -Agarpur Road Km 013.02-014.82 S 1.80 1469 Regional DBST @ Traff 100-2000 2013 2.445 0.79 6.29<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 010.70-011.00 S 0.30 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.119 0.79 2.31<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 006.10-006.40 S 0.30 1582 Regional DBST 25mm @ 25% Crk 2013 0.482 0.79 0.87<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 009.30-010.70 S 1.40 535 Regional Overlay 50mm @ IRI 5-7 2013 2.704 0.79 2.38<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 002.90-003.10 S 0.20 1398 Regional DBST 25mm @ 25% Crk 2013 0.272 0.79 0.58<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 0<strong>12</strong>.90-016.94 S 4.04 535 Regional Overlay 50mm @ IRI 5-7 2013 7.798 0.79 6.76<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 010.10-010.20 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.69<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 011.10-011.20 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.69<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 033.70-035.60 S 1.90 464 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.867 0.77 9.54<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 000.70-000.80 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.69<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 000.90-001.00 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.68<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 017.80-018.00 S 0.20 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.052 0.76 1.51<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 014.18-014.68 S 0.50 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.997 0.76 6.<strong>23</strong><br />

Khulna Kushtia R713 Charikoal -Shilahdah Link Road Km 001.50-004.50 S 3.00 1416 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 29.975 0.76 21.44<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 007.70-010.70 S 3.00 <strong>23</strong>26 Regional DBST @ IRI><strong>12</strong> 2013 2.594 0.75 17.09<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 007.80-007.90 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.75 0.67<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 013.50-013.70 S 0.20 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.74 1.32<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.00-0<strong>12</strong>.10 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.74 0.66<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 001.30-001.70 S 0.40 1582 Regional DBST @ Traff 100-2000 2013 0.642 0.73 1.21<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 006.00-006.30 S 0.30 4488 Regional DBST @ IRI><strong>12</strong> 2013 0.282 0.73 1.87<br />

Dhaka Mymensingh R314 Gafargaon-Mawna Road Km 019.60-030.15 S 10.55 1346 Regional DBST 25mm @ 25% Crk 2013 14.753 0.73 20.11<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 003.20-003.30 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.73 0.65<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.90-013.00 S 0.10 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.73 0.65<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 053.93-054.43 S 0.50 1661 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.615 0.73 4.<strong>12</strong><br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 017.08-017.68 S 0.60 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 0.73 7.15<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 005.60-005.70 S 0.10 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 0.72 0.72<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 009.50-009.70 S 0.20 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.72 1.29<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 005.90-006.10 S 0.20 1582 Regional DBST @ IRI><strong>12</strong> 2013 0.321 0.72 1.73<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 003.50-003.70 S 0.20 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.72 1.29<br />

Appendix-A: Page:87 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 002.40-002.60 S 0.20 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.72 1.29<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 021.50-022.00 S 0.50 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.726 0.72 3.21<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 003.80-003.90 S 0.10 6255 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 0.72 1.54<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 002.80-002.90 S 0.10 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.72 0.75<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 001.30-001.50 S 0.20 6255 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 0.72 3.07<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 016.08-016.78 S 0.70 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 0.71 8.21<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 002.90-003.20 S 0.30 1582 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.668 0.71 2.60<br />

Khulna Narail R720 Magura-Narail Road Km 043.40-043.60 S 0.20 1047 Regional DBST 25mm @ 25% Crk 2013 0.272 0.71 0.47<br />

Khulna Jessore N708 Jessore Town Old Section Km 002.70-002.90 L 0.20 3249 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.455 0.71 3.13<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 008.40-009.00 S 0.60 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 6.157 0.71 4.21<br />

Rajshahi Naogaon R547 Naogaon-Badalgachhi-Rohonpur Km 053.13-053.93 S 0.80 1661 Regional DBST 25mm @ 25% Crk 2013 1.328 0.71 1.89<br />

Dhaka Narayanganj R202 Bhulta-Rampura Road Km 000.90-001.00 S 0.10 6255 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 0.71 1.52<br />

Khulna Narail R720 Magura-Narail Road Km 036.60-037.40 S 0.80 1047 Regional DBST @ IRI><strong>12</strong> 2013 1.087 0.71 5.74<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 006.00-006.30 S 0.30 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.836 0.71 1.89<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 000.10-000.30 S 0.20 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.70 1.26<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 026.44-026.54 S 0.10 1096 Regional DBST @ IRI><strong>12</strong> 2013 0.091 0.70 0.48<br />

Khulna Magura R720 Magura-Narail Road Km 002.40-002.80 S 0.40 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.138 0.70 2.81<br />

Chittagong B<strong>and</strong>arban R161 Rangamati -B<strong>and</strong>arban Road Km 032.40-033.10 S 0.70 464 Regional DBST @ IRI><strong>12</strong> 2013 0.622 0.70 3.25<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 016.70-017.00 S 0.30 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.241 0.70 2.17<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 041.56-054.71 S 13.15 715 Regional Overlay 50mm @ IRI 7-9 2013 31.637 0.70 24.95<br />

Khulna Magura R720 Magura-Narail Road Km 018.50-018.60 S 0.10 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.999 0.70 0.66<br />

Sylhet Habiganj R220 Sarail-Habiganj Road Km 025.68-026.40 S 0.72 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 9.697 0.70 6.18<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 007.00-007.70 S 0.70 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.951 0.69 5.08<br />

Khulna Magura R720 Magura-Narail Road Km 010.70-011.10 S 0.40 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.138 0.68 2.70<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 005.50-005.90 S 0.40 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.781 0.66 2.37<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 006.50-007.60 S 1.10 1582 Regional DBST 25mm @ 25% Crk 2013 1.766 0.66 3.00<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 003.50-004.10 S 0.60 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.<strong>23</strong>8 0.66 3.85<br />

Khulna Jessore N708 Jessore Town Old Section Km 002.70-002.90 R 0.20 3249 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.455 0.66 2.90<br />

Khulna Narail R720 Magura-Narail Road Km 037.40-037.70 S 0.30 1047 Regional DBST 25mm @ 25% Crk 2013 0.408 0.66 0.57<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 027.40-030.40 S 3.00 1301 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 21.444 0.64 13.93<br />

Khulna Magura R720 Magura-Narail Road Km 008.50-008.80 S 0.30 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.104 0.64 1.93<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 000.90-001.60 S 0.70 2154 Regional Overlay 50mm @ IRI 5-7 2013 3.749 0.64 3.13<br />

Khulna Magura R720 Magura-Narail Road Km 009.60-010.20 S 0.60 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 6.208 0.64 3.84<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 010.50-0<strong>12</strong>.30 S 1.80 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 32.388 0.64 18.92<br />

Khulna Magura R720 Magura-Narail Road Km 028.10-028.30 S 0.20 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.998 0.64 1.20<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 000.00-000.10 S 0.10 2080 Regional DBST 25mm @ 25% Crk 2013 0.173 0.63 0.24<br />

Khulna Magura R720 Magura-Narail Road Km 032.50-033.00 S 0.50 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.173 0.62 3.11<br />

Khulna Magura R720 Magura-Narail Road Km 015.90-016.10 S 0.20 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.998 0.62 1.17<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 007.40-010.50 S 3.10 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 41.808 0.61 <strong>23</strong>.50<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 006.50-006.70 S 0.20 818 Regional DBST 25mm @ 25% Crk 2013 0.173 0.61 0.22<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 004.40-007.70 S 3.30 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 34.307 0.61 19.56<br />

Appendix-A: Page:88 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Jessore N711 Benapole Town Old Section Km 000.00-001.28 S 1.28 4485 National Full Recon 150mm @ IRI <strong>12</strong> 2013 37.688 0.61 22.32<br />

Khulna Magura R720 Magura-Narail Road Km 026.80-026.90 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.091 0.61 0.42<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 007.70-008.00 S 0.30 570 Regional Overlay 50mm @ IRI 7-9 2013 0.940 0.61 0.66<br />

Khulna Magura R720 Magura-Narail Road Km 024.80-025.10 S 0.30 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.998 0.60 1.69<br />

Khulna Narail R720 Magura-Narail Road Km 033.00-036.60 S 3.60 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 37.246 0.60 21.36<br />

Barisal Barisal N809 Barishal-Lakshmipur Road Km 005.25-006.25 S 1.00 1488 National Full Recon 110mm @ IRI <strong>12</strong> 2013 14.853 0.59 8.32<br />

Rajshahi Pabna N504 Nagarbari -Kashinathpur Road Km 000.00-000.20 S 0.20 2162 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.349 0.58 2.37<br />

Khulna Magura R720 Magura-Narail Road Km 027.10-027.40 S 0.30 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.274 0.58 1.18<br />

Comilla Noakhali R143 Maijdi-Ch<strong>and</strong>raganj Road Km 000.10-000.40 S 0.30 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.397 0.58 2.34<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 000.20-000.30 S 0.10 2080 Regional DBST 25mm @ 25% Crk 2013 0.168 0.57 0.21<br />

Comilla Comilla R144 Laksam Old Section Km 000.00-003.00 S 3.00 2057 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 51.784 0.56 29.20<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 001.50-002.10 S 0.60 4488 Regional DBST @ IRI><strong>12</strong> 2013 0.593 0.55 2.95<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 0<strong>23</strong>.20-0<strong>23</strong>.40 S 0.20 1301 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.052 0.55 1.08<br />

Comilla Comilla R140 Comilla-Begumganj Road Km 000.10-000.20 S 0.10 2080 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.050 0.54 1.06<br />

Khulna Magura R720 Magura-Narail Road Km 0<strong>23</strong>.60-0<strong>23</strong>.90 S 0.30 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.408 0.53 1.61<br />

Khulna Magura R720 Magura-Narail Road Km 005.10-005.30 S 0.20 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.272 0.52 1.06<br />

Khulna Narail R720 Magura-Narail Road Km 040.90-041.00 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.52 0.53<br />

Sylhet Habiganj N204 Jagadishpur-Shaistaganj Km 014.40-014.50 S 0.10 1956 National Full Recon 110mm @ IRI <strong>12</strong> 2013 1.566 0.52 0.79<br />

Chittagong Rangamati R162 Rangamati -Khagrachhari Road Km 022.50-039.66 S 17.16 543 Regional DBST 25mm @ 25% Crk 2013 14.835 0.52 16.49<br />

Rajshahi Natore R548 Naogaon-Atrai-Natore Road Km 040.17-055.36 S 15.19 1939 Regional DBST 25mm @ 25% Crk 2013 13.510 0.51 <strong>12</strong>.93<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 009.00-009.10 S 0.10 2154 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.51 0.61<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 007.30-007.50 S 0.20 1363 National Full Recon 110mm @ IRI <strong>12</strong> 2013 3.025 0.49 1.39<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 026.60-027.20 S 0.60 1301 Regional DBST @ IRI><strong>12</strong> 2013 0.563 0.48 2.10<br />

Chittagong Chittagong R151 Baraiyerhat-Fatikchhari Road Km 025.30-025.70 S 0.40 1301 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.105 0.48 1.88<br />

Chittagong B<strong>and</strong>arban N108 Keranirhat-B<strong>and</strong>arban Road Km 000.10-000.30 S 0.20 1363 National Full Recon 110mm @ IRI <strong>12</strong> 2013 3.462 0.48 1.55<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 093.37-096.57 S 3.20 2269 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 40.507 0.47 19.00<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 062.14-062.20 S 0.06 715 Regional DBST @ Traff 100-2000 2013 0.086 0.46 0.<strong>12</strong><br />

Rajshahi Pabna N504 Nagarbari -Kashinathpur Road Km 000.90-001.40 S 0.50 2162 National DBST @ IRI><strong>12</strong> 2013 0.902 0.46 3.73<br />

Khulna Magura R720 Magura-Narail Road Km 030.10-032.20 S 2.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 2.469 0.45 8.28<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 011.80-011.90 S 0.10 2154 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 0.45 0.69<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 000.50-001.00 S 0.50 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.543 0.44 2.66<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 006.00-006.10 S 0.10 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.43 0.61<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 008.10-010.40 S 2.30 1398 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 <strong>23</strong>.796 0.43 10.<strong>12</strong><br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 101.57-102.47 S 0.90 2269 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 11.393 0.42 4.80<br />

Barisal Bhola R890 Bhola -Char Manika Road Km 072.66-072.80 L 0.14 1779 Regional DBST 25mm @ 25% Crk 2013 0.283 0.41 0.<strong>23</strong><br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 010.<strong>12</strong>-010.17 S 0.05 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.860 0.41 0.34<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 003.40-004.00 S 0.60 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 0.41 2.92<br />

Rangpur Lalmonirhat N509 Barabari-Burimary Road Km 096.57-100.97 S 4.40 2269 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 55.697 0.40 22.43<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 000.10-000.30 S 0.20 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.836 0.40 1.10<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 008.92-009.02 S 0.10 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.40 0.67<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 001.70-001.80 S 0.10 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.40 0.67<br />

Appendix-A: Page:89 of 90


Appendix-A<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Capital Works of National <strong>and</strong> Regional Roads (Excluding Ongoing )<br />

(Sorted by NPV/Cost)<br />

Million Taka<br />

Zone Division<br />

Road<br />

Cway Length<br />

Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 000.70-000.80 S 0.10 2154 Regional DBST 25mm @ 25% Crk 2013 0.270 0.39 0.<strong>23</strong><br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 001.10-001.30 S 0.20 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.511 0.39 1.31<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 005.60-005.70 S 0.10 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.39 0.65<br />

Comilla Comilla R144 Laksam Old Section Km 003.80-003.90 S 0.10 2057 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.228 0.38 0.82<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 0<strong>12</strong>.00-0<strong>12</strong>.40 S 0.40 2154 Regional DBST @ IRI><strong>12</strong> 2013 0.543 0.38 1.80<br />

Chittagong Chittagong R152 Heako-Ramgarh Road Km 003.10-003.30 S 0.20 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.971 0.36 1.04<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 008.30-008.60 S 0.30 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 5.266 0.36 1.83<br />

Comilla Brahmanbaria R220 Sarail-Habiganj Road Km 002.40-003.10 S 0.70 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 0.34 2.88<br />

Chittagong Chittagong R164 Baraichhari-Kaptai Road Km 008.80-008.90 S 0.10 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.33 0.56<br />

Khulna Magura R720 Magura-Narail Road Km 010.40-010.50 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.32 0.32<br />

Chittagong Khagrachari R162 Rangamati -Khagrachhari Road Km 059.76-060.26 S 0.50 <strong>23</strong>7 Regional DBST @ IRI><strong>12</strong> 2013 0.457 0.30 0.92<br />

Rajshahi Pabna N504 Nagarbari -Kashinathpur Road Km 002.30-002.40 S 0.10 2162 National Full Recon 135mm @ IRI <strong>12</strong> 2013 3.208 0.29 0.86<br />

Khulna Magura R720 Magura-Narail Road Km 008.30-008.40 S 0.10 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.29 0.40<br />

Khulna Magura R720 Magura-Narail Road Km 032.30-032.40 S 0.10 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.28 0.40<br />

Khulna Narail R720 Magura-Narail Road Km 038.70-039.30 S 0.60 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 8.9<strong>12</strong> 0.27 2.28<br />

Khulna Magura R720 Magura-Narail Road Km 000.80-001.00 S 0.20 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.971 0.27 0.76<br />

Khulna Narail R720 Magura-Narail Road Km 043.60-046.60 S 3.00 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 44.558 0.27 11.31<br />

Rajshahi Pabna R601 Pabna-Natakhola Ferry Ghat Road Km 016.94-017.24 S 0.30 535 Regional DBST @ IRI><strong>12</strong> 2013 0.274 0.27 0.55<br />

Khulna Narail R720 Magura-Narail Road Km 041.30-043.40 S 2.10 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 31.191 0.27 7.86<br />

Khulna Magura R720 Magura-Narail Road Km 011.20-011.30 S 0.10 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.26 0.36<br />

Khulna Narail R720 Magura-Narail Road Km 037.70-038.50 S 0.80 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 11.882 0.25 2.85<br />

Khulna Narail R720 Magura-Narail Road Km 039.40-040.60 S 1.20 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 17.8<strong>23</strong> 0.25 4.15<br />

Khulna Magura R720 Magura-Narail Road Km 024.10-024.30 S 0.20 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.971 0.24 0.68<br />

Khulna Magura R720 Magura-Narail Road Km 007.40-007.50 S 0.10 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.24 0.34<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 000.80-000.90 S 0.10 2154 Regional DBST @ Traff 2000-4000 2013 0.346 0.<strong>23</strong> 0.00<br />

Chittagong Khagrachari R162 Rangamati -Khagrachhari Road Km 039.66-056.66 S 17.00 <strong>23</strong>7 Regional DBST @ IRI><strong>12</strong> 2013 15.281 0.22 20.81<br />

Khulna Magura R720 Magura-Narail Road Km 000.10-000.40 S 0.30 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.456 0.22 0.92<br />

Khulna Khulna N710 Khulna Town Old Section Km 000.00-000.02 S 0.02 17790 National DBST @ Traff >6000 2013 0.104 0.20 0.04<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 055.42-061.80 S 6.39 715 Regional DBST @ IRI><strong>12</strong> 2013 9.131 0.20 11.50<br />

Chittagong Dohazari R170 Patiya-Chokoria Road Km 062.00-062.14 S 0.14 715 Regional DBST @ IRI><strong>12</strong> 2013 0.200 0.20 0.25<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 000.30-000.40 S 0.10 570 Regional DBST @ IRI><strong>12</strong> 2013 0.148 0.20 0.18<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 000.60-000.70 S 0.10 570 Regional DBST @ IRI><strong>12</strong> 2013 0.148 0.20 0.18<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 000.10-000.20 S 0.10 570 Regional DBST @ IRI><strong>12</strong> 2013 0.148 0.17 0.00<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 004.00-004.30 S 0.30 570 Regional DBST @ IRI><strong>12</strong> 2013 0.445 0.<strong>12</strong> 0.34<br />

Chittagong Cox's Bazar R170 Patiya-Chokoria Road Km 062.30-062.40 S 0.10 715 Regional DBST @ IRI><strong>12</strong> 2013 0.143 0.07 0.06<br />

Chittagong Cox's Bazar R172 Chokoria-Baderkhali Road Km 006.30-006.60 S 0.30 570 Regional DBST @ IRI><strong>12</strong> 2013 0.445 0.07 0.19<br />

Khulna Meherpur R746 Meherpur-Mujibnagar Road Km 000.10-000.70 S 0.60 2154 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 18.178 0.03 0.59<br />

Chittagong Rangamati R161 Rangamati -B<strong>and</strong>arban Road Km 031.90-031.90 S 0.00 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.000 0.00 0.56<br />

Appendix-A: Page:90 of 90


Appendix-B<br />

1st Year Unconstrained Periodic Works for National<br />

<strong>and</strong> Regional Roads. (Excluding ongoing projects)


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

No<br />

Barisal Zone<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

Barisal Division<br />

N8 Dhaka -Patuakhali Road Km 148.55-149.25 S 0.70 11451 National DBST @ Traff >6000 2013 1.262 10.51 67.63<br />

N8 Dhaka -Patuakhali Road Km 149.25-157.50 S 8.25 9061 National Overlay 60mm @ IRI 7-9 2013 29.218 9.78 434.91<br />

N8 Dhaka -Patuakhali Road Km 169.50-171.00 S 1.50 9061 National Overlay 60mm @ IRI 7-9 2013 5.134 8.89 70.52<br />

N8 Dhaka -Patuakhali Road Km 169.50-171.00 S 1.50 9061 National Overlay 60mm @ IRI 7-9 2013 5.134 8.89 70.52<br />

N8 Dhaka -Patuakhali Road Km 140.65-143.85 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 19.228 10.38 281.79<br />

N8 Dhaka -Patuakhali Road Km 143.85-147.05 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 19.228 8.75 247.65<br />

N8 Dhaka -Patuakhali Road Km 147.05-148.25 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.211 10.<strong>12</strong> 107.46<br />

N8 Dhaka -Patuakhali Road Km 148.45-148.55 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.601 <strong>12</strong>.10 10.26<br />

N809 Barishal-Lakshmipur Road Km 002.50-002.85 S 0.35 11451 National DBST @ Traff >6000 2013 0.503 10.93 22.83<br />

N809 Barishal-Lakshmipur Road Km 001.30-001.80 S 0.50 9061 National Overlay 60mm @ IRI 7-9 2013 1.789 10.16 26.64<br />

N809 Barishal-Lakshmipur Road Km 000.00-000.10 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.8<strong>23</strong> 10.33 13.11<br />

R870 Barisal-Pirojpur Road Km 000.00-000.10 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.249 2.35 2.40<br />

R870 Barisal-Pirojpur Road Km 003.80-004.50 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.010 11.75 35.64<br />

R870 Barisal-Pirojpur Road Km 004.70-004.80 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 7.90 3.85<br />

Sub-total Barisal Division<br />

92.732<br />

Bhola Division<br />

N809 Barishal-Lakshmipur Road Km 025.15-025.19 S 0.04 9061 National DBST @ Traff >6000 2013 0.050 5.36 2.99<br />

N809 Barishal-Lakshmipur Road Km 029.39-030.29 S 0.90 9061 National DBST @ Traff >6000 2013 1.2<strong>23</strong> 6.31 31.71<br />

N809 Barishal-Lakshmipur Road Km 024.25-024.55 S 0.30 1488 National DBST @ Traff 100-2000 2013 0.408 2.86 3.74<br />

N809 Barishal-Lakshmipur Road Km 030.39-030.69 S 0.30 9061 National DBST 25mm @ 25% Crk 2013 0.408 7.43 <strong>12</strong>.95<br />

N809 Barishal-Lakshmipur Road Km 030.79-040.88 S 10.09 9061 National Overlay 50mm @ IRI 5-7 2013 28.971 9.15 468.80<br />

R890 Bhola -Char Manika Road Km 004.00-007.20 S 3.20 4887 Regional DBST @ Traff 4000-6000 2013 4.347 5.<strong>12</strong> 97.91<br />

R890 Bhola -Char Manika Road Km 072.66-072.80 L 0.14 1779 Regional DBST 25mm @ 25% Crk 2013 0.283 0.41 0.<strong>23</strong><br />

R890 Bhola -Char Manika Road Km 072.66-072.80 R 0.14 1779 Regional DBST 25mm @ 25% Crk 2013 0.183 0.94 0.33<br />

R890 Bhola -Char Manika Road Km 027.37-035.77 S 8.40 1785 Regional DBST 25mm @ 25% Crk 2013 11.411 1.14 26.32<br />

R890 Bhola -Char Manika Road Km 052.07-072.66 S 20.59 1779 Regional DBST 25mm @ 25% Crk 2013 27.977 1.00 57.17<br />

R890 Bhola -Char Manika Road Km 072.80-073.99 S 1.20 1779 Regional DBST 25mm @ 25% Crk 2013 1.6<strong>23</strong> 1.21 4.19<br />

R890 Bhola -Char Manika Road Km 016.67-027.37 S 10.70 1785 Regional Overlay 50mm @ IRI 7-9 2013 30.717 2.68 97.89<br />

R890 Bhola -Char Manika Road Km 007.20-007.77 S 0.57 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.951 8.01 <strong>23</strong>.24<br />

R890 Bhola -Char Manika Road Km 008.47-015.37 S 6.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 <strong>23</strong>.618 6.15 228.85<br />

R890 Bhola -Char Manika Road Km 035.77-047.57 S 11.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 40.390 6.48 417.21<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-B: Page: 1 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

NPV<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

R890 Bhola -Char Manika Road Km 073.99-097.50 S <strong>23</strong>.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 78.982 6.26 779.21<br />

Sub-total Bhola Division<br />

252.542<br />

Jhalokati Division<br />

R870 Barisal-Pirojpur Road Km 042.87-042.97 S 0.10 22<strong>23</strong> Regional DBST @ Traff 2000-4000 2013 0.136 4.16 2.09<br />

R870 Barisal-Pirojpur Road Km 042.97-043.27 S 0.30 22<strong>23</strong> Regional DBST @ Traff 2000-4000 2013 0.408 1.52 1.75<br />

R870 Barisal-Pirojpur Road Km 043.27-043.47 S 0.20 22<strong>23</strong> Regional DBST @ Traff 2000-4000 2013 0.272 3.81 3.40<br />

R870 Barisal-Pirojpur Road Km 008.00-008.70 S 0.70 4887 Regional DBST @ Traff 4000-6000 2013 0.951 9.52 33.09<br />

R870 Barisal-Pirojpur Road Km 013.75-017.25 S 3.50 4887 Regional DBST @ Traff 4000-6000 2013 4.755 2.64 154.81<br />

R870 Barisal-Pirojpur Road Km 033.47-035.37 S 1.90 22<strong>23</strong> Regional DBST 25mm @ 25% Crk 2013 2.440 2.68 18.96<br />

R870 Barisal-Pirojpur Road Km 035.47-037.37 S 1.90 22<strong>23</strong> Regional DBST 25mm @ 25% Crk 2013 2.581 2.46 19.93<br />

R870 Barisal-Pirojpur Road Km 017.55-018.05 S 0.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.435 7.82 20.40<br />

R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.25-0<strong>23</strong>.55 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 8.22 <strong>12</strong>.87<br />

R870 Barisal-Pirojpur Road Km 031.77-033.37 S 1.60 22<strong>23</strong> Regional Overlay 50mm @ IRI 5-7 2013 4.593 3.50 24.38<br />

R870 Barisal-Pirojpur Road Km 041.77-042.87 S 1.10 22<strong>23</strong> Regional Overlay 50mm @ IRI 5-7 2013 2.584 6.66 21.06<br />

R870 Barisal-Pirojpur Road Km 038.07-039.87 S 1.80 22<strong>23</strong> Regional Overlay 50mm @ IRI 7-9 2013 3.730 5.65 25.82<br />

R870 Barisal-Pirojpur Road Km 043.47-044.05 S 0.58 22<strong>23</strong> Regional Overlay 50mm @ IRI 7-9 2013 1.966 2.58 6.21<br />

R870 Barisal-Pirojpur Road Km 008.90-009.30 S 0.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.369 4.01 18.76<br />

R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.75-025.47 S 1.72 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.891 8.56 82.82<br />

R870 Barisal-Pirojpur Road Km 025.57-026.87 S 1.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.450 7.82 56.<strong>23</strong><br />

Sub-total Jhalokati Division<br />

38.421<br />

Patuakhali Division<br />

N8 Dhaka -Patuakhali Road Km 180.42-187.22 S 6.80 9061 National Overlay 50mm @ IRI 4-7 2013 19.521 8.70 207.95<br />

N8 Dhaka -Patuakhali Road Km 187.82-189.<strong>12</strong> S 1.30 9061 National Overlay 50mm @ IRI 4-7 2013 3.732 13.06 77.73<br />

N8 Dhaka -Patuakhali Road Km 187.22-187.82 S 0.60 9061 National Overlay 60mm @ IRI 7-9 2013 2.054 13.50 40.25<br />

R881 Amtali-Kuakata Road Km 000.00-011.90 S 11.90 3019 Regional DBST @ Traff 2000-4000 2013 11.111 3.61 154.04<br />

R881 Amtali-Kuakata Road Km 017.00-018.29 S 1.29 3019 Regional Overlay 50mm @ IRI 5-7 2013 3.497 4.71 27.47<br />

R881 Amtali-Kuakata Road Km 031.42-032.72 S 1.30 3019 Regional Overlay 50mm @ IRI 7-9 2013 2.511 5.17 21.32<br />

R881 Amtali-Kuakata Road Km 032.82-040.70 S 7.87 3019 Regional Overlay 50mm @ IRI 7-9 2013 15.203 5.33 135.15<br />

Sub-total Patuakhali Division<br />

57.627<br />

Pirojpur Division<br />

R870 Barisal-Pirojpur Road Km 055.07-061.47 S 6.40 3803 Regional DBST @ Traff 2000-4000 2013 7.193 1.72 32.19<br />

Appendix-B: Page: 2 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R870 Barisal-Pirojpur Road Km 053.37-053.97 S 0.60 3892 Regional DBST 25mm @ 25% Crk 2013 0.815 8.87 24.07<br />

R870 Barisal-Pirojpur Road Km 054.07-054.67 S 0.60 3803 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.27 6.45<br />

R870 Barisal-Pirojpur Road Km 062.07-064.24 S 2.18 3581 Regional Overlay 50mm @ IRI 5-7 2013 4.831 2.08 10.63<br />

R870 Barisal-Pirojpur Road Km 052.17-052.47 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 6.48 10.37<br />

Sub-total Pirojpur Division<br />

Total Barisal Zone<br />

15.588<br />

456.9<strong>12</strong><br />

Chittagong Zone<br />

B<strong>and</strong>arban Division<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 005.90-006.10 S 0.20 1363 National DBST @ IRI><strong>12</strong> 2013 0.298 1.14 2.61<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 007.50-009.50 S 2.00 1363 National DBST @ Traff 100-2000 2013 2.796 1.07 8.84<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 009.50-010.30 S 0.80 1363 National DBST @ Traff 100-2000 2013 1.146 2.03 8.57<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 015.70-017.00 S 1.30 1363 National DBST @ Traff 100-2000 2013 1.830 2.07 13.99<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 000.30-000.60 S 0.30 1363 National Overlay 50mm @ IRI 5-9 2013 0.971 1.20 1.47<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 006.30-007.30 S 1.00 1363 National Overlay 50mm @ IRI 5-9 2013 3.<strong>12</strong>1 1.32 5.20<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 010.30-011.50 S 1.20 1363 National Overlay 50mm @ IRI 5-9 2013 3.633 1.28 5.75<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 011.90-014.30 S 2.40 1363 National Overlay 50mm @ IRI 5-9 2013 7.015 1.73 14.41<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 015.00-015.70 S 0.70 1363 National Overlay 50mm @ IRI 5-9 2013 2.083 1.24 3.16<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 017.80-019.30 S 1.50 1363 National Overlay 50mm @ IRI 5-9 2013 4.588 1.75 11.84<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 032.40-033.10 S 0.70 464 Regional DBST @ IRI><strong>12</strong> 2013 0.622 0.70 3.25<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 038.70-038.84 S 0.14 3019 Regional DBST @ Traff 2000-4000 2013 0.<strong>12</strong>4 1.62 1.61<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 058.04-061.17 S 3.14 4887 Regional DBST 25mm @ 25% Crk 2013 5.464 3.64 84.86<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 033.10-033.70 S 0.60 464 Regional Overlay 50mm @ IRI 7-9 2013 1.<strong>12</strong>7 1.65 2.38<br />

Sub-total B<strong>and</strong>arban Division<br />

34.820<br />

Chittagong Division<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 216.08-216.68 S 0.60 11451 National DBST @ Traff >6000 2013 0.948 11.71 51.73<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 217.88-218.18 S 0.30 11451 National DBST @ Traff >6000 2013 0.526 11.50 29.68<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 219.78-219.98 S 0.20 11451 National DBST @ Traff >6000 2013 0.351 8.58 10.36<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 225.28-225.58 S 0.30 11451 National DBST @ Traff >6000 2013 0.771 14.64 51.60<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 228.86-228.96 S 0.10 11451 National DBST @ Traff >6000 2013 0.210 17.45 16.76<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 225.98-226.08 S 0.10 9061 National DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>8 8.80 3.76<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 228.76-228.86 S 0.10 11451 National Overlay 50mm @ IRI 4 2013 0.444 10.46 7.92<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 228.96-229.26 S 0.30 11451 National Overlay 50mm @ IRI 4 2013 1.331 8.49 19.28<br />

Appendix-B: Page: 3 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 170.18-170.38 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 8.35 15.18<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 170.48-171.08 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 3.704 11.14 58.21<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 171.18-171.48 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.852 13.44 33.78<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 171.78-171.98 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 <strong>12</strong>.19 21.24<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 173.18-174.38 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.507 <strong>12</strong>.00 <strong>12</strong>2.17<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 174.38-174.58 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.251 18.32 31.10<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 174.58-175.38 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 5.005 13.72 84.77<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 176.58-176.88 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.901 <strong>12</strong>.89 34.58<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 176.98-179.48 S 2.50 11451 National Overlay 80mm @ IRI 4-9 2013 16.195 <strong>12</strong>.22 279.27<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 179.58-182.88 S 3.30 11451 National Overlay 80mm @ IRI 4-9 2013 20.915 10.<strong>12</strong> 342.32<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 182.98-183.08 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.630 13.37 14.62<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 190.28-193.88 S 3.60 11451 National Overlay 80mm @ IRI 4-9 2013 19.261 10.67 305.66<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 195.28-195.58 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.457 10.66 22.11<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 199.68-200.38 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.457 15.82 69.08<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 200.48-200.68 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.103 15.72 21.90<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 200.78-201.08 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.654 <strong>12</strong>.43 29.28<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 203.58-204.98 S 1.40 11451 National Overlay 80mm @ IRI 4-9 2013 11.985 8.29 140.19<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 205.18-205.78 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 5.136 10.53 73.38<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 206.08-208.98 S 2.90 11451 National Overlay 80mm @ IRI 4-9 2013 24.825 8.78 307.75<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 209.08-209.28 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.7<strong>12</strong> 9.78 20.68<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 209.38-210.08 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.391 9.09 49.25<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 210.48-211.18 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.688 11.27 47.02<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 211.38-213.18 S 1.80 11451 National Overlay 80mm @ IRI 4-9 2013 9.482 10.88 145.64<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 214.68-215.78 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.918 9.90 100.89<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 216.78-217.08 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 10.46 28.28<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 218.18-218.48 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 14.78 36.30<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 218.48-218.58 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.584 11.72 9.59<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 219.08-219.48 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.338 15.24 43.59<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 219.48-219.78 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 20.41 43.78<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 220.48-222.98 S 2.50 11451 National Overlay 80mm @ IRI 4-9 2013 19.981 13.45 331.83<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 224.18-225.28 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 8.357 10.67 110.09<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 226.38-226.78 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.799 14.52 50.17<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 227.08-227.46 S 0.38 11451 National Overlay 80mm @ IRI 4-9 2013 2.680 11.56 38.24<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 227.56-227.76 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.399 11.88 20.53<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm <strong>23</strong>3.46-241.30 S 7.83 11451 National Overlay 80mm @ IRI 4-9 2013 92.211 6.08 760.68<br />

Appendix-B: Page: 4 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 241.30-243.04 S 1.75 11451 National Overlay 80mm @ IRI 4-9 2013 9.980 8.77 133.04<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 243.14-243.34 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.185 10.16 17.73<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 243.44-244.04 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 3.556 8.83 46.22<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 244.34-244.44 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.658 10.25 10.40<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 244.54-244.84 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.975 9.50 28.92<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 245.34-245.84 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.992 8.<strong>23</strong> 50.65<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 245.94-246.17 S 0.<strong>23</strong> 11451 National Overlay 80mm @ IRI 4-9 2013 2.289 3.97 11.11<br />

N106 Chittagong-Rangamati Road Km 004.20-004.30 S 0.10 13468 National DBST @ Traff >6000 2013 0.198 6.83 6.88<br />

N106 Chittagong-Rangamati Road Km 005.90-006.10 S 0.20 13468 National DBST @ Traff >6000 2013 0.278 10.40 13.86<br />

N106 Chittagong-Rangamati Road Km 013.10-013.50 S 0.40 11451 National Overlay 50mm @ IRI 5 2013 1.211 18.97 31.17<br />

N106 Chittagong-Rangamati Road Km 013.70-014.00 S 0.30 11451 National Overlay 50mm @ IRI 5 2013 0.908 19.62 24.18<br />

N106 Chittagong-Rangamati Road Km 000.00-000.20 S 0.20 13468 National Overlay 80mm @ IRI 5-9 2013 1.317 8.61 14.00<br />

N106 Chittagong-Rangamati Road Km 002.10-002.60 S 0.50 13468 National Overlay 80mm @ IRI 5-9 2013 3.292 8.09 37.58<br />

N106 Chittagong-Rangamati Road Km 003.90-004.10 S 0.20 13468 National Overlay 80mm @ IRI 5-9 2013 1.317 9.26 17.96<br />

N106 Chittagong-Rangamati Road Km 005.30-005.60 S 0.30 13468 National Overlay 80mm @ IRI 5-9 2013 1.432 11.65 24.57<br />

N106 Chittagong-Rangamati Road Km 0<strong>12</strong>.90-013.00 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.477 20.44 10.58<br />

N106 Chittagong-Rangamati Road Km 014.10-014.60 S 0.50 11451 National Overlay 80mm @ IRI 5-9 2013 2.387 16.55 42.84<br />

N106 Chittagong-Rangamati Road Km 014.90-015.20 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.432 17.28 26.84<br />

N106 Chittagong-Rangamati Road Km 015.30-016.10 S 0.80 11451 National Overlay 80mm @ IRI 5-9 2013 3.997 19.92 88.08<br />

N106 Chittagong-Rangamati Road Km 016.30-017.20 S 0.90 11451 National Overlay 80mm @ IRI 5-9 2013 5.037 17.71 104.57<br />

N106 Chittagong-Rangamati Road Km 017.30-018.60 S 1.30 11451 National Overlay 80mm @ IRI 5-9 2013 7.276 13.22 1<strong>12</strong>.70<br />

N106 Chittagong-Rangamati Road Km 019.30-021.20 S 1.90 11451 National Overlay 80mm @ IRI 5-9 2013 9.071 16.81 165.27<br />

N106 Chittagong-Rangamati Road Km 021.80-022.20 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 1.910 24.14 52.14<br />

N106 Chittagong-Rangamati Road Km 022.60-0<strong>23</strong>.00 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 1.910 26.05 56.27<br />

N106 Chittagong-Rangamati Road Km 0<strong>23</strong>.60-027.80 S 4.20 11451 National Overlay 80mm @ IRI 5-9 2013 20.570 19.66 447.43<br />

N106 Chittagong-Rangamati Road Km 027.80-030.00 S 2.20 11451 National Overlay 80mm @ IRI 5-9 2013 10.503 16.49 206.03<br />

R151 Baraiyerhat-Fatikchhari Road Km 013.80-014.00 S 0.20 1484 Regional DBST @ IRI><strong>12</strong> 2013 0.188 1.05 1.54<br />

R151 Baraiyerhat-Fatikchhari Road Km 017.00-017.30 S 0.30 1484 Regional DBST @ IRI><strong>12</strong> 2013 0.282 1.73 3.79<br />

R151 Baraiyerhat-Fatikchhari Road Km 019.20-021.70 S 2.50 1378 Regional DBST @ IRI><strong>12</strong> 2013 2.347 0.92 16.83<br />

R151 Baraiyerhat-Fatikchhari Road Km 026.60-027.20 S 0.60 1301 Regional DBST @ IRI><strong>12</strong> 2013 0.563 0.48 2.10<br />

R151 Baraiyerhat-Fatikchhari Road Km 004.70-005.50 S 0.80 1484 Regional DBST @ Traff 100-2000 2013 0.751 3.35 8.70<br />

R151 Baraiyerhat-Fatikchhari Road Km 014.00-014.20 S 0.20 1484 Regional DBST @ Traff 100-2000 2013 0.188 3.11 1.60<br />

R151 Baraiyerhat-Fatikchhari Road Km 014.20-016.90 S 2.70 1484 Regional DBST @ Traff 100-2000 2013 2.534 3.03 25.82<br />

R151 Baraiyerhat-Fatikchhari Road Km 003.20-003.30 S 0.10 3019 Regional DBST @ Traff 2000-4000 2013 0.094 7.31 1.96<br />

R151 Baraiyerhat-Fatikchhari Road Km 004.60-004.70 S 0.10 1484 Regional DBST 25mm @ 25% Crk 2013 0.094 3.62 0.77<br />

Appendix-B: Page: 5 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R151 Baraiyerhat-Fatikchhari Road Km 000.00-000.80 S 0.80 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.587 6.60 <strong>12</strong>.45<br />

R151 Baraiyerhat-Fatikchhari Road Km 001.60-003.00 S 1.40 3019 Regional Overlay 50mm @ IRI 5-7 2013 2.777 6.30 20.27<br />

R151 Baraiyerhat-Fatikchhari Road Km 003.50-004.20 S 0.70 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.388 8.30 15.07<br />

R151 Baraiyerhat-Fatikchhari Road Km 0<strong>12</strong>.40-013.80 S 1.40 1484 Regional Overlay 50mm @ IRI 5-7 2013 2.777 4.04 13.72<br />

R151 Baraiyerhat-Fatikchhari Road Km 025.70-026.60 S 0.90 1301 Regional Overlay 50mm @ IRI 5-7 2013 1.785 1.87 3.91<br />

R151 Baraiyerhat-Fatikchhari Road Km 027.20-027.40 S 0.20 1301 Regional Overlay 50mm @ IRI 5-7 2013 0.397 2.35 1.04<br />

R151 Baraiyerhat-Fatikchhari Road Km 000.90-001.50 S 0.60 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.190 7.47 <strong>12</strong>.53<br />

R151 Baraiyerhat-Fatikchhari Road Km 004.50-004.60 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.198 10.42 3.16<br />

R151 Baraiyerhat-Fatikchhari Road Km 005.70-008.40 S 2.70 1484 Regional Overlay 50mm @ IRI 7-9 2013 5.989 3.09 <strong>23</strong>.39<br />

R151 Baraiyerhat-Fatikchhari Road Km 009.00-009.20 S 0.20 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.397 4.65 2.33<br />

R151 Baraiyerhat-Fatikchhari Road Km 009.70-011.00 S 1.30 1484 Regional Overlay 50mm @ IRI 7-9 2013 2.578 4.41 13.92<br />

R151 Baraiyerhat-Fatikchhari Road Km 017.60-017.80 S 0.20 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.397 5.34 3.<strong>12</strong><br />

R151 Baraiyerhat-Fatikchhari Road Km 018.00-018.20 S 0.20 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.397 5.04 2.45<br />

R151 Baraiyerhat-Fatikchhari Road Km 019.10-019.20 S 0.10 1484 Regional Overlay 50mm @ IRI 7-9 2013 0.198 5.19 1.19<br />

R151 Baraiyerhat-Fatikchhari Road Km 021.70-021.80 S 0.10 1301 Regional Overlay 50mm @ IRI 7-9 2013 0.198 4.28 0.96<br />

R151 Baraiyerhat-Fatikchhari Road Km 022.50-0<strong>23</strong>.20 S 0.70 1301 Regional Overlay 50mm @ IRI 7-9 2013 1.388 3.20 5.61<br />

R151 Baraiyerhat-Fatikchhari Road Km 0<strong>23</strong>.40-025.30 S 1.90 1301 Regional Overlay 50mm @ IRI 7-9 2013 3.768 2.95 13.59<br />

R152 Heako-Ramgarh Road Km 002.80-002.90 S 0.10 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.72 0.75<br />

R152 Heako-Ramgarh Road Km 007.00-007.70 S 0.70 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.951 0.69 5.08<br />

R152 Heako-Ramgarh Road Km 010.50-010.80 S 0.30 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.346 0.90 2.33<br />

R152 Heako-Ramgarh Road Km 0<strong>12</strong>.60-0<strong>12</strong>.80 S 0.20 1398 Regional DBST @ IRI><strong>12</strong> 2013 0.198 1.44 2.21<br />

R152 Heako-Ramgarh Road Km 003.80-004.20 S 0.40 1398 Regional DBST @ Traff 100-2000 2013 0.543 1.41 2.58<br />

R152 Heako-Ramgarh Road Km 014.00-014.20 S 0.20 1398 Regional DBST @ Traff 100-2000 2013 0.198 3.01 2.05<br />

R152 Heako-Ramgarh Road Km 015.00-016.70 S 1.70 1398 Regional DBST @ Traff 100-2000 2013 1.680 1.32 5.42<br />

R152 Heako-Ramgarh Road Km 002.70-002.80 S 0.10 1398 Regional DBST 25mm @ 25% Crk 2013 0.136 0.99 0.24<br />

R152 Heako-Ramgarh Road Km 002.90-003.10 S 0.20 1398 Regional DBST 25mm @ 25% Crk 2013 0.272 0.79 0.58<br />

R152 Heako-Ramgarh Road Km 017.00-017.66 S 0.66 1398 Regional DBST 25mm @ 25% Crk 2013 0.654 1.<strong>23</strong> 1.68<br />

R152 Heako-Ramgarh Road Km 000.30-001.10 S 0.80 1398 Regional Overlay 50mm @ IRI 5-7 2013 1.841 2.33 5.45<br />

R152 Heako-Ramgarh Road Km 006.10-007.00 S 0.90 1398 Regional Overlay 50mm @ IRI 5-7 2013 2.584 1.28 3.94<br />

R152 Heako-Ramgarh Road Km 010.40-010.50 S 0.10 1398 Regional Overlay 50mm @ IRI 5-7 2013 0.287 1.49 0.52<br />

R152 Heako-Ramgarh Road Km 010.80-011.00 S 0.20 1398 Regional Overlay 50mm @ IRI 5-7 2013 0.418 2.52 1.22<br />

R152 Heako-Ramgarh Road Km 011.90-0<strong>12</strong>.60 S 0.70 1398 Regional Overlay 50mm @ IRI 5-7 2013 1.461 2.42 3.91<br />

R152 Heako-Ramgarh Road Km 001.20-002.20 S 1.00 1398 Regional Overlay 50mm @ IRI 7-9 2013 1.926 4.09 9.96<br />

R152 Heako-Ramgarh Road Km 003.30-003.80 S 0.50 1398 Regional Overlay 50mm @ IRI 7-9 2013 1.435 1.20 2.19<br />

R152 Heako-Ramgarh Road Km 004.20-006.00 S 1.80 1398 Regional Overlay 50mm @ IRI 7-9 2013 5.167 1.21 8.09<br />

Appendix-B: Page: 6 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R152 Heako-Ramgarh Road Km 007.70-008.10 S 0.40 1398 Regional Overlay 50mm @ IRI 7-9 2013 1.148 1.65 2.39<br />

R152 Heako-Ramgarh Road Km 0<strong>12</strong>.80-014.00 S 1.20 1398 Regional Overlay 50mm @ IRI 7-9 2013 2.505 2.27 6.77<br />

R152 Heako-Ramgarh Road Km 014.60-015.00 S 0.40 1398 Regional Overlay 50mm @ IRI 7-9 2013 0.835 2.49 2.41<br />

R160 Hathazari-Khagrachhari Road Km 025.10-025.40 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.385 13.02 18.78<br />

R160 Hathazari-Khagrachhari Road Km 000.00-000.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.173 1.51 0.49<br />

R160 Hathazari-Khagrachhari Road Km 017.10-017.60 S 0.50 5045 Regional DBST 25mm @ 25% Crk 2013 0.692 2.71 6.52<br />

R160 Hathazari-Khagrachhari Road Km 019.90-020.30 S 0.40 5045 Regional DBST 25mm @ 25% Crk 2013 0.553 2.53 4.82<br />

R160 Hathazari-Khagrachhari Road Km 020.40-021.10 S 0.70 5045 Regional DBST 25mm @ 25% Crk 2013 0.968 2.41 4.81<br />

R160 Hathazari-Khagrachhari Road Km 021.60-0<strong>23</strong>.20 S 1.60 4406 Regional DBST 25mm @ 25% Crk 2013 2.213 5.11 39.60<br />

R160 Hathazari-Khagrachhari Road Km 017.70-018.40 S 0.70 5045 Regional Overlay 60mm @ IRI 5.5-9 2013 2.440 3.68 10.31<br />

R160 Hathazari-Khagrachhari Road Km 018.50-019.50 S 1.00 5045 Regional Overlay 60mm @ IRI 5.5-9 2013 3.485 4.69 19.27<br />

R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.40-0<strong>23</strong>.50 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.349 <strong>12</strong>.36 5.89<br />

R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.90-024.10 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.551 11.92 9.27<br />

R160 Hathazari-Khagrachhari Road Km 026.00-029.00 S 3.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 9.709 <strong>12</strong>.14 144.29<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 021.80-022.50 S 0.70 76<strong>12</strong> Regional DBST @ Traff >6000 2013 0.951 6.91 24.02<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 0<strong>23</strong>.70-024.40 S 0.70 76<strong>12</strong> Regional DBST @ Traff >6000 2013 0.951 6.69 <strong>23</strong>.25<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.00-000.10 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.131 5.88 3.33<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 011.90-013.00 S 1.10 4887 Regional DBST @ Traff 4000-6000 2013 1.494 8.86 47.34<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 032.10-033.27 S 1.17 4887 Regional DBST @ Traff 4000-6000 2013 1.589 5.57 39.74<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.20-007.30 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.131 5.26 2.85<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.90-016.40 S 2.50 5687 Regional DBST 25mm @ 25% Crk 2013 3.396 4.41 49.36<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.50-016.60 S 0.10 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.136 4.92 1.45<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.90-017.50 S 0.60 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.815 3.26 8.65<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.50-020.80 S 0.30 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.408 3.39 4.44<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 0<strong>23</strong>.00-0<strong>23</strong>.70 S 0.70 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.951 2.40 5.18<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 024.40-024.50 S 0.10 76<strong>12</strong> Regional DBST 25mm @ 25% Crk 2013 0.136 6.09 1.94<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.00-031.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 5.87 3.44<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.10-013.40 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 11.85 13.14<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.60-013.80 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 10.18 8.17<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.20-031.30 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 7.81 4.00<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 017.60-018.00 S 0.40 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 6.02 8.77<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 018.20-019.20 S 1.00 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 5.27 19.18<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 019.90-020.40 S 0.50 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 5.90 10.95<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.90-021.40 S 0.50 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 5.51 10.22<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 021.60-021.80 S 0.20 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 0.685 7.89 5.97<br />

Appendix-B: Page: 7 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 022.50-022.80 S 0.30 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.027 7.08 8.04<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 024.50-024.90 S 0.40 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 6.86 11.17<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 024.90-027.00 S 2.10 76<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 7.188 5.36 42.59<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.30-000.50 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.660 6.87 7.06<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.00-007.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.330 8.61 4.53<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.40-008.30 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.969 6.80 31.81<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.60-009.40 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.669 6.60 27.73<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.70-009.90 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 7.89 8.61<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.40-010.70 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 7.97 13.24<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.90-011.60 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.396 6.57 24.78<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 029.00-029.20 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 8.79 9.87<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 029.80-030.10 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 8.05 13.37<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.40-030.50 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.56 5.37<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.60-030.70 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.58 5.39<br />

R164 Baraichhari-Kaptai Road Km 005.90-006.10 S 0.20 1582 Regional DBST @ IRI><strong>12</strong> 2013 0.321 0.72 1.73<br />

R164 Baraichhari-Kaptai Road Km 001.30-001.70 S 0.40 1582 Regional DBST @ Traff 100-2000 2013 0.642 0.73 1.21<br />

R164 Baraichhari-Kaptai Road Km 006.40-006.50 S 0.10 1582 Regional DBST @ Traff 100-2000 2013 0.161 1.48 0.81<br />

R164 Baraichhari-Kaptai Road Km 007.60-007.90 S 0.30 1582 Regional DBST @ Traff 100-2000 2013 0.482 1.41 2.30<br />

R164 Baraichhari-Kaptai Road Km 000.00-001.10 S 1.10 1582 Regional DBST 25mm @ 25% Crk 2013 1.766 0.80 3.24<br />

R164 Baraichhari-Kaptai Road Km 006.10-006.40 S 0.30 1582 Regional DBST 25mm @ 25% Crk 2013 0.482 0.79 0.87<br />

R164 Baraichhari-Kaptai Road Km 006.50-007.60 S 1.10 1582 Regional DBST 25mm @ 25% Crk 2013 1.766 0.66 3.00<br />

R164 Baraichhari-Kaptai Road Km 008.60-008.80 S 0.20 1582 Regional Overlay 50mm @ IRI 5-7 2013 0.679 1.<strong>12</strong> 0.90<br />

R164 Baraichhari-Kaptai Road Km 008.90-008.92 S 0.02 1582 Regional Overlay 50mm @ IRI 5-7 2013 0.054 1.26 0.08<br />

Sub-total Chittagong Division<br />

526.577<br />

Cox's Bazar Division<br />

N110 Link Road-Cox's Bazar Road Km 005.00-005.20 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.136 10.58 15.19<br />

N110 Link Road-Cox's Bazar Road Km 005.40-005.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.568 <strong>12</strong>.45 9.98<br />

N110 Link Road-Cox's Bazar Road Km 006.00-006.20 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.136 14.15 20.31<br />

N110 Link Road-Cox's Bazar Road Km 006.50-007.70 S 1.20 11451 National Overlay 80mm @ IRI 5-9 2013 7.072 9.70 93.04<br />

R170 Patiya-Chokoria Road Km 062.30-062.40 S 0.10 715 Regional DBST @ IRI><strong>12</strong> 2013 0.143 0.07 0.06<br />

R170 Patiya-Chokoria Road Km 062.14-062.20 S 0.06 715 Regional DBST @ Traff 100-2000 2013 0.086 0.46 0.<strong>12</strong><br />

R170 Patiya-Chokoria Road Km 063.10-063.20 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.302 16.80 6.33<br />

R170 Patiya-Chokoria Road Km 064.00-064.20 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.604 15.96 <strong>12</strong>.41<br />

R170 Patiya-Chokoria Road Km 065.30-065.80 S 0.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.511 15.42 29.02<br />

Appendix-B: Page: 8 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R170 Patiya-Chokoria Road Km 069.90-071.00 S 1.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.324 13.06 55.89<br />

R170 Patiya-Chokoria Road Km 064.40-065.10 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.522 16.70 50.11<br />

R170 Patiya-Chokoria Road Km 067.40-068.60 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.324 13.38 67.02<br />

R170 Patiya-Chokoria Road Km 069.20-069.40 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.721 15.99 14.11<br />

R170 Patiya-Chokoria Road Km 071.70-072.20 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.802 14.83 31.79<br />

R172 Chokoria-Baderkhali Road Km 000.10-000.20 S 0.10 570 Regional DBST @ IRI><strong>12</strong> 2013 0.148 0.17 0.00<br />

R172 Chokoria-Baderkhali Road Km 000.30-000.40 S 0.10 570 Regional DBST @ IRI><strong>12</strong> 2013 0.148 0.20 0.18<br />

R172 Chokoria-Baderkhali Road Km 000.60-000.70 S 0.10 570 Regional DBST @ IRI><strong>12</strong> 2013 0.148 0.20 0.18<br />

R172 Chokoria-Baderkhali Road Km 004.00-004.30 S 0.30 570 Regional DBST @ IRI><strong>12</strong> 2013 0.445 0.<strong>12</strong> 0.34<br />

R172 Chokoria-Baderkhali Road Km 006.30-006.60 S 0.30 570 Regional DBST @ IRI><strong>12</strong> 2013 0.445 0.07 0.19<br />

R172 Chokoria-Baderkhali Road Km 011.80-011.90 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.313 11.92 5.68<br />

R172 Chokoria-Baderkhali Road Km 014.80-015.30 S 0.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.566 11.59 27.72<br />

R172 Chokoria-Baderkhali Road Km 007.70-008.00 S 0.30 570 Regional Overlay 50mm @ IRI 7-9 2013 0.940 0.61 0.66<br />

R172 Chokoria-Baderkhali Road Km 016.10-017.83 S 1.73 4887 Regional Overlay 60mm @ IRI 7-9 2013 6.460 6.28 62.10<br />

R180 Laharpur-Laboni More Road Km 000.20-000.30 S 0.10 4993 Regional DBST @ Traff 4000-6000 2013 0.148 4.71 2.43<br />

R180 Laharpur-Laboni More Road Km 000.00-000.20 S 0.20 4993 Regional DBST 25mm @ 25% Crk 2013 0.296 1.32 0.67<br />

Sub-total Cox's Bazar Division<br />

36.308<br />

Dohazari Division<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 301.08-302.18 S 1.10 11451 National DBST @ Traff >6000 2013 1.956 8.64 89.29<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 246.94-247.14 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 2.017 3.95 9.47<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 251.94-254.84 S 2.90 11451 National Overlay 80mm @ IRI 4-9 2013 15.826 <strong>12</strong>.13 270.95<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 254.94-255.14 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.103 11.67 18.18<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 255.44-255.54 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.551 9.84 8.16<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 275.58-276.58 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 4.782 10.52 71.64<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 276.88-277.08 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.955 10.79 15.48<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 278.48-278.78 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.432 14.39 32.45<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 281.18-283.58 S 2.40 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.<strong>12</strong>9 10.31 176.50<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 283.78-284.28 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 2.881 13.37 53.95<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 284.58-285.68 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.175 11.59 97.93<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 291.08-292.18 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 5.885 10.85 94.97<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 292.28-294.88 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 13.740 10.03 205.01<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 298.78-300.48 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 9.459 19.58 226.76<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 300.68-300.88 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.185 9.42 16.45<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 302.58-302.98 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.371 10.57 36.89<br />

Appendix-B: Page: 9 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 303.08-303.38 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.753 16.60 37.17<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 303.48-303.88 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.305 14.35 46.29<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 303.98-304.18 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.152 16.49 24.27<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 304.68-304.88 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.152 16.33 26.35<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 305.08-305.78 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.860 16.78 81.83<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 309.18-309.88 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 3.872 <strong>12</strong>.65 72.85<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 309.98-310.98 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 5.482 9.57 78.04<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 311.28-3<strong>12</strong>.98 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 9.<strong>23</strong>5 10.76 140.25<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 313.38-314.48 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 5.976 16.<strong>23</strong> <strong>12</strong>6.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 314.58-315.17 S 0.59 11451 National Overlay 80mm @ IRI 4-9 2013 3.222 16.32 68.71<br />

R170 Patiya-Chokoria Road Km 055.42-061.80 S 6.39 715 Regional DBST @ IRI><strong>12</strong> 2013 9.131 0.20 11.50<br />

R170 Patiya-Chokoria Road Km 062.00-062.14 S 0.14 715 Regional DBST @ IRI><strong>12</strong> 2013 0.200 0.20 0.25<br />

R170 Patiya-Chokoria Road Km 009.10-009.50 S 0.40 3516 Regional DBST @ Traff 2000-4000 2013 0.346 2.80 2.45<br />

R170 Patiya-Chokoria Road Km 009.70-010.10 S 0.40 3516 Regional DBST @ Traff 2000-4000 2013 0.346 2.85 2.50<br />

R170 Patiya-Chokoria Road Km 019.70-020.20 S 0.50 4887 Regional DBST @ Traff 4000-6000 2013 0.498 10.63 17.77<br />

R170 Patiya-Chokoria Road Km 001.00-001.40 S 0.40 3516 Regional DBST 25mm @ 25% Crk 2013 0.375 2.55 1.90<br />

R170 Patiya-Chokoria Road Km 008.80-008.90 S 0.10 3516 Regional DBST 25mm @ 25% Crk 2013 0.086 5.46 1.04<br />

R170 Patiya-Chokoria Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.089 6.44 1.61<br />

R170 Patiya-Chokoria Road Km 000.30-000.70 S 0.40 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.793 3.83 3.13<br />

R170 Patiya-Chokoria Road Km 000.80-000.90 S 0.10 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.198 6.91 1.41<br />

R170 Patiya-Chokoria Road Km 003.30-003.50 S 0.20 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.365 5.86 2.24<br />

R170 Patiya-Chokoria Road Km 007.90-008.00 S 0.10 3516 Regional Overlay 50mm @ IRI 5-7 2013 0.183 8.39 1.70<br />

R170 Patiya-Chokoria Road Km 010.20-011.10 S 0.90 3181 Regional Overlay 50mm @ IRI 5-7 2013 1.588 6.61 <strong>12</strong>.85<br />

R170 Patiya-Chokoria Road Km 011.20-0<strong>12</strong>.00 S 0.80 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.378 7.90 13.33<br />

R170 Patiya-Chokoria Road Km 0<strong>12</strong>.50-0<strong>12</strong>.90 S 0.40 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.737 7.65 6.70<br />

R170 Patiya-Chokoria Road Km 002.60-003.20 S 0.60 3516 Regional Overlay 50mm @ IRI 7-9 2013 1.159 3.77 5.52<br />

R170 Patiya-Chokoria Road Km 003.70-005.50 S 1.80 3516 Regional Overlay 50mm @ IRI 7-9 2013 3.288 3.68 13.70<br />

R170 Patiya-Chokoria Road Km 006.30-006.40 S 0.10 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.183 8.02 1.85<br />

R170 Patiya-Chokoria Road Km 006.90-007.00 S 0.10 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.183 8.17 1.83<br />

R170 Patiya-Chokoria Road Km 007.40-007.80 S 0.40 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.731 5.58 5.33<br />

R170 Patiya-Chokoria Road Km 008.90-009.10 S 0.20 3516 Regional Overlay 50mm @ IRI 7-9 2013 0.365 6.43 3.07<br />

R170 Patiya-Chokoria Road Km 013.00-013.50 S 0.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.940 8.39 10.31<br />

R170 Patiya-Chokoria Road Km 041.56-054.71 S 13.15 715 Regional Overlay 50mm @ IRI 7-9 2013 31.637 0.70 24.95<br />

R170 Patiya-Chokoria Road Km 020.70-020.90 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.518 19.69 <strong>12</strong>.48<br />

R171 Banshkhali -Chunti Road Km 002.40-002.90 S 0.50 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.469 1.<strong>12</strong> 4.05<br />

Appendix-B: Page: 10 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R171 Banshkhali -Chunti Road Km 003.00-003.80 S 0.80 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.751 1.53 8.80<br />

R171 Banshkhali -Chunti Road Km 004.40-004.80 S 0.40 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.375 1.53 4.40<br />

R171 Banshkhali -Chunti Road Km 009.30-010.00 S 0.70 1514 Regional DBST @ IRI><strong>12</strong> 2013 0.657 1.08 5.44<br />

R171 Banshkhali -Chunti Road Km 002.90-003.00 S 0.10 1514 Regional Overlay 50mm @ IRI 5-7 2013 0.198 5.31 1.14<br />

Sub-total Dohazari Division<br />

178.226<br />

Khagrachari Division<br />

R160 Hathazari-Khagrachhari Road Km 078.32-078.52 S 0.20 3019 Regional DBST @ Traff 2000-4000 2013 0.178 5.99 3.13<br />

R160 Hathazari-Khagrachhari Road Km 080.32-080.52 S 0.20 3019 Regional DBST @ Traff 2000-4000 2013 0.178 3.67 2.36<br />

R160 Hathazari-Khagrachhari Road Km 055.80-055.82 S 0.02 3362 Regional DBST 25mm @ 25% Crk 2013 0.018 <strong>12</strong>.65 0.65<br />

R160 Hathazari-Khagrachhari Road Km 042.60-042.70 S 0.10 3362 Regional Overlay 50mm @ IRI 5-7 2013 0.198 11.96 2.82<br />

R160 Hathazari-Khagrachhari Road Km 035.00-035.10 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.198 9.26 2.81<br />

R160 Hathazari-Khagrachhari Road Km 037.10-039.30 S 2.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 4.421 5.85 35.06<br />

R160 Hathazari-Khagrachhari Road Km 041.00-041.50 S 0.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.986 6.07 8.<strong>12</strong><br />

R160 Hathazari-Khagrachhari Road Km 046.70-049.10 S 2.40 3362 Regional Overlay 50mm @ IRI 7-9 2013 4.760 7.59 48.99<br />

R160 Hathazari-Khagrachhari Road Km 049.20-050.00 S 0.80 3362 Regional Overlay 50mm @ IRI 7-9 2013 1.587 7.49 15.53<br />

R160 Hathazari-Khagrachhari Road Km 051.20-051.40 S 0.20 3362 Regional Overlay 50mm @ IRI 7-9 2013 0.397 7.<strong>23</strong> 3.51<br />

R160 Hathazari-Khagrachhari Road Km 051.50-051.60 S 0.10 3362 Regional Overlay 50mm @ IRI 7-9 2013 0.198 10.80 2.55<br />

R160 Hathazari-Khagrachhari Road Km 080.02-080.22 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.376 4.46 2.75<br />

R160 Hathazari-Khagrachhari Road Km 083.82-084.<strong>12</strong> S 0.30 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.564 4.59 4.32<br />

R160 Hathazari-Khagrachhari Road Km 040.10-040.70 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.811 11.53 24.19<br />

R162 Rangamati -Khagrachhari Road Km 039.66-056.66 S 17.00 <strong>23</strong>7 Regional DBST @ IRI><strong>12</strong> 2013 15.281 0.22 20.81<br />

R162 Rangamati -Khagrachhari Road Km 059.76-060.26 S 0.50 <strong>23</strong>7 Regional DBST @ IRI><strong>12</strong> 2013 0.457 0.30 0.92<br />

R162 Rangamati -Khagrachhari Road Km 056.66-059.76 S 3.10 <strong>23</strong>7 Regional DBST @ Traff 100-2000 2013 2.871 0.84 8.06<br />

R162 Rangamati -Khagrachhari Road Km 060.66-062.66 S 2.01 <strong>23</strong>7 Regional DBST @ Traff 100-2000 2013 1.833 0.96 6.09<br />

R162 Rangamati -Khagrachhari Road Km 060.26-060.66 S 0.40 <strong>23</strong>7 Regional Overlay 50mm @ IRI 7-9 2013 0.772 0.97 0.98<br />

Sub-total Khagrachari Division<br />

37.085<br />

Rangamati Division<br />

N106 Chittagong-Rangamati Road Km 059.<strong>12</strong>-059.62 S 0.50 3555 National DBST @ Traff 2000-4000 2013 0.642 4.46 9.90<br />

N106 Chittagong-Rangamati Road Km 056.<strong>12</strong>-059.<strong>12</strong> S 3.00 3555 National Overlay 50mm @ IRI 5-9 2013 8.142 4.07 43.27<br />

N106 Chittagong-Rangamati Road Km 059.62-060.32 S 0.70 3555 National Overlay 50mm @ IRI 5-9 2013 1.900 2.62 5.74<br />

N106 Chittagong-Rangamati Road Km 062.<strong>12</strong>-062.52 S 0.40 3555 National Overlay 50mm @ IRI 5-9 2013 1.211 3.59 6.70<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 001.20-002.80 S 1.60 <strong>23</strong>26 Regional DBST @ IRI><strong>12</strong> 2013 1.383 1.11 13.40<br />

Appendix-B: Page: 11 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 007.70-010.70 S 3.00 <strong>23</strong>26 Regional DBST @ IRI><strong>12</strong> 2013 2.594 0.75 17.09<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 002.90-003.10 S 0.20 <strong>23</strong>26 Regional DBST @ Traff 2000-4000 2013 0.173 3.56 2.02<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.20-018.30 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.151 4.58 2.88<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.20-018.30 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.151 4.58 2.88<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 002.80-002.90 S 0.10 <strong>23</strong>26 Regional DBST 25mm @ 25% Crk 2013 0.086 3.50 0.56<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 003.10-003.20 S 0.10 <strong>23</strong>26 Regional DBST 25mm @ 25% Crk 2013 0.086 3.28 0.56<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 011.00-011.60 S 0.60 <strong>23</strong>26 Regional DBST 25mm @ 25% Crk 2013 0.519 1.86 2.15<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 004.10-004.40 S 0.30 <strong>23</strong>26 Regional Overlay 50mm @ IRI 5-7 2013 0.548 3.74 2.32<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 015.50-015.90 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.274 8.83 17.10<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 027.20-027.70 S 0.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.940 5.41 8.11<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 015.50-015.90 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.274 8.83 17.10<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 003.40-003.50 S 0.10 <strong>23</strong>26 Regional Overlay 50mm @ IRI 7-9 2013 0.183 6.35 1.42<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 021.20-021.40 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.376 4.28 2.69<br />

R162 Rangamati -Khagrachhari Road Km 006.40-006.50 S 0.10 818 Regional DBST @ IRI><strong>12</strong> 2013 0.086 0.95 0.61<br />

R162 Rangamati -Khagrachhari Road Km 007.00-007.40 S 0.40 818 Regional DBST @ IRI><strong>12</strong> 2013 0.346 1.28 3.29<br />

R162 Rangamati -Khagrachhari Road Km 015.90-016.10 S 0.20 818 Regional DBST @ IRI><strong>12</strong> 2013 0.173 1.62 2.09<br />

R162 Rangamati -Khagrachhari Road Km 018.60-019.70 S 1.10 818 Regional DBST @ IRI><strong>12</strong> 2013 0.951 1.26 8.93<br />

R162 Rangamati -Khagrachhari Road Km 020.90-021.10 S 0.20 818 Regional DBST @ IRI><strong>12</strong> 2013 0.173 1.34 1.73<br />

R162 Rangamati -Khagrachhari Road Km 006.70-006.90 S 0.20 818 Regional DBST @ Traff 100-2000 2013 0.173 2.89 1.84<br />

R162 Rangamati -Khagrachhari Road Km 007.90-008.00 S 0.10 818 Regional DBST @ Traff 100-2000 2013 0.086 1.33 0.32<br />

R162 Rangamati -Khagrachhari Road Km 008.00-008.20 S 0.20 818 Regional DBST @ Traff 100-2000 2013 0.173 2.44 1.40<br />

R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.20-0<strong>12</strong>.50 S 0.30 818 Regional DBST @ Traff 100-2000 2013 0.259 2.62 2.42<br />

R162 Rangamati -Khagrachhari Road Km 017.90-018.00 S 0.10 818 Regional DBST @ Traff 100-2000 2013 0.086 2.68 0.76<br />

R162 Rangamati -Khagrachhari Road Km 022.40-022.50 S 0.10 818 Regional DBST @ Traff 100-2000 2013 0.086 3.06 0.95<br />

R162 Rangamati -Khagrachhari Road Km 001.00-001.40 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 1.37 0.95<br />

R162 Rangamati -Khagrachhari Road Km 005.90-006.00 S 0.10 818 Regional DBST 25mm @ 25% Crk 2013 0.086 1.35 0.20<br />

R162 Rangamati -Khagrachhari Road Km 006.50-006.70 S 0.20 818 Regional DBST 25mm @ 25% Crk 2013 0.173 0.61 0.22<br />

R162 Rangamati -Khagrachhari Road Km 008.20-008.70 S 0.50 818 Regional DBST 25mm @ 25% Crk 2013 0.432 0.98 1.09<br />

R162 Rangamati -Khagrachhari Road Km 008.80-008.90 S 0.10 818 Regional DBST 25mm @ 25% Crk 2013 0.086 1.39 0.29<br />

R162 Rangamati -Khagrachhari Road Km 009.10-009.50 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 1.31 0.90<br />

R162 Rangamati -Khagrachhari Road Km 009.70-010.10 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 0.99 0.80<br />

R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.10 818 Regional DBST 25mm @ 25% Crk 2013 0.086 1.76 0.33<br />

R162 Rangamati -Khagrachhari Road Km 016.10-016.40 S 0.30 818 Regional DBST 25mm @ 25% Crk 2013 0.259 0.90 0.44<br />

R162 Rangamati -Khagrachhari Road Km 017.70-017.90 S 0.20 818 Regional DBST 25mm @ 25% Crk 2013 0.173 1.02 0.35<br />

R162 Rangamati -Khagrachhari Road Km 018.00-018.60 S 0.60 818 Regional DBST 25mm @ 25% Crk 2013 0.519 0.92 0.81<br />

Appendix-B: Page: <strong>12</strong> of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R162 Rangamati -Khagrachhari Road Km 019.70-020.20 S 0.50 818 Regional DBST 25mm @ 25% Crk 2013 0.432 1.19 0.95<br />

R162 Rangamati -Khagrachhari Road Km 022.00-022.40 S 0.40 818 Regional DBST 25mm @ 25% Crk 2013 0.346 0.91 0.66<br />

R162 Rangamati -Khagrachhari Road Km 022.50-039.66 S 17.16 543 Regional DBST 25mm @ 25% Crk 2013 14.835 0.52 16.49<br />

R162 Rangamati -Khagrachhari Road Km 000.30-000.70 S 0.40 818 Regional Overlay 50mm @ IRI 5-7 2013 0.731 1.53 1.27<br />

R162 Rangamati -Khagrachhari Road Km 000.80-000.90 S 0.10 818 Regional Overlay 50mm @ IRI 5-7 2013 0.183 1.85 0.38<br />

R162 Rangamati -Khagrachhari Road Km 003.30-003.50 S 0.20 818 Regional Overlay 50mm @ IRI 5-7 2013 0.365 1.46 0.59<br />

R162 Rangamati -Khagrachhari Road Km 006.90-007.00 S 0.10 818 Regional Overlay 50mm @ IRI 5-7 2013 0.183 2.93 0.64<br />

R162 Rangamati -Khagrachhari Road Km 010.20-011.10 S 0.90 818 Regional Overlay 50mm @ IRI 5-7 2013 1.644 1.27 2.44<br />

R162 Rangamati -Khagrachhari Road Km 011.20-0<strong>12</strong>.00 S 0.80 818 Regional Overlay 50mm @ IRI 5-7 2013 1.461 1.29 2.21<br />

R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.50-0<strong>12</strong>.90 S 0.40 818 Regional Overlay 50mm @ IRI 5-7 2013 0.731 1.50 1.28<br />

R162 Rangamati -Khagrachhari Road Km 013.00-013.50 S 0.50 818 Regional Overlay 50mm @ IRI 5-7 2013 0.913 1.67 1.87<br />

R162 Rangamati -Khagrachhari Road Km 002.60-003.20 S 0.60 818 Regional Overlay 50mm @ IRI 7-9 2013 1.096 2.90 3.78<br />

R162 Rangamati -Khagrachhari Road Km 003.70-005.50 S 1.80 818 Regional Overlay 50mm @ IRI 7-9 2013 3.288 1.47 5.93<br />

R162 Rangamati -Khagrachhari Road Km 006.30-006.40 S 0.10 818 Regional Overlay 50mm @ IRI 7-9 2013 0.183 2.99 0.65<br />

R162 Rangamati -Khagrachhari Road Km 007.40-007.80 S 0.40 818 Regional Overlay 50mm @ IRI 7-9 2013 0.731 2.15 1.94<br />

R162 Rangamati -Khagrachhari Road Km 008.90-009.10 S 0.20 818 Regional Overlay 50mm @ IRI 7-9 2013 0.365 2.82 1.26<br />

R162 Rangamati -Khagrachhari Road Km 013.70-015.90 S 2.20 818 Regional Overlay 50mm @ IRI 7-9 2013 4.019 2.09 9.72<br />

R162 Rangamati -Khagrachhari Road Km 020.70-020.90 S 0.20 818 Regional Overlay 50mm @ IRI 7-9 2013 0.365 2.02 0.82<br />

R162 Rangamati -Khagrachhari Road Km 021.10-021.50 S 0.40 818 Regional Overlay 50mm @ IRI 7-9 2013 0.731 2.66 2.38<br />

Sub-total Rangamati Division<br />

Total Chittagong Zone<br />

59.680<br />

872.696<br />

Comilla Zone<br />

Brahmanbaria Division<br />

N102 Comilla-Brahmanbaria Road Km 080.06-082.33 S 2.27 15273 National DBST @ Traff >6000 2013 3.348 7.84 106.62<br />

N102 Comilla-Brahmanbaria Road Km 077.06-077.16 S 0.10 15273 National Overlay 50mm @ IRI 5 2013 0.313 8.50 5.16<br />

N102 Comilla-Brahmanbaria Road Km 053.40-053.50 S 0.10 9061 National Overlay 60mm @ IRI 7-9 2013 0.336 10.04 5.01<br />

N102 Comilla-Brahmanbaria Road Km 072.19-072.34 S 0.15 11451 National Overlay 80mm @ IRI 5-9 2013 0.714 18.39 20.94<br />

N102 Comilla-Brahmanbaria Road Km 072.44-072.66 S 0.22 11451 National Overlay 80mm @ IRI 5-9 2013 1.081 16.73 28.48<br />

N2 Dhaka-Sylhet-Jaflong Road Km 074.24-074.54 S 0.30 1<strong>23</strong>30 National DBST @ Traff >6000 2013 0.556 13.24 33.65<br />

N2 Dhaka-Sylhet-Jaflong Road Km 074.18-074.24 S 0.06 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 0.227 1.76 0.55<br />

N2 Dhaka-Sylhet-Jaflong Road Km 074.84-075.24 S 0.40 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 1.566 7.58 15.67<br />

N2 Dhaka-Sylhet-Jaflong Road Km 075.44-076.94 S 1.50 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 5.872 9.43 82.57<br />

N2 Dhaka-Sylhet-Jaflong Road Km 077.44-078.34 S 0.90 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 3.5<strong>23</strong> 10.68 64.<strong>23</strong><br />

Appendix-B: Page: 13 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N2 Dhaka-Sylhet-Jaflong Road Km 078.44-079.54 S 1.10 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 4.306 <strong>12</strong>.25 90.01<br />

N2 Dhaka-Sylhet-Jaflong Road Km 079.74-082.44 S 2.70 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 10.569 8.99 162.11<br />

N2 Dhaka-Sylhet-Jaflong Road Km 084.64-085.24 S 0.60 1<strong>23</strong>30 National Overlay 50mm @ IRI 4 2013 2.349 13.08 58.74<br />

N2 Dhaka-Sylhet-Jaflong Road Km 074.54-074.74 S 0.20 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 6.80 10.18<br />

N2 Dhaka-Sylhet-Jaflong Road Km 077.14-077.24 S 0.10 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 0.617 17.19 14.40<br />

N2 Dhaka-Sylhet-Jaflong Road Km 082.64-084.14 S 1.50 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 9.260 <strong>12</strong>.20 182.65<br />

N2 Dhaka-Sylhet-Jaflong Road Km 084.34-084.54 S 0.20 1<strong>23</strong>30 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 13.00 21.77<br />

N2 Dhaka-Sylhet-Jaflong Road Km 085.44-087.74 S 2.30 11451 National Overlay 80mm @ IRI 4-9 2013 14.199 10.27 205.88<br />

N2 Dhaka-Sylhet-Jaflong Road Km 087.94-092.14 S 4.20 11451 National Overlay 80mm @ IRI 4-9 2013 25.928 13.05 477.72<br />

R220 Sarail-Habiganj Road Km 001.50-002.10 S 0.60 4488 Regional DBST @ IRI><strong>12</strong> 2013 0.593 0.55 2.95<br />

R220 Sarail-Habiganj Road Km 006.00-006.30 S 0.30 4488 Regional DBST @ IRI><strong>12</strong> 2013 0.282 0.73 1.87<br />

R220 Sarail-Habiganj Road Km 015.18-015.78 S 0.60 6240 Regional DBST @ IRI><strong>12</strong> 2013 0.815 1.<strong>12</strong> 8.28<br />

R220 Sarail-Habiganj Road Km 007.35-007.40 S 0.05 6240 Regional DBST @ Traff >6000 2013 0.068 8.60 1.28<br />

R220 Sarail-Habiganj Road Km 018.08-018.38 S 0.30 6240 Regional DBST @ Traff >6000 2013 0.408 2.87 3.97<br />

R220 Sarail-Habiganj Road Km 004.40-004.70 S 0.30 4488 Regional DBST @ Traff 4000-6000 2013 0.296 2.18 2.18<br />

R220 Sarail-Habiganj Road Km 000.00-000.10 S 0.10 6240 Regional DBST 25mm @ 25% Crk 2013 0.143 2.53 0.65<br />

R220 Sarail-Habiganj Road Km 013.68-013.78 S 0.10 6240 Regional DBST 25mm @ 25% Crk 2013 0.136 4.66 1.03<br />

R220 Sarail-Habiganj Road Km 000.40-000.50 S 0.10 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.209 5.62 1.30<br />

R220 Sarail-Habiganj Road Km 002.10-002.20 S 0.10 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.209 5.65 1.28<br />

R220 Sarail-Habiganj Road Km 002.30-002.40 S 0.10 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.209 5.81 1.29<br />

R220 Sarail-Habiganj Road Km 003.10-003.40 S 0.30 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.626 2.50 1.77<br />

R220 Sarail-Habiganj Road Km 004.70-004.90 S 0.20 4488 Regional Overlay 50mm @ IRI 5-7 2013 0.409 3.34 1.45<br />

R220 Sarail-Habiganj Road Km 005.00-006.00 S 1.00 4488 Regional Overlay 50mm @ IRI 5-7 2013 1.983 1.46 3.15<br />

R220 Sarail-Habiganj Road Km 006.30-007.35 S 1.05 4488 Regional Overlay 50mm @ IRI 5-7 2013 2.083 1.44 3.26<br />

R220 Sarail-Habiganj Road Km 0<strong>12</strong>.40-013.60 S 1.20 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 4.107 1.93 7.15<br />

R220 Sarail-Habiganj Road Km 014.08-014.18 S 0.10 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 6.78 2.09<br />

R220 Sarail-Habiganj Road Km 014.68-015.18 S 0.50 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 2.89 5.59<br />

R220 Sarail-Habiganj Road Km 016.78-017.08 S 0.30 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.027 3.50 3.24<br />

R220 Sarail-Habiganj Road Km 017.68-018.08 S 0.40 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 2.63 3.62<br />

R220 Sarail-Habiganj Road Km 018.38-018.58 S 0.20 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 0.685 4.21 2.60<br />

R220 Sarail-Habiganj Road Km 018.68-019.00 S 0.32 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.092 3.37 3.31<br />

R220 Sarail-Habiganj Road Km 001.00-001.50 S 0.50 4488 Regional Overlay 60mm @ IRI 7-9 2013 1.245 2.24 2.90<br />

R220 Sarail-Habiganj Road Km 004.00-004.40 S 0.40 4488 Regional Overlay 60mm @ IRI 7-9 2013 0.996 2.26 2.25<br />

Sub-total Brahmanbaria Division<br />

108.276<br />

Appendix-B: Page: 14 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Ch<strong>and</strong>pur Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

R140 Comilla-Begumganj Road Km 040.47-040.57 S 0.10 8774 Regional DBST @ Traff >6000 2013 0.143 6.67 4.09<br />

R140 Comilla-Begumganj Road Km 078.20-079.60 S 1.40 7103 Regional DBST @ Traff >6000 2013 2.075 3.39 69.29<br />

R140 Comilla-Begumganj Road Km 081.00-081.10 S 0.10 10297 Regional DBST @ Traff >6000 2013 0.148 8.21 5.75<br />

R140 Comilla-Begumganj Road Km 083.72-084.52 S 0.80 10297 Regional DBST @ Traff >6000 2013 1.186 5.29 26.15<br />

R140 Comilla-Begumganj Road Km 084.72-084.92 S 0.20 10297 Regional DBST @ Traff >6000 2013 0.296 7.49 9.96<br />

R140 Comilla-Begumganj Road Km 030.61-032.29 S 1.68 4887 Regional DBST @ Traff 4000-6000 2013 2.418 9.26 78.03<br />

R140 Comilla-Begumganj Road Km 032.79-034.09 S 1.30 4887 Regional DBST @ Traff 4000-6000 2013 1.862 6.41 47.82<br />

R140 Comilla-Begumganj Road Km 064.10-064.30 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.287 7.75 8.<strong>12</strong><br />

R140 Comilla-Begumganj Road Km 064.50-065.00 S 0.50 4887 Regional DBST @ Traff 4000-6000 2013 0.716 7.27 19.02<br />

R140 Comilla-Begumganj Road Km 077.70-078.10 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.593 3.36 19.78<br />

R140 Comilla-Begumganj Road Km 052.80-053.00 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.285 7.31 7.15<br />

R140 Comilla-Begumganj Road Km 071.40-071.50 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.148 5.85 3.78<br />

R140 Comilla-Begumganj Road Km 079.70-079.80 S 0.10 10297 Regional DBST 25mm @ 25% Crk 2013 0.148 7.78 5.45<br />

R140 Comilla-Begumganj Road Km 035.09-035.89 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.297 6.91 27.42<br />

R140 Comilla-Begumganj Road Km 036.19-036.79 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.183 5.16 20.30<br />

R140 Comilla-Begumganj Road Km 051.80-052.20 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.211 9.00 17.01<br />

R140 Comilla-Begumganj Road Km 053.40-053.50 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.298 9.39 4.74<br />

R140 Comilla-Begumganj Road Km 055.30-055.50 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.595 6.39 6.67<br />

R140 Comilla-Begumganj Road Km 058.60-059.40 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.384 6.22 26.02<br />

R140 Comilla-Begumganj Road Km 060.30-062.30 S 2.00 4887 Regional Overlay 50mm @ IRI 5-7 2013 5.961 6.72 69.25<br />

R140 Comilla-Begumganj Road Km 063.30-064.00 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.167 7.95 29.38<br />

R140 Comilla-Begumganj Road Km 065.10-065.90 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.422 8.<strong>12</strong> 33.53<br />

R140 Comilla-Begumganj Road Km 066.00-066.90 S 0.90 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.725 6.59 32.77<br />

R140 Comilla-Begumganj Road Km 067.10-067.40 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.940 5.71 9.28<br />

R140 Comilla-Begumganj Road Km 068.50-068.60 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.313 6.65 3.65<br />

R140 Comilla-Begumganj Road Km 069.10-069.80 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.192 6.15 <strong>23</strong>.66<br />

R140 Comilla-Begumganj Road Km 036.99-038.49 S 1.50 84<strong>23</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 5.629 7.25 58.67<br />

R140 Comilla-Begumganj Road Km 038.59-038.99 S 0.40 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.394 11.77 22.44<br />

R140 Comilla-Begumganj Road Km 039.09-039.49 S 0.40 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.394 9.96 19.17<br />

R140 Comilla-Begumganj Road Km 039.59-039.89 S 0.30 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.083 8.84 15.07<br />

R140 Comilla-Begumganj Road Km 039.99-040.29 S 0.30 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.083 9.15 15.81<br />

R140 Comilla-Begumganj Road Km 041.37-041.97 S 0.60 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 2.113 8.50 28.29<br />

R140 Comilla-Begumganj Road Km 042.37-042.47 S 0.10 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 13.11 5.67<br />

R140 Comilla-Begumganj Road Km 042.67-043.10 S 0.43 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.472 8.51 16.37<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-B: Page: 15 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R140 Comilla-Begumganj Road Km 043.20-045.70 S 2.50 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 8.775 8.79 115.96<br />

R140 Comilla-Begumganj Road Km 045.90-046.00 S 0.10 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 0.355 10.15 5.35<br />

R140 Comilla-Begumganj Road Km 046.10-046.40 S 0.30 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.064 <strong>12</strong>.46 16.76<br />

R140 Comilla-Begumganj Road Km 046.70-046.90 S 0.20 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 1.033 7.64 11.26<br />

R140 Comilla-Begumganj Road Km 047.00-047.70 S 0.70 8774 Regional Overlay 60mm @ IRI 5.5-9 2013 3.<strong>23</strong>2 7.92 36.49<br />

R140 Comilla-Begumganj Road Km 080.30-080.70 S 0.40 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 1.494 9.52 24.19<br />

R140 Comilla-Begumganj Road Km 081.40-081.90 S 0.50 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 1.867 7.83 <strong>23</strong>.04<br />

R140 Comilla-Begumganj Road Km 082.00-082.10 S 0.10 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 0.436 7.54 5.24<br />

R140 Comilla-Begumganj Road Km 082.20-082.50 S 0.30 10297 Regional Overlay 60mm @ IRI 5.5-9 2013 1.143 7.<strong>12</strong> <strong>12</strong>.22<br />

R140 Comilla-Begumganj Road Km 034.29-034.89 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.054 6.45 20.15<br />

R140 Comilla-Begumganj Road Km 049.60-049.70 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.355 9.16 5.25<br />

R140 Comilla-Begumganj Road Km 049.90-050.40 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.774 8.06 <strong>23</strong>.<strong>12</strong><br />

R140 Comilla-Begumganj Road Km 050.80-051.30 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.795 6.65 20.01<br />

R140 Comilla-Begumganj Road Km 051.60-051.70 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.361 9.68 5.<strong>23</strong><br />

R140 Comilla-Begumganj Road Km 053.60-053.80 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.709 7.81 8.84<br />

R140 Comilla-Begumganj Road Km 054.00-054.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.355 8.94 5.13<br />

R140 Comilla-Begumganj Road Km 054.20-055.10 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.193 6.76 34.40<br />

R140 Comilla-Begumganj Road Km 055.70-056.70 S 1.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.547 8.03 46.06<br />

R140 Comilla-Begumganj Road Km 057.00-058.40 S 1.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.080 6.47 55.07<br />

R140 Comilla-Begumganj Road Km 068.80-068.90 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 7.63 4.55<br />

R140 Comilla-Begumganj Road Km 070.00-071.20 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.600 7.47 55.54<br />

R140 Comilla-Begumganj Road Km 072.30-072.40 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 9.01 5.52<br />

R140 Comilla-Begumganj Road Km 073.10-073.20 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 8.82 5.41<br />

R140 Comilla-Begumganj Road Km 073.30-074.50 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.481 8.37 61.54<br />

R140 Comilla-Begumganj Road Km 074.90-075.90 S 1.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.734 7.61 45.93<br />

R140 Comilla-Begumganj Road Km 076.90-077.50 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.240 7.65 27.73<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 063.51-064.16 S 0.65 1<strong>23</strong>9 Regional DBST @ Traff 100-2000 2013 0.879 1.46 3.65<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 071.26-071.46 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 8.11 8.64<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 064.86-064.96 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.39 5.37<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.36-069.76 S 0.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.369 8.39 19.19<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.56-070.66 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.81 5.52<br />

Sub-total Ch<strong>and</strong>pur Division<br />

108.805<br />

Comilla Division<br />

R140 Comilla-Begumganj Road Km 000.30-000.40 S 0.10 2080 Regional DBST @ IRI><strong>12</strong> 2013 0.168 0.92 1.41<br />

Appendix-B: Page: 16 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R140 Comilla-Begumganj Road Km 000.40-001.<strong>23</strong> S 0.83 2080 Regional DBST @ Traff 2000-4000 2013 1.404 0.83 3.40<br />

R140 Comilla-Begumganj Road Km 010.70-010.90 S 0.20 4909 Regional DBST @ Traff 4000-6000 2013 0.287 9.75 9.20<br />

R140 Comilla-Begumganj Road Km 011.50-011.70 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.287 9.35 8.48<br />

R140 Comilla-Begumganj Road Km 026.99-028.89 S 1.90 4887 Regional DBST @ Traff 4000-6000 2013 3.318 3.85 52.78<br />

R140 Comilla-Begumganj Road Km 029.09-029.19 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.178 5.03 3.66<br />

R140 Comilla-Begumganj Road Km 000.00-000.10 S 0.10 2080 Regional DBST 25mm @ 25% Crk 2013 0.173 0.63 0.24<br />

R140 Comilla-Begumganj Road Km 000.20-000.30 S 0.10 2080 Regional DBST 25mm @ 25% Crk 2013 0.168 0.57 0.21<br />

R140 Comilla-Begumganj Road Km 001.50-002.90 S 1.40 3942 Regional DBST 25mm @ 25% Crk 2013 2.351 2.71 18.63<br />

R140 Comilla-Begumganj Road Km 011.20-011.40 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.287 8.59 8.27<br />

R140 Comilla-Begumganj Road Km 0<strong>12</strong>.30-013.36 S 1.06 4887 Regional DBST 25mm @ 25% Crk 2013 1.534 7.00 39.26<br />

R140 Comilla-Begumganj Road Km 016.06-016.26 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.277 8.71 7.63<br />

R140 Comilla-Begumganj Road Km 017.29-017.39 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.138 8.15 3.88<br />

R140 Comilla-Begumganj Road Km 017.49-018.89 S 1.40 4887 Regional DBST 25mm @ 25% Crk 2013 1.950 6.25 48.50<br />

R140 Comilla-Begumganj Road Km 026.19-026.49 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.445 5.48 8.55<br />

R140 Comilla-Begumganj Road Km 001.<strong>23</strong>-001.40 S 0.17 3942 Regional Overlay 50mm @ IRI 5-7 2013 0.603 3.97 3.42<br />

R140 Comilla-Begumganj Road Km 003.40-004.35 S 0.95 3942 Regional Overlay 50mm @ IRI 5-7 2013 3.379 4.70 26.77<br />

R140 Comilla-Begumganj Road Km 007.80-008.50 S 0.70 4909 Regional Overlay 50mm @ IRI 5-7 2013 2.558 4.83 21.67<br />

R140 Comilla-Begumganj Road Km 014.16-014.26 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.292 9.29 4.63<br />

R140 Comilla-Begumganj Road Km 014.76-014.96 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.585 9.55 9.52<br />

R140 Comilla-Begumganj Road Km 018.99-020.29 S 1.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.343 9.24 64.62<br />

R140 Comilla-Begumganj Road Km 020.49-021.19 S 0.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.305 9.32 34.63<br />

R140 Comilla-Begumganj Road Km 021.29-021.39 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.334 6.49 3.74<br />

R140 Comilla-Begumganj Road Km 021.49-0<strong>23</strong>.69 S 2.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 7.464 5.57 68.13<br />

R140 Comilla-Begumganj Road Km 0<strong>23</strong>.79-024.89 S 1.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.485 6.63 39.96<br />

R140 Comilla-Begumganj Road Km 025.29-026.09 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.505 6.30 25.88<br />

R140 Comilla-Begumganj Road Km 026.59-026.69 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.313 7.46 4.04<br />

R140 Comilla-Begumganj Road Km 029.49-030.61 S 1.<strong>12</strong> 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.688 7.35 43.68<br />

R140 Comilla-Begumganj Road Km 004.35-004.78 S 0.42 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.869 6.43 19.43<br />

R140 Comilla-Begumganj Road Km 004.78-007.80 S 3.03 4909 Regional Overlay 60mm @ IRI 7-9 2013 13.517 4.57 91.22<br />

R140 Comilla-Begumganj Road Km 009.50-009.80 S 0.30 4909 Regional Overlay 60mm @ IRI 7-9 2013 1.307 7.86 14.10<br />

R140 Comilla-Begumganj Road Km 010.00-010.60 S 0.60 4909 Regional Overlay 60mm @ IRI 7-9 2013 2.166 8.96 28.51<br />

R140 Comilla-Begumganj Road Km 013.46-013.66 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.697 7.43 7.70<br />

R140 Comilla-Begumganj Road Km 013.86-013.96 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.349 10.80 5.42<br />

R140 Comilla-Begumganj Road Km 024.99-025.09 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 6.93 4.13<br />

R141 Lalmai-Sonaimuri Road Km 000.40-001.20 S 0.80 4887 Regional DBST @ Traff 4000-6000 2013 1.146 5.76 30.83<br />

Appendix-B: Page: 17 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R141 Lalmai-Sonaimuri Road Km 000.00-000.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.143 9.53 4.22<br />

R141 Lalmai-Sonaimuri Road Km 022.10-022.<strong>12</strong> S 0.02 5257 Regional DBST 25mm @ 25% Crk 2013 0.034 6.59 0.89<br />

R141 Lalmai-Sonaimuri Road Km 014.20-014.50 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.907 6.37 10.14<br />

R141 Lalmai-Sonaimuri Road Km 014.70-017.80 S 3.10 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 11.267 5.87 100.58<br />

R141 Lalmai-Sonaimuri Road Km 018.00-018.80 S 0.80 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 2.888 7.99 37.87<br />

R141 Lalmai-Sonaimuri Road Km 019.00-020.60 S 1.60 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 5.865 5.74 53.61<br />

R141 Lalmai-Sonaimuri Road Km 020.70-022.00 S 1.30 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 4.814 5.16 39.59<br />

R141 Lalmai-Sonaimuri Road Km 022.22-0<strong>23</strong>.02 S 0.80 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 2.888 5.79 25.43<br />

R141 Lalmai-Sonaimuri Road Km 024.42-024.52 S 0.10 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 0.361 7.51 4.32<br />

R141 Lalmai-Sonaimuri Road Km 024.62-027.62 S 3.00 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 10.791 6.11 100.<strong>23</strong><br />

R141 Lalmai-Sonaimuri Road Km 028.<strong>12</strong>-030.22 S 2.10 5257 Regional Overlay 60mm @ IRI 5.5-9 2013 7.554 6.39 70.13<br />

R141 Lalmai-Sonaimuri Road Km 001.50-004.30 S 2.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.473 8.36 143.72<br />

R141 Lalmai-Sonaimuri Road Km 004.40-006.80 S 2.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 8.514 8.51 117.15<br />

R141 Lalmai-Sonaimuri Road Km 007.00-007.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.358 9.42 5.64<br />

R141 Lalmai-Sonaimuri Road Km 007.60-013.80 S 6.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 22.379 8.28 299.78<br />

R141 Lalmai-Sonaimuri Road Km 014.00-014.10 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.355 8.62 4.94<br />

R141 Lalmai-Sonaimuri Road Km 030.62-031.52 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.305 7.45 39.81<br />

R144 Laksam Old Section Km 003.90-004.50 S 0.60 2057 Regional DBST 25mm @ 25% Crk 2013 1.1<strong>12</strong> 2.17 6.65<br />

R144 Laksam Old Section Km 003.00-003.80 S 0.80 2057 Regional Overlay 50mm @ IRI 7-9 2013 3.132 3.09 16.<strong>12</strong><br />

Sub-total Comilla Division<br />

163.380<br />

Feni Division<br />

N104 Feni-Noakhali Road Km 001.70-002.20 S 0.50 11732 National DBST @ Traff >6000 2013 1.334 9.15 55.80<br />

N104 Feni-Noakhali Road Km 017.10-017.20 S 0.10 9193 National DBST 25mm @ 25% Crk 2013 0.143 6.53 3.89<br />

N104 Feni-Noakhali Road Km 017.30-019.50 S 2.20 9193 National DBST 25mm @ 25% Crk 2013 3.152 5.57 78.39<br />

N104 Feni-Noakhali Road Km 002.50-002.60 S 0.10 1<strong>23</strong>76 National Overlay 50mm @ IRI 5 2013 0.303 25.99 11.59<br />

N104 Feni-Noakhali Road Km 016.90-017.00 S 0.10 9193 National Overlay 50mm @ IRI 5-7 2013 0.303 8.09 4.74<br />

N104 Feni-Noakhali Road Km 000.40-000.70 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.383 20.86 32.62<br />

N104 Feni-Noakhali Road Km 002.80-005.10 S 2.30 1<strong>12</strong>25 National Overlay 80mm @ IRI 5-9 2013 10.980 17.18 218.59<br />

N104 Feni-Noakhali Road Km 005.30-005.90 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 2.864 <strong>12</strong>.28 44.46<br />

N104 Feni-Noakhali Road Km 007.40-008.50 S 1.10 11451 National Overlay 80mm @ IRI 5-9 2013 5.315 11.13 74.74<br />

N104 Feni-Noakhali Road Km 008.60-009.20 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 2.766 16.39 59.25<br />

N104 Feni-Noakhali Road Km 009.30-009.80 S 0.50 11451 National Overlay 80mm @ IRI 5-9 2013 2.305 14.72 42.87<br />

N104 Feni-Noakhali Road Km 010.00-010.30 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.383 13.86 <strong>23</strong>.48<br />

N104 Feni-Noakhali Road Km 010.40-010.60 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 0.922 16.01 18.08<br />

Appendix-B: Page: 18 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

NPV<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

N104 Feni-Noakhali Road Km 011.40-011.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.461 22.11 <strong>12</strong>.<strong>12</strong><br />

Sub-total Feni Division<br />

33.613<br />

Laxmipur Division<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 014.00-014.10 S 0.10 4563 Regional DBST @ Traff 4000-6000 2013 0.090 3.82 0.89<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 015.50-015.52 S 0.02 5722 Regional Overlay 60mm @ IRI 5.5-9 2013 0.067 20.15 1.40<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 018.00-018.80 S 0.80 5722 Regional Overlay 60mm @ IRI 5.5-9 2013 2.240 3.38 7.92<br />

Sub-total Laxmipur Division<br />

2.398<br />

Noakhali Division<br />

N104 Feni-Noakhali Road Km 033.20-033.50 S 0.30 13490 National DBST @ Traff >6000 2013 0.608 9.82 24.94<br />

N104 Feni-Noakhali Road Km 048.49-048.79 S 0.30 11451 National DBST @ Traff >6000 2013 0.548 11.43 28.67<br />

N104 Feni-Noakhali Road Km 035.74-036.50 S 0.76 10253 National Overlay 50mm @ IRI 5 2013 3.229 6.07 27.63<br />

N104 Feni-Noakhali Road Km 036.80-036.90 S 0.10 10253 National Overlay 50mm @ IRI 5 2013 0.292 10.75 3.74<br />

N104 Feni-Noakhali Road Km 037.10-038.00 S 0.90 10253 National Overlay 50mm @ IRI 5 2013 2.631 10.13 32.65<br />

N104 Feni-Noakhali Road Km 041.40-041.58 S 0.18 10253 National Overlay 50mm @ IRI 5 2013 0.539 <strong>12</strong>.78 9.34<br />

N104 Feni-Noakhali Road Km 032.40-032.90 S 0.50 13564 National Overlay 80mm @ IRI 5-9 2013 2.901 8.53 34.66<br />

N104 Feni-Noakhali Road Km 034.20-035.30 S 1.10 11451 National Overlay 80mm @ IRI 5-9 2013 7.425 <strong>12</strong>.09 110.81<br />

N104 Feni-Noakhali Road Km 035.50-035.74 S 0.24 11451 National Overlay 80mm @ IRI 5-9 2013 1.620 <strong>12</strong>.52 25.04<br />

N104 Feni-Noakhali Road Km 038.00-038.20 S 0.20 10253 National Overlay 80mm @ IRI 5-9 2013 0.924 18.20 17.90<br />

N104 Feni-Noakhali Road Km 038.20-038.60 S 0.40 10253 National Overlay 80mm @ IRI 5-9 2013 1.910 8.40 16.31<br />

N104 Feni-Noakhali Road Km 038.70-039.40 S 0.70 10253 National Overlay 80mm @ IRI 5-9 2013 3.509 <strong>12</strong>.75 47.62<br />

N104 Feni-Noakhali Road Km 039.90-040.00 S 0.10 10253 National Overlay 80mm @ IRI 5-9 2013 0.477 16.68 8.63<br />

N104 Feni-Noakhali Road Km 041.78-041.88 S 0.10 10253 National Overlay 80mm @ IRI 5-9 2013 0.461 16.77 8.38<br />

N104 Feni-Noakhali Road Km 042.28-042.68 S 0.40 10253 National Overlay 80mm @ IRI 5-9 2013 2.<strong>12</strong>0 13.39 33.78<br />

N104 Feni-Noakhali Road Km 042.68-042.98 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.852 10.22 26.70<br />

N104 Feni-Noakhali Road Km 044.38-044.78 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 4.260 10.22 53.74<br />

N104 Feni-Noakhali Road Km 044.78-045.48 S 0.70 11451 National Overlay 80mm @ IRI 5-9 2013 4.488 <strong>12</strong>.36 68.48<br />

N104 Feni-Noakhali Road Km 045.58-045.99 S 0.41 11451 National Overlay 80mm @ IRI 5-9 2013 2.072 18.37 44.11<br />

N104 Feni-Noakhali Road Km 046.19-046.29 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.510 14.02 9.04<br />

N104 Feni-Noakhali Road Km 046.69-048.09 S 1.40 11451 National Overlay 80mm @ IRI 5-9 2013 7.594 14.55 139.65<br />

N104 Feni-Noakhali Road Km 048.79-049.17 S 0.38 11451 National Overlay 80mm @ IRI 5-9 2013 2.352 15.97 46.38<br />

R140 Comilla-Begumganj Road Km 131.57-132.67 S 1.10 101<strong>12</strong> Regional DBST @ Traff >6000 2013 1.630 5.94 40.03<br />

R140 Comilla-Begumganj Road Km 133.57-134.87 S 1.30 101<strong>12</strong> Regional DBST @ Traff >6000 2013 1.927 6.14 48.91<br />

Appendix-B: Page: 19 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R140 Comilla-Begumganj Road Km 132.97-133.17 S 0.20 101<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 0.747 8.03 9.45<br />

R140 Comilla-Begumganj Road Km 135.17-135.67 S 0.50 101<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.867 8.07 22.65<br />

R140 Comilla-Begumganj Road Km 136.97-137.37 S 0.40 101<strong>12</strong> Regional Overlay 60mm @ IRI 5.5-9 2013 1.494 7.46 16.95<br />

R141 Lalmai-Sonaimuri Road Km 031.82-032.22 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.569 6.15 15.72<br />

R141 Lalmai-Sonaimuri Road Km 035.72-037.97 S 2.24 4887 Regional DBST @ Traff 4000-6000 2013 3.354 5.22 75.66<br />

R141 Lalmai-Sonaimuri Road Km 035.32-035.62 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.430 4.59 8.<strong>23</strong><br />

R141 Lalmai-Sonaimuri Road Km 032.52-033.<strong>12</strong> S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.166 8.09 28.33<br />

R141 Lalmai-Sonaimuri Road Km 034.62-034.72 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.367 6.64 4.09<br />

R142 Begamganj-Ramganj Road Km 028.25-028.99 S 0.75 4887 Regional DBST @ Traff 4000-6000 2013 1.015 5.69 25.89<br />

R142 Begamganj-Ramganj Road Km 000.00-000.30 S 0.30 9769 Regional DBST 25mm @ 25% Crk 2013 0.408 5.81 8.14<br />

R142 Begamganj-Ramganj Road Km 026.35-027.25 S 0.90 4887 Regional DBST 25mm @ 25% Crk 2013 1.2<strong>23</strong> 6.99 31.22<br />

R142 Begamganj-Ramganj Road Km 000.50-001.50 S 1.00 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 7.49 39.95<br />

R142 Begamganj-Ramganj Road Km 001.70-002.10 S 0.40 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 7.85 16.73<br />

R142 Begamganj-Ramganj Road Km 002.90-003.90 S 1.00 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 7.81 42.09<br />

R142 Begamganj-Ramganj Road Km 004.00-004.10 S 0.10 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 9.27 5.13<br />

R142 Begamganj-Ramganj Road Km 004.40-007.50 S 3.10 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 10.611 7.67 133.60<br />

R142 Begamganj-Ramganj Road Km 008.20-008.60 S 0.40 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 8.15 15.75<br />

R142 Begamganj-Ramganj Road Km 008.70-010.60 S 1.90 9769 Regional Overlay 60mm @ IRI 5.5-9 2013 6.503 7.69 73.06<br />

R142 Begamganj-Ramganj Road Km 021.85-022.45 S 0.60 7837 Regional Overlay 60mm @ IRI 5.5-9 2013 2.054 6.07 18.20<br />

R142 Begamganj-Ramganj Road Km 022.55-022.95 S 0.40 7837 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 7.07 <strong>12</strong>.<strong>23</strong><br />

R142 Begamganj-Ramganj Road Km 0<strong>23</strong>.05-024.95 S 1.90 5770 Regional Overlay 60mm @ IRI 5.5-9 2013 6.503 8.<strong>23</strong> 67.62<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 000.00-000.10 S 0.10 4563 Regional DBST 25mm @ 25% Crk 2013 0.096 4.43 0.73<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 001.40-004.30 S 2.90 4563 Regional DBST 25mm @ 25% Crk 2013 2.758 0.86 4.71<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 000.40-001.30 S 0.90 4563 Regional Overlay 50mm @ IRI 5-7 2013 1.898 1.53 2.95<br />

Sub-total Noakhali Division<br />

Total Comilla Zone<br />

111.<strong>23</strong>7<br />

527.708<br />

Dhaka Zone<br />

Dhaka Division<br />

N105 Madanpur-Joydevpur Km 018.00-027.84 S 9.84 113<strong>12</strong> National DBST @ Traff >6000 2013 17.750 11.29 916.57<br />

N105 Madanpur-Joydevpur Km 027.84-028.00 S 0.16 <strong>12</strong>144 National Overlay 80mm @ IRI 5-9 2013 0.937 10.82 <strong>12</strong>.52<br />

N3 Dhaka -Mymensingh Road Km 009.10-010.00 L 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.594 7.09 110.21<br />

N3 Dhaka -Mymensingh Road Km 009.10-010.00 R 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.594 7.07 109.90<br />

N302 Tongi-Ashulia-Zerabo-EPZ Road Km 000.00-006.50 S 6.50 21914 National Overlay 80mm @ IRI 5-9 2013 53.556 21.80 1441.83<br />

Appendix-B: Page: 20 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N302 Tongi-Ashulia-Zerabo-EPZ Road Km 006.50-017.44 S 10.94 15146 National Overlay 80mm @ IRI 5-9 2013 86.522 13.55 1447.53<br />

N302 Tongi-Ashulia-Zerabo-EPZ Road Km 017.44-017.55 S 0.11 18611 National Overlay 80mm @ IRI 5-9 2013 0.816 19.37 19.53<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 017.70-017.81 R 0.11 9061 National Overlay 50mm @ IRI 4-7 2013 0.290 <strong>12</strong>.25 4.34<br />

N501 Mirpur Bridge-Dhour Road Km 0<strong>12</strong>.40-013.98 S 1.58 9061 National DBST @ Traff >6000 2013 1.884 10.17 71.54<br />

N501 Mirpur Bridge-Dhour Road Km 009.10-010.50 S 1.40 9061 National Overlay 60mm @ IRI 7-9 2013 4.182 11.16 68.43<br />

N501 Mirpur Bridge-Dhour Road Km 010.90-011.10 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.597 10.59 9.39<br />

N501 Mirpur Bridge-Dhour Road Km 011.10-0<strong>12</strong>.40 S 1.30 9061 National Overlay 60mm @ IRI 7-9 2013 3.883 9.88 57.62<br />

N501 Mirpur Bridge-Dhour Road Km 001.70-002.00 S 0.30 10311 National Overlay 80mm @ IRI 5-9 2013 1.185 9.85 10.51<br />

N501 Mirpur Bridge-Dhour Road Km 005.10-008.30 S 3.20 10311 National Overlay 80mm @ IRI 5-9 2013 <strong>12</strong>.643 6.86 78.10<br />

R1<strong>12</strong> Narayanganj -Rampura Road Km 000.00-017.50 S 17.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 29.229 5.38 254.48<br />

R504 Hemayetpur-Manikganj Road Km 003.20-004.00 S 0.80 4187 Regional Overlay 60mm @ IRI 7-9 2013 2.803 4.81 20.99<br />

R801 Jurain-Chasara Road Km 000.00-010.00 S 10.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 46.676 5.31 356.74<br />

R802 Bishwa -Kayetpara Road Km 000.00-004.24 S 4.24 3875 Regional Overlay 50mm @ IRI 7-9 2013 11.181 2.72 36.11<br />

R803 Jurain-Abdullahpur Road Km 000.00-026.31 S 26.31 4887 Regional Overlay 60mm @ IRI 7-9 2013 114.616 6.18 1104.93<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 000.00-008.83 S 8.83 13225 Regional DBST @ Traff >6000 2013 11.930 11.17 604.91<br />

Sub-total Dhaka Division<br />

425.869<br />

Gazipur Division<br />

N105 Madanpur-Joydevpur Km 028.84-029.14 S 0.30 11451 National DBST @ Traff >6000 2013 0.541 15.40 38.09<br />

N105 Madanpur-Joydevpur Km 032.24-036.94 S 4.70 11451 National Overlay 50mm @ IRI 5 2013 17.908 14.46 386.17<br />

N105 Madanpur-Joydevpur Km 028.00-028.84 S 0.84 10730 National Overlay 80mm @ IRI 5-9 2013 5.071 11.30 70.75<br />

N105 Madanpur-Joydevpur Km 029.14-029.44 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.803 8.90 19.82<br />

N105 Madanpur-Joydevpur Km 029.44-030.24 S 0.80 11451 National Overlay 80mm @ IRI 5-9 2013 4.807 18.91 1<strong>12</strong>.25<br />

N105 Madanpur-Joydevpur Km 030.24-032.24 S 2.00 11451 National Overlay 80mm @ IRI 5-9 2013 <strong>12</strong>.018 14.37 213.28<br />

N105 Madanpur-Joydevpur Km 036.94-040.14 S 3.20 11451 National Overlay 80mm @ IRI 5-9 2013 19.228 <strong>12</strong>.11 315.98<br />

N105 Madanpur-Joydevpur Km 043.14-048.66 S 5.52 11451 National Overlay 80mm @ IRI 5-9 2013 33.144 9.89 444.88<br />

N3 Dhaka -Mymensingh Road Km 022.30-0<strong>23</strong>.20 L 0.90 11451 National DBST @ Traff >6000 2013 2.445 6.31 76.<strong>12</strong><br />

N3 Dhaka -Mymensingh Road Km 022.30-0<strong>23</strong>.20 R 0.90 11451 National DBST @ Traff >6000 2013 3.779 5.04 94.09<br />

N3 Dhaka -Mymensingh Road Km 036.75-039.78 S 3.03 11451 National DBST @ Traff >6000 2013 8.460 13.97 540.48<br />

N3 Dhaka -Mymensingh Road Km 010.00-0<strong>12</strong>.70 L 2.70 8665 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.958 4.76 194.60<br />

N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.80-014.30 L 1.50 8665 National Overlay 50mm @ IRI 4-7 2013 11.486 5.49 <strong>12</strong>0.51<br />

N3 Dhaka -Mymensingh Road Km 014.70-014.80 L 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 8.46 6.85<br />

N3 Dhaka -Mymensingh Road Km 015.30-015.40 L 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 10.65 7.97<br />

N3 Dhaka -Mymensingh Road Km 015.60-017.80 L 2.20 8665 National Overlay 50mm @ IRI 4-7 2013 17.982 4.44 152.65<br />

N3 Dhaka -Mymensingh Road Km 010.00-0<strong>12</strong>.70 R 2.70 8665 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.958 4.26 174.28<br />

Appendix-B: Page: 21 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.80-014.30 R 1.50 8665 National Overlay 50mm @ IRI 4-7 2013 10.217 6.28 <strong>12</strong>2.59<br />

N3 Dhaka -Mymensingh Road Km 014.70-014.80 R 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 7.36 5.97<br />

N3 Dhaka -Mymensingh Road Km 015.30-015.40 R 0.10 8665 National Overlay 50mm @ IRI 4-7 2013 0.391 13.36 10.00<br />

N3 Dhaka -Mymensingh Road Km 014.80-015.30 L 0.50 8665 National Overlay 60mm @ IRI 7-9 2013 2.334 9.17 37.41<br />

N3 Dhaka -Mymensingh Road Km 014.80-015.30 R 0.50 8665 National Overlay 60mm @ IRI 7-9 2013 2.334 7.24 31.22<br />

N3 Dhaka -Mymensingh Road Km 019.60-022.30 L 2.70 11451 National Overlay 80mm @ IRI 4-9 2013 22.758 9.16 336.89<br />

N3 Dhaka -Mymensingh Road Km 0<strong>23</strong>.20-0<strong>23</strong>.98 L 0.78 11451 National Overlay 80mm @ IRI 4-9 2013 7.090 9.10 87.50<br />

N3 Dhaka -Mymensingh Road Km 048.65-049.03 L 0.38 11451 National Overlay 80mm @ IRI 4-9 2013 2.195 <strong>12</strong>.89 34.33<br />

N3 Dhaka -Mymensingh Road Km 019.60-022.30 R 2.70 11451 National Overlay 80mm @ IRI 4-9 2013 24.891 5.98 219.09<br />

N3 Dhaka -Mymensingh Road Km 0<strong>23</strong>.20-0<strong>23</strong>.98 R 0.78 11451 National Overlay 80mm @ IRI 4-9 2013 10.957 6.11 82.66<br />

N3 Dhaka -Mymensingh Road Km 048.65-049.03 R 0.38 11451 National Overlay 80mm @ IRI 4-9 2013 2.195 <strong>12</strong>.89 34.33<br />

N3 Dhaka -Mymensingh Road Km 033.55-036.75 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 25.839 <strong>12</strong>.20 427.71<br />

N3 Dhaka -Mymensingh Road Km 039.78-044.65 S 4.87 11451 National Overlay 80mm @ IRI 4-9 2013 36.270 9.61 430.25<br />

N3 Dhaka -Mymensingh Road Km 045.35-047.05 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 10.215 13.73 190.22<br />

N3 Dhaka -Mymensingh Road Km 048.15-048.58 S 0.43 11451 National Overlay 80mm @ IRI 4-9 2013 2.590 8.39 26.84<br />

N3 Dhaka -Mymensingh Road Km 049.03-055.40 S 6.37 11451 National Overlay 80mm @ IRI 4-9 2013 43.309 7.98 426.70<br />

N3 Dhaka -Mymensingh Road Km 055.40-055.80 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.469 <strong>12</strong>.75 38.89<br />

N3 Dhaka -Mymensingh Road Km 055.80-058.00 S 2.20 11451 National Overlay 80mm @ IRI 4-9 2013 13.581 6.35 105.46<br />

N4 Joydebpur-Jamalpur Road Km 000.00-017.27 S 17.27 15927 National Overlay 80mm @ IRI 4-9 2013 114.575 11.22 1743.44<br />

N4 Joydebpur-Jamalpur Road Km 017.27-019.47 S 2.20 16227 National Overlay 80mm @ IRI 4-9 2013 17.<strong>23</strong>9 15.44 410.38<br />

N4 Joydebpur-Jamalpur Road Km 019.67-021.37 S 1.70 16574 National Overlay 80mm @ IRI 4-9 2013 10.915 <strong>12</strong>.64 203.11<br />

N4 Joydebpur-Jamalpur Road Km 021.47-026.75 S 5.28 19452 National Overlay 80mm @ IRI 4-9 2013 33.074 18.46 828.26<br />

R301 Tongi-Pachdona Road Km 000.01-000.06 R 0.05 30316 Regional DBST @ Traff >6000 2013 0.142 21.26 9.93<br />

R301 Tongi-Pachdona Road Km 001.50-001.70 S 0.20 21334 Regional DBST @ Traff >6000 2013 0.346 16.98 18.33<br />

R301 Tongi-Pachdona Road Km 000.01-000.06 L 0.05 30316 Regional DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>4 27.65 10.78<br />

R301 Tongi-Pachdona Road Km 000.00-000.01 S 0.01 30316 Regional DBST 25mm @ 25% Crk 2013 0.041 8.87 1.61<br />

R301 Tongi-Pachdona Road Km 000.06-000.71 S 0.64 30316 Regional DBST 25mm @ 25% Crk 2013 1.928 21.98 137.15<br />

R301 Tongi-Pachdona Road Km 004.90-005.40 S 0.50 21334 Regional DBST 25mm @ 25% Crk 2013 0.692 27.90 67.67<br />

R301 Tongi-Pachdona Road Km 005.60-005.90 S 0.30 21334 Regional DBST 25mm @ 25% Crk 2013 0.415 28.79 42.73<br />

R301 Tongi-Pachdona Road Km 008.00-008.10 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.138 7.39 3.19<br />

R301 Tongi-Pachdona Road Km 026.03-026.43 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.211 11.47 19.38<br />

R301 Tongi-Pachdona Road Km 001.30-001.40 S 0.10 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.436 27.67 13.63<br />

R301 Tongi-Pachdona Road Km 001.90-002.50 S 0.60 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 2.106 33.50 81.76<br />

R301 Tongi-Pachdona Road Km 002.60-002.70 S 0.10 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.349 40.02 17.62<br />

R301 Tongi-Pachdona Road Km 002.80-004.10 S 1.30 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 4.531 38.79 215.19<br />

Appendix-B: Page: 22 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R301 Tongi-Pachdona Road Km 004.20-004.70 S 0.50 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 1.743 31.24 66.66<br />

R301 Tongi-Pachdona Road Km 006.30-006.50 S 0.20 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.697 38.<strong>12</strong> 31.61<br />

R301 Tongi-Pachdona Road Km 006.60-006.80 S 0.20 21334 Regional Overlay 60mm @ IRI 5.5-9 2013 0.792 33.73 33.74<br />

R301 Tongi-Pachdona Road Km 006.90-007.50 S 0.60 8310 Regional Overlay 60mm @ IRI 5.5-9 2013 2.102 22.09 55.26<br />

R301 Tongi-Pachdona Road Km 008.40-009.30 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.282 <strong>12</strong>.29 51.28<br />

R301 Tongi-Pachdona Road Km 024.70-025.93 S 1.<strong>23</strong> 4285 Regional Overlay 60mm @ IRI 7-9 2013 4.436 11.08 67.63<br />

R302 Kaliganj Bazr Road Km 004.60-004.70 S 0.10 3076 Regional DBST @ Traff 2000-4000 2013 0.138 6.60 3.24<br />

R302 Kaliganj Bazr Road Km 005.90-006.20 S 0.30 3076 Regional DBST @ Traff 2000-4000 2013 0.415 5.15 6.21<br />

R302 Kaliganj Bazr Road Km 000.00-000.10 S 0.10 3076 Regional DBST 25mm @ 25% Crk 2013 0.138 1.74 0.44<br />

R302 Kaliganj Bazr Road Km 000.30-001.40 S 1.10 3076 Regional DBST 25mm @ 25% Crk 2013 1.560 0.99 2.88<br />

R302 Kaliganj Bazr Road Km 006.40-007.04 S 0.64 3076 Regional DBST 25mm @ 25% Crk 2013 0.885 4.90 15.50<br />

R302 Kaliganj Bazr Road Km 005.00-005.20 S 0.20 3076 Regional Overlay 50mm @ IRI 5-7 2013 0.585 6.82 5.84<br />

R302 Kaliganj Bazr Road Km 001.80-003.00 S 1.20 3076 Regional Overlay 50mm @ IRI 7-9 2013 3.508 4.07 17.77<br />

R302 Kaliganj Bazr Road Km 003.80-004.20 S 0.40 3076 Regional Overlay 50mm @ IRI 7-9 2013 1.169 6.96 13.54<br />

R302 Kaliganj Bazr Road Km 005.60-005.70 S 0.10 3076 Regional Overlay 50mm @ IRI 7-9 2013 0.292 6.66 3.26<br />

R303 Tongi By-Pass Road Km 000.00-000.10 S 0.10 10199 Regional DBST 25mm @ 25% Crk 2013 0.136 <strong>12</strong>.40 5.22<br />

R303 Tongi By-Pass Road Km 000.90-001.40 S 0.50 10199 Regional DBST 25mm @ 25% Crk 2013 0.677 13.78 30.09<br />

R303 Tongi By-Pass Road Km 000.20-000.30 S 0.10 10199 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 <strong>12</strong>.66 6.33<br />

R303 Tongi By-Pass Road Km 000.60-000.70 S 0.10 10199 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 20.20 9.04<br />

R310 Joydebpur-Itakhola Road Km 000.00-000.10 S 0.10 17870 Regional DBST @ Traff >6000 2013 0.287 8.76 8.78<br />

R310 Joydebpur-Itakhola Road Km 000.20-001.70 S 1.50 17870 Regional DBST @ Traff >6000 2013 4.261 15.98 263.76<br />

R310 Joydebpur-Itakhola Road Km 003.80-004.20 S 0.40 6578 Regional DBST 25mm @ 25% Crk 2013 0.816 2.64 4.87<br />

R310 Joydebpur-Itakhola Road Km 004.50-005.10 S 0.60 6578 Regional DBST 25mm @ 25% Crk 2013 1.208 1.54 3.92<br />

R310 Joydebpur-Itakhola Road Km 007.40-010.29 S 2.89 6578 Regional DBST 25mm @ 25% Crk 2013 3.828 0.88 5.47<br />

R310 Joydebpur-Itakhola Road Km 001.90-002.20 S 0.30 17870 Regional Overlay 60mm @ IRI 5.5-9 2013 2.<strong>12</strong>8 20.25 56.96<br />

R310 Joydebpur-Itakhola Road Km 002.60-003.40 S 0.80 5531 Regional Overlay 60mm @ IRI 5.5-9 2013 4.854 2.33 13.79<br />

R310 Joydebpur-Itakhola Road Km 005.20-005.50 S 0.30 6578 Regional Overlay 60mm @ IRI 5.5-9 2013 0.896 11.00 10.68<br />

R310 Joydebpur-Itakhola Road Km 010.48-011.36 S 0.88 6578 Regional Overlay 60mm @ IRI 5.5-9 2013 2.886 11.28 36.81<br />

R310 Joydebpur-Itakhola Road Km 011.50-034.73 S <strong>23</strong>.<strong>23</strong> 6578 Regional Overlay 60mm @ IRI 5.5-9 2013 79.668 8.96 789.45<br />

R311 Joydebpur -Ordinance Factory Km 000.00-000.20 S 0.20 2929 Regional DBST 25mm @ 25% Crk 2013 0.188 2.44 0.78<br />

R311 Joydebpur -Ordinance Factory Km 001.40-001.50 S 0.10 2929 Regional DBST 25mm @ 25% Crk 2013 0.094 4.14 0.71<br />

R311 Joydebpur -Ordinance Factory Km 000.30-000.90 S 0.60 2929 Regional Overlay 50mm @ IRI 5-7 2013 1.190 3.33 4.38<br />

R311 Joydebpur -Ordinance Factory Km 001.10-001.30 S 0.20 2929 Regional Overlay 50mm @ IRI 5-7 2013 0.397 4.77 2.09<br />

R311 Joydebpur -Ordinance Factory Km 002.00-002.20 S 0.20 2929 Regional Overlay 50mm @ IRI 5-7 2013 0.397 4.78 1.95<br />

R311 Joydebpur -Ordinance Factory Km 003.90-004.10 S 0.20 2929 Regional Overlay 50mm @ IRI 5-7 2013 0.397 4.85 1.96<br />

Appendix-B: Page: <strong>23</strong> of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R311 Joydebpur -Ordinance Factory Km 001.50-002.00 S 0.50 2929 Regional Overlay 50mm @ IRI 7-9 2013 0.992 4.05 5.26<br />

R311 Joydebpur -Ordinance Factory Km 002.60-003.10 S 0.50 2929 Regional Overlay 50mm @ IRI 7-9 2013 0.992 4.01 5.39<br />

R311 Joydebpur -Ordinance Factory Km 003.50-003.60 S 0.10 2929 Regional Overlay 50mm @ IRI 7-9 2013 0.198 6.94 1.56<br />

R313 Mawna-Monohardi Road Km 008.57-008.87 S 0.30 3571 Regional DBST @ Traff 2000-4000 2013 0.222 3.13 1.57<br />

R313 Mawna-Monohardi Road Km 019.77-020.57 S 0.80 3571 Regional DBST @ Traff 2000-4000 2013 0.594 3.95 7.33<br />

R313 Mawna-Monohardi Road Km 021.97-022.17 S 0.20 5572 Regional DBST @ Traff 4000-6000 2013 0.247 8.10 5.77<br />

R313 Mawna-Monohardi Road Km 006.35-006.47 S 0.11 3019 Regional DBST 25mm @ 25% Crk 2013 0.094 5.78 1.50<br />

R313 Mawna-Monohardi Road Km 006.77-007.07 S 0.30 3571 Regional DBST 25mm @ 25% Crk 2013 0.252 1.64 0.77<br />

R313 Mawna-Monohardi Road Km 018.07-018.27 S 0.20 3571 Regional DBST 25mm @ 25% Crk 2013 0.148 4.81 2.21<br />

R313 Mawna-Monohardi Road Km 020.97-021.07 S 0.10 3571 Regional DBST 25mm @ 25% Crk 2013 0.074 4.06 0.96<br />

R313 Mawna-Monohardi Road Km 025.17-025.27 S 0.10 5572 Regional DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>4 4.99 1.05<br />

R313 Mawna-Monohardi Road Km 033.07-033.37 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.408 5.60 6.86<br />

R313 Mawna-Monohardi Road Km 033.47-033.57 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 5.82 1.53<br />

R313 Mawna-Monohardi Road Km 034.97-035.07 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 5.99 1.63<br />

R313 Mawna-Monohardi Road Km 000.00-000.90 S 0.90 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.785 8.33 20.35<br />

R313 Mawna-Monohardi Road Km 019.27-019.37 S 0.10 3571 Regional Overlay 50mm @ IRI 5-7 2013 0.157 5.44 1.34<br />

R313 Mawna-Monohardi Road Km 001.70-002.70 S 1.00 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.775 7.97 19.18<br />

R313 Mawna-Monohardi Road Km 003.40-004.20 S 0.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.420 6.09 10.59<br />

R313 Mawna-Monohardi Road Km 004.80-004.90 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.177 9.44 1.99<br />

R313 Mawna-Monohardi Road Km 007.27-007.47 S 0.20 3571 Regional Overlay 50mm @ IRI 7-9 2013 0.355 5.19 2.50<br />

R313 Mawna-Monohardi Road Km 017.47-017.77 S 0.30 3571 Regional Overlay 50mm @ IRI 7-9 2013 0.470 7.02 4.82<br />

R313 Mawna-Monohardi Road Km 0<strong>23</strong>.27-0<strong>23</strong>.87 S 0.60 5572 Regional Overlay 60mm @ IRI 5.5-9 2013 1.867 15.31 36.11<br />

R313 Mawna-Monohardi Road Km 031.67-032.87 S 1.20 4741 Regional Overlay 60mm @ IRI 7-9 2013 4.107 6.54 42.86<br />

R313 Mawna-Monohardi Road Km 035.37-035.47 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 <strong>12</strong>.71 5.04<br />

R314 Gafargaon-Mawna Road Km 037.00-042.16 S 5.16 1346 Regional Overlay 50mm @ IRI 7-9 2013 9.692 2.47 27.72<br />

R315 Mawna-Nabinagar Road Km 031.00-031.50 S 0.50 2048 Regional DBST @ Traff 2000-4000 2013 0.420 6.27 8.65<br />

R315 Mawna-Nabinagar Road Km 034.40-034.60 S 0.20 2048 Regional DBST @ Traff 2000-4000 2013 0.153 9.41 5.13<br />

R315 Mawna-Nabinagar Road Km 034.60-034.80 S 0.20 2048 Regional DBST @ Traff 2000-4000 2013 0.153 3.33 1.40<br />

R315 Mawna-Nabinagar Road Km 034.80-036.10 S 1.30 2048 Regional DBST @ Traff 2000-4000 2013 0.995 8.75 31.03<br />

R315 Mawna-Nabinagar Road Km 033.70-034.40 S 0.70 2048 Regional DBST 25mm @ 25% Crk 2013 0.536 3.31 4.73<br />

R315 Mawna-Nabinagar Road Km 036.10-036.20 S 0.10 2048 Regional DBST 25mm @ 25% Crk 2013 0.077 6.29 0.90<br />

R315 Mawna-Nabinagar Road Km 032.50-033.60 S 1.10 2048 Regional Overlay 50mm @ IRI 5-7 2013 1.780 7.29 15.04<br />

R315 Mawna-Nabinagar Road Km 037.90-039.40 S 1.50 2048 Regional Overlay 50mm @ IRI 5-7 2013 2.427 4.13 10.34<br />

R315 Mawna-Nabinagar Road Km 000.00-030.60 S 30.60 3372 Regional Overlay 50mm @ IRI 7-9 2013 60.053 7.28 662.49<br />

R505 Nabinagar-Kaliakoir Road Km 014.00-015.83 S 1.83 17384 Regional DBST @ Traff >6000 2013 3.381 19.30 229.48<br />

Appendix-B: Page: 24 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Sub-total Gazipur Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

819.<strong>12</strong>8<br />

NPV /<br />

Cost<br />

NPV<br />

Jamalpur Division<br />

N4 Joydebpur-Jamalpur Road Km 130.81-137.61 S 6.80 9061 National Overlay 50mm @ IRI 4-7 2013 18.918 14.27 436.54<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>7.15-<strong>12</strong>7.61 S 0.46 3779 National Overlay 50mm @ IRI 4-9 2013 1.309 4.73 7.58<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>7.61-130.71 S 3.10 9061 National Overlay 60mm @ IRI 7-9 2013 10.611 8.36 147.09<br />

N4 Joydebpur-Jamalpur Road Km 143.01-143.41 S 0.40 9061 National Overlay 60mm @ IRI 7-9 2013 1.319 9.16 18.67<br />

N4 Joydebpur-Jamalpur Road Km 144.11-146.30 S 2.19 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.757 13.<strong>12</strong> 270.52<br />

Sub-total Jamalpur Division<br />

44.914<br />

Kishoreganj Division<br />

N2 Dhaka-Sylhet-Jaflong Road Km 071.71-071.94 S 0.<strong>23</strong> 11451 National Overlay 80mm @ IRI 4-9 2013 1.408 9.50 19.69<br />

N2 Dhaka-Sylhet-Jaflong Road Km 072.04-074.18 S 2.14 10258 National Overlay 80mm @ IRI 4-9 2013 13.2<strong>23</strong> 5.<strong>12</strong> 80.51<br />

R211 Itakhola-Kotiadi Road Km 032.38-044.75 S <strong>12</strong>.37 4153 Regional DBST 25mm @ 25% Crk 2013 14.240 1.33 50.29<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 017.79-022.31 S 4.52 3019 Regional Overlay 50mm @ IRI 7-9 2013 8.489 5.78 61.99<br />

R360 Mymensingh -Bhairab Road Km 108.89-109.38 S 0.48 4887 Regional DBST @ Traff 4000-6000 2013 0.658 10.35 25.47<br />

R360 Mymensingh -Bhairab Road Km 109.68-116.10 S 6.42 4887 Regional DBST 25mm @ 25% Crk 2013 9.008 7.16 221.66<br />

R360 Mymensingh -Bhairab Road Km 095.98-102.68 S 6.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 21.997 7.04 213.65<br />

R360 Mymensingh -Bhairab Road Km 102.68-108.89 S 6.22 4887 Regional Overlay 50mm @ IRI 5-7 2013 19.986 8.10 244.30<br />

R360 Mymensingh -Bhairab Road Km 095.58-095.98 S 0.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.369 13.32 <strong>23</strong>.04<br />

R364 Battoli - Kishoreganj Road Km 003.00-003.10 S 0.09 3019 Regional DBST @ Traff 2000-4000 2013 0.0<strong>23</strong> 11.50 1.07<br />

Sub-total Kishoreganj Division<br />

90.402<br />

Manikganj Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 051.03-057.46 S 6.43 7636 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.981 9.18 420.88<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 057.46-065.56 S 8.10 11451 National Overlay 80mm @ IRI 4-9 2013 45.909 10.67 578.22<br />

N503 Utholi-Aricha Road Km 001.58-003.25 L 1.67 2015 National DBST 25mm @ 25% Crk 2013 2.366 1.04 7.70<br />

N503 Utholi-Aricha Road Km 001.58-003.25 R 1.67 2015 National DBST 25mm @ 25% Crk 2013 2.366 1.04 7.70<br />

R315 Mawna-Nabinagar Road Km 039.40-043.30 S 3.90 2048 Regional Overlay 50mm @ IRI 5-7 2013 6.310 5.04 28.61<br />

R315 Mawna-Nabinagar Road Km 044.00-044.70 S 0.70 2048 Regional Overlay 50mm @ IRI 5-7 2013 1.133 3.93 5.<strong>12</strong><br />

R315 Mawna-Nabinagar Road Km 044.80-045.00 S 0.20 2048 Regional Overlay 50mm @ IRI 5-7 2013 0.324 6.27 2.25<br />

R505 Nabinagar-Kaliakoir Road Km 000.00-009.10 S 9.10 13534 Regional Overlay 60mm @ IRI 5.5-9 2013 43.154 10.97 754.09<br />

R506 Aricha -Daulatpur-Tangail Road Km 000.00-001.20 S 1.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.382 <strong>12</strong>.64 57.00<br />

R506 Aricha -Daulatpur-Tangail Road Km 003.90-005.00 S 1.10 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.975 7.68 19.17<br />

Appendix-B: Page: 25 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R506 Aricha -Daulatpur-Tangail Road Km 001.70-003.10 S 1.40 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.011 6.51 24.75<br />

R506 Aricha -Daulatpur-Tangail Road Km 010.30-010.70 S 0.40 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.724 8.87 8.40<br />

R506 Aricha -Daulatpur-Tangail Road Km 001.20-001.70 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.6<strong>12</strong> 15.03 29.66<br />

R506 Aricha -Daulatpur-Tangail Road Km 003.10-003.90 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.639 9.57 36.90<br />

R506 Aricha -Daulatpur-Tangail Road Km 005.00-005.20 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.672 10.11 9.92<br />

Sub-total Manikganj Division<br />

139.559<br />

Munshiganj Division<br />

N8 Dhaka -Patuakhali Road Km 003.60-004.10 S 0.50 11451 National DBST @ Traff >6000 2013 1.050 15.29 73.41<br />

N8 Dhaka -Patuakhali Road Km 0<strong>12</strong>.50-0<strong>12</strong>.70 S 0.20 11451 National DBST @ Traff >6000 2013 0.371 11.49 18.89<br />

N8 Dhaka -Patuakhali Road Km 013.80-014.10 S 0.30 11451 National DBST @ Traff >6000 2013 0.556 11.69 28.83<br />

N8 Dhaka -Patuakhali Road Km 014.20-014.60 S 0.40 11451 National DBST @ Traff >6000 2013 0.741 14.32 47.10<br />

N8 Dhaka -Patuakhali Road Km 010.70-011.00 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.852 <strong>12</strong>.91 29.26<br />

N8 Dhaka -Patuakhali Road Km 0<strong>12</strong>.70-013.80 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.791 6.36 50.01<br />

N8 Dhaka -Patuakhali Road Km 019.10-019.90 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.939 <strong>12</strong>.55 76.56<br />

N8 Dhaka -Patuakhali Road Km 033.10-034.93 S 1.83 11451 National Overlay 80mm @ IRI 4-9 2013 11.297 9.49 157.85<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 008.83-010.22 S 1.39 13225 Regional Overlay 60mm @ IRI 5.5-9 2013 4.798 15.01 <strong>12</strong>0.25<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 0<strong>12</strong>.82-018.82 S 6.00 8882 Regional Overlay 60mm @ IRI 5.5-9 2013 21.0<strong>23</strong> 10.27 354.36<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 010.42-011.32 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.081 7.04 34.59<br />

R813 Muktarpur - Munshiganj Road Km 000.40-001.60 S 1.20 3788 Regional DBST @ Traff 2000-4000 2013 1.067 5.30 20.15<br />

R813 Muktarpur - Munshiganj Road Km 002.00-002.50 S 0.50 3788 Regional DBST @ Traff 2000-4000 2013 0.445 5.39 8.54<br />

R813 Muktarpur - Munshiganj Road Km 002.50-004.00 S 1.50 3788 Regional DBST @ Traff 2000-4000 2013 1.752 2.08 9.46<br />

R813 Muktarpur - Munshiganj Road Km 000.00-000.40 S 0.40 3788 Regional DBST 25mm @ 25% Crk 2013 0.356 2.55 1.80<br />

R820 Zinzira-Srinagar Road Km 016.73-022.91 S 6.18 4579 Regional DBST @ Traff 4000-6000 2013 7.744 10.04 258.77<br />

R820 Zinzira-Srinagar Road Km 041.88-042.58 S 0.70 4887 Regional DBST @ Traff 4000-6000 2013 0.968 9.64 36.40<br />

R820 Zinzira-Srinagar Road Km 029.21-040.18 S 10.97 4887 Regional Overlay 50mm @ IRI 5-7 2013 30.756 14.42 591.37<br />

R820 Zinzira-Srinagar Road Km 010.47-016.73 S 6.26 5393 Regional Overlay 60mm @ IRI 5.5-9 2013 21.994 5.41 145.40<br />

R820 Zinzira-Srinagar Road Km 040.28-041.48 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.182 7.49 47.10<br />

Sub-total Munshiganj Division<br />

<strong>12</strong>5.761<br />

Mymensingh Division<br />

N3 Dhaka -Mymensingh Road Km 059.20-059.30 S 0.10 11451 National DBST @ Traff >6000 2013 0.185 <strong>12</strong>.60 9.63<br />

N3 Dhaka -Mymensingh Road Km 069.10-071.10 S 2.00 11451 National DBST @ Traff >6000 2013 4.910 6.69 173.59<br />

N3 Dhaka -Mymensingh Road Km 074.30-074.50 S 0.20 11451 National DBST @ Traff >6000 2013 0.371 13.86 22.64<br />

Appendix-B: Page: 26 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N3 Dhaka -Mymensingh Road Km 088.80-090.00 S 1.20 11451 National DBST @ Traff >6000 2013 2.2<strong>23</strong> <strong>12</strong>.14 133.22<br />

N3 Dhaka -Mymensingh Road Km 108.48-109.00 L 0.52 11451 National Overlay 80mm @ IRI 4-9 2013 3.210 11.84 46.94<br />

N3 Dhaka -Mymensingh Road Km 108.48-109.00 R 0.52 11451 National Overlay 80mm @ IRI 4-9 2013 3.210 11.84 46.94<br />

N3 Dhaka -Mymensingh Road Km 058.00-059.20 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.408 6.53 52.44<br />

N3 Dhaka -Mymensingh Road Km 059.30-064.80 S 5.50 11451 National Overlay 80mm @ IRI 4-9 2013 34.497 7.47 318.18<br />

N3 Dhaka -Mymensingh Road Km 064.90-067.50 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 16.051 9.30 184.31<br />

N3 Dhaka -Mymensingh Road Km 067.90-069.10 S 1.20 11451 National Overlay 80mm @ IRI 4-9 2013 7.408 13.63 <strong>12</strong>4.65<br />

N3 Dhaka -Mymensingh Road Km 071.10-072.20 S 1.10 11451 National Overlay 80mm @ IRI 4-9 2013 6.791 8.86 88.61<br />

N3 Dhaka -Mymensingh Road Km 072.20-073.10 S 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 5.556 9.80 65.62<br />

N3 Dhaka -Mymensingh Road Km 073.10-073.60 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.087 6.36 24.<strong>23</strong><br />

N3 Dhaka -Mymensingh Road Km 073.60-073.80 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 13.02 19.36<br />

N3 Dhaka -Mymensingh Road Km 073.80-074.30 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.087 6.80 24.76<br />

N3 Dhaka -Mymensingh Road Km 074.50-074.60 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.617 6.52 4.97<br />

N3 Dhaka -Mymensingh Road Km 074.60-077.20 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 16.051 17.04 337.77<br />

N3 Dhaka -Mymensingh Road Km 077.20-085.70 S 8.50 11451 National Overlay 80mm @ IRI 4-9 2013 52.474 7.98 516.84<br />

N3 Dhaka -Mymensingh Road Km 085.70-088.80 S 3.10 11451 National Overlay 80mm @ IRI 4-9 2013 19.138 13.94 361.89<br />

N3 Dhaka -Mymensingh Road Km 090.00-094.00 S 4.00 11451 National Overlay 80mm @ IRI 4-9 2013 26.241 9.93 415.75<br />

N3 Dhaka -Mymensingh Road Km 094.00-097.20 S 3.20 11451 National Overlay 80mm @ IRI 4-9 2013 19.749 8.76 254.78<br />

N3 Dhaka -Mymensingh Road Km 097.20-106.60 S 9.40 11451 National Overlay 80mm @ IRI 4-9 2013 58.572 8.60 621.79<br />

N309 Mymensingh Town By-Pass Road Km 005.16-007.40 S 2.24 11451 National Overlay 80mm @ IRI 5-9 2013 17.724 9.11 197.79<br />

R314 Gafargaon-Mawna Road Km 010.60-010.80 S 0.20 1346 Regional DBST @ Traff 100-2000 2013 0.148 5.<strong>23</strong> 2.61<br />

R314 Gafargaon-Mawna Road Km 0<strong>12</strong>.10-0<strong>12</strong>.30 S 0.20 1346 Regional DBST @ Traff 100-2000 2013 0.148 4.32 2.15<br />

R314 Gafargaon-Mawna Road Km 000.00-000.80 S 0.80 1346 Regional DBST 25mm @ 25% Crk 2013 0.771 1.<strong>23</strong> 2.04<br />

R314 Gafargaon-Mawna Road Km 0<strong>12</strong>.30-0<strong>12</strong>.70 S 0.40 1346 Regional DBST 25mm @ 25% Crk 2013 0.296 1.<strong>12</strong> 0.62<br />

R314 Gafargaon-Mawna Road Km 013.10-013.30 S 0.20 1346 Regional DBST 25mm @ 25% Crk 2013 0.148 1.71 0.43<br />

R314 Gafargaon-Mawna Road Km 013.40-013.60 S 0.20 1346 Regional DBST 25mm @ 25% Crk 2013 0.148 1.62 0.49<br />

R314 Gafargaon-Mawna Road Km 013.70-015.10 S 1.40 1346 Regional DBST 25mm @ 25% Crk 2013 1.037 0.86 1.69<br />

R314 Gafargaon-Mawna Road Km 019.60-030.15 S 10.55 1346 Regional DBST 25mm @ 25% Crk 2013 14.753 0.73 20.11<br />

R314 Gafargaon-Mawna Road Km 001.10-003.40 S 2.30 1346 Regional Overlay 50mm @ IRI 5-7 2013 4.658 2.69 14.52<br />

R314 Gafargaon-Mawna Road Km 003.80-004.00 S 0.20 1346 Regional Overlay 50mm @ IRI 5-7 2013 0.397 2.51 1.21<br />

R314 Gafargaon-Mawna Road Km 004.50-007.50 S 3.00 1346 Regional Overlay 50mm @ IRI 5-7 2013 4.885 2.91 19.09<br />

R314 Gafargaon-Mawna Road Km 008.00-009.90 S 1.90 1346 Regional Overlay 50mm @ IRI 5-7 2013 6.803 1.28 11.33<br />

R314 Gafargaon-Mawna Road Km 010.20-010.60 S 0.40 1346 Regional Overlay 50mm @ IRI 5-7 2013 0.626 3.89 3.27<br />

R314 Gafargaon-Mawna Road Km 010.80-011.50 S 0.70 1346 Regional Overlay 50mm @ IRI 5-7 2013 1.096 4.45 5.97<br />

R314 Gafargaon-Mawna Road Km 015.60-017.10 S 1.50 1346 Regional Overlay 50mm @ IRI 5-7 2013 2.349 2.59 6.01<br />

Appendix-B: Page: 27 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R314 Gafargaon-Mawna Road Km 017.20-018.30 S 1.10 1346 Regional Overlay 50mm @ IRI 5-7 2013 1.722 2.31 4.44<br />

R314 Gafargaon-Mawna Road Km 018.70-019.60 S 0.90 1346 Regional Overlay 50mm @ IRI 5-7 2013 1.550 3.43 5.77<br />

R314 Gafargaon-Mawna Road Km 003.40-003.80 S 0.40 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.793 3.88 3.77<br />

R314 Gafargaon-Mawna Road Km 004.00-004.50 S 0.50 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.992 3.36 4.21<br />

R314 Gafargaon-Mawna Road Km 007.50-008.00 S 0.50 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.783 4.49 4.44<br />

R314 Gafargaon-Mawna Road Km 009.90-010.20 S 0.30 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.825 2.26 2.55<br />

R314 Gafargaon-Mawna Road Km 011.50-011.90 S 0.40 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.626 5.02 4.63<br />

R314 Gafargaon-Mawna Road Km 011.90-0<strong>12</strong>.10 S 0.20 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.313 5.33 2.04<br />

R314 Gafargaon-Mawna Road Km 015.30-015.50 S 0.20 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.313 4.28 1.70<br />

R314 Gafargaon-Mawna Road Km 018.30-018.70 S 0.40 1346 Regional Overlay 50mm @ IRI 7-9 2013 0.626 4.81 4.25<br />

R314 Gafargaon-Mawna Road Km 030.15-037.00 S 6.85 1346 Regional Overlay 50mm @ IRI 7-9 2013 <strong>12</strong>.866 3.<strong>23</strong> 50.86<br />

R371 Sherpur-Nakla-Mymensingh Km 030.00-030.40 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.593 3.73 6.32<br />

R371 Sherpur-Nakla-Mymensingh Km 030.40-031.00 S 0.60 4887 Regional DBST @ Traff 4000-6000 2013 0.889 5.04 15.06<br />

R371 Sherpur-Nakla-Mymensingh Km 034.70-034.77 S 0.07 4887 Regional DBST @ Traff 4000-6000 2013 0.104 10.64 4.31<br />

R371 Sherpur-Nakla-Mymensingh Km 000.00-018.10 S 18.10 4540 Regional DBST 25mm @ 25% Crk 2013 26.869 5.00 386.80<br />

R371 Sherpur-Nakla-Mymensingh Km 031.00-032.40 S 1.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.384 4.50 24.04<br />

R371 Sherpur-Nakla-Mymensingh Km 032.60-034.70 S 2.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 6.577 4.84 44.17<br />

Sub-total Mymensingh Division<br />

408.884<br />

Narayanganj Division<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.30-009.40 L 0.10 11451 National DBST @ Traff >6000 2013 0.183 17.34 14.49<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 000.00-000.70 R 0.70 11451 National DBST @ Traff >6000 2013 1.527 6.08 47.31<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 020.98-021.78 R 0.80 11451 National DBST @ Traff >6000 2013 1.940 5.97 61.14<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 005.60-006.10 R 0.50 8665 National DBST 25mm @ 25% Crk 2013 0.988 9.25 35.98<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.40-0<strong>12</strong>.40 R 3.00 11451 National Overlay 50mm @ IRI 4 2013 <strong>12</strong>.<strong>12</strong>0 14.48 316.39<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 003.70-005.40 R 1.70 8665 National Overlay 50mm @ IRI 4-7 2013 6.513 10.26 <strong>12</strong>7.74<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 006.70-009.00 R 2.30 8665 National Overlay 50mm @ IRI 4-7 2013 9.448 11.82 201.32<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.20-009.30 L 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.609 7.45 5.60<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 026.08-034.88 L 8.80 11451 National Overlay 80mm @ IRI 4-9 2013 55.340 8.19 667.51<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 035.18-035.68 L 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.046 <strong>12</strong>.44 51.40<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 009.20-009.30 R 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.609 8.<strong>23</strong> 6.19<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 0<strong>12</strong>.60-016.50 R 3.90 11451 National Overlay 80mm @ IRI 4-9 2013 27.062 7.52 299.57<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 018.58-018.78 R 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 13.90 29.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 020.78-020.88 R 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 1.152 6.48 11.51<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 025.08-025.88 R 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.873 9.19 63.22<br />

Appendix-B: Page: 28 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 026.08-034.88 R 8.80 11451 National Overlay 80mm @ IRI 4-9 2013 54.471 <strong>12</strong>.52 925.03<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 035.18-036.08 R 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 5.452 15.06 101.36<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 036.28-037.78 R 1.50 11451 National Overlay 80mm @ IRI 4-9 2013 9.013 18.25 203.11<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 037.88-039.13 R 1.25 11451 National Overlay 80mm @ IRI 4-9 2013 7.511 15.70 145.57<br />

N1 Dhaka-Comilla-Chittagong-Teknaf RoadKm 024.48-025.07 S 0.59 11451 National Overlay 80mm @ IRI 4-9 2013 6.503 8.83 70.92<br />

N105 Madanpur-Joydevpur Km 000.00-006.50 S 6.50 9061 National DBST @ Traff >6000 2013 6.583 9.49 270.14<br />

N105 Madanpur-Joydevpur Km 006.60-014.34 S 7.74 11451 National Overlay 50mm @ IRI 5 2013 27.890 14.20 676.13<br />

N105 Madanpur-Joydevpur Km 014.34-017.54 S 3.20 11451 National Overlay 50mm @ IRI 5 2013 <strong>12</strong>.193 8.14 147.97<br />

N105 Madanpur-Joydevpur Km 006.50-006.60 S 0.10 9061 National Overlay 50mm @ IRI 5-7 2013 0.214 21.52 6.02<br />

N105 Madanpur-Joydevpur Km 017.54-018.00 S 0.46 11451 National Overlay 80mm @ IRI 5-9 2013 2.740 8.87 30.02<br />

N2 Dhaka-Sylhet-Jaflong Road Km 000.00-000.13 L 0.13 21762 National Overlay 50mm @ IRI 4 2013 0.391 14.44 8.33<br />

N2 Dhaka-Sylhet-Jaflong Road Km 000.00-000.13 R 0.13 21762 National Overlay 50mm @ IRI 4 2013 0.391 14.44 8.33<br />

N2 Dhaka-Sylhet-Jaflong Road Km 000.13-017.00 S 16.88 18<strong>23</strong>3 National Overlay 50mm @ IRI 4 2013 102.6<strong>12</strong> 6.11 910.82<br />

R111 Signboard -Narayanganj Road Km 000.00-003.20 S 3.20 15970 Regional DBST 25mm @ 25% Crk 2013 6.0<strong>23</strong> 10.22 228.52<br />

R113 Madanpur-Sayedpur Road Km 002.30-005.40 S 3.10 4887 Regional DBST @ Traff 4000-6000 2013 4.043 <strong>12</strong>.<strong>23</strong> 176.86<br />

R113 Madanpur-Sayedpur Road Km 011.10-011.20 S 0.10 5419 Regional DBST @ Traff 4000-6000 2013 0.138 8.57 4.33<br />

R113 Madanpur-Sayedpur Road Km 005.40-011.10 S 5.70 5074 Regional DBST 25mm @ 25% Crk 2013 6.800 5.71 131.52<br />

R113 Madanpur-Sayedpur Road Km 011.20-011.88 S 0.68 5419 Regional DBST 25mm @ 25% Crk 2013 0.804 3.60 6.90<br />

R113 Madanpur-Sayedpur Road Km 000.00-001.30 S 1.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.976 9.79 55.20<br />

R113 Madanpur-Sayedpur Road Km 001.80-002.00 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.585 10.86 9.26<br />

R113 Madanpur-Sayedpur Road Km 001.30-001.80 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.743 14.34 31.58<br />

R114 Nayapur-Raipura Road Km 015.50-015.80 S 0.30 1140 Regional DBST @ Traff 100-2000 2013 0.282 1.56 1.41<br />

R114 Nayapur-Raipura Road Km 019.40-019.70 S 0.30 1140 Regional DBST @ Traff 100-2000 2013 0.282 1.43 1.25<br />

R114 Nayapur-Raipura Road Km 022.50-022.65 S 0.15 1140 Regional DBST @ Traff 100-2000 2013 0.141 1.47 0.66<br />

R114 Nayapur-Raipura Road Km 004.60-005.40 S 0.80 4082 Regional DBST @ Traff 4000-6000 2013 0.751 3.17 8.11<br />

R114 Nayapur-Raipura Road Km 006.90-007.60 S 0.70 4082 Regional DBST @ Traff 4000-6000 2013 0.657 2.72 5.85<br />

R114 Nayapur-Raipura Road Km 007.60-009.35 S 1.75 4082 Regional DBST @ Traff 4000-6000 2013 1.638 1.59 6.76<br />

R114 Nayapur-Raipura Road Km 003.20-003.70 S 0.50 4082 Regional DBST 25mm @ 25% Crk 2013 0.469 1.37 1.36<br />

R114 Nayapur-Raipura Road Km 022.40-022.50 S 0.10 1140 Regional DBST 25mm @ 25% Crk 2013 0.094 1.98 0.39<br />

R114 Nayapur-Raipura Road Km 005.40-005.80 S 0.40 4082 Regional Overlay 50mm @ IRI 5-7 2013 0.793 3.<strong>12</strong> 2.80<br />

R114 Nayapur-Raipura Road Km 006.50-006.90 S 0.40 4082 Regional Overlay 50mm @ IRI 5-7 2013 0.793 3.27 2.34<br />

R114 Nayapur-Raipura Road Km 009.35-015.50 S 6.16 1140 Regional Overlay 50mm @ IRI 5-7 2013 <strong>12</strong>.208 0.81 11.60<br />

R114 Nayapur-Raipura Road Km 018.00-019.40 S 1.40 1140 Regional Overlay 50mm @ IRI 5-7 2013 2.777 0.95 3.<strong>12</strong><br />

R114 Nayapur-Raipura Road Km 015.80-016.90 S 1.10 1140 Regional Overlay 50mm @ IRI 7-9 2013 2.182 1.00 2.64<br />

R114 Nayapur-Raipura Road Km 016.90-018.00 S 1.10 1140 Regional Overlay 50mm @ IRI 7-9 2013 2.182 1.50 4.27<br />

Appendix-B: Page: 29 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R114 Nayapur-Raipura Road Km 019.70-020.50 S 0.80 1140 Regional Overlay 50mm @ IRI 7-9 2013 1.587 1.03 1.98<br />

R114 Nayapur-Raipura Road Km 020.50-022.40 S 1.90 1140 Regional Overlay 50mm @ IRI 7-9 2013 3.768 1.33 5.96<br />

R114 Nayapur-Raipura Road Km 000.00-003.20 S 3.20 4082 Regional Overlay 60mm @ IRI 7-9 2013 8.324 2.61 <strong>23</strong>.76<br />

R114 Nayapur-Raipura Road Km 004.00-004.60 S 0.60 4082 Regional Overlay 60mm @ IRI 7-9 2013 1.419 3.15 4.64<br />

R114 Nayapur-Raipura Road Km 005.80-006.50 S 0.70 4082 Regional Overlay 60mm @ IRI 7-9 2013 1.655 3.30 5.98<br />

R201 Tarabo-Demraghat Road Km 000.00-002.<strong>12</strong> S 2.<strong>12</strong> 19185 Regional Overlay 60mm @ IRI 5.5-9 2013 8.720 19.18 270.49<br />

R202 Bhulta-Rampura Road Km 000.00-000.60 S 0.60 6255 Regional DBST @ IRI><strong>12</strong> 2013 1.037 1.50 14.52<br />

R202 Bhulta-Rampura Road Km 001.70-002.90 S 1.20 6255 Regional DBST @ IRI><strong>12</strong> 2013 2.075 1.72 33.20<br />

R202 Bhulta-Rampura Road Km 003.10-003.70 S 0.60 6255 Regional DBST @ IRI><strong>12</strong> 2013 1.037 1.70 16.41<br />

R202 Bhulta-Rampura Road Km 002.90-003.10 S 0.20 6255 Regional DBST @ Traff >6000 2013 0.346 3.97 5.31<br />

R202 Bhulta-Rampura Road Km 003.70-003.80 S 0.10 6255 Regional DBST @ Traff >6000 2013 0.173 2.15 1.14<br />

R202 Bhulta-Rampura Road Km 003.90-004.00 S 0.10 6255 Regional DBST 25mm @ 25% Crk 2013 0.173 1.97 0.90<br />

R202 Bhulta-Rampura Road Km 007.20-009.10 S 1.90 4887 Regional DBST 25mm @ 25% Crk 2013 1.821 6.56 44.71<br />

R202 Bhulta-Rampura Road Km 004.40-004.70 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.096 5.43 10.86<br />

R202 Bhulta-Rampura Road Km 000.60-000.90 S 0.30 6255 Regional Overlay 60mm @ IRI 5.5-9 2013 1.307 3.42 5.46<br />

R202 Bhulta-Rampura Road Km 001.00-001.30 S 0.30 6255 Regional Overlay 60mm @ IRI 5.5-9 2013 1.307 3.68 6.13<br />

R202 Bhulta-Rampura Road Km 001.50-001.70 S 0.20 6255 Regional Overlay 60mm @ IRI 5.5-9 2013 0.871 4.42 4.89<br />

R202 Bhulta-Rampura Road Km 005.10-005.70 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.614 5.02 20.89<br />

R202 Bhulta-Rampura Road Km 005.90-007.00 S 1.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.792 4.92 37.56<br />

Sub-total Narayanganj Division<br />

456.090<br />

Narsingdi Division<br />

N2 Dhaka-Sylhet-Jaflong Road Km 033.58-033.65 L 0.06 9032 National DBST 25mm @ 25% Crk 2013 0.071 <strong>12</strong>.33 2.91<br />

N2 Dhaka-Sylhet-Jaflong Road Km 063.97-064.11 L 0.14 8884 National DBST 25mm @ 25% Crk 2013 0.177 9.81 6.26<br />

N2 Dhaka-Sylhet-Jaflong Road Km 041.54-041.64 L 0.10 16426 National Overlay 50mm @ IRI 4 2013 0.369 13.66 8.43<br />

N2 Dhaka-Sylhet-Jaflong Road Km 033.58-033.65 R 0.06 16426 National Overlay 50mm @ IRI 4 2013 0.217 22.30 9.26<br />

N2 Dhaka-Sylhet-Jaflong Road Km 041.54-041.64 R 0.10 16426 National Overlay 50mm @ IRI 4 2013 0.343 17.82 9.00<br />

N2 Dhaka-Sylhet-Jaflong Road Km 063.97-064.11 R 0.14 11669 National Overlay 50mm @ IRI 4 2013 0.545 16.41 16.<strong>12</strong><br />

N2 Dhaka-Sylhet-Jaflong Road Km 017.70-027.40 S 9.70 17148 National Overlay 50mm @ IRI 4 2013 37.960 18.25 <strong>12</strong>49.48<br />

N2 Dhaka-Sylhet-Jaflong Road Km 033.65-041.54 S 7.89 16426 National Overlay 50mm @ IRI 4 2013 30.875 16.87 939.24<br />

N2 Dhaka-Sylhet-Jaflong Road Km 041.64-042.60 S 0.96 16426 National Overlay 50mm @ IRI 4 2013 3.762 11.10 71.27<br />

N2 Dhaka-Sylhet-Jaflong Road Km 042.82-051.75 S 8.93 13453 National Overlay 50mm @ IRI 4 2013 34.946 14.01 882.80<br />

N2 Dhaka-Sylhet-Jaflong Road Km 027.49-027.65 L 0.15 9061 National Overlay 50mm @ IRI 4-7 2013 0.431 11.70 7.26<br />

N2 Dhaka-Sylhet-Jaflong Road Km 029.89-030.<strong>12</strong> L 0.22 9061 National Overlay 50mm @ IRI 4-7 2013 0.617 16.73 16.69<br />

N2 Dhaka-Sylhet-Jaflong Road Km 051.75-051.89 L 0.14 8987 National Overlay 50mm @ IRI 4-7 2013 0.402 10.83 5.95<br />

Appendix-B: Page: 30 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N2 Dhaka-Sylhet-Jaflong Road Km 054.55-054.91 L 0.36 8983 National Overlay 50mm @ IRI 4-7 2013 0.942 14.02 21.68<br />

N2 Dhaka-Sylhet-Jaflong Road Km 029.89-030.<strong>12</strong> R 0.22 9061 National Overlay 50mm @ IRI 4-7 2013 0.524 19.46 16.48<br />

N2 Dhaka-Sylhet-Jaflong Road Km 051.75-051.89 R 0.14 8987 National Overlay 50mm @ IRI 4-7 2013 0.402 10.83 5.95<br />

N2 Dhaka-Sylhet-Jaflong Road Km 052.76-052.87 R 0.11 8987 National Overlay 50mm @ IRI 4-7 2013 0.319 <strong>12</strong>.56 5.76<br />

N2 Dhaka-Sylhet-Jaflong Road Km 054.55-054.91 R 0.36 8983 National Overlay 50mm @ IRI 4-7 2013 0.942 14.02 21.68<br />

N2 Dhaka-Sylhet-Jaflong Road Km 052.76-052.87 L 0.11 <strong>12</strong>877 National Overlay 80mm @ IRI 4-9 2013 0.685 15.69 13.28<br />

N2 Dhaka-Sylhet-Jaflong Road Km 058.95-059.00 L 0.05 11451 National Overlay 80mm @ IRI 4-9 2013 0.257 20.51 6.45<br />

N2 Dhaka-Sylhet-Jaflong Road Km 027.49-027.65 R 0.15 11451 National Overlay 80mm @ IRI 4-9 2013 0.945 14.37 16.76<br />

N2 Dhaka-Sylhet-Jaflong Road Km 058.95-059.00 R 0.05 11451 National Overlay 80mm @ IRI 4-9 2013 0.257 20.51 6.45<br />

N2 Dhaka-Sylhet-Jaflong Road Km 027.65-029.85 S 2.21 11451 National Overlay 80mm @ IRI 4-9 2013 13.637 13.51 250.00<br />

N2 Dhaka-Sylhet-Jaflong Road Km 030.<strong>12</strong>-033.47 S 3.36 15267 National Overlay 80mm @ IRI 4-9 2013 20.730 14.97 437.96<br />

N2 Dhaka-Sylhet-Jaflong Road Km 054.91-058.95 S 4.04 11451 National Overlay 80mm @ IRI 4-9 2013 24.953 10.01 352.55<br />

R114 Nayapur-Raipura Road Km 022.65-025.00 S 2.35 1140 Regional DBST @ Traff 100-2000 2013 2.229 1.27 9.07<br />

R114 Nayapur-Raipura Road Km 026.60-028.99 S 2.39 3019 Regional DBST @ Traff 2000-4000 2013 2.317 6.16 49.34<br />

R114 Nayapur-Raipura Road Km 025.00-025.75 S 0.75 1140 Regional DBST 25mm @ 25% Crk 2013 0.721 1.06 1.29<br />

R114 Nayapur-Raipura Road Km 025.75-026.00 S 0.25 3019 Regional DBST 25mm @ 25% Crk 2013 0.243 3.30 2.28<br />

R114 Nayapur-Raipura Road Km 026.10-026.20 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.096 4.60 1.28<br />

R114 Nayapur-Raipura Road Km 026.30-026.60 S 0.30 3019 Regional DBST 25mm @ 25% Crk 2013 0.289 2.74 1.68<br />

R114 Nayapur-Raipura Road Km 028.99-054.78 S 25.79 3806 Regional Overlay 50mm @ IRI 7-9 2013 50.746 10.44 733.91<br />

R210 Shahepratap-Narsingdi Road Km 000.00-004.73 S 4.73 8494 Regional DBST 25mm @ 25% Crk 2013 8.031 6.95 204.47<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 009.00-009.42 S 0.42 1469 Regional DBST @ Traff 100-2000 2013 0.568 0.94 1.64<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 009.42-0<strong>12</strong>.<strong>12</strong> S 2.70 1469 Regional DBST @ Traff 100-2000 2013 3.648 0.82 9.67<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 013.02-014.82 S 1.80 1469 Regional DBST @ Traff 100-2000 2013 2.445 0.79 6.29<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 001.30-008.00 S 6.70 4887 Regional DBST @ Traff 4000-6000 2013 8.970 6.<strong>23</strong> 214.62<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 008.00-008.80 S 0.80 4887 Regional DBST @ Traff 4000-6000 2013 1.055 9.02 32.25<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 000.00-000.20 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 8.85 7.75<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 0<strong>12</strong>.<strong>12</strong>-013.02 S 0.90 1469 Regional Overlay 50mm @ IRI 7-9 2013 2.584 1.05 3.15<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 014.82-015.61 S 0.79 1469 Regional Overlay 50mm @ IRI 7-9 2013 2.268 1.07 2.88<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 015.61-017.79 S 2.18 3019 Regional Overlay 50mm @ IRI 7-9 2013 4.100 6.44 32.31<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 008.80-009.00 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 10.88 8.42<br />

R301 Tongi-Pachdona Road Km 031.03-031.13 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.153 6.00 2.86<br />

R301 Tongi-Pachdona Road Km 031.33-032.86 S 1.53 4887 Regional DBST 25mm @ 25% Crk 2013 2.340 5.48 36.92<br />

R301 Tongi-Pachdona Road Km 030.63-030.73 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.324 8.09 3.75<br />

R301 Tongi-Pachdona Road Km 029.83-029.93 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.361 10.82 4.92<br />

R310 Joydebpur-Itakhola Road Km 034.73-043.00 S 8.27 4887 Regional Overlay 60mm @ IRI 7-9 2013 28.307 6.86 286.03<br />

Appendix-B: Page: 31 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Sub-total Narsingdi Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

298.359<br />

NPV /<br />

Cost<br />

NPV<br />

Sherpur Division<br />

R371 Sherpur-Nakla-Mymensingh Km 035.20-035.60 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 6.55 10.67<br />

R371 Sherpur-Nakla-Mymensingh Km 055.36-058.36 S 3.00 3786 Regional Overlay 50mm @ IRI 5-7 2013 9.395 5.22 67.64<br />

R371 Sherpur-Nakla-Mymensingh Km 034.77-035.20 S 0.43 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.606 9.74 20.62<br />

R460 Jamalpur-Sherpur-Bangaon Road Km 006.71-015.60 S 8.89 4887 Regional DBST @ Traff 4000-6000 2013 13.456 4.57 263.43<br />

R460 Jamalpur-Sherpur-Bangaon Road Km 001.20-001.80 S 0.60 4422 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.38 6.62<br />

R460 Jamalpur-Sherpur-Bangaon Road Km 002.50-006.71 S 4.21 4422 Regional Overlay 50mm @ IRI 5-7 2013 <strong>12</strong>.358 8.06 132.86<br />

R460 Jamalpur-Sherpur-Bangaon Road Km 000.70-001.20 S 0.50 4422 Regional Overlay 60mm @ IRI 7-9 2013 1.711 6.38 <strong>12</strong>.08<br />

R460 Jamalpur-Sherpur-Bangaon Road Km 001.80-002.50 S 0.70 4422 Regional Overlay 60mm @ IRI 7-9 2013 2.396 4.82 <strong>12</strong>.92<br />

Sub-total Sherpur Division<br />

43.897<br />

Tangail Division<br />

N4 Joydebpur-Jamalpur Road Km 039.89-039.99 S 0.10 11451 National DBST @ Traff >6000 2013 0.185 15.56 13.19<br />

N4 Joydebpur-Jamalpur Road Km 026.75-036.49 S 9.74 11451 National Overlay 50mm @ IRI 4 2013 38.164 10.85 706.77<br />

N4 Joydebpur-Jamalpur Road Km 091.76-097.39 S 5.63 6524 National Overlay 50mm @ IRI 4-7 2013 17.870 6.45 162.66<br />

N4 Joydebpur-Jamalpur Road Km 098.19-098.29 S 0.10 6524 National Overlay 50mm @ IRI 4-7 2013 0.313 11.82 5.80<br />

N4 Joydebpur-Jamalpur Road Km 099.09-100.59 S 1.50 6524 National Overlay 50mm @ IRI 4-7 2013 4.478 13.04 101.40<br />

N4 Joydebpur-Jamalpur Road Km 100.89-102.59 S 1.70 6524 National Overlay 50mm @ IRI 4-7 2013 4.969 10.63 93.78<br />

N4 Joydebpur-Jamalpur Road Km 102.79-103.49 S 0.70 6524 National Overlay 50mm @ IRI 4-7 2013 2.046 9.60 35.73<br />

N4 Joydebpur-Jamalpur Road Km 103.59-104.99 S 1.40 5901 National Overlay 50mm @ IRI 4-9 2013 5.013 6.54 59.59<br />

N4 Joydebpur-Jamalpur Road Km 105.09-107.46 S 2.37 3779 National Overlay 50mm @ IRI 4-9 2013 6.828 4.69 46.41<br />

N4 Joydebpur-Jamalpur Road Km 108.46-108.56 S 0.10 3779 National Overlay 50mm @ IRI 4-9 2013 0.287 6.54 2.84<br />

N4 Joydebpur-Jamalpur Road Km 108.66-109.16 S 0.50 3779 National Overlay 50mm @ IRI 4-9 2013 1.435 6.19 14.00<br />

N4 Joydebpur-Jamalpur Road Km 110.56-110.76 S 0.20 3779 National Overlay 50mm @ IRI 4-9 2013 0.574 5.79 4.96<br />

N4 Joydebpur-Jamalpur Road Km 114.46-117.51 S 3.05 3779 National Overlay 50mm @ IRI 4-9 2013 10.<strong>23</strong>0 7.08 117.11<br />

N4 Joydebpur-Jamalpur Road Km 117.51-119.51 S 2.00 3779 National Overlay 50mm @ IRI 4-9 2013 5.773 3.33 21.71<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>0.41-<strong>12</strong>0.51 S 0.10 3779 National Overlay 50mm @ IRI 4-9 2013 0.287 7.31 3.44<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>0.61-<strong>12</strong>1.61 S 1.00 3779 National Overlay 50mm @ IRI 4-9 2013 2.871 6.32 29.79<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>1.61-<strong>12</strong>1.91 S 0.30 3779 National Overlay 50mm @ IRI 4-9 2013 0.861 4.93 7.21<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>1.91-<strong>12</strong>2.01 S 0.10 3779 National Overlay 50mm @ IRI 4-9 2013 0.287 5.55 2.92<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>2.71-1<strong>23</strong>.01 S 0.30 3779 National Overlay 50mm @ IRI 4-9 2013 0.861 4.59 6.18<br />

N4 Joydebpur-Jamalpur Road Km 1<strong>23</strong>.01-1<strong>23</strong>.31 S 0.30 3779 National Overlay 50mm @ IRI 4-9 2013 0.861 7.20 9.89<br />

Appendix-B: Page: 32 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>5.61-<strong>12</strong>7.15 S 1.54 3779 National Overlay 50mm @ IRI 4-9 2013 4.432 4.64 32.62<br />

N4 Joydebpur-Jamalpur Road Km 039.99-040.99 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 6.173 8.46 64.48<br />

N4 Joydebpur-Jamalpur Road Km 040.99-041.19 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 17.59 26.82<br />

N4 Joydebpur-Jamalpur Road Km 057.92-059.72 S 1.80 11451 National Overlay 80mm @ IRI 4-9 2013 11.646 11.58 182.95<br />

N4 Joydebpur-Jamalpur Road Km 059.82-068.65 S 8.82 13569 National Overlay 80mm @ IRI 4-9 2013 54.480 10.32 866.32<br />

N4 Joydebpur-Jamalpur Road Km 072.85-073.15 S 0.30 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 1.408 16.49 32.76<br />

N4 Joydebpur-Jamalpur Road Km 074.35-075.15 S 0.80 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 3.753 21.31 104.56<br />

N4 Joydebpur-Jamalpur Road Km 075.45-078.55 S 3.10 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 18.704 18.13 418.59<br />

N4 Joydebpur-Jamalpur Road Km 078.55-078.75 S 0.20 151<strong>12</strong> National Overlay 80mm @ IRI 4-9 2013 1.<strong>23</strong>5 19.36 33.74<br />

N4 Joydebpur-Jamalpur Road Km 079.85-080.25 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.469 14.36 48.10<br />

N4 Joydebpur-Jamalpur Road Km 080.25-080.55 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.852 16.63 41.78<br />

N4 Joydebpur-Jamalpur Road Km 082.75-084.35 S 1.60 11451 National Overlay 80mm @ IRI 4-9 2013 9.746 9.61 137.90<br />

N4 Joydebpur-Jamalpur Road Km 084.35-084.95 S 0.60 11451 National Overlay 80mm @ IRI 4-9 2013 3.655 13.87 71.55<br />

N4 Joydebpur-Jamalpur Road Km 084.95-085.25 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.827 15.15 37.55<br />

N4 Joydebpur-Jamalpur Road Km 085.25-086.25 S 1.00 11451 National Overlay 80mm @ IRI 4-9 2013 6.091 16.41 141.05<br />

N4 Joydebpur-Jamalpur Road Km 086.25-086.35 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.609 14.72 <strong>12</strong>.17<br />

N4 Joydebpur-Jamalpur Road Km 086.35-087.64 S 1.29 11451 National Overlay 80mm @ IRI 4-9 2013 7.876 15.52 165.84<br />

N4 Joydebpur-Jamalpur Road Km 087.64-090.79 S 3.15 11451 National Overlay 80mm @ IRI 4-9 2013 19.077 14.05 350.49<br />

N4 Joydebpur-Jamalpur Road Km 091.09-091.29 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.811 8.36 18.69<br />

N401 Madhupur-Mymensingh Road Km 000.00-000.60 S 0.60 3417 National DBST 25mm @ 25% Crk 2013 1.037 1.07 1.95<br />

N401 Madhupur-Mymensingh Road Km 000.80-016.00 S 15.20 3417 National DBST 25mm @ 25% Crk 2013 21.175 2.32 110.19<br />

N403 Mirzapur Town old Section Km 000.00-004.00 S 4.00 11451 National DBST @ Traff >6000 2013 7.2<strong>12</strong> 13.07 431.<strong>12</strong><br />

R480 Elanga-Bhuanpur Road Km 001.51-016.81 S 15.30 3903 Regional DBST 25mm @ 25% Crk 2013 11.334 1.78 37.59<br />

R506 Aricha -Daulatpur-Tangail Road Km 036.71-038.41 S 1.70 2847 Regional Overlay 50mm @ IRI 7-9 2013 3.549 5.65 26.<strong>23</strong><br />

R506 Aricha -Daulatpur-Tangail Road Km 038.41-047.81 S 9.40 3019 Regional Overlay 50mm @ IRI 7-9 2013 19.625 4.43 140.52<br />

Sub-total Tangail Division<br />

Total Dhaka Zone<br />

326.206<br />

3179.070<br />

Gopalganj Zone<br />

Faridpur Division<br />

N7 Dauladia-Mongla Road Km 055.72-060.<strong>12</strong> S 4.40 7248 National DBST @ Traff >6000 2013 7.934 6.69 <strong>23</strong>9.10<br />

N7 Dauladia-Mongla Road Km 060.<strong>12</strong>-060.22 S 0.10 7248 National Overlay 50mm @ IRI 4-7 2013 0.381 <strong>12</strong>.79 8.78<br />

N7 Dauladia-Mongla Road Km 049.70-052.57 S 2.87 5397 National Overlay 50mm @ IRI 4-9 2013 10.920 8.49 178.33<br />

N7 Dauladia-Mongla Road Km 036.30-041.00 S 4.70 11451 National Overlay 80mm @ IRI 4-9 2013 28.241 8.93 371.24<br />

Appendix-B: Page: 33 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N7 Dauladia-Mongla Road Km 041.20-041.50 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.803 9.40 <strong>23</strong>.91<br />

N803 Faridpur Town Old section Km 000.00-000.10 S 0.10 24928 National DBST @ Traff >6000 2013 0.371 2.05 2.04<br />

N803 Faridpur Town Old section Km 002.30-002.60 S 0.30 24928 National DBST @ Traff >6000 2013 0.630 14.64 41.58<br />

N803 Faridpur Town Old section Km 006.20-006.72 S 0.52 9061 National DBST @ Traff >6000 2013 0.706 <strong>12</strong>.98 30.11<br />

N803 Faridpur Town Old section Km 000.80-001.50 S 0.70 24928 National Overlay 50mm @ IRI 5 2013 4.151 6.49 36.49<br />

N803 Faridpur Town Old section Km 002.10-002.20 S 0.10 24928 National Overlay 50mm @ IRI 5 2013 0.444 9.99 6.52<br />

N803 Faridpur Town Old section Km 003.10-004.60 S 1.50 11315 National Overlay 50mm @ IRI 5 2013 4.549 10.46 70.06<br />

N803 Faridpur Town Old section Km 000.20-000.70 S 0.50 24928 National Overlay 80mm @ IRI 5-9 2013 5.062 6.55 39.14<br />

N803 Faridpur Town Old section Km 005.40-005.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.510 14.72 9.82<br />

N804 Bhanga-Faridpur Road Km 030.20-030.80 S 0.60 11451 National Overlay 50mm @ IRI 5 2013 2.286 9.63 42.09<br />

Sub-total Faridpur Division<br />

67.987<br />

Gopalganj Division<br />

N805 Bhanga-Mollahhat Road Km 000.90-004.00 S 3.10 11451 National DBST @ Traff >6000 2013 5.590 10.28 262.89<br />

N805 Bhanga-Mollahhat Road Km 007.00-010.90 S 3.90 2650 National DBST 25mm @ 25% Crk 2013 7.032 2.17 46.30<br />

N805 Bhanga-Mollahhat Road Km 004.10-004.90 S 0.80 11451 National Overlay 50mm @ IRI 5 2013 3.048 <strong>12</strong>.25 67.34<br />

N806 Bhatiapara-Kalna Road Km 001.20-002.70 S 1.50 2860 National Overlay 50mm @ IRI 5-9 2013 2.897 3.86 18.37<br />

N806 Bhatiapara-Kalna Road Km 002.80-003.00 S 0.20 2860 National Overlay 50mm @ IRI 5-9 2013 0.386 4.40 2.79<br />

R850 Tekerhat-Mollahhat Road Km 001.50-002.30 S 0.80 <strong>23</strong>43 Regional DBST @ Traff 2000-4000 2013 1.186 2.37 8.24<br />

R850 Tekerhat-Mollahhat Road Km 019.10-021.30 S 2.20 3497 Regional DBST @ Traff 2000-4000 2013 2.989 1.41 <strong>12</strong>.30<br />

R850 Tekerhat-Mollahhat Road Km 031.40-031.80 S 0.40 3497 Regional DBST @ Traff 2000-4000 2013 0.543 5.81 11.45<br />

R850 Tekerhat-Mollahhat Road Km 018.80-018.90 S 0.10 <strong>23</strong>43 Regional Overlay 50mm @ IRI 5-7 2013 0.287 3.62 1.34<br />

R850 Tekerhat-Mollahhat Road Km 001.20-001.50 S 0.30 <strong>23</strong>43 Regional Overlay 50mm @ IRI 7-9 2013 0.940 5.52 8.37<br />

R850 Tekerhat-Mollahhat Road Km 005.40-005.60 S 0.20 <strong>23</strong>43 Regional Overlay 50mm @ IRI 7-9 2013 0.574 6.53 5.11<br />

R850 Tekerhat-Mollahhat Road Km 008.90-009.80 S 0.90 <strong>23</strong>43 Regional Overlay 50mm @ IRI 7-9 2013 2.584 3.95 16.93<br />

R850 Tekerhat-Mollahhat Road Km 025.90-026.00 S 0.10 3497 Regional Overlay 50mm @ IRI 7-9 2013 0.287 8.58 3.41<br />

R850 Tekerhat-Mollahhat Road Km 033.00-033.70 S 0.70 3497 Regional Overlay 50mm @ IRI 7-9 2013 2.010 7.03 <strong>23</strong>.13<br />

Sub-total Gopalganj Division<br />

30.352<br />

Madaripur Division<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 001.10-001.40 S 0.30 5672 Regional DBST @ Traff 4000-6000 2013 0.408 6.37 8.67<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 000.00-000.10 S 0.10 5672 Regional DBST 25mm @ 25% Crk 2013 0.210 2.16 1.02<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 000.20-001.10 S 0.90 5672 Regional DBST 25mm @ 25% Crk 2013 1.2<strong>23</strong> 2.96 10.59<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 001.40-002.70 S 1.30 5672 Regional DBST 25mm @ 25% Crk 2013 1.766 2.79 13.33<br />

Appendix-B: Page: 34 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.38-016.48 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.099 5.81 1.89<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 007.50-007.70 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.709 7.41 8.96<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 002.90-003.90 S 1.00 5672 Regional Overlay 60mm @ IRI 5.5-9 2013 3.4<strong>23</strong> 7.53 33.69<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 004.60-005.00 S 0.40 5672 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 7.51 <strong>12</strong>.99<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 005.30-006.20 S 0.90 5179 Regional Overlay 60mm @ IRI 5.5-9 2013 3.848 4.28 25.48<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 006.30-007.10 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.968 4.77 28.46<br />

Sub-total Madaripur Division<br />

17.022<br />

Rajbari Division<br />

R710 Ahaladipur-Kushtia Road Km 000.40-000.60 S 0.20 6<strong>23</strong>8 Regional DBST @ Traff >6000 2013 0.282 7.59 8.00<br />

R710 Ahaladipur-Kushtia Road Km 013.91-015.71 S 1.80 3636 Regional DBST @ Traff 2000-4000 2013 2.583 2.45 18.02<br />

R710 Ahaladipur-Kushtia Road Km 016.81-021.31 S 4.50 3636 Regional DBST @ Traff 2000-4000 2013 6.336 6.29 133.82<br />

R710 Ahaladipur-Kushtia Road Km 026.11-026.71 S 0.60 3636 Regional DBST @ Traff 2000-4000 2013 0.845 7.<strong>12</strong> 21.34<br />

R710 Ahaladipur-Kushtia Road Km 029.71-029.91 S 0.20 3636 Regional DBST @ Traff 2000-4000 2013 0.282 2.64 2.11<br />

R710 Ahaladipur-Kushtia Road Km 013.11-013.41 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.437 9.82 16.61<br />

R710 Ahaladipur-Kushtia Road Km 043.01-044.71 S 1.70 4887 Regional DBST @ Traff 4000-6000 2013 2.225 8.17 68.02<br />

R710 Ahaladipur-Kushtia Road Km 009.90-009.91 S 0.01 6<strong>23</strong>8 Regional DBST 25mm @ 25% Crk 2013 0.021 10.56 0.83<br />

R710 Ahaladipur-Kushtia Road Km 010.81-013.11 S 2.30 4048 Regional DBST 25mm @ 25% Crk 2013 3.511 3.03 26.68<br />

R710 Ahaladipur-Kushtia Road Km 013.41-013.71 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.437 4.37 5.48<br />

R710 Ahaladipur-Kushtia Road Km 016.11-016.51 S 0.40 3636 Regional DBST 25mm @ 25% Crk 2013 0.563 4.06 7.25<br />

R710 Ahaladipur-Kushtia Road Km 026.81-029.51 S 2.70 3636 Regional DBST 25mm @ 25% Crk 2013 3.801 4.98 60.50<br />

R710 Ahaladipur-Kushtia Road Km 030.21-031.81 S 1.60 3636 Regional DBST 25mm @ 25% Crk 2013 2.253 2.43 14.27<br />

R710 Ahaladipur-Kushtia Road Km 032.01-035.01 S 3.00 3636 Regional DBST 25mm @ 25% Crk 2013 4.157 2.00 22.49<br />

R710 Ahaladipur-Kushtia Road Km 039.41-039.91 S 0.50 3636 Regional DBST 25mm @ 25% Crk 2013 0.655 6.79 13.63<br />

R710 Ahaladipur-Kushtia Road Km 024.61-024.71 S 0.10 3636 Regional Overlay 50mm @ IRI 5-7 2013 0.298 9.29 3.86<br />

R710 Ahaladipur-Kushtia Road Km 038.31-038.41 S 0.10 3636 Regional Overlay 50mm @ IRI 5-7 2013 0.277 <strong>12</strong>.58 4.34<br />

R710 Ahaladipur-Kushtia Road Km 015.71-016.11 S 0.40 3636 Regional Overlay 50mm @ IRI 7-9 2013 1.190 7.80 15.35<br />

R710 Ahaladipur-Kushtia Road Km 016.51-016.81 S 0.30 3636 Regional Overlay 50mm @ IRI 7-9 2013 0.893 8.04 <strong>12</strong>.00<br />

R710 Ahaladipur-Kushtia Road Km 003.90-005.60 S 1.70 6<strong>23</strong>8 Regional Overlay 60mm @ IRI 5.5-9 2013 6.030 10.35 83.27<br />

R710 Ahaladipur-Kushtia Road Km 007.40-008.30 S 0.90 6<strong>23</strong>8 Regional Overlay 60mm @ IRI 5.5-9 2013 3.310 10.99 44.56<br />

R710 Ahaladipur-Kushtia Road Km 009.60-009.70 S 0.10 6<strong>23</strong>8 Regional Overlay 60mm @ IRI 5.5-9 2013 0.386 7.19 3.94<br />

Sub-total Rajbari Division<br />

40.771<br />

Sariatpur Division<br />

Appendix-B: Page: 35 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 019.88-020.18 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 7.34 <strong>12</strong>.02<br />

R861 Monohar -Shariatpur Road Km 006.40-006.80 S 0.40 3750 Regional DBST @ Traff 2000-4000 2013 0.543 3.40 5.33<br />

R861 Monohar -Shariatpur Road Km 001.90-002.10 S 0.20 4885 Regional DBST @ Traff 4000-6000 2013 0.272 5.93 6.03<br />

R861 Monohar -Shariatpur Road Km 002.90-003.00 S 0.10 4885 Regional DBST @ Traff 4000-6000 2013 0.141 4.15 1.43<br />

R861 Monohar -Shariatpur Road Km 003.00-003.40 S 0.40 4885 Regional DBST @ Traff 4000-6000 2013 0.543 7.75 15.76<br />

R861 Monohar -Shariatpur Road Km 004.40-004.50 S 0.10 4885 Regional DBST @ Traff 4000-6000 2013 0.136 4.83 1.68<br />

R861 Monohar -Shariatpur Road Km 003.40-003.60 S 0.20 4885 Regional DBST 25mm @ 25% Crk 2013 0.272 6.24 4.97<br />

R861 Monohar -Shariatpur Road Km 000.10-000.60 S 0.50 4885 Regional Overlay 50mm @ IRI 5-7 2013 1.435 8.98 17.20<br />

R861 Monohar -Shariatpur Road Km 001.00-001.10 S 0.10 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.287 11.22 4.30<br />

R861 Monohar -Shariatpur Road Km 001.30-001.40 S 0.10 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.287 11.45 4.38<br />

R861 Monohar -Shariatpur Road Km 001.50-001.70 S 0.20 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.574 6.61 5.73<br />

R861 Monohar -Shariatpur Road Km 001.80-001.90 S 0.10 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.287 10.98 4.20<br />

R861 Monohar -Shariatpur Road Km 005.00-005.20 S 0.20 4885 Regional Overlay 50mm @ IRI 5-7 2013 0.501 7.21 5.46<br />

R861 Monohar -Shariatpur Road Km 005.80-006.20 S 0.40 4885 Regional Overlay 50mm @ IRI 5-7 2013 1.<strong>12</strong>7 6.16 10.48<br />

R861 Monohar -Shariatpur Road Km 002.10-002.50 S 0.40 4885 Regional Overlay 60mm @ IRI 7-9 2013 1.369 7.64 <strong>12</strong>.82<br />

R861 Monohar -Shariatpur Road Km 002.60-002.80 S 0.20 4885 Regional Overlay 60mm @ IRI 7-9 2013 0.685 9.71 8.14<br />

R861 Monohar -Shariatpur Road Km 003.70-004.00 S 0.30 4885 Regional Overlay 60mm @ IRI 7-9 2013 1.027 9.55 <strong>12</strong>.01<br />

R861 Monohar -Shariatpur Road Km 004.10-004.30 S 0.20 4885 Regional Overlay 60mm @ IRI 7-9 2013 0.685 5.89 5.46<br />

Sub-total Sariatpur Division<br />

Total Gopalganj Zone<br />

11.198<br />

167.329<br />

Khulna Zone<br />

Bagerhat Division<br />

R771 Rupsha-Bagerhat Road Km 031.08-031.18 S 0.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.186 7.87 2.28<br />

Sub-total Bagerhat Division<br />

0.186<br />

Chuadanga Division<br />

R745 Kushtia -Jhenaidah Road Km 077.48-077.78 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.645 6.48 16.01<br />

R745 Kushtia -Jhenaidah Road Km 077.98-078.58 S 0.60 4887 Regional DBST @ Traff 4000-6000 2013 1.289 5.68 29.31<br />

R745 Kushtia -Jhenaidah Road Km 079.46-079.56 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.215 5.88 4.44<br />

R745 Kushtia -Jhenaidah Road Km 079.76-079.86 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.215 6.47 4.89<br />

R745 Kushtia -Jhenaidah Road Km 081.86-081.96 S 0.10 5536 Regional DBST @ Traff 4000-6000 2013 0.136 9.<strong>12</strong> 3.52<br />

R745 Kushtia -Jhenaidah Road Km 093.86-095.16 S 1.30 5536 Regional DBST @ Traff 4000-6000 2013 1.606 11.11 53.<strong>12</strong><br />

R745 Kushtia -Jhenaidah Road Km 084.56-085.56 S 1.00 5536 Regional DBST 25mm @ 25% Crk 2013 1.359 10.59 51.44<br />

Appendix-B: Page: 36 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R745 Kushtia -Jhenaidah Road Km 092.86-093.66 S 0.80 5536 Regional DBST 25mm @ 25% Crk 2013 0.988 11.53 39.24<br />

R745 Kushtia -Jhenaidah Road Km 095.46-096.46 S 1.00 5536 Regional DBST 25mm @ 25% Crk 2013 1.<strong>23</strong>5 13.18 56.05<br />

R745 Kushtia -Jhenaidah Road Km 096.56-096.66 S 0.10 5536 Regional DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>5 14.47 6.24<br />

R745 Kushtia -Jhenaidah Road Km 071.02-071.98 S 0.96 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.897 8.77 41.14<br />

R745 Kushtia -Jhenaidah Road Km 081.36-081.76 S 0.40 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 1.369 13.<strong>23</strong> 20.99<br />

R745 Kushtia -Jhenaidah Road Km 082.76-083.66 S 0.90 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 3.081 9.<strong>12</strong> 38.42<br />

R745 Kushtia -Jhenaidah Road Km 083.86-084.06 S 0.20 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 0.685 9.96 9.32<br />

R745 Kushtia -Jhenaidah Road Km 084.36-084.46 S 0.10 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 8.47 4.31<br />

R745 Kushtia -Jhenaidah Road Km 085.66-088.06 S 2.40 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 8.215 13.81 131.44<br />

R745 Kushtia -Jhenaidah Road Km 088.56-090.26 S 1.70 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 5.290 15.59 98.14<br />

R745 Kushtia -Jhenaidah Road Km 090.36-091.76 S 1.40 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 4.356 15.79 81.83<br />

R745 Kushtia -Jhenaidah Road Km 091.96-092.46 S 0.50 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 1.556 17.36 31.30<br />

R745 Kushtia -Jhenaidah Road Km 097.26-097.30 S 0.04 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 0.147 25.68 4.50<br />

R745 Kushtia -Jhenaidah Road Km 071.98-073.98 S 2.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 8.613 7.37 91.36<br />

R745 Kushtia -Jhenaidah Road Km 075.08-075.38 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 6.40 9.87<br />

R745 Kushtia -Jhenaidah Road Km 075.58-076.18 S 0.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.801 4.82 22.37<br />

R745 Kushtia -Jhenaidah Road Km 076.48-077.18 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.396 9.74 29.48<br />

R747 Kushtia -Chuadanga Road Km 025.64-030.64 S 5.00 4887 Regional DBST @ Traff 4000-6000 2013 7.361 8.17 202.14<br />

R747 Kushtia -Chuadanga Road Km 033.04-033.44 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 7.<strong>23</strong> 15.66<br />

R747 Kushtia -Chuadanga Road Km 033.54-033.94 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 9.07 20.65<br />

R747 Kushtia -Chuadanga Road Km 034.04-034.44 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.253 9.07 20.66<br />

R747 Kushtia -Chuadanga Road Km 034.54-035.94 S 1.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.384 8.96 70.07<br />

R747 Kushtia -Chuadanga Road Km 036.14-036.44 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.940 6.52 10.04<br />

R747 Kushtia -Chuadanga Road Km 041.94-044.77 S 2.83 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.875 8.43 <strong>12</strong>1.18<br />

R747 Kushtia -Chuadanga Road Km 025.30-025.34 S 0.04 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.146 9.39 1.95<br />

R747 Kushtia -Chuadanga Road Km 041.04-041.84 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.987 6.06 26.06<br />

Sub-total Chuadanga Division<br />

79.037<br />

Jessore Division<br />

N7 Dauladia-Mongla Road Km 154.36-154.46 S 0.10 9061 National DBST 25mm @ 25% Crk 2013 0.<strong>12</strong>4 11.36 4.47<br />

N7 Dauladia-Mongla Road Km 150.32-150.72 S 0.40 9061 National Overlay 50mm @ IRI 4-7 2013 1.044 15.35 25.55<br />

N7 Dauladia-Mongla Road Km 150.82-153.06 S 2.24 9061 National Overlay 50mm @ IRI 4-7 2013 5.846 <strong>12</strong>.91 114.77<br />

N7 Dauladia-Mongla Road Km 153.66-153.96 S 0.30 9061 National Overlay 50mm @ IRI 4-7 2013 0.783 14.71 18.37<br />

N7 Dauladia-Mongla Road Km 187.49-188.19 S 0.70 7406 National Overlay 50mm @ IRI 4-7 2013 2.415 8.27 37.32<br />

N7 Dauladia-Mongla Road Km 188.29-188.77 S 0.48 7406 National Overlay 50mm @ IRI 4-7 2013 1.665 6.74 22.81<br />

Appendix-B: Page: 37 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N7 Dauladia-Mongla Road Km 138.86-139.32 S 0.46 5636 National Overlay 50mm @ IRI 4-9 2013 1.372 7.41 21.65<br />

N7 Dauladia-Mongla Road Km 139.82-140.92 S 1.10 5636 National Overlay 50mm @ IRI 4-9 2013 3.858 6.<strong>23</strong> 51.66<br />

N7 Dauladia-Mongla Road Km 141.02-141.42 S 0.40 5636 National Overlay 50mm @ IRI 4-9 2013 1.409 6.07 18.24<br />

N7 Dauladia-Mongla Road Km 141.52-141.92 S 0.40 5636 National Overlay 50mm @ IRI 4-9 2013 1.378 6.43 17.99<br />

N7 Dauladia-Mongla Road Km 142.<strong>12</strong>-142.82 S 0.70 5636 National Overlay 50mm @ IRI 4-9 2013 2.031 6.93 26.95<br />

N7 Dauladia-Mongla Road Km 143.<strong>12</strong>-143.22 S 0.10 5636 National Overlay 50mm @ IRI 4-9 2013 0.287 7.77 4.08<br />

N7 Dauladia-Mongla Road Km 143.42-143.52 S 0.10 5636 National Overlay 50mm @ IRI 4-9 2013 0.287 7.83 4.15<br />

N7 Dauladia-Mongla Road Km 143.72-143.82 S 0.10 5636 National Overlay 50mm @ IRI 4-9 2013 0.324 7.06 4.27<br />

N7 Dauladia-Mongla Road Km 144.02-144.72 S 0.70 5636 National Overlay 50mm @ IRI 4-9 2013 2.214 6.63 28.87<br />

N7 Dauladia-Mongla Road Km 153.46-153.56 S 0.10 9061 National Overlay 60mm @ IRI 7-9 2013 0.311 17.37 7.93<br />

N7 Dauladia-Mongla Road Km 145.42-145.52 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.477 17.26 13.32<br />

N7 Dauladia-Mongla Road Km 148.62-148.72 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.551 17.80 15.87<br />

N706 Jessore -Benapole Road Km 030.20-030.40 S 0.20 7314 National DBST @ Traff >6000 2013 0.375 4.32 7.51<br />

N706 Jessore -Benapole Road Km 0<strong>23</strong>.20-024.10 S 0.90 7314 National Overlay 50mm @ IRI 5-7 2013 3.288 11.75 65.95<br />

N706 Jessore -Benapole Road Km 024.40-024.70 S 0.30 7314 National Overlay 60mm @ IRI 7-9 2013 1.307 8.57 19.62<br />

N706 Jessore -Benapole Road Km 029.40-030.10 S 0.70 7314 National Overlay 60mm @ IRI 7-9 2013 3.311 7.48 43.27<br />

N706 Jessore -Benapole Road Km 032.10-032.90 S 0.80 7314 National Overlay 60mm @ IRI 7-9 2013 3.784 5.56 34.35<br />

N706 Jessore -Benapole Road Km 036.63-037.91 L 1.28 11451 National Overlay 80mm @ IRI 5-9 2013 7.877 14.44 175.28<br />

N706 Jessore -Benapole Road Km 036.63-037.91 R 1.28 11451 National Overlay 80mm @ IRI 5-9 2013 7.877 14.46 175.58<br />

N707 Jessore Town Old Section Km 004.60-004.70 S 0.10 11451 National DBST @ Traff >6000 2013 0.165 9.71 7.70<br />

N707 Jessore Town Old Section Km 001.40-001.50 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.510 17.91 14.78<br />

N707 Jessore Town Old Section Km 001.60-003.40 S 1.80 11451 National Overlay 80mm @ IRI 5-9 2013 11.157 15.40 264.75<br />

N707 Jessore Town Old Section Km 003.50-004.30 S 0.80 11451 National Overlay 80mm @ IRI 5-9 2013 4.4<strong>12</strong> 11.54 75.02<br />

N707 Jessore Town Old Section Km 005.70-005.90 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.103 13.70 22.48<br />

N707 Jessore Town Old Section Km 006.10-006.76 S 0.66 11451 National Overlay 80mm @ IRI 5-9 2013 3.656 <strong>12</strong>.67 68.25<br />

N708 Jessore Town Old Section Km 003.29-004.74 S 1.45 3249 National DBST @ Traff 2000-4000 2013 3.109 2.19 26.59<br />

N708 Jessore Town Old Section Km 002.90-003.00 L 0.10 3249 National DBST 25mm @ 25% Crk 2013 0.185 1.78 0.71<br />

N708 Jessore Town Old Section Km 002.90-003.00 R 0.10 3249 National DBST 25mm @ 25% Crk 2013 0.185 1.50 0.71<br />

N708 Jessore Town Old Section Km 002.10-002.70 L 0.60 3249 National Overlay 50mm @ IRI 5-9 2013 2.349 2.75 9.15<br />

N708 Jessore Town Old Section Km 002.10-002.70 R 0.60 3249 National Overlay 50mm @ IRI 5-9 2013 2.349 3.42 11.53<br />

N708 Jessore Town Old Section Km 000.00-000.20 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.202 14.31 25.33<br />

N708 Jessore Town Old Section Km 001.40-001.60 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.202 9.37 15.27<br />

R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.80-0<strong>12</strong>.90 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 9.51 4.41<br />

R755 Jessore -Chuknagar Road Km 013.00-013.30 S 0.30 3292 Regional DBST @ Traff 2000-4000 2013 0.408 5.26 6.44<br />

R755 Jessore -Chuknagar Road Km 014.30-014.40 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 8.67 4.02<br />

Appendix-B: Page: 38 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R755 Jessore -Chuknagar Road Km 017.00-018.70 S 1.70 3292 Regional DBST @ Traff 2000-4000 2013 2.309 6.04 45.43<br />

R755 Jessore -Chuknagar Road Km 020.90-021.00 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 5.39 2.14<br />

R755 Jessore -Chuknagar Road Km 021.00-021.30 S 0.30 3292 Regional DBST @ Traff 2000-4000 2013 0.408 7.74 <strong>12</strong>.58<br />

R755 Jessore -Chuknagar Road Km 021.30-021.70 S 0.40 3292 Regional DBST @ Traff 2000-4000 2013 0.543 6.15 10.88<br />

R755 Jessore -Chuknagar Road Km 021.90-022.00 S 0.10 3292 Regional DBST @ Traff 2000-4000 2013 0.136 8.03 3.27<br />

R755 Jessore -Chuknagar Road Km 0<strong>23</strong>.20-025.70 S 2.50 3292 Regional DBST @ Traff 2000-4000 2013 3.396 4.15 41.51<br />

R755 Jessore -Chuknagar Road Km 001.30-003.20 S 1.90 4887 Regional DBST @ Traff 4000-6000 2013 2.581 6.60 49.11<br />

R755 Jessore -Chuknagar Road Km 027.53-028.13 S 0.60 4887 Regional DBST @ Traff 4000-6000 2013 0.815 9.15 25.07<br />

R755 Jessore -Chuknagar Road Km 028.<strong>23</strong>-030.13 S 1.90 4887 Regional DBST @ Traff 4000-6000 2013 2.581 7.11 67.05<br />

R755 Jessore -Chuknagar Road Km 030.83-032.33 S 1.50 4887 Regional DBST @ Traff 4000-6000 2013 2.038 7.10 54.11<br />

R755 Jessore -Chuknagar Road Km 033.33-034.13 S 0.80 4887 Regional DBST @ Traff 4000-6000 2013 1.087 7.36 29.22<br />

R755 Jessore -Chuknagar Road Km 034.<strong>23</strong>-037.83 S 3.60 4887 Regional DBST @ Traff 4000-6000 2013 4.891 9.06 148.88<br />

R755 Jessore -Chuknagar Road Km 000.00-000.40 S 0.40 4887 Regional DBST 25mm @ 25% Crk 2013 0.543 8.47 16.83<br />

R755 Jessore -Chuknagar Road Km 000.60-001.20 S 0.60 4887 Regional DBST 25mm @ 25% Crk 2013 0.815 6.94 16.31<br />

R755 Jessore -Chuknagar Road Km 003.90-005.40 S 1.50 4887 Regional DBST 25mm @ 25% Crk 2013 2.038 4.99 22.<strong>23</strong><br />

R755 Jessore -Chuknagar Road Km 016.40-016.80 S 0.40 3292 Regional DBST 25mm @ 25% Crk 2013 0.543 8.04 13.41<br />

R755 Jessore -Chuknagar Road Km 018.80-020.80 S 2.00 3292 Regional DBST 25mm @ 25% Crk 2013 2.717 5.11 49.11<br />

R755 Jessore -Chuknagar Road Km 022.10-0<strong>23</strong>.10 S 1.00 3292 Regional DBST 25mm @ 25% Crk 2013 1.359 5.95 26.56<br />

R755 Jessore -Chuknagar Road Km 026.40-026.50 S 0.10 3292 Regional DBST 25mm @ 25% Crk 2013 0.136 4.28 1.20<br />

R755 Jessore -Chuknagar Road Km 003.70-003.80 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 8.69 3.40<br />

R755 Jessore -Chuknagar Road Km 015.20-016.30 S 1.10 3292 Regional Overlay 50mm @ IRI 5-7 2013 3.158 7.63 37.89<br />

R755 Jessore -Chuknagar Road Km 026.90-027.33 S 0.43 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.2<strong>23</strong> 10.14 18.91<br />

R755 Jessore -Chuknagar Road Km 037.83-038.11 S 0.28 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.804 8.74 11.24<br />

R755 Jessore -Chuknagar Road Km 013.50-014.10 S 0.60 3292 Regional Overlay 50mm @ IRI 7-9 2013 1.722 8.44 22.64<br />

R755 Jessore -Chuknagar Road Km 003.30-003.60 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 10.31 <strong>12</strong>.27<br />

R755 Jessore -Chuknagar Road Km 006.40-007.20 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.738 7.94 36.99<br />

R755 Jessore -Chuknagar Road Km 007.30-011.60 S 4.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 14.718 7.98 195.99<br />

R755 Jessore -Chuknagar Road Km 011.80-0<strong>12</strong>.10 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 6.73 10.89<br />

R755 Jessore -Chuknagar Road Km 030.63-030.73 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 8.08 4.11<br />

R765 Khulna-Satkhira Road Km 010.70-010.90 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.272 8.25 8.39<br />

R765 Khulna-Satkhira Road Km 010.50-010.60 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 8.54 3.99<br />

R765 Khulna-Satkhira Road Km 013.80-016.00 S 2.20 4887 Regional DBST 25mm @ 25% Crk 2013 2.989 7.46 83.41<br />

R765 Khulna-Satkhira Road Km 001.50-007.30 S 5.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 16.650 6.03 176.16<br />

R765 Khulna-Satkhira Road Km 007.50-010.40 S 2.90 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.325 6.32 92.39<br />

R765 Khulna-Satkhira Road Km 011.20-011.60 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.148 8.35 15.53<br />

Appendix-B: Page: 39 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R765 Khulna-Satkhira Road Km 0<strong>12</strong>.90-013.20 S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 7.19 10.55<br />

R765 Khulna-Satkhira Road Km 013.30-013.70 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.148 6.88 13.48<br />

R765 Khulna-Satkhira Road Km 000.00-001.10 S 1.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.765 8.03 51.43<br />

R765 Khulna-Satkhira Road Km 011.80-0<strong>12</strong>.70 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.081 7.24 33.51<br />

Sub-total Jessore Division<br />

180.954<br />

Jhenaidah Division<br />

N7 Dauladia-Mongla Road Km 135.92-136.62 S 0.70 5636 National DBST @ Traff 4000-6000 2013 1.003 4.45 46.52<br />

N7 Dauladia-Mongla Road Km 108.22-110.32 S 2.10 6605 National Overlay 50mm @ IRI 4-7 2013 7.<strong>12</strong>5 6.97 92.76<br />

N7 Dauladia-Mongla Road Km 110.72-1<strong>12</strong>.62 S 1.90 6605 National Overlay 50mm @ IRI 4-7 2013 5.911 9.88 106.21<br />

N7 Dauladia-Mongla Road Km 1<strong>12</strong>.72-114.<strong>12</strong> S 1.40 6605 National Overlay 50mm @ IRI 4-7 2013 4.019 7.28 54.65<br />

N7 Dauladia-Mongla Road Km 114.42-114.82 S 0.40 6605 National Overlay 50mm @ IRI 4-7 2013 1.148 7.21 15.47<br />

N7 Dauladia-Mongla Road Km 115.02-116.<strong>12</strong> S 1.10 6605 National Overlay 50mm @ IRI 4-7 2013 3.290 10.22 61.13<br />

N7 Dauladia-Mongla Road Km 116.22-116.82 S 0.60 6605 National Overlay 50mm @ IRI 4-7 2013 1.989 7.27 27.01<br />

N7 Dauladia-Mongla Road Km 118.02-119.62 S 1.60 6605 National Overlay 50mm @ IRI 4-7 2013 5.328 5.84 63.27<br />

N7 Dauladia-Mongla Road Km 119.82-<strong>12</strong>1.22 S 1.40 6605 National Overlay 50mm @ IRI 4-7 2013 4.626 6.49 56.06<br />

N7 Dauladia-Mongla Road Km <strong>12</strong>1.32-<strong>12</strong>2.92 S 1.60 6605 National Overlay 50mm @ IRI 4-7 2013 6.013 7.60 90.73<br />

N7 Dauladia-Mongla Road Km <strong>12</strong>5.72-<strong>12</strong>9.42 S 3.70 5636 National Overlay 50mm @ IRI 4-9 2013 <strong>12</strong>.263 5.51 137.29<br />

N7 Dauladia-Mongla Road Km 130.22-135.52 S 5.30 5636 National Overlay 50mm @ IRI 4-9 2013 17.013 7.28 266.25<br />

N7 Dauladia-Mongla Road Km 136.92-138.86 S 1.94 5636 National Overlay 50mm @ IRI 4-9 2013 5.879 4.37 <strong>12</strong>5.37<br />

N7 Dauladia-Mongla Road Km 116.92-117.22 S 0.30 6605 National Overlay 60mm @ IRI 7-9 2013 1.214 7.61 15.82<br />

N7 Dauladia-Mongla Road Km 117.32-117.72 S 0.40 6605 National Overlay 60mm @ IRI 7-9 2013 1.618 7.35 22.00<br />

N7 Dauladia-Mongla Road Km 104.82-105.32 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 3.004 13.56 66.86<br />

N7 Dauladia-Mongla Road Km 107.22-108.<strong>12</strong> S 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 4.815 <strong>12</strong>.53 96.20<br />

N7 Dauladia-Mongla Road Km <strong>12</strong>2.92-<strong>12</strong>5.72 S 2.80 11451 National Overlay 80mm @ IRI 4-9 2013 16.825 10.34 281.40<br />

N703 Jhenaidah Town Old Section Km 000.00-000.10 S 0.10 4905 National DBST 25mm @ 25% Crk 2013 0.186 1.18 0.45<br />

N703 Jhenaidah Town Old Section Km 003.40-003.47 S 0.07 11451 National Overlay 80mm @ IRI 5-9 2013 0.336 16.68 7.08<br />

N704 Jhenaidah-Dasuria Road Km 001.20-002.60 S 1.40 11451 National DBST @ Traff >6000 2013 2.524 8.68 108.14<br />

N704 Jhenaidah-Dasuria Road Km 008.00-0<strong>12</strong>.90 S 4.90 11451 National DBST @ Traff >6000 2013 8.859 9.98 404.32<br />

N704 Jhenaidah-Dasuria Road Km 000.00-000.10 S 0.10 9061 National DBST 25mm @ 25% Crk 2013 0.136 9.40 4.38<br />

N704 Jhenaidah-Dasuria Road Km 007.20-007.50 S 0.30 11451 National Overlay 80mm @ IRI 5-9 2013 1.803 7.82 19.88<br />

N704 Jhenaidah-Dasuria Road Km 007.70-007.90 S 0.20 11451 National Overlay 80mm @ IRI 5-9 2013 1.350 9.17 16.80<br />

N704 Jhenaidah-Dasuria Road Km 013.20-020.80 S 7.60 11451 National Overlay 80mm @ IRI 5-9 2013 49.608 8.24 554.31<br />

R745 Kushtia -Jhenaidah Road Km 107.36-110.46 S 3.10 4887 Regional DBST @ Traff 4000-6000 2013 4.211 7.32 1<strong>12</strong>.66<br />

R745 Kushtia -Jhenaidah Road Km 101.96-103.76 S 1.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 5.167 8.85 74.01<br />

Appendix-B: Page: 40 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R745 Kushtia -Jhenaidah Road Km 110.56-110.66 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 7.60 3.58<br />

R745 Kushtia -Jhenaidah Road Km 1<strong>12</strong>.56-114.26 S 1.70 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.880 6.05 47.79<br />

R745 Kushtia -Jhenaidah Road Km 114.36-114.46 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 8.<strong>23</strong> 4.08<br />

R745 Kushtia -Jhenaidah Road Km 099.66-101.26 S 1.60 5536 Regional Overlay 60mm @ IRI 5.5-9 2013 5.477 13.88 88.10<br />

R745 Kushtia -Jhenaidah Road Km 110.86-1<strong>12</strong>.46 S 1.60 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.477 6.93 56.45<br />

R745 Kushtia -Jhenaidah Road Km 114.56-114.66 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 7.31 3.76<br />

R745 Kushtia -Jhenaidah Road Km 115.06-115.86 S 0.80 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.738 6.01 24.74<br />

R748 Chuadanga-Kaliganj Road Km 049.60-051.40 S 1.80 4887 Regional DBST @ Traff 4000-6000 2013 2.757 6.46 67.<strong>12</strong><br />

R748 Chuadanga-Kaliganj Road Km 051.80-052.30 S 0.50 4887 Regional DBST @ Traff 4000-6000 2013 0.764 8.88 25.60<br />

R748 Chuadanga-Kaliganj Road Km 057.10-058.70 S 1.60 4887 Regional DBST @ Traff 4000-6000 2013 2.292 7.10 59.49<br />

R748 Chuadanga-Kaliganj Road Km 058.80-064.20 S 5.40 4887 Regional DBST @ Traff 4000-6000 2013 7.736 7.14 201.76<br />

R748 Chuadanga-Kaliganj Road Km 064.50-064.70 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.287 8.62 9.03<br />

R748 Chuadanga-Kaliganj Road Km 056.40-056.90 S 0.50 4887 Regional DBST 25mm @ 25% Crk 2013 0.716 9.08 <strong>23</strong>.78<br />

R748 Chuadanga-Kaliganj Road Km 053.40-055.60 S 2.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 6.384 8.86 91.52<br />

R748 Chuadanga-Kaliganj Road Km 055.70-056.30 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.816 10.11 29.58<br />

R748 Chuadanga-Kaliganj Road Km 049.30-049.50 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.772 8.26 9.45<br />

R748 Chuadanga-Kaliganj Road Km 052.50-053.00 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.711 7.26 19.34<br />

R748 Chuadanga-Kaliganj Road Km 053.20-053.30 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 8.30 4.<strong>23</strong><br />

R748 Chuadanga-Kaliganj Road Km 065.10-065.30 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.722 9.22 9.96<br />

Sub-total Jhenaidah Division<br />

2<strong>23</strong>.050<br />

Khulna Division<br />

N7 Dauladia-Mongla Road Km 220.86-221.86 S 1.00 9474 National DBST @ Traff >6000 2013 1.729 6.40 56.06<br />

N7 Dauladia-Mongla Road Km 2<strong>23</strong>.66-224.46 S 0.80 9684 National DBST @ Traff >6000 2013 1.383 6.47 45.33<br />

N7 Dauladia-Mongla Road Km 188.77-189.49 S 0.72 7406 National Overlay 50mm @ IRI 4-7 2013 2.532 7.09 36.47<br />

N7 Dauladia-Mongla Road Km 191.39-191.89 S 0.50 7406 National Overlay 50mm @ IRI 4-7 2013 1.683 8.87 31.80<br />

N7 Dauladia-Mongla Road Km 221.96-2<strong>23</strong>.06 S 1.10 9684 National Overlay 50mm @ IRI 4-7 2013 4.019 10.07 77.39<br />

N7 Dauladia-Mongla Road Km 2<strong>23</strong>.26-2<strong>23</strong>.56 S 0.30 9684 National Overlay 50mm @ IRI 4-7 2013 1.096 10.71 22.45<br />

N7 Dauladia-Mongla Road Km 211.26-2<strong>12</strong>.92 L 1.66 9061 National Overlay 60mm @ IRI 7-9 2013 5.699 9.01 79.33<br />

N7 Dauladia-Mongla Road Km 211.26-2<strong>12</strong>.92 R 1.66 9061 National Overlay 60mm @ IRI 7-9 2013 5.699 9.01 79.33<br />

N7 Dauladia-Mongla Road Km 192.19-202.22 S 10.03 7406 National Overlay 60mm @ IRI 7-9 2013 41.501 9.41 754.83<br />

N7 Dauladia-Mongla Road Km 204.28-206.<strong>23</strong> L 1.95 11451 National Overlay 80mm @ IRI 4-9 2013 10.760 14.74 252.88<br />

N7 Dauladia-Mongla Road Km 215.46-215.54 L 0.08 11451 National Overlay 80mm @ IRI 4-9 2013 0.650 6.82 6.53<br />

N7 Dauladia-Mongla Road Km 204.28-206.<strong>23</strong> R 1.95 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.847 <strong>12</strong>.42 258.09<br />

N7 Dauladia-Mongla Road Km 215.46-215.54 R 0.08 11451 National Overlay 80mm @ IRI 4-9 2013 0.650 6.82 6.53<br />

Appendix-B: Page: 41 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N7 Dauladia-Mongla Road Km 202.22-204.28 S 2.06 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>12</strong>.783 8.57 154.60<br />

N7 Dauladia-Mongla Road Km 206.<strong>23</strong>-211.26 S 5.03 11451 National Overlay 80mm @ IRI 4-9 2013 34.9<strong>23</strong> 11.25 635.40<br />

N7 Dauladia-Mongla Road Km 2<strong>12</strong>.92-213.88 S 0.95 11451 National Overlay 80mm @ IRI 4-9 2013 8.332 6.88 80.85<br />

N7 Dauladia-Mongla Road Km 215.54-216.05 S 0.51 11451 National Overlay 80mm @ IRI 4-9 2013 5.258 5.58 41.37<br />

N7 Dauladia-Mongla Road Km 217.26-217.56 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.780 8.92 24.47<br />

N7 Dauladia-Mongla Road Km 217.66-219.36 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 9.795 11.79 184.21<br />

N709 Khulna City By-Pass Road Km 017.00-018.00 L 1.00 11451 National DBST @ Traff >6000 2013 1.507 10.68 77.03<br />

N709 Khulna City By-Pass Road Km 017.00-018.00 R 1.00 11451 National DBST @ Traff >6000 2013 1.507 10.68 77.03<br />

N709 Khulna City By-Pass Road Km 013.90-016.10 S 2.20 11451 National Overlay 80mm @ IRI 5-9 2013 13.219 11.16 208.29<br />

N709 Khulna City By-Pass Road Km 016.20-016.30 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.601 <strong>12</strong>.93 11.44<br />

N709 Khulna City By-Pass Road Km 016.40-017.00 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 3.605 11.47 58.38<br />

N710 Khulna Town Old Section Km 000.00-000.02 S 0.02 17790 National DBST @ Traff >6000 2013 0.104 0.20 0.04<br />

R760 Khulna-Satkhira Road Km 005.50-006.70 S 1.20 3206 Regional DBST @ Traff 2000-4000 2013 1.778 3.45 <strong>23</strong>.75<br />

R760 Khulna-Satkhira Road Km 009.70-010.30 S 0.60 3206 Regional DBST @ Traff 2000-4000 2013 0.889 3.27 11.91<br />

R760 Khulna-Satkhira Road Km 013.80-014.40 S 0.60 3206 Regional DBST @ Traff 2000-4000 2013 0.889 2.18 5.79<br />

R760 Khulna-Satkhira Road Km 000.00-000.30 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.459 6.18 13.22<br />

R760 Khulna-Satkhira Road Km 000.50-000.70 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.306 10.00 <strong>12</strong>.16<br />

R760 Khulna-Satkhira Road Km 003.10-003.40 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.593 2.42 14.10<br />

R760 Khulna-Satkhira Road Km 021.70-027.80 S 6.10 4887 Regional DBST @ Traff 4000-6000 2013 9.055 5.40 152.22<br />

R760 Khulna-Satkhira Road Km 000.40-000.50 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.153 5.17 1.93<br />

R760 Khulna-Satkhira Road Km 000.70-001.20 S 0.50 4887 Regional DBST 25mm @ 25% Crk 2013 0.766 5.28 14.67<br />

R760 Khulna-Satkhira Road Km 001.60-001.90 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.459 4.46 5.58<br />

R760 Khulna-Satkhira Road Km 004.30-004.60 S 0.30 4887 Regional DBST 25mm @ 25% Crk 2013 0.445 6.36 13.16<br />

R760 Khulna-Satkhira Road Km 007.10-007.80 S 0.70 3206 Regional Overlay 50mm @ IRI 5-7 2013 2.192 3.65 13.48<br />

R760 Khulna-Satkhira Road Km 011.90-013.70 S 1.80 3206 Regional Overlay 50mm @ IRI 5-7 2013 5.637 3.83 28.67<br />

R760 Khulna-Satkhira Road Km 030.60-033.60 S 3.00 3937 Regional Overlay 50mm @ IRI 5-7 2013 9.395 5.15 83.57<br />

R760 Khulna-Satkhira Road Km 006.80-006.90 S 0.10 3206 Regional Overlay 50mm @ IRI 7-9 2013 0.313 3.93 2.20<br />

R760 Khulna-Satkhira Road Km 007.90-008.00 S 0.10 3206 Regional Overlay 50mm @ IRI 7-9 2013 0.313 3.91 2.15<br />

R760 Khulna-Satkhira Road Km 009.00-009.60 S 0.60 3206 Regional Overlay 50mm @ IRI 7-9 2013 1.879 5.43 17.40<br />

R760 Khulna-Satkhira Road Km 010.90-011.50 S 0.60 3206 Regional Overlay 50mm @ IRI 7-9 2013 1.879 5.27 16.88<br />

R760 Khulna-Satkhira Road Km 016.57-016.80 S 0.<strong>23</strong> 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.855 11.79 <strong>12</strong>.41<br />

R760 Khulna-Satkhira Road Km 017.70-018.90 S 1.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.481 5.98 40.73<br />

R760 Khulna-Satkhira Road Km 020.00-020.30 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.<strong>12</strong>0 7.84 14.00<br />

R760 Khulna-Satkhira Road Km 028.70-029.00 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.<strong>12</strong>0 7.72 15.61<br />

R760 Khulna-Satkhira Road Km 029.10-030.50 S 1.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.228 8.40 72.09<br />

Appendix-B: Page: 42 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

NPV<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

R760 Khulna-Satkhira Road Km 033.60-034.87 S 1.27 4116 Regional Overlay 60mm @ IRI 7-9 2013 4.742 5.19 37.54<br />

Sub-total Khulna Division<br />

<strong>23</strong>8.613<br />

Kushtia Division<br />

N704 Jhenaidah-Dasuria Road Km 061.68-066.66 S 4.97 5419 National DBST @ Traff 4000-6000 2013 9.472 3.22 307.59<br />

N704 Jhenaidah-Dasuria Road Km 0<strong>23</strong>.50-024.10 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 3.605 9.87 48.29<br />

N704 Jhenaidah-Dasuria Road Km 040.40-040.80 S 0.40 11451 National Overlay 80mm @ IRI 5-9 2013 2.404 13.52 47.87<br />

N704 Jhenaidah-Dasuria Road Km 045.38-045.48 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.988 8.72 <strong>12</strong>.69<br />

R710 Ahaladipur-Kushtia Road Km 048.75-051.45 S 2.70 4887 Regional DBST @ Traff 4000-6000 2013 3.668 7.16 95.95<br />

R710 Ahaladipur-Kushtia Road Km 053.95-054.25 S 0.30 4887 Regional DBST @ Traff 4000-6000 2013 0.408 10.29 15.33<br />

R710 Ahaladipur-Kushtia Road Km 052.65-052.85 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.272 10.60 9.47<br />

R710 Ahaladipur-Kushtia Road Km 052.95-053.75 S 0.80 4887 Regional DBST 25mm @ 25% Crk 2013 1.087 9.53 37.05<br />

R710 Ahaladipur-Kushtia Road Km 054.45-056.05 S 1.60 4887 Regional DBST 25mm @ 25% Crk 2013 2.174 9.48 67.79<br />

R710 Ahaladipur-Kushtia Road Km 052.15-052.55 S 0.40 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.148 8.40 14.71<br />

R710 Ahaladipur-Kushtia Road Km 059.95-060.55 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.722 7.80 21.74<br />

R710 Ahaladipur-Kushtia Road Km 061.35-062.95 S 1.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.593 7.72 57.39<br />

R710 Ahaladipur-Kushtia Road Km 066.85-067.15 S 0.30 4484 Regional Overlay 50mm @ IRI 5-7 2013 0.861 10.43 11.19<br />

R710 Ahaladipur-Kushtia Road Km 067.65-067.95 S 0.30 4484 Regional Overlay 50mm @ IRI 5-7 2013 0.861 11.03 14.35<br />

R710 Ahaladipur-Kushtia Road Km 070.45-070.65 S 0.20 4484 Regional Overlay 50mm @ IRI 5-7 2013 0.574 9.86 7.05<br />

R710 Ahaladipur-Kushtia Road Km 045.00-048.25 S 3.25 4887 Regional Overlay 60mm @ IRI 7-9 2013 11.111 6.94 114.63<br />

R710 Ahaladipur-Kushtia Road Km 048.35-048.55 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 6.80 7.08<br />

R710 Ahaladipur-Kushtia Road Km 051.75-051.95 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 10.10 9.76<br />

R710 Ahaladipur-Kushtia Road Km 056.25-057.95 S 1.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.819 6.14 54.30<br />

R713 Charikoal -Shilahdah Link Road Km 001.40-001.50 S 0.10 1416 Regional DBST @ Traff 100-2000 2013 0.091 2.35 0.48<br />

R713 Charikoal -Shilahdah Link Road Km 004.50-004.90 S 0.40 1416 Regional DBST @ Traff 100-2000 2013 0.366 1.55 1.38<br />

R713 Charikoal -Shilahdah Link Road Km 000.00-000.10 S 0.10 1416 Regional DBST 25mm @ 25% Crk 2013 0.091 2.26 0.35<br />

R713 Charikoal -Shilahdah Link Road Km 000.70-000.90 S 0.20 1416 Regional DBST 25mm @ 25% Crk 2013 0.183 1.95 0.79<br />

Sub-total Kushtia Division<br />

52.867<br />

Magura Division<br />

N7 Dauladia-Mongla Road Km 065.02-069.02 S 4.00 7248 National Overlay 50mm @ IRI 4-7 2013 16.682 10.16 305.70<br />

N7 Dauladia-Mongla Road Km 078.21-082.91 S 4.70 7850 National Overlay 50mm @ IRI 4-7 2013 18.791 9.29 297.82<br />

N7 Dauladia-Mongla Road Km 083.21-085.51 S 2.30 7850 National Overlay 50mm @ IRI 4-7 2013 8.764 <strong>12</strong>.45 196.76<br />

N7 Dauladia-Mongla Road Km 085.61-087.21 S 1.60 7850 National Overlay 50mm @ IRI 4-7 2013 6.096 11.59 <strong>12</strong>7.45<br />

Appendix-B: Page: 43 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N7 Dauladia-Mongla Road Km 087.61-089.51 S 1.90 7850 National Overlay 50mm @ IRI 4-7 2013 7.378 9.84 138.78<br />

N7 Dauladia-Mongla Road Km 089.61-089.71 S 0.10 7850 National Overlay 50mm @ IRI 4-7 2013 0.381 <strong>12</strong>.68 9.24<br />

N7 Dauladia-Mongla Road Km 090.11-092.21 S 2.10 7850 National Overlay 50mm @ IRI 4-7 2013 8.319 <strong>12</strong>.03 191.26<br />

N7 Dauladia-Mongla Road Km 092.31-097.51 S 5.20 7850 National Overlay 50mm @ IRI 4-7 2013 19.813 10.11 382.99<br />

N7 Dauladia-Mongla Road Km 097.61-097.91 S 0.30 7850 National Overlay 50mm @ IRI 4-7 2013 1.143 <strong>12</strong>.38 27.05<br />

N7 Dauladia-Mongla Road Km 098.01-100.31 S 2.30 7850 National Overlay 50mm @ IRI 4-7 2013 8.764 9.91 166.05<br />

N7 Dauladia-Mongla Road Km 102.02-102.<strong>12</strong> S 0.10 7850 National Overlay 50mm @ IRI 4-7 2013 0.381 9.80 7.14<br />

N7 Dauladia-Mongla Road Km 100.71-101.21 S 0.50 7850 National Overlay 60mm @ IRI 7-9 2013 2.272 7.34 29.15<br />

N7 Dauladia-Mongla Road Km 069.42-070.32 S 0.90 11451 National Overlay 80mm @ IRI 4-9 2013 5.408 9.97 79.39<br />

N7 Dauladia-Mongla Road Km 075.31-075.41 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.766 10.78 13.34<br />

N7 Dauladia-Mongla Road Km 076.11-076.61 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 4.009 8.24 44.81<br />

N7 Dauladia-Mongla Road Km 076.81-077.31 S 0.50 11451 National Overlay 80mm @ IRI 4-9 2013 4.815 6.93 45.24<br />

N7 Dauladia-Mongla Road Km 077.51-078.21 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 6.741 5.50 52.34<br />

N702 Jessore -Magura Road Km 026.19-026.79 S 0.60 3649 National Overlay 50mm @ IRI 5-9 2013 2.286 8.89 33.64<br />

N702 Jessore -Magura Road Km 028.29-029.49 S 1.20 3649 National Overlay 50mm @ IRI 5-9 2013 4.572 6.45 45.73<br />

N702 Jessore -Magura Road Km 035.89-038.59 S 2.70 11451 National Overlay 80mm @ IRI 5-9 2013 16.224 <strong>12</strong>.11 256.84<br />

R720 Magura-Narail Road Km 005.10-005.30 S 0.20 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.272 0.52 1.06<br />

R720 Magura-Narail Road Km 010.40-010.50 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.32 0.32<br />

R720 Magura-Narail Road Km 0<strong>12</strong>.20-0<strong>12</strong>.40 S 0.20 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.163 1.08 1.31<br />

R720 Magura-Narail Road Km 0<strong>12</strong>.80-013.80 S 1.00 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.815 1.59 9.67<br />

R720 Magura-Narail Road Km 022.00-0<strong>23</strong>.40 S 1.40 1047 Regional DBST @ IRI><strong>12</strong> 2013 1.328 1.18 11.65<br />

R720 Magura-Narail Road Km 0<strong>23</strong>.60-0<strong>23</strong>.90 S 0.30 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.408 0.53 1.61<br />

R720 Magura-Narail Road Km 025.30-025.40 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.091 0.96 0.66<br />

R720 Magura-Narail Road Km 026.80-026.90 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.091 0.61 0.42<br />

R720 Magura-Narail Road Km 027.10-027.40 S 0.30 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.274 0.58 1.18<br />

R720 Magura-Narail Road Km 030.10-032.20 S 2.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 2.469 0.45 8.28<br />

R720 Magura-Narail Road Km 000.40-000.80 S 0.40 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.148 1.64 2.29<br />

R720 Magura-Narail Road Km 001.80-002.40 S 0.60 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.722 0.96 1.96<br />

R720 Magura-Narail Road Km 007.50-008.30 S 0.80 1047 Regional Overlay 50mm @ IRI 5-7 2013 2.297 1.36 3.84<br />

R720 Magura-Narail Road Km 017.50-018.50 S 1.00 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.931 2.20 5.<strong>12</strong><br />

R720 Magura-Narail Road Km 021.80-022.00 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.386 1.64 0.78<br />

R720 Magura-Narail Road Km 0<strong>23</strong>.40-0<strong>23</strong>.60 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.574 1.17 0.78<br />

R720 Magura-Narail Road Km 024.30-024.80 S 0.50 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.368 1.25 2.06<br />

R720 Magura-Narail Road Km 025.10-025.30 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.386 1.97 0.88<br />

R720 Magura-Narail Road Km 025.40-025.50 S 0.10 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.193 2.65 0.60<br />

Appendix-B: Page: 44 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R720 Magura-Narail Road Km 025.90-026.80 S 0.90 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.738 1.38 2.80<br />

R720 Magura-Narail Road Km 026.90-027.10 S 0.20 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.386 2.18 0.99<br />

R720 Magura-Narail Road Km 027.40-027.90 S 0.50 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.966 1.37 1.53<br />

R720 Magura-Narail Road Km 028.30-028.80 S 0.50 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.966 1.87 2.08<br />

R720 Magura-Narail Road Km 029.10-030.10 S 1.00 1047 Regional Overlay 50mm @ IRI 5-7 2013 1.931 2.19 5.10<br />

R720 Magura-Narail Road Km 001.60-001.80 S 0.20 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.574 1.32 1.00<br />

R720 Magura-Narail Road Km 005.30-007.40 S 2.10 1047 Regional Overlay 50mm @ IRI 7-9 2013 6.029 1.72 13.00<br />

R720 Magura-Narail Road Km 008.80-009.60 S 0.80 1047 Regional Overlay 50mm @ IRI 7-9 2013 2.297 2.04 5.43<br />

R720 Magura-Narail Road Km 010.20-010.40 S 0.20 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.574 2.00 1.33<br />

R720 Magura-Narail Road Km 010.50-010.70 S 0.20 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.574 2.24 1.74<br />

R720 Magura-Narail Road Km 0<strong>12</strong>.40-0<strong>12</strong>.80 S 0.40 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.689 3.47 2.70<br />

R720 Magura-Narail Road Km 013.80-015.90 S 2.10 1047 Regional Overlay 50mm @ IRI 7-9 2013 4.001 2.34 10.86<br />

R720 Magura-Narail Road Km 016.10-017.20 S 1.10 1047 Regional Overlay 50mm @ IRI 7-9 2013 2.<strong>12</strong>4 2.46 6.22<br />

R720 Magura-Narail Road Km 028.80-029.10 S 0.30 1047 Regional Overlay 50mm @ IRI 7-9 2013 0.579 3.56 2.53<br />

Sub-total Magura Division<br />

183.085<br />

Meherpur Division<br />

R745 Kushtia -Jhenaidah Road Km 064.48-064.68 S 0.20 4283 Regional DBST @ Traff 4000-6000 2013 0.272 7.22 6.30<br />

R745 Kushtia -Jhenaidah Road Km 064.98-065.08 S 0.10 4283 Regional DBST @ Traff 4000-6000 2013 0.136 10.24 4.98<br />

R745 Kushtia -Jhenaidah Road Km 054.18-062.08 S 7.90 4283 Regional Overlay 50mm @ IRI 5-7 2013 22.679 9.02 272.67<br />

R745 Kushtia -Jhenaidah Road Km 062.78-064.38 S 1.60 4283 Regional Overlay 50mm @ IRI 5-7 2013 4.593 11.38 69.70<br />

R745 Kushtia -Jhenaidah Road Km 069.08-069.68 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.722 8.82 <strong>23</strong>.41<br />

R745 Kushtia -Jhenaidah Road Km 070.88-071.02 S 0.14 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.396 10.11 6.48<br />

R746 Meherpur-Mujibnagar Road Km 009.00-009.10 S 0.10 2154 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.51 0.61<br />

R746 Meherpur-Mujibnagar Road Km 0<strong>12</strong>.00-0<strong>12</strong>.40 S 0.40 2154 Regional DBST @ IRI><strong>12</strong> 2013 0.543 0.38 1.80<br />

R746 Meherpur-Mujibnagar Road Km 000.80-000.90 S 0.10 2154 Regional DBST @ Traff 2000-4000 2013 0.346 0.<strong>23</strong> 0.00<br />

R746 Meherpur-Mujibnagar Road Km 000.00-000.10 S 0.10 2154 Regional DBST 25mm @ 25% Crk 2013 0.141 1.08 0.27<br />

R746 Meherpur-Mujibnagar Road Km 000.70-000.80 S 0.10 2154 Regional DBST 25mm @ 25% Crk 2013 0.270 0.39 0.<strong>23</strong><br />

R746 Meherpur-Mujibnagar Road Km 000.90-001.60 S 0.70 2154 Regional Overlay 50mm @ IRI 5-7 2013 3.749 0.64 3.13<br />

R746 Meherpur-Mujibnagar Road Km 009.10-011.80 S 2.70 2154 Regional Overlay 50mm @ IRI 5-7 2013 7.751 1.03 9.68<br />

R746 Meherpur-Mujibnagar Road Km 011.90-0<strong>12</strong>.00 S 0.10 2154 Regional Overlay 50mm @ IRI 5-7 2013 0.287 1.76 0.62<br />

R746 Meherpur-Mujibnagar Road Km 001.60-007.90 S 6.30 2154 Regional Overlay 50mm @ IRI 7-9 2013 18.086 1.95 52.39<br />

Sub-total Meherpur Division<br />

61.106<br />

Appendix-B: Page: 45 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

No<br />

Narail Division<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

R720 Magura-Narail Road Km 036.60-037.40 S 0.80 1047 Regional DBST @ IRI><strong>12</strong> 2013 1.087 0.71 5.74<br />

R720 Magura-Narail Road Km 040.90-041.00 S 0.10 1047 Regional DBST @ IRI><strong>12</strong> 2013 0.136 0.52 0.53<br />

R720 Magura-Narail Road Km 037.40-037.70 S 0.30 1047 Regional DBST 25mm @ 25% Crk 2013 0.408 0.66 0.57<br />

R720 Magura-Narail Road Km 038.50-038.70 S 0.20 1047 Regional DBST 25mm @ 25% Crk 2013 0.272 0.92 0.50<br />

R720 Magura-Narail Road Km 039.30-039.40 S 0.10 1047 Regional DBST 25mm @ 25% Crk 2013 0.136 0.85 0.26<br />

R720 Magura-Narail Road Km 043.40-043.60 S 0.20 1047 Regional DBST 25mm @ 25% Crk 2013 0.272 0.71 0.47<br />

R720 Magura-Narail Road Km 040.60-040.90 S 0.30 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.861 1.11 1.10<br />

R720 Magura-Narail Road Km 041.00-041.30 S 0.30 1047 Regional Overlay 50mm @ IRI 5-7 2013 0.861 0.83 0.84<br />

Sub-total Narail Division<br />

4.032<br />

Satkhira Division<br />

N715 Benapole Town Old Section Km 000.00-000.10 S 0.10 9061 National DBST @ Traff >6000 2013 0.136 7.96 4.73<br />

N715 Benapole Town Old Section Km 005.30-005.40 S 0.10 9061 National DBST @ Traff >6000 2013 0.136 11.15 4.15<br />

N715 Benapole Town Old Section Km 006.10-007.20 S 1.10 9061 National Overlay 50mm @ IRI 5-7 2013 3.158 11.32 57.02<br />

N715 Benapole Town Old Section Km 007.30-009.50 S 2.20 9061 National Overlay 50mm @ IRI 5-7 2013 6.316 <strong>12</strong>.46 <strong>12</strong>5.49<br />

N715 Benapole Town Old Section Km 003.60-004.00 S 0.40 9061 National Overlay 60mm @ IRI 7-9 2013 1.369 17.44 31.74<br />

N715 Benapole Town Old Section Km 004.20-004.40 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.685 17.99 16.37<br />

N715 Benapole Town Old Section Km 004.80-005.00 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.685 16.94 16.01<br />

R760 Khulna-Satkhira Road Km 036.30-036.70 S 0.40 4116 Regional DBST @ Traff 4000-6000 2013 0.593 6.61 14.51<br />

R760 Khulna-Satkhira Road Km 037.56-038.56 S 1.00 4116 Regional DBST @ Traff 4000-6000 2013 1.482 2.09 9.75<br />

R760 Khulna-Satkhira Road Km 048.56-049.56 S 1.00 4887 Regional DBST @ Traff 4000-6000 2013 1.482 10.73 60.37<br />

R760 Khulna-Satkhira Road Km 051.26-053.76 S 2.50 4887 Regional DBST @ Traff 4000-6000 2013 3.705 10.01 140.75<br />

R760 Khulna-Satkhira Road Km 036.70-037.20 S 0.50 4116 Regional DBST 25mm @ 25% Crk 2013 0.741 2.76 5.16<br />

R760 Khulna-Satkhira Road Km 037.30-037.36 S 0.05 4116 Regional DBST 25mm @ 25% Crk 2013 0.082 1.48 0.26<br />

R760 Khulna-Satkhira Road Km 056.06-056.96 S 0.90 4887 Regional DBST 25mm @ 25% Crk 2013 1.334 6.17 27.84<br />

R760 Khulna-Satkhira Road Km 057.36-058.16 S 0.80 4887 Regional DBST 25mm @ 25% Crk 2013 1.186 6.17 26.92<br />

R760 Khulna-Satkhira Road Km 058.26-058.46 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.296 5.25 3.67<br />

R760 Khulna-Satkhira Road Km 040.56-040.76 S 0.20 4116 Regional Overlay 50mm @ IRI 5-7 2013 0.626 4.60 3.45<br />

R760 Khulna-Satkhira Road Km 054.16-055.36 S 1.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.758 8.01 44.15<br />

R760 Khulna-Satkhira Road Km 055.56-055.66 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.373 11.<strong>23</strong> 5.40<br />

R765 Khulna-Satkhira Road Km 018.80-019.50 S 0.70 4887 Regional DBST @ Traff 4000-6000 2013 0.951 6.65 29.04<br />

R765 Khulna-Satkhira Road Km 019.60-021.70 S 2.10 4887 Regional DBST @ Traff 4000-6000 2013 2.853 6.15 78.72<br />

R765 Khulna-Satkhira Road Km 022.90-0<strong>23</strong>.30 S 0.40 4887 Regional DBST @ Traff 4000-6000 2013 0.543 5.69 <strong>12</strong>.78<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-B: Page: 46 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R765 Khulna-Satkhira Road Km 026.49-029.39 S 2.90 4887 Regional DBST @ Traff 4000-6000 2013 3.940 5.94 104.94<br />

R765 Khulna-Satkhira Road Km 030.89-030.99 S 0.10 4887 Regional DBST @ Traff 4000-6000 2013 0.136 8.68 4.42<br />

R765 Khulna-Satkhira Road Km 031.09-032.39 S 1.30 4887 Regional DBST @ Traff 4000-6000 2013 1.766 7.63 50.42<br />

R765 Khulna-Satkhira Road Km 032.39-032.59 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.272 6.30 7.21<br />

R765 Khulna-Satkhira Road Km 029.89-029.99 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 10.90 5.30<br />

R765 Khulna-Satkhira Road Km 030.29-030.39 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 7.44 3.20<br />

R765 Khulna-Satkhira Road Km 032.59-033.79 S 1.20 4887 Regional DBST 25mm @ 25% Crk 2013 1.630 7.26 43.<strong>23</strong><br />

R765 Khulna-Satkhira Road Km 033.89-036.89 S 3.00 4887 Regional DBST 25mm @ 25% Crk 2013 4.076 8.86 131.92<br />

R765 Khulna-Satkhira Road Km 040.69-040.79 S 0.10 4887 Regional DBST 25mm @ 25% Crk 2013 0.136 7.71 3.40<br />

R765 Khulna-Satkhira Road Km 041.29-043.00 S 1.72 4887 Regional DBST 25mm @ 25% Crk 2013 2.330 6.66 50.35<br />

R765 Khulna-Satkhira Road Km 021.90-022.50 S 0.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 1.722 5.93 17.64<br />

R765 Khulna-Satkhira Road Km 022.60-022.80 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 7.68 7.<strong>23</strong><br />

R765 Khulna-Satkhira Road Km 025.09-025.19 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 8.65 4.51<br />

R765 Khulna-Satkhira Road Km 029.49-029.69 S 0.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.574 14.55 11.14<br />

R765 Khulna-Satkhira Road Km 0<strong>23</strong>.40-024.40 S 1.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.4<strong>23</strong> 6.97 38.06<br />

R765 Khulna-Satkhira Road Km 024.69-024.79 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.43 5.22<br />

R765 Khulna-Satkhira Road Km 024.89-024.99 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.60 5.39<br />

R765 Khulna-Satkhira Road Km 025.29-025.79 S 0.50 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.711 8.29 <strong>23</strong>.29<br />

R765 Khulna-Satkhira Road Km 026.19-026.29 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.42 5.21<br />

R765 Khulna-Satkhira Road Km 036.89-039.99 S 3.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.611 6.52 108.89<br />

Sub-total Satkhira Division<br />

Total Khulna Zone<br />

66.975<br />

1089.903<br />

Rajshahi Zone<br />

Naogaon Division<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 038.09-038.49 S 0.40 1661 Regional DBST @ Traff 100-2000 2013 0.356 3.73 4.59<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 042.09-043.99 S 1.90 1661 Regional DBST @ Traff 100-2000 2013 1.816 3.20 19.08<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 044.39-044.49 S 0.10 1661 Regional DBST @ Traff 100-2000 2013 0.089 4.97 1.45<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 044.89-044.99 S 0.10 1661 Regional DBST @ Traff 100-2000 2013 0.089 4.79 1.37<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 049.43-050.63 S 1.20 1661 Regional DBST @ Traff 100-2000 2013 1.067 3.72 13.36<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 054.43-060.<strong>23</strong> S 5.80 1661 Regional DBST @ Traff 100-2000 2013 5.960 1.37 18.55<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 063.<strong>23</strong>-064.<strong>23</strong> S 1.00 1661 Regional DBST @ Traff 100-2000 2013 0.889 3.65 11.21<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 064.33-064.83 S 0.50 1661 Regional DBST @ Traff 100-2000 2013 0.600 2.72 5.49<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 014.87-015.96 S 1.09 3109 Regional DBST @ Traff 2000-4000 2013 1.449 4.36 22.68<br />

Appendix-B: Page: 47 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 016.97-017.17 S 0.20 3019 Regional DBST 25mm @ 25% Crk 2013 0.180 5.06 2.56<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 045.89-049.03 S 3.14 1661 Regional DBST 25mm @ 25% Crk 2013 2.796 1.27 11.00<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 053.13-053.93 S 0.80 1661 Regional DBST 25mm @ 25% Crk 2013 1.328 0.71 1.89<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 064.<strong>23</strong>-064.33 S 0.10 1661 Regional DBST 25mm @ 25% Crk 2013 0.089 3.34 0.76<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 064.83-065.33 S 0.50 1661 Regional DBST 25mm @ 25% Crk 2013 0.457 1.11 0.86<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 017.27-019.09 S 1.81 3019 Regional Overlay 50mm @ IRI 5-7 2013 3.456 6.60 26.44<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 019.19-020.09 S 0.90 3019 Regional Overlay 50mm @ IRI 5-7 2013 1.715 7.48 16.21<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 021.89-022.29 S 0.40 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.762 6.43 5.31<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 022.49-0<strong>23</strong>.49 S 1.00 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.030 15.51 39.22<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 038.49-038.69 S 0.20 1661 Regional Overlay 50mm @ IRI 5-7 2013 0.376 2.63 1.19<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 038.99-042.09 S 3.10 1661 Regional Overlay 50mm @ IRI 5-7 2013 5.825 2.27 16.61<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 004.47-014.87 S 10.40 3109 Regional Overlay 50mm @ IRI 7-9 2013 29.313 5.18 226.70<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 020.09-021.89 S 1.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.429 8.09 36.25<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 022.29-022.49 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.381 9.27 4.98<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 0<strong>23</strong>.49-0<strong>23</strong>.79 S 0.30 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.564 7.42 5.46<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 026.69-027.39 S 0.70 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.315 6.<strong>23</strong> <strong>12</strong>.76<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 028.49-030.29 S 1.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.720 4.59 26.88<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 030.99-031.99 S 1.00 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.879 7.96 <strong>23</strong>.29<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 034.89-038.09 S 3.20 1661 Regional Overlay 50mm @ IRI 7-9 2013 6.531 3.03 26.79<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 060.<strong>23</strong>-063.<strong>23</strong> S 3.00 1661 Regional Overlay 50mm @ IRI 7-9 2013 5.637 3.00 21.38<br />

R549 Badalgachhi-Joypurhat Road Km 003.40-003.60 S 0.20 1779 Regional DBST @ Traff 100-2000 2013 0.181 3.29 1.44<br />

R549 Badalgachhi-Joypurhat Road Km 003.60-004.90 S 1.30 1779 Regional DBST @ Traff 100-2000 2013 1.175 3.56 14.10<br />

R549 Badalgachhi-Joypurhat Road Km 005.10-005.80 S 0.70 1779 Regional DBST @ Traff 100-2000 2013 0.633 3.29 6.54<br />

R549 Badalgachhi-Joypurhat Road Km 010.85-011.85 S 1.00 1779 Regional DBST @ Traff 100-2000 2013 0.904 3.62 11.02<br />

R549 Badalgachhi-Joypurhat Road Km 011.85-0<strong>12</strong>.35 S 0.50 1779 Regional DBST @ Traff 100-2000 2013 0.452 2.63 3.09<br />

R549 Badalgachhi-Joypurhat Road Km 000.30-003.40 S 3.10 1779 Regional Overlay 50mm @ IRI 7-9 2013 5.922 3.82 30.63<br />

R549 Badalgachhi-Joypurhat Road Km 004.90-005.10 S 0.20 1779 Regional Overlay 50mm @ IRI 7-9 2013 0.382 3.89 1.64<br />

R549 Badalgachhi-Joypurhat Road Km 005.80-007.80 S 2.00 1779 Regional Overlay 50mm @ IRI 7-9 2013 3.821 3.76 18.17<br />

R549 Badalgachhi-Joypurhat Road Km 010.30-010.85 S 0.55 1779 Regional Overlay 50mm @ IRI 7-9 2013 1.053 3.27 4.10<br />

R549 Badalgachhi-Joypurhat Road Km 015.05-017.00 S 1.95 1779 Regional Overlay 50mm @ IRI 7-9 2013 4.517 2.89 15.96<br />

Sub-total Naogaon Division<br />

103.136<br />

Natore Division<br />

N502 Bogra -Natore Road Km 045.96-046.66 S 0.70 9061 National DBST @ Traff >6000 2013 0.951 6.06 14.97<br />

N502 Bogra -Natore Road Km 046.66-047.16 S 0.50 9061 National DBST @ Traff >6000 2013 0.679 8.83 18.87<br />

Appendix-B: Page: 48 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N502 Bogra -Natore Road Km 047.16-048.06 S 0.90 9061 National DBST @ Traff >6000 2013 1.2<strong>23</strong> 5.81 18.46<br />

N502 Bogra -Natore Road Km 053.16-053.36 S 0.20 6500 National DBST @ Traff >6000 2013 0.272 9.80 9.94<br />

N502 Bogra -Natore Road Km 056.76-062.81 S 6.05 9061 National DBST @ Traff >6000 2013 8.731 11.79 311.70<br />

N502 Bogra -Natore Road Km 041.86-043.36 S 1.50 9061 National Overlay 50mm @ IRI 5-7 2013 4.306 11.56 78.43<br />

N502 Bogra -Natore Road Km 051.56-052.66 S 1.10 6500 National Overlay 50mm @ IRI 5-7 2013 3.158 8.07 41.22<br />

N502 Bogra -Natore Road Km 055.96-056.16 S 0.20 6500 National Overlay 50mm @ IRI 5-7 2013 0.574 8.15 7.96<br />

N502 Bogra -Natore Road Km 044.26-045.26 S 1.00 9061 National Overlay 60mm @ IRI 7-9 2013 3.510 16.72 70.73<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 090.02-100.52 S 10.50 7507 National Overlay 50mm @ IRI 4-7 2013 40.007 11.31 864.81<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 068.<strong>12</strong>-078.52 S 10.39 11451 National Overlay 80mm @ IRI 4-9 2013 62.449 10.31 873.07<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 083.92-090.02 S 6.10 11451 National Overlay 80mm @ IRI 4-9 2013 36.654 10.85 561.28<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 100.52-102.22 S 1.70 11451 National Overlay 80mm @ IRI 4-9 2013 10.215 14.34 198.74<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 102.22-102.42 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 1.202 17.21 28.06<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 102.42-103.92 S 1.50 11451 National Overlay 80mm @ IRI 4-9 2013 9.013 14.89 182.02<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 104.02-1<strong>12</strong>.<strong>12</strong> S 8.10 11451 National Overlay 80mm @ IRI 4-9 2013 48.671 10.47 690.94<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 1<strong>12</strong>.<strong>12</strong>-113.60 S 1.48 11451 National Overlay 80mm @ IRI 4-9 2013 8.911 14.79 162.73<br />

N602 Natore Town old Section Km 002.59-002.89 S 0.30 7<strong>23</strong>7 National DBST @ Traff >6000 2013 0.630 3.95 9.20<br />

N602 Natore Town old Section Km 001.09-002.59 S 1.50 7<strong>23</strong>7 National Overlay 50mm @ IRI 5-7 2013 6.561 3.13 24.46<br />

N602 Natore Town old Section Km 003.59-004.89 S 1.30 7<strong>23</strong>7 National Overlay 50mm @ IRI 5-7 2013 5.937 2.62 20.88<br />

N602 Natore Town old Section Km 003.19-003.59 S 0.40 7<strong>23</strong>7 National Overlay 60mm @ IRI 7-9 2013 2.116 4.19 11.38<br />

N602 Natore Town old Section Km 004.89-005.41 S 0.52 11451 National Overlay 80mm @ IRI 5-9 2013 3.249 9.60 42.29<br />

R548 Naogaon-Atrai-Natore Road Km 029.58-035.89 S 6.31 3019 Regional DBST @ Traff 2000-4000 2013 6.<strong>23</strong>6 7.20 159.87<br />

R548 Naogaon-Atrai-Natore Road Km 040.17-055.36 S 15.19 1939 Regional DBST 25mm @ 25% Crk 2013 13.510 0.51 <strong>12</strong>.93<br />

R548 Naogaon-Atrai-Natore Road Km 037.29-038.99 S 1.70 3019 Regional Overlay 50mm @ IRI 7-9 2013 3.549 7.73 41.89<br />

R548 Naogaon-Atrai-Natore Road Km 039.29-040.17 S 0.88 1939 Regional Overlay 50mm @ IRI 7-9 2013 1.835 5.41 <strong>12</strong>.97<br />

Sub-total Natore Division<br />

284.149<br />

Nawabganj Division<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 081.42-082.62 S 1.20 3019 Regional DBST @ Traff 2000-4000 2013 1.097 5.63 20.29<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 097.47-098.37 S 0.90 3019 Regional DBST @ Traff 2000-4000 2013 0.8<strong>23</strong> 4.86 <strong>12</strong>.57<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 082.62-082.82 S 0.20 3019 Regional DBST 25mm @ 25% Crk 2013 0.183 3.<strong>23</strong> 1.31<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 083.<strong>12</strong>-083.32 S 0.20 3019 Regional DBST 25mm @ 25% Crk 2013 0.183 3.48 1.35<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 096.07-096.17 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.091 4.08 0.76<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 097.07-097.47 S 0.40 3019 Regional DBST 25mm @ 25% Crk 2013 0.366 3.14 2.42<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 098.37-098.47 S 0.10 3019 Regional DBST 25mm @ 25% Crk 2013 0.091 4.25 0.74<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 099.27-099.87 S 0.60 3019 Regional DBST 25mm @ 25% Crk 2013 0.548 2.65 3.27<br />

Appendix-B: Page: 49 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 100.07-100.66 S 0.59 3019 Regional DBST 25mm @ 25% Crk 2013 0.539 1.32 1.37<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 081.<strong>12</strong>-081.42 S 0.30 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.579 6.13 4.02<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 083.37-084.87 S 1.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 2.897 4.68 14.71<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 087.07-089.57 S 2.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 4.828 4.73 25.81<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 089.77-091.67 S 1.90 3019 Regional Overlay 50mm @ IRI 5-7 2013 3.669 7.76 35.99<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 098.57-099.07 S 0.50 3019 Regional Overlay 50mm @ IRI 5-7 2013 0.966 4.61 4.59<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 084.87-087.07 S 2.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 4.249 6.01 32.24<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 091.87-094.57 S 2.70 3019 Regional Overlay 50mm @ IRI 7-9 2013 5.214 7.44 50.71<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 094.57-096.07 S 1.50 3019 Regional Overlay 50mm @ IRI 7-9 2013 2.897 6.<strong>23</strong> 24.47<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 096.17-097.07 S 0.90 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.790 4.82 10.26<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 099.87-100.07 S 0.20 3019 Regional Overlay 50mm @ IRI 7-9 2013 0.386 6.53 3.09<br />

Sub-total Nawabganj Division<br />

31.396<br />

Pabna Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 101.10-101.80 S 0.70 1550 National Overlay 50mm @ IRI 4-9 2013 2.667 1.91 6.06<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 102.00-106.93 S 4.93 1550 National Overlay 50mm @ IRI 4-9 2013 18.777 1.67 35.47<br />

N504 Nagarbari -Kashinathpur Road Km 000.90-001.40 S 0.50 2162 National DBST @ IRI><strong>12</strong> 2013 0.902 0.46 3.73<br />

N504 Nagarbari -Kashinathpur Road Km 000.20-000.40 S 0.20 2162 National Overlay 50mm @ IRI 5-9 2013 0.762 1.62 1.49<br />

N505 Baderhat-Kazirhat Road Km 000.00-002.63 S 2.63 1472 National Overlay 50mm @ IRI 5-9 2013 10.378 0.91 10.92<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 044.05-044.15 S 0.10 7153 National DBST @ Traff >6000 2013 0.180 8.46 7.25<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 025.27-040.35 S 15.08 6210 National Overlay 50mm @ IRI 4-7 2013 57.447 6.60 534.56<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 041.85-044.05 S 2.20 7153 National Overlay 50mm @ IRI 4-7 2013 8.383 6.08 71.07<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 044.15-046.20 S 2.05 7153 National Overlay 50mm @ IRI 4-7 2013 7.822 5.16 54.70<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 041.68-041.85 S 0.17 11451 National Overlay 80mm @ IRI 4-9 2013 1.034 13.41 22.41<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 046.20-048.55 S 2.35 11451 National Overlay 80mm @ IRI 4-9 2013 14.103 14.82 258.10<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 048.65-051.25 S 2.60 11451 National Overlay 80mm @ IRI 4-9 2013 15.6<strong>23</strong> 11.11 245.01<br />

N604 Pabna Town Old Section Km 001.90-003.40 S 1.50 7342 National Overlay 50mm @ IRI 5-7 2013 7.853 4.04 44.<strong>23</strong><br />

N604 Pabna Town Old Section Km 000.00-001.90 S 1.90 11451 National Overlay 80mm @ IRI 5-9 2013 <strong>12</strong>.699 11.92 186.98<br />

N604 Pabna Town Old Section Km 003.40-007.57 S 4.17 11451 National Overlay 80mm @ IRI 5-9 2013 28.791 13.43 477.28<br />

N704 Jhenaidah-Dasuria Road Km 070.40-081.39 S 10.99 6607 National Overlay 60mm @ IRI 7-9 2013 50.530 7.57 692.19<br />

N705 Paksey -Iswardi-Dasuria Km 004.50-004.60 S 0.10 2897 National Overlay 50mm @ IRI 5-9 2013 0.287 4.18 1.49<br />

N705 Paksey -Iswardi-Dasuria Km 005.70-006.60 S 0.90 11451 National Overlay 80mm @ IRI 5-9 2013 5.334 10.99 79.50<br />

N705 Paksey -Iswardi-Dasuria Km 008.30-009.20 S 0.90 11451 National Overlay 80mm @ IRI 5-9 2013 5.334 10.03 72.54<br />

N705 Paksey -Iswardi-Dasuria Km 009.30-009.40 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.593 11.95 9.61<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 016.94-017.24 S 0.30 535 Regional DBST @ IRI><strong>12</strong> 2013 0.274 0.27 0.55<br />

Appendix-B: Page: 50 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 026.44-026.54 S 0.10 1096 Regional DBST @ IRI><strong>12</strong> 2013 0.091 0.70 0.48<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 033.84-033.87 S 0.03 1096 Regional DBST @ IRI><strong>12</strong> 2013 0.026 1.49 0.29<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 008.00-008.60 S 0.60 535 Regional Overlay 50mm @ IRI 5-7 2013 1.159 0.90 1.26<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 009.30-010.70 S 1.40 535 Regional Overlay 50mm @ IRI 5-7 2013 2.704 0.79 2.38<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 0<strong>12</strong>.90-016.94 S 4.04 535 Regional Overlay 50mm @ IRI 5-7 2013 7.798 0.79 6.76<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 017.24-020.24 S 3.00 882 Regional Overlay 50mm @ IRI 5-7 2013 6.483 0.87 6.79<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 033.87-034.17 S 0.30 1096 Regional Overlay 50mm @ IRI 5-7 2013 0.579 2.28 1.52<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 034.67-034.87 S 0.20 1096 Regional Overlay 50mm @ IRI 5-7 2013 0.386 1.98 0.88<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 035.97-036.17 S 0.20 1096 Regional Overlay 50mm @ IRI 5-7 2013 0.386 2.53 1.14<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 045.87-047.07 S 1.20 3019 Regional Overlay 50mm @ IRI 5-7 2013 2.317 9.29 27.21<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 000.40-000.60 S 0.20 535 Regional Overlay 50mm @ IRI 7-9 2013 0.595 0.92 0.65<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 002.30-002.70 S 0.40 535 Regional Overlay 50mm @ IRI 7-9 2013 0.772 1.24 1.06<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 005.60-006.50 S 0.90 535 Regional Overlay 50mm @ IRI 7-9 2013 1.738 1.71 4.21<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 006.70-008.00 S 1.30 535 Regional Overlay 50mm @ IRI 7-9 2013 2.511 1.44 5.34<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 008.60-009.30 S 0.70 535 Regional Overlay 50mm @ IRI 7-9 2013 1.352 1.55 2.50<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 010.70-011.10 S 0.40 535 Regional Overlay 50mm @ IRI 7-9 2013 0.772 1.45 1.27<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 0<strong>12</strong>.30-0<strong>12</strong>.90 S 0.60 535 Regional Overlay 50mm @ IRI 7-9 2013 1.159 1.54 2.01<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 020.24-0<strong>23</strong>.34 S 3.10 1096 Regional Overlay 50mm @ IRI 7-9 2013 5.987 3.67 26.16<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 027.24-027.44 S 0.20 1096 Regional Overlay 50mm @ IRI 7-9 2013 0.386 3.94 1.76<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 027.74-030.74 S 3.00 1096 Regional Overlay 50mm @ IRI 7-9 2013 5.794 2.50 16.04<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 030.74-033.74 S 3.00 1096 Regional Overlay 50mm @ IRI 7-9 2013 5.794 3.30 24.14<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 038.07-038.97 S 0.90 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.738 8.64 19.63<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 039.67-042.77 S 3.10 3019 Regional Overlay 50mm @ IRI 7-9 2013 5.987 8.03 60.74<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 047.07-047.87 S 0.80 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.545 7.52 18.09<br />

R603 Pabna-Paksey (EPZ) Road Km 000.00-001.90 S 1.90 3297 Regional DBST 25mm @ 25% Crk 2013 2.816 1.42 10.92<br />

R603 Pabna-Paksey (EPZ) Road Km 001.90-004.40 S 2.50 3297 Regional Overlay 50mm @ IRI 5-7 2013 7.829 2.54 <strong>23</strong>.70<br />

R603 Pabna-Paksey (EPZ) Road Km 007.70-009.50 S 1.80 3297 Regional Overlay 50mm @ IRI 5-7 2013 5.637 2.40 15.80<br />

R603 Pabna-Paksey (EPZ) Road Km 010.20-0<strong>12</strong>.80 S 2.60 3297 Regional Overlay 50mm @ IRI 5-7 2013 8.142 2.<strong>23</strong> 19.21<br />

R603 Pabna-Paksey (EPZ) Road Km 004.40-007.60 S 3.20 3297 Regional Overlay 50mm @ IRI 7-9 2013 10.021 3.62 42.59<br />

R603 Pabna-Paksey (EPZ) Road Km 009.50-010.20 S 0.70 3297 Regional Overlay 50mm @ IRI 7-9 2013 2.192 3.71 10.47<br />

R603 Pabna-Paksey (EPZ) Road Km 0<strong>12</strong>.80-015.20 S 2.40 3297 Regional Overlay 50mm @ IRI 7-9 2013 7.516 3.58 34.66<br />

R603 Pabna-Paksey (EPZ) Road Km 021.81-025.78 S 3.96 3019 Regional Overlay 50mm @ IRI 7-9 2013 8.915 5.01 56.42<br />

R604 Tebunia-Hamkuria Road Km 003.20-009.30 S 6.10 3778 Regional Overlay 50mm @ IRI 5-7 2013 19.103 2.58 58.14<br />

R604 Tebunia-Hamkuria Road Km 009.80-013.20 S 3.40 3778 Regional Overlay 50mm @ IRI 5-7 2013 10.648 2.86 36.89<br />

R604 Tebunia-Hamkuria Road Km 013.40-018.50 S 5.10 3778 Regional Overlay 50mm @ IRI 5-7 2013 15.972 3.00 59.02<br />

Appendix-B: Page: 51 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R604 Tebunia-Hamkuria Road Km 019.60-031.60 S <strong>12</strong>.00 2942 Regional Overlay 50mm @ IRI 5-7 2013 35.388 1.57 66.52<br />

R604 Tebunia-Hamkuria Road Km 013.20-013.40 S 0.20 3778 Regional Overlay 50mm @ IRI 7-9 2013 0.626 5.17 4.48<br />

R604 Tebunia-Hamkuria Road Km 031.60-040.57 S 8.97 2942 Regional Overlay 50mm @ IRI 7-9 2013 21.499 2.17 52.85<br />

Sub-total Pabna Division<br />

464.136<br />

Rajshahi Division<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 118.02-<strong>12</strong>4.57 S 6.55 7109 National Overlay 50mm @ IRI 4-7 2013 25.516 6.45 326.38<br />

N6 Kashinathpur-Natore-Rajshahi Road Km <strong>12</strong>4.57-<strong>12</strong>4.98 S 0.41 7109 National Overlay 60mm @ IRI 7-9 2013 2.582 5.88 26.68<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 144.98-145.73 L 0.75 11451 National Overlay 80mm @ IRI 4-9 2013 6.198 9.21 70.51<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 144.98-145.73 R 0.75 11451 National Overlay 80mm @ IRI 4-9 2013 6.198 9.21 70.51<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 113.60-117.22 S 3.62 11451 National Overlay 80mm @ IRI 4-9 2013 21.734 <strong>12</strong>.94 381.62<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 117.22-118.02 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.807 <strong>12</strong>.54 92.94<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 142.55-144.98 S 2.43 11451 National Overlay 80mm @ IRI 4-9 2013 14.601 16.18 291.72<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 145.73-149.67 S 3.94 11451 National Overlay 80mm @ IRI 4-9 2013 <strong>23</strong>.657 13.40 391.28<br />

N603 Rajshahi Town By-Pass Road Km 000.00-000.10 S 0.10 3802 National DBST 25mm @ 25% Crk 2013 0.180 5.22 2.82<br />

N603 Rajshahi Town By-Pass Road Km 002.30-003.90 S 1.60 3802 National Overlay 50mm @ IRI 5-9 2013 6.096 7.54 73.57<br />

N603 Rajshahi Town By-Pass Road Km 003.90-004.60 S 0.70 3802 National Overlay 50mm @ IRI 5-9 2013 2.667 6.46 30.07<br />

N603 Rajshahi Town By-Pass Road Km 004.60-006.30 S 1.70 3802 National Overlay 50mm @ IRI 5-9 2013 6.477 6.91 71.67<br />

N603 Rajshahi Town By-Pass Road Km 006.30-006.90 S 0.60 3802 National Overlay 50mm @ IRI 5-9 2013 2.286 5.98 <strong>23</strong>.58<br />

N603 Rajshahi Town By-Pass Road Km 006.90-009.30 S 2.40 3802 National Overlay 50mm @ IRI 5-9 2013 9.145 7.65 111.97<br />

N603 Rajshahi Town By-Pass Road Km 009.30-017.20 S 7.90 11451 National Overlay 80mm @ IRI 5-9 2013 47.469 10.54 705.84<br />

N603 Rajshahi Town By-Pass Road Km 017.60-020.83 S 3.<strong>23</strong> 11451 National Overlay 80mm @ IRI 5-9 2013 19.408 10.89 298.22<br />

R685 Rajshahi -Chowmasia Road Km 010.00-011.20 S 1.20 6330 Regional DBST @ Traff >6000 2013 1.630 10.49 61.18<br />

R685 Rajshahi -Chowmasia Road Km 026.00-028.30 S 2.30 4887 Regional DBST @ Traff 4000-6000 2013 3.227 8.10 101.06<br />

R685 Rajshahi -Chowmasia Road Km 022.20-026.00 S 3.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 10.909 <strong>12</strong>.91 187.77<br />

R685 Rajshahi -Chowmasia Road Km 029.82-030.<strong>12</strong> S 0.30 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.861 7.<strong>12</strong> 10.59<br />

R685 Rajshahi -Chowmasia Road Km 007.00-010.00 S 3.00 6330 Regional Overlay 60mm @ IRI 5.5-9 2013 11.557 7.14 104.01<br />

R685 Rajshahi -Chowmasia Road Km 0<strong>12</strong>.40-0<strong>12</strong>.50 S 0.10 6330 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 8.63 3.01<br />

R685 Rajshahi -Chowmasia Road Km 015.80-019.00 S 3.20 6330 Regional Overlay 60mm @ IRI 5.5-9 2013 10.953 10.14 136.06<br />

R685 Rajshahi -Chowmasia Road Km 028.70-029.00 S 0.30 4887 Regional Overlay 60mm @ IRI 7-9 2013 1.027 10.16 13.64<br />

R685 Rajshahi -Chowmasia Road Km 030.32-032.34 S 2.02 4887 Regional Overlay 60mm @ IRI 7-9 2013 6.921 6.42 70.02<br />

Sub-total Rajshahi Division<br />

246.449<br />

Sirajganj Division<br />

Appendix-B: Page: 52 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N405 Elenga-Hatikamrul Road Km 036.25-040.81 S 4.56 11451 National DBST @ Traff >6000 2013 8.222 7.40 191.15<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 134.51-137.51 S 3.00 6306 National Overlay 50mm @ IRI 4-7 2013 11.431 4.42 81.11<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 137.51-143.61 S 6.10 6306 National Overlay 50mm @ IRI 4-7 2013 <strong>23</strong>.242 6.03 197.52<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 143.61-146.71 S 3.10 6306 National Overlay 50mm @ IRI 4-7 2013 11.8<strong>12</strong> 4.64 87.99<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km <strong>12</strong>2.31-<strong>12</strong>9.61 S 7.30 5355 National Overlay 50mm @ IRI 4-9 2013 27.815 3.76 151.21<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km <strong>12</strong>9.61-132.71 S 3.10 11451 National Overlay 80mm @ IRI 4-9 2013 18.627 8.15 187.49<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 132.71-134.51 S 1.80 11451 National Overlay 80mm @ IRI 4-9 2013 10.816 7.44 99.30<br />

R451 Nalka-Sirajganj Road Km 006.90-009.50 S 2.60 4965 Regional DBST @ Traff 4000-6000 2013 3.532 6.50 82.17<br />

R451 Nalka-Sirajganj Road Km 000.00-001.30 S 1.30 4965 Regional Overlay 50mm @ IRI 5-7 2013 3.732 4.72 21.94<br />

R451 Nalka-Sirajganj Road Km 002.70-003.40 S 0.70 4965 Regional Overlay 50mm @ IRI 5-7 2013 2.010 5.69 14.24<br />

R451 Nalka-Sirajganj Road Km 009.50-009.70 S 0.20 4965 Regional Overlay 50mm @ IRI 5-7 2013 0.574 6.18 4.29<br />

R451 Nalka-Sirajganj Road Km 0<strong>12</strong>.25-013.27 L 1.02 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.161 14.39 55.71<br />

R451 Nalka-Sirajganj Road Km 0<strong>12</strong>.25-013.27 R 1.02 4887 Regional Overlay 60mm @ IRI 7-9 2013 4.742 8.10 53.01<br />

R451 Nalka-Sirajganj Road Km 001.30-002.70 S 1.40 4965 Regional Overlay 60mm @ IRI 7-9 2013 4.792 5.73 32.65<br />

R451 Nalka-Sirajganj Road Km 003.40-005.90 S 2.50 4965 Regional Overlay 60mm @ IRI 7-9 2013 8.557 6.31 66.<strong>12</strong><br />

R451 Nalka-Sirajganj Road Km 005.90-006.90 S 1.00 4965 Regional Overlay 60mm @ IRI 7-9 2013 3.4<strong>23</strong> 7.08 28.82<br />

R451 Nalka-Sirajganj Road Km 009.70-010.80 S 1.10 4965 Regional Overlay 60mm @ IRI 7-9 2013 3.765 6.20 27.04<br />

R451 Nalka-Sirajganj Road Km 013.27-014.74 S 1.47 4887 Regional Overlay 60mm @ IRI 7-9 2013 5.032 14.68 90.44<br />

Sub-total Sirajganj Division<br />

Total Rajshahi Zone<br />

155.285<br />

<strong>12</strong>84.551<br />

Rangpur Zone<br />

Bogra Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 161.37-164.<strong>12</strong> S 2.75 11451 National Overlay 80mm @ IRI 4-9 2013 16.536 13.73 367.01<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 164.<strong>12</strong>-174.36 S 10.<strong>23</strong> 10530 National Overlay 80mm @ IRI 4-9 2013 62.667 17.56 1492.52<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 174.36-201.28 S 26.93 20036 National Overlay 80mm @ IRI 4-9 2013 161.798 13.<strong>12</strong> 3272.90<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 201.28-245.52 S 44.<strong>23</strong> 13193 National Overlay 80mm @ IRI 4-9 2013 269.791 8.54 3250.65<br />

N502 Bogra -Natore Road Km 003.60-004.50 S 0.90 5705 National DBST @ Traff 4000-6000 2013 1.2<strong>23</strong> 7.20 34.26<br />

N502 Bogra -Natore Road Km 008.10-008.80 S 0.70 5705 National DBST @ Traff 4000-6000 2013 0.951 9.94 34.14<br />

N502 Bogra -Natore Road Km 009.10-010.20 S 1.10 5705 National DBST @ Traff 4000-6000 2013 1.494 6.60 36.44<br />

N502 Bogra -Natore Road Km 017.10-019.90 S 2.80 5705 National DBST @ Traff 4000-6000 2013 3.845 9.07 <strong>12</strong>5.95<br />

N502 Bogra -Natore Road Km 028.26-028.36 S 0.10 9061 National Overlay 50mm @ IRI 5-7 2013 0.287 9.29 4.45<br />

N502 Bogra -Natore Road Km 028.66-028.86 S 0.20 9061 National Overlay 50mm @ IRI 5-7 2013 0.574 8.68 8.32<br />

N502 Bogra -Natore Road Km 002.40-003.60 S 1.20 5705 National Overlay 50mm @ IRI 5-9 2013 3.445 6.85 29.79<br />

Appendix-B: Page: 53 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N502 Bogra -Natore Road Km 004.50-004.90 S 0.40 5705 National Overlay 50mm @ IRI 5-9 2013 1.148 6.80 9.28<br />

N502 Bogra -Natore Road Km 007.50-008.10 S 0.60 5705 National Overlay 50mm @ IRI 5-9 2013 1.722 8.01 20.30<br />

N502 Bogra -Natore Road Km 010.60-010.80 S 0.20 5705 National Overlay 50mm @ IRI 5-9 2013 0.574 8.05 7.37<br />

N502 Bogra -Natore Road Km 0<strong>12</strong>.30-013.10 S 0.80 5705 National Overlay 50mm @ IRI 5-9 2013 2.297 7.01 20.34<br />

N502 Bogra -Natore Road Km 013.30-015.10 S 1.80 5705 National Overlay 50mm @ IRI 5-9 2013 5.167 5.50 38.55<br />

N502 Bogra -Natore Road Km 016.90-017.10 S 0.20 5705 National Overlay 50mm @ IRI 5-9 2013 0.574 9.51 7.14<br />

N502 Bogra -Natore Road Km 019.90-026.16 S 6.26 9061 National Overlay 60mm @ IRI 7-9 2013 21.859 9.31 295.31<br />

N502 Bogra -Natore Road Km 027.06-027.46 S 0.40 9061 National Overlay 60mm @ IRI 7-9 2013 1.369 9.51 20.13<br />

N502 Bogra -Natore Road Km 030.86-032.00 S 1.14 9061 National Overlay 60mm @ IRI 7-9 2013 3.899 14.64 75.86<br />

N510 Bogra Station Road Km 000.00-002.78 L 2.78 13893 National Overlay 50mm @ IRI 5 2013 10.577 2.97 42.<strong>12</strong><br />

N510 Bogra Station Road Km 000.00-002.78 R 2.78 13893 National Overlay 50mm @ IRI 5 2013 10.577 2.97 42.19<br />

N514 Bogra (Banani)-Matidali Road Km 007.50-007.91 L 0.41 9159 National DBST @ Traff >6000 2013 1.404 4.02 <strong>23</strong>.59<br />

N514 Bogra (Banani)-Matidali Road Km 008.40-008.67 L 0.27 9159 National DBST @ Traff >6000 2013 0.934 3.10 9.10<br />

N514 Bogra (Banani)-Matidali Road Km 003.70-003.78 L 0.08 14432 National Overlay 50mm @ IRI 5 2013 0.585 1.74 1.<strong>12</strong><br />

N514 Bogra (Banani)-Matidali Road Km 003.70-003.78 R 0.08 10992 National Overlay 50mm @ IRI 5 2013 0.585 1.76 1.14<br />

N514 Bogra (Banani)-Matidali Road Km 007.50-007.91 R 0.41 10964 National Overlay 50mm @ IRI 5 2013 2.967 1.49 4.78<br />

N515 Bogra 2nd Town By-Pass Road Km 000.00-000.10 S 0.10 11451 National Overlay 50mm @ IRI 5 2013 0.381 7.57 5.86<br />

N515 Bogra 2nd Town By-Pass Road Km 000.50-003.70 S 3.20 11451 National Overlay 80mm @ IRI 5-9 2013 19.228 15.48 364.54<br />

N515 Bogra 2nd Town By-Pass Road Km 003.70-006.70 S 3.00 11451 National Overlay 80mm @ IRI 5-9 2013 18.026 13.85 305.74<br />

N515 Bogra 2nd Town By-Pass Road Km 006.70-010.40 S 3.70 11451 National Overlay 80mm @ IRI 5-9 2013 22.<strong>23</strong>2 16.38 446.09<br />

N515 Bogra 2nd Town By-Pass Road Km 010.70-013.30 S 2.60 11451 National Overlay 80mm @ IRI 5-9 2013 15.6<strong>23</strong> 14.33 274.21<br />

N515 Bogra 2nd Town By-Pass Road Km 013.30-013.90 S 0.60 11451 National Overlay 80mm @ IRI 5-9 2013 3.605 13.79 60.92<br />

N515 Bogra 2nd Town By-Pass Road Km 013.90-014.00 S 0.10 11451 National Overlay 80mm @ IRI 5-9 2013 0.601 15.60 10.60<br />

N515 Bogra 2nd Town By-Pass Road Km 014.30-016.00 S 1.70 11451 National Overlay 80mm @ IRI 5-9 2013 10.215 15.84 198.25<br />

R545 Bogra-Joypurhat Road Km 000.70-007.30 S 6.60 7933 Regional DBST @ Traff >6000 2013 8.901 15.39 442.<strong>23</strong><br />

R545 Bogra-Joypurhat Road Km 0<strong>12</strong>.90-013.90 S 1.00 4887 Regional DBST @ Traff 4000-6000 2013 1.359 6.03 31.47<br />

R546 Railgate-Shantahar Road Km 000.40-001.10 S 0.70 3283 Regional Overlay 50mm @ IRI 7-9 2013 2.010 2.43 6.52<br />

R550 Mokamtala-Joypurhat Road Km 005.30-005.60 S 0.30 3<strong>23</strong>4 Regional DBST @ Traff 2000-4000 2013 0.408 1.91 2.28<br />

R550 Mokamtala-Joypurhat Road Km 005.80-007.70 S 1.90 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 5.454 3.52 <strong>23</strong>.24<br />

R550 Mokamtala-Joypurhat Road Km 008.50-009.30 S 0.80 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 2.297 4.35 <strong>12</strong>.55<br />

R550 Mokamtala-Joypurhat Road Km 009.60-011.00 S 1.40 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 4.019 8.17 45.96<br />

R550 Mokamtala-Joypurhat Road Km 005.60-005.80 S 0.20 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 0.574 7.42 5.68<br />

R550 Mokamtala-Joypurhat Road Km 007.70-008.50 S 0.80 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 2.297 6.21 18.36<br />

R550 Mokamtala-Joypurhat Road Km 011.20-014.20 S 3.00 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 8.6<strong>12</strong> 7.36 84.47<br />

R550 Mokamtala-Joypurhat Road Km 014.20-016.00 S 1.80 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 7-9 2013 5.167 5.99 38.58<br />

Appendix-B: Page: 54 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R550 Mokamtala-Joypurhat Road Km 000.00-002.40 S 2.40 4887 Regional Overlay 60mm @ IRI 7-9 2013 8.215 7.20 84.<strong>23</strong><br />

R550 Mokamtala-Joypurhat Road Km 002.40-002.60 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 8.49 8.57<br />

R550 Mokamtala-Joypurhat Road Km 002.60-005.30 S 2.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 9.242 11.98 <strong>12</strong>8.34<br />

Sub-total Bogra Division<br />

737.999<br />

Dinajpur Division<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 066.60-068.30 S 1.70 2707 Regional DBST @ Traff 2000-4000 2013 2.309 4.33 29.03<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 081.60-083.00 S 1.40 2707 Regional DBST @ Traff 2000-4000 2013 1.902 5.34 36.61<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 083.00-083.60 S 0.60 2707 Regional DBST @ Traff 2000-4000 2013 0.815 4.48 13.06<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 083.60-084.66 S 1.06 2707 Regional DBST @ Traff 2000-4000 2013 1.437 5.<strong>23</strong> 27.<strong>12</strong><br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 086.06-087.16 S 1.10 2707 Regional DBST @ Traff 2000-4000 2013 1.494 4.26 22.52<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 065.42-066.60 S 1.18 4887 Regional DBST @ Traff 4000-6000 2013 1.607 8.07 47.41<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 090.26-091.36 S 1.10 4887 Regional DBST @ Traff 4000-6000 2013 1.494 <strong>12</strong>.04 67.32<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 095.06-095.26 S 0.20 4887 Regional DBST @ Traff 4000-6000 2013 0.272 <strong>12</strong>.57 <strong>12</strong>.48<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 096.36-097.96 S 1.60 4887 Regional DBST @ Traff 4000-6000 2013 2.174 13.27 107.92<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 079.90-080.30 S 0.40 2707 Regional DBST 25mm @ 25% Crk 2013 0.543 1.84 2.52<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 084.66-084.76 S 0.10 2707 Regional DBST 25mm @ 25% Crk 2013 0.136 3.25 1.09<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 102.66-102.86 S 0.20 4887 Regional DBST 25mm @ 25% Crk 2013 0.274 8.79 8.79<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 054.02-057.72 S 3.70 4331 Regional Overlay 50mm @ IRI 5-7 2013 10.622 5.58 77.73<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 058.<strong>12</strong>-059.<strong>12</strong> S 1.00 4331 Regional Overlay 50mm @ IRI 5-7 2013 2.871 4.26 15.90<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 069.80-070.40 S 0.60 2707 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.80 8.91<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 070.70-073.30 S 2.60 2707 Regional Overlay 50mm @ IRI 5-7 2013 7.464 2.48 <strong>23</strong>.60<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 074.70-074.90 S 0.20 2707 Regional Overlay 50mm @ IRI 5-7 2013 0.574 2.89 2.11<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 075.80-076.10 S 0.30 2707 Regional Overlay 50mm @ IRI 5-7 2013 0.861 2.79 3.13<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 081.00-081.60 S 0.60 2707 Regional Overlay 50mm @ IRI 5-7 2013 1.722 3.22 7.30<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 089.76-089.86 S 0.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 0.287 <strong>12</strong>.52 5.48<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 092.06-095.06 S 3.00 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.6<strong>12</strong> 10.20 113.06<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 095.26-096.36 S 1.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.158 9.90 40.<strong>23</strong><br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 097.96-098.76 S 0.80 4887 Regional Overlay 50mm @ IRI 5-7 2013 2.297 11.14 32.92<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 099.66-100.86 S 1.20 4887 Regional Overlay 50mm @ IRI 5-7 2013 3.445 10.81 47.93<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 103.66-105.94 S 2.29 4887 Regional Overlay 50mm @ IRI 5-7 2013 6.813 5.92 65.28<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 068.30-069.80 S 1.50 2707 Regional Overlay 50mm @ IRI 7-9 2013 4.306 4.78 30.80<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 070.40-070.70 S 0.30 2707 Regional Overlay 50mm @ IRI 7-9 2013 0.861 4.98 6.38<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 074.90-075.80 S 0.90 2707 Regional Overlay 50mm @ IRI 7-9 2013 2.584 3.89 <strong>12</strong>.30<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 076.30-079.30 S 3.00 2707 Regional Overlay 50mm @ IRI 7-9 2013 8.6<strong>12</strong> 3.09 35.75<br />

Appendix-B: Page: 55 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 079.30-079.90 S 0.60 2707 Regional Overlay 50mm @ IRI 7-9 2013 1.722 4.07 9.29<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 080.30-081.00 S 0.70 2707 Regional Overlay 50mm @ IRI 7-9 2013 2.010 4.08 10.86<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 053.54-054.02 S 0.48 4331 Regional Overlay 60mm @ IRI 7-9 2013 1.629 7.59 15.40<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 059.42-062.42 S 3.00 4331 Regional Overlay 60mm @ IRI 7-9 2013 10.269 6.71 101.45<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 062.42-065.42 S 3.00 4331 Regional Overlay 60mm @ IRI 7-9 2013 10.272 8.13 111.39<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 098.76-099.46 S 0.70 4887 Regional Overlay 60mm @ IRI 7-9 2013 2.396 13.89 40.74<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 103.46-103.56 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 7.60 4.10<br />

R586 Fulbari Bus St<strong>and</strong>-Dinajpur Road Km 000.00-003.27 S 3.27 6695 Regional DBST 25mm @ 25% Crk 2013 4.735 4.00 58.31<br />

Sub-total Dinajpur Division<br />

114.644<br />

Gaib<strong>and</strong>a Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 278.06-279.50 S 1.44 4731 National Overlay 50mm @ IRI 4-9 2013 5.397 9.57 80.64<br />

R555 Palashbari-Gaib<strong>and</strong>ah Road Km 017.80-021.02 S 3.22 4887 Regional DBST @ Traff 4000-6000 2013 4.374 8.16 119.87<br />

R555 Palashbari-Gaib<strong>and</strong>ah Road Km 003.50-007.00 S 3.50 2956 Regional Overlay 50mm @ IRI 5-7 2013 10.048 3.76 51.43<br />

R555 Palashbari-Gaib<strong>and</strong>ah Road Km 014.40-017.80 S 3.40 2956 Regional Overlay 50mm @ IRI 5-7 2013 9.760 3.81 52.08<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 002.40-003.90 S 1.50 6187 Regional DBST @ Traff >6000 2013 2.038 5.64 44.10<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 003.90-005.10 S 1.20 6027 Regional DBST @ Traff >6000 2013 1.630 9.37 57.19<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 005.10-028.15 S <strong>23</strong>.05 4887 Regional DBST 25mm @ 25% Crk 2013 31.3<strong>12</strong> 7.29 7<strong>12</strong>.97<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 028.15-040.65 S <strong>12</strong>.50 4887 Regional Overlay 50mm @ IRI 5-7 2013 35.884 10.61 507.86<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 040.65-043.92 S 3.27 4887 Regional Overlay 50mm @ IRI 5-7 2013 9.379 9.17 <strong>12</strong>0.32<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 043.92-047.02 S 3.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.899 13.00 148.84<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 050.<strong>12</strong>-051.72 S 1.60 4887 Regional Overlay 50mm @ IRI 5-7 2013 4.593 10.65 62.98<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 000.00-000.50 S 0.50 6187 Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 5.67 14.59<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 001.10-001.60 S 0.50 6187 Regional Overlay 60mm @ IRI 5.5-9 2013 1.711 6.26 16.88<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 047.02-050.<strong>12</strong> S 3.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.611 14.37 186.72<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 052.72-053.02 S 0.30 4331 Regional Overlay 60mm @ IRI 7-9 2013 1.027 9.59 11.72<br />

Sub-total Gaib<strong>and</strong>a Division<br />

138.375<br />

Joypurhat Division<br />

R545 Bogra-Joypurhat Road Km 117.79-117.99 S 0.20 2947 Regional DBST @ Traff 2000-4000 2013 0.272 5.01 3.99<br />

R545 Bogra-Joypurhat Road Km <strong>12</strong>0.09-<strong>12</strong>0.78 S 0.69 4887 Regional DBST @ Traff 4000-6000 2013 0.932 5.87 24.56<br />

R545 Bogra-Joypurhat Road Km 113.77-116.79 S 3.02 2947 Regional DBST 25mm @ 25% Crk 2013 2.764 1.59 9.75<br />

R545 Bogra-Joypurhat Road Km 117.29-117.49 S 0.20 2947 Regional DBST 25mm @ 25% Crk 2013 0.272 4.48 2.91<br />

R545 Bogra-Joypurhat Road Km 118.29-118.39 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 9.44 5.49<br />

Appendix-B: Page: 56 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R545 Bogra-Joypurhat Road Km 119.79-119.89 S 0.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.342 5.17 5.38<br />

R550 Mokamtala-Joypurhat Road Km 016.00-024.<strong>12</strong> S 8.<strong>12</strong> 3<strong>23</strong>4 Regional Overlay 50mm @ IRI 5-7 2013 <strong>23</strong>.316 5.33 169.36<br />

R550 Mokamtala-Joypurhat Road Km 025.02-028.<strong>12</strong> S 3.10 4887 Regional Overlay 50mm @ IRI 5-7 2013 8.899 <strong>12</strong>.83 146.98<br />

R550 Mokamtala-Joypurhat Road Km 024.<strong>12</strong>-025.02 S 0.90 4887 Regional Overlay 60mm @ IRI 7-9 2013 3.081 13.91 52.47<br />

Sub-total Joypurhat Division<br />

40.219<br />

Kurigram Division<br />

N506 Rangpur-Barobari-Kurigram Road Km 042.70-042.90 S 0.20 2992 National DBST @ Traff 2000-4000 2013 0.272 3.19 3.43<br />

N506 Rangpur-Barobari-Kurigram Road Km 045.30-046.00 S 0.70 2992 National DBST @ Traff 2000-4000 2013 0.951 2.98 11.07<br />

N506 Rangpur-Barobari-Kurigram Road Km 036.00-041.80 S 5.80 2992 National Overlay 50mm @ IRI 5-9 2013 16.659 3.77 104.85<br />

N506 Rangpur-Barobari-Kurigram Road Km 041.80-042.00 S 0.20 2992 National Overlay 50mm @ IRI 5-9 2013 0.574 3.91 3.75<br />

N506 Rangpur-Barobari-Kurigram Road Km 042.00-042.70 S 0.70 2992 National Overlay 50mm @ IRI 5-9 2013 2.010 5.28 16.69<br />

N506 Rangpur-Barobari-Kurigram Road Km 042.90-045.30 S 2.40 2992 National Overlay 50mm @ IRI 5-9 2013 6.890 5.81 66.51<br />

N506 Rangpur-Barobari-Kurigram Road Km 046.00-047.20 S 1.20 2992 National Overlay 50mm @ IRI 5-9 2013 3.508 5.48 30.56<br />

N506 Rangpur-Barobari-Kurigram Road Km 047.20-050.04 S 2.83 11451 National Overlay 80mm @ IRI 5-9 2013 15.600 13.40 310.79<br />

Sub-total Kurigram Division<br />

46.463<br />

Lalmonirhat Division<br />

N506 Rangpur-Barobari-Kurigram Road Km 022.65-022.85 S 0.20 7068 National Overlay 50mm @ IRI 5-7 2013 0.574 6.98 6.96<br />

N506 Rangpur-Barobari-Kurigram Road Km 027.35-033.00 S 5.65 9061 National Overlay 50mm @ IRI 5-7 2013 16.225 8.67 224.36<br />

N506 Rangpur-Barobari-Kurigram Road Km 033.00-036.00 S 3.00 2992 National Overlay 50mm @ IRI 5-9 2013 8.604 5.<strong>23</strong> 59.40<br />

N506 Rangpur-Barobari-Kurigram Road Km 021.15-022.55 S 1.40 7068 National Overlay 60mm @ IRI 7-9 2013 4.792 5.82 43.80<br />

N509 Barabari-Burimary Road Km 059.45-059.55 S 0.10 9061 National Overlay 50mm @ IRI 5-7 2013 0.287 16.38 6.76<br />

N509 Barabari-Burimary Road Km 061.35-062.45 S 1.10 9061 National Overlay 50mm @ IRI 5-7 2013 3.158 15.96 74.25<br />

N509 Barabari-Burimary Road Km 062.75-062.95 S 0.20 9061 National Overlay 50mm @ IRI 5-7 2013 0.574 17.95 13.02<br />

N509 Barabari-Burimary Road Km 070.45-071.55 S 1.10 9061 National Overlay 50mm @ IRI 5-7 2013 3.158 13.61 63.90<br />

N509 Barabari-Burimary Road Km 100.97-101.57 S 0.60 2269 National Overlay 50mm @ IRI 5-9 2013 1.722 3.20 7.99<br />

N509 Barabari-Burimary Road Km 047.44-048.24 S 0.80 9061 National Overlay 60mm @ IRI 7-9 2013 2.738 14.66 53.37<br />

N509 Barabari-Burimary Road Km 048.24-048.94 S 0.70 9061 National Overlay 60mm @ IRI 7-9 2013 2.396 16.17 53.07<br />

N509 Barabari-Burimary Road Km 049.94-050.84 S 0.90 9061 National Overlay 60mm @ IRI 7-9 2013 3.081 18.21 69.66<br />

N509 Barabari-Burimary Road Km 053.34-056.25 S 2.90 9061 National Overlay 60mm @ IRI 7-9 2013 9.940 8.65 <strong>12</strong>6.10<br />

N509 Barabari-Burimary Road Km 056.35-056.65 S 0.30 9061 National Overlay 60mm @ IRI 7-9 2013 1.027 9.00 13.56<br />

N509 Barabari-Burimary Road Km 059.55-061.35 S 1.80 9061 National Overlay 60mm @ IRI 7-9 2013 6.161 <strong>12</strong>.41 105.51<br />

N509 Barabari-Burimary Road Km 062.95-066.05 S 3.10 9061 National Overlay 60mm @ IRI 7-9 2013 10.611 9.66 148.82<br />

Appendix-B: Page: 57 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N509 Barabari-Burimary Road Km 066.05-069.25 S 3.20 9061 National Overlay 60mm @ IRI 7-9 2013 10.953 9.51 145.03<br />

N509 Barabari-Burimary Road Km 069.25-070.45 S 1.20 9061 National Overlay 60mm @ IRI 7-9 2013 4.107 13.<strong>12</strong> 77.53<br />

N509 Barabari-Burimary Road Km 089.47-091.77 S 2.30 9061 National Overlay 60mm @ IRI 7-9 2013 7.873 8.80 102.72<br />

N509 Barabari-Burimary Road Km 092.77-092.97 S 0.20 9061 National Overlay 60mm @ IRI 7-9 2013 0.685 9.50 9.64<br />

Sub-total Lalmonirhat Division<br />

98.666<br />

Nilphamari Division<br />

N518 Sayedpur Town Old Section Km 000.20-001.00 S 0.80 4662 National DBST @ Traff 4000-6000 2013 1.284 3.97 19.92<br />

N518 Sayedpur Town Old Section Km 004.00-004.11 S 0.11 4662 National DBST 25mm @ 25% Crk 2013 0.145 2.79 0.92<br />

N518 Sayedpur Town Old Section Km 001.00-004.00 S 3.00 4662 National Overlay 50mm @ IRI 5-9 2013 9.599 3.07 38.68<br />

R570 Sayedpur-Nilphamari Road Km 009.40-0<strong>12</strong>.50 S 3.10 3900 Regional Overlay 50mm @ IRI 5-7 2013 8.899 8.56 98.01<br />

Sub-total Nilphamari Division<br />

19.928<br />

Panchgarh Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 439.41-443.44 S 4.03 11451 National Overlay 80mm @ IRI 4-9 2013 19.903 9.90 293.06<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 443.44-443.84 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 1.975 13.60 39.96<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 443.84-446.84 S 3.00 11451 National Overlay 80mm @ IRI 4-9 2013 14.890 9.<strong>23</strong> 204.27<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 447.14-447.44 S 0.30 11451 National Overlay 80mm @ IRI 4-9 2013 1.482 11.87 25.05<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 447.44-447.64 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.988 13.14 19.29<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 447.64-458.76 S 11.<strong>12</strong> 11451 National Overlay 80mm @ IRI 4-9 2013 54.924 11.<strong>12</strong> 961.75<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 458.76-468.26 S 9.50 11451 National Overlay 80mm @ IRI 4-9 2013 46.918 11.46 758.96<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 468.26-475.34 S 7.08 11451 National Overlay 80mm @ IRI 4-9 2013 33.174 9.80 483.46<br />

Sub-total Panchgarh Division<br />

174.253<br />

Rangpur Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 306.06-3<strong>23</strong>.96 S 17.90 8871 National Overlay 50mm @ IRI 4-7 2013 67.078 9.50 <strong>12</strong>17.54<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 279.50-285.98 S 6.48 4731 National Overlay 50mm @ IRI 4-9 2013 24.337 6.37 287.60<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 291.38-294.48 S 3.10 4405 National Overlay 50mm @ IRI 4-9 2013 11.650 5.70 <strong>12</strong>8.26<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 294.48-306.06 S 11.58 4405 National Overlay 50mm @ IRI 4-9 2013 44.017 9.17 630.36<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 3<strong>23</strong>.96-358.07 S 34.11 11451 National Overlay 80mm @ IRI 4-9 2013 207.193 9.<strong>12</strong> 2668.13<br />

N506 Rangpur-Barobari-Kurigram Road Km 003.10-019.25 S 16.15 7068 National DBST @ Traff >6000 2013 21.941 7.33 6<strong>12</strong>.52<br />

N506 Rangpur-Barobari-Kurigram Road Km 020.25-020.35 S 0.10 7068 National DBST @ Traff >6000 2013 0.136 2.60 3.52<br />

N506 Rangpur-Barobari-Kurigram Road Km 000.00-003.00 S 3.00 9061 National Overlay 50mm @ IRI 5-7 2013 8.6<strong>12</strong> 9.07 <strong>12</strong>4.61<br />

N506 Rangpur-Barobari-Kurigram Road Km 019.45-019.85 S 0.40 7068 National Overlay 50mm @ IRI 5-7 2013 1.148 8.78 15.55<br />

Appendix-B: Page: 58 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N506 Rangpur-Barobari-Kurigram Road Km 003.00-003.10 S 0.10 9061 National Overlay 60mm @ IRI 7-9 2013 0.342 10.01 5.08<br />

N506 Rangpur-Barobari-Kurigram Road Km 019.25-019.45 S 0.20 7068 National Overlay 60mm @ IRI 7-9 2013 0.685 7.26 7.68<br />

N517 Rangpur Town Old Section Km 000.00-002.50 S 2.50 9<strong>12</strong>6 National DBST @ Traff >6000 2013 4.051 5.80 102.08<br />

N517 Rangpur Town Old Section Km 002.50-002.60 S 0.10 9111 National DBST @ Traff >6000 2013 0.180 5.58 4.44<br />

Sub-total Rangpur Division<br />

391.371<br />

Thakurgaon Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 405.20-408.20 S 3.00 3083 National Overlay 50mm @ IRI 4-9 2013 9.395 7.39 110.79<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 408.20-410.87 S 2.66 3083 National Overlay 50mm @ IRI 4-9 2013 8.340 5.53 64.69<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 411.77-416.07 S 4.30 3083 National Overlay 50mm @ IRI 4-9 2013 13.466 3.14 55.56<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 416.07-422.27 S 6.20 3083 National Overlay 50mm @ IRI 4-9 2013 19.417 7.37 242.13<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 422.27-434.54 S <strong>12</strong>.27 3083 National Overlay 50mm @ IRI 4-9 2013 42.083 6.42 381.18<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 400.60-402.00 S 1.40 11451 National Overlay 80mm @ IRI 4-9 2013 6.914 10.90 1<strong>12</strong>.06<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 403.60-403.80 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.988 <strong>12</strong>.26 18.20<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 404.10-404.30 S 0.20 11451 National Overlay 80mm @ IRI 4-9 2013 0.988 11.59 16.17<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 405.10-405.20 S 0.10 11451 National Overlay 80mm @ IRI 4-9 2013 0.494 17.22 10.75<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 434.54-439.41 S 4.87 11451 National Overlay 80mm @ IRI 4-9 2013 24.267 20.36 587.78<br />

Sub-total Thakurgaon Division<br />

Total Rangpur Zone<br />

<strong>12</strong>6.351<br />

1888.270<br />

Sylhet Zone<br />

Habiganj Division<br />

N2 Dhaka-Sylhet-Jaflong Road Km 153.11-153.21 S 0.10 6671 National DBST @ Traff >6000 2013 0.185 5.22 3.30<br />

N2 Dhaka-Sylhet-Jaflong Road Km 140.75-141.07 S 0.32 9332 National DBST 25mm @ 25% Crk 2013 0.593 10.63 26.34<br />

N2 Dhaka-Sylhet-Jaflong Road Km 145.65-148.15 S 2.50 6671 National DBST 25mm @ 25% Crk 2013 4.631 5.73 73.00<br />

N2 Dhaka-Sylhet-Jaflong Road Km 181.52-185.62 S 4.10 11451 National Overlay 50mm @ IRI 4 2013 16.042 14.82 454.52<br />

N2 Dhaka-Sylhet-Jaflong Road Km 115.94-131.24 S 15.30 9332 National Overlay 50mm @ IRI 4-7 2013 59.894 10.80 1104.10<br />

N2 Dhaka-Sylhet-Jaflong Road Km 133.25-138.15 S 4.90 9332 National Overlay 50mm @ IRI 4-7 2013 19.174 8.06 <strong>23</strong>0.47<br />

N2 Dhaka-Sylhet-Jaflong Road Km 148.21-149.41 S 1.20 6671 National Overlay 50mm @ IRI 4-7 2013 4.698 6.38 54.28<br />

N2 Dhaka-Sylhet-Jaflong Road Km 153.41-153.51 S 0.10 6671 National Overlay 50mm @ IRI 4-7 2013 0.391 5.68 4.03<br />

N2 Dhaka-Sylhet-Jaflong Road Km 185.62-187.02 S 1.40 8158 National Overlay 50mm @ IRI 4-7 2013 5.480 <strong>12</strong>.21 <strong>12</strong>0.62<br />

N2 Dhaka-Sylhet-Jaflong Road Km 187.13-187.33 S 0.20 8158 National Overlay 50mm @ IRI 4-7 2013 0.783 9.68 14.49<br />

N2 Dhaka-Sylhet-Jaflong Road Km 187.43-188.53 S 1.10 8158 National Overlay 50mm @ IRI 4-7 2013 4.306 10.88 89.59<br />

N2 Dhaka-Sylhet-Jaflong Road Km 188.63-190.50 S 1.87 8158 National Overlay 50mm @ IRI 4-7 2013 7.313 13.04 182.21<br />

Appendix-B: Page: 59 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N2 Dhaka-Sylhet-Jaflong Road Km 141.07-145.55 S 4.48 11451 National Overlay 80mm @ IRI 4-9 2013 27.657 7.96 324.17<br />

N204 Jagadishpur-Shaistaganj Km 008.70-009.30 S 0.60 1956 National Overlay 50mm @ IRI 5-9 2013 1.816 1.26 2.58<br />

R220 Sarail-Habiganj Road Km 019.68-019.98 S 0.30 6240 Regional DBST @ IRI><strong>12</strong> 2013 0.408 1.10 4.07<br />

R220 Sarail-Habiganj Road Km 021.18-022.18 S 1.00 6240 Regional DBST @ IRI><strong>12</strong> 2013 1.359 1.06 13.08<br />

R220 Sarail-Habiganj Road Km 019.00-019.68 S 0.68 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 2.331 2.42 5.08<br />

R220 Sarail-Habiganj Road Km 019.98-021.18 S 1.20 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 4.107 1.90 7.85<br />

R220 Sarail-Habiganj Road Km 022.18-022.28 S 0.10 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 0.342 6.89 2.<strong>12</strong><br />

R220 Sarail-Habiganj Road Km 022.38-022.98 S 0.60 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 2.054 2.28 4.71<br />

R220 Sarail-Habiganj Road Km 0<strong>23</strong>.18-0<strong>23</strong>.48 S 0.30 6240 Regional Overlay 60mm @ IRI 5.5-9 2013 1.027 3.01 3.11<br />

Sub-total Habiganj Division<br />

164.591<br />

Moulavi Bazar Division<br />

N208 Moulvibazar-Sylhet Road Km 013.40-030.60 S 17.20 7159 National Overlay 50mm @ IRI 5-7 2013 53.868 5.09 317.42<br />

N208 Moulvibazar-Sylhet Road Km 000.00-013.40 S 13.40 <strong>12</strong>587 National Overlay 80mm @ IRI 5-9 2013 67.828 4.85 296.14<br />

R282 Juri-Lathidila Road Km 003.00-006.10 S 3.10 4391 Regional DBST @ Traff 4000-6000 2013 2.910 2.32 17.57<br />

R282 Juri-Lathidila Road Km 000.00-003.00 S 3.00 4388 Regional Overlay 60mm @ IRI 7-9 2013 8.103 3.16 26.59<br />

R282 Juri-Lathidila Road Km 006.10-009.10 S 3.00 4391 Regional Overlay 60mm @ IRI 7-9 2013 7.095 4.67 37.04<br />

R282 Juri-Lathidila Road Km 015.40-015.99 S 0.58 4391 Regional Overlay 60mm @ IRI 7-9 2013 1.274 5.59 8.14<br />

Sub-total Moulavi Bazar Division<br />

141.078<br />

Sunamganj Division<br />

R370 Mymensingh -Sunamganj Road Km 072.36-073.29 S 0.93 3019 Regional Overlay 50mm @ IRI 7-9 2013 1.746 8.84 24.03<br />

Sub-total Sunamganj Division<br />

1.746<br />

Sylhet Division<br />

N2 Dhaka-Sylhet-Jaflong Road Km 275.49-275.89 S 0.40 11451 National DBST @ Traff >6000 2013 0.741 7.93 26.88<br />

N2 Dhaka-Sylhet-Jaflong Road Km 265.99-266.99 S 1.00 11451 National Overlay 50mm @ IRI 4 2013 3.915 9.01 52.59<br />

N2 Dhaka-Sylhet-Jaflong Road Km 273.59-274.49 S 0.90 11451 National Overlay 50mm @ IRI 4 2013 3.5<strong>23</strong> 10.51 63.20<br />

N2 Dhaka-Sylhet-Jaflong Road Km 190.50-190.80 S 0.30 8158 National Overlay 50mm @ IRI 4-7 2013 1.174 11.95 26.82<br />

N2 Dhaka-Sylhet-Jaflong Road Km 192.73-198.03 S 5.30 11451 National Overlay 80mm @ IRI 4-9 2013 32.719 9.03 471.<strong>23</strong><br />

N2 Dhaka-Sylhet-Jaflong Road Km 271.19-271.89 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.321 8.98 47.91<br />

N2 Dhaka-Sylhet-Jaflong Road Km 274.69-275.39 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.321 10.47 55.85<br />

N2 Dhaka-Sylhet-Jaflong Road Km 276.19-276.99 S 0.80 11451 National Overlay 80mm @ IRI 4-9 2013 4.939 11.38 82.80<br />

N2 Dhaka-Sylhet-Jaflong Road Km 277.19-278.79 S 1.60 11451 National Overlay 80mm @ IRI 4-9 2013 9.877 9.32 135.50<br />

Appendix-B: Page: 60 of 61


Appendix-B<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong> - 2013<br />

1st Year Periodic Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N2 Dhaka-Sylhet-Jaflong Road Km 278.89-279.29 S 0.40 11451 National Overlay 80mm @ IRI 4-9 2013 2.469 13.59 41.45<br />

N2 Dhaka-Sylhet-Jaflong Road Km 279.39-280.09 S 0.70 11451 National Overlay 80mm @ IRI 4-9 2013 4.321 11.91 63.53<br />

N2 Dhaka-Sylhet-Jaflong Road Km 282.46-284.66 S 2.20 11451 National Overlay 80mm @ IRI 4-9 2013 13.581 10.22 195.86<br />

N2 Dhaka-Sylhet-Jaflong Road Km 284.76-286.26 S 1.50 11451 National Overlay 80mm @ IRI 4-9 2013 9.260 14.42 181.19<br />

N206 Keean Bridge-Nayarpool Road Km 000.70-000.97 S 0.26 14220 National DBST @ Traff >6000 2013 0.687 3.73 10.42<br />

N209 Sylhet Twn By-Pass Road Km 000.20-001.41 S 1.21 4434 National Overlay 50mm @ IRI 5-9 2013 3.170 3.31 9.45<br />

N210 Sylhet Twn By-Pass Road Km 000.10-002.50 S 2.40 11451 National DBST @ Traff >6000 2013 4.327 9.55 158.16<br />

N210 Sylhet Twn By-Pass Road Km 002.60-005.30 S 2.70 11451 National DBST @ Traff >6000 2013 4.868 11.88 241.67<br />

N210 Sylhet Twn By-Pass Road Km 005.70-006.40 S 0.70 11451 National DBST @ Traff >6000 2013 1.262 <strong>12</strong>.42 65.53<br />

N210 Sylhet Twn By-Pass Road Km 006.60-006.90 S 0.30 11451 National DBST @ Traff >6000 2013 0.541 7.90 16.36<br />

N210 Sylhet Twn By-Pass Road Km 007.20-009.40 S 2.20 11451 National DBST @ Traff >6000 2013 3.967 7.28 90.78<br />

N210 Sylhet Twn By-Pass Road Km 009.50-010.60 S 1.10 11451 National DBST @ Traff >6000 2013 1.983 8.54 53.26<br />

N210 Sylhet Twn By-Pass Road Km 010.70-010.99 S 0.29 11451 National DBST @ Traff >6000 2013 0.5<strong>23</strong> 6.62 10.88<br />

R250 Sylhet-Jakiganj Road Km 010.20-010.70 S 0.50 7545 Regional DBST @ Traff >6000 2013 0.865 6.55 22.57<br />

R250 Sylhet-Jakiganj Road Km 017.10-020.65 S 3.55 4887 Regional DBST @ Traff 4000-6000 2013 5.510 10.53 220.34<br />

R250 Sylhet-Jakiganj Road Km 024.15-031.05 S 6.90 4887 Regional DBST @ Traff 4000-6000 2013 9.374 9.80 328.69<br />

R250 Sylhet-Jakiganj Road Km 021.85-0<strong>23</strong>.95 S 2.10 4887 Regional DBST 25mm @ 25% Crk 2013 2.853 6.59 69.06<br />

R250 Sylhet-Jakiganj Road Km 031.05-040.43 S 9.38 3155 Regional Overlay 50mm @ IRI 7-9 2013 26.280 5.01 172.21<br />

R250 Sylhet-Jakiganj Road Km 075.45-086.57 S 11.<strong>12</strong> 3019 Regional Overlay 50mm @ IRI 7-9 2013 22.402 8.11 246.40<br />

R250 Sylhet-Jakiganj Road Km 000.00-003.30 S 3.30 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 14.458 6.13 109.54<br />

R250 Sylhet-Jakiganj Road Km 003.30-010.20 S 6.90 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 28.771 8.02 294.56<br />

R250 Sylhet-Jakiganj Road Km 010.70-013.50 S 2.80 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 <strong>12</strong>.198 7.26 <strong>12</strong>5.82<br />

R250 Sylhet-Jakiganj Road Km 013.50-014.10 S 0.60 7545 Regional Overlay 60mm @ IRI 5.5-9 2013 2.614 7.11 28.37<br />

R250 Sylhet-Jakiganj Road Km 014.10-017.10 S 3.00 7088 Regional Overlay 60mm @ IRI 5.5-9 2013 13.069 8.00 140.61<br />

R250 Sylhet-Jakiganj Road Km 0<strong>23</strong>.95-024.15 S 0.20 4887 Regional Overlay 60mm @ IRI 7-9 2013 0.685 14.81 <strong>12</strong>.81<br />

R250 Sylhet-Jakiganj Road Km 062.25-075.35 S 13.10 4887 Regional Overlay 60mm @ IRI 7-9 2013 44.106 6.71 421.37<br />

R281 Rajnagar-Charkhai Road Km 067.22-068.52 S 1.30 4682 Regional Overlay 50mm @ IRI 5-7 2013 3.732 2.79 13.08<br />

R281 Rajnagar-Charkhai Road Km 071.52-082.76 S 11.24 4887 Regional Overlay 50mm @ IRI 5-7 2013 31.261 10.29 414.17<br />

R281 Rajnagar-Charkhai Road Km 058.52-061.59 S 3.07 4682 Regional Overlay 60mm @ IRI 7-9 2013 10.505 3.01 36.56<br />

R281 Rajnagar-Charkhai Road Km 061.59-067.22 S 5.63 4682 Regional Overlay 60mm @ IRI 7-9 2013 19.320 4.52 101.15<br />

R281 Rajnagar-Charkhai Road Km 068.52-071.52 S 3.00 4887 Regional Overlay 60mm @ IRI 7-9 2013 10.269 5.90 91.05<br />

Sub-total Sylhet Division<br />

Total Sylhet Zone<br />

374.762<br />

682.176<br />

10,148.62<br />

Total Bangladesh<br />

Appendix-B: Page: 61 of 61


Appendix-C<br />

1st Year Unconstrained <strong>Rehabilitation</strong> Works for<br />

National <strong>and</strong> Regional Highways sorted by Zone <strong>and</strong><br />

Division. (Excluding ongoing projects)


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

No<br />

Barisal Zone<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

Barisal Division<br />

N8 Dhaka -Patuakhali Road Km 171.00-174.20 S 3.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 65.861 3.82 <strong>23</strong>9.65<br />

N8 Dhaka -Patuakhali Road Km 174.20-177.30 S 3.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 63.844 3.61 219.54<br />

N8 Dhaka -Patuakhali Road Km 168.42-169.00 S 0.58 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.937 3.82 43.46<br />

N8 Dhaka -Patuakhali Road Km 171.00-173.80 S 2.8 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 57.567 3.82 209.83<br />

N8 Dhaka -Patuakhali Road Km <strong>12</strong>0.65-1<strong>23</strong>.75 S 3.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 73.<strong>12</strong>8 7.01 489.55<br />

N8 Dhaka -Patuakhali Road Km 1<strong>23</strong>.75-<strong>12</strong>6.85 S 3.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 73.973 7.24 511.11<br />

N8 Dhaka -Patuakhali Road Km 132.05-132.15 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.77 17.78<br />

N8 Dhaka -Patuakhali Road Km 132.35-132.45 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.77 17.78<br />

N8 Dhaka -Patuakhali Road Km 138.85-139.05 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.648 7.51 33.31<br />

N8 Dhaka -Patuakhali Road Km 139.05-140.45 S 1.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 39.783 5.31 208.68<br />

N8 Dhaka -Patuakhali Road Km 140.45-140.65 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.61 31.54<br />

N8 Dhaka -Patuakhali Road Km 160.80-169.00 S 8.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 199.182 7.10 1359.27<br />

N8 Dhaka -Patuakhali Road Km 157.50-160.80 S 3.3 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 53.047 4.84 246.18<br />

N8 Dhaka -Patuakhali Road Km <strong>12</strong>6.85-132.05 S 5.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 99.084 8.<strong>23</strong> 813.26<br />

N8 Dhaka -Patuakhali Road Km 132.15-132.35 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.811 7.88 29.95<br />

N8 Dhaka -Patuakhali Road Km 132.45-138.85 S 6.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>1.752 8.29 1006.60<br />

N8 Dhaka -Patuakhali Road Km 148.25-148.45 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 3.70 16.80<br />

N809 Barishal-Lakshmipur Road Km 005.25-006.25 S 1 1488 National Full Recon 110mm @ IRI <strong>12</strong> 2013 14.853 0.59 8.32<br />

N809 Barishal-Lakshmipur Road Km 001.80-002.00 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.92 15.38<br />

N809 Barishal-Lakshmipur Road Km 002.10-002.50 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.47 27.28<br />

N809 Barishal-Lakshmipur Road Km 002.85-003.75 S 0.9 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 18.5<strong>23</strong> 3.68 65.02<br />

N809 Barishal-Lakshmipur Road Km 003.75-003.85 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 3.79 7.45<br />

N809 Barishal-Lakshmipur Road Km 003.85-003.95 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.24 8.32<br />

N809 Barishal-Lakshmipur Road Km 003.95-005.05 S 1.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 22.640 3.46 74.80<br />

N809 Barishal-Lakshmipur Road Km 005.05-005.25 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.94 15.49<br />

N809 Barishal-Lakshmipur Road Km 000.10-000.40 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 10.791 3.71 39.42<br />

N809 Barishal-Lakshmipur Road Km 000.70-001.30 S 0.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 16.980 5.05 84.84<br />

N809 Barishal-Lakshmipur Road Km 002.00-002.10 S 0.1 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 3.95 6.<strong>12</strong><br />

N809 Barishal-Lakshmipur Road Km 000.40-000.70 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.993 6.90 40.05<br />

R870 Barisal-Pirojpur Road Km 000.10-000.40 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.949 3.00 20.26<br />

R870 Barisal-Pirojpur Road Km 000.50-000.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

R870 Barisal-Pirojpur Road Km 003.60-003.80 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.03 10.62<br />

R870 Barisal-Pirojpur Road Km 004.50-004.70 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.34 11.68<br />

R870 Barisal-Pirojpur Road Km 004.80-005.00 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.37 8.31<br />

R870 Barisal-Pirojpur Road Km 000.40-000.50 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.417 4.31 6.14<br />

R870 Barisal-Pirojpur Road Km 000.60-003.60 S 3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 40.827 3.74 153.66<br />

Sub-total Barisal Division<br />

1056.372<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-C: Page: 1 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

No<br />

Bhola Division<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

N809 Barishal-Lakshmipur Road Km 024.55-025.05 S 0.5 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.291 3.78 37.10<br />

N809 Barishal-Lakshmipur Road Km 025.05-025.15 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.38 8.59<br />

N809 Barishal-Lakshmipur Road Km 025.19-025.29 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.38 8.59<br />

N809 Barishal-Lakshmipur Road Km 025.79-026.19 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.94 30.92<br />

N809 Barishal-Lakshmipur Road Km 026.19-026.39 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.95 15.51<br />

N809 Barishal-Lakshmipur Road Km 026.39-026.49 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.38 8.59<br />

N809 Barishal-Lakshmipur Road Km 028.19-029.39 S 1.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 24.698 3.77 88.82<br />

N809 Barishal-Lakshmipur Road Km 030.29-030.39 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.07 8.00<br />

N809 Barishal-Lakshmipur Road Km 030.69-030.79 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.28 8.41<br />

N809 Barishal-Lakshmipur Road Km 025.29-025.79 S 0.5 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 8.037 4.48 34.68<br />

N809 Barishal-Lakshmipur Road Km 026.49-028.19 S 1.7 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 27.327 4.50 118.50<br />

R890 Bhola -Char Manika Road Km 007.77-008.47 S 0.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 2.55 31.19<br />

R890 Bhola -Char Manika Road Km 015.37-016.67 S 1.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.391 2.83 64.25<br />

R890 Bhola -Char Manika Road Km 000.00-004.00 S 4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 53.946 2.52 136.50<br />

R890 Bhola -Char Manika Road Km 047.57-051.17 S 3.6 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 48.552 4.06 198.32<br />

R890 Bhola -Char Manika Road Km 051.17-052.07 S 0.9 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.138 3.75 45.75<br />

Sub-total Bhola Division<br />

243.615<br />

Jhalokati Division<br />

R870 Barisal-Pirojpur Road Km 033.37-033.47 S 0.1 22<strong>23</strong> Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 0.92 1.42<br />

R870 Barisal-Pirojpur Road Km 035.37-035.47 S 0.1 22<strong>23</strong> Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.<strong>12</strong> 1.73<br />

R870 Barisal-Pirojpur Road Km 037.37-038.07 S 0.7 22<strong>23</strong> Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.377 0.97 8.52<br />

R870 Barisal-Pirojpur Road Km 008.70-008.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.41 11.94<br />

R870 Barisal-Pirojpur Road Km 009.30-009.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

R870 Barisal-Pirojpur Road Km 010.20-010.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

R870 Barisal-Pirojpur Road Km 010.65-010.75 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

R870 Barisal-Pirojpur Road Km 011.95-0<strong>12</strong>.25 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.57 18.77<br />

R870 Barisal-Pirojpur Road Km 013.15-013.25 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.92 6.86<br />

R870 Barisal-Pirojpur Road Km 013.55-013.75 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.81<br />

R870 Barisal-Pirojpur Road Km 017.25-017.55 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.47 18.20<br />

R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.15-0<strong>23</strong>.25 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.79<br />

R870 Barisal-Pirojpur Road Km 0<strong>23</strong>.55-0<strong>23</strong>.75 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.61 <strong>12</strong>.63<br />

R870 Barisal-Pirojpur Road Km 025.47-025.57 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.86 6.76<br />

R870 Barisal-Pirojpur Road Km 026.87-027.07 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.81<br />

R870 Barisal-Pirojpur Road Km 039.87-041.77 S 1.9 22<strong>23</strong> Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 16.005 3.28 49.42<br />

R870 Barisal-Pirojpur Road Km 005.00-008.00 S 3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 40.460 2.83 115.29<br />

R870 Barisal-Pirojpur Road Km 009.40-010.20 S 0.8 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 3.96 43.01<br />

R870 Barisal-Pirojpur Road Km 010.30-010.65 S 0.34 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.653 3.68 17.21<br />

R870 Barisal-Pirojpur Road Km 010.75-011.95 S 1.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 16.184 4.05 65.87<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-C: Page: 2 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R870 Barisal-Pirojpur Road Km 0<strong>12</strong>.25-013.15 S 0.9 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.138 3.95 48.28<br />

R870 Barisal-Pirojpur Road Km 013.25-013.55 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 4.10 16.70<br />

Sub-total Jhalokati Division<br />

152.905<br />

Patuakhali Division<br />

N8 Dhaka -Patuakhali Road Km 177.30-180.42 S 3.<strong>12</strong> 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 64.1<strong>12</strong> 3.63 221.82<br />

N8 Dhaka -Patuakhali Road Km 189.62-202.09 S <strong>12</strong>.48 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 200.535 4.17 801.59<br />

R881 Amtali-Kuakata Road Km 011.90-0<strong>12</strong>.00 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.78 2.95<br />

R881 Amtali-Kuakata Road Km 016.90-017.00 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.45 2.60<br />

R881 Amtali-Kuakata Road Km 032.72-032.82 S 0.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.852 3.55 3.03<br />

Sub-total Patuakhali Division<br />

267.696<br />

Pirojpur Division<br />

R870 Barisal-Pirojpur Road Km 053.97-054.07 S 0.1 3803 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.34 3.58<br />

R870 Barisal-Pirojpur Road Km 054.67-055.07 S 0.4 3803 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 1.58 9.65<br />

R870 Barisal-Pirojpur Road Km 061.47-062.07 S 0.6 3803 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.5<strong>23</strong> 1.75 10.43<br />

R870 Barisal-Pirojpur Road Km 047.37-048.37 S 1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.993 3.43 60.03<br />

R870 Barisal-Pirojpur Road Km 049.57-049.77 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.81<br />

R870 Barisal-Pirojpur Road Km 049.97-050.17 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.66 <strong>12</strong>.82<br />

R870 Barisal-Pirojpur Road Km 051.87-052.17 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.40 17.84<br />

R870 Barisal-Pirojpur Road Km 044.05-047.37 S 3.32 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 45.941 3.37 153.13<br />

R870 Barisal-Pirojpur Road Km 048.37-049.57 S 1.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 16.184 3.91 63.71<br />

R870 Barisal-Pirojpur Road Km 049.77-049.97 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 4.19 11.36<br />

R870 Barisal-Pirojpur Road Km 050.17-051.87 S 1.7 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 22.927 3.83 88.27<br />

Sub-total Pirojpur Division<br />

Total Barisal Zone<br />

Chittagong Zone<br />

133.029<br />

1853.619<br />

B<strong>and</strong>arban Division<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 000.10-000.30 S 0.2 1363 National Full Recon 110mm @ IRI <strong>12</strong> 2013 3.462 0.48 1.55<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 007.30-007.50 S 0.2 1363 National Full Recon 110mm @ IRI <strong>12</strong> 2013 3.025 0.49 1.39<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 000.60-000.90 S 0.3 1363 National Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.471 0.97 3.36<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 014.30-015.00 S 0.7 1363 National Rehab 110mm @ IRI 9-<strong>12</strong> 2013 7.492 0.92 6.92<br />

N108 Keranirhat-B<strong>and</strong>arban Road Km 017.10-017.40 S 0.3 1363 National Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.217 1.30 4.17<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 031.90-032.40 S 0.5 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.347 2.17 10.56<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 035.60-038.70 S 3.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 33.149 2.17 65.68<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 038.84-039.24 S 0.4 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.289 2.36 9.22<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 041.74-055.14 S 13.4 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 143.289 2.42 316.49<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 055.64-056.14 S 0.5 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.347 2.71 13.19<br />

Appendix-C: Page: 3 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 056.14-056.34 S 0.2 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.139 2.69 5.24<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 056.34-056.54 S 0.2 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.139 2.90 5.66<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 056.64-057.74 S 1.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.808 3.49 75.06<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 057.94-058.04 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.225 3.11 6.78<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 033.70-035.60 S 1.9 464 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.867 0.77 9.54<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 039.24-041.74 S 2.5 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 20.771 2.58 50.61<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 055.14-055.64 S 0.5 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.143 3.14 <strong>12</strong>.30<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 056.54-056.64 S 0.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.55 2.78<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 057.74-057.94 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.335 3.69 <strong>12</strong>.37<br />

Sub-total B<strong>and</strong>arban Division<br />

282.340<br />

Chittagong Division<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 225.78-225.98 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.892 3.92 14.40<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 170.17-170.18 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.263 5.78 1.49<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 170.38-170.48 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.00 14.29<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 171.08-171.18 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.26 15.05<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 171.48-171.78 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 5.30 45.50<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 175.38-175.58 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 3.43 19.86<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 176.88-176.98 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.997 4.90 14.39<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 179.48-179.58 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.958 4.99 14.47<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 182.88-182.98 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.978 5.76 16.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 183.08-183.18 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.978 5.76 16.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 185.08-185.28 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.956 5.76 33.59<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 185.98-186.28 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.887 5.79 50.39<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 186.28-187.58 S 1.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 38.460 5.28 198.69<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 187.58-187.68 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.958 5.80 16.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 187.68-187.88 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 5.25 30.40<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 187.88-188.18 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.875 5.80 50.39<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 188.88-189.08 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 5.61 32.51<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 189.08-189.28 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.917 4.77 27.64<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 189.28-189.68 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.834 5.35 61.99<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 190.18-190.28 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.958 5.61 16.26<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 193.88-194.28 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.047 7.35 62.72<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 194.28-194.48 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 7.38 33.99<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 194.88-195.28 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.187 6.68 58.18<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 195.58-195.88 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.890 6.86 44.86<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 196.48-196.58 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.297 7.52 16.40<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 197.28-197.38 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.41 16.53<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 198.08-198.18 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.18 16.01<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 199.58-199.68 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 6.98 15.57<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 200.38-200.48 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.402 6.20 14.22<br />

Appendix-C: Page: 4 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 201.08-201.18 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.06 17.73<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 202.08-202.38 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.642 5.92 50.06<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 202.38-203.48 S 1.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 42.563 3.73 155.47<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 203.48-203.58 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.048 3.66 14.48<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 205.78-206.08 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.145 3.43 40.63<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 208.98-209.08 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.048 2.45 9.68<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 209.28-209.38 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.048 3.<strong>23</strong> <strong>12</strong>.76<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 210.08-210.18 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 6.33 15.04<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 210.38-210.48 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 6.38 15.18<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 211.18-211.38 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.983 4.88 <strong>23</strong>.20<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.18-213.28 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 7.59 18.05<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.28-213.78 S 0.5 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.457 7.02 83.52<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.78-213.88 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 7.59 18.05<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 213.88-214.18 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.474 6.80 48.50<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 214.18-214.38 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.983 7.27 34.59<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 214.38-214.58 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.983 6.64 31.60<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 214.58-214.68 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.410 5.01 16.74<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 215.78-216.08 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.474 6.73 48.02<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 216.68-216.78 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 6.<strong>23</strong> 16.57<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 217.08-217.18 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.764 5.99 16.21<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 217.78-217.88 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.764 5.17 14.00<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 222.98-2<strong>23</strong>.18 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.333 5.53 28.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 226.78-227.08 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.926 3.31 32.15<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 227.46-227.56 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.309 4.44 14.38<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 227.76-227.86 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.309 4.41 14.30<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 228.46-228.76 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.926 3.44 33.43<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km <strong>23</strong>0.26-<strong>23</strong>0.36 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.107 3.13 <strong>12</strong>.57<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 243.04-243.14 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 5.74 15.75<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 243.34-243.44 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 5.84 16.04<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 244.04-244.34 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.724 5.51 47.06<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 244.44-244.54 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 5.07 15.46<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 244.84-245.34 S 0.5 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 15.571 4.58 69.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 245.84-245.94 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.769 2.56 11.80<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 226.08-226.18 S 0.1 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.868 4.93 9.04<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 171.98-173.18 S 1.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 27.918 4.81 134.38<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 175.98-176.58 S 0.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.051 4.03 56.68<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 183.18-185.08 S 1.9 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 44.671 6.68 298.70<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 185.28-185.98 S 0.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 16.458 6.86 1<strong>12</strong>.95<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 188.18-188.88 S 0.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 16.350 6.58 107.67<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 189.68-190.18 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.679 5.79 67.65<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 194.48-194.88 S 0.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.290 7.40 52.27<br />

Appendix-C: Page: 5 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 195.88-196.48 S 0.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.880 5.35 55.99<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 196.58-197.28 S 0.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.800 6.21 76.98<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 197.38-198.08 S 0.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.908 5.74 71.85<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 198.18-199.58 S 1.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 25.816 5.11 <strong>12</strong>7.88<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 200.68-200.78 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.059 5.25 10.59<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 201.18-202.08 S 0.9 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 19.694 6.74 132.74<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 204.98-205.18 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.392 3.<strong>12</strong> 19.91<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 217.18-217.78 S 0.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 13.092 4.96 64.90<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 218.58-219.08 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.910 9.00 98.22<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 219.98-220.48 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.910 8.42 91.93<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 2<strong>23</strong>.68-224.18 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.526 9.16 96.08<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 226.28-226.38 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.6<strong>12</strong> 4.63 <strong>12</strong>.10<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 229.26-229.76 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 15.674 5.<strong>23</strong> 82.02<br />

N106 Chittagong-Rangamati Road Km 000.20-000.60 S 0.4 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.457 3.32 40.34<br />

N106 Chittagong-Rangamati Road Km 001.20-001.40 S 0.2 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.228 3.21 19.52<br />

N106 Chittagong-Rangamati Road Km 001.60-001.70 S 0.1 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 3.13 9.51<br />

N106 Chittagong-Rangamati Road Km 001.90-002.10 S 0.2 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.228 3.31 20.11<br />

N106 Chittagong-Rangamati Road Km 002.60-003.20 S 0.6 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 18.685 3.31 60.45<br />

N106 Chittagong-Rangamati Road Km 003.20-003.70 S 0.5 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 15.571 3.14 47.80<br />

N106 Chittagong-Rangamati Road Km 003.70-003.90 S 0.2 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.228 3.42 20.80<br />

N106 Chittagong-Rangamati Road Km 004.10-004.20 S 0.1 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 3.48 10.60<br />

N106 Chittagong-Rangamati Road Km 004.30-004.60 S 0.3 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.343 3.48 31.77<br />

N106 Chittagong-Rangamati Road Km 004.70-005.00 S 0.3 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.191 3.49 31.34<br />

N106 Chittagong-Rangamati Road Km 005.10-005.30 S 0.2 13468 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 5.<strong>12</strong> 21.81<br />

N106 Chittagong-Rangamati Road Km 013.50-013.70 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 6.56 27.82<br />

N106 Chittagong-Rangamati Road Km 014.00-014.10 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 6.24 13.22<br />

N106 Chittagong-Rangamati Road Km 014.60-014.90 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 5.08 32.29<br />

N106 Chittagong-Rangamati Road Km 015.20-015.30 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 6.92 14.67<br />

N106 Chittagong-Rangamati Road Km 016.10-016.30 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.294 4.52 <strong>23</strong>.48<br />

N106 Chittagong-Rangamati Road Km 017.20-017.30 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.647 4.52 11.73<br />

N106 Chittagong-Rangamati Road Km 018.60-019.30 S 0.7 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.821 8.52 144.86<br />

N106 Chittagong-Rangamati Road Km 021.20-021.60 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.031 5.14 43.60<br />

N106 Chittagong-Rangamati Road Km 021.70-021.80 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 5.62 11.90<br />

N106 Chittagong-Rangamati Road Km 022.20-022.30 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.20 15.25<br />

N106 Chittagong-Rangamati Road Km 022.50-022.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.20 15.25<br />

N106 Chittagong-Rangamati Road Km 0<strong>23</strong>.00-0<strong>23</strong>.20 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 4.96 21.02<br />

N106 Chittagong-Rangamati Road Km 0<strong>23</strong>.40-0<strong>23</strong>.60 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 6.52 27.64<br />

N106 Chittagong-Rangamati Road Km 000.60-001.20 S 0.6 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.752 2.98 43.82<br />

N106 Chittagong-Rangamati Road Km 001.40-001.60 S 0.2 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.917 3.16 15.50<br />

N106 Chittagong-Rangamati Road Km 004.60-004.70 S 0.1 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.459 3.46 8.48<br />

N106 Chittagong-Rangamati Road Km 005.00-005.10 S 0.1 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.783 5.70 9.70<br />

Appendix-C: Page: 6 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N106 Chittagong-Rangamati Road Km 005.60-005.90 S 0.3 13468 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.348 5.79 29.57<br />

N106 Chittagong-Rangamati Road Km 013.00-013.10 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.783 10.25 17.34<br />

R151 Baraiyerhat-Fatikchhari Road Km 005.60-005.70 S 0.1 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 0.72 0.72<br />

R151 Baraiyerhat-Fatikchhari Road Km 008.40-009.00 S 0.6 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 6.157 0.71 4.21<br />

R151 Baraiyerhat-Fatikchhari Road Km 011.00-011.10 S 0.1 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 0.96 0.95<br />

R151 Baraiyerhat-Fatikchhari Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.1 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 1.05 1.04<br />

R151 Baraiyerhat-Fatikchhari Road Km 017.50-017.60 S 0.1 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 0.99 0.98<br />

R151 Baraiyerhat-Fatikchhari Road Km 017.80-018.00 S 0.2 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.052 0.76 1.51<br />

R151 Baraiyerhat-Fatikchhari Road Km 018.20-019.10 S 0.9 1484 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 9.<strong>23</strong>6 0.81 7.22<br />

R151 Baraiyerhat-Fatikchhari Road Km 0<strong>23</strong>.20-0<strong>23</strong>.40 S 0.2 1301 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.052 0.55 1.08<br />

R151 Baraiyerhat-Fatikchhari Road Km 025.30-025.70 S 0.4 1301 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.105 0.48 1.88<br />

R151 Baraiyerhat-Fatikchhari Road Km 000.80-000.90 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.44 2.62<br />

R151 Baraiyerhat-Fatikchhari Road Km 001.50-001.60 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.13 2.28<br />

R151 Baraiyerhat-Fatikchhari Road Km 003.00-003.20 S 0.2 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 2.27 4.88<br />

R151 Baraiyerhat-Fatikchhari Road Km 003.30-003.50 S 0.2 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 2.28 4.89<br />

R151 Baraiyerhat-Fatikchhari Road Km 004.20-004.50 S 0.3 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 1.73 5.58<br />

R151 Baraiyerhat-Fatikchhari Road Km 009.20-009.70 S 0.5 1484 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.574 1.82 6.62<br />

R151 Baraiyerhat-Fatikchhari Road Km 011.70-0<strong>12</strong>.10 S 0.4 1484 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.859 1.90 5.51<br />

R151 Baraiyerhat-Fatikchhari Road Km 021.80-022.50 S 0.7 1301 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.004 1.10 5.54<br />

R151 Baraiyerhat-Fatikchhari Road Km 027.40-030.40 S 3 1301 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 21.444 0.64 13.93<br />

R152 Heako-Ramgarh Road Km 000.10-000.30 S 0.2 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.836 0.40 1.10<br />

R152 Heako-Ramgarh Road Km 001.10-001.20 S 0.1 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 1.14 1.02<br />

R152 Heako-Ramgarh Road Km 003.10-003.30 S 0.2 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.971 0.36 1.04<br />

R152 Heako-Ramgarh Road Km 006.00-006.10 S 0.1 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.43 0.61<br />

R152 Heako-Ramgarh Road Km 011.80-011.90 S 0.1 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.080 0.90 0.94<br />

R152 Heako-Ramgarh Road Km 016.70-017.00 S 0.3 1398 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.241 0.70 2.17<br />

R152 Heako-Ramgarh Road Km 002.20-002.70 S 0.5 1398 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.173 1.03 5.31<br />

R152 Heako-Ramgarh Road Km 008.10-010.40 S 2.3 1398 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 <strong>23</strong>.796 0.43 10.<strong>12</strong><br />

R152 Heako-Ramgarh Road Km 011.00-011.60 S 0.6 1398 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.515 1.34 6.09<br />

R160 Hathazari-Khagrachhari Road Km 024.10-025.10 S 1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 13.664 1.55 20.22<br />

R160 Hathazari-Khagrachhari Road Km 017.00-017.10 S 0.1 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.95 5.11<br />

R160 Hathazari-Khagrachhari Road Km 018.40-018.50 S 0.1 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.08 3.60<br />

R160 Hathazari-Khagrachhari Road Km 020.30-020.40 S 0.1 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.64 4.58<br />

R160 Hathazari-Khagrachhari Road Km 021.10-021.60 S 0.5 5045 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.53 21.89<br />

R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.20-0<strong>23</strong>.40 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 3.38 <strong>12</strong>.13<br />

R160 Hathazari-Khagrachhari Road Km 0<strong>23</strong>.50-0<strong>23</strong>.90 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.328 2.75 19.73<br />

R160 Hathazari-Khagrachhari Road Km 025.40-026.00 S 0.6 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.207 2.34 <strong>23</strong>.19<br />

R160 Hathazari-Khagrachhari Road Km 029.00-031.40 S 2.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 40.828 4.57 181.67<br />

R160 Hathazari-Khagrachhari Road Km 017.60-017.70 S 0.1 5045 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.373 2.96 3.98<br />

R160 Hathazari-Khagrachhari Road Km 019.50-019.90 S 0.4 5045 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.493 2.69 14.48<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.10-000.30 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.468 3.49 11.82<br />

Appendix-C: Page: 7 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.50-000.70 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.468 3.20 10.84<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.10-007.20 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.79 6.41<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 007.30-007.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.79 6.42<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.30-008.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.75 6.35<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.50-008.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 3.81 6.45<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.40-009.50 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.77 6.62<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.60-009.70 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.73 6.54<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.90-010.00 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.72 6.54<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.10-010.40 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.43 18.06<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.70-010.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.43 <strong>12</strong>.03<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 011.60-011.90 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.31 17.44<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.00-013.10 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.25 5.71<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.80-013.90 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.24 5.69<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.40-016.50 S 0.1 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.25 5.48<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 016.60-016.90 S 0.3 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 1.60 8.09<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 017.50-017.60 S 0.1 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.06 5.17<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 018.00-018.20 S 0.2 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.78 9.38<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 019.20-019.90 S 0.7 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 2.36 27.81<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.40-020.50 S 0.1 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.33 3.93<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 020.80-020.90 S 0.1 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.39 4.02<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 021.40-021.60 S 0.2 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.66 5.58<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 022.80-0<strong>23</strong>.00 S 0.2 76<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.70 5.71<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 027.00-029.00 S 2 5390 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 35.987 2.19 75.89<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 029.20-029.80 S 0.6 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 3.33 35.08<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.10-030.40 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.40 17.93<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.50-030.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.83 6.73<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 030.70-031.00 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.25 17.14<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.10-031.20 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.66 6.44<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 031.30-032.10 S 0.8 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.395 3.07 43.17<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 000.70-004.00 S 3.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 42.887 2.73 119.16<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 004.00-007.00 S 3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 38.988 2.59 102.71<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 008.40-008.50 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.300 4.14 5.47<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 009.50-009.60 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.69 5.06<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 010.00-010.10 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.87 5.30<br />

R163 Chittagong -Ch<strong>and</strong>ragona Road Km 013.40-013.60 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 4.52 <strong>12</strong>.40<br />

R164 Baraichhari-Kaptai Road Km 001.10-001.30 S 0.2 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.511 0.39 1.31<br />

R164 Baraichhari-Kaptai Road Km 001.70-001.80 S 0.1 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.40 0.67<br />

R164 Baraichhari-Kaptai Road Km 005.60-005.70 S 0.1 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.39 0.65<br />

R164 Baraichhari-Kaptai Road Km 008.30-008.60 S 0.3 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 5.266 0.36 1.83<br />

R164 Baraichhari-Kaptai Road Km 008.80-008.90 S 0.1 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.33 0.56<br />

R164 Baraichhari-Kaptai Road Km 008.92-009.02 S 0.1 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.755 0.40 0.67<br />

Appendix-C: Page: 8 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R164 Baraichhari-Kaptai Road Km 010.<strong>12</strong>-010.17 S 0.05 1582 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.860 0.41 0.34<br />

R164 Baraichhari-Kaptai Road Km 002.90-003.20 S 0.3 1582 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.668 0.71 2.60<br />

Sub-total Chittagong Division<br />

1350.085<br />

Cox's Bazar Division<br />

N110 Link Road-Cox's Bazar Road Km 005.20-005.40 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.372 5.70 30.09<br />

N110 Link Road-Cox's Bazar Road Km 005.50-005.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.686 6.46 17.06<br />

N110 Link Road-Cox's Bazar Road Km 005.80-006.00 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.372 5.90 31.17<br />

N110 Link Road-Cox's Bazar Road Km 006.20-006.50 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.058 5.58 44.<strong>23</strong><br />

N110 Link Road-Cox's Bazar Road Km 007.70-008.00 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.693 5.00 47.90<br />

N110 Link Road-Cox's Bazar Road Km 005.60-005.80 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.241 5.17 22.06<br />

R170 Patiya-Chokoria Road Km 063.20-063.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.31 6.10<br />

R170 Patiya-Chokoria Road Km 063.90-064.00 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.41 6.29<br />

R170 Patiya-Chokoria Road Km 064.20-064.40 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.788 3.20 11.78<br />

R170 Patiya-Chokoria Road Km 065.10-065.30 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.788 3.20 11.78<br />

R170 Patiya-Chokoria Road Km 065.80-066.10 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.683 3.01 16.65<br />

R170 Patiya-Chokoria Road Km 066.40-066.50 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 2.33 4.30<br />

R170 Patiya-Chokoria Road Km 067.10-067.40 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.683 3.07 16.99<br />

R170 Patiya-Chokoria Road Km 068.60-069.10 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.471 2.20 20.24<br />

R170 Patiya-Chokoria Road Km 069.80-069.90 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.29 6.06<br />

R170 Patiya-Chokoria Road Km 071.00-071.10 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.894 3.04 5.60<br />

R170 Patiya-Chokoria Road Km 072.20-072.50 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.683 2.31 <strong>12</strong>.80<br />

R170 Patiya-Chokoria Road Km 071.50-071.70 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.840 3.43 9.86<br />

R172 Chokoria-Baderkhali Road Km 010.00-010.20 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.88 11.01<br />

R172 Chokoria-Baderkhali Road Km 011.70-011.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.33 4.44<br />

R172 Chokoria-Baderkhali Road Km 011.90-0<strong>12</strong>.00 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.11 5.93<br />

R172 Chokoria-Baderkhali Road Km 014.70-014.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.24 6.19<br />

R172 Chokoria-Baderkhali Road Km 015.30-015.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.08 3.96<br />

R172 Chokoria-Baderkhali Road Km 015.60-016.10 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 2.00 19.11<br />

R172 Chokoria-Baderkhali Road Km 010.50-010.90 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 2.59 15.41<br />

R180 Laharpur-Laboni More Road Km 001.60-001.70 S 0.1 4993 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.41 4.43<br />

R180 Laharpur-Laboni More Road Km 002.10-002.30 S 0.2 4993 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.71 5.75<br />

R180 Laharpur-Laboni More Road Km 002.90-003.00 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.04 5.29<br />

Sub-total Cox's Bazar Division<br />

116.666<br />

Dohazari Division<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 254.84-254.94 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.00 15.25<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 255.14-255.44 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 5.51 42.02<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 255.54-255.64 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.86 17.43<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 275.38-275.58 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.403 6.05 31.84<br />

Appendix-C: Page: 9 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 276.58-276.88 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 7.41 47.64<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 277.08-278.18 S 1.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 24.835 6.47 152.32<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 278.38-278.48 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 8.00 17.13<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 278.78-279.08 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 7.64 49.<strong>12</strong><br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 279.08-279.18 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.29 15.62<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 279.18-279.28 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 8.09 17.32<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 280.28-280.38 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.90 17.51<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 280.78-281.18 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.343 7.45 66.03<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 283.58-283.78 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 4.82 25.63<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 284.28-284.58 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.175 5.73 45.73<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 292.18-292.28 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.491 7.34 17.45<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 294.88-295.18 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.46 49.26<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 300.48-300.68 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.606 5.13 28.15<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 300.88-301.08 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.606 5.73 31.43<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 302.18-302.58 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.211 5.37 59.00<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 302.98-303.08 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 4.<strong>23</strong> 11.60<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 303.38-303.48 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 5.95 15.82<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.18-304.38 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 5.71 30.39<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.58-304.68 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 5.95 15.82<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.88-305.08 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.286 6.10 31.43<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 305.78-305.98 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.15 31.<strong>23</strong><br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 308.98-309.18 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.50 33.05<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 309.88-309.98 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.628 6.71 17.17<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 310.98-311.28 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.708 6.00 44.14<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 3<strong>12</strong>.98-313.38 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 10.277 4.48 43.90<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 314.48-314.58 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.569 6.63 16.26<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 246.74-246.94 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.530 4.49 33.36<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 278.18-278.38 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.565 7.64 26.18<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 279.28-280.28 S 1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.010 7.83 136.59<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 280.38-280.78 S 0.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.376 8.40 59.56<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 290.58-291.08 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.296 6.76 69.15<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 295.18-298.78 S 3.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 70.367 4.43 302.41<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 303.88-303.98 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.151 4.84 10.38<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 304.38-304.58 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.303 4.27 18.32<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 305.98-308.98 S 3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 61.774 6.35 389.64<br />

R170 Patiya-Chokoria Road Km 000.10-000.30 S 0.2 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 1.45 3.07<br />

R170 Patiya-Chokoria Road Km 000.70-000.80 S 0.1 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.71 1.80<br />

R170 Patiya-Chokoria Road Km 000.90-001.00 S 0.1 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.71 1.81<br />

R170 Patiya-Chokoria Road Km 002.40-002.60 S 0.2 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.198 1.43 2.95<br />

R170 Patiya-Chokoria Road Km 003.20-003.30 S 0.1 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 1.78 1.78<br />

R170 Patiya-Chokoria Road Km 003.50-003.70 S 0.2 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.61 3.14<br />

Appendix-C: Page: 10 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R170 Patiya-Chokoria Road Km 005.50-005.90 S 0.4 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.158 1.34 5.20<br />

R170 Patiya-Chokoria Road Km 006.00-006.30 S 0.3 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.119 1.59 4.65<br />

R170 Patiya-Chokoria Road Km 006.40-006.50 S 0.1 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.71 1.67<br />

R170 Patiya-Chokoria Road Km 007.00-007.40 S 0.4 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.158 2.<strong>23</strong> 8.70<br />

R170 Patiya-Chokoria Road Km 007.80-007.90 S 0.1 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.96 1.91<br />

R170 Patiya-Chokoria Road Km 008.70-008.80 S 0.1 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.96 1.91<br />

R170 Patiya-Chokoria Road Km 009.50-009.70 S 0.2 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.70 3.30<br />

R170 Patiya-Chokoria Road Km 010.10-010.20 S 0.1 3516 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.040 1.96 1.91<br />

R170 Patiya-Chokoria Road Km 011.10-011.20 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.951 2.87 2.63<br />

R170 Patiya-Chokoria Road Km 0<strong>12</strong>.00-0<strong>12</strong>.10 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.52 2.59<br />

R170 Patiya-Chokoria Road Km 0<strong>12</strong>.90-013.00 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.49 2.56<br />

R170 Patiya-Chokoria Road Km 013.50-013.60 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.53 2.60<br />

R170 Patiya-Chokoria Road Km 018.74-019.70 S 0.96 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.019 1.82 17.59<br />

R170 Patiya-Chokoria Road Km 020.90-021.10 S 0.2 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.91 3.83<br />

R170 Patiya-Chokoria Road Km 020.20-020.70 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.361 2.39 17.02<br />

R170 Patiya-Chokoria Road Km 001.40-002.40 S 1 3516 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 8.654 1.88 15.72<br />

R170 Patiya-Chokoria Road Km 006.70-006.90 S 0.2 3516 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.611 2.58 4.00<br />

R170 Patiya-Chokoria Road Km 008.00-008.20 S 0.2 3516 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.611 2.21 3.44<br />

R170 Patiya-Chokoria Road Km 0<strong>12</strong>.20-0<strong>12</strong>.50 S 0.3 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.348 4.06 9.46<br />

R171 Banshkhali -Chunti Road Km 007.40-007.50 S 0.1 1514 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.026 1.05 1.02<br />

R171 Banshkhali -Chunti Road Km 008.60-008.80 S 0.2 1514 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.052 0.80 1.55<br />

R171 Banshkhali -Chunti Road Km 005.20-005.70 S 0.5 1514 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.574 1.25 4.44<br />

Sub-total Dohazari Division<br />

431.640<br />

Khagrachari Division<br />

R160 Hathazari-Khagrachhari Road Km 039.30-039.40 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.21 2.32<br />

R160 Hathazari-Khagrachhari Road Km 040.70-041.00 S 0.3 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.297 1.84 5.80<br />

R160 Hathazari-Khagrachhari Road Km 041.50-041.70 S 0.2 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 2.04 4.39<br />

R160 Hathazari-Khagrachhari Road Km 042.40-042.60 S 0.2 3792 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.9<strong>23</strong> 2.87 8.22<br />

R160 Hathazari-Khagrachhari Road Km 049.10-049.20 S 0.1 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.24 2.37<br />

R160 Hathazari-Khagrachhari Road Km 051.40-051.50 S 0.1 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.45 2.59<br />

R160 Hathazari-Khagrachhari Road Km 054.00-055.80 S 1.8 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 20.317 2.07 39.30<br />

R160 Hathazari-Khagrachhari Road Km 055.82-055.92 S 0.1 3362 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 2.70 2.85<br />

R160 Hathazari-Khagrachhari Road Km 078.52-078.92 S 0.4 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.277 2.40 9.82<br />

R160 Hathazari-Khagrachhari Road Km 079.<strong>12</strong>-080.02 S 0.9 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.624 2.26 20.77<br />

R160 Hathazari-Khagrachhari Road Km 080.22-080.32 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.71 2.77<br />

R160 Hathazari-Khagrachhari Road Km 080.52-081.42 S 0.9 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.624 2.39 21.96<br />

R160 Hathazari-Khagrachhari Road Km 081.52-081.62 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.88 2.94<br />

R160 Hathazari-Khagrachhari Road Km 081.72-083.<strong>12</strong> S 1.4 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 14.970 2.41 34.45<br />

R160 Hathazari-Khagrachhari Road Km 083.22-083.82 S 0.6 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.416 2.41 14.75<br />

R160 Hathazari-Khagrachhari Road Km 084.<strong>12</strong>-084.22 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.069 2.81 2.87<br />

Appendix-C: Page: 11 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R160 Hathazari-Khagrachhari Road Km 035.10-037.10 S 2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 31.145 3.29 99.43<br />

R160 Hathazari-Khagrachhari Road Km 031.40-035.00 S 3.6 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 33.722 3.40 111.91<br />

R160 Hathazari-Khagrachhari Road Km 041.70-042.40 S 0.7 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.541 2.09 13.24<br />

R160 Hathazari-Khagrachhari Road Km 042.70-046.70 S 4 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 34.983 3.80 <strong>12</strong>9.69<br />

R160 Hathazari-Khagrachhari Road Km 050.00-051.20 S 1.2 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 10.495 3.62 37.05<br />

R160 Hathazari-Khagrachhari Road Km 051.60-053.30 S 1.7 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 14.868 3.44 49.93<br />

R160 Hathazari-Khagrachhari Road Km 053.30-054.00 S 0.7 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.<strong>12</strong>2 2.41 14.42<br />

R160 Hathazari-Khagrachhari Road Km 055.92-056.42 S 0.5 3362 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.373 1.85 7.89<br />

R160 Hathazari-Khagrachhari Road Km 081.42-081.52 S 0.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.22 2.58<br />

R160 Hathazari-Khagrachhari Road Km 081.62-081.72 S 0.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.36 2.69<br />

R160 Hathazari-Khagrachhari Road Km 083.<strong>12</strong>-083.22 S 0.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.829 3.35 2.69<br />

R160 Hathazari-Khagrachhari Road Km 039.50-040.10 S 0.6 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.444 4.50 28.40<br />

Sub-total Khagrachari Division<br />

<strong>23</strong>2.577<br />

Rangamati Division<br />

N106 Chittagong-Rangamati Road Km 060.32-060.62 S 0.3 3555 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.634 1.55 7.02<br />

N106 Chittagong-Rangamati Road Km 062.02-062.<strong>12</strong> S 0.1 3555 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.7<strong>23</strong> 1.35 2.28<br />

N106 Chittagong-Rangamati Road Km 062.52-064.88 S 2.36 3555 National Full Recon 135mm @ IRI <strong>12</strong> 2013 40.027 1.62 63.49<br />

N106 Chittagong-Rangamati Road Km 033.00-033.30 S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.950 4.06 <strong>23</strong>.06<br />

N106 Chittagong-Rangamati Road Km 033.30-033.60 S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.950 4.16 <strong>23</strong>.61<br />

N106 Chittagong-Rangamati Road Km 047.36-048.36 S 1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 20.132 3.45 66.07<br />

N106 Chittagong-Rangamati Road Km 048.36-048.66 S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.838 4.24 <strong>23</strong>.62<br />

N106 Chittagong-Rangamati Road Km 048.66-049.26 S 0.6 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.675 4.09 45.58<br />

N106 Chittagong-Rangamati Road Km 049.26-049.36 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.70 8.72<br />

N106 Chittagong-Rangamati Road Km 049.36-049.96 S 0.6 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.675 3.85 42.88<br />

N106 Chittagong-Rangamati Road Km 049.96-050.46 S 0.5 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 9.729 4.15 38.52<br />

N106 Chittagong-Rangamati Road Km 050.46-050.66 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.892 4.06 15.06<br />

N106 Chittagong-Rangamati Road Km 050.66-051.06 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.784 4.18 31.04<br />

N106 Chittagong-Rangamati Road Km 051.06-051.76 S 0.7 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 13.621 3.66 47.51<br />

N106 Chittagong-Rangamati Road Km 051.76-051.86 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.63 8.59<br />

N106 Chittagong-Rangamati Road Km 052.16-052.26 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.63 8.59<br />

N106 Chittagong-Rangamati Road Km 052.26-053.26 S 1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 19.459 3.84 71.29<br />

N106 Chittagong-Rangamati Road Km 053.26-053.36 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.63 8.59<br />

N106 Chittagong-Rangamati Road Km 053.36-053.46 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.52 8.39<br />

N106 Chittagong-Rangamati Road Km 053.46-053.56 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.62 8.58<br />

N106 Chittagong-Rangamati Road Km 053.56-054.46 S 0.9 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.513 3.88 64.86<br />

N106 Chittagong-Rangamati Road Km 054.46-054.56 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.58 8.51<br />

N106 Chittagong-Rangamati Road Km 054.56-054.72 S 0.17 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.211 4.22 <strong>12</strong>.94<br />

N106 Chittagong-Rangamati Road Km 054.72-054.82 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.946 4.58 8.51<br />

N106 Chittagong-Rangamati Road Km 054.82-055.42 S 0.6 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 11.675 3.82 42.59<br />

N106 Chittagong-Rangamati Road Km 055.42-055.82 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.784 4.07 30.<strong>23</strong><br />

Appendix-C: Page: <strong>12</strong> of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N106 Chittagong-Rangamati Road Km 055.82-056.<strong>12</strong> S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.838 3.91 21.80<br />

N106 Chittagong-Rangamati Road Km 033.60-039.50 S 5.9 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>9.763 7.55 919.92<br />

N106 Chittagong-Rangamati Road Km 039.50-039.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.78 17.81<br />

N106 Chittagong-Rangamati Road Km 039.60-040.00 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.654 7.05 64.58<br />

N106 Chittagong-Rangamati Road Km 040.00-040.30 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.240 6.44 44.24<br />

N106 Chittagong-Rangamati Road Km 041.20-041.30 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 8.38 17.24<br />

N106 Chittagong-Rangamati Road Km 041.60-041.90 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.540 7.87 48.54<br />

N106 Chittagong-Rangamati Road Km 043.30-043.50 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.99 32.85<br />

N106 Chittagong-Rangamati Road Km 043.50-046.40 S 2.9 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 63.218 6.88 410.41<br />

N106 Chittagong-Rangamati Road Km 046.40-046.96 S 0.56 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.099 7.30 83.32<br />

N106 Chittagong-Rangamati Road Km 046.96-047.16 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 6.58 27.05<br />

N106 Chittagong-Rangamati Road Km 047.16-047.36 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.64 31.42<br />

N106 Chittagong-Rangamati Road Km 051.86-052.16 S 0.3 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.559 3.99 17.56<br />

N106 Chittagong-Rangamati Road Km 030.00-033.00 S 3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 52.000 4.94 245.33<br />

N106 Chittagong-Rangamati Road Km 040.30-041.20 S 0.9 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 16.568 7.90 <strong>12</strong>6.79<br />

N106 Chittagong-Rangamati Road Km 041.30-041.60 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.163 8.71 42.96<br />

N106 Chittagong-Rangamati Road Km 041.90-043.30 S 1.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 24.095 8.78 201.99<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 003.20-003.40 S 0.2 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.079 1.50 2.91<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 003.50-004.10 S 0.6 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.<strong>23</strong>8 0.66 3.85<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 004.40-007.70 S 3.3 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 34.307 0.61 19.56<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 010.70-011.00 S 0.3 <strong>23</strong>26 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.119 0.79 2.31<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 011.60-015.50 S 3.9 2489 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 44.484 0.81 33.79<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 020.30-021.20 S 0.9 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 9.624 2.54 22.26<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 021.40-024.40 S 3 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 32.080 2.52 73.66<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 024.40-027.20 S 2.8 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 29.941 2.42 66.06<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 014.61-015.50 S 0.89 3038 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 13.192 1.36 17.66<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 031.90-031.90 S 0 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.000 0.00 0.56<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 015.90-018.20 S 2.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 45.899 2.38 106.95<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.30-018.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.996 3.38 6.62<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.80-020.00 S 1.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.947 3.06 71.73<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 015.90-018.20 S 2.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 45.899 2.38 106.95<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.30-018.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.996 3.38 6.62<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.80-019.37 S 0.57 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 11.375 3.15 35.13<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 000.30-000.90 S 0.6 <strong>23</strong>26 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.944 1.00 4.63<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 027.70-031.90 S 4.2 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 34.799 2.16 70.98<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.40-018.80 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.983 2.49 14.97<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 020.00-020.30 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.531 3.27 11.49<br />

R161 Rangamati -B<strong>and</strong>arban Road Km 018.40-018.80 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.983 2.49 14.97<br />

R162 Rangamati -Khagrachhari Road Km 000.10-000.30 S 0.2 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.70 1.26<br />

R162 Rangamati -Khagrachhari Road Km 000.70-000.80 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.69<br />

R162 Rangamati -Khagrachhari Road Km 000.90-001.00 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.68<br />

Appendix-C: Page: 13 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R162 Rangamati -Khagrachhari Road Km 002.40-002.60 S 0.2 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.72 1.29<br />

R162 Rangamati -Khagrachhari Road Km 003.20-003.30 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.73 0.65<br />

R162 Rangamati -Khagrachhari Road Km 003.50-003.70 S 0.2 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.72 1.29<br />

R162 Rangamati -Khagrachhari Road Km 005.50-005.90 S 0.4 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.781 0.66 2.37<br />

R162 Rangamati -Khagrachhari Road Km 006.00-006.30 S 0.3 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.836 0.71 1.89<br />

R162 Rangamati -Khagrachhari Road Km 007.80-007.90 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.75 0.67<br />

R162 Rangamati -Khagrachhari Road Km 008.70-008.80 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.80 0.72<br />

R162 Rangamati -Khagrachhari Road Km 009.50-009.70 S 0.2 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.72 1.29<br />

R162 Rangamati -Khagrachhari Road Km 010.10-010.20 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.69<br />

R162 Rangamati -Khagrachhari Road Km 011.10-011.20 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.77 0.69<br />

R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.00-0<strong>12</strong>.10 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.74 0.66<br />

R162 Rangamati -Khagrachhari Road Km 0<strong>12</strong>.90-013.00 S 0.1 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.945 0.73 0.65<br />

R162 Rangamati -Khagrachhari Road Km 013.50-013.70 S 0.2 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.890 0.74 1.32<br />

R162 Rangamati -Khagrachhari Road Km 021.50-022.00 S 0.5 818 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.726 0.72 3.21<br />

R162 Rangamati -Khagrachhari Road Km 001.40-002.40 S 1 818 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 6.584 1.19 7.55<br />

R162 Rangamati -Khagrachhari Road Km 016.40-017.70 S 1.3 818 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 8.559 1.18 9.74<br />

R162 Rangamati -Khagrachhari Road Km 020.20-020.70 S 0.5 818 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.292 1.22 3.88<br />

981.399<br />

3394.706<br />

Sub-total Rangamati Division<br />

Total Chittagong Zone<br />

Comilla Zone<br />

Brahmanbaria Division<br />

N102 Comilla-Brahmanbaria Road Km 053.50-055.10 S 1.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 35.564 6.84 228.32<br />

N102 Comilla-Brahmanbaria Road Km 055.10-055.21 S 0.11 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.354 7.37 16.37<br />

N102 Comilla-Brahmanbaria Road Km 055.21-057.41 S 2.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 48.301 7.05 321.40<br />

N102 Comilla-Brahmanbaria Road Km 071.79-072.19 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.187 7.52 65.55<br />

N102 Comilla-Brahmanbaria Road Km 072.34-072.44 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.297 7.99 17.41<br />

N102 Comilla-Brahmanbaria Road Km 072.66-072.76 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.89 17.58<br />

N102 Comilla-Brahmanbaria Road Km 072.86-074.36 S 1.5 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 34.159 7.44 240.98<br />

N102 Comilla-Brahmanbaria Road Km 074.46-075.96 S 1.5 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 34.859 7.33 243.80<br />

N102 Comilla-Brahmanbaria Road Km 077.16-079.06 S 1.9 15273 National Full Recon 195mm @ IRI <strong>12</strong> 2013 44.155 4.41 183.86<br />

N102 Comilla-Brahmanbaria Road Km 079.16-080.06 S 0.9 15273 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.670 3.88 75.58<br />

N102 Comilla-Brahmanbaria Road Km 071.59-071.79 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.627 8.07 28.13<br />

N102 Comilla-Brahmanbaria Road Km 072.76-072.86 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.844 8.68 15.51<br />

N102 Comilla-Brahmanbaria Road Km 074.36-074.46 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.783 9.38 15.87<br />

N102 Comilla-Brahmanbaria Road Km 079.06-079.16 S 0.1 15273 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.813 4.00 6.92<br />

N2 Dhaka-Sylhet-Jaflong Road Km 074.74-074.84 S 0.1 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.18 14.91<br />

N2 Dhaka-Sylhet-Jaflong Road Km 076.94-077.14 S 0.2 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.58 26.39<br />

N2 Dhaka-Sylhet-Jaflong Road Km 078.34-078.44 S 0.1 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 3.37 9.71<br />

N2 Dhaka-Sylhet-Jaflong Road Km 079.54-079.74 S 0.2 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.76 27.39<br />

Appendix-C: Page: 14 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N2 Dhaka-Sylhet-Jaflong Road Km 082.44-082.64 S 0.2 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.44 31.31<br />

N2 Dhaka-Sylhet-Jaflong Road Km 084.14-084.34 S 0.2 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.47 25.70<br />

N2 Dhaka-Sylhet-Jaflong Road Km 084.54-084.64 S 0.1 1<strong>23</strong>30 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.01 14.42<br />

N2 Dhaka-Sylhet-Jaflong Road Km 085.24-085.44 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.<strong>23</strong> 30.19<br />

N2 Dhaka-Sylhet-Jaflong Road Km 087.74-087.94 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.11 29.21<br />

N2 Dhaka-Sylhet-Jaflong Road Km 092.14-092.44 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.14 35.52<br />

N2 Dhaka-Sylhet-Jaflong Road Km 075.24-075.44 S 0.2 1<strong>23</strong>30 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 6.49 30.19<br />

N2 Dhaka-Sylhet-Jaflong Road Km 077.24-077.44 S 0.2 1<strong>23</strong>30 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 4.22 19.61<br />

R<strong>12</strong>0 Akhaura Town By-Pass Km 000.00-002.50 S 2.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 44.983 3.13 137.43<br />

R220 Sarail-Habiganj Road Km 000.10-000.40 S 0.3 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 0.83 4.41<br />

R220 Sarail-Habiganj Road Km 000.50-001.00 S 0.5 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.543 0.44 2.66<br />

R220 Sarail-Habiganj Road Km 002.20-002.30 S 0.1 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.309 1.19 1.43<br />

R220 Sarail-Habiganj Road Km 002.40-003.10 S 0.7 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 0.34 2.88<br />

R220 Sarail-Habiganj Road Km 003.40-004.00 S 0.6 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 0.41 2.92<br />

R220 Sarail-Habiganj Road Km 004.90-005.00 S 0.1 4488 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.243 1.18 1.34<br />

R220 Sarail-Habiganj Road Km 010.50-0<strong>12</strong>.30 S 1.8 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 32.388 0.64 18.92<br />

R220 Sarail-Habiganj Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.1 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.42 2.32<br />

R220 Sarail-Habiganj Road Km 013.60-013.68 S 0.08 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.457 1.78 2.37<br />

R220 Sarail-Habiganj Road Km 013.78-014.08 S 0.3 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 0.87 4.27<br />

R220 Sarail-Habiganj Road Km 014.18-014.68 S 0.5 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.997 0.76 6.<strong>23</strong><br />

R220 Sarail-Habiganj Road Km 015.88-015.98 S 0.1 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.42 2.33<br />

R220 Sarail-Habiganj Road Km 016.08-016.78 S 0.7 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 0.71 8.21<br />

R220 Sarail-Habiganj Road Km 017.08-017.68 S 0.6 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 0.73 7.15<br />

R220 Sarail-Habiganj Road Km 018.58-018.68 S 0.1 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.74 2.86<br />

R220 Sarail-Habiganj Road Km 007.40-010.50 S 3.1 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 41.808 0.61 <strong>23</strong>.50<br />

R220 Sarail-Habiganj Road Km 015.78-015.88 S 0.1 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 1.73 2.14<br />

R220 Sarail-Habiganj Road Km 015.98-016.08 S 0.1 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 1.62 2.00<br />

Sub-total Brahmanbaria Division<br />

503.036<br />

Ch<strong>and</strong>pur Division<br />

R140 Comilla-Begumganj Road Km 032.29-032.79 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.487 2.41 22.<strong>23</strong><br />

R140 Comilla-Begumganj Road Km 034.09-034.29 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.703 3.61 <strong>12</strong>.93<br />

R140 Comilla-Begumganj Road Km 034.89-035.09 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.46 <strong>12</strong>.14<br />

R140 Comilla-Begumganj Road Km 035.89-036.19 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.457 3.56 19.09<br />

R140 Comilla-Begumganj Road Km 036.79-036.99 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 2.73 9.82<br />

R140 Comilla-Begumganj Road Km 038.49-038.59 S 0.1 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 5.00 8.90<br />

R140 Comilla-Begumganj Road Km 038.99-039.09 S 0.1 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 4.38 7.80<br />

R140 Comilla-Begumganj Road Km 039.49-039.59 S 0.1 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.871 4.78 8.71<br />

R140 Comilla-Begumganj Road Km 039.89-039.99 S 0.1 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 5.01 9.28<br />

R140 Comilla-Begumganj Road Km 040.29-040.47 S 0.18 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.453 4.85 16.35<br />

R140 Comilla-Begumganj Road Km 040.57-041.37 S 0.8 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.090 4.30 71.74<br />

Appendix-C: Page: 15 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R140 Comilla-Begumganj Road Km 041.97-042.37 S 0.4 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 2.54 17.53<br />

R140 Comilla-Begumganj Road Km 042.47-042.67 S 0.2 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.<strong>23</strong> 11.19<br />

R140 Comilla-Begumganj Road Km 043.10-043.20 S 0.1 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 4.04 7.01<br />

R140 Comilla-Begumganj Road Km 045.70-045.90 S 0.2 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.690 3.69 13.25<br />

R140 Comilla-Begumganj Road Km 046.00-046.10 S 0.1 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.70 8.52<br />

R140 Comilla-Begumganj Road Km 046.40-046.70 S 0.3 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.782 2.86 18.94<br />

R140 Comilla-Begumganj Road Km 046.90-047.00 S 0.1 8774 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.715 3.<strong>12</strong> 8.36<br />

R140 Comilla-Begumganj Road Km 047.70-047.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.53 13.51<br />

R140 Comilla-Begumganj Road Km 049.20-049.60 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.459 3.67 26.48<br />

R140 Comilla-Begumganj Road Km 049.70-049.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.71 13.40<br />

R140 Comilla-Begumganj Road Km 050.40-050.80 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.459 3.61 26.07<br />

R140 Comilla-Begumganj Road Km 051.30-051.60 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 3.34 18.52<br />

R140 Comilla-Begumganj Road Km 051.70-051.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.43 6.33<br />

R140 Comilla-Begumganj Road Km 052.20-052.40 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 2.56 9.45<br />

R140 Comilla-Begumganj Road Km 052.70-052.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 3.86 6.96<br />

R140 Comilla-Begumganj Road Km 053.50-053.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.00 7.21<br />

R140 Comilla-Begumganj Road Km 053.80-054.00 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.70 13.36<br />

R140 Comilla-Begumganj Road Km 054.10-054.20 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.00 7.22<br />

R140 Comilla-Begumganj Road Km 055.10-055.30 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.73 13.48<br />

R140 Comilla-Begumganj Road Km 055.50-055.70 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.69 13.33<br />

R140 Comilla-Begumganj Road Km 056.70-057.00 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.624 3.58 19.48<br />

R140 Comilla-Begumganj Road Km 058.40-058.60 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.867 3.48 13.11<br />

R140 Comilla-Begumganj Road Km 059.40-060.30 S 0.9 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 16.783 2.84 46.16<br />

R140 Comilla-Begumganj Road Km 062.30-063.30 S 1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 18.648 3.34 60.21<br />

R140 Comilla-Begumganj Road Km 064.00-064.10 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.67 6.78<br />

R140 Comilla-Begumganj Road Km 064.30-064.50 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.41 <strong>12</strong>.61<br />

R140 Comilla-Begumganj Road Km 065.00-065.10 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.64 6.72<br />

R140 Comilla-Begumganj Road Km 066.90-067.10 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.919 3.44 13.16<br />

R140 Comilla-Begumganj Road Km 067.40-068.50 S 1.09 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.474 2.77 58.06<br />

R140 Comilla-Begumganj Road Km 068.90-069.10 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.21 <strong>12</strong>.28<br />

R140 Comilla-Begumganj Road Km 069.80-070.00 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.49 13.38<br />

R140 Comilla-Begumganj Road Km 071.20-071.40 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.48 13.51<br />

R140 Comilla-Begumganj Road Km 072.10-072.30 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.03 11.77<br />

R140 Comilla-Begumganj Road Km 072.40-072.50 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.66 7.11<br />

R140 Comilla-Begumganj Road Km 072.90-073.10 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.45 13.40<br />

R140 Comilla-Begumganj Road Km 073.20-073.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.63 7.05<br />

R140 Comilla-Begumganj Road Km 074.50-074.90 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 3.45 26.85<br />

R140 Comilla-Begumganj Road Km 075.90-076.60 S 0.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.740 3.24 44.05<br />

R140 Comilla-Begumganj Road Km 076.70-076.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.39 13.18<br />

R140 Comilla-Begumganj Road Km 077.50-077.70 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.39 13.18<br />

R140 Comilla-Begumganj Road Km 078.10-078.20 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.66 7.11<br />

Appendix-C: Page: 16 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R140 Comilla-Begumganj Road Km 079.60-079.70 S 0.1 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 4.83 9.22<br />

R140 Comilla-Begumganj Road Km 079.80-080.30 S 0.5 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 4.31 41.17<br />

R140 Comilla-Begumganj Road Km 080.70-081.00 S 0.3 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.31 24.68<br />

R140 Comilla-Begumganj Road Km 081.10-081.40 S 0.3 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 3.81 21.85<br />

R140 Comilla-Begumganj Road Km 081.90-082.00 S 0.1 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.038 4.58 9.04<br />

R140 Comilla-Begumganj Road Km 082.10-082.20 S 0.1 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 3.85 8.60<br />

R140 Comilla-Begumganj Road Km 082.50-082.60 S 0.1 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 4.55 8.69<br />

R140 Comilla-Begumganj Road Km 083.42-083.72 S 0.3 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.15 <strong>23</strong>.78<br />

R140 Comilla-Begumganj Road Km 084.52-084.72 S 0.2 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 4.52 17.26<br />

R140 Comilla-Begumganj Road Km 085.52-085.61 S 0.09 10297 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.82 8.75<br />

R140 Comilla-Begumganj Road Km 047.90-049.20 S 1.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 18.999 3.40 65.<strong>23</strong><br />

R140 Comilla-Begumganj Road Km 052.40-052.70 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.<strong>23</strong>7 2.69 11.54<br />

R140 Comilla-Begumganj Road Km 053.00-053.40 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.610 2.86 16.<strong>12</strong><br />

R140 Comilla-Begumganj Road Km 065.90-066.00 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.422 2.87 4.<strong>12</strong><br />

R140 Comilla-Begumganj Road Km 068.60-068.80 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 3.50 10.42<br />

R140 Comilla-Begumganj Road Km 071.50-071.70 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 4.25 <strong>12</strong>.73<br />

R140 Comilla-Begumganj Road Km 071.70-072.10 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 3.63 21.75<br />

R140 Comilla-Begumganj Road Km 072.50-072.90 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 3.46 20.75<br />

R140 Comilla-Begumganj Road Km 076.60-076.70 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.50 5.25<br />

R140 Comilla-Begumganj Road Km 082.60-083.42 S 0.82 10297 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.020 3.88 47.14<br />

R140 Comilla-Begumganj Road Km 084.92-085.<strong>12</strong> S 0.2 10297 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 5.32 15.83<br />

R140 Comilla-Begumganj Road Km 085.<strong>12</strong>-085.52 S 0.4 10297 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 4.95 29.47<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 064.16-064.86 S 0.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 3.44 42.30<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 064.96-065.16 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.42 <strong>12</strong>.01<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.16-069.36 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.62 <strong>12</strong>.73<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.76-070.06 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.54 18.64<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.26-070.56 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.54 18.65<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.66-070.76 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.81<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.96-071.26 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.54 18.64<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 071.46-074.46 S 3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 53.980 3.39 178.40<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 074.46-074.80 S 0.34 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.172 3.48 20.97<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 069.06-069.16 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 4.31 5.91<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.06-070.26 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.86 10.59<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 070.76-070.96 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.88 10.65<br />

Sub-total Ch<strong>and</strong>pur Division<br />

481.589<br />

Comilla Division<br />

R140 Comilla-Begumganj Road Km 000.10-000.20 S 0.1 2080 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.050 0.54 1.06<br />

R140 Comilla-Begumganj Road Km 001.40-001.50 S 0.1 3942 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.020 1.53 3.04<br />

R140 Comilla-Begumganj Road Km 008.50-008.70 S 0.2 4909 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 2.31 10.29<br />

R140 Comilla-Begumganj Road Km 009.80-010.00 S 0.2 4909 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 1.62 7.<strong>23</strong><br />

Appendix-C: Page: 17 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R140 Comilla-Begumganj Road Km 010.60-010.70 S 0.1 4909 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 2.81 5.24<br />

R140 Comilla-Begumganj Road Km 010.90-011.20 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 2.28 <strong>12</strong>.61<br />

R140 Comilla-Begumganj Road Km 011.40-011.50 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 2.88 5.31<br />

R140 Comilla-Begumganj Road Km 011.70-0<strong>12</strong>.30 S 0.6 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.054 2.57 35.71<br />

R140 Comilla-Begumganj Road Km 013.36-013.46 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.89 6.99<br />

R140 Comilla-Begumganj Road Km 013.66-013.86 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 2.69 9.67<br />

R140 Comilla-Begumganj Road Km 013.96-014.16 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 3.31 11.89<br />

R140 Comilla-Begumganj Road Km 014.26-014.76 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.69 24.18<br />

R140 Comilla-Begumganj Road Km 014.96-015.06 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.83 6.89<br />

R140 Comilla-Begumganj Road Km 015.06-015.56 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.34 21.05<br />

R140 Comilla-Begumganj Road Km 015.86-016.06 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 3.40 <strong>12</strong>.25<br />

R140 Comilla-Begumganj Road Km 016.26-017.29 S 1.03 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.383 2.38 44.57<br />

R140 Comilla-Begumganj Road Km 017.39-017.49 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.86 6.95<br />

R140 Comilla-Begumganj Road Km 018.89-018.99 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.094 3.09 6.32<br />

R140 Comilla-Begumganj Road Km 020.29-020.49 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.188 2.04 8.36<br />

R140 Comilla-Begumganj Road Km 021.19-021.29 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.094 3.25 6.64<br />

R140 Comilla-Begumganj Road Km 021.39-021.49 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.<strong>12</strong>0 3.20 6.61<br />

R140 Comilla-Begumganj Road Km 0<strong>23</strong>.69-0<strong>23</strong>.79 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.<strong>12</strong>6 3.19 6.61<br />

R140 Comilla-Begumganj Road Km 024.89-024.99 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.54 6.78<br />

R140 Comilla-Begumganj Road Km 025.09-025.29 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.01 11.54<br />

R140 Comilla-Begumganj Road Km 026.49-026.59 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.54 6.79<br />

R140 Comilla-Begumganj Road Km 026.69-026.99 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.596 2.44 18.28<br />

R140 Comilla-Begumganj Road Km 028.89-029.09 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.606 2.08 9.37<br />

R140 Comilla-Begumganj Road Km 029.19-029.49 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.066 2.56 17.88<br />

R140 Comilla-Begumganj Road Km 002.90-003.40 S 0.5 3942 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 7.825 1.47 11.62<br />

R140 Comilla-Begumganj Road Km 008.70-009.20 S 0.5 4909 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 8.582 2.36 20.36<br />

R140 Comilla-Begumganj Road Km 009.20-009.50 S 0.3 4909 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.149 1.75 9.06<br />

R140 Comilla-Begumganj Road Km 015.56-015.86 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.<strong>12</strong>0 2.37 9.96<br />

R140 Comilla-Begumganj Road Km 026.09-026.19 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.37 5.02<br />

R141 Lalmai-Sonaimuri Road Km 000.10-000.40 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 3.63 20.30<br />

R141 Lalmai-Sonaimuri Road Km 001.20-001.50 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.594 3.41 18.65<br />

R141 Lalmai-Sonaimuri Road Km 004.30-004.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 4.46 7.95<br />

R141 Lalmai-Sonaimuri Road Km 007.10-007.30 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.91 14.19<br />

R141 Lalmai-Sonaimuri Road Km 007.50-007.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 4.35 7.88<br />

R141 Lalmai-Sonaimuri Road Km 013.80-014.00 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.756 3.65 13.44<br />

R141 Lalmai-Sonaimuri Road Km 014.10-014.20 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.878 3.96 7.30<br />

R141 Lalmai-Sonaimuri Road Km 014.50-014.70 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.21 11.94<br />

R141 Lalmai-Sonaimuri Road Km 017.80-018.00 S 0.2 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.860 3.17 11.98<br />

R141 Lalmai-Sonaimuri Road Km 018.80-019.00 S 0.2 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.21 11.94<br />

R141 Lalmai-Sonaimuri Road Km 020.60-020.70 S 0.1 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.45 6.42<br />

R141 Lalmai-Sonaimuri Road Km 022.00-022.10 S 0.1 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.40 6.33<br />

Appendix-C: Page: 18 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R141 Lalmai-Sonaimuri Road Km 022.<strong>12</strong>-022.22 S 0.1 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.40 6.33<br />

R141 Lalmai-Sonaimuri Road Km 0<strong>23</strong>.02-0<strong>23</strong>.22 S 0.2 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.18 11.82<br />

R141 Lalmai-Sonaimuri Road Km 024.22-024.42 S 0.2 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.09 11.51<br />

R141 Lalmai-Sonaimuri Road Km 024.52-024.62 S 0.1 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.39 6.31<br />

R141 Lalmai-Sonaimuri Road Km 027.62-028.<strong>12</strong> S 0.5 5257 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.324 3.00 27.01<br />

R141 Lalmai-Sonaimuri Road Km 030.22-030.32 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.65 7.04<br />

R141 Lalmai-Sonaimuri Road Km 030.52-030.62 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.930 3.73 7.08<br />

R141 Lalmai-Sonaimuri Road Km 031.52-031.72 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.783 3.46 <strong>12</strong>.85<br />

R141 Lalmai-Sonaimuri Road Km 006.80-007.00 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.795 4.76 <strong>12</strong>.88<br />

R141 Lalmai-Sonaimuri Road Km 007.30-007.50 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.844 4.52 <strong>12</strong>.43<br />

R141 Lalmai-Sonaimuri Road Km 0<strong>23</strong>.22-024.22 S 1 5257 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 14.222 2.75 39.30<br />

R141 Lalmai-Sonaimuri Road Km 030.32-030.52 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.898 3.55 10.48<br />

R144 Laksam Old Section Km 003.80-003.90 S 0.1 2057 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.228 0.38 0.82<br />

R144 Laksam Old Section Km 000.00-003.00 S 3 2057 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 51.784 0.56 29.20<br />

Sub-total Comilla Division<br />

302.733<br />

Feni Division<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 169.21-169.38 S 0.17 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.934 4.56 22.03<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 169.88-170.17 S 0.29 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.496 5.48 45.63<br />

N104 Feni-Noakhali Road Km 001.30-001.70 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 2.81 22.<strong>12</strong><br />

N104 Feni-Noakhali Road Km 017.00-017.10 S 0.1 9193 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.170 4.65 9.59<br />

N104 Feni-Noakhali Road Km 017.20-017.30 S 0.1 9193 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.170 4.73 9.76<br />

N104 Feni-Noakhali Road Km 000.20-000.40 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.06 29.04<br />

N104 Feni-Noakhali Road Km 002.20-002.50 S 0.3 1<strong>23</strong>76 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 4.50 28.94<br />

N104 Feni-Noakhali Road Km 002.60-002.80 S 0.2 1<strong>23</strong>76 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 6.37 27.30<br />

N104 Feni-Noakhali Road Km 005.10-005.30 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 7.41 31.41<br />

N104 Feni-Noakhali Road Km 005.90-006.00 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

N104 Feni-Noakhali Road Km 006.00-006.10 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.08 15.00<br />

N104 Feni-Noakhali Road Km 006.10-006.20 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

N104 Feni-Noakhali Road Km 006.60-006.70 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

N104 Feni-Noakhali Road Km 007.30-007.40 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 7.94 16.83<br />

N104 Feni-Noakhali Road Km 008.50-008.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 8.03 16.52<br />

N104 Feni-Noakhali Road Km 009.20-009.30 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 7.89 16.<strong>23</strong><br />

N104 Feni-Noakhali Road Km 009.80-010.00 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.42 30.50<br />

N104 Feni-Noakhali Road Km 010.30-010.40 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 7.89 16.<strong>23</strong><br />

N104 Feni-Noakhali Road Km 010.60-010.70 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 7.89 16.<strong>23</strong><br />

N104 Feni-Noakhali Road Km 011.20-011.40 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 7.50 30.87<br />

N104 Feni-Noakhali Road Km 011.50-011.70 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 5.75 <strong>23</strong>.66<br />

N104 Feni-Noakhali Road Km 011.70-0<strong>12</strong>.00 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.633 7.19 44.79<br />

N104 Feni-Noakhali Road Km 0<strong>12</strong>.00-0<strong>12</strong>.40 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.875 7.74 64.51<br />

N104 Feni-Noakhali Road Km 0<strong>12</strong>.70-0<strong>12</strong>.90 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.438 7.93 33.05<br />

Appendix-C: Page: 19 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N104 Feni-Noakhali Road Km 014.60-014.70 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.367 7.86 17.75<br />

N104 Feni-Noakhali Road Km 014.80-015.00 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 7.18 32.89<br />

N104 Feni-Noakhali Road Km 016.70-016.90 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 7.84 33.<strong>23</strong><br />

N104 Feni-Noakhali Road Km 000.70-000.90 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.442 7.76 25.52<br />

N104 Feni-Noakhali Road Km 006.20-006.60 S 0.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.130 7.70 52.09<br />

N104 Feni-Noakhali Road Km 006.70-007.30 S 0.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.695 7.53 76.39<br />

N104 Feni-Noakhali Road Km 010.70-011.20 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 8.605 6.53 53.69<br />

N104 Feni-Noakhali Road Km 0<strong>12</strong>.40-0<strong>12</strong>.70 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.255 8.42 41.99<br />

N104 Feni-Noakhali Road Km 0<strong>12</strong>.90-014.60 S 1.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 29.780 8.22 <strong>23</strong>2.33<br />

N104 Feni-Noakhali Road Km 014.70-014.80 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.921 8.43 15.69<br />

N104 Feni-Noakhali Road Km 015.00-016.70 S 1.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 30.460 7.60 220.99<br />

Sub-total Feni Division<br />

208.200<br />

Laxmipur Division<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 013.80-014.00 S 0.2 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.421 1.00 2.<strong>23</strong><br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 017.80-018.00 S 0.2 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.670 0.87 2.13<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 018.80-019.00 S 0.2 5722 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.944 1.19 3.21<br />

Sub-total Laxmipur Division<br />

8.035<br />

Noakhali Division<br />

N104 Feni-Noakhali Road Km 032.90-033.20 S 0.3 13564 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.576 3.57 33.77<br />

N104 Feni-Noakhali Road Km 033.50-034.20 S 0.7 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 22.344 4.20 92.71<br />

N104 Feni-Noakhali Road Km 035.30-035.50 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.384 4.80 30.27<br />

N104 Feni-Noakhali Road Km 036.50-036.80 S 0.3 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.540 4.35 26.70<br />

N104 Feni-Noakhali Road Km 038.60-038.70 S 0.1 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 4.57 9.73<br />

N104 Feni-Noakhali Road Km 039.80-039.90 S 0.1 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.258 4.81 10.25<br />

N104 Feni-Noakhali Road Km 040.00-040.20 S 0.2 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.516 3.63 15.45<br />

N104 Feni-Noakhali Road Km 041.58-041.78 S 0.2 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 4.07 16.67<br />

N104 Feni-Noakhali Road Km 041.88-042.28 S 0.4 10253 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.720 3.45 28.24<br />

N104 Feni-Noakhali Road Km 042.98-043.08 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.54 15.98<br />

N104 Feni-Noakhali Road Km 043.68-044.08 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 15.431 3.54 53.52<br />

N104 Feni-Noakhali Road Km 045.48-045.58 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.00 16.02<br />

N104 Feni-Noakhali Road Km 045.99-046.19 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 6.56 30.05<br />

N104 Feni-Noakhali Road Km 046.29-046.69 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.654 5.76 52.76<br />

N104 Feni-Noakhali Road Km 048.09-048.49 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.507 4.52 51.44<br />

N104 Feni-Noakhali Road Km 036.90-037.10 S 0.2 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.442 5.61 18.32<br />

N104 Feni-Noakhali Road Km 039.40-039.60 S 0.2 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.565 6.54 22.28<br />

N104 Feni-Noakhali Road Km 040.30-041.00 S 0.7 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.478 5.77 68.72<br />

N104 Feni-Noakhali Road Km 041.20-041.40 S 0.2 10253 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.565 4.91 16.71<br />

N104 Feni-Noakhali Road Km 043.08-043.68 S 0.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.217 5.24 75.36<br />

Appendix-C: Page: 20 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R140 Comilla-Begumganj Road Km 131.27-131.57 S 0.3 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.19 <strong>23</strong>.88<br />

R140 Comilla-Begumganj Road Km 132.67-132.97 S 0.3 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 4.19 <strong>23</strong>.90<br />

R140 Comilla-Begumganj Road Km 133.17-133.57 S 0.4 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 3.74 28.40<br />

R140 Comilla-Begumganj Road Km 135.67-136.17 S 0.5 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 4.01 38.08<br />

R140 Comilla-Begumganj Road Km 136.47-136.97 S 0.5 101<strong>12</strong> Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 3.33 31.64<br />

R140 Comilla-Begumganj Road Km 134.87-135.17 S 0.3 101<strong>12</strong> Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.414 4.27 18.94<br />

R140 Comilla-Begumganj Road Km 137.37-137.67 S 0.3 101<strong>12</strong> Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.811 3.31 19.50<br />

R141 Lalmai-Sonaimuri Road Km 032.22-032.52 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.340 3.18 19.61<br />

R141 Lalmai-Sonaimuri Road Km 033.<strong>12</strong>-033.32 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 3.65 13.31<br />

R141 Lalmai-Sonaimuri Road Km 034.52-034.62 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.930 3.69 6.99<br />

R141 Lalmai-Sonaimuri Road Km 034.72-034.82 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.930 3.68 6.98<br />

R141 Lalmai-Sonaimuri Road Km 035.22-035.32 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.83 7.13<br />

R141 Lalmai-Sonaimuri Road Km 035.62-035.72 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.28 6.<strong>12</strong><br />

R141 Lalmai-Sonaimuri Road Km 031.72-031.82 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.494 3.95 6.02<br />

R141 Lalmai-Sonaimuri Road Km 033.32-034.52 S 1.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 17.302 3.14 55.36<br />

R141 Lalmai-Sonaimuri Road Km 034.82-035.22 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.797 2.76 16.27<br />

R142 Begamganj-Ramganj Road Km 000.30-000.50 S 0.2 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.54 <strong>12</strong>.15<br />

R142 Begamganj-Ramganj Road Km 001.50-001.70 S 0.2 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.34 11.58<br />

R142 Begamganj-Ramganj Road Km 002.10-002.30 S 0.2 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.37 11.67<br />

R142 Begamganj-Ramganj Road Km 002.70-002.90 S 0.2 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.46 11.99<br />

R142 Begamganj-Ramganj Road Km 003.90-004.00 S 0.1 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.89 6.74<br />

R142 Begamganj-Ramganj Road Km 004.10-004.20 S 0.1 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.89 6.74<br />

R142 Begamganj-Ramganj Road Km 004.20-004.30 S 0.1 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.62 6.27<br />

R142 Begamganj-Ramganj Road Km 004.30-004.40 S 0.1 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.89 6.74<br />

R142 Begamganj-Ramganj Road Km 008.10-008.20 S 0.1 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.72 6.45<br />

R142 Begamganj-Ramganj Road Km 008.60-008.70 S 0.1 9769 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.76 6.52<br />

R142 Begamganj-Ramganj Road Km 022.45-022.55 S 0.1 7837 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.39 5.87<br />

R142 Begamganj-Ramganj Road Km 022.95-0<strong>23</strong>.05 S 0.1 7837 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.49 6.06<br />

R142 Begamganj-Ramganj Road Km 024.95-025.25 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.86 15.14<br />

R142 Begamganj-Ramganj Road Km 026.25-026.35 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.51 6.19<br />

R142 Begamganj-Ramganj Road Km 027.25-027.55 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.42 18.10<br />

R142 Begamganj-Ramganj Road Km 027.95-028.25 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.45 18.22<br />

R142 Begamganj-Ramganj Road Km 028.99-029.00 S 0.01 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.108 11.74 1.24<br />

R142 Begamganj-Ramganj Road Km 002.30-002.70 S 0.4 9769 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 3.33 17.58<br />

R142 Begamganj-Ramganj Road Km 007.50-008.10 S 0.6 9769 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 8.092 3.17 25.11<br />

R142 Begamganj-Ramganj Road Km 027.55-027.95 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 3.38 18.56<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 000.10-000.40 S 0.3 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.397 0.58 2.34<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 001.30-001.40 S 0.1 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.243 1.26 1.45<br />

R143 Maijdi-Ch<strong>and</strong>raganj Road Km 004.30-004.50 S 0.2 4563 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.486 0.90 2.07<br />

Sub-total Noakhali Division<br />

316.672<br />

Appendix-C: Page: 21 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

No<br />

Total Comilla Zone<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

1820.265<br />

NPV /<br />

Cost<br />

NPV<br />

Dhaka Zone<br />

Dhaka Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 000.30-000.40 L 0.1 9159 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.45 <strong>12</strong>.37<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 004.50-004.60 L 0.1 9159 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.00 11.10<br />

N501 Mirpur Bridge-Dhour Road Km 008.30-009.10 S 0.8 9855 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 11.2<strong>23</strong> 5.08 53.92<br />

N501 Mirpur Bridge-Dhour Road Km 010.50-010.90 S 0.4 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 5.6<strong>12</strong> 3.80 20.51<br />

Sub-total Dhaka Division<br />

22.448<br />

Gazipur Division<br />

N105 Madanpur-Joydevpur Km 040.14-043.14 S 3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 85.250 4.96 418.40<br />

N3 Dhaka -Mymensingh Road Km 018.00-019.40 L 1.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 47.032 4.82 222.09<br />

N3 Dhaka -Mymensingh Road Km 019.40-019.60 L 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.785 3.88 29.36<br />

N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.70-0<strong>12</strong>.80 L 0.1 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.969 1.48 7.27<br />

N3 Dhaka -Mymensingh Road Km 014.30-014.70 L 0.4 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.533 2.<strong>12</strong> 26.30<br />

N3 Dhaka -Mymensingh Road Km 015.40-015.60 L 0.2 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 7.745 1.76 13.84<br />

N3 Dhaka -Mymensingh Road Km 0<strong>12</strong>.70-0<strong>12</strong>.80 R 0.1 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.969 1.48 7.26<br />

N3 Dhaka -Mymensingh Road Km 014.30-014.70 R 0.4 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 10.498 2.63 27.40<br />

N3 Dhaka -Mymensingh Road Km 015.40-015.60 R 0.2 8665 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.314 3.04 13.30<br />

N3 Dhaka -Mymensingh Road Km 017.80-018.00 L 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.136 2.95 20.79<br />

N3 Dhaka -Mymensingh Road Km 047.05-047.25 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 5.07 22.75<br />

N3 Dhaka -Mymensingh Road Km 047.95-048.15 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 5.<strong>23</strong> <strong>23</strong>.49<br />

N4 Joydebpur-Jamalpur Road Km 019.47-019.67 S 0.2 16227 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 7.49 34.95<br />

N4 Joydebpur-Jamalpur Road Km 021.37-021.47 S 0.1 19452 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 8.61 20.10<br />

R301 Tongi-Pachdona Road Km 000.80-000.86 R 0.06 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.119 8.20 8.97<br />

R301 Tongi-Pachdona Road Km 000.86-000.90 S 0.04 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.985 6.88 6.63<br />

R301 Tongi-Pachdona Road Km 001.10-001.30 S 0.2 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 6.07 27.20<br />

R301 Tongi-Pachdona Road Km 001.40-001.50 S 0.1 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 6.79 15.21<br />

R301 Tongi-Pachdona Road Km 001.70-001.90 S 0.2 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.155 6.37 25.89<br />

R301 Tongi-Pachdona Road Km 002.50-002.60 S 0.1 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 8.89 15.93<br />

R301 Tongi-Pachdona Road Km 002.70-002.80 S 0.1 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 9.78 17.53<br />

R301 Tongi-Pachdona Road Km 004.10-004.20 S 0.1 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 9.98 17.88<br />

R301 Tongi-Pachdona Road Km 004.70-004.90 S 0.2 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 9.27 33.21<br />

R301 Tongi-Pachdona Road Km 005.40-005.60 S 0.2 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.664 8.74 31.30<br />

R301 Tongi-Pachdona Road Km 005.90-006.30 S 0.4 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.328 8.88 63.66<br />

R301 Tongi-Pachdona Road Km 006.50-006.60 S 0.1 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 9.68 17.35<br />

R301 Tongi-Pachdona Road Km 006.80-006.90 S 0.1 21334 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 6.47 14.50<br />

R301 Tongi-Pachdona Road Km 007.50-008.00 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.52 22.38<br />

R301 Tongi-Pachdona Road Km 008.10-008.40 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.496 2.54 13.52<br />

Appendix-C: Page: 22 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R301 Tongi-Pachdona Road Km 009.30-009.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.34 5.92<br />

R301 Tongi-Pachdona Road Km 025.93-026.03 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.34 6.16<br />

R301 Tongi-Pachdona Road Km 000.80-000.86 L 0.06 9143 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 0.769 8.38 6.31<br />

R301 Tongi-Pachdona Road Km 026.43-026.81 S 0.38 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.419 3.86 21.<strong>12</strong><br />

R302 Kaliganj Bazr Road Km 000.10-000.30 S 0.2 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.327 1.39 4.50<br />

R302 Kaliganj Bazr Road Km 001.40-001.80 S 0.4 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.654 1.88 <strong>12</strong>.<strong>12</strong><br />

R302 Kaliganj Bazr Road Km 004.20-004.60 S 0.4 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.654 1.16 7.47<br />

R302 Kaliganj Bazr Road Km 004.70-005.00 S 0.3 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.990 1.49 7.24<br />

R302 Kaliganj Bazr Road Km 005.20-005.60 S 0.4 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.654 1.18 7.62<br />

R302 Kaliganj Bazr Road Km 005.70-005.90 S 0.2 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.327 1.11 3.60<br />

R302 Kaliganj Bazr Road Km 006.20-006.40 S 0.2 3076 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.327 1.03 3.33<br />

R302 Kaliganj Bazr Road Km 003.00-003.80 S 0.8 3076 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 10.311 1.46 15.07<br />

R303 Tongi By-Pass Road Km 000.10-000.20 S 0.1 10199 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 5.49 9.65<br />

R303 Tongi By-Pass Road Km 000.30-000.60 S 0.3 10199 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 5.00 26.37<br />

R303 Tongi By-Pass Road Km 000.70-000.90 S 0.2 10199 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 4.65 16.35<br />

R310 Joydebpur-Itakhola Road Km 000.10-000.20 S 0.1 17870 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 4.11 15.62<br />

R310 Joydebpur-Itakhola Road Km 001.70-001.90 S 0.2 17870 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.459 4.20 31.40<br />

R310 Joydebpur-Itakhola Road Km 002.20-002.60 S 0.4 8616 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.918 1.41 20.55<br />

R310 Joydebpur-Itakhola Road Km 003.40-003.80 S 0.4 5766 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.600 1.42 14.29<br />

R310 Joydebpur-Itakhola Road Km 004.20-004.50 S 0.3 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.815 1.96 18.27<br />

R310 Joydebpur-Itakhola Road Km 005.10-005.20 S 0.1 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.570 3.52 5.04<br />

R310 Joydebpur-Itakhola Road Km 005.50-005.70 S 0.2 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.049 3.22 8.95<br />

R310 Joydebpur-Itakhola Road Km 007.20-007.40 S 0.2 6578 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.272 4.28 <strong>12</strong>.75<br />

R310 Joydebpur-Itakhola Road Km 006.80-007.10 S 0.3 37<strong>23</strong> Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.762 2.36 6.22<br />

R311 Joydebpur -Ordinance Factory Km 000.20-000.30 S 0.1 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.38 1.45<br />

R311 Joydebpur -Ordinance Factory Km 000.90-001.10 S 0.2 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.257 1.16 2.43<br />

R311 Joydebpur -Ordinance Factory Km 001.30-001.40 S 0.1 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.<strong>12</strong>9 1.40 1.48<br />

R311 Joydebpur -Ordinance Factory Km 003.60-003.90 S 0.3 2929 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 1.44 4.54<br />

R311 Joydebpur -Ordinance Factory Km 002.20-002.60 S 0.4 2929 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.498 1.68 5.68<br />

R311 Joydebpur -Ordinance Factory Km 003.10-003.50 S 0.4 2929 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.498 1.78 6.00<br />

R311 Joydebpur -Ordinance Factory Km 004.10-004.40 S 0.3 2929 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.624 1.64 4.15<br />

R313 Mawna-Monohardi Road Km 002.70-003.40 S 0.7 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.069 1.98 13.61<br />

R313 Mawna-Monohardi Road Km 004.90-006.35 S 1.45 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 14.684 3.21 45.67<br />

R313 Mawna-Monohardi Road Km 006.47-006.77 S 0.3 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.030 1.76 5.00<br />

R313 Mawna-Monohardi Road Km 007.07-007.27 S 0.2 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.020 1.51 2.86<br />

R313 Mawna-Monohardi Road Km 007.47-008.57 S 1.1 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.554 1.19 11.80<br />

R313 Mawna-Monohardi Road Km 008.87-017.47 S 8.6 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 76.635 1.14 82.17<br />

R313 Mawna-Monohardi Road Km 017.77-018.07 S 0.3 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 2.673 1.38 3.45<br />

R313 Mawna-Monohardi Road Km 018.27-019.27 S 1 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 8.911 1.67 13.93<br />

R313 Mawna-Monohardi Road Km 019.37-019.77 S 0.4 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.67 5.57<br />

R313 Mawna-Monohardi Road Km 020.57-020.97 S 0.4 3571 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.82 6.10<br />

Appendix-C: Page: <strong>23</strong> of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R313 Mawna-Monohardi Road Km 021.07-021.97 S 0.9 5261 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.809 2.52 33.07<br />

R313 Mawna-Monohardi Road Km 022.17-022.37 S 0.2 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.272 2.70 8.59<br />

R313 Mawna-Monohardi Road Km 022.77-0<strong>23</strong>.27 S 0.5 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.179 2.35 18.66<br />

R313 Mawna-Monohardi Road Km 0<strong>23</strong>.87-025.17 S 1.3 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.265 4.87 100.46<br />

R313 Mawna-Monohardi Road Km 025.27-028.37 S 3.1 5572 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 54.562 3.78 201.24<br />

R313 Mawna-Monohardi Road Km 032.87-033.07 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.33 11.68<br />

R313 Mawna-Monohardi Road Km 033.37-033.47 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.74 4.82<br />

R313 Mawna-Monohardi Road Km 033.57-034.97 S 1.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 25.191 2.26 55.65<br />

R313 Mawna-Monohardi Road Km 035.07-035.37 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.73 14.39<br />

R313 Mawna-Monohardi Road Km 035.47-035.57 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.74 4.82<br />

R313 Mawna-Monohardi Road Km 035.67-035.87 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 4.25 14.92<br />

R313 Mawna-Monohardi Road Km 000.90-001.70 S 0.8 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.739 3.32 22.45<br />

R313 Mawna-Monohardi Road Km 004.20-004.80 S 0.6 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.695 3.14 14.77<br />

R313 Mawna-Monohardi Road Km 022.37-022.77 S 0.4 5572 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.904 6.49 31.48<br />

R313 Mawna-Monohardi Road Km 028.37-031.67 S 3.3 5572 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 44.506 2.94 132.84<br />

R315 Mawna-Nabinagar Road Km 033.60-033.70 S 0.1 2048 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.921 4.68 4.03<br />

R315 Mawna-Nabinagar Road Km 032.10-032.50 S 0.4 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.373 2.15 9.21<br />

R315 Mawna-Nabinagar Road Km 036.20-037.90 S 1.7 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.<strong>12</strong>9 2.32 27.35<br />

Sub-total Gazipur Division<br />

754.336<br />

Jamalpur Division<br />

N4 Joydebpur-Jamalpur Road Km 130.71-130.81 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.55 8.90<br />

N4 Joydebpur-Jamalpur Road Km 140.61-140.91 S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.950 4.14 <strong>23</strong>.43<br />

N4 Joydebpur-Jamalpur Road Km 143.41-143.51 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.983 4.70 8.86<br />

N4 Joydebpur-Jamalpur Road Km 143.51-143.61 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.983 4.37 8.<strong>23</strong><br />

N4 Joydebpur-Jamalpur Road Km 143.61-144.11 S 0.5 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.291 3.93 38.47<br />

N4 Joydebpur-Jamalpur Road Km 137.61-140.61 S 3 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 46.471 3.38 150.57<br />

N4 Joydebpur-Jamalpur Road Km 140.91-143.01 S 2.1 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 32.530 4.30 134.03<br />

Sub-total Jamalpur Division<br />

101.267<br />

Kishoreganj Division<br />

N2 Dhaka-Sylhet-Jaflong Road Km 071.94-072.04 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.58 13.21<br />

R360 Mymensingh -Bhairab Road Km 011.20-011.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.767 4.03 6.94<br />

R360 Mymensingh -Bhairab Road Km 109.38-109.68 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.29 <strong>12</strong>.07<br />

R360 Mymensingh -Bhairab Road Km 045.42-046.82 S 1.4 2693 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 17.722 1.98 35.48<br />

R364 Battoli - Kishoreganj Road Km 000.00-003.00 S 3 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 8.911 8.54 73.81<br />

Sub-total Kishoreganj Division<br />

36.717<br />

Manikganj Division<br />

R315 Mawna-Nabinagar Road Km 043.30-044.00 S 0.7 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 4.994 2.61 <strong>12</strong>.66<br />

Appendix-C: Page: 24 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R315 Mawna-Nabinagar Road Km 044.70-044.80 S 0.1 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.713 4.44 3.08<br />

R315 Mawna-Nabinagar Road Km 045.00-048.10 S 3.1 2048 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 22.118 3.66 78.64<br />

R505 Nabinagar-Kaliakoir Road Km 009.10-009.40 S 0.3 17384 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.361 8.80 63.99<br />

R505 Nabinagar-Kaliakoir Road Km 009.40-014.00 S 4.6 17384 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 84.597 8.16 720.74<br />

R506 Aricha -Daulatpur-Tangail Road Km 006.80-006.90 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.324 5.45 7.18<br />

Sub-total Manikganj Division<br />

<strong>12</strong>1.108<br />

Munshiganj Division<br />

N8 Dhaka -Patuakhali Road Km 007.40-007.80 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 13.<strong>23</strong>5 4.04 52.84<br />

N8 Dhaka -Patuakhali Road Km 016.50-016.70 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.61 26.62<br />

N8 Dhaka -Patuakhali Road Km 018.80-019.10 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.72 40.88<br />

N8 Dhaka -Patuakhali Road Km 019.90-020.10 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.38 25.26<br />

N8 Dhaka -Patuakhali Road Km 022.50-022.80 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 5.03 43.55<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 010.22-010.42 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.13 11.06<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 011.32-011.52 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.20 11.33<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 011.92-0<strong>12</strong>.82 S 0.9 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 16.194 2.46 39.21<br />

R8<strong>12</strong> Fatullah -Mawa Road Km 011.52-011.92 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 3.05 16.42<br />

R820 Zinzira-Srinagar Road Km 040.18-040.28 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 3.14 5.61<br />

R820 Zinzira-Srinagar Road Km 022.91-026.11 S 3.2 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 35.130 1.40 47.90<br />

R820 Zinzira-Srinagar Road Km 026.11-029.21 S 3.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 40.744 3.98 164.06<br />

R820 Zinzira-Srinagar Road Km 041.48-041.88 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.493 2.81 15.70<br />

R820 Zinzira-Srinagar Road Km 042.58-045.71 S 3.13 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 42.994 3.09 134.95<br />

Sub-total Munshiganj Division<br />

197.410<br />

Mymensingh Division<br />

N3 Dhaka -Mymensingh Road Km 064.80-064.90 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 6.77 19.34<br />

N3 Dhaka -Mymensingh Road Km 106.60-106.70 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 3.91 11.19<br />

N3 Dhaka -Mymensingh Road Km 067.50-067.90 S 0.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 9.220 7.83 72.25<br />

R314 Gafargaon-Mawna Road Km 000.80-001.10 S 0.3 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.160 0.82 2.52<br />

R314 Gafargaon-Mawna Road Km 0<strong>12</strong>.70-013.10 S 0.4 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 3.241 1.14 3.61<br />

R314 Gafargaon-Mawna Road Km 013.30-013.40 S 0.1 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.87 1.48<br />

R314 Gafargaon-Mawna Road Km 013.60-013.70 S 0.1 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.42 1.<strong>12</strong><br />

R314 Gafargaon-Mawna Road Km 015.10-015.30 S 0.2 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.620 2.03 3.20<br />

R314 Gafargaon-Mawna Road Km 015.50-015.60 S 0.1 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.69 1.33<br />

R314 Gafargaon-Mawna Road Km 017.10-017.20 S 0.1 1346 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.810 1.88 1.49<br />

R371 Sherpur-Nakla-Mymensingh Km 018.10-018.30 S 0.2 4540 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.37 8.94<br />

R371 Sherpur-Nakla-Mymensingh Km 022.90-0<strong>23</strong>.00 S 0.1 4540 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.75 5.19<br />

R371 Sherpur-Nakla-Mymensingh Km 032.40-032.60 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.943 2.85 8.49<br />

Sub-total Mymensingh Division<br />

35.151<br />

Appendix-C: Page: 25 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Narayanganj Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 005.40-005.60 R 0.2 8665 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.987 3.28 19.25<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 006.10-006.70 R 0.6 8665 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.962 2.91 51.14<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 009.00-009.20 L 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.761 4.65 26.22<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 034.88-035.18 L 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.642 3.88 32.87<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 000.70-000.90 R 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.360 8.01 32.79<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.00-001.10 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.180 8.41 17.21<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.20-001.30 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.22 18.<strong>12</strong><br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 002.50-002.80 R 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.84 51.49<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 002.80-003.60 R 0.8 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.865 5.66 113.71<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 003.60-003.70 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.79 17.05<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 009.00-009.20 R 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.761 5.21 29.38<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 0<strong>12</strong>.40-0<strong>12</strong>.60 R 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.851 4.49 30.15<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 016.50-016.60 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.881 5.97 16.84<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 016.90-017.10 R 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.89 33.67<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 017.10-017.70 R 0.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.517 5.69 97.65<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 017.70-017.80 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.89 16.84<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 018.48-018.58 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.89 16.84<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 018.78-018.98 R 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.89 33.67<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 018.98-019.68 R 0.7 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.437 5.80 116.06<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 019.68-020.08 R 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.678 5.89 67.35<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 020.18-020.78 R 0.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.343 5.02 100.04<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 020.88-020.98 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 2.59 13.73<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 021.78-021.88 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.89 16.84<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.18-024.28 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.87 16.77<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.28-024.38 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.62 16.06<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.38-024.47 R 0.09 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.744 5.87 15.77<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 025.88-026.08 R 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.761 5.79 32.67<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 036.08-036.28 R 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 3.95 22.01<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 037.78-037.88 R 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.06 14.07<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 024.47-024.48 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.311 2.11 0.64<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 000.90-001.00 R 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.721 9.56 16.09<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.10-001.20 R 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.721 9.11 15.32<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 001.30-002.50 R 1.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 24.709 7.41 179.24<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 009.30-009.40 R 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.274 6.78 15.43<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 016.60-016.90 R 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.878 7.05 48.49<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 017.80-018.48 R 0.68 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 15.582 6.71 104.58<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 020.08-020.18 R 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 6.88 15.87<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 021.88-024.18 R 2.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 53.015 6.74 357.64<br />

N1 Dhaka-Comilla-Chittagong-Teknaf Roa Km 034.88-035.18 R 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.8<strong>23</strong> 4.92 33.55<br />

R111 Signboard -Narayanganj Road Km 003.20-006.60 S 3.4 15970 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 60.027 4.72 285.74<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-C: Page: 26 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R113 Madanpur-Sayedpur Road Km 002.00-002.30 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.<strong>12</strong>0 5.60 <strong>23</strong>.16<br />

R114 Nayapur-Raipura Road Km 003.70-004.00 S 0.3 4082 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.795 1.52 3.92<br />

R202 Bhulta-Rampura Road Km 000.90-001.00 S 0.1 6255 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 0.71 1.52<br />

R202 Bhulta-Rampura Road Km 001.30-001.50 S 0.2 6255 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 0.72 3.07<br />

R202 Bhulta-Rampura Road Km 003.80-003.90 S 0.1 6255 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.290 0.72 1.54<br />

R202 Bhulta-Rampura Road Km 004.00-004.40 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.83 25.25<br />

R202 Bhulta-Rampura Road Km 004.70-005.10 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.160 2.83 25.22<br />

R202 Bhulta-Rampura Road Km 005.70-005.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 2.59 11.52<br />

R202 Bhulta-Rampura Road Km 007.00-007.20 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.580 2.42 10.77<br />

Sub-total Narayanganj Division<br />

431.944<br />

Narsingdi Division<br />

N2 Dhaka-Sylhet-Jaflong Road Km 017.60-017.70 S 0.1 17174 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 10.36 <strong>23</strong>.81<br />

R114 Nayapur-Raipura Road Km 026.00-026.10 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.158 3.22 3.59<br />

R114 Nayapur-Raipura Road Km 026.20-026.30 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.158 3.22 3.59<br />

R2<strong>12</strong> Akdaria -Agarpur Road Km 000.20-001.30 S 1.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.793 3.09 60.04<br />

R301 Tongi-Pachdona Road Km 026.81-029.83 S 3.02 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 57.285 2.21 <strong>12</strong>2.97<br />

R301 Tongi-Pachdona Road Km 029.93-030.63 S 0.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.351 2.40 31.<strong>12</strong><br />

R301 Tongi-Pachdona Road Km 030.73-031.03 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.085 2.44 14.48<br />

R301 Tongi-Pachdona Road Km 031.13-031.33 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 2.84 11.25<br />

Sub-total Narsingdi Division<br />

105.192<br />

Sherpur Division<br />

R371 Sherpur-Nakla-Mymensingh Km 055.16-055.36 S 0.2 3786 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.762 3.29 9.15<br />

R371 Sherpur-Nakla-Mymensingh Km 035.60-035.90 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.414 4.80 21.49<br />

Sub-total Sherpur Division<br />

7.176<br />

Tangail Division<br />

N4 Joydebpur-Jamalpur Road Km 107.46-108.46 S 1 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 17.441 1.61 26.81<br />

N4 Joydebpur-Jamalpur Road Km 108.56-108.66 S 0.1 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 1.744 2.19 3.64<br />

N4 Joydebpur-Jamalpur Road Km 109.16-109.66 S 0.5 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 8.721 1.85 15.42<br />

N4 Joydebpur-Jamalpur Road Km 110.26-110.56 S 0.3 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 5.<strong>23</strong>2 2.00 10.00<br />

N4 Joydebpur-Jamalpur Road Km 113.86-114.46 S 0.6 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 10.465 1.77 17.74<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>0.51-<strong>12</strong>0.61 S 0.1 3779 National Full Recon 140mm @ IRI <strong>12</strong> 2013 1.744 2.74 4.56<br />

N4 Joydebpur-Jamalpur Road Km 097.39-098.19 S 0.8 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.962 2.85 49.41<br />

N4 Joydebpur-Jamalpur Road Km 098.29-099.09 S 0.8 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.962 2.82 48.97<br />

N4 Joydebpur-Jamalpur Road Km 100.59-100.89 S 0.3 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.287 3.46 20.55<br />

N4 Joydebpur-Jamalpur Road Km 102.59-102.79 S 0.2 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.191 3.85 15.25<br />

N4 Joydebpur-Jamalpur Road Km 103.49-103.59 S 0.1 6524 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.096 3.86 7.65<br />

N4 Joydebpur-Jamalpur Road Km 068.65-069.05 S 0.4 16332 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.678 8.13 96.20<br />

Appendix-C: Page: 27 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N4 Joydebpur-Jamalpur Road Km 069.05-069.25 S 0.2 16332 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 7.94 47.00<br />

N4 Joydebpur-Jamalpur Road Km 069.25-069.75 S 0.5 16332 National Full Recon 195mm @ IRI <strong>12</strong> 2013 14.598 8.13 <strong>12</strong>0.25<br />

N4 Joydebpur-Jamalpur Road Km 075.15-075.45 S 0.3 151<strong>12</strong> National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.657 7.87 49.16<br />

N4 Joydebpur-Jamalpur Road Km 081.75-082.35 S 0.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.424 5.68 96.94<br />

N4 Joydebpur-Jamalpur Road Km 082.35-082.75 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.522 5.34 60.22<br />

N4 Joydebpur-Jamalpur Road Km 090.79-091.09 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.846 3.<strong>12</strong> 38.96<br />

N4 Joydebpur-Jamalpur Road Km 091.29-091.39 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.282 2.58 10.74<br />

N4 Joydebpur-Jamalpur Road Km 091.49-091.59 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.282 3.11 <strong>12</strong>.96<br />

N4 Joydebpur-Jamalpur Road Km 104.99-105.09 S 0.1 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 1.411 1.94 2.73<br />

N4 Joydebpur-Jamalpur Road Km 109.66-110.26 S 0.6 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 7.761 3.27 25.15<br />

N4 Joydebpur-Jamalpur Road Km 110.76-113.86 S 3.1 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 40.097 2.99 118.99<br />

N4 Joydebpur-Jamalpur Road Km 119.51-<strong>12</strong>0.41 S 0.9 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 11.641 1.99 <strong>23</strong>.00<br />

N4 Joydebpur-Jamalpur Road Km <strong>12</strong>2.01-<strong>12</strong>2.71 S 0.7 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 9.054 2.08 18.66<br />

N4 Joydebpur-Jamalpur Road Km 1<strong>23</strong>.71-<strong>12</strong>5.61 S 1.9 3779 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 24.575 2.96 72.10<br />

N4 Joydebpur-Jamalpur Road Km 036.49-036.59 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 7.15 16.49<br />

N4 Joydebpur-Jamalpur Road Km 057.82-057.92 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.86 11.20<br />

N4 Joydebpur-Jamalpur Road Km 059.72-059.82 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.34 10.00<br />

N4 Joydebpur-Jamalpur Road Km 069.75-072.65 S 2.9 15188 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 57.754 7.88 462.78<br />

N4 Joydebpur-Jamalpur Road Km 072.65-072.85 S 0.2 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.504 9.44 32.62<br />

N4 Joydebpur-Jamalpur Road Km 073.15-073.55 S 0.4 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 7.007 8.83 61.04<br />

N4 Joydebpur-Jamalpur Road Km 073.55-074.15 S 0.6 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.511 10.43 108.22<br />

N4 Joydebpur-Jamalpur Road Km 074.15-074.35 S 0.2 151<strong>12</strong> National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.504 9.41 32.54<br />

N4 Joydebpur-Jamalpur Road Km 078.75-079.85 S 1.1 11497 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 25.355 4.14 106.36<br />

N4 Joydebpur-Jamalpur Road Km 080.95-081.75 S 0.8 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.440 5.72 105.58<br />

N401 Madhupur-Mymensingh Road Km 000.60-000.80 S 0.2 3417 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.222 1.70 5.48<br />

R506 Aricha -Daulatpur-Tangail Road Km 047.81-053.28 S 5.47 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 80.210 3.41 286.02<br />

493.931<br />

<strong>23</strong>06.678<br />

Sub-total Tangail Division<br />

Total Dhaka Zone<br />

Gopalganj Zone<br />

Faridpur Division<br />

N7 Dauladia-Mongla Road Km 044.20-044.30 S 0.1 5397 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.388 3.44 8.33<br />

N7 Dauladia-Mongla Road Km 045.00-045.10 S 0.1 5397 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.388 3.44 8.33<br />

N7 Dauladia-Mongla Road Km 055.42-055.72 S 0.3 7248 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.195 3.73 29.84<br />

N7 Dauladia-Mongla Road Km 060.22-060.42 S 0.2 7248 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.463 3.45 18.39<br />

N7 Dauladia-Mongla Road Km 061.02-061.<strong>12</strong> S 0.1 7248 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 2.47 6.57<br />

N7 Dauladia-Mongla Road Km 034.80-035.30 S 0.5 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 14.208 5.61 78.04<br />

N7 Dauladia-Mongla Road Km 036.20-036.30 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.06 14.08<br />

N7 Dauladia-Mongla Road Km 041.00-041.20 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.58 31.07<br />

N7 Dauladia-Mongla Road Km 041.50-041.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.65 15.71<br />

Appendix-C: Page: 28 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N7 Dauladia-Mongla Road Km 055.30-055.40 S 0.1 7248 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.134 3.85 8.19<br />

N803 Faridpur Town Old section Km 000.10-000.20 S 0.1 24928 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.924 2.29 10.58<br />

N803 Faridpur Town Old section Km 000.70-000.80 S 0.1 24928 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.788 1.98 8.89<br />

N803 Faridpur Town Old section Km 002.20-002.30 S 0.1 24928 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.309 3.42 10.92<br />

N803 Faridpur Town Old section Km 004.60-005.40 S 0.8 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 18.872 6.88 1<strong>23</strong>.86<br />

N803 Faridpur Town Old section Km 005.50-005.90 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.109 5.98 51.98<br />

N803 Faridpur Town Old section Km 006.10-006.20 S 0.1 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 3.77 5.81<br />

N803 Faridpur Town Old section Km 001.50-002.10 S 0.6 24928 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.993 6.35 115.21<br />

N803 Faridpur Town Old section Km 002.60-003.10 S 0.5 24928 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.955 7.34 86.13<br />

N804 Bhanga-Faridpur Road Km 027.70-028.00 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.957 5.03 44.09<br />

N804 Bhanga-Faridpur Road Km 028.90-029.30 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.356 2.06 47.02<br />

N804 Bhanga-Faridpur Road Km 030.00-030.20 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.73 31.90<br />

N804 Bhanga-Faridpur Road Km 030.80-031.10 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.56 46.41<br />

N804 Bhanga-Faridpur Road Km 031.20-031.30 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 2.25 10.33<br />

N804 Bhanga-Faridpur Road Km 031.50-032.05 S 0.55 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 17.681 3.20 56.35<br />

Sub-total Faridpur Division<br />

191.246<br />

Gopalganj Division<br />

N805 Bhanga-Mollahhat Road Km 010.90-011.20 S 0.3 2650 National Full Recon 135mm @ IRI <strong>12</strong> 2013 6.505 1.29 8.35<br />

N805 Bhanga-Mollahhat Road Km 000.00-000.10 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.67 15.94<br />

N805 Bhanga-Mollahhat Road Km 000.70-000.90 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.66 31.81<br />

N805 Bhanga-Mollahhat Road Km 004.00-004.10 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.65 15.89<br />

N805 Bhanga-Mollahhat Road Km 004.90-005.00 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.66 15.90<br />

N805 Bhanga-Mollahhat Road Km 006.60-007.00 S 0.4 2650 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.720 1.19 8.07<br />

N806 Bhatiapara-Kalna Road Km 000.00-000.10 S 0.1 2860 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.58 2.59<br />

N806 Bhatiapara-Kalna Road Km 000.20-001.20 S 1 2860 National Full Recon 135mm @ IRI <strong>12</strong> 2013 10.990 1.66 16.69<br />

N806 Bhatiapara-Kalna Road Km 002.70-002.80 S 0.1 2860 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.099 2.59 2.60<br />

R850 Tekerhat-Mollahhat Road Km 000.00-000.50 S 0.5 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.693 0.95 9.65<br />

R850 Tekerhat-Mollahhat Road Km 002.30-002.50 S 0.2 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.291 1.30 4.10<br />

R850 Tekerhat-Mollahhat Road Km 003.40-003.50 S 0.1 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.38 2.16<br />

R850 Tekerhat-Mollahhat Road Km 006.20-006.60 S 0.4 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 1.<strong>23</strong> 7.66<br />

R850 Tekerhat-Mollahhat Road Km 007.50-007.60 S 0.1 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.73 2.71<br />

R850 Tekerhat-Mollahhat Road Km 008.80-008.90 S 0.1 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.73 2.71<br />

R850 Tekerhat-Mollahhat Road Km 009.80-009.90 S 0.1 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.40 2.20<br />

R850 Tekerhat-Mollahhat Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.1 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.36 2.13<br />

R850 Tekerhat-Mollahhat Road Km 013.00-013.40 S 0.4 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 0.88 5.52<br />

R850 Tekerhat-Mollahhat Road Km 018.70-018.80 S 0.1 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.39 2.17<br />

R850 Tekerhat-Mollahhat Road Km 018.90-019.00 S 0.1 <strong>23</strong>43 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.699 2.31 3.75<br />

R850 Tekerhat-Mollahhat Road Km 019.00-019.10 S 0.1 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.568 1.58 2.37<br />

R850 Tekerhat-Mollahhat Road Km 021.30-021.40 S 0.1 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.86 2.90<br />

R850 Tekerhat-Mollahhat Road Km 021.90-022.00 S 0.1 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.87 2.92<br />

Appendix-C: Page: 29 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R850 Tekerhat-Mollahhat Road Km 025.70-025.90 S 0.2 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.25 3.92<br />

R850 Tekerhat-Mollahhat Road Km 026.00-026.10 S 0.1 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 1.73 2.71<br />

R850 Tekerhat-Mollahhat Road Km 027.70-028.10 S 0.4 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.535 1.38 8.60<br />

R850 Tekerhat-Mollahhat Road Km 032.50-032.70 S 0.2 3497 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.37 4.27<br />

R850 Tekerhat-Mollahhat Road Km 010.10-010.20 S 0.1 <strong>23</strong>43 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.266 2.68 3.38<br />

R850 Tekerhat-Mollahhat Road Km 010.60-010.70 S 0.1 <strong>23</strong>43 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.266 2.49 3.14<br />

R850 Tekerhat-Mollahhat Road Km 034.00-034.20 S 0.2 3497 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 2.50 6.30<br />

R850 Tekerhat-Mollahhat Road Km 034.50-035.00 S 0.5 3497 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 6.329 1.86 11.74<br />

Sub-total Gopalganj Division<br />

110.108<br />

Madaripur Division<br />

N8 Dhaka -Patuakhali Road Km 045.57-045.58 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.521 3.68 1.89<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.28-016.38 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.188 2.22 2.56<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.48-016.50 S 0.02 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.190 3.54 0.65<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 000.10-000.20 S 0.1 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.13 3.66<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 002.70-002.90 S 0.2 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.16 7.46<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 003.90-004.60 S 0.7 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 1.56 18.87<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 005.00-005.30 S 0.3 5672 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.07 10.71<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 006.20-006.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.944 2.02 5.86<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 007.70-008.30 S 0.6 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 11.660 2.52 28.61<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 007.10-007.50 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.375 2.67 17.20<br />

Sub-total Madaripur Division<br />

46.270<br />

Rajbari Division<br />

N7 Dauladia-Mongla Road Km 000.10-000.20 S 0.1 7649 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.742 2.14 7.85<br />

R710 Ahaladipur-Kushtia Road Km 021.31-021.61 S 0.3 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.079 1.75 8.51<br />

R710 Ahaladipur-Kushtia Road Km 024.71-024.81 S 0.1 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.693 1.97 3.20<br />

R710 Ahaladipur-Kushtia Road Km 024.91-025.11 S 0.2 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 1.96 6.35<br />

R710 Ahaladipur-Kushtia Road Km 025.91-026.11 S 0.2 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 2.14 6.92<br />

R710 Ahaladipur-Kushtia Road Km 026.71-026.81 S 0.1 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.693 2.36 3.82<br />

R710 Ahaladipur-Kushtia Road Km 029.51-029.71 S 0.2 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 2.78 9.00<br />

R710 Ahaladipur-Kushtia Road Km 029.91-030.21 S 0.3 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 5.079 1.62 7.89<br />

R710 Ahaladipur-Kushtia Road Km 031.81-032.01 S 0.2 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.386 2.60 8.42<br />

R710 Ahaladipur-Kushtia Road Km 036.01-036.21 S 0.2 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.99 6.36<br />

R710 Ahaladipur-Kushtia Road Km 038.21-038.31 S 0.1 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.49 3.84<br />

R710 Ahaladipur-Kushtia Road Km 038.41-038.51 S 0.1 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.49 3.84<br />

R710 Ahaladipur-Kushtia Road Km 039.31-039.41 S 0.1 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.53 3.90<br />

R710 Ahaladipur-Kushtia Road Km 039.91-040.01 S 0.1 3636 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.574 2.53 3.90<br />

R710 Ahaladipur-Kushtia Road Km 005.60-005.80 S 0.2 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.730 2.40 8.53<br />

R710 Ahaladipur-Kushtia Road Km 007.20-007.40 S 0.2 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.860 2.52 9.24<br />

Appendix-C: Page: 30 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R710 Ahaladipur-Kushtia Road Km 009.40-009.60 S 0.2 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 2.43 9.45<br />

R710 Ahaladipur-Kushtia Road Km 009.70-009.90 S 0.2 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 1.93 7.48<br />

R710 Ahaladipur-Kushtia Road Km 009.91-010.81 S 0.9 6<strong>23</strong>8 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 22.730 1.72 37.49<br />

R710 Ahaladipur-Kushtia Road Km 013.71-013.91 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.860 2.40 9.06<br />

R710 Ahaladipur-Kushtia Road Km 044.71-044.75 S 0.03 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.555 4.58 2.46<br />

R710 Ahaladipur-Kushtia Road Km 044.85-044.95 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.734 2.49 4.17<br />

R710 Ahaladipur-Kushtia Road Km 035.01-035.21 S 0.2 3636 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 2.50 6.33<br />

R710 Ahaladipur-Kushtia Road Km 036.91-037.11 S 0.2 3636 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 2.47 6.25<br />

R710 Ahaladipur-Kushtia Road Km 041.91-042.11 S 0.2 3636 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.440 2.05 5.01<br />

R710 Ahaladipur-Kushtia Road Km 008.30-008.50 S 0.2 6<strong>23</strong>8 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.041 1.97 5.98<br />

R7<strong>12</strong> Tottipur -Machpara Link Road Km 000.00-002.22 S 2.22 1160 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 22.002 0.87 18.10<br />

Sub-total Rajbari Division<br />

117.524<br />

Sariatpur Division<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 017.88-018.98 S 1.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.793 3.25 62.79<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 019.18-019.88 S 0.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 3.28 40.28<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 016.50-017.88 S 1.38 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 15.544 1.72 27.02<br />

R860 Mostafapur-Ch<strong>and</strong>pur Road Km 018.98-019.18 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.78 10.37<br />

R861 Monohar -Shariatpur Road Km 006.37-006.40 S 0.03 3750 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.506 3.19 1.52<br />

R861 Monohar -Shariatpur Road Km 006.80-006.90 S 0.1 3750 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.650 1.77 2.75<br />

R861 Monohar -Shariatpur Road Km 000.00-000.10 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.865 1.78 3.<strong>12</strong><br />

R861 Monohar -Shariatpur Road Km 001.10-001.30 S 0.2 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.50 5.05<br />

R861 Monohar -Shariatpur Road Km 001.40-001.50 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.24 3.77<br />

R861 Monohar -Shariatpur Road Km 001.70-001.80 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.31 3.89<br />

R861 Monohar -Shariatpur Road Km 002.50-002.60 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.94 3.27<br />

R861 Monohar -Shariatpur Road Km 002.80-002.90 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.822 1.90 3.<strong>23</strong><br />

R861 Monohar -Shariatpur Road Km 003.60-003.70 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.19 3.69<br />

R861 Monohar -Shariatpur Road Km 004.00-004.10 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.21 3.73<br />

R861 Monohar -Shariatpur Road Km 004.30-004.40 S 0.1 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.21 3.73<br />

R861 Monohar -Shariatpur Road Km 006.20-006.37 S 0.17 4885 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.041 1.90 5.40<br />

R861 Monohar -Shariatpur Road Km 000.60-001.00 S 0.4 4885 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 1.74 9.21<br />

R861 Monohar -Shariatpur Road Km 004.50-005.00 S 0.5 4885 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.461 3.14 19.88<br />

R861 Monohar -Shariatpur Road Km 005.20-005.80 S 0.6 4885 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 7.062 1.58 10.90<br />

Sub-total Sariatpur Division<br />

Total Gopalganj Zone<br />

Khulna Zone<br />

92.826<br />

557.975<br />

Bagerhat Division<br />

N7 Dauladia-Mongla Road Km 224.46-224.56 S 0.1 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.515 4.87 11.96<br />

Appendix-C: Page: 31 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R772 Bagerhat Town Section Km 000.00-000.20 S 0.2 5300 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 4.776 1.06 4.75<br />

R772 Bagerhat Town Section Km 000.60-000.63 S 0.03 5300 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 0.716 1.06 0.71<br />

Sub-total Bagerhat Division<br />

8.008<br />

Chuadanga Division<br />

R745 Kushtia -Jhenaidah Road Km 075.38-075.58 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.801 3.39 <strong>12</strong>.72<br />

R745 Kushtia -Jhenaidah Road Km 076.18-076.48 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.634 3.08 16.83<br />

R745 Kushtia -Jhenaidah Road Km 077.18-077.48 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.016 2.97 17.64<br />

R745 Kushtia -Jhenaidah Road Km 077.78-077.98 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 1.98 11.07<br />

R745 Kushtia -Jhenaidah Road Km 078.58-079.46 S 0.88 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 24.904 1.81 44.36<br />

R745 Kushtia -Jhenaidah Road Km 079.56-079.76 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 1.84 10.31<br />

R745 Kushtia -Jhenaidah Road Km 079.86-081.36 S 1.5 5210 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 36.755 1.83 64.17<br />

R745 Kushtia -Jhenaidah Road Km 081.96-082.06 S 0.1 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.80 6.41<br />

R745 Kushtia -Jhenaidah Road Km 082.56-082.76 S 0.2 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.86 13.01<br />

R745 Kushtia -Jhenaidah Road Km 083.66-083.86 S 0.2 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.39 11.43<br />

R745 Kushtia -Jhenaidah Road Km 084.06-084.36 S 0.3 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.77 19.05<br />

R745 Kushtia -Jhenaidah Road Km 084.46-084.56 S 0.1 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 4.20 7.07<br />

R745 Kushtia -Jhenaidah Road Km 088.06-088.56 S 0.5 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.440 3.50 27.60<br />

R745 Kushtia -Jhenaidah Road Km 090.26-090.36 S 0.1 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.636 4.45 6.78<br />

R745 Kushtia -Jhenaidah Road Km 091.76-091.96 S 0.2 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.272 3.59 10.93<br />

R745 Kushtia -Jhenaidah Road Km 092.46-092.86 S 0.4 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 6.543 3.78 <strong>23</strong>.00<br />

R745 Kushtia -Jhenaidah Road Km 096.46-096.56 S 0.1 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.636 4.44 6.76<br />

R745 Kushtia -Jhenaidah Road Km 096.66-097.26 S 0.6 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 3.01 30.47<br />

R745 Kushtia -Jhenaidah Road Km 073.98-075.08 S 1.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 15.051 2.66 39.78<br />

R745 Kushtia -Jhenaidah Road Km 081.76-081.86 S 0.1 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 6.11 8.10<br />

R745 Kushtia -Jhenaidah Road Km 085.56-085.66 S 0.1 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.73 4.95<br />

R745 Kushtia -Jhenaidah Road Km 093.66-093.86 S 0.2 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.452 4.02 9.59<br />

R745 Kushtia -Jhenaidah Road Km 095.16-095.46 S 0.3 5536 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 3.678 3.83 13.73<br />

R747 Kushtia -Chuadanga Road Km 019.50-019.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.35 6.42<br />

R747 Kushtia -Chuadanga Road Km 0<strong>23</strong>.80-024.20 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 3.13 <strong>23</strong>.96<br />

R747 Kushtia -Chuadanga Road Km 024.60-024.80 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.24 <strong>12</strong>.42<br />

R747 Kushtia -Chuadanga Road Km 025.34-025.64 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.889 3.19 18.36<br />

R747 Kushtia -Chuadanga Road Km 030.64-030.74 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.37 6.45<br />

R747 Kushtia -Chuadanga Road Km 031.94-032.34 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.63 20.17<br />

R747 Kushtia -Chuadanga Road Km 032.54-032.64 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.37 6.45<br />

R747 Kushtia -Chuadanga Road Km 032.94-033.04 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.37 6.45<br />

R747 Kushtia -Chuadanga Road Km 033.44-033.54 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.71 7.11<br />

R747 Kushtia -Chuadanga Road Km 033.94-034.04 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.71 7.11<br />

R747 Kushtia -Chuadanga Road Km 034.44-034.54 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.71 7.10<br />

R747 Kushtia -Chuadanga Road Km 035.94-036.14 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 3.56 13.66<br />

R747 Kushtia -Chuadanga Road Km 036.44-036.64 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.47 9.45<br />

Appendix-C: Page: 32 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R747 Kushtia -Chuadanga Road Km 037.44-037.54 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.41 6.53<br />

R747 Kushtia -Chuadanga Road Km 041.84-041.94 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.42 6.56<br />

R747 Kushtia -Chuadanga Road Km 024.90-025.30 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.885 2.91 17.28<br />

Sub-total Chuadanga Division<br />

217.811<br />

Jessore Division<br />

N7 Dauladia-Mongla Road Km 139.32-139.42 S 0.1 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.100 4.21 8.84<br />

N7 Dauladia-Mongla Road Km 139.52-139.82 S 0.3 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 6.478 4.04 25.85<br />

N7 Dauladia-Mongla Road Km 140.92-141.02 S 0.1 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.388 3.56 8.43<br />

N7 Dauladia-Mongla Road Km 141.42-141.52 S 0.1 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.159 3.96 8.45<br />

N7 Dauladia-Mongla Road Km 141.92-142.<strong>12</strong> S 0.2 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 4.318 3.70 15.80<br />

N7 Dauladia-Mongla Road Km 142.82-143.<strong>12</strong> S 0.3 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 4.47 <strong>23</strong>.43<br />

N7 Dauladia-Mongla Road Km 143.22-143.42 S 0.2 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 4.60 16.09<br />

N7 Dauladia-Mongla Road Km 143.52-143.72 S 0.2 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 3.775 3.69 13.91<br />

N7 Dauladia-Mongla Road Km 143.82-144.02 S 0.2 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 4.057 3.80 15.39<br />

N7 Dauladia-Mongla Road Km 144.72-144.82 S 0.1 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 1.835 5.<strong>23</strong> 9.34<br />

N7 Dauladia-Mongla Road Km 150.22-150.32 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.871 5.20 9.19<br />

N7 Dauladia-Mongla Road Km 150.72-150.82 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.871 3.98 7.03<br />

N7 Dauladia-Mongla Road Km 153.06-153.46 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.484 4.14 29.26<br />

N7 Dauladia-Mongla Road Km 153.56-153.66 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.871 4.79 8.47<br />

N7 Dauladia-Mongla Road Km 153.96-154.36 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.484 3.25 22.95<br />

N7 Dauladia-Mongla Road Km 154.46-154.96 S 0.5 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 9.355 3.54 31.32<br />

N7 Dauladia-Mongla Road Km 188.19-188.29 S 0.1 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.507 4.57 11.33<br />

N7 Dauladia-Mongla Road Km 144.82-145.42 S 0.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 13.176 7.68 95.03<br />

N7 Dauladia-Mongla Road Km 145.52-145.82 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.773 7.68 49.05<br />

N7 Dauladia-Mongla Road Km 146.42-146.62 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.79 34.89<br />

N7 Dauladia-Mongla Road Km 148.02-148.<strong>12</strong> S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.07 18.17<br />

N7 Dauladia-Mongla Road Km 148.<strong>12</strong>-148.42 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.54 50.45<br />

N7 Dauladia-Mongla Road Km 148.42-148.62 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.61 34.01<br />

N7 Dauladia-Mongla Road Km 148.72-148.82 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 7.07 18.17<br />

N7 Dauladia-Mongla Road Km 139.42-139.52 S 0.1 5636 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.618 4.28 7.18<br />

N7 Dauladia-Mongla Road Km 145.82-146.42 S 0.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.451 7.94 88.06<br />

N7 Dauladia-Mongla Road Km 146.62-148.02 S 1.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 28.828 7.37 214.19<br />

N7 Dauladia-Mongla Road Km 148.82-150.22 S 1.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 25.213 7.69 186.48<br />

N706 Jessore -Benapole Road Km 024.10-024.40 S 0.3 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.858 3.16 24.14<br />

N706 Jessore -Benapole Road Km 024.70-024.80 S 0.1 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 3.<strong>23</strong> 8.21<br />

N706 Jessore -Benapole Road Km 025.30-025.40 S 0.1 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 3.<strong>23</strong> 8.21<br />

N706 Jessore -Benapole Road Km 026.40-029.40 S 3 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 84.646 2.88 <strong>23</strong>7.06<br />

N706 Jessore -Benapole Road Km 030.10-030.20 S 0.1 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.844 2.69 7.43<br />

N706 Jessore -Benapole Road Km 030.40-032.10 S 1.7 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 48.348 2.43 114.<strong>23</strong><br />

N706 Jessore -Benapole Road Km 032.90-036.63 S 3.73 7314 National Full Recon 180mm @ IRI <strong>12</strong> 2013 106.335 2.72 280.77<br />

Appendix-C: Page: 33 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N706 Jessore -Benapole Road Km 024.80-025.30 S 0.5 7314 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 10.<strong>23</strong>0 3.56 36.06<br />

N706 Jessore -Benapole Road Km 025.40-026.40 S 1 7314 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 20.459 3.43 69.47<br />

N707 Jessore Town Old Section Km 000.10-001.10 S 1 9500 National Full Recon 180mm @ IRI <strong>12</strong> 2013 <strong>23</strong>.<strong>23</strong>8 4.37 98.27<br />

N707 Jessore Town Old Section Km 001.20-001.40 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 4.827 7.42 34.21<br />

N707 Jessore Town Old Section Km 001.50-001.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.413 7.74 17.84<br />

N707 Jessore Town Old Section Km 003.40-003.50 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.608 6.64 17.02<br />

N707 Jessore Town Old Section Km 004.30-004.60 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.824 6.00 46.15<br />

N707 Jessore Town Old Section Km 004.70-005.70 S 1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 26.081 6.14 157.53<br />

N707 Jessore Town Old Section Km 005.90-006.10 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.65 34.11<br />

N707 Jessore Town Old Section Km 001.10-001.20 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.905 8.52 15.73<br />

N708 Jessore Town Old Section Km 002.70-002.90 L 0.2 3249 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.455 0.71 3.13<br />

N708 Jessore Town Old Section Km 002.70-002.90 R 0.2 3249 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.455 0.66 2.90<br />

N708 Jessore Town Old Section Km 001.90-002.10 L 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.43 25.58<br />

N708 Jessore Town Old Section Km 000.20-001.10 S 0.9 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 25.575 5.81 146.79<br />

N708 Jessore Town Old Section Km 001.30-001.40 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.65 15.88<br />

N708 Jessore Town Old Section Km 001.60-001.70 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.931 5.05 14.63<br />

N708 Jessore Town Old Section Km 001.80-001.87 S 0.07 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.363 3.20 10.49<br />

N708 Jessore Town Old Section Km 003.00-003.29 L 0.29 3249 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.006 1.14 5.71<br />

N708 Jessore Town Old Section Km 003.00-003.29 R 0.29 3249 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.006 1.64 8.22<br />

N708 Jessore Town Old Section Km 001.90-002.10 R 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 5.97 27.88<br />

N708 Jessore Town Old Section Km 001.10-001.30 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.487 4.38 19.89<br />

N711 Benapole Town Old Section Km 000.00-001.28 S 1.28 4485 National Full Recon 150mm @ IRI <strong>12</strong> 2013 37.688 0.61 22.32<br />

R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.90-013.00 S 0.1 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.<strong>12</strong> 3.31<br />

R755 Jessore -Chuknagar Road Km 013.30-013.50 S 0.2 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.84 5.76<br />

R755 Jessore -Chuknagar Road Km 014.10-014.30 S 0.2 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.73 5.42<br />

R755 Jessore -Chuknagar Road Km 016.30-016.40 S 0.1 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.44 3.82<br />

R755 Jessore -Chuknagar Road Km 016.80-017.00 S 0.2 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 2.08 6.50<br />

R755 Jessore -Chuknagar Road Km 020.80-020.90 S 0.1 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.05 3.20<br />

R755 Jessore -Chuknagar Road Km 021.70-021.90 S 0.2 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 2.18 6.80<br />

R755 Jessore -Chuknagar Road Km 022.00-022.10 S 0.1 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.41 3.77<br />

R755 Jessore -Chuknagar Road Km 0<strong>23</strong>.10-0<strong>23</strong>.20 S 0.1 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 2.18 3.41<br />

R755 Jessore -Chuknagar Road Km 025.70-026.40 S 0.7 3292 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 11.436 1.91 20.85<br />

R755 Jessore -Chuknagar Road Km 000.40-000.60 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.43 8.56<br />

R755 Jessore -Chuknagar Road Km 001.20-001.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.17 5.59<br />

R755 Jessore -Chuknagar Road Km 003.20-003.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.00 5.28<br />

R755 Jessore -Chuknagar Road Km 003.60-003.70 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.59 4.56<br />

R755 Jessore -Chuknagar Road Km 003.80-003.90 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.00 5.29<br />

R755 Jessore -Chuknagar Road Km 005.40-005.50 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.74<br />

R755 Jessore -Chuknagar Road Km 006.30-006.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.74<br />

R755 Jessore -Chuknagar Road Km 007.20-007.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.74<br />

R755 Jessore -Chuknagar Road Km 011.60-011.80 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.34 11.77<br />

Appendix-C: Page: 34 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.10-0<strong>12</strong>.50 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 3.26 <strong>23</strong>.03<br />

R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.70-0<strong>12</strong>.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.61 6.36<br />

R755 Jessore -Chuknagar Road Km 026.80-026.90 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.77 4.89<br />

R755 Jessore -Chuknagar Road Km 027.33-027.53 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.00 10.59<br />

R755 Jessore -Chuknagar Road Km 028.13-028.<strong>23</strong> S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.48 6.13<br />

R755 Jessore -Chuknagar Road Km 030.13-030.<strong>23</strong> S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.57 6.29<br />

R755 Jessore -Chuknagar Road Km 030.53-030.63 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.55 6.26<br />

R755 Jessore -Chuknagar Road Km 030.73-030.83 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.56 6.28<br />

R755 Jessore -Chuknagar Road Km 032.33-032.43 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.48 6.13<br />

R755 Jessore -Chuknagar Road Km 033.<strong>23</strong>-033.33 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.44 6.06<br />

R755 Jessore -Chuknagar Road Km 034.13-034.<strong>23</strong> S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.48 6.13<br />

R755 Jessore -Chuknagar Road Km 014.40-015.20 S 0.8 3292 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 10.<strong>12</strong>7 1.64 16.48<br />

R755 Jessore -Chuknagar Road Km 018.70-018.80 S 0.1 3292 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.266 4.07 5.<strong>12</strong><br />

R755 Jessore -Chuknagar Road Km 026.50-026.80 S 0.3 3292 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.798 3.53 13.32<br />

R755 Jessore -Chuknagar Road Km 005.50-006.30 S 0.8 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 4.07 44.<strong>12</strong><br />

R755 Jessore -Chuknagar Road Km 0<strong>12</strong>.50-0<strong>12</strong>.70 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.31 8.97<br />

R755 Jessore -Chuknagar Road Km 030.<strong>23</strong>-030.53 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.34 9.51<br />

R755 Jessore -Chuknagar Road Km 032.43-033.<strong>23</strong> S 0.8 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 2.16 <strong>23</strong>.40<br />

R765 Khulna-Satkhira Road Km 001.10-001.50 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 3.10 21.79<br />

R765 Khulna-Satkhira Road Km 007.30-007.50 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.56 <strong>12</strong>.51<br />

R765 Khulna-Satkhira Road Km 010.60-010.70 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.56 6.26<br />

R765 Khulna-Satkhira Road Km 010.90-011.20 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.<strong>23</strong> 17.00<br />

R765 Khulna-Satkhira Road Km 011.60-011.80 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.30 11.59<br />

R765 Khulna-Satkhira Road Km 0<strong>12</strong>.70-0<strong>12</strong>.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.13 10.98<br />

R765 Khulna-Satkhira Road Km 013.20-013.30 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.62 6.36<br />

R765 Khulna-Satkhira Road Km 013.70-013.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.63 6.37<br />

R765 Khulna-Satkhira Road Km 010.40-010.50 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.35 4.60<br />

Sub-total Jessore Division<br />

798.520<br />

Jhenaidah Division<br />

N7 Dauladia-Mongla Road Km <strong>12</strong>9.72-130.22 S 0.5 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 10.142 4.21 42.66<br />

N7 Dauladia-Mongla Road Km 135.52-135.92 S 0.4 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 7.590 4.63 35.09<br />

N7 Dauladia-Mongla Road Km 136.62-136.92 S 0.3 5636 National Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 4.67 26.59<br />

N7 Dauladia-Mongla Road Km 1<strong>12</strong>.62-1<strong>12</strong>.72 S 0.1 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.71 9.17<br />

N7 Dauladia-Mongla Road Km 114.<strong>12</strong>-114.42 S 0.3 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 4.18 24.41<br />

N7 Dauladia-Mongla Road Km 114.82-115.02 S 0.2 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 4.44 17.29<br />

N7 Dauladia-Mongla Road Km 116.<strong>12</strong>-116.22 S 0.1 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.170 4.66 9.81<br />

N7 Dauladia-Mongla Road Km 116.82-116.92 S 0.1 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.432 3.95 9.40<br />

N7 Dauladia-Mongla Road Km 117.22-117.32 S 0.1 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.432 3.95 9.40<br />

N7 Dauladia-Mongla Road Km 117.72-118.02 S 0.3 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.297 3.70 26.46<br />

N7 Dauladia-Mongla Road Km 119.62-119.82 S 0.2 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.640 4.<strong>12</strong> 18.68<br />

Appendix-C: Page: 35 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N7 Dauladia-Mongla Road Km <strong>12</strong>1.22-<strong>12</strong>1.32 S 0.1 6605 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.432 3.91 9.32<br />

N7 Dauladia-Mongla Road Km 104.40-104.42 S 0.01 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.341 5.94 1.98<br />

N7 Dauladia-Mongla Road Km 104.42-104.82 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 6.03 67.17<br />

N7 Dauladia-Mongla Road Km 105.32-105.52 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.621 6.10 33.58<br />

N7 Dauladia-Mongla Road Km 106.82-107.02 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.068 6.84 33.98<br />

N7 Dauladia-Mongla Road Km 107.<strong>12</strong>-107.22 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.530 7.29 18.10<br />

N7 Dauladia-Mongla Road Km 108.<strong>12</strong>-108.22 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.530 7.29 18.09<br />

N7 Dauladia-Mongla Road Km <strong>12</strong>9.42-<strong>12</strong>9.72 S 0.3 5636 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.561 4.76 22.58<br />

N7 Dauladia-Mongla Road Km 110.32-110.72 S 0.4 6605 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 7.599 3.47 26.42<br />

N7 Dauladia-Mongla Road Km 105.52-106.82 S 1.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 22.454 7.82 171.54<br />

N7 Dauladia-Mongla Road Km 107.02-107.<strong>12</strong> S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 1.998 7.18 14.37<br />

N703 Jhenaidah Town Old Section Km 003.30-003.40 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.336 7.53 16.68<br />

N703 Jhenaidah Town Old Section Km 000.10-001.90 S 1.8 4905 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 24.276 3.14 74.<strong>12</strong><br />

N703 Jhenaidah Town Old Section Km 002.30-003.30 S 1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 18.440 5.06 89.78<br />

N704 Jhenaidah-Dasuria Road Km 000.10-000.20 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.32 8.44<br />

N704 Jhenaidah-Dasuria Road Km 000.40-001.20 S 0.8 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 17.034 3.58 57.90<br />

N704 Jhenaidah-Dasuria Road Km 002.60-002.80 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.74 31.92<br />

N704 Jhenaidah-Dasuria Road Km 007.10-007.20 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.71 15.90<br />

N704 Jhenaidah-Dasuria Road Km 007.50-007.70 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.707 5.81 32.49<br />

N704 Jhenaidah-Dasuria Road Km 007.90-008.00 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.192 5.08 15.88<br />

N704 Jhenaidah-Dasuria Road Km 0<strong>12</strong>.90-013.20 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.68 47.44<br />

N704 Jhenaidah-Dasuria Road Km 020.80-020.82 S 0.02 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 0.568 5.71 3.18<br />

R745 Kushtia -Jhenaidah Road Km 099.56-099.66 S 0.1 5536 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.80 6.41<br />

R745 Kushtia -Jhenaidah Road Km 101.26-101.96 S 0.7 5303 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 3.19 38.28<br />

R745 Kushtia -Jhenaidah Road Km 103.76-103.86 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.38 5.97<br />

R745 Kushtia -Jhenaidah Road Km 104.36-104.46 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.<strong>12</strong> 5.50<br />

R745 Kushtia -Jhenaidah Road Km 105.36-105.56 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.35 8.29<br />

R745 Kushtia -Jhenaidah Road Km 107.26-107.36 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.44 6.07<br />

R745 Kushtia -Jhenaidah Road Km 110.46-110.56 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.75 4.86<br />

R745 Kushtia -Jhenaidah Road Km 110.66-110.86 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.31 11.69<br />

R745 Kushtia -Jhenaidah Road Km 1<strong>12</strong>.46-1<strong>12</strong>.56 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.54 6.25<br />

R745 Kushtia -Jhenaidah Road Km 114.66-115.06 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 3.20 22.57<br />

R745 Kushtia -Jhenaidah Road Km 115.86-116.82 S 0.96 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 18.636 2.78 51.21<br />

R745 Kushtia -Jhenaidah Road Km 114.26-114.36 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.72 5.04<br />

R745 Kushtia -Jhenaidah Road Km 114.46-114.56 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.54 4.80<br />

R748 Chuadanga-Kaliganj Road Km 044.40-044.50 S 0.1 5607 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.806 3.74 6.33<br />

R748 Chuadanga-Kaliganj Road Km 045.00-045.10 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.028 3.16 6.29<br />

R748 Chuadanga-Kaliganj Road Km 049.50-049.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.028 3.19 6.34<br />

R748 Chuadanga-Kaliganj Road Km 052.30-052.50 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.30 11.64<br />

R748 Chuadanga-Kaliganj Road Km 053.00-053.20 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.72 9.59<br />

R748 Chuadanga-Kaliganj Road Km 053.30-053.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.52 6.22<br />

Appendix-C: Page: 36 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R748 Chuadanga-Kaliganj Road Km 056.90-057.10 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.795 3.21 11.91<br />

R748 Chuadanga-Kaliganj Road Km 058.70-058.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.52 6.54<br />

R748 Chuadanga-Kaliganj Road Km 064.20-064.50 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.692 3.24 18.05<br />

R748 Chuadanga-Kaliganj Road Km 064.70-064.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.18 5.90<br />

R748 Chuadanga-Kaliganj Road Km 065.00-065.10 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.897 3.53 6.55<br />

R748 Chuadanga-Kaliganj Road Km 065.30-065.80 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 9.471 3.19 29.55<br />

R748 Chuadanga-Kaliganj Road Km 044.50-045.00 S 0.5 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 7.602 2.57 19.53<br />

R748 Chuadanga-Kaliganj Road Km 051.40-051.80 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.081 2.49 15.14<br />

R748 Chuadanga-Kaliganj Road Km 055.60-055.70 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.422 2.76 3.93<br />

R748 Chuadanga-Kaliganj Road Km 056.30-056.40 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.422 2.80 3.99<br />

Sub-total Jhenaidah Division<br />

327.063<br />

Khulna Division<br />

N7 Dauladia-Mongla Road Km 189.49-189.59 S 0.1 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.507 4.49 11.14<br />

N7 Dauladia-Mongla Road Km 190.39-190.59 S 0.2 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.790 4.73 22.33<br />

N7 Dauladia-Mongla Road Km 191.19-191.39 S 0.2 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.790 5.00 <strong>23</strong>.61<br />

N7 Dauladia-Mongla Road Km 191.89-192.19 S 0.3 7406 National Full Recon 180mm @ IRI <strong>12</strong> 2013 7.409 4.68 34.29<br />

N7 Dauladia-Mongla Road Km 221.86-221.96 S 0.1 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 4.60 11.77<br />

N7 Dauladia-Mongla Road Km 2<strong>23</strong>.06-2<strong>23</strong>.26 S 0.2 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.<strong>23</strong>9 4.48 22.92<br />

N7 Dauladia-Mongla Road Km 2<strong>23</strong>.56-2<strong>23</strong>.66 S 0.1 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.619 4.17 10.66<br />

N7 Dauladia-Mongla Road Km 224.46-224.46 S 0 9684 National Full Recon 180mm @ IRI <strong>12</strong> 2013 0.105 9.54 0.98<br />

N7 Dauladia-Mongla Road Km 213.88-215.46 L 1.58 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 61.544 3.91 <strong>23</strong>4.81<br />

N7 Dauladia-Mongla Road Km 213.88-215.46 R 1.58 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 61.544 3.91 <strong>23</strong>4.81<br />

N7 Dauladia-Mongla Road Km 216.56-217.26 S 0.7 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 19.892 5.78 1<strong>12</strong>.51<br />

N7 Dauladia-Mongla Road Km 217.56-217.66 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 6.14 16.34<br />

N7 Dauladia-Mongla Road Km 219.36-219.56 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.450 6.40 34.05<br />

N7 Dauladia-Mongla Road Km 220.06-220.66 S 0.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 16.349 6.30 100.66<br />

N7 Dauladia-Mongla Road Km 220.76-220.86 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.725 6.53 17.39<br />

N7 Dauladia-Mongla Road Km 219.56-220.06 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.757 5.96 63.87<br />

N7 Dauladia-Mongla Road Km 220.66-220.76 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.151 6.69 14.35<br />

N709 Khulna City By-Pass Road Km 000.10-000.20 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.80 16.30<br />

N709 Khulna City By-Pass Road Km 003.10-003.20 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.07 14.24<br />

N709 Khulna City By-Pass Road Km 005.00-005.10 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.75 16.16<br />

N709 Khulna City By-Pass Road Km 006.30-006.50 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.54 31.15<br />

N709 Khulna City By-Pass Road Km 013.80-013.90 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.91 16.61<br />

N709 Khulna City By-Pass Road Km 016.10-016.20 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.92 16.64<br />

N709 Khulna City By-Pass Road Km 016.30-016.40 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.92 16.64<br />

N709 Khulna City By-Pass Road Km 006.80-006.90 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.244 6.55 14.88<br />

R760 Khulna-Satkhira Road Km 004.60-005.50 S 0.9 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 16.040 2.00 30.66<br />

R760 Khulna-Satkhira Road Km 006.70-006.80 S 0.1 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.00 3.42<br />

R760 Khulna-Satkhira Road Km 006.90-007.10 S 0.2 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.62 5.53<br />

Appendix-C: Page: 37 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R760 Khulna-Satkhira Road Km 007.80-007.90 S 0.1 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.06 3.51<br />

R760 Khulna-Satkhira Road Km 008.00-008.40 S 0.4 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.<strong>12</strong>9 1.61 10.95<br />

R760 Khulna-Satkhira Road Km 008.80-009.00 S 0.2 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.53 5.22<br />

R760 Khulna-Satkhira Road Km 009.60-009.70 S 0.1 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.00 3.41<br />

R760 Khulna-Satkhira Road Km 010.30-010.90 S 0.6 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.693 1.36 13.96<br />

R760 Khulna-Satkhira Road Km 011.50-011.90 S 0.4 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.<strong>12</strong>9 1.59 10.84<br />

R760 Khulna-Satkhira Road Km 013.70-013.80 S 0.1 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 2.75 4.69<br />

R760 Khulna-Satkhira Road Km 014.40-014.50 S 0.1 3206 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.782 1.74 2.96<br />

R760 Khulna-Satkhira Road Km 000.30-000.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 2.028 2.86 5.69<br />

R760 Khulna-Satkhira Road Km 001.20-001.60 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.113 2.44 19.39<br />

R760 Khulna-Satkhira Road Km 001.90-003.10 S 1.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 27.324 2.42 64.76<br />

R760 Khulna-Satkhira Road Km 003.40-004.30 S 0.9 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 19.079 3.19 59.57<br />

R760 Khulna-Satkhira Road Km 016.80-017.70 S 0.9 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.666 2.17 37.54<br />

R760 Khulna-Satkhira Road Km 018.90-020.00 S 1.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 21.592 2.97 62.95<br />

R760 Khulna-Satkhira Road Km 020.30-021.70 S 1.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 27.481 1.90 51.13<br />

R760 Khulna-Satkhira Road Km 027.80-027.90 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.92 5.62<br />

R760 Khulna-Satkhira Road Km 028.60-028.70 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.92 5.62<br />

R760 Khulna-Satkhira Road Km 029.00-029.10 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.70 7.<strong>12</strong><br />

R760 Khulna-Satkhira Road Km 030.50-030.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.50 6.73<br />

R760 Khulna-Satkhira Road Km 008.40-008.80 S 0.4 3206 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.524 1.80 9.90<br />

Sub-total Khulna Division<br />

431.881<br />

Kushtia Division<br />

N704 Jhenaidah-Dasuria Road Km 020.82-021.10 S 0.28 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 7.957 5.57 43.43<br />

N704 Jhenaidah-Dasuria Road Km 021.40-021.60 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.68 31.63<br />

N704 Jhenaidah-Dasuria Road Km 0<strong>23</strong>.40-0<strong>23</strong>.50 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.16 14.35<br />

N704 Jhenaidah-Dasuria Road Km 024.10-024.30 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.66 31.52<br />

N704 Jhenaidah-Dasuria Road Km 024.50-024.80 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.53 46.15<br />

N704 Jhenaidah-Dasuria Road Km 025.90-026.30 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 5.52 61.43<br />

N704 Jhenaidah-Dasuria Road Km 030.40-030.50 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.26 11.84<br />

N704 Jhenaidah-Dasuria Road Km 030.70-031.00 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 4.21 35.10<br />

N704 Jhenaidah-Dasuria Road Km 034.10-034.30 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 5.10 28.40<br />

N704 Jhenaidah-Dasuria Road Km 035.30-035.40 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.69 15.84<br />

N704 Jhenaidah-Dasuria Road Km 036.60-036.90 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 5.28 44.11<br />

N704 Jhenaidah-Dasuria Road Km 038.50-038.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.61 15.61<br />

N704 Jhenaidah-Dasuria Road Km 038.70-038.80 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.75 15.99<br />

N704 Jhenaidah-Dasuria Road Km 040.30-040.40 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.04 16.81<br />

N704 Jhenaidah-Dasuria Road Km 040.80-040.90 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.04 16.81<br />

N704 Jhenaidah-Dasuria Road Km 041.50-042.60 S 1.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 31.258 6.03 184.64<br />

N704 Jhenaidah-Dasuria Road Km 042.90-043.32 S 0.42 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.992 5.89 69.15<br />

N704 Jhenaidah-Dasuria Road Km 044.<strong>12</strong>-045.02 S 0.9 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 35.665 4.01 139.56<br />

Appendix-C: Page: 38 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N704 Jhenaidah-Dasuria Road Km 045.18-045.38 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.343 3.37 30.70<br />

N704 Jhenaidah-Dasuria Road Km 045.48-046.48 S 1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 37.915 4.43 164.03<br />

N704 Jhenaidah-Dasuria Road Km 066.66-070.40 S 3.74 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 108.375 5.69 604.30<br />

N704 Jhenaidah-Dasuria Road Km 040.90-041.50 S 0.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 13.461 6.46 86.94<br />

N704 Jhenaidah-Dasuria Road Km 042.60-042.90 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.731 6.62 44.60<br />

N704 Jhenaidah-Dasuria Road Km 043.32-044.<strong>12</strong> S 0.8 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 <strong>23</strong>.849 4.01 95.43<br />

N704 Jhenaidah-Dasuria Road Km 045.02-045.18 S 0.16 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.975 3.56 21.19<br />

R710 Ahaladipur-Kushtia Road Km 048.25-048.35 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.59 6.33<br />

R710 Ahaladipur-Kushtia Road Km 048.55-048.75 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.37 11.90<br />

R710 Ahaladipur-Kushtia Road Km 051.45-051.75 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.22 11.74<br />

R710 Ahaladipur-Kushtia Road Km 051.95-052.15 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.20 11.29<br />

R710 Ahaladipur-Kushtia Road Km 052.55-052.65 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.43 6.05<br />

R710 Ahaladipur-Kushtia Road Km 052.85-052.95 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.38 5.97<br />

R710 Ahaladipur-Kushtia Road Km 053.75-053.95 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.15 11.<strong>12</strong><br />

R710 Ahaladipur-Kushtia Road Km 054.25-054.45 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.10 10.95<br />

R710 Ahaladipur-Kushtia Road Km 056.05-056.25 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.43 <strong>12</strong>.10<br />

R710 Ahaladipur-Kushtia Road Km 057.95-058.15 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.92 10.29<br />

R710 Ahaladipur-Kushtia Road Km 058.55-058.75 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.36 11.86<br />

R710 Ahaladipur-Kushtia Road Km 060.55-061.35 S 0.8 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.395 2.78 39.19<br />

R710 Ahaladipur-Kushtia Road Km 064.15-064.25 S 0.1 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.96 5.07<br />

R710 Ahaladipur-Kushtia Road Km 065.65-065.85 S 0.2 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.43 8.31<br />

R710 Ahaladipur-Kushtia Road Km 066.65-066.85 S 0.2 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.37 7.88<br />

R710 Ahaladipur-Kushtia Road Km 067.95-068.05 S 0.1 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.98 5.10<br />

R710 Ahaladipur-Kushtia Road Km 068.15-068.25 S 0.1 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.98 5.10<br />

R710 Ahaladipur-Kushtia Road Km 068.75-068.85 S 0.1 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.79 4.78<br />

R710 Ahaladipur-Kushtia Road Km 070.15-070.45 S 0.3 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.42 <strong>12</strong>.20<br />

R710 Ahaladipur-Kushtia Road Km 070.65-070.95 S 0.3 4484 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 2.49 <strong>12</strong>.42<br />

R710 Ahaladipur-Kushtia Road Km 058.15-058.55 S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 2.97 16.03<br />

R710 Ahaladipur-Kushtia Road Km 058.75-059.45 S 0.7 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 9.441 2.96 28.09<br />

R710 Ahaladipur-Kushtia Road Km 059.45-059.95 S 0.5 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.743 3.41 <strong>23</strong>.10<br />

R710 Ahaladipur-Kushtia Road Km 062.95-063.25 S 0.3 4101 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.57 10.33<br />

R710 Ahaladipur-Kushtia Road Km 067.15-067.65 S 0.5 4484 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.743 2.46 15.78<br />

R713 Charikoal -Shilahdah Link Road Km 000.10-000.70 S 0.6 1416 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 5.995 0.80 4.54<br />

R713 Charikoal -Shilahdah Link Road Km 000.90-001.40 S 0.5 1416 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.996 0.81 3.84<br />

R713 Charikoal -Shilahdah Link Road Km 001.50-004.50 S 3 1416 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 29.975 0.76 21.44<br />

R713 Charikoal -Shilahdah Link Road Km 004.90-005.41 S 0.51 1416 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.191 1.97 6.05<br />

Sub-total Kushtia Division<br />

518.500<br />

Magura Division<br />

N7 Dauladia-Mongla Road Km 082.91-083.21 S 0.3 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.195 3.66 29.28<br />

N7 Dauladia-Mongla Road Km 085.51-085.61 S 0.1 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.60 9.62<br />

Appendix-C: Page: 39 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N7 Dauladia-Mongla Road Km 087.21-087.61 S 0.4 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.927 3.05 32.51<br />

N7 Dauladia-Mongla Road Km 089.51-089.61 S 0.1 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.72 9.94<br />

N7 Dauladia-Mongla Road Km 089.71-090.11 S 0.4 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.927 3.32 35.46<br />

N7 Dauladia-Mongla Road Km 092.21-092.31 S 0.1 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 2.61 6.97<br />

N7 Dauladia-Mongla Road Km 097.51-097.61 S 0.1 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.70 9.87<br />

N7 Dauladia-Mongla Road Km 097.91-098.01 S 0.1 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.732 3.77 10.06<br />

N7 Dauladia-Mongla Road Km 102.<strong>12</strong>-103.62 S 1.5 7850 National Full Recon 180mm @ IRI <strong>12</strong> 2013 40.976 3.30 132.21<br />

N7 Dauladia-Mongla Road Km 069.32-069.42 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.98 16.64<br />

N7 Dauladia-Mongla Road Km 070.32-070.42 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.03 16.79<br />

N7 Dauladia-Mongla Road Km 071.<strong>12</strong>-071.32 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 6.03 33.59<br />

N7 Dauladia-Mongla Road Km 073.92-074.02 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 6.03 16.79<br />

N7 Dauladia-Mongla Road Km 074.02-074.62 S 0.6 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 17.050 5.76 96.21<br />

N7 Dauladia-Mongla Road Km 074.62-075.31 S 0.68 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 20.<strong>23</strong>6 5.75 113.97<br />

N7 Dauladia-Mongla Road Km 075.41-076.11 S 0.7 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 25.342 3.92 96.95<br />

N7 Dauladia-Mongla Road Km 076.61-076.81 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.109 3.17 28.20<br />

N7 Dauladia-Mongla Road Km 077.31-077.51 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 9.109 2.39 21.24<br />

N7 Dauladia-Mongla Road Km 103.62-104.40 S 0.79 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 22.392 6.03 132.33<br />

N7 Dauladia-Mongla Road Km 100.31-100.71 S 0.4 7850 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 8.534 3.40 28.99<br />

N7 Dauladia-Mongla Road Km 101.21-102.02 S 0.81 7850 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 17.282 2.72 46.98<br />

N7 Dauladia-Mongla Road Km 069.02-069.32 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.731 4.80 32.29<br />

N7 Dauladia-Mongla Road Km 070.42-071.<strong>12</strong> S 0.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 15.705 6.76 106.18<br />

N7 Dauladia-Mongla Road Km 071.32-073.92 S 2.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 58.331 6.47 377.29<br />

N702 Jessore -Magura Road Km 025.79-026.19 S 0.4 3649 National Full Recon 135mm @ IRI <strong>12</strong> 2013 8.673 1.53 13.17<br />

N702 Jessore -Magura Road Km 026.79-028.29 S 1.5 3649 National Full Recon 135mm @ IRI <strong>12</strong> 2013 32.525 2.71 87.76<br />

N702 Jessore -Magura Road Km 031.69-034.49 S 2.8 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 79.567 5.50 432.53<br />

N702 Jessore -Magura Road Km 035.79-035.89 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.52 15.51<br />

N702 Jessore -Magura Road Km 038.59-040.49 S 1.9 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 55.397 4.86 265.97<br />

N702 Jessore -Magura Road Km 042.79-042.99 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.216 6.55 33.59<br />

N702 Jessore -Magura Road Km 043.49-043.68 S 0.19 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 6.951 4.27 29.04<br />

N702 Jessore -Magura Road Km 021.98-025.79 S 3.81 3649 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 63.979 1.75 114.17<br />

N702 Jessore -Magura Road Km 029.49-031.69 S 2.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 49.357 3.84 192.09<br />

N702 Jessore -Magura Road Km 034.49-035.79 S 1.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 29.166 6.61 195.15<br />

N702 Jessore -Magura Road Km 040.49-042.79 S 2.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 53.721 4.32 <strong>23</strong>5.11<br />

N702 Jessore -Magura Road Km 042.99-043.49 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 10.419 5.93 62.33<br />

R720 Magura-Narail Road Km 000.10-000.40 S 0.3 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 4.456 0.22 0.92<br />

R720 Magura-Narail Road Km 000.80-001.00 S 0.2 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.971 0.27 0.76<br />

R720 Magura-Narail Road Km 007.40-007.50 S 0.1 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.24 0.34<br />

R720 Magura-Narail Road Km 008.30-008.40 S 0.1 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.29 0.40<br />

R720 Magura-Narail Road Km 011.20-011.30 S 0.1 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.26 0.36<br />

R720 Magura-Narail Road Km 015.90-016.10 S 0.2 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.998 0.62 1.17<br />

R720 Magura-Narail Road Km 018.50-018.60 S 0.1 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 0.999 0.70 0.66<br />

Appendix-C: Page: 40 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R720 Magura-Narail Road Km 024.10-024.30 S 0.2 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.971 0.24 0.68<br />

R720 Magura-Narail Road Km 024.80-025.10 S 0.3 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.998 0.60 1.69<br />

R720 Magura-Narail Road Km 028.10-028.30 S 0.2 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.998 0.64 1.20<br />

R720 Magura-Narail Road Km 032.30-032.40 S 0.1 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.485 0.28 0.40<br />

R720 Magura-Narail Road Km 002.40-002.80 S 0.4 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.138 0.70 2.81<br />

R720 Magura-Narail Road Km 008.50-008.80 S 0.3 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.104 0.64 1.93<br />

R720 Magura-Narail Road Km 009.60-010.20 S 0.6 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 6.208 0.64 3.84<br />

R720 Magura-Narail Road Km 010.70-011.10 S 0.4 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.138 0.68 2.70<br />

R720 Magura-Narail Road Km 025.50-025.90 S 0.4 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.784 1.48 3.96<br />

R720 Magura-Narail Road Km 027.90-028.00 S 0.1 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 0.696 1.63 1.09<br />

R720 Magura-Narail Road Km 032.50-033.00 S 0.5 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.173 0.62 3.11<br />

Sub-total Magura Division<br />

757.098<br />

Meherpur Division<br />

R745 Kushtia -Jhenaidah Road Km 062.68-062.78 S 0.1 4283 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.73 4.60<br />

R745 Kushtia -Jhenaidah Road Km 064.38-064.48 S 0.1 4283 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 2.75 4.63<br />

R745 Kushtia -Jhenaidah Road Km 064.68-064.88 S 0.2 4283 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.33 7.83<br />

R745 Kushtia -Jhenaidah Road Km 068.88-069.08 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.96 10.44<br />

R745 Kushtia -Jhenaidah Road Km 069.68-069.78 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.51 6.18<br />

R745 Kushtia -Jhenaidah Road Km 069.78-070.58 S 0.8 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 14.395 2.44 34.42<br />

R745 Kushtia -Jhenaidah Road Km 070.58-070.88 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.<strong>23</strong> 17.11<br />

R745 Kushtia -Jhenaidah Road Km 062.08-062.58 S 0.5 4283 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 6.743 2.33 14.86<br />

R746 Meherpur-Mujibnagar Road Km 000.10-000.70 S 0.6 2154 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 18.178 0.03 0.59<br />

R746 Meherpur-Mujibnagar Road Km 011.80-011.90 S 0.1 2154 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.634 0.45 0.69<br />

Sub-total Meherpur Division<br />

58.943<br />

Narail Division<br />

R720 Magura-Narail Road Km 037.70-038.50 S 0.8 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 11.882 0.25 2.85<br />

R720 Magura-Narail Road Km 038.70-039.30 S 0.6 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 8.9<strong>12</strong> 0.27 2.28<br />

R720 Magura-Narail Road Km 039.40-040.60 S 1.2 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 17.8<strong>23</strong> 0.25 4.15<br />

R720 Magura-Narail Road Km 041.30-043.40 S 2.1 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 31.191 0.27 7.86<br />

R720 Magura-Narail Road Km 043.60-046.60 S 3 1047 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 44.558 0.27 11.31<br />

R720 Magura-Narail Road Km 033.00-036.60 S 3.6 1047 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 37.246 0.60 21.36<br />

Sub-total Narail Division<br />

151.611<br />

Satkhira Division<br />

N715 Benapole Town Old Section Km 000.10-000.40 S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 4.10 <strong>23</strong>.84<br />

N715 Benapole Town Old Section Km 000.40-000.60 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 4.11 15.95<br />

N715 Benapole Town Old Section Km 000.60-002.30 S 1.7 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 34.989 3.91 <strong>12</strong>8.96<br />

N715 Benapole Town Old Section Km 002.30-002.50 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 4.11 15.95<br />

Appendix-C: Page: 41 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N715 Benapole Town Old Section Km 002.50-002.60 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.55 8.83<br />

N715 Benapole Town Old Section Km 002.60-003.50 S 0.9 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 18.5<strong>23</strong> 3.86 67.34<br />

N715 Benapole Town Old Section Km 003.50-003.60 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.20 8.15<br />

N715 Benapole Town Old Section Km 004.40-004.80 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.53 27.35<br />

N715 Benapole Town Old Section Km 005.00-005.30 S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 3.71 21.56<br />

N715 Benapole Town Old Section Km 005.40-006.10 S 0.7 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 14.407 3.63 49.25<br />

N715 Benapole Town Old Section Km 007.20-007.30 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 3.60 6.98<br />

N715 Benapole Town Old Section Km 004.00-004.20 S 0.2 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 3.215 3.68 11.37<br />

R760 Khulna-Satkhira Road Km 037.36-037.56 S 0.2 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.01 7.46<br />

R760 Khulna-Satkhira Road Km 038.56-038.76 S 0.2 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.24 8.32<br />

R760 Khulna-Satkhira Road Km 040.46-040.56 S 0.1 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.05 3.81<br />

R760 Khulna-Satkhira Road Km 040.76-040.86 S 0.1 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.27 6.07<br />

R760 Khulna-Satkhira Road Km 042.16-042.26 S 0.1 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 3.25 6.03<br />

R760 Khulna-Satkhira Road Km 043.26-043.36 S 0.1 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.06 3.82<br />

R760 Khulna-Satkhira Road Km 043.66-044.06 S 0.4 4116 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 1.93 14.35<br />

R760 Khulna-Satkhira Road Km 044.76-045.46 S 0.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 13.740 3.00 40.39<br />

R760 Khulna-Satkhira Road Km 049.56-051.26 S 1.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 33.369 1.98 64.85<br />

R760 Khulna-Satkhira Road Km 053.76-054.16 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.81 21.60<br />

R760 Khulna-Satkhira Road Km 055.36-055.56 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.926 2.69 10.35<br />

R760 Khulna-Satkhira Road Km 055.66-056.06 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.<strong>12</strong> 16.28<br />

R760 Khulna-Satkhira Road Km 056.96-057.36 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.852 2.43 18.70<br />

R760 Khulna-Satkhira Road Km 058.16-058.26 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.963 2.64 5.09<br />

R760 Khulna-Satkhira Road Km 058.46-058.75 S 0.29 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.791 2.88 16.34<br />

R760 Khulna-Satkhira Road Km 034.87-035.00 S 0.13 4116 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.913 1.94 3.62<br />

R760 Khulna-Satkhira Road Km 037.20-037.30 S 0.1 4116 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.02 4.35<br />

R765 Khulna-Satkhira Road Km 017.30-017.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.35 5.89<br />

R765 Khulna-Satkhira Road Km 018.70-018.80 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.81<br />

R765 Khulna-Satkhira Road Km 019.50-019.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.88 6.81<br />

R765 Khulna-Satkhira Road Km 021.70-021.90 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.40 11.95<br />

R765 Khulna-Satkhira Road Km 022.50-022.60 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.14 5.52<br />

R765 Khulna-Satkhira Road Km 022.80-022.90 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.64 6.40<br />

R765 Khulna-Satkhira Road Km 0<strong>23</strong>.30-0<strong>23</strong>.40 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.66 6.42<br />

R765 Khulna-Satkhira Road Km 024.40-024.69 S 0.28 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.<strong>12</strong>8 3.52 17.60<br />

R765 Khulna-Satkhira Road Km 024.79-024.89 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.63 6.37<br />

R765 Khulna-Satkhira Road Km 024.99-025.09 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.81 6.70<br />

R765 Khulna-Satkhira Road Km 025.19-025.29 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.82 6.71<br />

R765 Khulna-Satkhira Road Km 025.79-025.89 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.84 6.74<br />

R765 Khulna-Satkhira Road Km 026.09-026.19 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.85 6.77<br />

R765 Khulna-Satkhira Road Km 026.29-026.49 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.44 <strong>12</strong>.08<br />

R765 Khulna-Satkhira Road Km 029.39-029.49 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.39 5.96<br />

R765 Khulna-Satkhira Road Km 030.39-030.89 S 0.5 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.997 3.13 27.52<br />

Appendix-C: Page: 42 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R765 Khulna-Satkhira Road Km 030.99-031.09 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.53 6.19<br />

R765 Khulna-Satkhira Road Km 033.79-033.89 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.37 5.92<br />

R765 Khulna-Satkhira Road Km 040.79-041.09 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.26 17.20<br />

R765 Khulna-Satkhira Road Km 041.19-041.29 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.61 6.34<br />

R765 Khulna-Satkhira Road Km 025.89-026.09 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 4.17 11.43<br />

R765 Khulna-Satkhira Road Km 029.69-029.89 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.02 8.29<br />

R765 Khulna-Satkhira Road Km 029.99-030.29 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.40 9.87<br />

R765 Khulna-Satkhira Road Km 039.99-040.69 S 0.7 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 9.441 3.14 30.13<br />

287.996<br />

3557.432<br />

Sub-total Satkhira Division<br />

Total Khulna Zone<br />

Rajshahi Zone<br />

Naogaon Division<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 038.69-038.99 S 0.3 1661 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 2.917 1.40 3.86<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 015.96-016.97 S 1.01 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.108 1.70 19.41<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 019.09-019.19 S 0.1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 1.084 2.18 2.24<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 031.99-032.69 S 0.7 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 7.485 2.17 15.43<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 049.03-049.33 S 0.3 1661 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.032 2.13 4.32<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 052.83-053.13 S 0.3 1661 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 3.104 0.87 2.72<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 053.93-054.43 S 0.5 1661 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 5.615 0.73 4.<strong>12</strong><br />

R547 Naogaon-Badalgachhi-Rohonpur Km 017.17-017.27 S 0.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.840 4.39 3.54<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 025.19-026.69 S 1.5 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.428 2.74 32.62<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 030.29-030.99 S 0.7 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.800 2.79 15.51<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 027.39-028.49 S 1.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.596 4.88 59.52<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 032.69-034.89 S 2.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 27.998 2.86 81.50<br />

R549 Badalgachhi-Joypurhat Road Km 007.80-010.30 S 2.5 1779 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 24.709 1.45 34.33<br />

R549 Badalgachhi-Joypurhat Road Km 0<strong>12</strong>.35-015.05 S 2.7 1779 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 26.686 1.38 35.24<br />

Sub-total Naogaon Division<br />

145.403<br />

Natore Division<br />

N502 Bogra -Natore Road Km 032.00-036.76 S 4.76 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 99.058 2.86 269.17<br />

N502 Bogra -Natore Road Km 038.96-039.46 S 0.5 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 10.291 3.85 37.66<br />

N502 Bogra -Natore Road Km 041.46-041.86 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.94 30.84<br />

N502 Bogra -Natore Road Km 053.36-054.16 S 0.8 6500 National Full Recon 180mm @ IRI <strong>12</strong> 2013 16.465 3.08 47.57<br />

N502 Bogra -Natore Road Km 056.46-056.76 S 0.3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 6.174 3.69 21.62<br />

N502 Bogra -Natore Road Km 036.76-038.96 S 2.2 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 35.365 4.43 150.38<br />

N502 Bogra -Natore Road Km 039.46-041.46 S 2 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 32.150 4.04 <strong>12</strong>4.85<br />

N502 Bogra -Natore Road Km 045.26-045.96 S 0.7 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 11.252 3.11 33.56<br />

N502 Bogra -Natore Road Km 048.06-051.56 S 3.5 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 56.262 3.48 185.09<br />

Appendix-C: Page: 43 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N502 Bogra -Natore Road Km 052.66-053.16 S 0.5 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 8.037 3.<strong>12</strong> <strong>23</strong>.72<br />

N502 Bogra -Natore Road Km 054.16-055.66 S 1.5 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 24.1<strong>12</strong> 3.94 89.76<br />

N502 Bogra -Natore Road Km 055.66-055.96 S 0.3 6500 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.29 19.57<br />

N502 Bogra -Natore Road Km 056.16-056.46 S 0.3 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.48 20.75<br />

N502 Bogra -Natore Road Km 043.36-044.26 S 0.9 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 19.638 4.<strong>12</strong> 81.85<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 103.92-104.02 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.244 4.42 9.93<br />

R548 Naogaon-Atrai-Natore Road Km 038.99-039.29 S 0.3 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.564 1.56 5.38<br />

R548 Naogaon-Atrai-Natore Road Km 035.89-037.29 S 1.4 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.889 1.89 24.47<br />

Sub-total Natore Division<br />

355.380<br />

Nawabganj Division<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 083.32-083.37 S 0.05 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 0.561 4.76 2.53<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 082.82-083.<strong>12</strong> S 0.3 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.555 3.11 7.60<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 089.57-089.77 S 0.2 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.703 4.13 6.74<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 091.67-091.87 S 0.2 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.703 3.85 6.28<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 098.47-098.57 S 0.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 0.852 4.07 3.32<br />

R547 Naogaon-Badalgachhi-Rohonpur Km 099.07-099.27 S 0.2 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.703 3.01 4.91<br />

Sub-total Nawabganj Division<br />

9.076<br />

Pabna Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 101.80-102.00 S 0.2 1550 National Rehab <strong>12</strong>0mm @ IRI 9-<strong>12</strong> 2013 2.893 0.96 2.82<br />

N504 Nagarbari -Kashinathpur Road Km 000.00-000.20 S 0.2 2162 National Full Recon 135mm @ IRI <strong>12</strong> 2013 4.349 0.58 2.37<br />

N504 Nagarbari -Kashinathpur Road Km 002.30-002.40 S 0.1 2162 National Full Recon 135mm @ IRI <strong>12</strong> 2013 3.208 0.29 0.86<br />

N504 Nagarbari -Kashinathpur Road Km 000.40-000.50 S 0.1 2162 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.680 0.94 1.55<br />

N504 Nagarbari -Kashinathpur Road Km 004.60-004.70 S 0.1 2162 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.765 0.88 1.52<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 040.35-040.45 S 0.1 6210 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.134 2.30 4.79<br />

N6 Kashinathpur-Natore-Rajshahi Road Km 048.55-048.65 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.244 5.04 11.32<br />

N705 Paksey -Iswardi-Dasuria Km 000.00-000.10 S 0.1 2897 National Full Recon 135mm @ IRI <strong>12</strong> 2013 1.637 1.66 2.55<br />

N705 Paksey -Iswardi-Dasuria Km 004.30-004.50 S 0.2 2897 National Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 2.80 8.61<br />

N705 Paksey -Iswardi-Dasuria Km 004.60-005.20 S 0.6 2897 National Full Recon 135mm @ IRI <strong>12</strong> 2013 10.265 2.40 <strong>23</strong>.49<br />

N705 Paksey -Iswardi-Dasuria Km 009.20-009.30 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.803 5.69 15.61<br />

N705 Paksey -Iswardi-Dasuria Km 005.20-005.70 S 0.5 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 11.064 4.29 47.44<br />

N705 Paksey -Iswardi-Dasuria Km 006.60-008.30 S 1.7 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 37.617 4.46 168.00<br />

N705 Paksey -Iswardi-Dasuria Km 009.40-009.46 S 0.06 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.287 2.89 6.58<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 037.07-038.07 S 1 3019 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 10.990 1.66 17.49<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 0<strong>23</strong>.34-026.44 S 3.1 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 21.576 1.29 27.85<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 026.54-027.24 S 0.7 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 4.872 1.42 6.92<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 027.44-027.74 S 0.3 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 2.088 1.34 2.79<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 034.87-035.97 S 1.1 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 7.656 1.<strong>23</strong> 9.46<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 036.17-037.07 S 0.9 1096 Regional Rehab 110mm @ IRI 9-<strong>12</strong> 2013 6.264 1.36 8.50<br />

Appendix-C: Page: 44 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 038.97-039.67 S 0.7 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 5.961 3.34 19.28<br />

R601 Pabna-Natakhola Ferry Ghat Road Km 042.77-045.87 S 3.1 3019 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 26.398 2.49 63.55<br />

R602 Nazirganj -Ferry Ghat Road Km 000.60-000.80 S 0.2 1178 Regional Full Recon 110mm @ IRI <strong>12</strong> 2013 1.944 0.91 1.68<br />

R603 Pabna-Paksey (EPZ) Road Km 007.60-007.70 S 0.1 3297 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.381 1.86 2.45<br />

R604 Tebunia-Hamkuria Road Km 009.70-009.80 S 0.1 3778 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 1.381 2.29 3.10<br />

R604 Tebunia-Hamkuria Road Km 019.50-019.60 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.471 3.70 5.44<br />

Sub-total Pabna Division<br />

179.195<br />

Rajshahi Division<br />

N6 Kashinathpur-Natore-Rajshahi Road Km <strong>12</strong>4.98-<strong>12</strong>5.08 S 0.1 7109 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.134 3.87 8.26<br />

N603 Rajshahi Town By-Pass Road Km 017.20-017.60 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 5.54 61.63<br />

N603 Rajshahi Town By-Pass Road Km 000.10-002.30 S 2.2 3802 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 36.962 1.65 61.98<br />

R685 Rajshahi -Chowmasia Road Km 011.40-011.90 S 0.5 6330 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 8.997 2.06 17.66<br />

R685 Rajshahi -Chowmasia Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.1 6330 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 4.02 6.88<br />

R685 Rajshahi -Chowmasia Road Km 0<strong>12</strong>.50-0<strong>12</strong>.60 S 0.1 6330 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.74 6.40<br />

R685 Rajshahi -Chowmasia Road Km 030.<strong>12</strong>-030.32 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.31 11.69<br />

R685 Rajshahi -Chowmasia Road Km 028.30-028.40 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.56 4.83<br />

R685 Rajshahi -Chowmasia Road Km 029.52-029.82 S 0.3 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 2.73 11.11<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km <strong>12</strong>2.21-<strong>12</strong>2.31 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 3.114 3.73 11.50<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 146.71-147.11 S 0.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 8.974 7.09 64.37<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 147.11-150.51 S 3.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 79.984 4.33 350.47<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 150.51-161.37 S 10.86 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 244.291 5.16 <strong>12</strong>75.70<br />

Sub-total Sirajganj Division<br />

Total Rajshahi Zone<br />

Rangpur Zone<br />

408.414<br />

1097.468<br />

Bogra Division<br />

N502 Bogra -Natore Road Km 002.30-002.40 S 0.1 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 3.49 4.61<br />

N502 Bogra -Natore Road Km 004.90-007.50 S 2.6 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 35.065 3.48 119.48<br />

N502 Bogra -Natore Road Km 013.10-013.30 S 0.2 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.697 3.60 9.51<br />

N502 Bogra -Natore Road Km 015.10-016.90 S 1.8 5705 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 24.276 3.63 86.41<br />

N502 Bogra -Natore Road Km 026.16-027.06 S 0.9 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 14.467 4.82 66.90<br />

N502 Bogra -Natore Road Km 027.46-028.26 S 0.8 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.860 4.18 51.64<br />

N502 Bogra -Natore Road Km 028.36-028.66 S 0.3 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.38 20.29<br />

N502 Bogra -Natore Road Km 028.86-030.86 S 2 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 34.313 3.13 103.28<br />

N515 Bogra 2nd Town By-Pass Road Km 010.40-010.70 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 3.76 31.69<br />

N515 Bogra 2nd Town By-Pass Road Km 000.10-000.50 S 0.4 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 8.974 3.86 35.06<br />

N515 Bogra 2nd Town By-Pass Road Km 014.00-014.30 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 6.731 4.91 33.46<br />

R545 Bogra-Joypurhat Road Km 000.60-000.70 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.472 3.69 5.04<br />

Appendix-C: Page: 45 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

R545 Bogra-Joypurhat Road Km 011.30-0<strong>12</strong>.90 S 1.6 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 28.789 2.30 63.83<br />

R545 Bogra-Joypurhat Road Km 000.30-000.50 S 0.2 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 2.207 3.53 7.48<br />

R545 Bogra-Joypurhat Road Km 007.30-011.30 S 4 7130 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 53.946 5.22 276.85<br />

R545 Bogra-Joypurhat Road Km 013.90-016.00 S 2.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 28.322 2.83 79.71<br />

R550 Mokamtala-Joypurhat Road Km 009.30-009.60 S 0.3 3<strong>23</strong>4 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.798 1.89 7.14<br />

R550 Mokamtala-Joypurhat Road Km 011.00-011.20 S 0.2 3<strong>23</strong>4 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 2.532 1.58 3.99<br />

Sub-total Bogra Division<br />

275.144<br />

Dinajpur Division<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 076.10-076.30 S 0.2 2707 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 3.267 1.89 5.90<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 057.72-058.<strong>12</strong> S 0.4 4331 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 2.87 20.06<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 089.86-090.26 S 0.4 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 7.197 2.15 14.92<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 091.36-092.06 S 0.7 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 <strong>12</strong>.595 2.05 24.89<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 099.46-099.66 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 2.31 8.03<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 102.86-103.46 S 0.6 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 11.660 2.10 <strong>23</strong>.48<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 103.56-103.66 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.71 6.44<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 073.30-074.70 S 1.4 2707 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 17.722 1.67 29.48<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 084.76-086.06 S 1.3 2707 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 16.456 1.27 20.89<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 059.<strong>12</strong>-059.42 S 0.3 4331 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 3.79 15.<strong>23</strong><br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 087.16-087.96 S 0.8 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 2.61 27.97<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 088.06-089.76 S 1.7 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 22.927 2.88 65.72<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 100.86-102.66 S 1.8 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 24.276 2.76 66.56<br />

Sub-total Dinajpur Division<br />

143.531<br />

Gaib<strong>and</strong>a Division<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 000.50-001.10 S 0.6 6187 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 10.796 2.47 24.92<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 001.60-002.40 S 0.8 6187 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 10.789 2.94 31.19<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 051.72-052.<strong>12</strong> S 0.4 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.395 6.03 32.34<br />

R585 Gobindagnj-Fulbari-Dinajpur Road Km 053.<strong>12</strong>-053.54 S 0.42 4331 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 5.718 3.61 20.54<br />

Sub-total Gaib<strong>and</strong>a Division<br />

32.698<br />

Joypurhat Division<br />

R545 Bogra-Joypurhat Road Km 116.79-117.29 S 0.5 2947 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 6.401 1.75 10.25<br />

R545 Bogra-Joypurhat Road Km 117.99-118.29 S 0.3 3589 Regional Full Recon 135mm @ IRI <strong>12</strong> 2013 4.901 2.85 13.35<br />

R545 Bogra-Joypurhat Road Km 118.39-118.69 S 0.3 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 5.398 3.62 18.86<br />

R545 Bogra-Joypurhat Road Km 118.79-119.79 S 1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 17.993 3.50 60.75<br />

R545 Bogra-Joypurhat Road Km 119.89-<strong>12</strong>0.09 S 0.2 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 3.71 <strong>12</strong>.88<br />

R545 Bogra-Joypurhat Road Km 117.49-117.79 S 0.3 2947 Regional Rehab 135mm @ IRI 9-<strong>12</strong> 2013 3.798 1.62 5.82<br />

R545 Bogra-Joypurhat Road Km 118.69-118.79 S 0.1 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 1.349 4.42 5.93<br />

Appendix-C: Page: 46 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Sub-total Joypurhat Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

43.438<br />

NPV /<br />

Cost<br />

NPV<br />

Lalmonirhat Division<br />

N506 Rangpur-Barobari-Kurigram Road Km 021.00-021.15 S 0.15 7068 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.108 2.48 7.30<br />

N506 Rangpur-Barobari-Kurigram Road Km 0<strong>23</strong>.95-024.35 S 0.4 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 3.95 30.93<br />

N506 Rangpur-Barobari-Kurigram Road Km 022.55-022.65 S 0.1 7068 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 3.41 5.25<br />

N506 Rangpur-Barobari-Kurigram Road Km 022.85-0<strong>23</strong>.<strong>12</strong> S 0.27 7068 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.324 2.54 10.51<br />

N506 Rangpur-Barobari-Kurigram Road Km 0<strong>23</strong>.<strong>12</strong>-0<strong>23</strong>.95 S 0.83 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 13.358 4.02 51.59<br />

N506 Rangpur-Barobari-Kurigram Road Km 024.35-027.35 S 3 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 48.225 4.<strong>23</strong> 195.72<br />

N509 Barabari-Burimary Road Km 077.88-077.98 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.14 8.10<br />

N509 Barabari-Burimary Road Km 077.98-078.08 S 0.1 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.058 4.39 8.58<br />

N509 Barabari-Burimary Road Km 078.08-078.78 S 0.7 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 14.407 3.55 48.58<br />

N509 Barabari-Burimary Road Km 078.78-080.78 S 2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 41.163 3.65 142.61<br />

N509 Barabari-Burimary Road Km 080.78-080.98 S 0.2 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 4.116 3.92 15.32<br />

N509 Barabari-Burimary Road Km 080.98-083.98 S 3 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 61.745 3.62 2<strong>12</strong>.34<br />

N509 Barabari-Burimary Road Km 083.98-087.68 S 3.7 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 76.152 3.80 274.78<br />

N509 Barabari-Burimary Road Km 087.68-089.47 S 1.79 9061 National Full Recon 180mm @ IRI <strong>12</strong> 2013 36.779 2.78 97.07<br />

N509 Barabari-Burimary Road Km 093.37-096.57 S 3.2 2269 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 40.507 0.47 19.00<br />

N509 Barabari-Burimary Road Km 096.57-100.97 S 4.4 2269 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 55.697 0.40 22.43<br />

N509 Barabari-Burimary Road Km 101.57-102.47 S 0.9 2269 National Rehab 135mm @ IRI 9-<strong>12</strong> 2013 11.393 0.42 4.80<br />

N509 Barabari-Burimary Road Km 038.74-044.84 S 6.1 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 98.057 3.69 347.16<br />

N509 Barabari-Burimary Road Km 044.84-047.44 S 2.6 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 41.795 3.85 154.37<br />

N509 Barabari-Burimary Road Km 049.14-049.94 S 0.8 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.860 3.81 47.10<br />

N509 Barabari-Burimary Road Km 050.84-053.34 S 2.5 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 40.187 3.36 <strong>12</strong>9.69<br />

N509 Barabari-Burimary Road Km 056.25-056.35 S 0.1 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 1.607 4.26 6.58<br />

N509 Barabari-Burimary Road Km 056.65-059.45 S 2.8 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 45.010 3.18 137.61<br />

N509 Barabari-Burimary Road Km 062.45-062.75 S 0.3 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.822 4.05 18.73<br />

N509 Barabari-Burimary Road Km 071.55-077.88 S 6.33 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 101.819 3.29 321.20<br />

N509 Barabari-Burimary Road Km 091.77-092.77 S 1 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 16.075 3.92 60.58<br />

N509 Barabari-Burimary Road Km 092.97-093.37 S 0.4 9061 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 6.430 4.27 26.36<br />

Sub-total Lalmonirhat Division<br />

793.593<br />

Panchgarh Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 446.84-447.14 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.532 5.56 29.80<br />

Sub-total Panchgarh Division<br />

5.532<br />

Rangpur Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 288.38-291.38 S 3 4405 National Rehab 150mm @ IRI 9-<strong>12</strong> 2013 52.965 2.74 152.17<br />

N506 Rangpur-Barobari-Kurigram Road Km 019.85-020.25 S 0.4 7068 National Full Recon 180mm @ IRI <strong>12</strong> 2013 8.<strong>23</strong>3 2.99 <strong>23</strong>.29<br />

N506 Rangpur-Barobari-Kurigram Road Km 020.35-021.00 S 0.65 7068 National Full Recon 180mm @ IRI <strong>12</strong> 2013 13.357 3.07 38.78<br />

Appendix-C: Page: 47 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Sub-total Rangpur Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

74.555<br />

NPV /<br />

Cost<br />

NPV<br />

Thakurgaon Division<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 410.87-411.77 S 0.9 3083 National Rehab 140mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.699 2.79 35.73<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 399.80-400.60 S 0.8 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.752 7.09 101.37<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 402.00-403.60 S 1.6 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 29.504 6.13 175.15<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 403.80-404.10 S 0.3 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 5.532 4.65 24.93<br />

N5 Dhaka -Utholi-Banglab<strong>and</strong>h Road Km 404.30-405.10 S 0.8 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 14.752 4.17 59.62<br />

Sub-total Thakurgaon Division<br />

Total Rangpur Zone<br />

Sylhet Zone<br />

77.<strong>23</strong>9<br />

1445.730<br />

Habiganj Division<br />

N2 Dhaka-Sylhet-Jaflong Road Km 131.24-131.25 S 0.01 9332 National Full Recon 180mm @ IRI <strong>12</strong> 2013 0.365 4.03 1.46<br />

N2 Dhaka-Sylhet-Jaflong Road Km 133.15-133.25 S 0.1 9332 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 3.74 10.38<br />

N2 Dhaka-Sylhet-Jaflong Road Km 140.55-140.75 S 0.2 9332 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 3.95 21.96<br />

N2 Dhaka-Sylhet-Jaflong Road Km 148.15-148.21 S 0.06 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 1.824 2.88 5.14<br />

N2 Dhaka-Sylhet-Jaflong Road Km 149.41-149.61 S 0.2 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 2.75 15.11<br />

N2 Dhaka-Sylhet-Jaflong Road Km 152.91-153.11 S 0.2 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 2.36 <strong>12</strong>.95<br />

N2 Dhaka-Sylhet-Jaflong Road Km 153.21-153.41 S 0.2 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 2.22 <strong>12</strong>.17<br />

N2 Dhaka-Sylhet-Jaflong Road Km 153.51-153.71 S 0.2 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 5.613 4.35 <strong>23</strong>.89<br />

N2 Dhaka-Sylhet-Jaflong Road Km 160.51-160.61 S 0.1 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 2.25 6.18<br />

N2 Dhaka-Sylhet-Jaflong Road Km 161.11-161.21 S 0.1 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 2.79 7.65<br />

N2 Dhaka-Sylhet-Jaflong Road Km 177.02-177.<strong>12</strong> S 0.1 6671 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 2.80 7.70<br />

N2 Dhaka-Sylhet-Jaflong Road Km 187.02-187.13 S 0.11 8158 National Full Recon 180mm @ IRI <strong>12</strong> 2013 3.143 4.21 13.09<br />

N2 Dhaka-Sylhet-Jaflong Road Km 187.33-187.43 S 0.1 8158 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.25 11.81<br />

N2 Dhaka-Sylhet-Jaflong Road Km 188.53-188.63 S 0.1 8158 National Full Recon 180mm @ IRI <strong>12</strong> 2013 2.807 4.18 11.60<br />

N2 Dhaka-Sylhet-Jaflong Road Km 115.44-115.54 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 3.89 11.13<br />

N2 Dhaka-Sylhet-Jaflong Road Km 138.15-138.25 S 0.1 9332 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 2.192 6.<strong>12</strong> 13.60<br />

N2 Dhaka-Sylhet-Jaflong Road Km 138.35-138.55 S 0.2 9332 National Rehab 180mm @ IRI 9-<strong>12</strong> 2013 4.384 3.66 16.27<br />

N2 Dhaka-Sylhet-Jaflong Road Km 145.55-145.65 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.28 9.86<br />

N204 Jagadishpur-Shaistaganj Km 014.40-014.50 S 0.1 1956 National Full Recon 110mm @ IRI <strong>12</strong> 2013 1.566 0.52 0.79<br />

R220 Sarail-Habiganj Road Km 022.28-022.38 S 0.1 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 1.61 2.64<br />

R220 Sarail-Habiganj Road Km 022.98-0<strong>23</strong>.18 S 0.2 6240 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 3.599 1.00 3.29<br />

R220 Sarail-Habiganj Road Km 0<strong>23</strong>.48-0<strong>23</strong>.78 S 0.3 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 4.046 1.21 4.49<br />

R220 Sarail-Habiganj Road Km 025.68-026.40 S 0.72 6240 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 9.697 0.70 6.18<br />

Sub-total Habiganj Division<br />

82.745<br />

Sylhet Division<br />

Appendix-C: Page: 48 of 49


Appendix-C<br />

<strong>Annual</strong> <strong>Needs</strong> Reporet<br />

20<strong>12</strong> - 2013<br />

1st Year <strong>Rehabilitation</strong> Works of National <strong>and</strong> Regional Roads<br />

(Excluding Ongoing)<br />

Million Taka<br />

Road<br />

Cway Length Road<br />

Fin Cost NPV /<br />

Road Name<br />

Chainage<br />

AADT<br />

Work Name Year<br />

No<br />

Side (km)<br />

Class<br />

(Mill Taka) Cost<br />

NPV<br />

N2 Dhaka-Sylhet-Jaflong Road Km 192.63-192.73 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.85 16.88<br />

N2 Dhaka-Sylhet-Jaflong Road Km 265.69-265.99 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.62 39.98<br />

N2 Dhaka-Sylhet-Jaflong Road Km 266.99-267.09 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.68 13.51<br />

N2 Dhaka-Sylhet-Jaflong Road Km 268.19-268.49 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.41 38.17<br />

N2 Dhaka-Sylhet-Jaflong Road Km 269.59-269.79 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.<strong>12</strong> <strong>23</strong>.77<br />

N2 Dhaka-Sylhet-Jaflong Road Km 270.99-271.19 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.54 26.22<br />

N2 Dhaka-Sylhet-Jaflong Road Km 271.89-271.99 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.76 13.73<br />

N2 Dhaka-Sylhet-Jaflong Road Km 274.49-274.69 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 3.67 21.20<br />

N2 Dhaka-Sylhet-Jaflong Road Km 275.39-275.49 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 4.92 14.21<br />

N2 Dhaka-Sylhet-Jaflong Road Km 275.89-276.19 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.759 4.22 36.56<br />

N2 Dhaka-Sylhet-Jaflong Road Km 276.99-277.19 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 5.31 30.63<br />

N2 Dhaka-Sylhet-Jaflong Road Km 278.79-278.89 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.43 15.67<br />

N2 Dhaka-Sylhet-Jaflong Road Km 280.09-280.56 S 0.47 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 13.576 4.10 54.99<br />

N2 Dhaka-Sylhet-Jaflong Road Km 282.26-282.46 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.839 4.96 28.63<br />

N2 Dhaka-Sylhet-Jaflong Road Km 284.66-284.76 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.920 5.17 14.91<br />

N2 Dhaka-Sylhet-Jaflong Road Km <strong>23</strong>8.20-<strong>23</strong>8.30 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 4.15 9.69<br />

N2 Dhaka-Sylhet-Jaflong Road Km 257.11-257.31 S 0.2 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 4.610 4.15 19.37<br />

N2 Dhaka-Sylhet-Jaflong Road Km 273.49-273.59 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 6.97 16.27<br />

N2 Dhaka-Sylhet-Jaflong Road Km 279.29-279.39 S 0.1 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 2.305 5.60 13.08<br />

N2 Dhaka-Sylhet-Jaflong Road Km 286.26-286.41 S 0.15 11451 National Rehab 195mm @ IRI 9-<strong>12</strong> 2013 3.550 4.03 14.48<br />

N209 Sylhet Twn By-Pass Road Km 000.00-000.20 S 0.2 4434 National Full Recon 150mm @ IRI <strong>12</strong> 2013 2.944 2.34 6.35<br />

N210 Sylhet Twn By-Pass Road Km 000.00-000.10 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.72 13.26<br />

N210 Sylhet Twn By-Pass Road Km 002.50-002.60 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 5.08 14.26<br />

N210 Sylhet Twn By-Pass Road Km 005.30-005.70 S 0.4 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 11.367 4.40 49.45<br />

N210 Sylhet Twn By-Pass Road Km 006.40-006.60 S 0.2 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 5.683 4.95 27.84<br />

N210 Sylhet Twn By-Pass Road Km 006.90-007.20 S 0.3 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 8.525 4.33 36.48<br />

N210 Sylhet Twn By-Pass Road Km 009.40-009.50 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.21 11.84<br />

N210 Sylhet Twn By-Pass Road Km 010.60-010.70 S 0.1 11451 National Full Recon 195mm @ IRI <strong>12</strong> 2013 2.842 4.95 13.91<br />

R250 Sylhet-Jakiganj Road Km 021.75-021.85 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.<strong>23</strong> 5.68<br />

R250 Sylhet-Jakiganj Road Km 040.43-062.15 S 21.72 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 388.717 3.01 1163.53<br />

R250 Sylhet-Jakiganj Road Km 062.15-062.25 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.799 3.81 6.72<br />

R250 Sylhet-Jakiganj Road Km 075.35-075.45 S 0.1 4887 Regional Full Recon 150mm @ IRI <strong>12</strong> 2013 1.832 2.79 4.99<br />

R250 Sylhet-Jakiganj Road Km 086.57-089.68 S 3.<strong>12</strong> 4887 Regional Rehab 150mm @ IRI 9-<strong>12</strong> 2013 42.087 2.44 104.42<br />

577.760<br />

660.505<br />

16694.38<br />

Sub-total Sylhet Division<br />

Total Sylhet Zone<br />

Total Bangladesh<br />

Appendix-C: Page: 49 of 49


Appendix-D<br />

Zilla Road Recovery Programme by Zone <strong>and</strong> Division.<br />

(Excluding ongoing projects)


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Barisal Zone<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Barguna Division<br />

Z8814 Barguna -Baramasua Road Km 000.00-002.30 S 2.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.56 2.728 27.202<br />

Z8814 Barguna -Baramasua Road Km 002.80-003.60 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 2.963 10.276<br />

Sub-total Barguna Division<br />

14.<strong>23</strong><br />

Barisal Division<br />

Z8033 Gariarpar-Naikati Road Km 015.50-015.90 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.37 0.681 2.243<br />

Z8038 Shikarpur-Uzirpur Road Km 003.80-005.50 S 1.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.62 1.453 13.287<br />

Z8048 Chaker-Banaripara Road Km 000.00-006.29 S 6.29 1180 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 31.46 0.<strong>23</strong>8 7.025<br />

Sub-total Barisal Division<br />

44.45<br />

Bhola Division<br />

Z8915 Bagmara-Daulatkhan Road Km 000.14-003.90 S 3.76 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 21.11 2.098 41.436<br />

Z8915 Bagmara-Daulatkhan Road Km 014.50-014.75 S 0.25 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.42 1.952 2.597<br />

Z8916 Guingerhat-Daulatkhan Bazar Road Km 007.65-010.95 S 3.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.57 2.227 37.163<br />

Sub-total Bhola Division<br />

40.09<br />

Jhalokati Division<br />

Z8047 Bakerkati-Nalchity Road Km 004.44-005.24 S 0.80 643 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.48 0.277 1.137<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 0<strong>12</strong>.94-015.54 S 2.60 662 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.91 0.074 1.072<br />

Z8708 Rajapur-Patharghata Road Km 013.10-013.60 S 0.50 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.30 1.619 6.468<br />

Z8708 Rajapur-Patharghata Road Km 011.60-0<strong>12</strong>.03 S 0.43 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.42 2.386 5.601<br />

Z8708 Rajapur-Patharghata Road Km 013.60-014.00 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.24 1.919 4.17<br />

Sub-total Jhalokati Division<br />

29.35<br />

Pirojpur Division<br />

Z7704 Pirojpur-Gonapara Road Km 021.61-021.91 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 1.492 3.604<br />

Z7704 Pirojpur-Gonapara Road Km 022.21-029.00 S 6.79 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 58.39 0.651 35.603<br />

Z7704 Pirojpur-Gonapara Road Km 001.00-001.90 S 0.90 <strong>12</strong>04 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.04 0.575 2.66<br />

Z7704 Pirojpur-Gonapara Road Km 017.71-019.11 S 1.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.84 2.036 15.075<br />

Z7704 Pirojpur-Gonapara Road Km 019.71-021.41 S 1.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.52 2.345 21.084<br />

Z8701 Charkhali-Patharghata Road Km 013.60-014.20 S 0.60 3984 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.16 0.787 3.747<br />

Z8701 Charkhali-Patharghata Road Km 007.40-010.60 S 3.20 3984 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.92 1.635 27.678<br />

Z8701 Charkhali-Patharghata Road Km 010.60-013.60 S 3.00 3984 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.80 1.939 30.771<br />

Z8701 Charkhali-Patharghata Road Km 014.30-014.88 S 0.58 3984 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.25 1.565 4.811<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:1 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 004.70-006.49 S 1.79 1874 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.09 0.042 0.379<br />

Sub-total Pirojpur Division<br />

136.58<br />

Total Barisal Zone 264.69<br />

Chittagong Zone<br />

B<strong>and</strong>arban Division<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 019.44-022.34 S 2.90 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 21.80 2.186 44.119<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 022.54-022.84 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.26 1.218 2.544<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 022.94-0<strong>23</strong>.44 S 0.50 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.76 0.964 3.357<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 001.50-001.80 S 0.30 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 0.657 1.107<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 002.60-002.90 S 0.30 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 0.695 1.17<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 003.10-003.40 S 0.30 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 0.201 0.339<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 003.60-004.10 S 0.50 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.06 0.496 1.391<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 006.10-006.50 S 0.40 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.45 0.572 1.284<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 007.00-007.50 S 0.50 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.06 0.377 1.059<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 009.70-009.80 S 0.10 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 0.624 0.35<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 011.20-011.60 S 0.40 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.45 1.016 2.28<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 0<strong>12</strong>.60-013.30 S 0.70 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.28 1.024 4.0<strong>23</strong><br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 013.50-013.70 S 0.20 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.22 0.727 0.816<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 016.00-016.30 S 0.30 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 0.394 0.664<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 016.50-016.70 S 0.20 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.22 0.49 0.55<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 016.70-017.40 S 0.70 431 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.28 0.107 0.421<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 018.64-019.24 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 1.714 5.889<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 075.49-077.00 S 1.51 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.03 3.329 18.054<br />

Sub-total B<strong>and</strong>arban Division<br />

67.49<br />

Chittagong Division<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 000.60-000.70 S 0.10 3872 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 2.336 1.778<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 000.90-001.20 S 0.30 3872 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.868 4.265<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 002.10-003.70 S 1.60 3872 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 14.58 1.11 14.994<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 004.00-004.80 S 0.80 3832 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.95 1.147 7.177<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 005.20-005.80 S 0.60 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.22 1.604 7.529<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 006.30-006.80 S 0.50 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.35 1.609 6.294<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 007.00-007.30 S 0.30 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 2.511 5.892<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 008.30-008.40 S 0.10 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.896 1.483<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 009.10-009.20 S 0.10 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 2.964 2.318<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:2 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 009.80-009.90 S 0.10 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.781 1.393<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 011.10-011.20 S 0.10 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 2.963 2.318<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 011.40-011.70 S 0.30 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 2.513 5.896<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 014.50-015.20 S 0.70 3759 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.06 1.422 7.754<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 001.40-001.80 S 0.40 3872 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 2.596 5.376<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 005.90-006.10 S 0.20 3759 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 3.409 3.627<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 007.40-007.60 S 0.20 3759 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 3.701 3.938<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 009.30-009.60 S 0.30 3759 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 3.394 5.417<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 011.90-0<strong>12</strong>.30 S 0.40 3759 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 2.56 5.447<br />

Z1025 Kumira-S<strong>and</strong>wip Road Km 000.00-001.50 S 1.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.35 2.273 15.787<br />

Z1025 Kumira-S<strong>and</strong>wip Road Km 001.50-013.24 S 11.74 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 71.82 1.838 <strong>12</strong>7.105<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 000.50-000.70 S 0.20 1726 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 1.189 1.915<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 002.10-005.10 S 3.00 1726 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 22.49 1.343 29.079<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 008.50-008.80 S 0.30 1726 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.61 2.248 3.249<br />

Z1095 Sarikait-Santoshpur Road Km 011.00-011.80 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 1.933 8.269<br />

Z1095 Sarikait-Santoshpur Road Km 018.06-019.78 S 1.72 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.89 2.545 18.077<br />

Z1629 Raozan-Noapara Road Km 000.20-001.40 S 1.20 1891 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.87 0.672 3.693<br />

Z1629 Raozan-Noapara Road Km 0<strong>12</strong>.85-014.84 S 1.99 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.74 2.62 22.972<br />

Sub-total Chittagong Division<br />

190.65<br />

Cox's Bazar Division<br />

Z1002 Baraitali-Magnamaghat Road Km 000.70-002.00 S 1.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.37 2.448 19.471<br />

Z1002 Baraitali-Magnamaghat Road Km 002.00-005.10 S 3.10 444 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 19.92 0.726 13.241<br />

Z1002 Baraitali-Magnamaghat Road Km 005.60-006.94 S 1.34 444 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.60 0.788 6.203<br />

Z1009 Ramu-Maricha Road Km 007.20-007.60 S 0.40 1581 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.43 0.702 2.304<br />

Z1009 Ramu-Maricha Road Km 010.80-011.20 S 0.40 1581 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.716 1.531<br />

Z1009 Ramu-Maricha Road Km 011.50-011.70 S 0.20 1581 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 1.49 1.593<br />

Z1009 Ramu-Maricha Road Km 013.30-013.60 S 0.30 1581 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.695 1.115<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 000.70-000.80 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 0.799 0.652<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 003.80-004.10 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.98 2.401<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 005.70-006.40 S 0.70 910 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.89 0.095 0.514<br />

Z1133 Whykhong-Shaplapur Road Km 000.70-001.20 S 0.50 426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.29 0.968 2.034<br />

Z1133 Whykhong-Shaplapur Road Km 002.10-002.70 S 0.60 426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 0.963 2.428<br />

Z1133 Whykhong-Shaplapur Road Km 003.20-003.30 S 0.10 426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.46 1 0.42<br />

Z1133 Whykhong-Shaplapur Road Km 003.70-004.90 S 1.20 426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.74 0.689 4.249<br />

Z1133 Whykhong-Shaplapur Road Km 006.00-007.07 S 1.07 426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.06 0.656 3.637<br />

Z1504 Ukhia-Gundhum Road Km 000.70-002.10 S 1.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.95 1.21 10.<strong>23</strong>3<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:3 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Sub-total Cox's Bazar Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

81.92<br />

NPV /<br />

Cost<br />

NPV<br />

Dohazari Division<br />

Z1018 Shikalbaha-Anwara Road Km 000.10-001.30 S 1.20 5395 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 19.48 1.957 36.499<br />

Z1018 Shikalbaha-Anwara Road Km 005.50-005.80 S 0.30 5395 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.78 3.099 10.878<br />

Z1018 Shikalbaha-Anwara Road Km 005.93-006.03 S 0.10 5395 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.27 3.329 3.9<strong>23</strong><br />

Z1018 Shikalbaha-Anwara Road Km 006.13-006.53 S 0.40 5395 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.03 3.081 14.389<br />

Z1018 Shikalbaha-Anwara Road Km 006.63-006.93 S 0.30 4270 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.73 2.171 7.548<br />

Z1018 Shikalbaha-Anwara Road Km 008.43-008.93 S 0.50 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.30 0.601 3.56<br />

Z1018 Shikalbaha-Anwara Road Km 001.50-003.40 S 1.90 5395 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.93 3.<strong>23</strong>5 48.952<br />

Z1018 Shikalbaha-Anwara Road Km 004.50-005.20 S 0.70 5395 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.69 3.543 19.14<br />

Z1036 Hashimpur-Borma Road Km 004.72-004.82 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.78 2.407 1.734<br />

Z1036 Hashimpur-Borma Road Km 002.02-002.<strong>12</strong> S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.54 2.344 1.2<br />

Z1036 Hashimpur-Borma Road Km 002.22-003.32 S 1.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.74 2.6 14.264<br />

Z1036 Hashimpur-Borma Road Km 005.02-005.62 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.03 2.907 8.366<br />

Z1036 Hashimpur-Borma Road Km 006.72-007.42 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 2.5 8.78<br />

Z1036 Hashimpur-Borma Road Km 008.<strong>12</strong>-008.62 S 0.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.68 2.495 6.386<br />

Z1037 Ghatiadanga-Monufakirhat Road Km 000.30-000.48 S 0.18 3527 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 3.1<strong>12</strong> 2.559<br />

Z1037 Ghatiadanga-Monufakirhat Road Km 001.45-001.58 S 0.13 3527 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.64 2.132 1.221<br />

Z1040 Gasbaria-Anowara Road Km 009.20-009.90 S 0.70 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 8.22 0.876 6.851<br />

Z1040 Gasbaria-Anowara Road Km 002.30-002.60 S 0.30 3418 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.531 1.3<br />

Z1040 Gasbaria-Anowara Road Km 004.60-005.80 S 1.20 3418 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.84 0.778 7.37<br />

Z1040 Gasbaria-Anowara Road Km 006.60-007.90 S 1.30 2287 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.86 0.925 9.831<br />

Z1040 Gasbaria-Anowara Road Km 013.70-015.00 S 1.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 11.14 0.619 6.687<br />

Z1054 Companiganj-Homna Road Km 003.20-003.30 S 0.10 1006 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.46 0.536 0.225<br />

Z1070 Patiya -Anowara Road Km 001.30-003.10 S 1.80 1363 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.11 1.033 8.86<br />

Z1070 Patiya -Anowara Road Km 003.20-004.10 S 0.90 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.65 0.062 0.264<br />

Z1070 Patiya -Anowara Road Km 005.80-006.20 S 0.40 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.02 0.602 1.116<br />

Z1070 Patiya -Anowara Road Km 006.30-008.60 S 2.30 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 11.61 0.315 3.357<br />

Z1070 Patiya -Anowara Road Km 009.00-011.00 S 2.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.10 1.938 18.303<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 000.20-000.80 S 0.60 17019 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 7.82 14.345 106.137<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 001.10-001.30 S 0.20 17019 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 10.841 26.497<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 001.80-002.00 S 0.20 8<strong>12</strong>2 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.49 4.294 10.114<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 002.10-003.60 S 1.50 8<strong>12</strong>2 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 18.89 4.687 83.7<strong>23</strong><br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 004.90-005.50 S 0.60 2707 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.22 2.394 11.337<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 000.80-001.10 S 0.30 17019 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.55 14.047 36.703<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 007.70-008.10 S 0.40 2707 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 6.928 13.97<br />

Z1703 Anwara - Tailardwip Road Km 003.90-006.32 S 2.42 892 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.34 0.903 11.077<br />

Appendix-D: Page:4 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z1804 Maizzertek-BFDC Road Km 000.20-000.30 S 0.10 2464 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.99 1.103 1.005<br />

Sub-total Dohazari Division<br />

215.75<br />

Khagrachari Division<br />

Z1601 Manikchahri-Laksmichhari Road Km 009.40-013.81 S 4.41 491 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 26.24 0.256 6.156<br />

Z1602 Ramgarh-Mahalchhari Road Km 008.70-008.90 S 0.20 <strong>12</strong>17 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.64 1.724 2.584<br />

Z1602 Ramgarh-Mahalchhari Road Km 011.60-0<strong>12</strong>.90 S 1.30 <strong>12</strong>17 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 10.69 1.293 <strong>12</strong>.595<br />

Z1602 Ramgarh-Mahalchhari Road Km 013.20-013.40 S 0.20 <strong>12</strong>17 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.64 0.938 1.406<br />

Z1602 Ramgarh-Mahalchhari Road Km 005.60-006.30 S 0.70 <strong>12</strong>17 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.75 1.751 6.018<br />

Z1602 Ramgarh-Mahalchhari Road Km 009.70-011.20 S 1.50 <strong>12</strong>17 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.03 2.405 17.717<br />

Z1602 Ramgarh-Mahalchhari Road Km 013.60-013.90 S 0.30 <strong>12</strong>17 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.61 1.653 2.436<br />

Z1602 Ramgarh-Mahalchhari Road Km 015.60-016.40 S 0.80 <strong>12</strong>17 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.28 2.34 9.193<br />

Z1602 Ramgarh-Mahalchhari Road Km 017.40-017.80 S 0.40 <strong>12</strong>17 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.06 1.604 4.501<br />

Z1603 Khagrachhari-Sajek Road Km 026.40-026.60 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.799 2.896<br />

Z1603 Khagrachhari-Sajek Road Km 020.20-026.40 S 6.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 38.79 2.19 81.<strong>23</strong>1<br />

Z1603 Khagrachhari-Sajek Road Km 026.70-027.40 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 2.466 9.<strong>23</strong><br />

Z1604 Khagrachhari-Panchhari Road Km 000.40-000.60 S 0.20 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.22 0.307 0.344<br />

Z1604 Khagrachhari-Panchhari Road Km 000.70-001.80 S 1.10 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.73 0.633 3.901<br />

Z1604 Khagrachhari-Panchhari Road Km 002.90-003.30 S 0.40 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.42 0.039 0.086<br />

Z1604 Khagrachhari-Panchhari Road Km 007.30-007.80 S 0.50 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.14 0.33 0.947<br />

Z1604 Khagrachhari-Panchhari Road Km 010.10-010.80 S 0.70 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 0.615 2.<strong>23</strong>1<br />

Z1604 Khagrachhari-Panchhari Road Km 014.30-014.50 S 0.20 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.22 0.594 0.666<br />

Z1604 Khagrachhari-Panchhari Road Km 018.80-018.90 S 0.10 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 0.708 0.397<br />

Z1604 Khagrachhari-Panchhari Road Km 019.10-019.20 S 0.10 787 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 0.478 0.268<br />

Z1605 Dighinala-Langadu Road Km 003.90-005.00 S 1.10 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 0.452 2.584<br />

Z1605 Dighinala-Langadu Road Km 009.60-010.80 S 1.20 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.79 0.26 1.618<br />

Z1605 Dighinala-Langadu Road Km 010.80-0<strong>12</strong>.00 S 1.20 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.77 0.671 4.17<br />

Z1605 Dighinala-Langadu Road Km 0<strong>12</strong>.10-013.60 S 1.50 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.49 0.724 5.641<br />

Z1605 Dighinala-Langadu Road Km 015.70-015.90 S 0.20 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.827 0.859<br />

Z1605 Dighinala-Langadu Road Km 017.40-018.50 S 1.10 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 0.067 0.38<br />

Z1605 Dighinala-Langadu Road Km 018.50-018.80 S 0.30 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.677 1.054<br />

Z1605 Dighinala-Langadu Road Km 019.50-019.80 S 0.30 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.704 1.097<br />

Z1605 Dighinala-Langadu Road Km 020.30-021.40 S 1.10 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 0.49 2.801<br />

Z1605 Dighinala-Langadu Road Km 022.00-0<strong>23</strong>.70 S 1.70 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.62 0.<strong>23</strong> 2.028<br />

Z1605 Dighinala-Langadu Road Km 024.00-024.80 S 0.80 740 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 0.106 0.441<br />

Z1606 Baghaihat-Marisha Road Km 000.70-004.00 S 3.30 292 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 18.68 0.584 9.984<br />

Z1606 Baghaihat-Marisha Road Km 005.00-006.80 S 1.80 292 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.19 0.621 5.788<br />

Z1606 Baghaihat-Marisha Road Km 010.10-013.20 S 3.10 292 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.55 0.716 11.504<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:5 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z1606 Baghaihat-Marisha Road Km 018.50-018.90 S 0.40 292 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.581 1.205<br />

Z1606 Baghaihat-Marisha Road Km 019.10-019.30 S 0.20 292 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.775 0.803<br />

Z1608 Matiranga-Tannakapara Road Km 001.60-001.70 S 0.10 311 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.60 0.286 0.156<br />

Z1608 Matiranga-Tannakapara Road Km 003.50-003.60 S 0.10 311 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.60 0.184 0.101<br />

Z1608 Matiranga-Tannakapara Road Km 004.80-005.20 S 0.40 311 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.39 0.411 0.899<br />

Z1608 Matiranga-Tannakapara Road Km 019.60-020.20 S 0.60 311 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.58 0.452 1.484<br />

Z1608 Matiranga-Tannakapara Road Km 024.60-028.10 S 3.50 311 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 20.88 0.381 7.293<br />

Z1632 Gourangapara-Panchhari Road Km 001.00-001.50 S 0.50 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 0.533 1.385<br />

Z1632 Gourangapara-Panchhari Road Km 002.00-002.50 S 0.50 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 1.322 3.431<br />

Z1632 Gourangapara-Panchhari Road Km 002.80-003.40 S 0.60 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 1.036 3.226<br />

Z1632 Gourangapara-Panchhari Road Km 006.50-008.30 S 1.80 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.19 1.132 10.578<br />

Z1632 Gourangapara-Panchhari Road Km 008.60-009.00 S 0.40 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.092 2.267<br />

Z1632 Gourangapara-Panchhari Road Km 009.10-009.80 S 0.70 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 1.052 3.8<strong>23</strong><br />

Z1632 Gourangapara-Panchhari Road Km 011.00-011.90 S 0.90 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.09 1.474 6.889<br />

Z1632 Gourangapara-Panchhari Road Km 0<strong>12</strong>.30-013.70 S 1.40 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.92 0.936 6.802<br />

Sub-total Khagrachari Division<br />

301.10<br />

Rangamati Division<br />

Z1603 Khagrachhari-Sajek Road Km 008.30-008.80 S 0.50 579 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 0.272 0.706<br />

Z1613 Ranirhat-Kawkhali Road Km 003.20-003.70 S 0.50 892 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.52 0.474 1.53<br />

Z1613 Ranirhat-Kawkhali Road Km 005.10-005.50 S 0.40 892 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.45 0.734 1.667<br />

Z1613 Ranirhat-Kawkhali Road Km 005.60-006.40 S 0.80 892 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.34 0.389 1.925<br />

Sub-total Rangamati Division<br />

14.13<br />

Total Chittagong Zone 871.05<br />

Comilla Zone<br />

Brahmanbaria Division<br />

Z1042 Eliotganj-Bancharampur Road Km 030.08-030.10 S 0.02 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.18 2.917 0.488<br />

Z1042 Eliotganj-Bancharampur Road Km 030.30-030.50 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.604 2.683<br />

Z1042 Eliotganj-Bancharampur Road Km 030.60-030.70 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.501 1.255<br />

Z1042 Eliotganj-Bancharampur Road Km 030.90-031.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.746 1.46<br />

Z1042 Eliotganj-Bancharampur Road Km 031.60-031.80 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.80 0.72 1.214<br />

Z1042 Eliotganj-Bancharampur Road Km 032.40-032.70 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.75 1.6<strong>23</strong> 4.177<br />

Z<strong>12</strong>01 Kashba-Kuti Road Km 001.50-006.89 S 5.39 2262 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 31.57 1.019 30.392<br />

Z<strong>12</strong>01 Kashba-Kuti Road Km 006.89-009.34 S 2.45 1305 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.42 0.4<strong>23</strong> 5.204<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 000.10-000.20 S 0.10 2984 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.149 0.9<strong>23</strong><br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:6 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 000.50-000.60 S 0.10 2984 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.149 0.9<strong>23</strong><br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 006.10-006.20 S 0.10 2984 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.82 0.54 0.4<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 001.50-001.60 S 0.10 2984 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 1.057 0.578<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 002.00-002.10 S 0.10 2984 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 1.<strong>12</strong>1 0.6<strong>12</strong><br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 002.60-003.60 S 1.00 2984 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.35 1.053 5.3<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 008.60-009.20 S 0.60 2984 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.21 1.104 3.334<br />

Z<strong>12</strong>16 Sultanpur-Akhura Road Km 000.10-000.90 S 0.80 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.58 1.782 10.893<br />

Z<strong>12</strong>16 Sultanpur-Akhura Road Km 001.10-001.60 S 0.50 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.11 1.673 6.39<br />

Z<strong>12</strong>16 Sultanpur-Akhura Road Km 001.70-002.40 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.75 2.439 8.801<br />

Z<strong>12</strong>16 Sultanpur-Akhura Road Km 002.40-007.25 S 4.85 2494 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 26.71 0.477 <strong>12</strong>.042<br />

Sub-total Brahmanbaria Division<br />

106.78<br />

Ch<strong>and</strong>pur Division<br />

Z1050 Kaliapara-Kachua Road Km 003.30-003.60 S 0.30 1979 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.38 2.09 6.66<br />

Z1050 Kaliapara-Kachua Road Km 003.90-004.10 S 0.20 1979 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.26 0.993 2.11<br />

Z1050 Kaliapara-Kachua Road Km 005.70-006.10 S 0.40 1979 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.51 1.647 6.997<br />

Z1050 Kaliapara-Kachua Road Km 006.40-006.90 S 0.50 1979 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.64 1.783 9.467<br />

Z1050 Kaliapara-Kachua Road Km 009.20-009.70 S 0.50 1979 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.64 2.151 11.422<br />

Z1050 Kaliapara-Kachua Road Km 0<strong>12</strong>.80-013.10 S 0.30 1979 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.38 0.962 2.929<br />

Z1050 Kaliapara-Kachua Road Km 007.20-007.30 S 0.10 1979 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.73 1.657 1.174<br />

Z1050 Kaliapara-Kachua Road Km 009.70-010.20 S 0.50 1979 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 0.768 2.72<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 008.60-009.70 S 1.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 9.04 1.51 <strong>12</strong>.69<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 009.80-010.40 S 0.60 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.93 1.496 6.856<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 0<strong>12</strong>.90-013.20 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.47 1.763 4.041<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 015.80-016.40 S 0.60 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.93 0.857 3.926<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 019.90-020.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.82 1.851 1.414<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 020.20-020.40 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.64 0.883 1.348<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 020.50-021.70 S 1.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 9.87 1.826 16.735<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 021.80-022.80 S 1.00 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 8.22 1.453 11.096<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 024.30-024.60 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.47 1.107 2.537<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 002.00-002.80 S 0.80 1482 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.65 0.731 3.253<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 002.90-004.80 S 1.90 1482 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.93 0.88 9.213<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 004.80-007.80 S 3.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.06 2.868 44.348<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 011.40-0<strong>12</strong>.50 S 1.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.89 1.925 10.916<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 013.30-014.10 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.28 2.<strong>23</strong>3 9.21<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 022.90-024.10 S 1.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.42 2.35 14.537<br />

Z1824 Doabhanga-Ramganj Road Km 000.10-000.30 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.865 3.093<br />

Z1824 Doabhanga-Ramganj Road Km 001.00-001.30 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.68 1.408 3.504<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:7 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z1824 Doabhanga-Ramganj Road Km 001.70-001.90 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 1.724 1.917<br />

Z1824 Doabhanga-Ramganj Road Km 002.70-003.40 S 0.70 <strong>12</strong>24 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.07 0.097 0.362<br />

Z1824 Doabhanga-Ramganj Road Km 010.30-010.40 S 0.10 <strong>12</strong>24 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 0.14 0.074<br />

Z1824 Doabhanga-Ramganj Road Km 010.60-010.90 S 0.30 <strong>12</strong>24 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 0.492 0.786<br />

Z1824 Doabhanga-Ramganj Road Km 014.70-014.80 S 0.10 <strong>12</strong>24 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 0.1<strong>23</strong> 0.065<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 003.10-003.50 S 0.40 2622 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.22 1.252 2.603<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 004.00-004.30 S 0.30 2622 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.186 1.885<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 004.50-004.80 S 0.30 2622 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.247 1.981<br />

Sub-total Ch<strong>and</strong>pur Division<br />

140.07<br />

Comilla Division<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 000.30-000.70 S 0.40 4698 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.57 1.256 4.139<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 001.90-002.10 S 0.20 4698 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 0.862 1.421<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 002.90-003.00 S 0.10 4698 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.027 0.846<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 003.70-003.90 S 0.20 4698 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 0.881 1.452<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 005.80-007.70 S 1.90 4698 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 16.96 0.708 11.088<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 013.20-013.70 S 0.50 4698 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.46 1.224 5.044<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 000.90-001.80 S 0.90 4698 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.<strong>23</strong> 1.536 7.555<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 004.00-005.00 S 1.00 4698 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.81 1.519 8.3<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 005.40-005.70 S 0.30 4698 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 1.616 2.649<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 007.80-008.40 S 0.60 4698 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.49 1.527 5.006<br />

Z1041 Comilla-Mirpur Road Km 003.10-003.20 S 0.10 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.92 1.627 1.381<br />

Z1041 Comilla-Mirpur Road Km 003.30-003.50 S 0.20 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.83 0.659 1.118<br />

Z1041 Comilla-Mirpur Road Km 003.80-003.90 S 0.10 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.92 1.628 1.381<br />

Z1041 Comilla-Mirpur Road Km 004.00-004.10 S 0.10 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.92 0.845 0.717<br />

Z1041 Comilla-Mirpur Road Km 004.90-005.10 S 0.20 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.359 2.247<br />

Z1041 Comilla-Mirpur Road Km 006.40-006.50 S 0.10 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.679 1.388<br />

Z1041 Comilla-Mirpur Road Km 006.90-007.00 S 0.10 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.679 1.388<br />

Z1041 Comilla-Mirpur Road Km 007.60-007.70 S 0.10 4247 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.68 1.389<br />

Z1041 Comilla-Mirpur Road Km 007.80-008.20 S 0.40 4247 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 1.479 3.248<br />

Z1041 Comilla-Mirpur Road Km 0<strong>12</strong>.53-013.00 S 0.47 2<strong>23</strong>0 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.76 0.426 1.055<br />

Z1042 Eliotganj-Bancharampur Road Km 011.10-011.20 S 0.10 1360 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 0.803 0.654<br />

Z1042 Eliotganj-Bancharampur Road Km 015.60-015.70 S 0.10 1360 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 0.8<strong>23</strong> 0.669<br />

Z1042 Eliotganj-Bancharampur Road Km 021.60-021.70 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.646 1.376<br />

Z1042 Eliotganj-Bancharampur Road Km 022.30-022.50 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.6<strong>23</strong> 2.714<br />

Z1042 Eliotganj-Bancharampur Road Km 024.20-024.60 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.57 1.426 4.769<br />

Z1042 Eliotganj-Bancharampur Road Km 027.30-027.70 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.57 1.43 4.783<br />

Z1042 Eliotganj-Bancharampur Road Km 028.70-028.90 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.466 2.452<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:8 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z1042 Eliotganj-Bancharampur Road Km 029.70-029.80 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.762 1.473<br />

Z1042 Eliotganj-Bancharampur Road Km 029.90-030.08 S 0.18 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.61 1.631 2.455<br />

Z1042 Eliotganj-Bancharampur Road Km 009.20-009.70 S 0.50 1360 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.91 0.657 1.753<br />

Z1042 Eliotganj-Bancharampur Road Km 019.30-019.70 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 2.329 5.178<br />

Z1042 Eliotganj-Bancharampur Road Km 020.70-021.60 S 0.90 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.<strong>23</strong> 2.364 11.827<br />

Z1042 Eliotganj-Bancharampur Road Km 021.80-022.20 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 2.4<strong>23</strong> 5.386<br />

Z1042 Eliotganj-Bancharampur Road Km 025.20-025.40 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 2.132 2.37<br />

Z1042 Eliotganj-Bancharampur Road Km 025.70-026.00 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 2.32 3.869<br />

Z1042 Eliotganj-Bancharampur Road Km 026.10-026.80 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.07 2.38 9.258<br />

Z1046 Harishchar-Miabazar Road Km 000.10-000.20 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.708 1.366<br />

Z1046 Harishchar-Miabazar Road Km 000.30-000.40 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 0.8 0.627<br />

Z1046 Harishchar-Miabazar Road Km 001.10-001.20 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 0.836 0.673<br />

Z1046 Harishchar-Miabazar Road Km 001.30-001.50 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 0.774 1.247<br />

Z1046 Harishchar-Miabazar Road Km 002.50-002.60 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.994 1.605<br />

Z1046 Harishchar-Miabazar Road Km 002.90-003.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 0.79 0.636<br />

Z1046 Harishchar-Miabazar Road Km 004.40-004.60 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.692 2.7<strong>23</strong><br />

Z1046 Harishchar-Miabazar Road Km 005.00-005.20 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.873 3.014<br />

Z1046 Harishchar-Miabazar Road Km 005.40-005.60 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.669 2.687<br />

Z1046 Harishchar-Miabazar Road Km 006.40-006.60 S 0.20 4132 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 0.868 1.358<br />

Z1046 Harishchar-Miabazar Road Km 007.60-007.70 S 0.10 4132 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.608 1.258<br />

Z1046 Harishchar-Miabazar Road Km 008.20-008.50 S 0.30 4132 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 1.119 2.625<br />

Z1046 Harishchar-Miabazar Road Km 010.10-010.30 S 0.20 4132 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.218 1.906<br />

Z1046 Harishchar-Miabazar Road Km 010.60-010.80 S 0.20 4132 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.218 1.905<br />

Z1046 Harishchar-Miabazar Road Km 013.90-014.00 S 0.10 4132 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.599 1.251<br />

Z1046 Harishchar-Miabazar Road Km 000.50-001.00 S 0.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 2.26 6.076<br />

Z1046 Harishchar-Miabazar Road Km 006.90-007.20 S 0.30 4132 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.528 2.335<br />

Z1048 Laksham -Chewara Bazar Road Km 002.60-002.70 S 0.10 1903 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 0.722 0.368<br />

Z1048 Laksham -Chewara Bazar Road Km 002.90-003.50 S 0.60 1903 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.30 0.489 1.453<br />

Z1048 Laksham -Chewara Bazar Road Km 003.90-004.00 S 0.10 1903 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 0.64 0.326<br />

Z1048 Laksham -Chewara Bazar Road Km 005.70-006.10 S 0.40 1903 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.353 0.719<br />

Z1048 Laksham -Chewara Bazar Road Km 010.00-010.10 S 0.10 1903 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 0.767 0.391<br />

Z1051 Changani -Chaumohoni Road Km 000.00-000.70 S 0.70 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.93 2.1<strong>12</strong> 9.621<br />

Z1051 Changani -Chaumohoni Road Km 003.90-004.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.70 1.995 1.298<br />

Z1053 Gouripur-Homna Road Km 005.80-005.90 S 0.10 2028 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.99 0.752 0.698<br />

Z1053 Gouripur-Homna Road Km 001.30-001.50 S 0.20 2028 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 1.025 1.83<br />

Z1053 Gouripur-Homna Road Km 008.30-010.60 S 2.30 2028 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.87 1.619 25.143<br />

Z1053 Gouripur-Homna Road Km 010.70-014.40 S 3.70 2028 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 33.96 0.478 15.777<br />

Z1053 Gouripur-Homna Road Km 015.00-015.40 S 0.40 2028 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 1.137 4.06<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:9 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 008.31-008.41 S 0.10 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.278 0.999<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 008.91-009.11 S 0.20 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.1 1.72<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 009.21-009.71 S 0.50 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.35 1.732 6.774<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 010.11-010.41 S 0.30 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 1.09 2.559<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 010.71-011.10 S 0.39 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.40 1.808 5.53<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 013.91-017.21 S 3.30 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 27.91 1.642 41.<strong>23</strong><br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 017.61-018.01 S 0.40 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.38 1.1 3.348<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 018.21-018.31 S 0.10 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 2.425 1.846<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 018.51-018.61 S 0.10 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 2.425 1.846<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 018.81-018.91 S 0.10 4<strong>12</strong>1 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.362 1.036<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 020.81-021.01 S 0.20 4909 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 1.692 4.049<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 000.80-001.00 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 0.758 1.249<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 001.30-001.40 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 0.894 0.736<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 007.61-008.21 S 0.60 4<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 1.904 6.078<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 008.51-008.61 S 0.10 4<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.296 1.222<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 010.41-010.71 S 0.30 4<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.825 2.9<strong>12</strong><br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 011.96-0<strong>12</strong>.85 S 0.89 4<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.92 1.966 8.701<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 017.21-017.41 S 0.20 4<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 2.091 2.164<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 018.61-018.81 S 0.20 4<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 2.068 2.141<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 019.11-020.61 S 1.50 4<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.89 1.641 15.255<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 002.20-002.30 S 0.10 3461 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.415 1.077<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 004.40-004.50 S 0.10 3461 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.54 1.41 0.706<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 004.60-004.80 S 0.20 3461 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.07 1.068 1.07<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 005.77-006.17 S 0.40 3461 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.14 1.108 2.221<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 007.37-007.77 S 0.40 3461 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.831 1.76<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 000.50-000.80 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 1.969 4.77<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 001.00-001.60 S 0.60 818 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.<strong>12</strong> 0.76 2.176<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 001.70-001.80 S 0.10 818 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.52 0.398 0.19<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 004.00-005.30 S 1.30 818 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.96 0.58 3.701<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 005.50-006.00 S 0.50 818 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.68 0.416 1.0<strong>23</strong><br />

Z1401 Lalmai-Barura-Jagatpur Road Km 006.90-007.50 S 0.60 818 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 0.15 0.503<br />

Z1414 Laksam -Muddafarganj Road Km 005.80-007.10 S 1.30 2566 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.94 1.029 10.92<br />

Sub-total Comilla Division<br />

302.00<br />

Feni Division<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 004.00-004.90 S 0.90 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.37 2.<strong>23</strong>1 10.78<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 004.90-008.00 S 3.10 21<strong>23</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 18.64 0.775 <strong>12</strong>.997<br />

Z1033 Feni-Belonia Road Km 000.10-000.20 S 0.10 4955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.13 2.715 2.855<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:10 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z1033 Feni-Belonia Road Km 000.70-000.80 S 0.10 4955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.13 2.715 2.855<br />

Z1033 Feni-Belonia Road Km 005.30-005.40 S 0.10 4955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.99 3.493 3.214<br />

Z1033 Feni-Belonia Road Km 006.40-006.60 S 0.20 4955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.97 2.411 4.436<br />

Z1033 Feni-Belonia Road Km 016.90-017.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.99 1.768 1.62<br />

Z1033 Feni-Belonia Road Km 022.30-022.40 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.99 1.768 1.62<br />

Z1033 Feni-Belonia Road Km 000.90-001.40 S 0.50 4955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 2.02 6.433<br />

Z1033 Feni-Belonia Road Km 002.30-002.80 S 0.50 4955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.29 2.36 7.263<br />

Z1033 Feni-Belonia Road Km 003.40-003.80 S 0.40 4955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.63 2.708 6.666<br />

Z1033 Feni-Belonia Road Km 007.70-007.90 S 0.20 4955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.28 2.213 2.661<br />

Z1033 Feni-Belonia Road Km 009.20-009.40 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.28 1.899 2.35<br />

Z1033 Feni-Belonia Road Km 009.90-010.00 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.64 1.695 1.049<br />

Z1033 Feni-Belonia Road Km 021.40-021.60 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.28 1.377 1.703<br />

Z1033 Feni-Belonia Road Km 0<strong>23</strong>.30-0<strong>23</strong>.50 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.28 1.591 1.968<br />

Z1033 Feni-Belonia Road Km 024.20-024.30 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.64 1.718 1.063<br />

Z1034 Feni-Muhuriganj Road Km 002.40-002.90 S 0.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.05 0.85 4.202<br />

Z1034 Feni-Muhuriganj Road Km 004.30-004.50 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 1.454 2.395<br />

Z1034 Feni-Muhuriganj Road Km 018.94-030.26 S 11.32 1679 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 69.29 0.407 26.939<br />

Z1035 Chhagalnaiya-Parsuram Road Km 007.90-008.20 S 0.30 3081 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.546 3.632<br />

Z1035 Chhagalnaiya-Parsuram Road Km 008.40-008.50 S 0.10 3081 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.031 0.807<br />

Z1035 Chhagalnaiya-Parsuram Road Km 009.80-009.90 S 0.10 3081 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.05 1.537 1.449<br />

Z1035 Chhagalnaiya-Parsuram Road Km 013.60-013.80 S 0.20 3081 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.01 1.514 2.734<br />

Z1035 Chhagalnaiya-Parsuram Road Km 013.90-014.00 S 0.10 3081 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 0.982 0.8<strong>12</strong><br />

Z1035 Chhagalnaiya-Parsuram Road Km 018.50-018.60 S 0.10 3081 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.67 1.381<br />

Z1035 Chhagalnaiya-Parsuram Road Km 000.50-003.60 S 3.10 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 18.68 1.48 25.991<br />

Z1035 Chhagalnaiya-Parsuram Road Km 005.30-006.20 S 0.90 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.05 1.796 8.529<br />

Z1035 Chhagalnaiya-Parsuram Road Km 010.20-013.10 S 2.90 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.77 1.629 25.957<br />

Z1035 Chhagalnaiya-Parsuram Road Km 013.20-013.30 S 0.10 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 1.08 0.628<br />

Z1035 Chhagalnaiya-Parsuram Road Km 016.70-017.40 S 0.70 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.07 1.6<strong>23</strong> 6.275<br />

Z1035 Chhagalnaiya-Parsuram Road Km 017.50-017.70 S 0.20 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 1.752 1.935<br />

Z1035 Chhagalnaiya-Parsuram Road Km 017.80-018.40 S 0.60 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.49 1.728 5.727<br />

Z1035 Chhagalnaiya-Parsuram Road Km 019.50-020.00 S 0.50 3081 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.91 1.795 4.958<br />

Z1081 Fulgazi -Fazilpur Road Km 000.40-000.60 S 0.20 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.41 1.86 2.36<br />

Z1081 Fulgazi -Fazilpur Road Km 002.80-003.20 S 0.40 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.82 1.799 4.565<br />

Z1081 Fulgazi -Fazilpur Road Km 004.10-004.30 S 0.20 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.41 1.86 2.36<br />

Z1081 Fulgazi -Fazilpur Road Km 006.20-006.30 S 0.10 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.509 1.181<br />

Z1081 Fulgazi -Fazilpur Road Km 006.70-006.80 S 0.10 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.70 0.946 0.6<br />

Z1081 Fulgazi -Fazilpur Road Km 006.90-007.10 S 0.20 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.41 1.937 2.457<br />

Z1081 Fulgazi -Fazilpur Road Km 007.40-007.80 S 0.40 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.82 1.797 4.558<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:11 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z1081 Fulgazi -Fazilpur Road Km 007.90-008.00 S 0.10 1726 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.70 1.988 1.261<br />

Z1081 Fulgazi -Fazilpur Road Km 014.50-014.70 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.78 2.865<br />

Z1081 Fulgazi -Fazilpur Road Km 000.60-000.80 S 0.20 1726 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.92 1.<strong>12</strong>7 0.931<br />

Z1081 Fulgazi -Fazilpur Road Km 000.80-001.50 S 0.70 1726 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.21 1.531 4.426<br />

Z1081 Fulgazi -Fazilpur Road Km 008.10-009.30 S 1.20 1728 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.51 1.853 9.546<br />

Z1081 Fulgazi -Fazilpur Road Km 010.70-011.80 S 1.10 1732 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.05 1.044 4.93<br />

Z1081 Fulgazi -Fazilpur Road Km 0<strong>12</strong>.50-0<strong>12</strong>.70 S 0.20 1732 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.92 0.337 0.289<br />

Z1134 Feni -Chagalnaiya Road Km 003.50-006.60 S 3.10 447 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.98 0.352 5.167<br />

Z1433 Daganbhuiyan-Basurhat Road Km 000.10-000.90 S 0.80 2583 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 7.07 1.658 10.847<br />

Z1434 Sonagazi-Companiganj Road Km 001.80-002.00 S 0.20 1074 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.92 0.585 0.49<br />

Z1434 Sonagazi-Companiganj Road Km 002.80-003.20 S 0.40 1074 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 0.181 0.365<br />

Sub-total Feni Division<br />

<strong>23</strong>9.58<br />

Laxmipur Division<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 024.75-028.50 S 3.75 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 20.08 2.173 42.011<br />

Z1417 Paniwala-Chatkhil Road Km 001.60-002.40 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.65 2.708 11.896<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.10 3326 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 0.71 0.555<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 009.30-011.10 S 1.80 3326 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.68 1.054 10.131<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 001.70-002.00 S 0.30 1673 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 0.638 1.082<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 006.60-008.30 S 1.70 1673 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.88 0.725 6.966<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 007.60-008.10 S 0.50 507 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 0.176 0.456<br />

Z1466 Nalgara -Ramganj Road Km 003.00-003.20 S 0.20 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.13 0.135<br />

Z1466 Nalgara -Ramganj Road Km 005.70-005.90 S 0.20 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.92 0.43 0.363<br />

Z1466 Nalgara -Ramganj Road Km 006.90-007.10 S 0.20 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.92 0.279 0.<strong>23</strong>5<br />

Z1466 Nalgara -Ramganj Road Km 007.20-009.65 S 2.45 849 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 11.24 0.939 9.706<br />

Z1472 Sardarbari-Raipur Road Km 002.60-002.90 S 0.30 <strong>12</strong>17 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.79 4.565 7.5<strong>12</strong><br />

Sub-total Laxmipur Division<br />

66.74<br />

Noakhali Division<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 000.00-000.30 S 0.30 3439 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 2.863 6.896<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 000.70-002.10 S 1.40 3439 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 <strong>12</strong>.17 1.428 16.049<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 002.40-003.10 S 0.70 3439 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.07 2.797 15.678<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 006.30-006.60 S 0.30 3439 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 2.906 7<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 006.90-007.10 S 0.20 3439 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 2.853 4.582<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 007.60-008.00 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.48 1.416 4.559<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 008.10-008.70 S 0.60 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.22 1.467 7.086<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 008.80-008.91 S 0.11 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.97 1.925 1.735<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:<strong>12</strong> of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 002.10-002.40 S 0.30 3439 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 2.775 4.434<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 003.20-006.20 S 3.00 3439 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.84 3.043 48.<strong>23</strong><br />

Z1417 Paniwala-Chatkhil Road Km 003.<strong>23</strong>-006.30 S 3.07 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.85 2.153 36.302<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 003.40-003.60 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.88 1.627 2.752<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 003.90-004.30 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.76 0.713 2.4<strong>12</strong><br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 005.00-005.10 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.94 1.868 1.58<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 019.80-019.90 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.92 2.049 1.69<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 021.50-021.60 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.92 1.206 0.995<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 022.50-024.19 S 1.69 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 15.60 1.839 25.8<strong>23</strong><br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 011.90-0<strong>12</strong>.80 S 0.90 2565 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.51 1.554 7.702<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 020.20-020.50 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.89 0.781 1.385<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 021.80-022.40 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.58 1.049 3.528<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 007.90-008.00 S 0.10 3326 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.86 1.475 1.148<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 003.60-007.70 S 4.10 3326 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>23</strong>.21 1.134 <strong>23</strong>.679<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 008.20-009.00 S 0.80 3326 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.41 1.316 5.218<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 009.10-009.30 S 0.20 3326 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 1.524 1.511<br />

Z1438 Tamuruddin Link Road Km 000.00-004.00 S 4.00 2684 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 18.97 1.533 26.163<br />

Z1439 Hatiya -Jahajmara Road Km 000.00-006.70 S 6.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 38.33 1.792 64.288<br />

Z1439 Hatiya -Jahajmara Road Km 006.70-033.85 S 27.15 2606 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 153.67 0.988 141.99<br />

Z1450 Old C & B Road Km 000.00-001.10 S 1.10 4340 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.89 2.68 19.882<br />

Sub-total Noakhali Division<br />

354.67<br />

Total Comilla Zone <strong>12</strong>09.83<br />

Dhaka Zone<br />

Dhaka Division<br />

Z1101 Matuail -Shampur Road Km 000.00-001.00 S 1.00 19517 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 13.16 13.333 165.895<br />

Z3004 Mirpur-Kadda Road Km 000.00-020.61 S 20.61 1944 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 118.<strong>23</strong> 4.516 480.571<br />

Z3006 Mostofa Kamal - Pallabi Road Km 000.00-001.50 S 1.50 4154 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.49 4.5<strong>12</strong> 36.191<br />

Z8002 Keraniganj -Mirpur Road Km 008.70-008.80 S 0.10 3841 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 3.941 2.062<br />

Z8202 Uttar Basilla-Dakshin Basilla Road Km 000.00-001.13 S 1.13 989 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.32 1.745 10.452<br />

Z8208 Basilla Bridge approach Road Km 000.00-001.73 S 1.73 4319 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.72 7.651 91.048<br />

Sub-total Dhaka Division<br />

159.49<br />

Gazipur Division<br />

Z3008 Board Bazar-Gazipur Road Km 001.30-001.50 S 0.20 2883 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.64 2.86 4.372<br />

Z3008 Board Bazar-Gazipur Road Km 001.60-002.20 S 0.60 2883 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.93 2.75 <strong>12</strong>.616<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:13 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z3008 Board Bazar-Gazipur Road Km 002.30-002.70 S 0.40 2883 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.06 1.986 5.656<br />

Z3008 Board Bazar-Gazipur Road Km 004.70-005.80 S 1.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 9.04 1.8<strong>12</strong> 15.175<br />

Z3008 Board Bazar-Gazipur Road Km 005.90-006.20 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.47 0.987 2.254<br />

Z3008 Board Bazar-Gazipur Road Km 000.10-001.00 S 0.90 2883 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.82 3.563 16.331<br />

Z3008 Board Bazar-Gazipur Road Km 002.80-002.90 S 0.10 2883 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.46 4.787 2.09<br />

Z3009 Sripur-Bairagirchala Road Km 003.30-003.80 S 0.50 1498 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 1.516 4.082<br />

Z3025 Kapashia-Kaliganj Road Km 009.84-010.70 S 0.86 3170 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 7.27 3.014 20.313<br />

Z3025 Kapashia-Kaliganj Road Km 013.90-014.10 S 0.20 3170 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 3.437 5.386<br />

Z3025 Kapashia-Kaliganj Road Km 014.40-015.00 S 0.60 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.26 7.291 43.156<br />

Z3025 Kapashia-Kaliganj Road Km 015.70-016.70 S 1.00 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 11.04 4.174 43.358<br />

Z3025 Kapashia-Kaliganj Road Km 016.80-017.80 S 1.00 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 10.36 4.217 41.107<br />

Z3025 Kapashia-Kaliganj Road Km 017.90-018.50 S 0.60 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.62 5.167 32.205<br />

Z3025 Kapashia-Kaliganj Road Km 018.60-019.40 S 0.80 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 8.83 5.085 42.262<br />

Z3025 Kapashia-Kaliganj Road Km 019.50-019.90 S 0.40 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.42 4.252 17.667<br />

Z3025 Kapashia-Kaliganj Road Km 020.20-020.50 S 0.30 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.31 7.483 <strong>23</strong>.321<br />

Z3025 Kapashia-Kaliganj Road Km 021.00-021.10 S 0.10 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.10 5.552 5.768<br />

Z3025 Kapashia-Kaliganj Road Km 021.20-021.30 S 0.10 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.10 8.36 8.684<br />

Z3025 Kapashia-Kaliganj Road Km 022.60-0<strong>23</strong>.90 S 1.30 95<strong>12</strong> Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 14.35 4.734 63.934<br />

Z3025 Kapashia-Kaliganj Road Km 010.70-011.30 S 0.60 3170 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.30 4.098 <strong>12</strong>.681<br />

Z3025 Kapashia-Kaliganj Road Km 011.30-013.10 S 1.80 3170 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.91 4.11 38.154<br />

Z3025 Kapashia-Kaliganj Road Km 015.40-015.50 S 0.10 95<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.72 8.801 6.14<br />

Z3025 Kapashia-Kaliganj Road Km 021.40-022.50 S 1.10 95<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.91 9.496 72.878<br />

Z3026 Mawna-Shishupalli Road Km 000.20-000.70 S 0.50 2042 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 2.772 6.869<br />

Z3026 Mawna-Shishupalli Road Km 001.90-003.80 S 1.90 2042 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.46 2.694 25.368<br />

Sub-total Gazipur Division<br />

140.69<br />

Jamalpur Division<br />

Z4022 Jamalpur-Madarganj Road Km 005.70-006.20 S 0.50 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.44 0.728 3.091<br />

Z4022 Jamalpur-Madarganj Road Km 0<strong>12</strong>.59-013.99 S 1.40 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.14 1.286 10.019<br />

Z4022 Jamalpur-Madarganj Road Km 015.69-015.79 S 0.10 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 1.42 0.79<br />

Z4022 Jamalpur-Madarganj Road Km 016.09-016.39 S 0.30 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 1.146 1.914<br />

Z4022 Jamalpur-Madarganj Road Km 017.39-017.79 S 0.40 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 1.136 2.529<br />

Z4022 Jamalpur-Madarganj Road Km 019.49-019.82 S 0.33 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.90 0.7<strong>12</strong> 1.295<br />

Z4022 Jamalpur-Madarganj Road Km 022.09-022.39 S 0.30 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.79 1.424 2.44<br />

Z4022 Jamalpur-Madarganj Road Km 024.69-024.79 S 0.10 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.60 1.65 0.942<br />

Z4022 Jamalpur-Madarganj Road Km 026.19-027.09 S 0.90 1530 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.37 1.171 6.02<br />

Z4025 Jamalpur-Sharisabari Road Km 000.90-002.20 S 1.30 17<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.56 1.003 7.<strong>12</strong>4<br />

Z4025 Jamalpur-Sharisabari Road Km 004.20-004.50 S 0.30 17<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 1.109 1.818<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:14 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z4025 Jamalpur-Sharisabari Road Km 004.60-004.80 S 0.20 17<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 1.536 1.679<br />

Z4025 Jamalpur-Sharisabari Road Km 005.30-005.70 S 0.40 17<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 0.504 1.101<br />

Z4025 Jamalpur-Sharisabari Road Km 005.80-009.00 S 3.20 17<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.97 1.453 <strong>23</strong>.486<br />

Z4025 Jamalpur-Sharisabari Road Km 010.20-011.60 S 1.40 17<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.42 2.392 14.377<br />

Z4606 Jamalpur -Datbhanga Road Km 000.10-002.90 S 2.80 2745 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 <strong>23</strong>.68 2.626 57.291<br />

Z4606 Jamalpur -Datbhanga Road Km 003.00-004.60 S 1.60 2745 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 13.53 2.553 31.826<br />

Z4606 Jamalpur -Datbhanga Road Km 004.90-006.40 S 1.50 2745 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 <strong>12</strong>.69 2.335 27.286<br />

Z4606 Jamalpur -Datbhanga Road Km 007.70-008.50 S 0.80 2745 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.77 2.387 14.88<br />

Z4606 Jamalpur -Datbhanga Road Km 0<strong>12</strong>.90-013.00 S 0.10 2745 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 2.898 2.258<br />

Z4606 Jamalpur -Datbhanga Road Km 006.40-007.30 S 0.90 2745 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.96 2.73 <strong>12</strong>.733<br />

Z4606 Jamalpur -Datbhanga Road Km 007.30-007.70 S 0.40 2745 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 3.065 6.353<br />

Z4606 Jamalpur -Datbhanga Road Km 008.70-011.60 S 2.90 2745 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.97 2.786 41.865<br />

Z4606 Jamalpur -Datbhanga Road Km 041.27-041.37 S 0.10 <strong>12</strong>83 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 2.081 1.051<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 0<strong>12</strong>.89-013.59 S 0.70 1<strong>23</strong>9 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.07 0.33 1.229<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 014.09-014.89 S 0.80 1<strong>23</strong>9 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.65 0.262 1.114<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 028.<strong>12</strong>-028.32 S 0.20 1<strong>23</strong>9 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 0.292 0.311<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 029.22-029.32 S 0.10 1<strong>23</strong>9 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 0.283 0.151<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 017.00-018.90 S 1.90 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 24.99 1.262 30.014<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 019.00-020.40 S 1.40 2621 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 18.42 0.813 14.165<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 020.60-020.70 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.86 1.151 0.957<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 020.80-021.20 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.43 1.563 5.198<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 021.50-021.70 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.71 0.908 1.51<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 022.40-0<strong>23</strong>.40 S 1.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.57 1.193 9.92<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 0<strong>23</strong>.70-025.00 S 1.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 11.14 1.746 18.869<br />

Sub-total Jamalpur Division<br />

224.82<br />

Kishoreganj Division<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 013.20-013.38 S 0.18 1345 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.56 1.827 2.694<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 015.08-015.18 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.926 1.513<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 016.18-016.28 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 0.981 0.771<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 016.48-016.68 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 1.808 2.842<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 019.88-020.28 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.29 0.824 2.517<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 015.28-015.98 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.85 2.193 8.031<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 020.48-020.88 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.14 2.7 5.41<br />

Z3604 Kishoreganj-Hossainpur Road Km 004.00-004.50 S 0.50 2079 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.21 1.014 3.095<br />

Z3604 Kishoreganj-Hossainpur Road Km 005.30-007.90 S 2.60 2079 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.59 1.641 25.717<br />

Z3604 Kishoreganj-Hossainpur Road Km 008.90-009.20 S 0.30 2079 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.97 1.247 2.352<br />

Z3607 N<strong>and</strong>ail Chowrasta-Tarail Road Km 008.53-008.63 S 0.10 2891 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.89 0.72 0.62<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:15 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z3607 N<strong>and</strong>ail Chowrasta-Tarail Road Km 0<strong>12</strong>.03-0<strong>12</strong>.13 S 0.10 2891 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.89 1.095 0.943<br />

Z3608 N<strong>and</strong>ail-Kendua Road Km 011.60-011.70 S 0.10 937 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 1.246 0.701<br />

Z3609 Bojra-Kuliarchar Road Km 000.10-000.20 S 0.10 1931 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.197 0.961<br />

Z3615 Trisal - Gouripur Road Km 008.30-008.50 S 0.20 602 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.546 0.552<br />

Z3615 Trisal - Gouripur Road Km 011.30-0<strong>12</strong>.60 S 1.30 602 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.16 0.509 3.34<br />

Z3616 Motkhola-Kishoreganj Road Km 000.10-000.30 S 0.20 <strong>23</strong>46 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.715 2.844<br />

Z3616 Motkhola-Kishoreganj Road Km 002.70-002.80 S 0.10 <strong>23</strong>46 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 2.408 1.33<br />

Z3616 Motkhola-Kishoreganj Road Km 019.05-019.45 S 0.40 <strong>23</strong>46 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 1.084 2.396<br />

Z3616 Motkhola-Kishoreganj Road Km 020.55-021.15 S 0.60 <strong>23</strong>46 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.49 1.58 5.<strong>23</strong>5<br />

Z3616 Motkhola-Kishoreganj Road Km 021.35-021.75 S 0.40 2137 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 1.039 2.142<br />

Z3616 Motkhola-Kishoreganj Road Km 022.05-0<strong>23</strong>.15 S 1.10 1792 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.06 0.509 2.968<br />

Z3616 Motkhola-Kishoreganj Road Km 0<strong>23</strong>.45-024.05 S 0.60 1792 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.30 0.179 0.571<br />

Z36<strong>23</strong> Itna-Chamraghat Road Km 000.00-016.00 S 16.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 134.62 1.351 178.041<br />

Sub-total Kishoreganj Division<br />

201.90<br />

Manikganj Division<br />

Z5062 Kawalipara-Saturia Road Km 000.70-000.90 S 0.20 1154 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 0.778 1.204<br />

Sub-total Division<br />

1.68<br />

Munshiganj Division<br />

Z8004 Munshiganj -Srinagar Road Km 006.70-010.00 S 3.30 1547 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 21.30 1.01 20.752<br />

Z8004 Munshiganj -Srinagar Road Km 010.70-011.10 S 0.40 1547 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.43 0.444 1.468<br />

Z8206 Dohar -Tikorpur Road Km 000.00-001.70 S 1.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.62 2.227 20.245<br />

Z8206 Dohar -Tikorpur Road Km 002.20-015.00 S <strong>12</strong>.80 <strong>23</strong>34 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 72.45 1.469 100.107<br />

Sub-total Munshiganj Division<br />

106.80<br />

Mymensingh Division<br />

Z3031 Bhaluka-Gafargaon Road Km 006.20-006.40 S 0.20 2205 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.19 1.967<br />

Z3031 Bhaluka-Gafargaon Road Km 009.90-010.00 S 0.10 2205 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.361 1.<strong>12</strong>5<br />

Z3031 Bhaluka-Gafargaon Road Km 0<strong>12</strong>.50-0<strong>12</strong>.80 S 0.30 2205 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.68 1.308 3.243<br />

Z3031 Bhaluka-Gafargaon Road Km 001.50-001.90 S 0.40 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.77 1.132 3.071<br />

Z3031 Bhaluka-Gafargaon Road Km 001.90-003.10 S 1.20 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.01 1.346 8.914<br />

Z3031 Bhaluka-Gafargaon Road Km 004.60-004.70 S 0.10 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.89 1.139 1.009<br />

Z3031 Bhaluka-Gafargaon Road Km 005.10-005.20 S 0.10 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.89 0.956 0.847<br />

Z3031 Bhaluka-Gafargaon Road Km 006.40-006.60 S 0.20 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 1.564 1.728<br />

Z3031 Bhaluka-Gafargaon Road Km 008.90-009.20 S 0.30 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 1.471 2.438<br />

Z3031 Bhaluka-Gafargaon Road Km 011.80-0<strong>12</strong>.00 S 0.20 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.77 1.074 1.904<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:16 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z3031 Bhaluka-Gafargaon Road Km 014.70-016.00 S 1.30 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.56 1.213 8.707<br />

Z3031 Bhaluka-Gafargaon Road Km 016.20-016.30 S 0.10 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 1.402 0.774<br />

Z3031 Bhaluka-Gafargaon Road Km 017.80-018.00 S 0.20 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.77 0.816 1.446<br />

Z3031 Bhaluka-Gafargaon Road Km 019.20-019.30 S 0.10 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.89 0.736 0.652<br />

Z3031 Bhaluka-Gafargaon Road Km 020.50-020.60 S 0.10 2205 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.89 0.285 0.253<br />

Z3033 Mymensingh-Toke Road Km 036.43-036.63 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.35 0.849 1.898<br />

Z3033 Mymensingh-Toke Road Km 037.83-037.93 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.17 1.59 1.776<br />

Z3033 Mymensingh-Toke Road Km 004.90-005.50 S 0.60 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.51 0.786 4.2<br />

Z3033 Mymensingh-Toke Road Km 005.60-006.00 S 0.40 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.98 0.578 2.<strong>23</strong>2<br />

Z3033 Mymensingh-Toke Road Km 006.10-006.90 S 0.80 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>12</strong> 1.04 6.<strong>12</strong>6<br />

Z3033 Mymensingh-Toke Road Km 007.10-007.70 S 0.60 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.42 0.777 4.845<br />

Z3033 Mymensingh-Toke Road Km 008.90-009.90 S 1.00 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.71 1.084 11.259<br />

Z3033 Mymensingh-Toke Road Km 010.20-010.60 S 0.40 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.28 0.9<strong>12</strong> 3.789<br />

Z3033 Mymensingh-Toke Road Km 011.40-011.70 S 0.30 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.21 1.094 3.409<br />

Z3033 Mymensingh-Toke Road Km 011.90-0<strong>12</strong>.00 S 0.10 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.07 1.262 1.311<br />

Z3033 Mymensingh-Toke Road Km 0<strong>12</strong>.90-013.18 S 0.28 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.97 1.153 3.319<br />

Z3033 Mymensingh-Toke Road Km 013.58-013.68 S 0.10 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.07 0.995 1.034<br />

Z3033 Mymensingh-Toke Road Km 017.38-018.08 S 0.70 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.50 0.745 5.419<br />

Z3033 Mymensingh-Toke Road Km 018.48-018.58 S 0.10 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.07 1.119 1.163<br />

Z3033 Mymensingh-Toke Road Km 018.68-018.88 S 0.20 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.14 1.291 2.683<br />

Z3033 Mymensingh-Toke Road Km 022.98-0<strong>23</strong>.08 S 0.10 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.07 0.809 0.84<br />

Z3033 Mymensingh-Toke Road Km 024.88-026.18 S 1.30 <strong>23</strong>62 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.92 0.998 13.484<br />

Z3033 Mymensingh-Toke Road Km 027.98-028.18 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.22 2.189 2.411<br />

Z3033 Mymensingh-Toke Road Km 028.28-032.38 S 4.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 31.36 1.678 51.514<br />

Z3033 Mymensingh-Toke Road Km 035.58-035.88 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.29 1.69 3.795<br />

Z3033 Mymensingh-Toke Road Km 036.83-037.53 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.35 1.677 8.79<br />

Z3033 Mymensingh-Toke Road Km 044.54-068.19 S <strong>23</strong>.65 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 153.02 0.7<strong>12</strong> 103.551<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 007.70-008.10 S 0.40 1345 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.38 1.319 4.229<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 010.10-010.30 S 0.20 1345 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 0.742 1.189<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 011.70-0<strong>12</strong>.00 S 0.30 1345 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.774 4.265<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 0<strong>12</strong>.98-013.20 S 0.22 1345 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.83 1.883 3.259<br />

Z3035 Mymensingh-Fulbaria Road Km 001.60-001.70 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.99 1.477 1.425<br />

Z3035 Mymensingh-Fulbaria Road Km 004.60-004.90 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 1.628 3.989<br />

Z3035 Mymensingh-Fulbaria Road Km 011.00-011.30 S 0.30 1811 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 1.819 4.397<br />

Z3711 Phulpur-Tinkuni More Road Km 008.70-008.80 S 0.10 3376 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 1.222 1.501<br />

Z3711 Phulpur-Tinkuni More Road Km 003.90-004.00 S 0.10 3376 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 2.459 2.044<br />

Z3711 Phulpur-Tinkuni More Road Km 007.50-007.70 S 0.20 3376 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 1.47 2.444<br />

Z3711 Phulpur-Tinkuni More Road Km 008.00-008.10 S 0.10 3376 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 2.071 1.722<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:17 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z37<strong>12</strong> Haluaghat-Dhobaura Road Km 005.98-006.58 S 0.60 1936 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.94 2.993 8.262<br />

Z37<strong>12</strong> Haluaghat-Dhobaura Road Km 013.57-013.77 S 0.20 1936 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 2.859 2.992<br />

Z37<strong>12</strong> Haluaghat-Dhobaura Road Km 016.97-019.67 S 2.70 1936 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.70 1.641 <strong>23</strong>.186<br />

Z4105 Fulbaria-Muktagachha Road Km 000.80-001.60 S 0.80 640 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.92 0.319 1.145<br />

Z4105 Fulbaria-Muktagachha Road Km 010.20-011.70 S 1.50 640 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.60 0.281 2.215<br />

Sub-total Mymensingh Division<br />

353.55<br />

Narayanganj Division<br />

Z1061 Madanganj -Lalgalb<strong>and</strong>h Road Km 000.20-001.80 S 1.60 1878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.30 1.793 16.181<br />

Z1061 Madanganj -Lalgalb<strong>and</strong>h Road Km 002.10-002.60 S 0.50 1878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.91 1.354 3.818<br />

Sub-total Narayanganj Division<br />

<strong>12</strong>.21<br />

Narsingdi Division<br />

Z2033 Narsingdi -B<strong>and</strong>ardia Road Km 002.30-002.50 S 0.20 1608 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.04 0.729 0.722<br />

Z2036 Shibpur-Palas Road Km 003.10-003.30 S 0.20 1119 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.07 0.05 0.049<br />

Z2036 Shibpur-Palas Road Km 004.90-005.10 S 0.20 1119 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.07 0.043 0.042<br />

Z2036 Shibpur-Palas Road Km 009.80-009.90 S 0.10 1119 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.49 0.225 0.101<br />

Z2039 Palas-Gorashal Road Km 000.70-000.80 S 0.10 4048 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.22 2.727 3.095<br />

Z2039 Palas-Gorashal Road Km 001.30-001.40 S 0.10 4048 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.22 2.887 3.276<br />

Z2039 Palas-Gorashal Road Km 002.40-002.50 S 0.10 4048 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.80 5.263 4.031<br />

Z2039 Palas-Gorashal Road Km 002.80-002.90 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.80 1.077 0.838<br />

Z2039 Palas-Gorashal Road Km 004.70-004.90 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 1.471 2.642<br />

Z2039 Palas-Gorashal Road Km 005.00-006.40 S 1.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.85 1.511 19.01<br />

Z2042 Monohardi -Shakerbazar Road Km 004.20-005.20 S 1.00 1353 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.81 0.646 3.572<br />

Z2042 Monohardi -Shakerbazar Road Km 007.60-007.80 S 0.20 1353 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.654 0.685<br />

Z2044 Shibpur -Monohardi Road Km 006.40-006.50 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 2.043 1.555<br />

Z2044 Shibpur -Monohardi Road Km 0<strong>12</strong>.80-013.00 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 1.674 2.548<br />

Z2044 Shibpur -Monohardi Road Km 013.40-013.70 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.701 3.884<br />

Z2044 Shibpur -Monohardi Road Km 016.90-017.10 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.60 1.905 2.739<br />

Z2044 Shibpur -Monohardi Road Km 018.20-018.50 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.846 4.214<br />

Z2044 Shibpur -Monohardi Road Km 018.70-019.10 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.38 1.634 4.973<br />

Z2044 Shibpur -Monohardi Road Km 019.40-019.90 S 0.50 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.<strong>23</strong> 1.514 5.763<br />

Z2044 Shibpur -Monohardi Road Km 020.20-020.40 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 1.937 2.948<br />

Z2044 Shibpur -Monohardi Road Km 006.80-008.30 S 1.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.26 2.635 20.458<br />

Z2044 Shibpur -Monohardi Road Km 010.50-010.80 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 2.1<strong>23</strong> 3.297<br />

Z2044 Shibpur -Monohardi Road Km 011.00-011.80 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.41 2.<strong>12</strong>4 8.796<br />

Z2044 Shibpur -Monohardi Road Km 013.70-014.40 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.85 2.116 7.668<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:18 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z2044 Shibpur -Monohardi Road Km 014.40-016.40 S 2.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.62 2.131 21.268<br />

Z2044 Shibpur -Monohardi Road Km 017.10-017.70 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.<strong>12</strong> 3.222 9.45<br />

Z2045 Panchdona -Charsindur Road Km 018.77-019.32 S 0.55 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.77 0.809 5.361<br />

Z2115 Rupganj-Badda Road Km 001.00-001.10 S 0.10 745 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 0.517 0.268<br />

Z2115 Rupganj-Badda Road Km 001.20-002.00 S 0.80 745 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 0.5 2.075<br />

Z2115 Rupganj-Badda Road Km 003.70-003.90 S 0.20 745 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.515 0.535<br />

Z2<strong>12</strong>2 Nayak<strong>and</strong>i -Shakerbazar Road Km 000.00-004.04 S 4.04 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 22.43 2.1<strong>12</strong> 42.64<br />

Sub-total Narsingdi Division<br />

115.15<br />

Netrokona Division<br />

Z2834 Sunamganj-Jamalpur Road Km 027.91-109.83 S 81.92 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 260.66 4.267 1056.786<br />

Z2834 Sunamganj-Jamalpur Road Km 110.64-115.00 S 4.36 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 24.01 2.013 45.219<br />

Z3703 Netrokona -Kalmak<strong>and</strong>a Road Km 004.70-005.30 S 0.60 1356 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.49 0.703 2.356<br />

Z3706 Netrokona-Kendua Road Km 009.81-010.11 S 0.30 2878 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.68 1.587 3.935<br />

Z3706 Netrokona-Kendua Road Km 006.11-006.51 S 0.40 2878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 1.665 3.657<br />

Z3706 Netrokona-Kendua Road Km 011.61-011.71 S 0.10 2878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 2.538 1.394<br />

Z3706 Netrokona-Kendua Road Km 0<strong>12</strong>.51-0<strong>12</strong>.71 S 0.20 2878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 1.461 1.604<br />

Z3706 Netrokona-Kendua Road Km 014.81-015.01 S 0.20 2878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 1.559 1.7<strong>12</strong><br />

Z3706 Netrokona-Kendua Road Km 015.21-015.51 S 0.30 2878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 2.391 3.938<br />

Z3706 Netrokona-Kendua Road Km 016.11-016.21 S 0.10 2878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 2.725 1.497<br />

Z3706 Netrokona-Kendua Road Km 018.31-018.41 S 0.10 2878 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 1.769 0.971<br />

Z3707 Netrokona-Dhobaura Road Km 008.80-009.30 S 0.50 1884 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.<strong>23</strong> 0.778 3.095<br />

Z3707 Netrokona-Dhobaura Road Km 009.40-009.70 S 0.30 1884 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.461 3.487<br />

Z3707 Netrokona-Dhobaura Road Km 009.90-010.00 S 0.10 1884 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.588 1.263<br />

Z3707 Netrokona-Dhobaura Road Km 001.80-002.60 S 0.80 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.04 2.254 8.516<br />

Z3707 Netrokona-Dhobaura Road Km 003.30-005.50 S 2.20 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 11.38 2.447 26.039<br />

Z3707 Netrokona-Dhobaura Road Km 005.80-006.10 S 0.30 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 2.644 4.087<br />

Z3707 Netrokona-Dhobaura Road Km 006.20-006.30 S 0.10 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 2.79 1.438<br />

Z3707 Netrokona-Dhobaura Road Km 006.60-006.90 S 0.30 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 2.713 4.193<br />

Z3707 Netrokona-Dhobaura Road Km 008.10-008.40 S 0.30 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 2.572 3.976<br />

Z3707 Netrokona-Dhobaura Road Km 009.70-009.90 S 0.20 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 2.662 2.743<br />

Z3707 Netrokona-Dhobaura Road Km 010.10-010.60 S 0.50 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 1.778 4.581<br />

Z3707 Netrokona-Dhobaura Road Km 010.90-011.40 S 0.50 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 2.662 6.858<br />

Z3707 Netrokona-Dhobaura Road Km 0<strong>12</strong>.10-0<strong>12</strong>.40 S 0.30 1884 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 1.892 2.925<br />

Z3707 Netrokona-Dhobaura Road Km 027.59-028.59 S 1.00 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.81 1.39 7.559<br />

Z3707 Netrokona-Dhobaura Road Km 029.09-029.59 S 0.50 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.91 2.008 5.46<br />

Z3707 Netrokona-Dhobaura Road Km 032.39-032.59 S 0.20 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.16 1.98 2.153<br />

Z3707 Netrokona-Dhobaura Road Km 035.19-035.59 S 0.40 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.803 3.819<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:19 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z3707 Netrokona-Dhobaura Road Km 035.79-038.19 S 2.40 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.58 1.8 22.88<br />

Z3707 Netrokona-Dhobaura Road Km 038.29-039.59 S 1.30 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.36 1.803 <strong>12</strong>.413<br />

Z3707 Netrokona-Dhobaura Road Km 039.79-040.19 S 0.40 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.949 4.<strong>12</strong>9<br />

Z3707 Netrokona-Dhobaura Road Km 040.69-040.99 S 0.30 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.982 3.149<br />

Sub-total Netrokona Division<br />

372.81<br />

Sherpur Division<br />

Z4602 Bangaon-Nalitabari Road Km 010.50-010.60 S 0.10 1134 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.64 1.069 0.643<br />

Z4603 Sherpur -Hatipagar Road Km 004.50-006.50 S 2.00 999 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.79 0.825 7.662<br />

Z4603 Sherpur -Hatipagar Road Km 007.00-009.10 S 2.10 999 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.46 0.9<strong>12</strong> 10.563<br />

Z4603 Sherpur -Hatipagar Road Km 010.00-010.20 S 0.20 999 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.<strong>12</strong> 0.993 1.025<br />

Z4605 Jhulgaon-S<strong>and</strong>ahkura Road Km 008.70-008.80 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.64 2.27 1.404<br />

Z4605 Jhulgaon-S<strong>and</strong>ahkura Road Km 009.10-009.20 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.64 1.499 0.927<br />

Z4605 Jhulgaon-S<strong>and</strong>ahkura Road Km 0<strong>12</strong>.10-0<strong>12</strong>.50 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.57 1.448 3.583<br />

Z4607 Sherpur-Bakshiganj Road Km 000.00-004.00 S 4.00 2453 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 32.72 2.136 69.064<br />

Z4607 Sherpur-Bakshiganj Road Km 020.07-020.37 S 0.30 654 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 0.396 0.67<br />

Z4619 Nalitabari-Papuajuri Road Km 000.50-001.80 S 1.30 1350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 10.99 0.566 5.669<br />

Z4619 Nalitabari-Papuajuri Road Km 001.90-002.40 S 0.50 1350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.<strong>23</strong> 0.626 2.414<br />

Z4619 Nalitabari-Papuajuri Road Km 002.80-003.50 S 0.70 1350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.92 0.881 4.751<br />

Z4619 Nalitabari-Papuajuri Road Km 003.60-005.60 S 2.00 1350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 16.91 0.471 7.258<br />

Z4619 Nalitabari-Papuajuri Road Km 006.20-006.30 S 0.10 1350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.0<strong>23</strong> 0.788<br />

Z4619 Nalitabari-Papuajuri Road Km 007.00-007.10 S 0.10 1350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 0.655 0.529<br />

Z4619 Nalitabari-Papuajuri Road Km 000.10-000.20 S 0.10 1350 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 0.74 0.389<br />

Z4619 Nalitabari-Papuajuri Road Km 007.40-007.50 S 0.10 1350 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.60 0.688 0.393<br />

Sub-total Sherpur Division<br />

103.37<br />

Tangail Division<br />

Z4009 Nagarpur -Chauhali Road Km 000.00-001.30 S 1.29 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.13 2.519 16.973<br />

Z4017 Ghatail -Sarisabari Road Km 021.00-021.60 S 0.60 1599 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.07 1.074 5.085<br />

Z4017 Ghatail -Sarisabari Road Km 006.80-007.40 S 0.60 1599 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.65 1.44 6.418<br />

Z4017 Ghatail -Sarisabari Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.10 1599 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 1.825 1.086<br />

Z4017 Ghatail -Sarisabari Road Km 0<strong>12</strong>.30-013.40 S 1.10 1599 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.73 1.59 10.404<br />

Z4017 Ghatail -Sarisabari Road Km 018.50-019.60 S 1.10 1599 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.06 2.572 15.027<br />

Z4017 Ghatail -Sarisabari Road Km 019.70-019.80 S 0.10 1599 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 2.795 1.484<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 0<strong>12</strong>.60-0<strong>12</strong>.90 S 0.30 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.95 1.302 4.89<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 015.40-016.00 S 0.60 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 7.89 1.<strong>23</strong>1 9.243<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 001.90-008.70 S 6.80 2955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 58.25 1.607 91.652<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:20 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 008.90-009.40 S 0.50 2955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.28 2.509 10.518<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 009.50-0<strong>12</strong>.00 S 2.50 2955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 21.42 2.<strong>23</strong> 46.744<br />

Sub-total Tangail Division<br />

<strong>12</strong>6.60<br />

Total Dhaka Zone 1919.08<br />

Gopalganj Zone<br />

Faridpur Division<br />

Z7002 Sasrail-Alphadanga Road Km 002.50-002.70 S 0.20 1999 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 0.731 1.144<br />

Z7002 Sasrail-Alphadanga Road Km 003.60-003.70 S 0.10 1999 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.09 1.1<strong>12</strong><br />

Z7102 Rajbari-Madhukhali Road Km 032.00-033.40 S 1.40 1473 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.92 0.992 7.528<br />

Z7102 Rajbari-Madhukhali Road Km 035.10-036.55 S 1.45 1473 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.21 0.636 4.995<br />

Z8401 Bhanga -Sadarpur Road Km 000.00-001.18 S 1.18 1377 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.93 0.053 0.507<br />

Z8402 Faridpur-Sadarpur Road Km 034.00-034.10 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 0.7<strong>12</strong> 0.571<br />

Sub-total Faridpur Division<br />

29.<strong>23</strong><br />

Gopalganj Division<br />

Z80<strong>23</strong> Garakhola - Kashiani Road Km 000.35-001.55 S 1.20 <strong>12</strong>50 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.79 1.095 6.82<br />

Sub-total Gopalganj Division<br />

6.79<br />

Rajbari Division<br />

Z7106 Goalonda -Habashpur Road Km 047.20-048.60 S 1.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.92 1.468 10.93<br />

Sub-total Rajbari Division<br />

7.92<br />

Total Gopalganj Zone 43.95<br />

Khulna Zone<br />

Bagerhat Division<br />

Z7703 Bagerhat-Kachua Road Km 001.20-001.70 S 0.50 1056 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 0.209 0.528<br />

Z7703 Bagerhat-Kachua Road Km 005.10-005.50 S 0.40 1056 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 0.387 0.782<br />

Z7703 Bagerhat-Kachua Road Km 005.60-007.47 S 1.87 1056 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.54 0.482 4.661<br />

Z7704 Pirojpur-Gonapara Road Km 029.81-031.51 S 1.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.53 0.759 9.403<br />

Sub-total Bagerhat Division<br />

28.04<br />

Jessore Division<br />

Z7031 Churamonkathi-Chaugachha Road Km 004.10-004.30 S 0.20 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.89 1.138 1.934<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:21 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z7031 Churamonkathi-Chaugachha Road Km 004.70-005.30 S 0.60 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.89 1.687 9.204<br />

Z7031 Churamonkathi-Chaugachha Road Km 006.10-006.30 S 0.20 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.88 1.5<strong>23</strong> 2.65<br />

Z7031 Churamonkathi-Chaugachha Road Km 007.00-007.20 S 0.20 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.26 1.624 3.296<br />

Z7031 Churamonkathi-Chaugachha Road Km 008.40-008.60 S 0.20 2955 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.88 0.805 1.401<br />

Z7031 Churamonkathi-Chaugachha Road Km 001.40-002.20 S 0.80 2955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.90 1.889 8.736<br />

Z7031 Churamonkathi-Chaugachha Road Km 007.20-008.40 S 1.20 2955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.15 2.016 15.447<br />

Z7031 Churamonkathi-Chaugachha Road Km 008.60-010.90 S 2.30 2955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.78 1.424 19.876<br />

Z7031 Churamonkathi-Chaugachha Road Km 010.90-016.49 S 5.59 2955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 46.10 1.479 65.628<br />

Z7048 Prembag-Sundali Bazar Road Km 010.90-013.90 S 3.00 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 25.37 1.5<strong>23</strong> 35.675<br />

Z7048 Prembag-Sundali Bazar Road Km 013.90-014.10 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 1.773 2.787<br />

Z7048 Prembag-Sundali Bazar Road Km 014.10-014.90 S 0.80 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.77 1.542 9.69<br />

Z7048 Prembag-Sundali Bazar Road Km 014.90-015.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 1.652 1.298<br />

Z7057 Kaligang-Bagharpara Road Km 018.60-019.20 S 0.60 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.22 1.332 6.431<br />

Z7057 Kaligang-Bagharpara Road Km 017.50-018.00 S 0.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 2.393 6.399<br />

Z7057 Kaligang-Bagharpara Road Km 018.10-018.50 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 2.338 5.001<br />

Z7058 Sutighata-Dakuria Road Km 000.70-002.10 S 1.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.71 2.736 18.982<br />

Z7058 Sutighata-Dakuria Road Km 002.10-005.10 S 3.00 1932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.52 0.291 4.327<br />

Z7058 Sutighata-Dakuria Road Km 005.50-006.34 S 0.84 1932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.63 0.43 1.79<br />

Z7552 keshabpur- kalarawa Road Km 011.76-011.86 S 0.10 3814 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.72 0.906 0.599<br />

Sub-total Jessore Division<br />

162.27<br />

Jhenaidah Division<br />

Z7021 Arpara-Kaliganj Road Km 013.00-028.96 S 15.96 1754 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 88.88 2.161 180.511<br />

Z7024 Gopalpur-Maheshpur Road Km 000.00-002.20 S 2.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 17.11 1.151 17.727<br />

Z7024 Gopalpur-Maheshpur Road Km 007.80-008.40 S 0.60 1017 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.30 0.247 0.748<br />

Z7024 Gopalpur-Maheshpur Road Km 008.50-010.17 S 1.67 1017 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.20 0.216 1.822<br />

Z7024 Gopalpur-Maheshpur Road Km 011.90-014.90 S 3.00 <strong>12</strong>28 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.52 0.399 6.045<br />

Z7057 Kaligang-Bagharpara Road Km 000.10-001.30 S 1.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 10.39 1.844 17.734<br />

Z7057 Kaligang-Bagharpara Road Km 001.30-001.88 S 0.58 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.22 2.267 8.895<br />

Z7057 Kaligang-Bagharpara Road Km 005.18-005.20 S 0.03 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.18 1.281 0.217<br />

Z7057 Kaligang-Bagharpara Road Km 008.60-008.90 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.18 1.876 3.796<br />

Z7057 Kaligang-Bagharpara Road Km 010.30-010.60 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 1.51 3.647<br />

Z7057 Kaligang-Bagharpara Road Km 010.90-011.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.813 1.459<br />

Z7057 Kaligang-Bagharpara Road Km 011.80-013.30 S 1.50 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 13.04 1.433 17.296<br />

Z7057 Kaligang-Bagharpara Road Km 013.60-013.70 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.686 1.357<br />

Z7057 Kaligang-Bagharpara Road Km 013.80-013.90 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.955 1.574<br />

Z7057 Kaligang-Bagharpara Road Km 016.40-016.50 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 2.033 1.637<br />

Z7057 Kaligang-Bagharpara Road Km 005.40-005.58 S 0.18 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 3.286 2.496<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:22 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z7057 Kaligang-Bagharpara Road Km 005.58-008.60 S 3.02 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.33 1.7 <strong>23</strong>.01<br />

Z7057 Kaligang-Bagharpara Road Km 009.30-009.70 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.90 2.299 4.119<br />

Z7057 Kaligang-Bagharpara Road Km 013.30-013.60 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.539 2.469<br />

Z7057 Kaligang-Bagharpara Road Km 014.80-015.50 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 2.019 7.557<br />

Sub-total Jhenaidah Division<br />

193.84<br />

Khulna Division<br />

Z7041 Khulna -Terokhada Road Km 010.50-010.70 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.74 2.867<br />

Z7041 Khulna -Terokhada Road Km 010.90-011.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.89 1.906 1.57<br />

Z7041 Khulna -Terokhada Road Km 011.10-011.40 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.68 1.542 3.8<strong>12</strong><br />

Z7041 Khulna -Terokhada Road Km 011.80-0<strong>12</strong>.00 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.79 1.747 2.88<br />

Z7041 Khulna -Terokhada Road Km 014.90-015.50 S 0.60 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.36 1.483 7.334<br />

Z7041 Khulna -Terokhada Road Km 022.00-022.20 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.97 0.7 1.299<br />

Z7041 Khulna -Terokhada Road Km 009.30-009.70 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 2.<strong>12</strong>5 4.546<br />

Z7041 Khulna -Terokhada Road Km 009.70-010.00 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.906 3.058<br />

Z7041 Khulna -Terokhada Road Km 013.30-014.80 S 1.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.16 2.864 <strong>23</strong>.601<br />

Z7041 Khulna -Terokhada Road Km 015.80-016.40 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.74 1.2<strong>12</strong> 4.256<br />

Z7041 Khulna -Terokhada Road Km 017.20-018.80 S 1.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.28 2.397 <strong>23</strong>.554<br />

Z7041 Khulna -Terokhada Road Km 018.90-019.10 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.28 2.303 2.83<br />

Z7604 Betgram-Koyra Road Km 026.20-029.30 S 3.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 29.78 1.175 32.396<br />

Z7604 Betgram-Koyra Road Km 034.30-034.50 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 1.888 2.957<br />

Z7604 Betgram-Koyra Road Km 037.50-038.60 S 1.10 1621 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.06 0.291 1.683<br />

Z7604 Betgram-Koyra Road Km 038.60-039.00 S 0.40 1621 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 1.159 2.441<br />

Z7606 Gollamari-Nalian Forest Road Km 000.40-001.40 S 1.00 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 8.95 1.675 13.841<br />

Z7606 Gollamari-Nalian Forest Road Km 000.00-000.20 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 0.751 1.226<br />

Z7606 Gollamari-Nalian Forest Road Km 0<strong>12</strong>.90-013.10 S 0.20 941 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.248 0.25<br />

Z7606 Gollamari-Nalian Forest Road Km 017.00-019.80 S 2.80 941 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.42 0.446 6.301<br />

Sub-total Khulna Division<br />

109.78<br />

Kushtia Division<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 000.00-000.10 S 0.10 1791 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.85 0.832 0.633<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 002.10-002.90 S 0.80 1791 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.73 0.045 0.291<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 003.10-006.10 S 3.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 25.25 0.666 16.327<br />

Z7411 Bheramara-Daulatpur Road Km 009.20-009.50 S 0.30 2211 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.038 0.093<br />

Z7411 Bheramara-Daulatpur Road Km 0<strong>12</strong>.00-016.27 S 4.27 2211 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 35.92 0.001 0.019<br />

Z7463 Bheramara - Mirpur Thana Km 000.60-001.10 S 0.50 1336 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 0.303 0.794<br />

Z7463 Bheramara - Mirpur Thana Km 002.00-002.80 S 0.80 1336 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.41 0.379 1.587<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:<strong>23</strong> of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z7463 Bheramara - Mirpur Thana Km 003.80-004.60 S 0.80 1336 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 0.365 1.274<br />

Z7463 Bheramara - Mirpur Thana Km 005.10-007.10 S 2.00 1336 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.18 0.788 6.884<br />

Z7463 Bheramara - Mirpur Thana Km 007.30-008.00 S 0.70 1336 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.66 0.387 1.349<br />

Sub-total Kushtia Division<br />

94.94<br />

Magura Division<br />

Z7008 Sripur-Wapdah More Road Km 022.40-022.80 S 0.40 515 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.103 0.213<br />

Z7008 Sripur-Wapdah More Road Km 031.00-032.20 S 1.20 515 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.79 0.181 1.<strong>12</strong>8<br />

Z7011 Magura-Sripur Road Km 000.90-001.20 S 0.30 2254 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.29 0.211 0.459<br />

Z7011 Magura-Sripur Road Km 008.00-008.70 S 0.70 2254 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 0.33 1.178<br />

Z7011 Magura-Sripur Road Km 008.70-011.70 S 3.00 2254 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.03 1.103 16.908<br />

Z7011 Magura-Sripur Road Km 0<strong>12</strong>.00-0<strong>12</strong>.60 S 0.60 2254 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.03 1.338 3.646<br />

Z7011 Magura-Sripur Road Km 0<strong>12</strong>.80-014.06 S 1.26 2254 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.98 0.709 5.297<br />

Z7201 Arpara-Salikha Road Km 003.50-005.80 S 2.30 <strong>12</strong>22 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.02 0.277 3.298<br />

Sub-total Magura Division<br />

56.37<br />

Meherpur Division<br />

Z7452 Gangi-Kulbaria Road Km 000.00-000.20 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.8<strong>12</strong> 2.917<br />

Z7452 Gangi-Kulbaria Road Km 001.40-001.60 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.584 2.549<br />

Z7452 Gangi-Kulbaria Road Km 002.00-002.10 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.998 1.608<br />

Z7452 Gangi-Kulbaria Road Km 002.70-002.90 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.787 2.877<br />

Z7452 Gangi-Kulbaria Road Km 003.40-003.50 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.942 1.563<br />

Z7452 Gangi-Kulbaria Road Km 005.30-005.90 S 0.60 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.22 1.439 6.947<br />

Z7452 Gangi-Kulbaria Road Km 006.10-007.80 S 1.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.62 2.265 20.587<br />

Sub-total Meherpur Division<br />

21.79<br />

Satkhira Division<br />

Z7552 keshabpur- kalarawa Road Km 018.86-019.26 S 0.40 3814 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.87 1.551 4.103<br />

Z7602 Satkhira-Kaliganj Road Km 000.10-000.40 S 0.30 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.88 2.595 9.346<br />

Z7602 Satkhira-Kaliganj Road Km 001.80-001.90 S 0.10 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 2.845 3.415<br />

Z7602 Satkhira-Kaliganj Road Km 002.00-002.30 S 0.30 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.88 1.365 4.915<br />

Z7602 Satkhira-Kaliganj Road Km 002.40-002.60 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 2.6<strong>12</strong> 6.271<br />

Z7602 Satkhira-Kaliganj Road Km 002.70-003.10 S 0.40 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.17 2.55 <strong>12</strong>.247<br />

Z7602 Satkhira-Kaliganj Road Km 003.90-004.10 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 2.694 6.469<br />

Z7602 Satkhira-Kaliganj Road Km 004.80-004.90 S 0.10 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 1.541 1.85<br />

Z7602 Satkhira-Kaliganj Road Km 007.40-007.80 S 0.40 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.17 1.266 6.081<br />

Z7602 Satkhira-Kaliganj Road Km 010.60-010.80 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 2.533 6.082<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:24 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z7602 Satkhira-Kaliganj Road Km 011.70-011.90 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 1.257 3.019<br />

Z7602 Satkhira-Kaliganj Road Km 0<strong>12</strong>.40-0<strong>12</strong>.50 S 0.10 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 2.871 3.447<br />

Z7602 Satkhira-Kaliganj Road Km 014.40-014.60 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 1.377 3.307<br />

Z7602 Satkhira-Kaliganj Road Km 015.30-015.40 S 0.10 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 3.095 3.716<br />

Z7602 Satkhira-Kaliganj Road Km 015.60-015.80 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 1.482 3.557<br />

Z7602 Satkhira-Kaliganj Road Km 016.00-016.10 S 0.10 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 3.095 3.716<br />

Z7602 Satkhira-Kaliganj Road Km 016.70-017.00 S 0.30 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.88 2.5 9.002<br />

Z7602 Satkhira-Kaliganj Road Km 017.20-017.40 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 1.469 3.527<br />

Z7602 Satkhira-Kaliganj Road Km 017.50-017.60 S 0.10 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 2.961 3.554<br />

Z7602 Satkhira-Kaliganj Road Km 018.50-018.70 S 0.20 7913 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 2.653 6.37<br />

Z7602 Satkhira-Kaliganj Road Km 003.30-003.70 S 0.40 7913 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.37 2.628 8.457<br />

Z7602 Satkhira-Kaliganj Road Km 008.80-009.10 S 0.30 7913 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 3.363 8.115<br />

Z7602 Satkhira-Kaliganj Road Km 011.00-011.30 S 0.30 7913 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 2.417 5.832<br />

Z7602 Satkhira-Kaliganj Road Km 014.70-014.80 S 0.10 7913 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 2.758 2.218<br />

Z7602 Satkhira-Kaliganj Road Km 026.10-026.80 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.89 0.625 3.575<br />

Z7602 Satkhira-Kaliganj Road Km 026.90-027.00 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 0.671 0.548<br />

Z7602 Satkhira-Kaliganj Road Km 032.10-032.40 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.83 2.034<br />

Z7602 Satkhira-Kaliganj Road Km 032.90-034.50 S 1.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.46 0.856 11.176<br />

Z7607 Satkhira -Debhata Road Km 001.10-001.20 S 0.10 4350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 1.441 1.676<br />

Z7607 Satkhira -Debhata Road Km 003.50-003.80 S 0.30 4350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.242 2.835<br />

Z7607 Satkhira -Debhata Road Km 003.90-004.20 S 0.30 4350 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 1.258 2.873<br />

Z7607 Satkhira -Debhata Road Km 004.60-005.09 S 0.49 4350 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.<strong>12</strong> 1.<strong>12</strong>7 4.348<br />

Z7609 Banshipur-Munshiganj road Km 004.10-005.80 S 1.70 1603 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.09 0.528 4.986<br />

Z7609 Banshipur-Munshiganj road Km 009.10-009.70 S 0.60 1603 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.30 0.615 1.828<br />

Z7613 Tala-Satkhira Road Km 005.80-006.20 S 0.40 977 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.45 0.211 0.474<br />

Z7613 Tala-Satkhira Road Km 008.10-008.60 S 0.50 977 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.06 0.469 1.316<br />

Z7613 Tala-Satkhira Road Km 009.10-009.70 S 0.60 977 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.67 0.588 1.981<br />

Z7617 Kaliganj-Vetkhali Road Km 005.80-005.90 S 0.10 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 3.094 3.691<br />

Z7617 Kaliganj-Vetkhali Road Km 006.30-006.40 S 0.10 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 3.093 3.69<br />

Z7617 Kaliganj-Vetkhali Road Km 009.60-009.70 S 0.10 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 3.082 3.676<br />

Z7617 Kaliganj-Vetkhali Road Km 011.30-011.40 S 0.10 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 2.367 2.824<br />

Z7617 Kaliganj-Vetkhali Road Km 0<strong>12</strong>.20-0<strong>12</strong>.40 S 0.20 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 2.557 6.099<br />

Z7617 Kaliganj-Vetkhali Road Km 0<strong>12</strong>.50-0<strong>12</strong>.70 S 0.20 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 2.407 5.741<br />

Z7617 Kaliganj-Vetkhali Road Km 013.20-013.70 S 0.50 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.46 2.251 13.426<br />

Z7617 Kaliganj-Vetkhali Road Km 013.90-014.10 S 0.20 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.58 2.155 5.141<br />

Z7617 Kaliganj-Vetkhali Road Km 014.20-014.30 S 0.10 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 1.2<strong>23</strong> 1.459<br />

Z7617 Kaliganj-Vetkhali Road Km 014.80-014.90 S 0.10 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 2.407 2.871<br />

Z7617 Kaliganj-Vetkhali Road Km 015.60-015.70 S 0.10 4382 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.29 1.191 1.42<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:25 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z7617 Kaliganj-Vetkhali Road Km 006.00-006.20 S 0.20 4382 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 1.631 2.643<br />

Z7617 Kaliganj-Vetkhali Road Km 011.90-0<strong>12</strong>.00 S 0.10 4382 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 2.091 1.694<br />

Z7617 Kaliganj-Vetkhali Road Km 016.80-016.90 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 1.322 1.08<br />

Z7617 Kaliganj-Vetkhali Road Km 017.80-018.00 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 1.274 2.081<br />

Z7617 Kaliganj-Vetkhali Road Km 019.00-019.80 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.73 0.978 6.39<br />

Z7617 Kaliganj-Vetkhali Road Km 022.10-022.70 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.05 0.735 3.601<br />

Z7617 Kaliganj-Vetkhali Road Km 024.90-027.69 S 2.79 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 24.20 0.58 13.616<br />

Sub-total Satkhira Division<br />

182.57<br />

Total Khulna Zone 849.59<br />

Rajshahi Zone<br />

Naogaon Division<br />

Z5464 Patnitala-Shibpur Road Km 003.30-003.40 S 0.10 <strong>12</strong>44 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.70 0.439 0.282<br />

Z5464 Patnitala-Shibpur Road Km 000.30-001.70 S 1.40 <strong>12</strong>44 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.42 2.443 14.399<br />

Z5464 Patnitala-Shibpur Road Km 002.10-002.60 S 0.50 <strong>12</strong>44 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.29 2.<strong>23</strong>1 4.696<br />

Z5464 Patnitala-Shibpur Road Km 003.90-004.60 S 0.70 <strong>12</strong>44 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.21 2.113 6.227<br />

Z5464 Patnitala-Shibpur Road Km 006.90-007.40 S 0.50 <strong>12</strong>44 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.29 1.795 3.778<br />

Z5464 Patnitala-Shibpur Road Km 008.40-008.80 S 0.40 <strong>12</strong>44 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 0.598 1.208<br />

Z6810 M<strong>and</strong>a Thana link Road Km 001.60-001.90 S 0.30 1955 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.213 0.517<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 000.80-000.90 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.679 1.347<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 001.10-001.20 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.891 1.517<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 002.30-002.50 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.699 2.727<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 002.90-003.10 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.659 2.663<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 003.30-003.40 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.601 1.285<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 005.40-006.70 S 1.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 11.30 0.646 6.744<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 013.30-013.50 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.802 2.892<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 015.20-015.80 S 0.60 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.22 1.363 6.561<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 016.60-016.80 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.787 2.868<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 000.40-000.80 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.632 3.492<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 001.60-001.90 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 2.567 4.118<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 001.90-002.30 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.952 4.175<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 003.10-003.30 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 2.284 2.443<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 006.70-0<strong>12</strong>.80 S 6.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 34.53 2.06 67.194<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 014.60-015.00 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 2.133 4.562<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 016.40-016.50 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.55 1.364<br />

Sub-total Naogaon Division<br />

90.45<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:26 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

NPV /<br />

Cost<br />

NPV<br />

Natore Division<br />

Z5211 Natore -Gurudaspur Road Km 008.20-008.40 S 0.20 1680 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.<strong>12</strong> 0.272 0.288<br />

Z5211 Natore -Gurudaspur Road Km 0<strong>12</strong>.20-0<strong>12</strong>.50 S 0.30 1680 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 0.447 0.709<br />

Z5211 Natore -Gurudaspur Road Km 0<strong>12</strong>.60-013.18 S 0.57 1680 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.22 0.242 0.737<br />

Z6006 Baneswar-Ishwardi Road Km 031.00-031.01 S 0.01 <strong>12</strong>54 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.05 0.579 0.028<br />

Z6006 Baneswar-Ishwardi Road Km 031.41-031.61 S 0.20 <strong>12</strong>54 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 0.097 0.156<br />

Z6006 Baneswar-Ishwardi Road Km 032.61-032.71 S 0.10 <strong>12</strong>54 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.87 0.432 0.346<br />

Z6006 Baneswar-Ishwardi Road Km 041.21-041.31 S 0.10 3850 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.87 1.405 1.188<br />

Z6011 Lalpur -Natore Road Km 008.95-009.15 S 0.20 1730 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.322 2.145<br />

Z6011 Lalpur -Natore Road Km 015.25-015.35 S 0.10 1730 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.49 1.209<br />

Z6011 Lalpur -Natore Road Km 017.75-017.85 S 0.10 1730 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.58 1.282<br />

Z6011 Lalpur -Natore Road Km 009.15-015.25 S 6.10 1730 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 34.53 1.62 53.57<br />

Z6011 Lalpur -Natore Road Km 015.35-017.75 S 2.40 1730 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.58 1.918 24.951<br />

Z6011 Lalpur -Natore Road Km 019.45-020.75 S 1.30 1497 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.36 1.387 9.383<br />

Z6014 Bonpara-Lalpur Road Km 000.20-006.60 S 6.40 3100 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 77.58 3.527 257.469<br />

Z6014 Bonpara-Lalpur Road Km 006.80-007.90 S 1.10 3100 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 13.41 2.576 32.671<br />

Z6014 Bonpara-Lalpur Road Km 010.70-0<strong>12</strong>.00 S 1.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.94 1.114 11.8<strong>23</strong><br />

Z6014 Bonpara-Lalpur Road Km 013.20-016.20 S 3.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 25.24 0.991 24.273<br />

Z6022 Ishwardi-Kadamchilan Road Km 004.00-0<strong>12</strong>.70 S 8.70 1907 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 48.84 0.138 6.5<strong>23</strong><br />

Sub-total Natore Division<br />

244.51<br />

Nawabganj Division<br />

Z6801 Nawabganj-Baliadighi Road Km 001.10-001.20 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.<strong>12</strong> 0.583 0.632<br />

Z6801 Nawabganj-Baliadighi Road Km 013.00-013.10 S 0.10 2083 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.95 0.946 0.879<br />

Z6802 Kansat-Rohonpur Road Km 005.80-006.40 S 0.60 7<strong>23</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 0.421 1.314<br />

Z6802 Kansat-Rohonpur Road Km 011.30-011.50 S 0.20 7<strong>23</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.096 0.1<br />

Z6802 Kansat-Rohonpur Road Km 013.80-014.00 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 2.166 2.345<br />

Z6802 Kansat-Rohonpur Road Km 014.30-014.40 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.548 1.379<br />

Z6802 Kansat-Rohonpur Road Km 021.77-031.13 S 9.35 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 53.81 1.214 61.098<br />

Z6805 Rahonpur-Bholahati Road Km 001.03-001.<strong>23</strong> S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 1.591 2.561<br />

Z6805 Rahonpur-Bholahati Road Km 002.53-003.<strong>23</strong> S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 2.072 7.849<br />

Z6805 Rahonpur-Bholahati Road Km 003.33-003.43 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.821 1.526<br />

Z6805 Rahonpur-Bholahati Road Km 004.13-004.83 S 0.70 <strong>12</strong>06 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 1.026 3.854<br />

Z6805 Rahonpur-Bholahati Road Km 010.63-011.73 S 1.10 <strong>12</strong>06 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 0.38 2.242<br />

Z6805 Rahonpur-Bholahati Road Km 011.83-0<strong>12</strong>.93 S 1.10 <strong>12</strong>06 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 0.796 4.699<br />

Z6806 Nawabganj-Gomastapur Road Km 000.60-000.90 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.65 0.893 3.187<br />

Appendix-D: Page:27 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z6806 Nawabganj-Gomastapur Road Km 006.70-007.30 S 0.60 2209 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.74 0.667 3.091<br />

Z6806 Nawabganj-Gomastapur Road Km 007.40-007.70 S 0.30 2209 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.435 1.065<br />

Z6806 Nawabganj-Gomastapur Road Km 008.20-010.00 S 1.80 2209 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.82 1.182 <strong>12</strong>.021<br />

Z6806 Nawabganj-Gomastapur Road Km 010.70-010.90 S 0.20 2209 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 0.333 0.544<br />

Z6817 Nachol-Gomastapur Road Km 000.70-001.10 S 0.40 1107 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 0.421 0.85<br />

Z6817 Nachol-Gomastapur Road Km 001.20-002.50 S 1.30 1107 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.16 0.734 4.819<br />

Z6817 Nachol-Gomastapur Road Km 005.70-006.20 S 0.50 1107 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.44 0.362 1.141<br />

Z6817 Nachol-Gomastapur Road Km 010.10-0<strong>12</strong>.60 S 2.50 1107 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.61 0.554 7.425<br />

Z6817 Nachol-Gomastapur Road Km 013.40-015.70 S 2.30 1107 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.67 0.585 6.795<br />

Z6817 Nachol-Gomastapur Road Km 015.80-016.16 S 0.36 1107 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.98 1.034 1.88<br />

Z6818 Baragaria-Jadabpur Road Km 000.50-000.90 S 0.40 661 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.196 0.406<br />

Z6818 Baragaria-Jadabpur Road Km 001.50-002.60 S 1.10 661 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 0.181 1.033<br />

Sub-total Nawabganj Division<br />

158.74<br />

Pabna Division<br />

Z6006 Baneswar-Ishwardi Road Km 049.11-049.31 S 0.20 3850 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.74 1.396 2.362<br />

Z6006 Baneswar-Ishwardi Road Km 049.41-049.51 S 0.10 3850 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.87 1.385 1.172<br />

Z6006 Baneswar-Ishwardi Road Km 049.61-050.31 S 0.70 3850 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.10 1.773 10.499<br />

Z6021 Chatmohor-Bagabari Road Km 006.10-006.30 S 0.20 1832 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.90 0.034 0.063<br />

Z6021 Chatmohor-Bagabari Road Km 006.60-006.70 S 0.10 1832 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.95 0.433 0.399<br />

Z6021 Chatmohor-Bagabari Road Km 008.40-008.90 S 0.50 1832 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.74 0.388 1.787<br />

Z6021 Chatmohor-Bagabari Road Km 009.60-009.70 S 0.10 1832 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.95 0.558 0.513<br />

Z6021 Chatmohor-Bagabari Road Km 020.20-020.50 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.85 0.442 1.<strong>23</strong>1<br />

Z6021 Chatmohor-Bagabari Road Km 021.00-021.10 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.95 1.1<strong>12</strong> 1.032<br />

Z6026 Madhpur-Santhia-Bera Road Km 004.30-005.20 S 0.90 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.85 0.358 2.73<br />

Z6026 Madhpur-Santhia-Bera Road Km 019.50-019.60 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.87 0.952 0.806<br />

Z6034 Faridpur Upazilla Connecting Road Km 000.00-002.69 S 2.69 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.81 1.489 20.831<br />

Sub-total Pabna Division<br />

44.58<br />

Rajshahi Division<br />

Z6004 Puthia-Bagmara Road Km 009.00-009.20 S 0.20 802 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.116 0.117<br />

Z6004 Puthia-Bagmara Road Km 010.10-010.30 S 0.20 802 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.315 0.318<br />

Z6004 Puthia-Bagmara Road Km 0<strong>12</strong>.10-0<strong>12</strong>.40 S 0.30 802 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 0.05 0.076<br />

Z6004 Puthia-Bagmara Road Km 014.00-014.10 S 0.10 802 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 0.34 0.171<br />

Z6004 Puthia-Bagmara Road Km 015.80-015.90 S 0.10 802 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 0.658 0.332<br />

Z6004 Puthia-Bagmara Road Km 016.40-016.50 S 0.10 802 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 0.537 0.271<br />

Z6005 Shibpur-Taherpur Road Km 005.60-005.90 S 0.30 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 0.247 0.367<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:28 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z6005 Shibpur-Taherpur Road Km 006.20-006.60 S 0.40 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 0.229 0.454<br />

Z6005 Shibpur-Taherpur Road Km 007.20-007.30 S 0.10 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 0.855 0.424<br />

Z6005 Shibpur-Taherpur Road Km 009.00-009.10 S 0.10 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 0.801 0.397<br />

Z6005 Shibpur-Taherpur Road Km 010.70-010.90 S 0.20 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.778 0.772<br />

Z6005 Shibpur-Taherpur Road Km 011.20-011.50 S 0.30 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.65 0.395 0.587<br />

Z6005 Shibpur-Taherpur Road Km 0<strong>12</strong>.30-0<strong>12</strong>.70 S 0.40 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 0.757 1.501<br />

Z6005 Shibpur-Taherpur Road Km 019.50-019.70 S 0.20 1943 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.692 0.686<br />

Z6006 Baneswar-Ishwardi Road Km 003.20-006.00 S 2.80 3085 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>23</strong>.56 1.447 33.371<br />

Z6006 Baneswar-Ishwardi Road Km 010.10-010.70 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.05 1.482 7.258<br />

Z6006 Baneswar-Ishwardi Road Km 010.90-0<strong>12</strong>.10 S 1.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.10 1.852 18.146<br />

Z6006 Baneswar-Ishwardi Road Km 0<strong>12</strong>.20-014.50 S 2.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 19.35 1.819 34.166<br />

Z6006 Baneswar-Ishwardi Road Km 014.80-015.10 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 1.637 4.008<br />

Z6019 Puthia-Arani-Bagha Road Km 006.81-006.91 S 0.10 1709 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 1.134 0.668<br />

Z6020 Arani-Bagatipara Road Km 000.00-000.60 S 0.60 755 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.30 0.<strong>23</strong>4 0.706<br />

Z6020 Arani-Bagatipara Road Km 003.37-005.00 S 1.63 755 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.98 0.374 3.07<br />

Z6855 Bagshara-Gunigram Road Km 018.90-019.30 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.48 1.715 5.522<br />

Z6855 Bagshara-Gunigram Road Km 0<strong>23</strong>.80-024.63 S 0.83 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 9.75 0.779 7.147<br />

Z6855 Bagshara-Gunigram Road Km 015.80-017.30 S 1.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.49 2.995 22.883<br />

Z6855 Bagshara-Gunigram Road Km 017.50-018.50 S 1.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.66 2.439 <strong>12</strong>.426<br />

Sub-total Rajshahi Division<br />

117.37<br />

Sirajganj Division<br />

Z5042 Sirajganj-Raiganj Road Km 003.32-006.50 S 3.18 2865 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.80 0.89 14.819<br />

Z5042 Sirajganj-Raiganj Road Km 007.10-007.50 S 0.40 2865 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.8<strong>12</strong> 1.716<br />

Z5042 Sirajganj-Raiganj Road Km 0<strong>12</strong>.20-0<strong>12</strong>.50 S 0.30 2865 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.79 0.8<strong>23</strong> 1.392<br />

Z5042 Sirajganj-Raiganj Road Km 015.10-015.60 S 0.50 2865 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.98 0.662 1.778<br />

Z5042 Sirajganj-Raiganj Road Km 018.00-018.30 S 0.30 2865 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.79 0.869 1.399<br />

Z5042 Sirajganj-Raiganj Road Km 020.10-020.40 S 0.30 2865 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.79 0.676 1.089<br />

Z5046 Ullahpara-Taras Road Km 003.90-007.00 S 3.10 1858 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.36 0.262 4.091<br />

Z5047 Shahazadpur-Chauhali Road Km 002.60-002.70 S 0.10 1001 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 0.073 0.038<br />

Z5047 Shahazadpur-Chauhali Road Km 003.70-005.20 S 1.50 1001 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.49 0.113 0.881<br />

Z5402 Sirajganj-Samespur Road Km 006.90-007.00 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.10 1.611 1.663<br />

Z5402 Sirajganj-Samespur Road Km 001.10-001.80 S 0.70 1578 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.89 0.465 2.625<br />

Z5402 Sirajganj-Samespur Road Km 003.10-006.20 S 3.10 1578 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 26.08 0.779 19.46<br />

Z5402 Sirajganj-Samespur Road Km 007.20-007.30 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.56 2.537 1.358<br />

Z5409 Saidabad-Khaja Yunis MCH Road Km 018.10-018.70 S 0.60 <strong>12</strong>54 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.36 1.2<strong>12</strong> 3.741<br />

Z5409 Saidabad-Khaja Yunis MCH Road Km 019.00-019.20 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.<strong>12</strong> 2.976 3.166<br />

Z5409 Saidabad-Khaja Yunis MCH Road Km 019.50-019.60 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.53 3.737 1.868<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:29 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5410 Enayetpur-Shahazadpur Road Km 003.50-003.90 S 0.40 1426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.24 0.276 0.589<br />

Z5410 Enayetpur-Shahazadpur Road Km 010.40-010.50 S 0.10 1426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 0.401 0.21<br />

Z5410 Enayetpur-Shahazadpur Road Km 0<strong>12</strong>.70-013.70 S 1.00 1426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.58 0.336 1.783<br />

Sub-total Sirajganj Division<br />

101.83<br />

Total Rajshahi Zone 757.48<br />

Rangpur Zone<br />

Bogra Division<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 000.48-000.98 S 0.50 1809 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 0.4 1.02<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 001.08-003.88 S 2.80 1809 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.85 0.326 4.652<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 008.18-008.98 S 0.80 1809 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 0.014 0.059<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 013.18-014.28 S 1.10 1809 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 0.16 0.895<br />

Z5040 Sultanganj -Gabtali Road Km 000.80-001.20 S 0.40 <strong>23</strong>63 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.37 0.708 2.313<br />

Z5040 Sultanganj -Gabtali Road Km 004.50-004.60 S 0.10 <strong>23</strong>63 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 0.396 0.3<strong>23</strong><br />

Z5040 Sultanganj -Gabtali Road Km 0<strong>12</strong>.10-015.76 S 3.66 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 24.47 1.566 36.896<br />

Z5051 Baiguni-Poradah Road Km 003.20-004.14 S 0.94 <strong>12</strong>87 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.32 0.068 0.346<br />

Z5053 Kahalu Thana Connecting Road Km 004.10-004.70 S 0.60 3222 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 0.765 2.337<br />

Z5053 Kahalu Thana Connecting Road Km 005.30-005.90 S 0.60 3222 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 0.763 2.333<br />

Z5053 Kahalu Thana Connecting Road Km 006.80-007.60 S 0.80 3222 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.04 0.851 3.093<br />

Z5053 Kahalu Thana Connecting Road Km 010.10-010.96 S 0.86 3222 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.34 0.943 3.683<br />

Z5072 Dhunot-Mokamtala Road Km 019.13-019.<strong>23</strong> S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 2.752 1.534<br />

Z5072 Dhunot-Mokamtala Road Km 019.93-022.<strong>23</strong> S 2.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 15.59 1.671 24.751<br />

Z5072 Dhunot-Mokamtala Road Km 024.73-024.83 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 1.162 0.957<br />

Z5072 Dhunot-Mokamtala Road Km 028.43-031.73 S 3.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 24.08 1.682 39.299<br />

Z5072 Dhunot-Mokamtala Road Km 032.53-033.43 S 0.90 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.09 2.03 9.676<br />

Z5072 Dhunot-Mokamtala Road Km 039.<strong>23</strong>-039.33 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.206 1.168<br />

Z5072 Dhunot-Mokamtala Road Km 051.46-052.43 S 0.97 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.49 1.834 9.42<br />

Z5207 N<strong>and</strong>igram -Raninagar Road Km 007.60-007.80 S 0.20 <strong>12</strong>84 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.389 0.419<br />

Z5459 Nasratpur-Beragram Road Km 000.60-000.90 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 1.416 3.419<br />

Z5459 Nasratpur-Beragram Road Km 001.70-002.00 S 0.30 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.61 1.74 4.2<br />

Z5459 Nasratpur-Beragram Road Km 000.20-000.30 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.538 1.357<br />

Z5505 Mahashastan -Amtoli Road Km 006.92-007.02 S 0.10 3377 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.47 2.1<strong>23</strong> 0.906<br />

Z5505 Mahashastan -Amtoli Road Km 008.32-008.92 S 0.60 3377 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 0.807 2.467<br />

Z5505 Mahashastan -Amtoli Road Km 009.02-009.32 S 0.30 3377 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.97 0.92 1.702<br />

Sub-total Bogra Division<br />

143.59<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:30 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Dinajpur Division<br />

Z5007 Birganj-Kaharol Road Km 000.10-003.10 S 3.00 1335 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.44 0.055 0.643<br />

Z5008 Birganj-Darwani Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.10 2613 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.64 1.32<br />

Z5008 Birganj-Darwani Road Km 000.70-000.80 S 0.10 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.513 0.77<br />

Z5008 Birganj-Darwani Road Km 001.30-004.30 S 3.00 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.98 1.471 22.478<br />

Z5008 Birganj-Darwani Road Km 004.70-005.10 S 0.40 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.52 3.096<br />

Z5008 Birganj-Darwani Road Km 005.90-006.70 S 0.80 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 1.465 5.969<br />

Z5008 Birganj-Darwani Road Km 007.30-008.80 S 1.50 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.49 1.245 9.513<br />

Z5008 Birganj-Darwani Road Km 008.80-010.40 S 1.60 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.06 1.356 11.049<br />

Z5008 Birganj-Darwani Road Km 016.39-018.89 S 2.50 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.15 1.266 16.<strong>12</strong>5<br />

Z5008 Birganj-Darwani Road Km 019.19-019.29 S 0.10 2613 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.603 0.817<br />

Z5008 Birganj-Darwani Road Km 019.69-019.86 S 0.17 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.96 2.388 2.15<br />

Z5025 Rangpur-Dinajpur Road Km 060.45-061.45 S 1.00 845 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.60 1.071 5.514<br />

Z5025 Rangpur-Dinajpur Road Km 061.55-062.45 S 0.90 845 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.04 0.884 4.095<br />

Z5025 Rangpur-Dinajpur Road Km 063.25-063.35 S 0.10 845 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 0.685 0.528<br />

Z5025 Rangpur-Dinajpur Road Km 063.45-064.95 S 1.50 845 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.09 1.013 8.465<br />

Z5025 Rangpur-Dinajpur Road Km 065.05-065.45 S 0.40 845 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.24 1.11 2.286<br />

Z5803 Dinajpur-Birol Road Km 003.70-004.20 S 0.50 4046 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.35 3.916 15.8<strong>12</strong><br />

Z5803 Dinajpur-Birol Road Km 007.20-007.30 S 0.10 4046 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 2.304 1.861<br />

Z5803 Dinajpur-Birol Road Km 009.10-009.30 S 0.20 4046 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 4.286 6.9<strong>23</strong><br />

Z5803 Dinajpur-Birol Road Km 009.40-009.90 S 0.50 4046 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.35 3.744 15.117<br />

Z5803 Dinajpur-Birol Road Km 010.30-010.90 S 0.60 4046 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.22 3.828 18.55<br />

Z5803 Dinajpur-Birol Road Km 010.90-011.30 S 0.40 4046 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.48 2.247 7.286<br />

Z5803 Dinajpur-Birol Road Km 011.30-011.40 S 0.10 4046 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 4.382 3.552<br />

Z5803 Dinajpur-Birol Road Km 000.40-000.70 S 0.30 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 3.742 6.036<br />

Z5803 Dinajpur-Birol Road Km 000.70-001.50 S 0.80 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 3.283 14.<strong>12</strong>6<br />

Z5803 Dinajpur-Birol Road Km 001.50-001.90 S 0.40 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 4.475 9.627<br />

Z5803 Dinajpur-Birol Road Km 002.20-002.40 S 0.20 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 3.932 4.229<br />

Z5803 Dinajpur-Birol Road Km 002.80-003.10 S 0.30 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 3.229 5.209<br />

Z5803 Dinajpur-Birol Road Km 003.10-003.70 S 0.60 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 3.372 10.881<br />

Z5803 Dinajpur-Birol Road Km 007.40-009.00 S 1.60 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.06 4.658 40.08<br />

Z5803 Dinajpur-Birol Road Km 009.30-009.40 S 0.10 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 3.69 1.984<br />

Z5803 Dinajpur-Birol Road Km 009.90-010.30 S 0.40 4046 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 3.752 8.07<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 003.10-004.00 S 0.90 1592 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.09 0.645 2.957<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 004.20-005.20 S 1.00 1592 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.66 1.152 5.869<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 005.30-007.10 S 1.80 1592 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.19 1.198 10.989<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 007.20-010.40 S 3.20 1592 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 18.11 0.577 9.407<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 010.80-011.40 S 0.60 1592 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 1.178 3.602<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:31 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 014.00-014.50 S 0.50 1592 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 0.695 1.77<br />

Z5851 Birampur-Bhaduria Road Km 002.50-002.70 S 0.20 4097 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 2.359 2.404<br />

Z5851 Birampur-Bhaduria Road Km 002.80-002.90 S 0.10 4097 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.706 1.379<br />

Z5851 Birampur-Bhaduria Road Km 003.20-004.00 S 0.80 4097 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 2.274 9.268<br />

Z5851 Birampur-Bhaduria Road Km 004.80-005.00 S 0.20 4097 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 2.455 2.502<br />

Z5851 Birampur-Bhaduria Road Km 008.50-008.80 S 0.30 4097 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 3.131 4.785<br />

Z5851 Birampur-Bhaduria Road Km 0<strong>12</strong>.00-013.20 S 1.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.79 1.948 <strong>12</strong>.647<br />

Z5851 Birampur-Bhaduria Road Km 013.30-014.10 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 2.173 9.406<br />

Z5851 Birampur-Bhaduria Road Km 014.80-015.80 S 1.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.66 1.816 9.828<br />

Z5851 Birampur-Bhaduria Road Km 016.90-017.30 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 2.438 5.278<br />

Z5851 Birampur-Bhaduria Road Km 020.40-021.50 S 1.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 1.514 9.011<br />

Z5854 Birampur -Hakimpur Road Km 002.40-002.90 S 0.50 2246 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.02 0.758 3.007<br />

Z5854 Birampur -Hakimpur Road Km 003.30-004.00 S 0.70 2246 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.80 1.7<strong>23</strong> 9.881<br />

Z5854 Birampur -Hakimpur Road Km 004.40-010.98 S 6.58 2246 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 55.76 0.93 50.75<br />

Z5857 Fulbari-Parbatipur Road Km 002.10-002.20 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 1.359 1.11<br />

Sub-total Dinajpur Division<br />

287.37<br />

Gaib<strong>and</strong>a Division<br />

Z5551 Dariapur-Kamarzani Road Km 002.20-002.22 S 0.02 449 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.11 0.457 0.047<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 019.30-019.40 S 0.10 3503 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 0.56 0.451<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 020.90-021.00 S 0.10 3503 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.506 1.2<strong>12</strong><br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 021.50-021.60 S 0.10 3503 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 1.48 1.191<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 000.20-000.40 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 1.951 2.086<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 004.10-004.50 S 0.40 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.08 2.021 3.994<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 006.30-006.40 S 0.10 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.283 1.228<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 006.40-008.60 S 2.20 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.45 1.593 18.848<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 009.00-009.40 S 0.40 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.141 2.455<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 009.50-009.90 S 0.40 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.242 2.672<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 010.00-010.10 S 0.10 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.355 0.728<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 010.20-010.30 S 0.10 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.418 0.763<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 014.10-015.30 S 1.20 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.79 1.097 7.078<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 017.50-019.00 S 1.50 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.49 1.458 11.764<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 019.60-019.70 S 0.10 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.977 1.063<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 019.80-020.40 S 0.60 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 1.481 4.78<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 021.80-022.10 S 0.30 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.499 2.419<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 022.40-022.50 S 0.10 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.379 0.742<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 024.10-024.20 S 0.10 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.456 0.783<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 024.40-025.30 S 0.90 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.09 1.117 5.406<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:32 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 025.50-025.90 S 0.40 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.177 2.533<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 026.40-026.60 S 0.20 3503 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 1.227 1.319<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 003.40-007.80 S 4.40 2480 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 24.90 2.295 51.448<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 008.10-008.50 S 0.40 2480 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.181 2.406<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 008.70-009.50 S 0.80 2480 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 1.745 7.1<strong>12</strong><br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 010.00-010.10 S 0.10 2480 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.688 0.86<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 001.30-003.60 S 2.30 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.02 0.483 5.768<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 003.80-004.20 S 0.40 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.435 0.903<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 009.60-010.20 S 0.60 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 0.396 1.<strong>23</strong>4<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 010.60-011.20 S 0.60 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 0.551 1.718<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 0<strong>12</strong>.10-013.10 S 1.00 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.66 0.369 1.917<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 013.30-014.30 S 1.00 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.66 0.451 2.344<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 014.40-014.70 S 0.30 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.304 0.474<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 014.80-015.00 S 0.20 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.419 0.435<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 016.60-017.30 S 0.70 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 0.046 0.168<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 017.80-019.10 S 1.30 932 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.36 0.269 1.817<br />

Z5555 Gaib<strong>and</strong>ha-Balashighat Road Km 001.50-001.80 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.11 2.373 4.861<br />

Z5555 Gaib<strong>and</strong>ha-Balashighat Road Km 002.00-002.70 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 1.851 6.602<br />

Z5555 Gaib<strong>and</strong>ha-Balashighat Road Km 003.00-003.80 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 1.468 5.982<br />

Z5555 Gaib<strong>and</strong>ha-Balashighat Road Km 005.10-005.20 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.077 1.058<br />

Z5555 Gaib<strong>and</strong>ha-Balashighat Road Km 005.40-005.70 S 0.30 742 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.354 0.551<br />

Z5613 Gaib<strong>and</strong>ah-Pirgachha Road Km 004.35-004.45 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.92 1.071 0.954<br />

Z5852 Palashbari-Goraghat Road Km 000.20-000.30 S 0.10 2659 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.194 0.608<br />

Z5852 Palashbari-Goraghat Road Km 003.30-006.30 S 3.00 2659 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.98 1.2 18.34<br />

Z5852 Palashbari-Goraghat Road Km 006.60-006.80 S 0.20 2659 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 1.21 1.<strong>23</strong>3<br />

Z5852 Palashbari-Goraghat Road Km 007.00-008.00 S 1.00 2659 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.66 1.216 6.194<br />

Z5852 Palashbari-Goraghat Road Km 008.20-008.70 S 0.50 2659 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 1.051 2.678<br />

Z5855 Joypurhat-Gobindaganj Road Km 021.60-021.90 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 2.047 3.253<br />

Z5855 Joypurhat-Gobindaganj Road Km 021.90-0<strong>23</strong>.70 S 1.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.19 2.456 <strong>23</strong>.4<strong>12</strong><br />

Z5855 Joypurhat-Gobindaganj Road Km 0<strong>23</strong>.70-024.20 S 0.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 1.973 5.224<br />

Z5855 Joypurhat-Gobindaganj Road Km 024.20-025.30 S 1.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.<strong>23</strong> 2.446 14.248<br />

Z5855 Joypurhat-Gobindaganj Road Km 025.40-027.70 S 2.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 13.02 2.158 26.283<br />

Z5855 Joypurhat-Gobindaganj Road Km 028.80-029.20 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 1.941 4.111<br />

Sub-total Gaib<strong>and</strong>a Division<br />

2<strong>12</strong>.16<br />

Joypurhat Division<br />

Z5452 Joypurhat-Badalgachhi-Road Km 003.00-003.50 S 0.50 1982 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.06 0.<strong>23</strong>6 0.938<br />

Z5452 Joypurhat-Badalgachhi-Road Km 006.80-008.00 S 1.20 1982 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.61 1.38 8.925<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:33 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5452 Joypurhat-Badalgachhi-Road Km 008.00-008.40 S 0.40 1982 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.20 1.985 4.28<br />

Z5452 Joypurhat-Badalgachhi-Road Km 011.80-014.90 S 3.10 1982 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.07 1.561 26.084<br />

Z5452 Joypurhat-Badalgachhi-Road Km 015.00-015.81 S 0.81 1982 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.46 1.318 5.753<br />

Z5478 Akkelpur-Santhahar Road Km 000.30-000.90 S 0.60 1049 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.59 0.564 2.375<br />

Z5478 Akkelpur-Santhahar Road Km 001.10-002.90 S 1.80 1049 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.19 0.824 7.964<br />

Z5478 Akkelpur-Santhahar Road Km 003.90-004.00 S 0.10 1049 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 0.969 0.52<br />

Z5478 Akkelpur-Santhahar Road Km 004.50-010.50 S 6.00 1049 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 33.96 0.9<strong>23</strong> 29.729<br />

Z5478 Akkelpur-Santhahar Road Km 010.50-011.00 S 0.50 1049 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 0.866 2.3<strong>23</strong><br />

Z5478 Akkelpur-Santhahar Road Km 011.00-011.80 S 0.80 1049 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.53 0.867 3.722<br />

Z5501 Joypurhat-Khetlal Road Km 000.50-003.60 S 3.10 1326 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.55 0.211 3.525<br />

Z5503 Joypurhat-Hili Road Km 000.40-000.70 S 0.30 1158 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.37 0.886<br />

Z5503 Joypurhat-Hili Road Km 004.10-005.80 S 1.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.30 1.331 18.631<br />

Z5503 Joypurhat-Hili Road Km 006.20-006.60 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.37 1.286 4.<strong>23</strong>5<br />

Z5503 Joypurhat-Hili Road Km 006.80-008.00 S 1.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.10 1.349 13.328<br />

Z5503 Joypurhat-Hili Road Km 010.10-010.80 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.89 1.313 7.571<br />

Z5503 Joypurhat-Hili Road Km 014.50-015.00 S 0.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.21 1.094 4.506<br />

Z5508 Khetlal-Akkelpur Road Km 000.30-000.50 S 0.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 1.296 1.373<br />

Z5508 Khetlal-Akkelpur Road Km 011.90-0<strong>12</strong>.10 S 0.20 2225 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 1.2 1.283<br />

Z5508 Khetlal-Akkelpur Road Km 0<strong>12</strong>.90-014.40 S 1.50 2225 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.49 0.637 5.109<br />

Z5855 Joypurhat-Gobindaganj Road Km 000.30-001.20 S 0.90 3959 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 10.68 1.991 19.751<br />

Z5855 Joypurhat-Gobindaganj Road Km 003.80-005.10 S 1.30 3959 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 10.99 2.653 26.254<br />

Z5855 Joypurhat-Gobindaganj Road Km 005.20-006.50 S 1.30 3959 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 10.99 2.648 26.198<br />

Z5855 Joypurhat-Gobindaganj Road Km 013.60-014.00 S 0.40 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.91 1.048 2.826<br />

Z5855 Joypurhat-Gobindaganj Road Km 016.00-016.50 S 0.50 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.<strong>23</strong> 1.471 5.758<br />

Z5855 Joypurhat-Gobindaganj Road Km 001.30-003.40 S 2.10 3959 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.76 3.073 31.24<br />

Z5855 Joypurhat-Gobindaganj Road Km 006.70-007.50 S 0.80 3959 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.41 3.019 <strong>12</strong>.564<br />

Z5855 Joypurhat-Gobindaganj Road Km 014.20-015.40 S 1.20 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.68 2.438 15.24<br />

Sub-total Joypurhat Division<br />

221.41<br />

Kurigram Division<br />

Z5614 Kurigram-Rajarhat Road Km 003.70-006.70 S 3.00 2704 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 21.66 2.26 47.<strong>12</strong>9<br />

Z5614 Kurigram-Rajarhat Road Km 006.70-007.10 S 0.40 2704 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.37 1.554 5.<strong>12</strong><br />

Z5616 Nageswari-Lalmonirhat Road Km 009.20-009.40 S 0.20 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.76 1.565 2.553<br />

Z5616 Nageswari-Lalmonirhat Road Km 013.60-014.30 S 0.70 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 6.17 1.489 8.5<br />

Z5616 Nageswari-Lalmonirhat Road Km 014.50-014.60 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.88 1.605 1.309<br />

Z5616 Nageswari-Lalmonirhat Road Km 000.60-000.70 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.535 1.39<br />

Z5616 Nageswari-Lalmonirhat Road Km 003.70-004.50 S 0.80 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.59 2.427 10.649<br />

Z5616 Nageswari-Lalmonirhat Road Km 004.60-004.90 S 0.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.72 2.627 4.3<strong>23</strong><br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:34 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5616 Nageswari-Lalmonirhat Road Km 006.70-007.30 S 0.60 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.44 2.14 7.043<br />

Z5616 Nageswari-Lalmonirhat Road Km 011.00-011.50 S 0.50 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.87 2.384 6.537<br />

Z5616 Nageswari-Lalmonirhat Road Km 017.10-018.60 S 1.50 1461 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.60 0.856 7.107<br />

Z5617 Nageswari-Fulbari Road Km 006.18-007.48 S 1.30 <strong>12</strong>52 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.36 0.014 0.096<br />

Z5617 Nageswari-Fulbari Road Km 015.58-015.78 S 0.20 <strong>12</strong>52 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.108 0.115<br />

Z5621 Kurigram-Chillmari Road Km 001.70-001.90 S 0.20 4948 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.41 2.347 5.08<br />

Z5621 Kurigram-Chillmari Road Km 005.40-006.00 S 0.60 4753 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.16 2.635 <strong>12</strong>.586<br />

Z5621 Kurigram-Chillmari Road Km 010.80-010.90 S 0.10 4753 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.86 2.071 1.649<br />

Z5621 Kurigram-Chillmari Road Km 013.40-013.50 S 0.10 4753 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.86 2.387 1.9<br />

Z5621 Kurigram-Chillmari Road Km 024.41-024.51 S 0.10 2078 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.86 1.576 1.255<br />

Z5621 Kurigram-Chillmari Road Km 028.11-028.21 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.86 1.263 1.006<br />

Z5621 Kurigram-Chillmari Road Km 001.30-001.40 S 0.10 4948 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 4.143 3.261<br />

Z5621 Kurigram-Chillmari Road Km 002.00-004.10 S 2.10 4753 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.18 3.25 35.607<br />

Z5621 Kurigram-Chillmari Road Km 004.20-005.30 S 1.10 4753 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.16 2.767 15.942<br />

Z5621 Kurigram-Chillmari Road Km 006.10-007.10 S 1.00 4753 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.60 2.865 15.008<br />

Z5621 Kurigram-Chillmari Road Km 007.20-007.40 S 0.20 4753 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.<strong>12</strong> 2.581 2.704<br />

Z5621 Kurigram-Chillmari Road Km 007.50-009.60 S 2.10 4948 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.97 3.665 52.133<br />

Z5621 Kurigram-Chillmari Road Km 011.00-011.90 S 0.90 4753 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.04 4.243 20.002<br />

Z5621 Kurigram-Chillmari Road Km 027.21-027.71 S 0.50 2078 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.30 2.173 6.898<br />

Z5621 Kurigram-Chillmari Road Km 028.71-029.11 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.73 1.282 3.425<br />

Z5622 Kurigram-Bhurungamari Road Km 035.28-035.38 S 0.10 4592 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.86 4.951 3.831<br />

Z5622 Kurigram-Bhurungamari Road Km 001.60-001.80 S 0.20 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 0.144 0.<strong>23</strong>5<br />

Z5622 Kurigram-Bhurungamari Road Km 013.80-014.20 S 0.40 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.24 1.149 2.408<br />

Z5622 Kurigram-Bhurungamari Road Km 016.40-017.60 S 1.20 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.72 1.192 7.491<br />

Z5622 Kurigram-Bhurungamari Road Km 018.00-019.80 S 1.80 1953 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 10.08 0.989 9.322<br />

Z5622 Kurigram-Bhurungamari Road Km 028.98-035.28 S 6.30 9<strong>23</strong>3 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 43.46 7.327 306.62<br />

Z5622 Kurigram-Bhurungamari Road Km 035.38-038.67 S 3.29 9<strong>23</strong>3 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 25.99 5.496 137.518<br />

Z5622 Kurigram-Bhurungamari Road Km 038.67-047.49 S 8.82 4592 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 48.57 4.838 211.506<br />

Z56<strong>23</strong> Ulipur-Chillmari Road Km 007.20-007.40 S 0.20 2108 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 1.254 1.341<br />

Z56<strong>23</strong> Ulipur-Chillmari Road Km 008.88-010.08 S 1.20 2108 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.79 1.515 9.721<br />

Z56<strong>23</strong> Ulipur-Chillmari Road Km 010.38-010.48 S 0.10 2108 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.228 0.656<br />

Z56<strong>23</strong> Ulipur-Chillmari Road Km 010.68-010.78 S 0.10 2108 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 1.276 0.683<br />

Z56<strong>23</strong> Ulipur-Chillmari Road Km 010.98-011.28 S 0.30 2108 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 1.6 2.566<br />

Sub-total Kurigram Division<br />

277.41<br />

Lalmonirhat Division<br />

Z5901 Lalmonirhat-Phulbari Road Km 000.50-000.60 S 0.10 1<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.76 0.173 0.<strong>12</strong>1<br />

Z5901 Lalmonirhat-Phulbari Road Km 009.46-009.80 S 0.34 1<strong>12</strong>1 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.33 0.269 0.573<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:35 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5903 Patgram-Angarpota Road Km 000.00-000.03 S 0.03 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.25 0.799 0.196<br />

Z5903 Patgram-Angarpota Road Km 009.15-009.25 S 0.10 1174 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 0.<strong>12</strong>1 0.068<br />

Z5903 Patgram-Angarpota Road Km 010.35-010.45 S 0.10 1174 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.61 0.<strong>12</strong>2 0.068<br />

Z5903 Patgram-Angarpota Road Km 010.65-011.75 S 1.10 1174 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.73 0.155 0.956<br />

Z5903 Patgram-Angarpota Road Km 014.75-015.95 S 1.20 1174 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.34 0.172 1.156<br />

Z5904 Patgram Bypass Km 001.48-001.60 S 0.<strong>12</strong> 1039 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.01 0.269 0.249<br />

Z5907 Lalmonirhat-Mogalhat Road Km 000.10-000.30 S 0.20 1690 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.68 0.263 0.424<br />

Z5907 Lalmonirhat-Mogalhat Road Km 000.60-001.80 S 1.20 1690 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.44 0.165 1.332<br />

Z5907 Lalmonirhat-Mogalhat Road Km 002.70-002.80 S 0.10 1690 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 0.684 0.366<br />

Sub-total Lalmonirhat Division<br />

30.35<br />

Nilphamari Division<br />

Z5008 Birganj-Darwani Road Km 019.86-022.89 S 3.03 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.15 1.938 31.101<br />

Z5008 Birganj-Darwani Road Km 026.29-026.39 S 0.10 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 2.7 1.43<br />

Z5011 Sayedpur-Parbatipur Road Km 000.40-002.40 S 2.00 3082 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 17.16 1.2<strong>23</strong> 20.553<br />

Z5015 Taxerhat-Kishoreganj Road Km 022.00-022.55 S 0.55 1565 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.09 0.761 2.<strong>23</strong>7<br />

Z5015 Taxerhat-Kishoreganj Road Km 022.65-022.85 S 0.20 1565 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.13 0.548 0.59<br />

Z5022 Nilphamari -Kishoreganj Road Km 002.60-005.60 S 3.00 805 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.80 0.254 3.9<strong>12</strong><br />

Z5022 Nilphamari -Kishoreganj Road Km 009.30-009.50 S 0.20 805 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 0.577 0.583<br />

Z5701 Nilphamari-Jaldhaka Road Km 014.97-017.97 S 3.00 1426 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 16.52 0.344 5.407<br />

Z5706 Domar-Volaganj Road Km 006.73-008.13 S 1.40 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 11.84 3.795 41.48<br />

Z5706 Domar-Volaganj Road Km 010.83-011.43 S 0.60 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 5.07 2.696 <strong>12</strong>.629<br />

Z5706 Domar-Volaganj Road Km 011.63-0<strong>12</strong>.03 S 0.40 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.38 2.695 8.418<br />

Z5706 Domar-Volaganj Road Km 015.43-015.63 S 0.20 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.69 2.887 4.508<br />

Z5706 Domar-Volaganj Road Km 016.03-016.43 S 0.40 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 3.38 2.763 8.628<br />

Z5706 Domar-Volaganj Road Km 017.13-017.43 S 0.30 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 2.594 6.077<br />

Z5706 Domar-Volaganj Road Km 019.93-020.43 S 0.50 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 4.<strong>23</strong> 2.729 10.652<br />

Z5706 Domar-Volaganj Road Km 0<strong>23</strong>.<strong>23</strong>-0<strong>23</strong>.53 S 0.30 4682 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 2.54 2.839 6.649<br />

Z5706 Domar-Volaganj Road Km 003.39-006.73 S 3.34 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 18.41 4.0<strong>12</strong> 69.776<br />

Z5706 Domar-Volaganj Road Km 008.33-010.33 S 2.00 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 11.01 5.389 56.076<br />

Z5706 Domar-Volaganj Road Km 010.43-010.63 S 0.20 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.10 4.509 4.691<br />

Z5706 Domar-Volaganj Road Km 0<strong>12</strong>.13-0<strong>12</strong>.<strong>23</strong> S 0.10 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 4.552 2.368<br />

Z5706 Domar-Volaganj Road Km 0<strong>12</strong>.33-013.03 S 0.70 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.85 4.266 15.538<br />

Z5706 Domar-Volaganj Road Km 013.<strong>23</strong>-013.73 S 0.50 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 4.513 11.741<br />

Z5706 Domar-Volaganj Road Km 013.93-014.63 S 0.70 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.85 4.197 15.284<br />

Z5706 Domar-Volaganj Road Km 017.83-018.83 S 1.00 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.51 4.637 24.<strong>12</strong>2<br />

Z5706 Domar-Volaganj Road Km 019.13-019.63 S 0.50 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.75 4.743 <strong>12</strong>.337<br />

Z5706 Domar-Volaganj Road Km 020.73-020.83 S 0.10 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.55 5.946 3.094<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:36 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5706 Domar-Volaganj Road Km 021.93-0<strong>23</strong>.03 S 1.10 4682 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.06 4.328 24.769<br />

Z5707 Nilphamari-Domar Road Km 018.80-019.10 S 0.30 1454 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.984 1.59<br />

Z5709 Nilphamari Bypass Road Km 000.00-000.50 S 0.50 2298 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 2.37 6.036<br />

Z5709 Nilphamari Bypass Road Km 001.20-001.70 S 0.50 2298 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 1.749 4.455<br />

Sub-total Nilphamari Division<br />

171.96<br />

Panchgarh Division<br />

Z5001 Panchagarh-Ruhea Road Km 010.50-011.30 S 0.80 334 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.41 0.308 1.26<br />

Z5003 Boda-Domar Road Km 022.95-0<strong>23</strong>.05 S 0.10 15<strong>12</strong> Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.84 0.271 0.217<br />

Sub-total Panchgarh Division<br />

5.25<br />

Rangpur Division<br />

Z5010 Rangpur-Pirgachha Road Km 002.10-002.20 S 0.10 2146 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 0.87 0.645 0.521<br />

Z5010 Rangpur-Pirgachha Road Km 008.71-008.91 S 0.20 4465 Zilla Full Recon 75mm @ IRI><strong>12</strong> 2013 1.74 2.132 3.457<br />

Z5010 Rangpur-Pirgachha Road Km 003.20-004.50 S 1.30 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.36 1.391 9.214<br />

Z5010 Rangpur-Pirgachha Road Km 005.30-005.70 S 0.40 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 2.146 4.374<br />

Z5010 Rangpur-Pirgachha Road Km 006.11-006.71 S 0.60 4465 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 2.256 6.896<br />

Z5010 Rangpur-Pirgachha Road Km 006.91-007.01 S 0.10 4465 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.57 4.061 2.068<br />

Z5010 Rangpur-Pirgachha Road Km 007.21-008.11 S 0.90 4465 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 5.09 2.254 10.333<br />

Z5010 Rangpur-Pirgachha Road Km 009.11-009.41 S 0.30 4465 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 3.588 5.483<br />

Z5014 Rangpur Cantt-Ghagat Bridge Road Km 002.30-002.60 S 0.30 964 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.52 0.738 1.71<br />

Z5015 Taxerhat-Kishoreganj Road Km 007.72-009.42 S 1.70 1442 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.62 0.014 0.<strong>12</strong>7<br />

Z5015 Taxerhat-Kishoreganj Road Km 010.02-011.22 S 1.20 1442 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 6.79 0.271 1.731<br />

Z5015 Taxerhat-Kishoreganj Road Km 011.92-0<strong>12</strong>.62 S 0.70 1442 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.96 0.367 1.369<br />

Z5015 Taxerhat-Kishoreganj Road Km 016.25-016.65 S 0.40 1565 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.26 0.082 0.177<br />

Z5015 Taxerhat-Kishoreganj Road Km 016.75-017.05 S 0.30 1565 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.514 0.831<br />

Z5015 Taxerhat-Kishoreganj Road Km 020.95-021.55 S 0.60 1565 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.40 0.936 3.025<br />

Z50<strong>23</strong> Rangapur-Gangachhara Road Km 003.20-003.50 S 0.30 3591 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.84 1.983 3.406<br />

Z50<strong>23</strong> Rangapur-Gangachhara Road Km 010.10-010.70 S 0.60 3591 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.36 3.211 10.094<br />

Z56<strong>12</strong> Shahebganj-Haragachha Road Km 002.21-004.31 S 2.10 2144 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.58 1.<strong>23</strong>9 17.531<br />

Z56<strong>12</strong> Shahebganj-Haragachha Road Km 004.51-005.91 S 1.40 2144 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 11.78 0.618 7.062<br />

Sub-total Rangpur Division<br />

84.80<br />

Thakurgaon Division<br />

Z5004 Ranishankoil-Haripur Road Km 007.10-007.60 S 0.50 1550 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 2.83 0.31 0.834<br />

Z5004 Ranishankoil-Haripur Road Km 008.10-008.40 S 0.30 1550 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 1.70 0.683 1.103<br />

Z5004 Ranishankoil-Haripur Road Km 008.50-010.70 S 2.20 1550 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.45 0.482 5.7<strong>12</strong><br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:37 of 38


Appendix-D<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zilla Roads Recovery Programme<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT<br />

Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Tk)<br />

Z5055 Thakurgaon-Pirganj Road Km 000.10-001.70 S 1.60 2695 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 <strong>12</strong>.56 2.085 25.408<br />

Z5055 Thakurgaon-Pirganj Road Km 002.00-003.30 S 1.30 2695 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 9.35 2.453 22.074<br />

Z5055 Thakurgaon-Pirganj Road Km 006.61-007.81 S 1.20 2695 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 8.26 2.702 21.206<br />

Z5055 Thakurgaon-Pirganj Road Km 007.81-008.31 S 0.50 2695 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 3.05 1.996 5.7<br />

Sub-total Thakurgaon Division<br />

50.20<br />

Total Rangpur Zone 1484.48<br />

Sylhet Zone<br />

Moulavi Bazar Division<br />

Z28<strong>23</strong> Kulaura-Fultala Road Km 019.13-019.83 S 0.70 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 4.07 2.31 8.88<br />

Sub-total Division<br />

4.07<br />

Sunamganj Division<br />

Z2802 Gobindaganj-Dwarabazar Road Km 016.00-027.00 S 11.00 2146 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 63.94 1.676 102.446<br />

Sub-total Division<br />

63.94<br />

Sylhet Division<br />

Z2013 Sylhet -Balaganj Road Km 002.80-002.90 S 0.10 3765 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 0.58 2.691 1.478<br />

Z2013 Sylhet -Balaganj Road Km 019.70-020.50 S 0.80 3765 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 7.34 1.197 8.528<br />

Z2013 Sylhet -Balaganj Road Km 020.90-025.00 S 4.10 3765 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 37.63 1.386 50.608<br />

Z2831 Vadeshwar-Fenchuganj Road Km 000.00-002.80 S 2.80 971 Zilla Rehab 75mm @ IRI 9-<strong>12</strong> 2013 14.61 0.819 10.947<br />

Sub-total Sylhet Division<br />

60.16<br />

Total Sylhet Zone <strong>12</strong>8.17<br />

Total Bangladesh<br />

7528.32<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-D: Page:38 of 38


Appendix-E<br />

1st Year Unconstrained Periodic works of Zilla Roads<br />

sorted by Zone <strong>and</strong> Division. (Excluding ongoing<br />

projects)


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Barisal Zone<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

Barguna Division<br />

Z8701 Charkhali-Patharghata Road Km 038.00-040.24 S 2.24 1734 Zilla Carpet 40mm @ 1000-2000 2013 3.49 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 042.78-042.98 S 0.2 1734 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 044.78-046.48 S 1.7 1734 Zilla Carpet 40mm @ 1000-2000 2013 2.65 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 046.98-055.48 S 8.5 1734 Zilla Carpet 40mm @ 1000-2000 2013 13.27 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 055.78-055.88 S 0.1 1734 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 040.24-042.78 S 2.55 1734 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.97 0.381 5.266<br />

Z8701 Charkhali-Patharghata Road Km 042.98-044.78 S 1.8 1734 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.81 0.362 3.533<br />

Z8701 Charkhali-Patharghata Road Km 046.48-046.98 S 0.5 1734 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.78 0.353 0.954<br />

Z8701 Charkhali-Patharghata Road Km 055.48-055.78 S 0.3 1734 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.560 0.839<br />

Z8701 Charkhali-Patharghata Road Km 055.88-056.11 S 0.<strong>23</strong> 1734 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.36 0.568 0.711<br />

Z8708 Rajapur-Patharghata Road Km 030.00-058.63 S 28.63 1844 Zilla Carpet 40mm @ 1000-2000 2013 44.44 0.000 0.000<br />

Z8814 Barguna -Baramasua Road Km 013.42-014.22 S 0.8 203 Zilla Carpet 40mm @ Traff 100-1000 2013 1.26 0.000 0.000<br />

Sub-total Barguna Division<br />

73.97<br />

Barisal Division<br />

Z8031 Gouranadi-Gopalganj Road Km 000.00-006.10 S 6.1 1994 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 10.15 0.879 28.516<br />

Z8031 Gouranadi-Gopalganj Road Km 006.10-007.50 S 1.4 1994 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.19 1.117 8.480<br />

Z8031 Gouranadi-Gopalganj Road Km 007.50-0<strong>12</strong>.80 S 5.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 8.30 1.118 36.947<br />

Z8031 Gouranadi-Gopalganj Road Km 0<strong>12</strong>.90-013.10 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 1.970 2.450<br />

Z8033 Gariarpar-Naikati Road Km 003.20-003.30 S 0.1 2049 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.567 0.533<br />

Z8033 Gariarpar-Naikati Road Km 000.00-003.20 S 3.2 2049 Zilla Carpet 40mm @ Traff >=2000 2013 7.53 0.000 0.000<br />

Z8033 Gariarpar-Naikati Road Km 003.30-009.50 S 6.2 2049 Zilla Carpet 40mm @ Traff >=2000 2013 14.54 0.000 0.000<br />

Z8033 Gariarpar-Naikati Road Km 009.50-0<strong>12</strong>.60 S 3.1 2049 Zilla Carpet 40mm @ Traff >=2000 2013 7.27 0.000 0.000<br />

Z8033 Gariarpar-Naikati Road Km 0<strong>12</strong>.60-014.48 S 1.88 2049 Zilla Carpet 40mm @ Traff >=2000 2013 4.42 0.000 0.000<br />

Z8033 Gariarpar-Naikati Road Km 014.48-015.50 S 1.02 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.38 0.000 0.000<br />

Z8033 Gariarpar-Naikati Road Km 015.90-018.00 S 2.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 4.93 0.000 0.000<br />

Z8033 Gariarpar-Naikati Road Km 018.00-019.50 S 1.5 821 Zilla Carpet 40mm @ Traff 100-1000 2013 3.52 0.000 0.000<br />

Z8033 Gariarpar-Naikati Road Km 019.50-020.53 S 1.03 821 Zilla Carpet 40mm @ Traff 100-1000 2013 2.43 0.000 0.000<br />

Z8034 Rahamatpur-Hizla Road Km 000.00-001.80 S 1.8 1340 Zilla Carpet 40mm @ 1000-2000 2013 2.81 0.000 0.000<br />

Z8034 Rahamatpur-Hizla Road Km 004.20-007.69 S 3.49 1340 Zilla Carpet 40mm @ 1000-2000 2013 5.44 0.000 0.000<br />

Z8034 Rahamatpur-Hizla Road Km 008.79-009.09 S 0.3 <strong>12</strong>19 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z8034 Rahamatpur-Hizla Road Km 001.80-004.20 S 2.4 1340 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.75 0.498 7.362<br />

Z8034 Rahamatpur-Hizla Road Km 009.09-009.99 S 0.9 315 Zilla Carpet 40mm @ Traff 100-1000 2013 1.40 0.000 0.000<br />

Z8034 Rahamatpur-Hizla Road Km 009.99-024.49 S 14.5 986 Zilla Carpet 40mm @ Traff 100-1000 2013 22.70 0.000 0.000<br />

Z8034 Rahamatpur-Hizla Road Km 024.49-030.59 S 6.1 987 Zilla Carpet 40mm @ Traff 100-1000 2013 10.41 0.000 0.000<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-E: Page: 1 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z8034 Rahamatpur-Hizla Road Km 030.59-036.98 S 6.39 987 Zilla Carpet 40mm @ Traff 100-1000 2013 10.90 0.000 0.000<br />

Z8037 Barisal-Swarupkathi Road Km 000.00-007.90 S 7.9 1173 Zilla Carpet 40mm @ 1000-2000 2013 13.48 0.000 0.000<br />

Z8038 Shikarpur-Uzirpur Road Km 000.00-003.50 S 3.5 1016 Zilla Carpet 40mm @ 1000-2000 2013 5.24 0.000 0.000<br />

Z8038 Shikarpur-Uzirpur Road Km 003.60-003.80 S 0.2 1016 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.194 0.198<br />

Z8910 Barisal-Bauphaul Road Km 007.86-010.00 S 2.14 432 Zilla Carpet 40mm @ Traff 100-1000 2013 3.29 0.000 0.000<br />

Sub-total Barisal Division<br />

148.39<br />

Bhola Division<br />

Z8909 Charfeshion-Betua Road Km 006.30-006.40 S 0.1 522 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z8909 Charfeshion-Betua Road Km 000.00-006.30 S 6.3 522 Zilla Carpet 40mm @ Traff 100-1000 2013 10.40 0.000 0.000<br />

Z8915 Bagmara-Daulatkhan Road Km 011.60-013.60 S 2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.16 1.818 22.625<br />

Z8915 Bagmara-Daulatkhan Road Km 013.90-014.50 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 1.018 3.802<br />

Z8915 Bagmara-Daulatkhan Road Km 003.90-010.50 S 6.6 989 Zilla Carpet 40mm @ Traff 100-1000 2013 10.30 0.000 0.000<br />

Z8916 Guingerhat-Daulatkhan Bazar Road Km 000.00-005.88 S 5.88 1147 Zilla Carpet 40mm @ 1000-2000 2013 8.83 0.000 0.000<br />

Z8916 Guingerhat-Daulatkhan Bazar Road Km 006.29-007.65 S 1.36 1147 Zilla Carpet 40mm @ 1000-2000 2013 1.89 0.000 0.000<br />

Sub-total Bhola Division<br />

35.68<br />

Jhalokati Division<br />

Z8037 Barisal-Swarupkathi Road Km 015.63-024.80 S 9.17 361 Zilla Carpet 40mm @ Traff 100-1000 2013 15.64 0.000 0.000<br />

Z8047 Bakerkati-Nalchity Road Km 005.54-008.34 S 2.8 643 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.37 0.311 4.063<br />

Z8047 Bakerkati-Nalchity Road Km 008.84-009.51 S 0.68 643 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.06 0.332 1.056<br />

Z8047 Bakerkati-Nalchity Road Km 000.00-003.24 S 3.<strong>23</strong> 643 Zilla Carpet 40mm @ Traff 100-1000 2013 5.06 0.000 0.000<br />

Z8047 Bakerkati-Nalchity Road Km 003.24-004.44 S 1.2 643 Zilla Carpet 40mm @ Traff 100-1000 2013 1.87 0.000 0.000<br />

Z8047 Bakerkati-Nalchity Road Km 005.24-005.54 S 0.3 643 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z8047 Bakerkati-Nalchity Road Km 008.34-008.84 S 0.5 643 Zilla Carpet 40mm @ Traff 100-1000 2013 0.78 0.000 0.000<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 010.54-0<strong>12</strong>.74 S 2.2 662 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.75 0.<strong>12</strong>1 1.354<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 000.65-002.24 S 1.59 662 Zilla Carpet 40mm @ Traff 100-1000 2013 2.71 0.000 0.000<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 002.24-002.44 S 0.2 662 Zilla Carpet 40mm @ Traff 100-1000 2013 0.34 0.000 0.000<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 002.44-005.54 S 3.1 662 Zilla Carpet 40mm @ Traff 100-1000 2013 5.29 0.135 1.684<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 005.54-007.94 S 2.4 662 Zilla Carpet 40mm @ Traff 100-1000 2013 4.09 0.000 0.000<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 007.94-008.54 S 0.6 662 Zilla Carpet 40mm @ Traff 100-1000 2013 1.02 0.076 0.214<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 008.54-010.54 S 2 662 Zilla Carpet 40mm @ Traff 100-1000 2013 3.41 0.2<strong>23</strong> 1.313<br />

Z8058 Nalchity-Pir Moazzam Hossain Road Km 0<strong>12</strong>.74-0<strong>12</strong>.94 S 0.2 662 Zilla Carpet 40mm @ Traff 100-1000 2013 0.34 0.000 0.000<br />

Z8062 Pir Moazzem Hossain - Rajapur Road Km 007.22-007.36 S 0.14 174 Zilla Carpet 40mm @ Traff 100-1000 2013 0.14 0.000 0.000<br />

Z8708 Rajapur-Patharghata Road Km 000.00-000.90 S 0.9 1371 Zilla Carpet 40mm @ 1000-2000 2013 1.41 0.000 0.000<br />

Z8708 Rajapur-Patharghata Road Km 000.90-005.83 S 4.93 1371 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 7.69 0.210 5.366<br />

Z8708 Rajapur-Patharghata Road Km 005.83-008.94 S 3.<strong>12</strong> 767 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.87 0.2<strong>23</strong> 3.<strong>23</strong>6<br />

Appendix-E: Page: 2 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z8708 Rajapur-Patharghata Road Km 008.94-011.60 S 2.66 767 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.15 0.000 0.000<br />

Z8708 Rajapur-Patharghata Road Km 0<strong>12</strong>.17-0<strong>12</strong>.60 S 0.43 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.67 1.018 2.676<br />

Z8708 Rajapur-Patharghata Road Km 014.00-017.20 S 3.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.99 1.916 37.733<br />

Z8709 Satpakhia -Nalcity Road Km 000.00-003.47 S 3.47 1105 Zilla Carpet 40mm @ 1000-2000 2013 5.51 0.000 0.000<br />

Sub-total Jhalokati Division<br />

79.65<br />

Patuakhali Division<br />

Z8910 Barisal-Bauphaul Road Km 010.00-013.36 S 3.36 432 Zilla Carpet 40mm @ Traff 100-1000 2013 5.15 0.000 0.000<br />

Z8910 Barisal-Bauphaul Road Km 013.36-016.36 S 3 432 Zilla Carpet 40mm @ Traff 100-1000 2013 4.61 0.000 0.000<br />

Z8910 Barisal-Bauphaul Road Km 016.36-016.56 S 0.2 432 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.160 0.090<br />

Z8910 Barisal-Bauphaul Road Km 016.56-018.66 S 2.1 432 Zilla Carpet 40mm @ Traff 100-1000 2013 3.26 0.000 0.000<br />

Z8910 Barisal-Bauphaul Road Km 018.66-019.36 S 0.7 432 Zilla Carpet 40mm @ Traff 100-1000 2013 1.10 0.000 0.000<br />

Z8910 Barisal-Bauphaul Road Km 019.36-019.76 S 0.4 432 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z8910 Barisal-Bauphaul Road Km 019.76-021.56 S 1.8 432 Zilla Carpet 40mm @ Traff 100-1000 2013 3.58 0.000 0.000<br />

Z8910 Barisal-Bauphaul Road Km 021.56-022.26 S 0.7 432 Zilla Carpet 40mm @ Traff 100-1000 2013 1.64 0.000 0.000<br />

Z8910 Barisal-Bauphaul Road Km 022.26-035.00 S <strong>12</strong>.74 432 Zilla Carpet 40mm @ Traff 100-1000 2013 20.16 0.000 0.000<br />

Sub-total Patuakhali Division<br />

40.44<br />

Pirojpur Division<br />

Z7704 Pirojpur-Gonapara Road Km 001.90-003.11 S 1.21 1099 Zilla Carpet 40mm @ 1000-2000 2013 2.32 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 003.11-003.91 S 0.8 1099 Zilla Carpet 40mm @ 1000-2000 2013 1.33 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 003.91-004.31 S 0.4 1099 Zilla Carpet 40mm @ 1000-2000 2013 0.86 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 004.91-005.01 S 0.1 1099 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 005.91-006.91 S 1 1099 Zilla Carpet 40mm @ 1000-2000 2013 1.56 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 007.01-008.41 S 1.4 1099 Zilla Carpet 40mm @ 1000-2000 2013 2.19 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 014.71-014.81 S 0.1 1099 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 014.81-015.21 S 0.4 1099 Zilla Carpet 40mm @ 1000-2000 2013 0.62 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 015.21-016.01 S 0.8 1099 Zilla Carpet 40mm @ 1000-2000 2013 1.25 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 016.01-016.41 S 0.4 1099 Zilla Carpet 40mm @ 1000-2000 2013 0.62 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 016.41-017.35 S 0.94 1106 Zilla Carpet 40mm @ 1000-2000 2013 1.47 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 017.55-017.71 S 0.16 1145 Zilla Carpet 40mm @ 1000-2000 2013 0.25 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 004.31-004.91 S 0.6 1099 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.080 0.263<br />

Z7704 Pirojpur-Gonapara Road Km 005.01-005.91 S 0.9 1099 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.40 0.077 0.382<br />

Z7704 Pirojpur-Gonapara Road Km 006.91-007.01 S 0.1 1099 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.014 0.008<br />

Z7704 Pirojpur-Gonapara Road Km 008.41-010.61 S 2.2 1099 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.43 0.000 0.000<br />

Z7704 Pirojpur-Gonapara Road Km 021.41-021.61 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 0.762 0.491<br />

Z7704 Pirojpur-Gonapara Road Km 021.91-022.21 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.651 0.629<br />

Appendix-E: Page: 3 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7709 Priojpur -Hularhat Road Km 001.20-006.21 S 5.01 1830 Zilla Carpet 40mm @ 1000-2000 2013 <strong>12</strong>.67 0.000 0.000<br />

Z7709 Priojpur -Hularhat Road Km 000.00-001.20 S 1.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 3.58 0.000 0.000<br />

Z8037 Barisal-Swarupkathi Road Km 024.80-034.00 S 9.2 361 Zilla Carpet 40mm @ Traff 100-1000 2013 15.69 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 033.44-035.14 S 1.7 1734 Zilla Carpet 40mm @ 1000-2000 2013 2.65 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 035.24-038.00 S 2.76 1734 Zilla Carpet 40mm @ 1000-2000 2013 4.31 0.000 0.000<br />

Z8701 Charkhali-Patharghata Road Km 014.20-014.30 S 0.1 3984 Zilla Carpet 40mm @ Cracks >25% 2013 0.16 0.889 0.180<br />

Z8701 Charkhali-Patharghata Road Km 000.00-000.80 S 0.8 3984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.46 1.063 4.962<br />

Z8701 Charkhali-Patharghata Road Km 001.00-002.90 S 1.9 3984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.97 1.100 11.744<br />

Z8701 Charkhali-Patharghata Road Km 028.44-033.44 S 5 1734 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 7.80 0.454 13.900<br />

Z8701 Charkhali-Patharghata Road Km 035.14-035.24 S 0.1 1734 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.369 0.184<br />

Z8701 Charkhali-Patharghata Road Km 000.80-001.00 S 0.2 3984 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 1.217 0.665<br />

Z8701 Charkhali-Patharghata Road Km 014.88-017.90 S 3.02 <strong>23</strong>65 Zilla Carpet 40mm @ Traff >=2000 2013 4.71 0.342 2.417<br />

Z8701 Charkhali-Patharghata Road Km 017.90-021.44 S 3.54 <strong>23</strong>65 Zilla Carpet 40mm @ Traff >=2000 2013 5.52 0.3<strong>23</strong> 2.595<br />

Z8711 Bh<strong>and</strong>aria-Banaihat Road Km 000.00-003.00 S 3 <strong>12</strong>42 Zilla Carpet 40mm @ 1000-2000 2013 4.61 0.000 0.000<br />

Z8711 Bh<strong>and</strong>aria-Banaihat Road Km 003.00-007.00 S 4 <strong>12</strong>42 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.14 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 001.10-003.40 S 2.3 1874 Zilla Carpet 40mm @ 1000-2000 2013 3.59 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 003.90-004.70 S 0.8 1874 Zilla Carpet 40mm @ 1000-2000 2013 1.25 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 000.00-001.10 S 1.1 1874 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.73 0.245 1.250<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 003.40-003.90 S 0.5 1874 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.78 0.169 0.389<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 011.60-011.70 S 0.1 861 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.1 861 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 0<strong>12</strong>.30-014.00 S 1.7 861 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.65 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 010.70-010.90 S 0.2 861 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 010.90-011.60 S 0.7 861 Zilla Carpet 40mm @ Traff 100-1000 2013 1.09 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 011.70-0<strong>12</strong>.10 S 0.4 861 Zilla Carpet 40mm @ Traff 100-1000 2013 0.62 0.053 0.032<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 014.00-014.20 S 0.2 861 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 014.20-015.30 S 1.1 861 Zilla Carpet 40mm @ Traff 100-1000 2013 1.72 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 015.30-015.60 S 0.3 861 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 015.60-015.93 S 0.33 861 Zilla Carpet 40mm @ Traff 100-1000 2013 0.52 0.000 0.000<br />

Z8713 Kawkhali-Bh<strong>and</strong>aria Road Km 0<strong>12</strong>.20-0<strong>12</strong>.30 S 0.1 861 Zilla Seal Coat 2013 0.05 1.966 0.157<br />

Sub-total Pirojpur Division<br />

Total Barisal Zone<br />

Chittagong Zone<br />

B<strong>and</strong>arban Division<br />

Z1001 Ramu-Naikhongchhari Road Km 000.00-005.70 S 5.7 5<strong>23</strong> Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 8.61 0.398 10.248<br />

Z1001 Ramu-Naikhongchhari Road Km 008.70-0<strong>12</strong>.00 S 3.3 5<strong>23</strong> Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.35 0.205 3.273<br />

107.65<br />

485.79<br />

Appendix-E: Page: 4 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1013 Tonkabati-Baro Aulia Road Km 003.00-004.10 S 1.1 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.60 0.453 2.766<br />

Z1013 Tonkabati-Baro Aulia Road Km 004.20-004.30 S 0.1 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.456 0.253<br />

Z1013 Tonkabati-Baro Aulia Road Km 004.50-006.80 S 2.3 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.34 0.455 5.8<strong>12</strong><br />

Z1013 Tonkabati-Baro Aulia Road Km 007.20-009.60 S 2.4 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.17 0.476 5.787<br />

Z1013 Tonkabati-Baro Aulia Road Km 009.70-010.50 S 0.8 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.06 0.499 2.022<br />

Z1013 Tonkabati-Baro Aulia Road Km 006.80-007.20 S 0.4 292 Zilla Carpet 40mm @ Traff 100-1000 2013 0.55 0.000 0.000<br />

Z1013 Tonkabati-Baro Aulia Road Km 009.60-009.70 S 0.1 292 Zilla Carpet 40mm @ Traff 100-1000 2013 0.13 0.000 0.000<br />

Z1013 Tonkabati-Baro Aulia Road Km 010.50-013.46 S 2.95 292 Zilla Seal Coat 2013 1.26 0.438 1.040<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 000.40-000.60 S 0.2 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.526 0.945<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 000.90-001.20 S 0.3 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.380 1.025<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 002.00-002.40 S 0.4 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.602 1.576<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 004.20-006.00 S 1.8 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.07 0.622 7.330<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 007.80-008.10 S 0.3 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.687 1.050<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 008.30-008.40 S 0.1 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.748 0.414<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 008.80-009.00 S 0.2 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.949 1.243<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 009.20-009.60 S 0.4 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.576 1.509<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 010.20-011.10 S 0.9 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.655 3.263<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 011.70-011.80 S 0.1 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.591 0.387<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 011.90-0<strong>12</strong>.40 S 0.5 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.85 0.652 1.804<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 013.90-014.10 S 0.2 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.925 1.211<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 014.60-014.80 S 0.2 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.591 0.774<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 014.90-015.30 S 0.4 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.592 1.551<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 015.40-015.90 S 0.5 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.85 0.617 1.855<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 017.40-017.50 S 0.1 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.562 0.368<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 017.60-017.80 S 0.2 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.590 0.772<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 017.84-018.24 S 0.4 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.947 2.479<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 018.34-018.64 S 0.3 431 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.540 1.060<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 0<strong>23</strong>.44-073.65 S 50.21 2146 Zilla Carpet 40mm @ Traff >=2000 2013 68.53 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 002.90-003.10 S 0.2 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.34 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 006.50-007.00 S 0.5 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.85 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 008.40-008.80 S 0.4 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.68 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 009.60-009.70 S 0.1 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.17 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 013.30-013.50 S 0.2 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.34 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 013.70-013.90 S 0.2 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.34 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 014.10-014.60 S 0.5 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.85 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 014.80-014.90 S 0.1 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.17 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 015.90-016.00 S 0.1 431 Zilla Carpet 40mm @ Traff 100-1000 2013 0.17 0.000 0.000<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 004.10-004.20 S 0.1 431 Zilla Seal Coat 2013 0.05 0.491 0.044<br />

Appendix-E: Page: 5 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 006.00-006.10 S 0.1 431 Zilla Seal Coat 2013 0.05 1.751 0.158<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 008.10-008.30 S 0.2 431 Zilla Seal Coat 2013 0.10 0.897 0.162<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 016.30-016.50 S 0.2 431 Zilla Seal Coat 2013 0.10 1.751 0.316<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 017.50-017.60 S 0.1 431 Zilla Seal Coat 2013 0.05 0.978 0.088<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 017.80-017.84 S 0.04 431 Zilla Seal Coat 2013 0.02 1.719 0.056<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 018.24-018.34 S 0.1 431 Zilla Seal Coat 2013 0.05 1.810 0.163<br />

Z1811 B<strong>and</strong>arban-Gundum Road Km 022.34-022.54 S 0.2 2146 Zilla Seal Coat 2013 0.08 0.691 0.134<br />

Z18<strong>12</strong> Chimbuk-Ruma Road Km 021.80-021.90 S 0.1 362 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.14 0.579 0.245<br />

Sub-total B<strong>and</strong>arban Division<br />

111.42<br />

Chittagong Division<br />

Z10<strong>12</strong> Rangunia -Raozan Road Km 0<strong>12</strong>.60-014.20 S 1.6 3759 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.52 1.982 19.569<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 000.10-000.20 S 0.1 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.038 0.976<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 000.90-002.00 S 1.1 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.58 0.631 6.524<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 005.70-006.00 S 0.3 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.64 0.966 2.461<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 006.20-006.40 S 0.2 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.43 0.955 1.487<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 006.70-007.60 S 0.9 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 1.217 5.977<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 009.40-009.80 S 0.4 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.60 1.936 4.371<br />

Z1084 Muhuriganj-Chittagong Beri B<strong>and</strong> Road Km 010.00-014.90 S 4.9 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 7.86 1.727 51.337<br />

Sub-total Chittagong Division<br />

16.40<br />

Cox's Bazar Division<br />

Z1002 Baraitali-Magnamaghat Road Km 000.10-000.50 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.78 0.902 2.820<br />

Z1002 Baraitali-Magnamaghat Road Km 005.10-005.30 S 0.2 444 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.36 0.697 0.956<br />

Z1009 Ramu-Maricha Road Km 002.90-003.00 S 0.1 1581 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 006.30-006.40 S 0.1 1581 Zilla Carpet 40mm @ 1000-2000 2013 0.24 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 007.10-007.20 S 0.1 1581 Zilla Carpet 40mm @ 1000-2000 2013 0.24 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 010.30-010.70 S 0.4 1581 Zilla Carpet 40mm @ 1000-2000 2013 0.63 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 011.40-011.50 S 0.1 1581 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 011.70-0<strong>12</strong>.00 S 0.3 1581 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 0<strong>12</strong>.60-013.30 S 0.7 1581 Zilla Carpet 40mm @ 1000-2000 2013 1.10 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 013.60-013.80 S 0.2 1581 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1009 Ramu-Maricha Road Km 000.10-000.50 S 0.4 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.957 3.542<br />

Z1009 Ramu-Maricha Road Km 001.00-001.50 S 0.5 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.17 0.843 3.902<br />

Z1009 Ramu-Maricha Road Km 002.30-002.90 S 0.6 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.00 0.718 2.827<br />

Z1009 Ramu-Maricha Road Km 003.00-003.70 S 0.7 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.16 0.755 3.467<br />

Z1009 Ramu-Maricha Road Km 003.80-004.30 S 0.5 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.83 0.7<strong>12</strong> 2.334<br />

Appendix-E: Page: 6 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1009 Ramu-Maricha Road Km 004.40-004.90 S 0.5 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.83 1.<strong>23</strong>2 4.040<br />

Z1009 Ramu-Maricha Road Km 005.20-005.40 S 0.2 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.547 1.111<br />

Z1009 Ramu-Maricha Road Km 005.90-006.30 S 0.4 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 0.613 2.167<br />

Z1009 Ramu-Maricha Road Km 006.40-007.10 S 0.7 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.67 0.837 5.553<br />

Z1009 Ramu-Maricha Road Km 007.80-008.70 S 0.9 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.67 0.847 4.701<br />

Z1009 Ramu-Maricha Road Km 008.80-009.40 S 0.6 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 1.555 5.780<br />

Z1009 Ramu-Maricha Road Km 009.70-009.90 S 0.2 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.511 1.872<br />

Z1009 Ramu-Maricha Road Km 010.00-010.30 S 0.3 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.469 2.729<br />

Z1009 Ramu-Maricha Road Km 010.70-010.80 S 0.1 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.856 0.469<br />

Z1009 Ramu-Maricha Road Km 011.20-011.40 S 0.2 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.772 0.956<br />

Z1009 Ramu-Maricha Road Km 0<strong>12</strong>.00-0<strong>12</strong>.60 S 0.6 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 1.735 6.447<br />

Z1009 Ramu-Maricha Road Km 013.80-014.20 S 0.4 1581 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.780 1.932<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 000.00-000.10 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.669 1.579<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 000.20-000.50 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.942 2.452<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 003.30-003.40 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.674 1.584<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 003.50-003.60 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.595 1.510<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 005.00-005.30 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 1.063 3.019<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 006.60-006.70 S 0.1 910 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.430 0.386<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 006.90-007.70 S 0.8 910 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.88 0.175 0.980<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 008.90-009.00 S 0.1 910 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.430 0.386<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 010.40-010.50 S 0.1 910 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.420 0.378<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 0<strong>12</strong>.40-0<strong>12</strong>.50 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.658 1.569<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 0<strong>12</strong>.80-013.20 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 1.024 3.604<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 013.40-013.50 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.29 1.134 1.338<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 014.10-014.50 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.754 2.854<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 015.70-015.80 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.728 0.689<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 018.30-019.27 S 0.97 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.28 1.671 15.340<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 000.10-000.20 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 000.50-000.70 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 003.00-003.30 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 004.10-005.00 S 0.9 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.11 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 0<strong>12</strong>.00-0<strong>12</strong>.40 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.94 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 0<strong>12</strong>.50-0<strong>12</strong>.80 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 013.20-013.40 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.59 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 013.50-014.10 S 0.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.46 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 014.50-015.70 S 1.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.81 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 015.80-018.30 S 2.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.86 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 005.30-005.70 S 0.4 910 Zilla Carpet 40mm @ Traff 100-1000 2013 0.94 0.000 0.000<br />

Appendix-E: Page: 7 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 006.40-006.60 S 0.2 910 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 006.70-006.90 S 0.2 910 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 007.70-008.90 S 1.2 910 Zilla Carpet 40mm @ Traff 100-1000 2013 2.81 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 009.00-010.40 S 1.4 910 Zilla Carpet 40mm @ Traff 100-1000 2013 3.28 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 010.50-010.70 S 0.2 910 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z1<strong>12</strong>5 Ekatabazar-Magnamaghat Road Km 010.70-011.50 S 0.8 910 Zilla Carpet 40mm @ Traff 100-1000 2013 1.88 0.000 0.000<br />

Z1<strong>12</strong>7 Lakkharchar-Bagguzra Road Km 005.30-005.60 S 0.3 1392 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.333 0.465<br />

Z1<strong>12</strong>7 Lakkharchar-Bagguzra Road Km 005.90-006.10 S 0.2 1392 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.338 0.342<br />

Z1<strong>12</strong>7 Lakkharchar-Bagguzra Road Km 007.60-007.70 S 0.1 1392 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.341 0.187<br />

Z1<strong>12</strong>7 Lakkharchar-Bagguzra Road Km 007.80-008.00 S 0.2 1392 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.339 0.372<br />

Z1<strong>12</strong>7 Lakkharchar-Bagguzra Road Km 008.40-010.60 S 2.2 1392 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.47 0.<strong>23</strong>2 2.381<br />

Z1133 Whykhong-Shaplapur Road Km 000.30-000.40 S 0.1 426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 0.563 0.253<br />

Z1133 Whykhong-Shaplapur Road Km 001.50-001.80 S 0.3 426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.38 0.507 0.745<br />

Z1133 Whykhong-Shaplapur Road Km 002.80-002.90 S 0.1 426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 0.488 0.<strong>23</strong>9<br />

Z1133 Whykhong-Shaplapur Road Km 003.40-003.50 S 0.1 426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 0.513 0.<strong>23</strong>1<br />

Z1133 Whykhong-Shaplapur Road Km 005.80-005.90 S 0.1 426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.425 0.217<br />

Z1504 Ukhia-Gundhum Road Km 000.00-000.70 S 0.7 587 Zilla Carpet 40mm @ Traff 100-1000 2013 0.90 0.000 0.000<br />

Sub-total Cox's Bazar Division<br />

61.40<br />

Dohazari Division<br />

Z1018 Shikalbaha-Anwara Road Km 007.33-007.43 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.476 1.387<br />

Z1018 Shikalbaha-Anwara Road Km 000.00-000.10 S 0.1 5395 Zilla Carpet 40mm @ Traff >=2000 2013 0.35 0.189 0.092<br />

Z1018 Shikalbaha-Anwara Road Km 006.93-007.33 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.93 0.000 0.000<br />

Z1018 Shikalbaha-Anwara Road Km 007.43-007.45 S 0.03 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.07 0.000 0.000<br />

Z1018 Shikalbaha-Anwara Road Km 007.65-008.43 S 0.77 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.80 0.000 0.000<br />

Z1018 Shikalbaha-Anwara Road Km 005.80-005.93 S 0.13 5395 Zilla Overlay 50mm @ Cracking >25% 2013 0.35 0.<strong>12</strong>4 0.049<br />

Z1018 Shikalbaha-Anwara Road Km 006.03-006.13 S 0.1 5395 Zilla Overlay 50mm @ Cracking >25% 2013 0.28 0.530 0.173<br />

Z1018 Shikalbaha-Anwara Road Km 006.53-006.63 S 0.1 5395 Zilla Overlay 50mm @ IRI 6-9 2013 0.28 3.484 1.138<br />

Z1018 Shikalbaha-Anwara Road Km 008.93-009.02 S 0.09 2146 Zilla Seal Coat 2013 0.06 1.096 0.159<br />

Z1036 Hashimpur-Borma Road Km 000.10-000.50 S 0.4 1706 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.60 0.327 0.628<br />

Z1036 Hashimpur-Borma Road Km 000.70-000.90 S 0.2 1706 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 0.328 0.289<br />

Z1036 Hashimpur-Borma Road Km 001.<strong>12</strong>-001.72 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.87 1.769 6.114<br />

Z1036 Hashimpur-Borma Road Km 001.72-002.02 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.44 0.000 0.000<br />

Z1036 Hashimpur-Borma Road Km 002.<strong>12</strong>-002.22 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z1036 Hashimpur-Borma Road Km 005.62-006.72 S 1.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.57 0.000 0.000<br />

Z1037 Ghatiadanga-Monufakirhat Road Km 000.25-000.30 S 0.05 3527 Zilla Carpet 40mm @ Cracks >25% 2013 0.04 0.407 0.024<br />

Z1037 Ghatiadanga-Monufakirhat Road Km 001.80-004.90 S 3.1 3527 Zilla Carpet 40mm @ Cracks >25% 2013 4.55 1.309 7.7<strong>23</strong><br />

Z1037 Ghatiadanga-Monufakirhat Road Km 007.90-008.38 S 0.48 3527 Zilla Carpet 40mm @ Traff >=2000 2013 0.74 0.678 0.608<br />

Appendix-E: Page: 8 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1040 Gasbaria-Anowara Road Km 000.20-000.30 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.24 1.406 1.345<br />

Z1040 Gasbaria-Anowara Road Km 001.00-001.10 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.24 1.406 1.345<br />

Z1040 Gasbaria-Anowara Road Km 001.60-002.10 S 0.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.15 1.343 6.251<br />

Z1040 Gasbaria-Anowara Road Km 003.10-003.60 S 0.5 3418 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.21 0.619 2.524<br />

Z1040 Gasbaria-Anowara Road Km 006.10-006.20 S 0.1 3418 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.137 0.926<br />

Z1040 Gasbaria-Anowara Road Km 006.40-006.50 S 0.1 3418 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.591 0.481<br />

Z1040 Gasbaria-Anowara Road Km 008.30-009.10 S 0.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.73 1.289 7.595<br />

Z1040 Gasbaria-Anowara Road Km 0<strong>12</strong>.20-0<strong>12</strong>.40 S 0.2 1678 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.039 0.057<br />

Z1040 Gasbaria-Anowara Road Km 002.10-002.30 S 0.2 3418 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z1040 Gasbaria-Anowara Road Km 002.60-003.10 S 0.5 3418 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 0.090 0.137<br />

Z1040 Gasbaria-Anowara Road Km 007.90-008.30 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.92 0.<strong>12</strong>4 0.136<br />

Z1040 Gasbaria-Anowara Road Km 009.10-009.20 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.21 0.251 0.065<br />

Z1040 Gasbaria-Anowara Road Km 0<strong>12</strong>.60-013.70 S 1.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.63 0.000 0.000<br />

Z1070 Patiya -Anowara Road Km 000.00-000.10 S 0.1 1363 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.<strong>12</strong>1 0.017<br />

Z1070 Patiya -Anowara Road Km 000.10-001.20 S 1.1 1363 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.80 0.541 3.827<br />

Z1070 Patiya -Anowara Road Km 004.20-004.60 S 0.4 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.56 0.493 1.065<br />

Z1070 Patiya -Anowara Road Km 005.10-005.70 S 0.6 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.84 0.500 1.621<br />

Z1070 Patiya -Anowara Road Km 008.70-008.80 S 0.1 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.14 0.546 0.249<br />

Z1070 Patiya -Anowara Road Km 005.70-005.80 S 0.1 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.14 0.000 0.000<br />

Z1070 Patiya -Anowara Road Km 006.20-006.30 S 0.1 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.14 0.242 0.037<br />

Z1070 Patiya -Anowara Road Km 008.60-008.70 S 0.1 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.14 0.000 0.000<br />

Z1070 Patiya -Anowara Road Km 003.10-003.14 S 0.04 1363 Zilla Seal Coat 2013 0.02 0.136 0.005<br />

Z1070 Patiya -Anowara Road Km 003.14-003.20 S 0.06 849 Zilla Seal Coat 2013 0.02 1.863 0.073<br />

Z1071 Santirhat-Kaliganj Road Km 000.30-003.20 S 2.9 1657 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.18 1.821 26.442<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 003.90-004.10 S 0.2 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 5.672 6.859<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 006.10-007.50 S 1.4 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.19 5.167 43.268<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 008.20-008.30 S 0.1 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 5.728 3.370<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 008.40-008.70 S 0.3 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 3.564 6.290<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 008.90-009.70 S 0.8 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.30 2.603 11.872<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 009.95-010.55 S 0.6 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 5.174 18.820<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 010.85-011.05 S 0.2 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.29 3.946 4.333<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 011.55-011.75 S 0.2 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.28 5.941 6.407<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 011.85-013.35 S 1.5 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.19 5.433 45.546<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 013.65-013.85 S 0.2 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.27 6.280 6.568<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 014.65-015.25 S 0.6 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.86 4.166 13.685<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 015.85-016.51 S 0.66 2707 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.96 3.724 13.717<br />

Z1088 CUFL Gate-Juid<strong>and</strong>i Road Km 015.25-015.85 S 0.6 2707 Zilla Carpet 40mm @ Traff >=2000 2013 0.87 1.569 2.<strong>23</strong>9<br />

Z1703 Anwara - Tailardwip Road Km 000.00-003.90 S 3.9 892 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.99 0.599 <strong>12</strong>.653<br />

Appendix-E: Page: 9 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1804 Maizzertek-BFDC Road Km 001.60-001.70 S 0.1 2464 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.18 1.219 0.875<br />

Z1804 Maizzertek-BFDC Road Km 001.80-003.13 S 1.33 2464 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.40 2.504 24.199<br />

Sub-total Dohazari Division<br />

52.31<br />

Khagrachari Division<br />

Z1601 Manikchahri-Laksmichhari Road Km 000.10-009.40 S 9.3 491 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 13.49 0.336 14.683<br />

Z1601 Manikchahri-Laksmichhari Road Km 000.00-000.10 S 0.1 491 Zilla Seal Coat 2013 0.07 1.143 0.094<br />

Z1602 Ramgarh-Mahalchhari Road Km 000.10-000.80 S 0.7 <strong>12</strong>17 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.70 1.029 5.687<br />

Z1602 Ramgarh-Mahalchhari Road Km 003.00-004.90 S 1.9 <strong>12</strong>17 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.04 1.329 15.526<br />

Z1602 Ramgarh-Mahalchhari Road Km 007.20-007.40 S 0.2 <strong>12</strong>17 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 1.219 1.399<br />

Z1602 Ramgarh-Mahalchhari Road Km 008.40-008.50 S 0.1 <strong>12</strong>17 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 1.272 0.730<br />

Z1602 Ramgarh-Mahalchhari Road Km 014.20-014.70 S 0.5 <strong>12</strong>17 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.75 1.989 5.707<br />

Z1602 Ramgarh-Mahalchhari Road Km 015.00-015.20 S 0.2 <strong>12</strong>17 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 2.069 2.374<br />

Z1602 Ramgarh-Mahalchhari Road Km 017.00-017.10 S 0.1 <strong>12</strong>17 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.21 1.353 1.107<br />

Z1603 Khagrachhari-Sajek Road Km 015.20-017.80 S 2.6 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.10 0.316 3.878<br />

Z1603 Khagrachhari-Sajek Road Km 018.80-020.20 S 1.4 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.21 0.172 1.135<br />

Z1603 Khagrachhari-Sajek Road Km 027.50-028.<strong>23</strong> S 0.73 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.15 1.990 9.039<br />

Z1603 Khagrachhari-Sajek Road Km 038.28-038.58 S 0.3 979 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.185 0.258<br />

Z1603 Khagrachhari-Sajek Road Km 038.68-039.15 S 0.47 979 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.75 0.185 0.409<br />

Z1603 Khagrachhari-Sajek Road Km 026.60-026.70 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1603 Khagrachhari-Sajek Road Km 0<strong>12</strong>.00-015.20 S 3.2 579 Zilla Carpet 40mm @ Traff 100-1000 2013 5.05 0.000 0.000<br />

Z1603 Khagrachhari-Sajek Road Km 028.83-038.28 S 9.45 979 Zilla Carpet 40mm @ Traff 100-1000 2013 14.91 0.000 0.000<br />

Z1603 Khagrachhari-Sajek Road Km 038.58-038.68 S 0.1 979 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z1603 Khagrachhari-Sajek Road Km 028.63-028.83 S 0.2 979 Zilla Seal Coat 2013 0.09 1.483 0.247<br />

Z1604 Khagrachhari-Panchhari Road Km 000.10-000.30 S 0.2 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.654 0.856<br />

Z1604 Khagrachhari-Panchhari Road Km 003.50-003.90 S 0.4 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.494 1.215<br />

Z1604 Khagrachhari-Panchhari Road Km 004.50-005.10 S 0.6 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.05 0.611 2.455<br />

Z1604 Khagrachhari-Panchhari Road Km 005.30-006.20 S 0.9 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.57 0.448 2.481<br />

Z1604 Khagrachhari-Panchhari Road Km 006.50-006.60 S 0.1 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.664 0.445<br />

Z1604 Khagrachhari-Panchhari Road Km 008.80-009.10 S 0.3 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.772 1.401<br />

Z1604 Khagrachhari-Panchhari Road Km 011.10-011.20 S 0.1 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.787 0.476<br />

Z1604 Khagrachhari-Panchhari Road Km 0<strong>12</strong>.60-0<strong>12</strong>.80 S 0.2 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.543 0.656<br />

Z1604 Khagrachhari-Panchhari Road Km 013.10-013.80 S 0.7 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.19 0.432 1.978<br />

Z1604 Khagrachhari-Panchhari Road Km 015.20-015.60 S 0.4 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.648 1.697<br />

Z1604 Khagrachhari-Panchhari Road Km 015.80-016.00 S 0.2 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.504 0.660<br />

Z1604 Khagrachhari-Panchhari Road Km 017.90-018.00 S 0.1 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.554 0.333<br />

Z1604 Khagrachhari-Panchhari Road Km 018.20-018.40 S 0.2 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.534 0.591<br />

Z1604 Khagrachhari-Panchhari Road Km 019.40-021.40 S 2 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.41 0.616 8.063<br />

Appendix-E: Page: 10 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1604 Khagrachhari-Panchhari Road Km 021.80-022.10 S 0.3 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.663 1.301<br />

Z1604 Khagrachhari-Panchhari Road Km 022.30-0<strong>23</strong>.40 S 1.1 787 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.82 0.493 3.448<br />

Z1604 Khagrachhari-Panchhari Road Km 001.80-002.90 S 1.1 787 Zilla Carpet 40mm @ Traff 100-1000 2013 1.79 0.000 0.000<br />

Z1604 Khagrachhari-Panchhari Road Km 011.70-0<strong>12</strong>.60 S 0.9 787 Zilla Carpet 40mm @ Traff 100-1000 2013 1.42 0.000 0.000<br />

Z1604 Khagrachhari-Panchhari Road Km 022.10-022.30 S 0.2 787 Zilla Seal Coat 2013 0.10 0.966 0.160<br />

Z1605 Dighinala-Langadu Road Km 000.50-000.80 S 0.3 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.7<strong>23</strong> 1.314<br />

Z1605 Dighinala-Langadu Road Km 001.40-001.60 S 0.2 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.445 0.539<br />

Z1605 Dighinala-Langadu Road Km 001.90-002.50 S 0.6 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.392 1.203<br />

Z1605 Dighinala-Langadu Road Km 003.00-003.40 S 0.4 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.467 1.130<br />

Z1605 Dighinala-Langadu Road Km 005.60-005.80 S 0.2 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.433 0.482<br />

Z1605 Dighinala-Langadu Road Km 006.40-007.10 S 0.7 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.10 0.457 1.939<br />

Z1605 Dighinala-Langadu Road Km 008.10-008.20 S 0.1 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.485 0.294<br />

Z1605 Dighinala-Langadu Road Km 009.40-009.60 S 0.2 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.479 0.580<br />

Z1605 Dighinala-Langadu Road Km 014.10-014.70 S 0.6 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.486 1.764<br />

Z1605 Dighinala-Langadu Road Km 015.20-015.50 S 0.3 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.478 0.798<br />

Z1605 Dighinala-Langadu Road Km 016.30-017.40 S 1.1 740 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.74 0.483 3.219<br />

Z1605 Dighinala-Langadu Road Km 001.60-001.90 S 0.3 740 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z1605 Dighinala-Langadu Road Km 005.00-005.60 S 0.6 740 Zilla Carpet 40mm @ Traff 100-1000 2013 0.95 0.000 0.000<br />

Z1605 Dighinala-Langadu Road Km 007.10-008.10 S 1 740 Zilla Carpet 40mm @ Traff 100-1000 2013 1.58 0.000 0.000<br />

Z1605 Dighinala-Langadu Road Km 0<strong>12</strong>.00-0<strong>12</strong>.10 S 0.1 740 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z1605 Dighinala-Langadu Road Km 013.60-014.10 S 0.5 740 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z1605 Dighinala-Langadu Road Km 015.50-015.70 S 0.2 740 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z1605 Dighinala-Langadu Road Km 018.80-019.50 S 0.7 740 Zilla Carpet 40mm @ Traff 100-1000 2013 1.10 0.000 0.000<br />

Z1605 Dighinala-Langadu Road Km 0<strong>23</strong>.70-024.00 S 0.3 740 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z1606 Baghaihat-Marisha Road Km 000.00-000.70 S 0.7 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.10 0.404 1.711<br />

Z1606 Baghaihat-Marisha Road Km 004.60-004.80 S 0.2 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.506 0.517<br />

Z1606 Baghaihat-Marisha Road Km 013.60-013.80 S 0.2 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.407 0.492<br />

Z1606 Baghaihat-Marisha Road Km 013.90-014.30 S 0.4 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.425 0.944<br />

Z1606 Baghaihat-Marisha Road Km 014.40-015.00 S 0.6 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.413 1.498<br />

Z1606 Baghaihat-Marisha Road Km 015.40-018.30 S 2.9 292 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.58 0.414 7.259<br />

Z1608 Matiranga-Tannakapara Road Km 000.80-001.50 S 0.7 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.16 0.457 2.040<br />

Z1608 Matiranga-Tannakapara Road Km 002.40-002.50 S 0.1 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.524 0.283<br />

Z1608 Matiranga-Tannakapara Road Km 003.00-003.10 S 0.1 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.451 0.288<br />

Z1608 Matiranga-Tannakapara Road Km 003.20-003.30 S 0.1 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.536 0.289<br />

Z1608 Matiranga-Tannakapara Road Km 003.90-004.20 S 0.3 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.50 0.452 0.865<br />

Z1608 Matiranga-Tannakapara Road Km 004.50-004.70 S 0.2 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.33 0.522 0.6<strong>12</strong><br />

Z1608 Matiranga-Tannakapara Road Km 005.30-008.30 S 3 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.99 0.449 8.591<br />

Z1608 Matiranga-Tannakapara Road Km 008.40-008.80 S 0.4 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.67 0.670 1.711<br />

Appendix-E: Page: 11 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1608 Matiranga-Tannakapara Road Km 009.10-0<strong>12</strong>.00 S 2.9 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.82 0.444 8.224<br />

Z1608 Matiranga-Tannakapara Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.1 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.425 0.271<br />

Z1608 Matiranga-Tannakapara Road Km 0<strong>12</strong>.30-014.80 S 2.5 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.16 0.447 7.140<br />

Z1608 Matiranga-Tannakapara Road Km 015.00-019.10 S 4.1 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.82 0.457 11.954<br />

Z1608 Matiranga-Tannakapara Road Km 019.20-019.40 S 0.2 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.33 0.460 0.587<br />

Z1608 Matiranga-Tannakapara Road Km 020.40-020.90 S 0.5 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.83 0.656 2.095<br />

Z1608 Matiranga-Tannakapara Road Km 021.30-021.90 S 0.6 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.00 0.442 1.693<br />

Z1608 Matiranga-Tannakapara Road Km 022.00-022.20 S 0.2 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.33 0.745 0.952<br />

Z1608 Matiranga-Tannakapara Road Km 022.30-024.50 S 2.2 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.66 0.445 6.244<br />

Z1608 Matiranga-Tannakapara Road Km 028.10-031.90 S 3.8 311 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.03 0.472 10.927<br />

Z1608 Matiranga-Tannakapara Road Km 002.50-003.00 S 0.5 311 Zilla Carpet 40mm @ Traff 100-1000 2013 0.83 0.000 0.000<br />

Z1608 Matiranga-Tannakapara Road Km 004.20-004.50 S 0.3 311 Zilla Carpet 40mm @ Traff 100-1000 2013 0.50 0.000 0.000<br />

Z1608 Matiranga-Tannakapara Road Km 0<strong>12</strong>.00-0<strong>12</strong>.10 S 0.1 311 Zilla Carpet 40mm @ Traff 100-1000 2013 0.17 0.000 0.000<br />

Z1608 Matiranga-Tannakapara Road Km 021.90-022.00 S 0.1 311 Zilla Seal Coat 2013 0.05 0.189 0.014<br />

Z1632 Gourangapara-Panchhari Road Km 000.20-001.00 S 0.8 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.33 1.505 7.667<br />

Z1632 Gourangapara-Panchhari Road Km 001.50-001.70 S 0.2 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.411 1.708<br />

Z1632 Gourangapara-Panchhari Road Km 003.50-003.80 S 0.3 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.395 2.534<br />

Z1632 Gourangapara-Panchhari Road Km 004.00-005.40 S 1.4 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.21 1.225 8.772<br />

Z1632 Gourangapara-Panchhari Road Km 005.50-006.40 S 0.9 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.42 1.355 6.779<br />

Z1632 Gourangapara-Panchhari Road Km 008.30-008.60 S 0.3 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z1632 Gourangapara-Panchhari Road Km 003.40-003.50 S 0.1 849 Zilla Seal Coat 2013 0.05 1.851 0.154<br />

Sub-total Khagrachari Division<br />

130.88<br />

Rangamati Division<br />

Z1603 Khagrachhari-Sajek Road Km 000.10-000.30 S 0.2 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.304 0.286<br />

Z1603 Khagrachhari-Sajek Road Km 000.50-000.80 S 0.3 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.301 0.501<br />

Z1603 Khagrachhari-Sajek Road Km 002.20-003.80 S 1.6 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.52 0.298 2.433<br />

Z1603 Khagrachhari-Sajek Road Km 004.00-004.10 S 0.1 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.299 0.181<br />

Z1603 Khagrachhari-Sajek Road Km 007.10-008.00 S 0.9 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.42 0.154 0.654<br />

Z1603 Khagrachhari-Sajek Road Km 011.70-0<strong>12</strong>.00 S 0.3 579 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.280 0.508<br />

Z1603 Khagrachhari-Sajek Road Km 000.30-000.50 S 0.2 579 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z1603 Khagrachhari-Sajek Road Km 005.00-007.10 S 2.1 579 Zilla Carpet 40mm @ Traff 100-1000 2013 3.31 0.000 0.000<br />

Z1603 Khagrachhari-Sajek Road Km 008.00-008.30 S 0.3 579 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z1603 Khagrachhari-Sajek Road Km 000.00-000.10 S 0.1 579 Zilla Seal Coat 2013 0.05 1.009 0.090<br />

Z1613 Ranirhat-Kawkhali Road Km 000.70-001.90 S 1.2 892 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.35 0.411 3.715<br />

Z1613 Ranirhat-Kawkhali Road Km 004.50-005.00 S 0.5 892 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.87 0.491 1.185<br />

Sub-total Rangamati Division<br />

<strong>12</strong>.74<br />

Appendix-E: Page: <strong>12</strong> of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Total Chittagong Zone<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

385.14<br />

NPV /<br />

Cost<br />

NPV<br />

Comilla Zone<br />

Brahmanbaria Division<br />

Z1042 Eliotganj-Bancharampur Road Km 031.00-031.60 S 0.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.97 0.316 0.634<br />

Z1042 Eliotganj-Bancharampur Road Km 032.70-041.00 S 8.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 13.81 0.000 0.000<br />

Z<strong>12</strong>01 Kashba-Kuti Road Km 000.10-000.70 S 0.6 2262 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.11 1.007 4.362<br />

Z<strong>12</strong>01 Kashba-Kuti Road Km 000.70-001.50 S 0.8 2262 Zilla Carpet 40mm @ Traff >=2000 2013 1.34 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 000.70-001.10 S 0.4 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.65 1.110 2.814<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 002.20-002.60 S 0.4 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.60 0.536 1.262<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 004.30-004.50 S 0.2 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 0.847 0.878<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 004.70-006.00 S 1.3 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.94 0.584 4.435<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 006.30-006.60 S 0.3 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.45 0.811 1.261<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 006.70-008.50 S 1.8 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.69 1.194 <strong>12</strong>.548<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 009.50-010.90 S 1.4 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.09 0.880 6.391<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 011.00-013.58 S 2.58 2984 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.85 0.919 <strong>12</strong>.298<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 000.00-000.10 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 000.20-000.50 S 0.3 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.49 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 000.60-000.70 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 001.10-001.50 S 0.4 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.65 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 001.60-002.00 S 0.4 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.65 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 002.10-002.20 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 003.60-004.30 S 0.7 2984 Zilla Carpet 40mm @ Traff >=2000 2013 1.04 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 004.50-004.70 S 0.2 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.30 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 006.00-006.10 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 006.20-006.30 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 006.60-006.70 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 008.50-008.60 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 009.20-009.50 S 0.3 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.45 0.000 0.000<br />

Z<strong>12</strong>10 Brahmanbaria-Lalpur Road Km 010.90-011.00 S 0.1 2984 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>11 Dulalpur-Ramch<strong>and</strong>rapur Road Km 000.00-010.00 S 10 186 Zilla Carpet 40mm @ Traff 100-1000 2013 13.56 0.000 0.000<br />

Z<strong>12</strong>16 Sultanpur-Akhura Road Km 000.00-000.10 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>16 Sultanpur-Akhura Road Km 000.90-001.10 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.30 0.000 0.000<br />

Z<strong>12</strong>16 Sultanpur-Akhura Road Km 001.60-001.70 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Sub-total Brahmanbaria Division<br />

48.75<br />

Ch<strong>and</strong>pur Division<br />

Appendix-E: Page: 13 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1050 Kaliapara-Kachua Road Km 000.00-000.10 S 0.1 1979 Zilla Carpet 40mm @ 1000-2000 2013 0.22 0.<strong>12</strong>4 0.037<br />

Z1050 Kaliapara-Kachua Road Km 003.60-003.90 S 0.3 1979 Zilla Carpet 40mm @ 1000-2000 2013 0.61 0.000 0.000<br />

Z1050 Kaliapara-Kachua Road Km 006.10-006.40 S 0.3 1979 Zilla Carpet 40mm @ 1000-2000 2013 0.61 0.000 0.000<br />

Z1050 Kaliapara-Kachua Road Km 006.90-007.20 S 0.3 1979 Zilla Carpet 40mm @ 1000-2000 2013 0.61 0.000 0.000<br />

Z1050 Kaliapara-Kachua Road Km 007.30-007.50 S 0.2 1979 Zilla Carpet 40mm @ 1000-2000 2013 0.41 0.000 0.000<br />

Z1050 Kaliapara-Kachua Road Km 008.40-009.20 S 0.8 1979 Zilla Carpet 40mm @ 1000-2000 2013 1.64 0.000 0.000<br />

Z1050 Kaliapara-Kachua Road Km 010.50-010.90 S 0.4 1979 Zilla Carpet 40mm @ 1000-2000 2013 0.82 0.000 0.000<br />

Z1050 Kaliapara-Kachua Road Km 013.10-013.26 S 0.16 1979 Zilla Carpet 40mm @ 1000-2000 2013 0.33 0.000 0.000<br />

Z1050 Kaliapara-Kachua Road Km 000.10-003.00 S 2.9 1979 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.32 2.002 50.774<br />

Z1050 Kaliapara-Kachua Road Km 007.50-008.40 S 0.9 1979 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.84 1.826 13.577<br />

Z1050 Kaliapara-Kachua Road Km 010.20-010.50 S 0.3 1979 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 1.954 4.841<br />

Z1050 Kaliapara-Kachua Road Km 010.90-0<strong>12</strong>.20 S 1.3 1979 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.66 1.696 18.214<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 000.10-000.60 S 0.5 2191 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.766 2.285<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 000.90-001.10 S 0.2 2191 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.424 0.506<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 001.20-001.70 S 0.5 2191 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.398 1.090<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 001.80-002.00 S 0.2 2191 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.397 0.474<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 002.40-002.50 S 0.1 2191 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.447 0.245<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 000.00-000.10 S 0.1 2191 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.218 0.038<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 001.10-001.20 S 0.1 2191 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.1<strong>12</strong> 0.019<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 001.70-001.80 S 0.1 2191 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.151 0.030<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 002.00-002.40 S 0.4 2191 Zilla Carpet 40mm @ Traff >=2000 2013 0.58 0.000 0.000<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 002.50-010.30 S 7.8 2191 Zilla Carpet 40mm @ Traff >=2000 2013 10.51 0.245 2.904<br />

Z1403 Ch<strong>and</strong>pur -Harina Road Km 000.60-000.90 S 0.3 2191 Zilla Seal Coat 2013 0.14 0.174 0.060<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 001.40-001.50 S 0.1 1482 Zilla Carpet 40mm @ 1000-2000 2013 0.28 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 001.70-002.00 S 0.3 1482 Zilla Carpet 40mm @ 1000-2000 2013 0.49 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 002.80-002.90 S 0.1 1482 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 000.50-001.40 S 0.9 1482 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.49 0.175 1.595<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 001.50-001.70 S 0.2 1482 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.425 0.779<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 007.90-008.50 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.90 2.314 8.172<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 014.30-015.60 S 1.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.94 1.<strong>23</strong>7 9.463<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 016.80-018.60 S 1.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.69 1.197 <strong>12</strong>.685<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 018.80-019.60 S 0.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.19 2.<strong>23</strong>0 10.497<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 008.50-008.60 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 009.70-009.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 0<strong>12</strong>.50-0<strong>12</strong>.90 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.60 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 014.10-014.30 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.30 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 015.60-015.80 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.30 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 016.40-016.80 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.60 0.000 0.000<br />

Appendix-E: Page: 14 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 018.60-018.80 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.30 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 020.00-020.20 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.30 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 021.70-021.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.100 0.018<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 022.80-022.90 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 024.10-024.30 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.30 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 004.90-005.10 S 0.2 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 005.90-006.00 S 0.1 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 006.30-006.80 S 0.5 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.81 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 007.00-007.10 S 0.1 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 009.50-009.90 S 0.4 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.65 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 010.90-011.10 S 0.2 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 0<strong>12</strong>.20-013.40 S 1.2 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 1.94 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 014.10-014.30 S 0.2 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 014.60-014.70 S 0.1 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 014.80-015.10 S 0.3 <strong>12</strong>24 Zilla Carpet 40mm @ 1000-2000 2013 0.49 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 002.10-002.70 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 2.327 8.966<br />

Z1824 Doabhanga-Ramganj Road Km 003.70-004.90 S 1.2 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.94 0.375 2.428<br />

Z1824 Doabhanga-Ramganj Road Km 005.10-005.90 S 0.8 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.30 0.448 2.101<br />

Z1824 Doabhanga-Ramganj Road Km 006.00-006.30 S 0.3 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.410 0.787<br />

Z1824 Doabhanga-Ramganj Road Km 006.80-007.00 S 0.2 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.392 0.502<br />

Z1824 Doabhanga-Ramganj Road Km 007.10-009.50 S 2.4 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.89 0.403 6.191<br />

Z1824 Doabhanga-Ramganj Road Km 009.90-010.20 S 0.3 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.407 0.782<br />

Z1824 Doabhanga-Ramganj Road Km 011.10-011.80 S 0.7 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.13 0.370 1.398<br />

Z1824 Doabhanga-Ramganj Road Km 011.90-0<strong>12</strong>.20 S 0.3 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.444 0.782<br />

Z1824 Doabhanga-Ramganj Road Km 013.40-014.10 S 0.7 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.13 0.432 1.934<br />

Z1824 Doabhanga-Ramganj Road Km 014.30-014.60 S 0.3 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.544 1.044<br />

Z1824 Doabhanga-Ramganj Road Km 015.10-015.30 S 0.2 <strong>12</strong>24 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.549 0.702<br />

Z1824 Doabhanga-Ramganj Road Km 000.30-001.00 S 0.7 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.13 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 001.30-001.70 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.65 0.000 0.000<br />

Z1824 Doabhanga-Ramganj Road Km 000.00-000.10 S 0.1 2146 Zilla Seal Coat 2013 0.05 0.605 0.070<br />

Z1824 Doabhanga-Ramganj Road Km 003.40-003.70 S 0.3 <strong>12</strong>24 Zilla Seal Coat 2013 0.15 0.457 0.132<br />

Z1824 Doabhanga-Ramganj Road Km 010.20-010.30 S 0.1 <strong>12</strong>24 Zilla Seal Coat 2013 0.05 0.674 0.069<br />

Z1824 Doabhanga-Ramganj Road Km 015.30-015.61 S 0.31 <strong>12</strong>24 Zilla Seal Coat 2013 0.15 0.433 0.138<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 000.00-002.70 S 2.7 2622 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.11 0.996 13.095<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 003.50-003.90 S 0.4 2622 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.874 2.085<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 005.00-015.00 S 10 2622 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 15.05 1.390 79.170<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 002.70-003.10 S 0.4 2622 Zilla Carpet 40mm @ Traff >=2000 2013 0.60 0.575 0.417<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 004.30-004.50 S 0.2 2622 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.442 0.175<br />

Appendix-E: Page: 15 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z8699 Ch<strong>and</strong>ra-Haimchar Road Km 004.80-005.00 S 0.2 2622 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.987 0.436<br />

Sub-total Ch<strong>and</strong>pur Division<br />

86.15<br />

Comilla Division<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 002.20-002.80 S 0.6 4698 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 1.529 5.814<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 003.20-003.60 S 0.4 4698 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.65 1.040 2.636<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 008.50-009.00 S 0.5 4698 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.81 1.080 3.421<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 009.10-0<strong>12</strong>.10 S 3 4698 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.86 0.932 17.710<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 0<strong>12</strong>.10-013.00 S 0.9 4698 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.46 1.199 5.591<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 000.00-000.30 S 0.3 4698 Zilla Carpet 40mm @ Traff >=2000 2013 0.49 0.000 0.000<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 000.70-000.90 S 0.2 4698 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 005.70-005.80 S 0.1 4698 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 007.70-007.80 S 0.1 4698 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 013.00-013.20 S 0.2 4698 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 013.70-014.22 S 0.52 4698 Zilla Carpet 40mm @ Traff >=2000 2013 0.85 0.000 0.000<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 003.00-003.20 S 0.2 4698 Zilla Overlay 50mm @ Cracking >25% 2013 0.40 0.697 0.249<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 005.00-005.40 S 0.4 4698 Zilla Overlay 50mm @ Cracking >25% 2013 0.79 0.719 0.514<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 001.80-001.90 S 0.1 4698 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 0.617 0.<strong>12</strong>6<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 002.10-002.20 S 0.1 4698 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 0.559 0.113<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 002.80-002.90 S 0.1 4698 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 0.561 0.113<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 003.60-003.70 S 0.1 4698 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 0.814 0.145<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 003.90-004.00 S 0.1 4698 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 0.902 0.161<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 008.40-008.50 S 0.1 4698 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 0.839 0.150<br />

Z1008 Ch<strong>and</strong>ina-Debidwar Road Km 009.00-009.10 S 0.1 4698 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 0.835 0.149<br />

Z1041 Comilla-Mirpur Road Km 001.20-001.80 S 0.6 4247 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.00 0.949 3.718<br />

Z1041 Comilla-Mirpur Road Km 008.50-009.30 S 0.8 4247 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.30 1.448 7.367<br />

Z1041 Comilla-Mirpur Road Km 009.40-010.10 S 0.7 4247 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.13 0.952 4.<strong>23</strong>7<br />

Z1041 Comilla-Mirpur Road Km 001.80-003.10 S 1.3 4247 Zilla Carpet 40mm @ Traff >=2000 2013 2.16 0.783 2.1<strong>23</strong><br />

Z1041 Comilla-Mirpur Road Km 008.20-008.50 S 0.3 4247 Zilla Carpet 40mm @ Traff >=2000 2013 0.49 0.363 0.209<br />

Z1041 Comilla-Mirpur Road Km 000.00-001.20 S 1.2 4247 Zilla Overlay 50mm @ Cracking >25% 2013 2.44 1.347 3.639<br />

Z1041 Comilla-Mirpur Road Km 003.20-003.30 S 0.1 4247 Zilla Overlay 50mm @ Cracking >25% 2013 0.20 0.084 0.018<br />

Z1041 Comilla-Mirpur Road Km 003.90-004.00 S 0.1 4247 Zilla Overlay 50mm @ Cracking >25% 2013 0.20 0.152 0.028<br />

Z1041 Comilla-Mirpur Road Km 006.50-006.90 S 0.4 4247 Zilla Overlay 50mm @ Cracking >25% 2013 0.79 0.729 0.616<br />

Z1041 Comilla-Mirpur Road Km 007.00-007.60 S 0.6 4247 Zilla Overlay 50mm @ Cracking >25% 2013 1.19 1.351 1.779<br />

Z1041 Comilla-Mirpur Road Km 007.70-007.80 S 0.1 4247 Zilla Overlay 50mm @ Cracking >25% 2013 0.20 0.164 0.029<br />

Z1041 Comilla-Mirpur Road Km 003.50-003.80 S 0.3 4247 Zilla Overlay 50mm @ IRI 6-9 2013 0.61 1.904 1.347<br />

Z1041 Comilla-Mirpur Road Km 004.10-004.90 S 0.8 4247 Zilla Overlay 50mm @ IRI 6-9 2013 1.61 1.514 2.759<br />

Z1041 Comilla-Mirpur Road Km 005.10-006.40 S 1.3 4247 Zilla Overlay 50mm @ IRI 6-9 2013 2.58 1.480 4.221<br />

Appendix-E: Page: 16 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1041 Comilla-Mirpur Road Km 009.30-009.40 S 0.1 4247 Zilla Overlay 50mm @ IRI 6-9 2013 0.20 1.528 0.383<br />

Z1042 Eliotganj-Bancharampur Road Km 000.00-000.20 S 0.2 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 009.70-010.30 S 0.6 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.97 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 010.50-011.10 S 0.6 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.97 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 011.20-011.30 S 0.1 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 011.80-011.90 S 0.1 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 0<strong>12</strong>.10-0<strong>12</strong>.50 S 0.4 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.65 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 015.70-015.80 S 0.1 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 018.10-018.30 S 0.2 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 019.00-019.20 S 0.2 1360 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 000.20-009.20 S 9 1360 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 14.59 0.615 35.552<br />

Z1042 Eliotganj-Bancharampur Road Km 010.30-010.50 S 0.2 1360 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.031 1.326<br />

Z1042 Eliotganj-Bancharampur Road Km 011.30-011.80 S 0.5 1360 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.81 1.003 3.224<br />

Z1042 Eliotganj-Bancharampur Road Km 011.90-0<strong>12</strong>.10 S 0.2 1360 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.030 1.324<br />

Z1042 Eliotganj-Bancharampur Road Km 0<strong>12</strong>.50-015.60 S 3.1 1360 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.02 0.756 13.809<br />

Z1042 Eliotganj-Bancharampur Road Km 015.80-018.10 S 2.3 1360 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.73 0.984 14.552<br />

Z1042 Eliotganj-Bancharampur Road Km 018.30-019.00 S 0.7 1360 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.13 0.764 3.154<br />

Z1042 Eliotganj-Bancharampur Road Km 020.20-020.50 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.955 1.840<br />

Z1042 Eliotganj-Bancharampur Road Km 027.80-028.40 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 1.037 3.996<br />

Z1042 Eliotganj-Bancharampur Road Km 019.20-019.30 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.218 0.069<br />

Z1042 Eliotganj-Bancharampur Road Km 021.70-021.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 022.20-022.30 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.574 0.192<br />

Z1042 Eliotganj-Bancharampur Road Km 025.40-025.70 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.49 0.000 0.000<br />

Z1042 Eliotganj-Bancharampur Road Km 027.70-027.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.586 0.196<br />

Z1046 Harishchar-Miabazar Road Km 003.20-003.40 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.158 1.441<br />

Z1046 Harishchar-Miabazar Road Km 001.20-001.30 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1046 Harishchar-Miabazar Road Km 001.50-002.50 S 1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.58 0.000 0.000<br />

Z1046 Harishchar-Miabazar Road Km 003.00-003.20 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z1046 Harishchar-Miabazar Road Km 003.40-004.40 S 1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.58 0.000 0.000<br />

Z1046 Harishchar-Miabazar Road Km 005.20-005.40 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z1046 Harishchar-Miabazar Road Km 005.60-006.40 S 0.8 4132 Zilla Overlay 50mm @ Cracking >25% 2013 1.54 0.158 0.245<br />

Z1046 Harishchar-Miabazar Road Km 014.00-019.42 S 5.41 4132 Zilla Overlay 50mm @ Cracking >25% 2013 10.46 0.154 1.453<br />

Z1046 Harishchar-Miabazar Road Km 006.60-006.90 S 0.3 4132 Zilla Overlay 50mm @ IRI 6-9 2013 0.58 0.878 0.552<br />

Z1046 Harishchar-Miabazar Road Km 007.20-007.60 S 0.4 4132 Zilla Overlay 50mm @ IRI 6-9 2013 0.77 1.158 1.0<strong>12</strong><br />

Z1046 Harishchar-Miabazar Road Km 007.70-008.20 S 0.5 4132 Zilla Overlay 50mm @ IRI 6-9 2013 0.97 1.285 1.438<br />

Z1046 Harishchar-Miabazar Road Km 008.50-010.10 S 1.6 4132 Zilla Overlay 50mm @ IRI 6-9 2013 3.09 0.853 2.760<br />

Z1046 Harishchar-Miabazar Road Km 010.30-010.60 S 0.3 4132 Zilla Overlay 50mm @ IRI 6-9 2013 0.58 0.767 0.473<br />

Z1046 Harishchar-Miabazar Road Km 010.80-013.90 S 3.1 4132 Zilla Overlay 50mm @ IRI 6-9 2013 5.99 0.935 5.956<br />

Appendix-E: Page: 17 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1048 Laksham -Chewara Bazar Road Km 001.90-002.60 S 0.7 1903 Zilla Carpet 40mm @ 1000-2000 2013 1.10 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 002.70-002.90 S 0.2 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 003.50-003.90 S 0.4 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.61 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 004.00-004.10 S 0.1 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 004.50-004.80 S 0.3 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.45 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 005.30-005.70 S 0.4 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.63 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 006.10-006.40 S 0.3 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 006.50-007.10 S 0.6 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 007.70-009.20 S 1.5 1903 Zilla Carpet 40mm @ 1000-2000 2013 2.35 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 009.90-010.00 S 0.1 1903 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 010.10-011.13 S 1.03 1903 Zilla Carpet 40mm @ 1000-2000 2013 1.62 0.008 0.015<br />

Z1048 Laksham -Chewara Bazar Road Km 000.10-001.90 S 1.8 1903 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.68 0.789 7.343<br />

Z1048 Laksham -Chewara Bazar Road Km 004.10-004.50 S 0.4 1903 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.60 1.066 2.408<br />

Z1048 Laksham -Chewara Bazar Road Km 004.80-005.30 S 0.5 1903 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.78 0.642 1.480<br />

Z1048 Laksham -Chewara Bazar Road Km 006.40-006.50 S 0.1 1903 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.519 0.310<br />

Z1048 Laksham -Chewara Bazar Road Km 007.10-007.70 S 0.6 1903 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.534 1.9<strong>12</strong><br />

Z1048 Laksham -Chewara Bazar Road Km 009.20-009.90 S 0.7 1903 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.10 0.684 2.626<br />

Z1048 Laksham -Chewara Bazar Road Km 011.13-0<strong>23</strong>.64 S <strong>12</strong>.51 777 Zilla Carpet 40mm @ Traff 100-1000 2013 19.58 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 024.35-032.00 S 7.66 777 Zilla Carpet 40mm @ Traff 100-1000 2013 11.95 0.000 0.000<br />

Z1048 Laksham -Chewara Bazar Road Km 000.00-000.10 S 0.1 1903 Zilla Seal Coat 2013 0.04 0.246 0.022<br />

Z1051 Changani -Chaumohoni Road Km 004.10-005.20 S 1.1 983 Zilla Carpet 40mm @ Traff 100-1000 2013 1.43 0.000 0.000<br />

Z1051 Changani -Chaumohoni Road Km 005.20-005.80 S 0.6 983 Zilla Carpet 40mm @ Traff 100-1000 2013 0.77 0.000 0.000<br />

Z1051 Changani -Chaumohoni Road Km 005.80-006.00 S 0.2 983 Zilla Carpet 40mm @ Traff 100-1000 2013 0.26 0.000 0.000<br />

Z1051 Changani -Chaumohoni Road Km 006.00-010.26 S 4.26 983 Zilla Carpet 40mm @ Traff 100-1000 2013 5.36 0.000 0.000<br />

Z1053 Gouripur-Homna Road Km 000.10-000.80 S 0.7 2028 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.79 1.267 9.154<br />

Z1053 Gouripur-Homna Road Km 001.70-005.70 S 4 2028 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 7.69 1.304 40.469<br />

Z1053 Gouripur-Homna Road Km 006.00-008.10 S 2.1 2028 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.76 1.087 16.388<br />

Z1053 Gouripur-Homna Road Km 014.40-014.70 S 0.3 2028 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 1.042 3.227<br />

Z1053 Gouripur-Homna Road Km 000.00-000.10 S 0.1 2028 Zilla Carpet 40mm @ Traff >=2000 2013 0.26 0.084 0.031<br />

Z1053 Gouripur-Homna Road Km 000.80-001.30 S 0.5 2028 Zilla Carpet 40mm @ Traff >=2000 2013 1.28 0.000 0.000<br />

Z1053 Gouripur-Homna Road Km 005.70-005.80 S 0.1 2028 Zilla Carpet 40mm @ Traff >=2000 2013 0.18 0.000 0.000<br />

Z1053 Gouripur-Homna Road Km 005.90-006.00 S 0.1 2028 Zilla Carpet 40mm @ Traff >=2000 2013 0.18 0.000 0.000<br />

Z1053 Gouripur-Homna Road Km 008.10-008.30 S 0.2 2028 Zilla Carpet 40mm @ Traff >=2000 2013 0.36 0.000 0.000<br />

Z1053 Gouripur-Homna Road Km 010.60-010.70 S 0.1 2028 Zilla Carpet 40mm @ Traff >=2000 2013 0.26 0.000 0.000<br />

Z1053 Gouripur-Homna Road Km 014.70-015.00 S 0.3 2028 Zilla Carpet 40mm @ Traff >=2000 2013 0.77 0.000 0.000<br />

Z1053 Gouripur-Homna Road Km 015.40-017.68 S 2.28 2028 Zilla Carpet 40mm @ Traff >=2000 2013 5.43 0.000 0.000<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 000.10-000.70 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.41 1.513 8.589<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 002.10-003.10 S 1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.35 1.050 9.938<br />

Appendix-E: Page: 18 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 003.30-004.41 S 1.11 2826 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.60 1.595 16.626<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 004.51-007.61 S 3.1 4<strong>12</strong>1 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.04 1.746 39.897<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 000.00-000.10 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.186 0.060<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 000.70-000.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 001.00-001.30 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 001.80-001.90 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 003.10-003.30 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 004.41-004.51 S 0.1 4909 Zilla Overlay 50mm @ Cracking >25% 2013 0.29 0.047 0.016<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 008.61-008.91 S 0.3 4<strong>12</strong>1 Zilla Overlay 50mm @ Cracking >25% 2013 0.58 1.774 1.114<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 017.41-017.61 S 0.2 4<strong>12</strong>1 Zilla Overlay 50mm @ Cracking >25% 2013 0.38 1.909 0.794<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 021.01-021.75 S 0.74 4909 Zilla Overlay 50mm @ Cracking >25% 2013 2.13 0.146 0.361<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 008.21-008.31 S 0.1 4<strong>12</strong>1 Zilla Overlay 50mm @ IRI 6-9 2013 0.19 1.825 0.399<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 008.41-008.51 S 0.1 4<strong>12</strong>1 Zilla Overlay 50mm @ IRI 6-9 2013 0.19 1.829 0.400<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 009.11-009.21 S 0.1 4<strong>12</strong>1 Zilla Overlay 50mm @ IRI 6-9 2013 0.19 2.418 0.590<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 009.71-010.11 S 0.4 4<strong>12</strong>1 Zilla Overlay 50mm @ IRI 6-9 2013 0.77 2.996 2.925<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 018.01-018.21 S 0.2 4<strong>12</strong>1 Zilla Overlay 50mm @ IRI 6-9 2013 0.38 2.918 1.433<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 018.31-018.51 S 0.2 4<strong>12</strong>1 Zilla Overlay 50mm @ IRI 6-9 2013 0.38 2.913 1.484<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 018.91-019.11 S 0.2 4<strong>12</strong>1 Zilla Overlay 50mm @ IRI 6-9 2013 0.38 2.747 1.228<br />

Z<strong>12</strong>05 Dharkhar-Senarbadi Road Km 020.61-020.81 S 0.2 4909 Zilla Overlay 50mm @ IRI 6-9 2013 0.57 2.072 1.503<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 000.10-000.30 S 0.2 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 1.477 1.715<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 000.40-000.60 S 0.2 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 1.451 1.685<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 000.80-002.10 S 1.3 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.00 0.851 6.425<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 002.50-002.70 S 0.2 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 1.451 1.686<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 002.90-003.10 S 0.2 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 1.452 1.686<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 005.37-005.67 S 0.3 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.45 1.431 2.424<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 006.47-007.37 S 0.9 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.39 0.851 4.117<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 007.77-008.67 S 0.9 3461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.42 0.794 4.265<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 000.00-000.10 S 0.1 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 000.30-000.40 S 0.1 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.061 0.013<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 000.60-000.80 S 0.2 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 0.000 0.000<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 002.10-002.20 S 0.1 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 002.30-002.50 S 0.2 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 0.000 0.000<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 004.50-004.60 S 0.1 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 004.80-005.37 S 0.57 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.85 0.000 0.000<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 005.67-005.77 S 0.1 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z<strong>12</strong>19 Nimsar-Burichaung Road Km 006.17-006.47 S 0.3 3461 Zilla Carpet 40mm @ Traff >=2000 2013 0.45 0.744 0.448<br />

Z<strong>12</strong>21 Nabipur-Sreekail Road Km 000.00-008.55 S 8.55 2159 Zilla Carpet 40mm @ Traff >=2000 2013 17.14 0.000 0.000<br />

Z<strong>12</strong>21 Nabipur-Sreekail Road Km 010.56-016.33 S 5.77 2159 Zilla Carpet 40mm @ Traff >=2000 2013 13.04 0.000 0.000<br />

Appendix-E: Page: 19 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 002.00-003.60 S 1.6 818 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.74 0.405 3.311<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 003.80-003.90 S 0.1 818 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.825 0.473<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 000.80-000.82 S 0.02 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.03 0.000 0.000<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 001.80-002.00 S 0.2 818 Zilla Carpet 40mm @ Traff 100-1000 2013 0.29 0.000 0.000<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 003.60-003.80 S 0.2 818 Zilla Carpet 40mm @ Traff 100-1000 2013 0.30 0.000 0.000<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 003.90-004.00 S 0.1 818 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 005.30-005.50 S 0.2 818 Zilla Carpet 40mm @ Traff 100-1000 2013 0.30 0.000 0.000<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 006.00-006.90 S 0.9 818 Zilla Carpet 40mm @ Traff 100-1000 2013 1.34 0.000 0.000<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 000.00-000.50 S 0.5 2146 Zilla Seal Coat 2013 0.25 0.321 0.193<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 000.82-001.00 S 0.18 818 Zilla Seal Coat 2013 0.10 1.929 0.304<br />

Z1401 Lalmai-Barura-Jagatpur Road Km 001.60-001.70 S 0.1 818 Zilla Seal Coat 2013 0.04 1.451 0.102<br />

Z1414 Laksam -Muddafarganj Road Km 000.00-002.90 S 2.9 2566 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.80 1.144 31.386<br />

Z1414 Laksam -Muddafarganj Road Km 003.50-003.60 S 0.1 2566 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.584 1.499<br />

Z1414 Laksam -Muddafarganj Road Km 005.10-005.30 S 0.2 2566 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.018 1.766<br />

Z1414 Laksam -Muddafarganj Road Km 003.60-005.10 S 1.5 2566 Zilla Carpet 40mm @ Traff >=2000 2013 3.52 0.000 0.000<br />

Z1414 Laksam -Muddafarganj Road Km 007.10-007.93 S 0.83 2566 Zilla Carpet 40mm @ Traff >=2000 2013 1.95 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 000.10-000.70 S 0.6 <strong>12</strong>44 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 000.90-002.30 S 1.4 <strong>12</strong>44 Zilla Carpet 40mm @ 1000-2000 2013 2.21 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 002.70-003.20 S 0.5 <strong>12</strong>44 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 003.30-003.80 S 0.5 <strong>12</strong>44 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 004.00-004.20 S 0.2 <strong>12</strong>44 Zilla Carpet 40mm @ 1000-2000 2013 0.20 0.072 0.016<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 005.00-006.09 S 1.09 1152 Zilla Carpet 40mm @ 1000-2000 2013 1.13 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 000.00-000.10 S 0.1 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.317 0.148<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 000.70-000.90 S 0.2 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 002.30-002.70 S 0.4 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.62 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 003.20-003.30 S 0.1 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.228 0.106<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 003.80-004.00 S 0.2 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 004.20-004.40 S 0.2 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.20 0.355 0.247<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 004.50-004.90 S 0.4 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.40 0.134 0.159<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 0<strong>12</strong>.90-013.43 S 0.53 933 Zilla Carpet 40mm @ Traff 100-1000 2013 0.84 0.000 0.000<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 004.40-004.50 S 0.1 <strong>12</strong>44 Zilla Seal Coat 2013 0.03 0.<strong>23</strong>4 0.024<br />

Z14<strong>23</strong> Pepulia-Magbari Road Km 004.90-005.00 S 0.1 <strong>12</strong>44 Zilla Seal Coat 2013 0.03 0.652 0.039<br />

Sub-total Comilla Division<br />

255.56<br />

Feni Division<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 000.10-001.10 S 1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.21 1.434 <strong>12</strong>.718<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 001.30-003.60 S 2.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.80 1.438 20.643<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 008.00-008.20 S 0.2 21<strong>23</strong> Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.492 0.604<br />

Appendix-E: Page: 20 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 008.90-009.10 S 0.2 21<strong>23</strong> Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.946 1.160<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 009.90-010.20 S 0.3 21<strong>23</strong> Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.50 0.879 1.659<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 001.10-001.30 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.33 0.137 0.056<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 003.60-004.00 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.67 0.136 0.110<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 008.20-008.90 S 0.7 21<strong>23</strong> Zilla Carpet 40mm @ Traff >=2000 2013 1.13 0.000 0.000<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 009.10-009.90 S 0.8 21<strong>23</strong> Zilla Carpet 40mm @ Traff >=2000 2013 1.33 0.622 1.004<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 010.20-011.15 S 0.95 21<strong>23</strong> Zilla Carpet 40mm @ Traff >=2000 2013 1.69 0.000 0.000<br />

Z1032 Chhagalnaiya-Muhuriganj Road Km 000.00-000.10 S 0.1 2146 Zilla Seal Coat 2013 0.08 0.686 0.173<br />

Z1033 Feni-Belonia Road Km 016.20-016.50 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.54 1.090 2.348<br />

Z1033 Feni-Belonia Road Km 017.90-018.10 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.36 2.227 3.197<br />

Z1033 Feni-Belonia Road Km 022.80-0<strong>23</strong>.10 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.54 1.283 2.763<br />

Z1033 Feni-Belonia Road Km 0<strong>23</strong>.70-024.10 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.72 1.<strong>23</strong>4 3.542<br />

Z1033 Feni-Belonia Road Km 000.00-000.10 S 0.1 4955 Zilla Carpet 40mm @ Traff >=2000 2013 0.20 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 000.20-000.70 S 0.5 4955 Zilla Carpet 40mm @ Traff >=2000 2013 1.02 2.937 4.384<br />

Z1033 Feni-Belonia Road Km 002.80-003.40 S 0.6 4955 Zilla Carpet 40mm @ Traff >=2000 2013 1.10 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 007.90-009.20 S 1.3 4955 Zilla Carpet 40mm @ Traff >=2000 2013 2.33 2.614 9.735<br />

Z1033 Feni-Belonia Road Km 009.40-009.90 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.90 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 010.00-013.10 S 3.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.55 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 013.10-016.20 S 3.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.55 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 016.50-016.90 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.72 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 017.00-017.90 S 0.9 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.61 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 018.10-020.00 S 1.9 2146 Zilla Carpet 40mm @ Traff >=2000 2013 3.40 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 020.20-021.40 S 1.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.15 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 021.60-022.30 S 0.7 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.25 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 022.40-022.80 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.72 0.142 0.<strong>12</strong>4<br />

Z1033 Feni-Belonia Road Km 0<strong>23</strong>.10-0<strong>23</strong>.30 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.36 0.113 0.049<br />

Z1033 Feni-Belonia Road Km 0<strong>23</strong>.50-0<strong>23</strong>.70 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.36 0.110 0.048<br />

Z1033 Feni-Belonia Road Km 024.10-024.20 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.18 0.000 0.000<br />

Z1033 Feni-Belonia Road Km 000.80-000.90 S 0.1 4955 Zilla Overlay 50mm @ Cracking >25% 2013 0.25 0.078 0.018<br />

Z1033 Feni-Belonia Road Km 003.80-005.30 S 1.5 4955 Zilla Overlay 50mm @ Cracking >25% 2013 3.31 0.052 0.154<br />

Z1033 Feni-Belonia Road Km 005.40-006.40 S 1 4955 Zilla Overlay 50mm @ Cracking >25% 2013 2.19 0.147 0.290<br />

Z1033 Feni-Belonia Road Km 006.60-007.70 S 1.1 4955 Zilla Overlay 50mm @ Cracking >25% 2013 2.41 2.653 8.502<br />

Z1033 Feni-Belonia Road Km 001.40-002.30 S 0.9 4955 Zilla Overlay 50mm @ IRI 6-9 2013 2.02 1.808 3.287<br />

Z1034 Feni-Muhuriganj Road Km 000.40-000.80 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.06 0.371 3.065<br />

Z1034 Feni-Muhuriganj Road Km 000.90-001.30 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.68 0.494 3.328<br />

Z1034 Feni-Muhuriganj Road Km 003.90-004.10 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.50 1.025 2.082<br />

Z1034 Feni-Muhuriganj Road Km 009.40-009.60 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.445 2.735<br />

Z1034 Feni-Muhuriganj Road Km 0<strong>12</strong>.30-0<strong>12</strong>.40 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.24 1.059 0.930<br />

Appendix-E: Page: 21 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1034 Feni-Muhuriganj Road Km 000.80-000.90 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.52 0.000 0.000<br />

Z1034 Feni-Muhuriganj Road Km 001.30-002.40 S 1.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 3.16 0.045 0.204<br />

Z1034 Feni-Muhuriganj Road Km 003.10-003.90 S 0.8 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.16 0.035 0.108<br />

Z1034 Feni-Muhuriganj Road Km 007.90-009.40 S 1.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 3.52 0.000 0.000<br />

Z1034 Feni-Muhuriganj Road Km 0<strong>12</strong>.40-016.00 S 3.6 3527 Zilla Carpet 40mm @ Traff >=2000 2013 8.98 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 000.10-000.40 S 0.3 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.74 1.093 3.229<br />

Z1035 Chhagalnaiya-Parsuram Road Km 003.60-005.30 S 1.7 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.82 1.271 <strong>12</strong>.907<br />

Z1035 Chhagalnaiya-Parsuram Road Km 006.50-006.90 S 0.4 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 1.275 3.075<br />

Z1035 Chhagalnaiya-Parsuram Road Km 007.00-007.50 S 0.5 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 1.332 4.014<br />

Z1035 Chhagalnaiya-Parsuram Road Km 009.20-009.70 S 0.5 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 1.445 4.027<br />

Z1035 Chhagalnaiya-Parsuram Road Km 014.20-016.60 S 2.4 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.89 1.496 18.609<br />

Z1035 Chhagalnaiya-Parsuram Road Km 018.80-019.30 S 0.5 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.81 1.4<strong>12</strong> 3.660<br />

Z1035 Chhagalnaiya-Parsuram Road Km 021.00-021.40 S 0.4 3081 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.747 2.820<br />

Z1035 Chhagalnaiya-Parsuram Road Km 006.20-006.50 S 0.3 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.46 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 006.90-007.00 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 007.50-007.90 S 0.4 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.61 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 008.20-008.40 S 0.2 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 008.50-009.20 S 0.7 3081 Zilla Carpet 40mm @ Traff >=2000 2013 1.07 0.190 0.225<br />

Z1035 Chhagalnaiya-Parsuram Road Km 009.70-009.80 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.19 0.103 0.0<strong>23</strong><br />

Z1035 Chhagalnaiya-Parsuram Road Km 009.90-010.20 S 0.3 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.46 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 013.10-013.20 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.17 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 013.30-013.60 S 0.3 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.51 0.224 0.132<br />

Z1035 Chhagalnaiya-Parsuram Road Km 013.80-013.90 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.18 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 014.00-014.20 S 0.2 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 016.60-016.70 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 017.40-017.50 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 017.70-017.80 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 018.40-018.50 S 0.1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 018.60-018.80 S 0.2 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 019.30-019.50 S 0.2 3081 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z1035 Chhagalnaiya-Parsuram Road Km 020.00-021.00 S 1 3081 Zilla Carpet 40mm @ Traff >=2000 2013 2.02 1.409 4.342<br />

Z1081 Fulgazi -Fazilpur Road Km 000.00-000.40 S 0.4 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.51 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 001.50-002.80 S 1.3 1726 Zilla Carpet 40mm @ 1000-2000 2013 1.86 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 004.80-005.00 S 0.2 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.26 0.102 0.030<br />

Z1081 Fulgazi -Fazilpur Road Km 005.30-005.50 S 0.2 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 006.10-006.20 S 0.1 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 006.30-006.70 S 0.4 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.51 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 006.80-006.90 S 0.1 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.13 0.054 0.008<br />

Appendix-E: Page: 22 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1081 Fulgazi -Fazilpur Road Km 007.80-007.90 S 0.1 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.13 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 008.00-008.10 S 0.1 1726 Zilla Carpet 40mm @ 1000-2000 2013 0.13 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 010.10-010.70 S 0.6 1732 Zilla Carpet 40mm @ 1000-2000 2013 0.77 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 011.80-0<strong>12</strong>.40 S 0.6 1732 Zilla Carpet 40mm @ 1000-2000 2013 0.77 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 015.10-015.20 S 0.1 1914 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.040 0.007<br />

Z1081 Fulgazi -Fazilpur Road Km 015.70-015.90 S 0.2 1914 Zilla Carpet 40mm @ 1000-2000 2013 0.30 0.091 0.033<br />

Z1081 Fulgazi -Fazilpur Road Km 017.80-018.00 S 0.2 1914 Zilla Carpet 40mm @ 1000-2000 2013 0.26 0.000 0.000<br />

Z1081 Fulgazi -Fazilpur Road Km 019.30-022.30 S 3 1914 Zilla Carpet 40mm @ 1000-2000 2013 4.08 0.021 0.103<br />

Z1081 Fulgazi -Fazilpur Road Km 004.70-004.80 S 0.1 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 1.426 0.690<br />

Z1081 Fulgazi -Fazilpur Road Km 005.00-005.30 S 0.3 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.41 1.052 1.645<br />

Z1081 Fulgazi -Fazilpur Road Km 005.50-006.10 S 0.6 1726 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 1.007 3.607<br />

Z1081 Fulgazi -Fazilpur Road Km 009.70-010.10 S 0.4 1732 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.591 1.143<br />

Z1081 Fulgazi -Fazilpur Road Km 0<strong>12</strong>.40-0<strong>12</strong>.50 S 0.1 1732 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 1.367 0.661<br />

Z1081 Fulgazi -Fazilpur Road Km 0<strong>12</strong>.70-013.70 S 1 1732 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.28 0.643 3.110<br />

Z1081 Fulgazi -Fazilpur Road Km 013.70-014.40 S 0.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.93 1.411 5.150<br />

Z1081 Fulgazi -Fazilpur Road Km 014.80-015.10 S 0.3 1914 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.980 1.702<br />

Z1081 Fulgazi -Fazilpur Road Km 015.20-015.70 S 0.5 1914 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.75 0.986 2.783<br />

Z1081 Fulgazi -Fazilpur Road Km 015.90-017.80 S 1.9 1914 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.63 0.589 5.871<br />

Z1081 Fulgazi -Fazilpur Road Km 018.00-019.30 S 1.3 1914 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.57 0.715 4.244<br />

Z1083 Feni Old Airport Road Km 000.10-000.90 S 0.8 <strong>23</strong>6 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.88 0.167 0.940<br />

Z1083 Feni Old Airport Road Km 002.20-002.70 S 0.5 <strong>23</strong>6 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.13 0.000 0.000<br />

Z1083 Feni Old Airport Road Km 000.00-000.10 S 0.1 <strong>23</strong>6 Zilla Carpet 40mm @ Traff 100-1000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z1083 Feni Old Airport Road Km 000.90-001.50 S 0.6 <strong>23</strong>6 Zilla Carpet 40mm @ Traff 100-1000 2013 1.38 0.000 0.000<br />

Z1083 Feni Old Airport Road Km 001.50-002.00 S 0.5 <strong>23</strong>6 Zilla Carpet 40mm @ Traff 100-1000 2013 1.13 0.000 0.000<br />

Z1083 Feni Old Airport Road Km 002.00-002.20 S 0.2 <strong>23</strong>6 Zilla Carpet 40mm @ Traff 100-1000 2013 0.45 0.000 0.000<br />

Z1083 Feni Old Airport Road Km 002.70-002.78 S 0.08 <strong>23</strong>6 Zilla Carpet 40mm @ Traff 100-1000 2013 0.18 0.031 0.006<br />

Z1134 Feni -Chagalnaiya Road Km 000.10-000.30 S 0.2 447 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.37 0.207 0.292<br />

Z1134 Feni -Chagalnaiya Road Km 000.50-000.60 S 0.1 447 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.18 0.272 0.149<br />

Z1134 Feni -Chagalnaiya Road Km 001.60-003.30 S 1.7 447 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.54 0.339 2.793<br />

Z1134 Feni -Chagalnaiya Road Km 009.60-010.10 S 0.5 447 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.354 0.906<br />

Z1134 Feni -Chagalnaiya Road Km 010.20-010.80 S 0.6 447 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.172 0.487<br />

Z1134 Feni -Chagalnaiya Road Km 000.00-000.10 S 0.1 447 Zilla Carpet 40mm @ Traff 100-1000 2013 0.18 0.000 0.000<br />

Z1134 Feni -Chagalnaiya Road Km 000.30-000.50 S 0.2 447 Zilla Carpet 40mm @ Traff 100-1000 2013 0.37 0.000 0.000<br />

Z1134 Feni -Chagalnaiya Road Km 000.90-001.10 S 0.2 447 Zilla Carpet 40mm @ Traff 100-1000 2013 0.34 0.000 0.000<br />

Z1134 Feni -Chagalnaiya Road Km 001.10-001.60 S 0.5 447 Zilla Carpet 40mm @ Traff 100-1000 2013 0.81 0.000 0.000<br />

Z1134 Feni -Chagalnaiya Road Km 003.30-003.50 S 0.2 447 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z1134 Feni -Chagalnaiya Road Km 010.10-010.20 S 0.1 447 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z1134 Feni -Chagalnaiya Road Km 010.80-016.00 S 5.2 447 Zilla Carpet 40mm @ Traff 100-1000 2013 6.79 0.000 0.000<br />

Appendix-E: Page: <strong>23</strong> of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1433 Daganbhuiyan-Basurhat Road Km 001.10-006.20 S 5.1 2583 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.94 1.268 34.698<br />

Z1433 Daganbhuiyan-Basurhat Road Km 000.00-000.10 S 0.1 2583 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1433 Daganbhuiyan-Basurhat Road Km 000.90-001.10 S 0.2 2583 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.005 0.002<br />

Z1434 Sonagazi-Companiganj Road Km 000.60-000.90 S 0.3 1074 Zilla Carpet 40mm @ 1000-2000 2013 0.38 0.000 0.000<br />

Z1434 Sonagazi-Companiganj Road Km 002.00-002.80 S 0.8 1074 Zilla Carpet 40mm @ 1000-2000 2013 1.18 0.000 0.000<br />

Z1434 Sonagazi-Companiganj Road Km 003.20-003.50 S 0.3 1074 Zilla Carpet 40mm @ 1000-2000 2013 0.45 0.000 0.000<br />

Z1434 Sonagazi-Companiganj Road Km 000.50-000.60 S 0.1 1074 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 0.760 0.372<br />

Z1434 Sonagazi-Companiganj Road Km 000.90-001.40 S 0.5 1074 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.64 0.535 1.309<br />

Sub-total Feni Division<br />

144.98<br />

Laxmipur Division<br />

Z14<strong>12</strong> Ch<strong>and</strong>pur-Ramganj Road Km 028.50-032.47 S 3.97 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.92 0.000 0.000<br />

Z1413 Char Alax<strong>and</strong>er-Ramgati Road Km 000.20-000.50 S 0.3 916 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.400 0.748<br />

Z1413 Char Alax<strong>and</strong>er-Ramgati Road Km 000.00-000.20 S 0.2 916 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z1413 Char Alax<strong>and</strong>er-Ramgati Road Km 000.50-013.29 S <strong>12</strong>.79 916 Zilla Carpet 40mm @ Traff 100-1000 2013 20.73 0.000 0.000<br />

Z1417 Paniwala-Chatkhil Road Km 000.10-001.30 S 1.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.94 1.139 8.696<br />

Z1417 Paniwala-Chatkhil Road Km 002.60-003.<strong>23</strong> S 0.63 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.02 1.282 5.137<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 011.10-011.30 S 0.2 3326 Zilla Carpet 40mm @ Cracks >25% 2013 0.32 0.160 0.061<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 011.30-0<strong>12</strong>.00 S 0.7 3326 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.13 1.000 3.600<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 013.00-013.40 S 0.4 3326 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.797 1.902<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 0<strong>12</strong>.00-0<strong>12</strong>.30 S 0.3 3326 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.630 0.387<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 0<strong>12</strong>.40-013.00 S 0.6 3326 Zilla Carpet 40mm @ Traff >=2000 2013 0.95 0.516 0.594<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 013.40-013.45 S 0.05 3326 Zilla Carpet 40mm @ Traff >=2000 2013 0.08 0.000 0.000<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 000.00-000.40 S 0.4 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.65 0.030 0.024<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 000.70-001.20 S 0.5 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.81 0.000 0.000<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 001.40-001.70 S 0.3 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.49 0.000 0.000<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 002.00-002.10 S 0.1 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 002.30-002.50 S 0.2 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 003.30-003.90 S 0.6 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.97 0.000 0.000<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 006.50-006.60 S 0.1 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 008.30-008.50 S 0.2 1673 Zilla Carpet 40mm @ 1000-2000 2013 0.33 0.190 0.074<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 000.40-000.70 S 0.3 1673 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 1.246 2.449<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 001.20-001.40 S 0.2 1673 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.252 1.640<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 002.10-002.30 S 0.2 1673 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.065 1.395<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 002.50-003.30 S 0.8 1673 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.30 0.760 3.980<br />

Z1432 Daserhat-M<strong>and</strong>ari Road Km 003.90-006.50 S 2.6 1673 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.21 0.783 <strong>12</strong>.222<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 000.00-000.70 S 0.7 620 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.26 0.330 1.<strong>23</strong>8<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 000.90-001.40 S 0.5 620 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.85 0.336 0.857<br />

Appendix-E: Page: 24 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 001.80-002.10 S 0.3 620 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.316 0.459<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 006.10-006.70 S 0.6 507 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 0.264 0.767<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 000.70-000.90 S 0.2 620 Zilla Carpet 40mm @ Traff 100-1000 2013 0.34 0.000 0.000<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 001.40-001.80 S 0.4 620 Zilla Carpet 40mm @ Traff 100-1000 2013 0.65 0.000 0.000<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 002.10-005.10 S 3 509 Zilla Carpet 40mm @ Traff 100-1000 2013 4.93 0.000 0.000<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 005.10-005.60 S 0.5 507 Zilla Carpet 40mm @ Traff 100-1000 2013 0.81 0.000 0.000<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 005.60-005.80 S 0.2 507 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 006.00-006.10 S 0.1 507 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z1436 Paniwala Bazar-Dashgarai Bazar Road Km 006.70-007.00 S 0.3 507 Zilla Carpet 40mm @ Traff 100-1000 2013 0.49 0.000 0.000<br />

Z1437 Batara Bazar Connecting Road Km 000.00-000.80 S 0.8 2<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 1.19 0.000 0.000<br />

Z1437 Batara Bazar Connecting Road Km 001.30-003.00 S 1.7 2<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 2.44 0.000 0.000<br />

Z1447 Ramganj ByPass Road Km 000.00-000.30 S 0.3 1558 Zilla Carpet 40mm @ 1000-2000 2013 0.64 0.000 0.000<br />

Z1447 Ramganj ByPass Road Km 000.30-000.78 S 0.48 1558 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.02 0.892 3.606<br />

Z1466 Nalgara -Ramganj Road Km 000.10-002.40 S 2.3 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.58 0.362 4.580<br />

Z1466 Nalgara -Ramganj Road Km 002.60-002.70 S 0.1 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.716 0.4<strong>23</strong><br />

Z1466 Nalgara -Ramganj Road Km 003.50-004.10 S 0.6 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.349 1.166<br />

Z1466 Nalgara -Ramganj Road Km 004.60-005.00 S 0.4 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.672 1.321<br />

Z1466 Nalgara -Ramganj Road Km 005.10-005.50 S 0.4 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.778 1.530<br />

Z1466 Nalgara -Ramganj Road Km 006.30-006.40 S 0.1 849 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 0.476 0.<strong>23</strong>4<br />

Z1466 Nalgara -Ramganj Road Km 000.00-000.10 S 0.1 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.18 0.000 0.000<br />

Z1466 Nalgara -Ramganj Road Km 002.70-003.00 S 0.3 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.46 0.000 0.000<br />

Z1466 Nalgara -Ramganj Road Km 004.10-004.30 S 0.2 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.26 0.000 0.000<br />

Z1466 Nalgara -Ramganj Road Km 004.50-004.60 S 0.1 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.13 0.000 0.000<br />

Z1466 Nalgara -Ramganj Road Km 005.00-005.10 S 0.1 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.13 0.000 0.000<br />

Z1466 Nalgara -Ramganj Road Km 005.50-005.70 S 0.2 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.26 0.000 0.000<br />

Z1466 Nalgara -Ramganj Road Km 005.90-006.30 S 0.4 849 Zilla Carpet 40mm @ Traff 100-1000 2013 0.51 0.000 0.000<br />

Sub-total Laxmipur Division<br />

68.86<br />

Noakhali Division<br />

Z1416 Kall<strong>and</strong>i-Ch<strong>and</strong>erhat Road Km 008.70-008.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z1417 Paniwala-Chatkhil Road Km 006.30-013.26 S 6.96 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 11.28 1.243 55.076<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 000.10-000.20 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.549 1.456<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 000.70-000.90 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.43 1.857 3.155<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 005.80-006.60 S 0.8 2565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.36 0.740 3.822<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 007.50-007.70 S 0.2 2565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 1.561 2.014<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 008.10-008.30 S 0.2 2565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 1.598 2.067<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 008.80-008.90 S 0.1 2565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.750 0.484<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 009.60-009.70 S 0.1 2565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 1.769 1.141<br />

Appendix-E: Page: 25 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 009.90-010.10 S 0.2 2565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 1.562 2.016<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 011.50-011.60 S 0.1 2565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 1.710 1.103<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 018.20-018.60 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.67 2.025 5.267<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 000.00-000.10 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.188 0.064<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 000.20-000.70 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.07 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 000.90-003.40 S 2.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 4.33 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 004.30-005.00 S 0.7 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.19 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 005.50-005.80 S 0.3 2565 Zilla Carpet 40mm @ Traff >=2000 2013 0.56 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 006.60-007.50 S 0.9 2565 Zilla Carpet 40mm @ Traff >=2000 2013 1.54 0.828 1.546<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 007.70-008.10 S 0.4 2565 Zilla Carpet 40mm @ Traff >=2000 2013 0.68 0.793 0.658<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 008.90-009.60 S 0.7 2565 Zilla Carpet 40mm @ Traff >=2000 2013 1.19 1.214 1.881<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 009.70-009.90 S 0.2 2565 Zilla Carpet 40mm @ Traff >=2000 2013 0.34 1.216 0.558<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 010.10-011.50 S 1.4 2565 Zilla Carpet 40mm @ Traff >=2000 2013 2.46 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 011.60-011.90 S 0.3 2565 Zilla Carpet 40mm @ Traff >=2000 2013 0.51 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 0<strong>12</strong>.80-0<strong>12</strong>.90 S 0.1 2565 Zilla Carpet 40mm @ Traff >=2000 2013 0.17 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 0<strong>12</strong>.90-014.29 S 1.39 2565 Zilla Carpet 40mm @ Traff >=2000 2013 2.38 0.297 0.793<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 014.29-017.30 S 3.01 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.<strong>12</strong> 0.426 2.399<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 017.30-018.20 S 0.9 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.45 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 018.60-019.80 S 1.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.00 0.000 0.000<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 019.90-020.20 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.50 0.108 0.066<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 020.50-021.50 S 1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.67 0.763 1.466<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 021.60-021.80 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.33 0.083 0.034<br />

Z1421 Sonaimuri-Kall<strong>and</strong>i Road Km 022.40-022.50 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.17 0.139 0.028<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 000.10-003.60 S 3.5 3326 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.52 0.901 18.815<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 000.00-000.10 S 0.1 3326 Zilla Carpet 40mm @ Traff >=2000 2013 0.19 0.000 0.000<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 007.70-007.90 S 0.2 3326 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.820 0.377<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 008.00-008.20 S 0.2 3326 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 0.649 0.268<br />

Z1426 Chatkhil-Ch<strong>and</strong>raganj Road Km 009.00-009.10 S 0.1 3326 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.187 0.039<br />

Z1434 Sonagazi-Companiganj Road Km 007.44-019.89 S <strong>12</strong>.45 1074 Zilla Carpet 40mm @ 1000-2000 2013 21.72 0.483 19.189<br />

Z1449 Dadpurbazar-Khalifarhat Road Km 001.50-001.60 S 0.1 1540 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z1449 Dadpurbazar-Khalifarhat Road Km 000.00-001.50 S 1.5 1540 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.14 0.471 3.216<br />

Sub-total Noakhali Division<br />

Total Comilla Zone<br />

Dhaka Zone<br />

Gazipur Division<br />

Z3009 Sripur-Bairagirchala Road Km 000.40-000.60 S 0.2 1498 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.385 1.780<br />

74.04<br />

678.35<br />

Appendix-E: Page: 26 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z3009 Sripur-Bairagirchala Road Km 000.90-001.20 S 0.3 1498 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 1.558 3.005<br />

Z3009 Sripur-Bairagirchala Road Km 001.30-003.20 S 1.9 1498 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.08 0.845 9.463<br />

Z3025 Kapashia-Kaliganj Road Km 020.50-021.00 S 0.5 95<strong>12</strong> Zilla Overlay 50mm @ IRI 6-9 2013 1.<strong>23</strong> 16.713 28.919<br />

Z3025 Kapashia-Kaliganj Road Km 021.10-021.20 S 0.1 95<strong>12</strong> Zilla Overlay 50mm @ IRI 6-9 2013 0.25 14.481 4.018<br />

Z3025 Kapashia-Kaliganj Road<br />

Sub-total Gazipur Division<br />

Km 0<strong>23</strong>.90-024.39 S 0.49 95<strong>12</strong> Zilla Overlay 50mm @ IRI 6-9 2013 1.21 16.724 25.608<br />

6.57<br />

Jamalpur Division<br />

Z4022 Jamalpur-Madarganj Road Km 006.70-007.00 S 0.3 1530 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.74 0.516 1.520<br />

Z4022 Jamalpur-Madarganj Road Km 011.89-0<strong>12</strong>.49 S 0.6 1530 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 1.326 5.115<br />

Z4022 Jamalpur-Madarganj Road Km 016.69-016.89 S 0.2 1530 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.760 0.977<br />

Z4022 Jamalpur-Madarganj Road Km 019.39-019.49 S 0.1 1530 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 1.045 0.672<br />

Z4022 Jamalpur-Madarganj Road Km 022.79-022.89 S 0.1 1530 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.921 0.517<br />

Z4022 Jamalpur-Madarganj Road Km 0<strong>23</strong>.09-0<strong>23</strong>.19 S 0.1 1530 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 1.471 0.970<br />

Z4022 Jamalpur-Madarganj Road Km 0<strong>23</strong>.29-024.49 S 1.2 1530 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.00 0.881 5.940<br />

Z4025 Jamalpur-Sharisabari Road Km 003.50-004.10 S 0.6 17<strong>12</strong> Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 1.090 3.<strong>12</strong>9<br />

Z4025 Jamalpur-Sharisabari Road Km 010.00-010.20 S 0.2 17<strong>12</strong> Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.26 2.001 1.778<br />

Z4606 Jamalpur -Datbhanga Road Km 041.97-042.07 S 0.1 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.939 0.553<br />

Z4606 Jamalpur -Datbhanga Road Km 044.40-045.10 S 0.7 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 1.442 5.946<br />

Z4606 Jamalpur -Datbhanga Road Km 045.30-045.60 S 0.3 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.966 1.707<br />

Z4606 Jamalpur -Datbhanga Road Km 047.80-048.50 S 0.7 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 1.453 5.991<br />

Z4606 Jamalpur -Datbhanga Road Km 048.70-049.00 S 0.3 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.966 1.707<br />

Z4606 Jamalpur -Datbhanga Road Km 051.50-051.60 S 0.1 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.984 0.580<br />

Z4606 Jamalpur -Datbhanga Road Km 051.80-052.10 S 0.3 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 1.016 1.796<br />

Z4606 Jamalpur -Datbhanga Road Km 055.10-055.30 S 0.2 <strong>12</strong>83 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.953 1.<strong>12</strong>2<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 004.19-004.29 S 0.1 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.171 0.109<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 006.89-007.69 S 0.8 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.30 0.173 0.746<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 010.19-0<strong>12</strong>.39 S 2.2 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.57 0.086 0.941<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 017.09-017.89 S 0.8 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.30 0.161 0.695<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 018.19-018.39 S 0.2 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.043 0.043<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 018.89-019.29 S 0.4 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.65 0.199 0.509<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 020.59-021.09 S 0.5 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.81 0.267 0.783<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 027.82-028.02 S 0.2 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.<strong>23</strong>2 0.272<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 030.52-030.72 S 0.2 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.293 0.375<br />

Z4615 Bakshiganj-Char Rajibpur Road Km 030.92-031.22 S 0.3 1<strong>23</strong>9 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.289 0.555<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 0<strong>23</strong>.40-0<strong>23</strong>.50 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.24 1.160 1.024<br />

Sub-total Jamalpur Division<br />

19.38<br />

Appendix-E: Page: 27 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Kishoreganj Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 013.48-014.98 S 1.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.30 1.038 9.475<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 017.08-019.78 S 2.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.05 1.201 19.193<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 014.98-015.08 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 1.147 0.214<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 015.98-016.18 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 1.389 0.519<br />

Z3604 Kishoreganj-Hossainpur Road Km 003.40-004.00 S 0.6 2079 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 0.721 3.030<br />

Z3604 Kishoreganj-Hossainpur Road Km 004.50-005.00 S 0.5 2079 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.90 0.851 2.980<br />

Z3604 Kishoreganj-Hossainpur Road Km 007.90-008.20 S 0.3 2079 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.55 0.747 1.620<br />

Z3604 Kishoreganj-Hossainpur Road Km 009.40-009.60 S 0.2 2079 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.37 1.213 1.313<br />

Z3604 Kishoreganj-Hossainpur Road Km 011.10-011.40 S 0.3 2079 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.55 1.475 3.199<br />

Z3604 Kishoreganj-Hossainpur Road Km 011.70-0<strong>12</strong>.70 S 1 2079 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.83 1.<strong>23</strong>2 7.226<br />

Z3604 Kishoreganj-Hossainpur Road Km 005.00-005.30 S 0.3 2079 Zilla Carpet 40mm @ Traff >=2000 2013 0.52 0.000 0.000<br />

Z3604 Kishoreganj-Hossainpur Road Km 009.60-011.10 S 1.5 2079 Zilla Carpet 40mm @ Traff >=2000 2013 2.75 0.000 0.000<br />

Z3615 Trisal - Gouripur Road Km 002.60-004.10 S 1.5 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.30 0.348 3.067<br />

Z3615 Trisal - Gouripur Road Km 004.30-007.20 S 2.9 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.45 0.444 7.576<br />

Z3615 Trisal - Gouripur Road Km 008.60-008.90 S 0.3 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.535 0.944<br />

Z3615 Trisal - Gouripur Road Km 009.00-009.20 S 0.2 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.375 0.405<br />

Z3615 Trisal - Gouripur Road Km 009.40-009.50 S 0.1 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.386 0.208<br />

Z3615 Trisal - Gouripur Road Km 009.60-010.20 S 0.6 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.92 0.356 1.062<br />

Z3615 Trisal - Gouripur Road Km 013.10-014.80 S 1.7 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.61 0.325 2.747<br />

Z3615 Trisal - Gouripur Road Km 014.90-015.40 S 0.5 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 0.352 0.875<br />

Z3615 Trisal - Gouripur Road Km 015.60-016.20 S 0.6 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.92 0.5<strong>23</strong> 1.846<br />

Z3615 Trisal - Gouripur Road Km 016.30-016.60 S 0.3 602 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.449 0.793<br />

Z3616 Motkhola-Kishoreganj Road Km 021.75-022.05 S 0.3 1792 Zilla Carpet 40mm @ 1000-2000 2013 0.46 0.000 0.000<br />

Z3616 Motkhola-Kishoreganj Road Km 0<strong>23</strong>.15-0<strong>23</strong>.45 S 0.3 1792 Zilla Carpet 40mm @ 1000-2000 2013 0.46 0.000 0.000<br />

Z3616 Motkhola-Kishoreganj Road Km 008.50-008.70 S 0.2 <strong>23</strong>46 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.047 1.345<br />

Z3616 Motkhola-Kishoreganj Road Km 000.30-000.80 S 0.5 <strong>23</strong>46 Zilla Carpet 40mm @ Traff >=2000 2013 0.81 1.556 1.836<br />

Z3616 Motkhola-Kishoreganj Road Km 000.80-002.70 S 1.9 <strong>23</strong>46 Zilla Carpet 40mm @ Traff >=2000 2013 3.08 0.000 0.000<br />

Z3616 Motkhola-Kishoreganj Road Km 002.80-005.90 S 3.1 <strong>23</strong>46 Zilla Carpet 40mm @ Traff >=2000 2013 5.02 0.000 0.000<br />

Z3616 Motkhola-Kishoreganj Road Km 005.90-008.50 S 2.6 <strong>23</strong>46 Zilla Carpet 40mm @ Traff >=2000 2013 4.21 0.000 0.000<br />

Z3616 Motkhola-Kishoreganj Road Km 008.70-019.05 S 10.35 <strong>23</strong>46 Zilla Carpet 40mm @ Traff >=2000 2013 16.38 0.000 0.000<br />

Z3616 Motkhola-Kishoreganj Road Km 019.45-020.55 S 1.1 <strong>23</strong>46 Zilla Carpet 40mm @ Traff >=2000 2013 1.78 0.000 0.000<br />

Z3616 Motkhola-Kishoreganj Road Km 024.05-026.08 S 2.03 1792 Zilla Seal Coat 2013 1.07 0.630 1.594<br />

Sub-total Kishoreganj Division<br />

62.32<br />

Munshiganj Division<br />

Z8004 Munshiganj -Srinagar Road Km 000.00-000.60 S 0.6 1547 Zilla Carpet 40mm @ 1000-2000 2013 0.92 0.000 0.000<br />

Z8004 Munshiganj -Srinagar Road Km 000.90-001.20 S 0.3 1547 Zilla Carpet 40mm @ 1000-2000 2013 0.50 0.000 0.000<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-E: Page: 28 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z8004 Munshiganj -Srinagar Road Km 001.50-001.60 S 0.1 1547 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.000 0.000<br />

Z8004 Munshiganj -Srinagar Road Km 002.60-003.10 S 0.5 1547 Zilla Carpet 40mm @ 1000-2000 2013 0.85 0.000 0.000<br />

Z8004 Munshiganj -Srinagar Road Km 011.10-0<strong>12</strong>.40 S 1.3 1547 Zilla Carpet 40mm @ 1000-2000 2013 3.11 0.000 0.000<br />

Z8004 Munshiganj -Srinagar Road Km 000.60-000.90 S 0.3 1547 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 1.468 2.460<br />

Z8004 Munshiganj -Srinagar Road Km 001.20-001.50 S 0.3 1547 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.972 1.819<br />

Z8004 Munshiganj -Srinagar Road Km 001.60-002.60 S 1 1547 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.71 1.210 8.190<br />

Z8004 Munshiganj -Srinagar Road Km 003.10-003.70 S 0.6 1547 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.02 0.859 2.958<br />

Z8004 Munshiganj -Srinagar Road Km 0<strong>12</strong>.40-015.40 S 3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 7.16 0.000 0.000<br />

Sub-total Munshiganj Division<br />

16.42<br />

Mymensingh Division<br />

Z3031 Bhaluka-Gafargaon Road Km 000.30-000.50 S 0.2 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 1.175 2.341<br />

Z3031 Bhaluka-Gafargaon Road Km 000.70-001.50 S 0.8 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.94 0.841 6.707<br />

Z3031 Bhaluka-Gafargaon Road Km 003.60-004.00 S 0.4 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.99 0.660 2.675<br />

Z3031 Bhaluka-Gafargaon Road Km 004.10-004.20 S 0.1 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.25 0.741 0.752<br />

Z3031 Bhaluka-Gafargaon Road Km 005.30-005.80 S 0.5 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 0.676 2.931<br />

Z3031 Bhaluka-Gafargaon Road Km 006.60-008.60 S 2 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.24 1.422 18.170<br />

Z3031 Bhaluka-Gafargaon Road Km 009.60-009.80 S 0.2 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.40 1.118 1.797<br />

Z3031 Bhaluka-Gafargaon Road Km 010.10-010.30 S 0.2 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.704 0.900<br />

Z3031 Bhaluka-Gafargaon Road Km 010.50-011.50 S 1 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.62 1.351 8.634<br />

Z3031 Bhaluka-Gafargaon Road Km 014.20-014.40 S 0.2 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.49 0.696 1.411<br />

Z3031 Bhaluka-Gafargaon Road Km 019.40-019.50 S 0.1 2205 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.25 0.654 0.554<br />

Z3031 Bhaluka-Gafargaon Road Km 004.20-004.60 S 0.4 2205 Zilla Carpet 40mm @ Traff >=2000 2013 0.99 0.000 0.000<br />

Z3031 Bhaluka-Gafargaon Road Km 008.60-008.90 S 0.3 2205 Zilla Carpet 40mm @ Traff >=2000 2013 0.57 0.138 0.163<br />

Z3031 Bhaluka-Gafargaon Road Km 009.20-009.60 S 0.4 2205 Zilla Carpet 40mm @ Traff >=2000 2013 0.65 0.378 0.506<br />

Z3031 Bhaluka-Gafargaon Road Km 010.00-010.10 S 0.1 2205 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.652 0.218<br />

Z3031 Bhaluka-Gafargaon Road Km 010.30-010.50 S 0.2 2205 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.499 0.334<br />

Z3031 Bhaluka-Gafargaon Road Km 016.00-016.20 S 0.2 2205 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z3031 Bhaluka-Gafargaon Road Km 016.30-017.80 S 1.5 2205 Zilla Carpet 40mm @ Traff >=2000 2013 2.57 0.015 0.048<br />

Z3033 Mymensingh-Toke Road Km 003.20-003.60 S 0.4 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.10 0.979 3.971<br />

Z3033 Mymensingh-Toke Road Km 003.90-004.30 S 0.4 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.85 1.450 4.269<br />

Z3033 Mymensingh-Toke Road Km 007.90-008.50 S 0.6 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.79 0.889 5.851<br />

Z3033 Mymensingh-Toke Road Km 010.90-011.00 S 0.1 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 0.767 0.918<br />

Z3033 Mymensingh-Toke Road Km 011.20-011.30 S 0.1 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 0.809 0.888<br />

Z3033 Mymensingh-Toke Road Km 0<strong>12</strong>.30-0<strong>12</strong>.50 S 0.2 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.60 0.762 1.824<br />

Z3033 Mymensingh-Toke Road Km 013.88-013.98 S 0.1 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 0.961 1.150<br />

Z3033 Mymensingh-Toke Road Km 015.18-015.28 S 0.1 <strong>23</strong>62 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 0.962 1.150<br />

Z3033 Mymensingh-Toke Road Km 026.98-027.08 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.30 0.667 0.682<br />

Appendix-E: Page: 29 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z3033 Mymensingh-Toke Road Km 027.18-027.88 S 0.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.25 1.819 7.902<br />

Z3033 Mymensingh-Toke Road Km 037.63-037.73 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.21 0.830 0.715<br />

Z3033 Mymensingh-Toke Road Km 038.53-039.13 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.38 0.781 4.386<br />

Z3034 Trisal-N<strong>and</strong>ail Road Km 008.30-008.50 S 0.2 1345 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 2.877 3.966<br />

Z3035 Mymensingh-Fulbaria Road Km 004.20-004.30 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.044 0.906<br />

Z4105 Fulbaria-Muktagachha Road Km 001.80-001.90 S 0.1 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.<strong>12</strong>0 0.061<br />

Z4105 Fulbaria-Muktagachha Road Km 004.60-005.30 S 0.7 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.<strong>12</strong> 0.322 1.077<br />

Z4105 Fulbaria-Muktagachha Road Km 007.50-009.00 S 1.5 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.30 0.349 2.598<br />

Z4105 Fulbaria-Muktagachha Road Km 009.10-009.30 S 0.2 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.164 0.150<br />

Z4105 Fulbaria-Muktagachha Road Km 009.70-009.80 S 0.1 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.328 0.151<br />

Z4105 Fulbaria-Muktagachha Road Km 013.60-013.70 S 0.1 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.345 0.197<br />

Z4105 Fulbaria-Muktagachha Road Km 013.80-013.90 S 0.1 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.314 0.152<br />

Z4105 Fulbaria-Muktagachha Road Km 014.10-014.30 S 0.2 640 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.365 0.353<br />

Sub-total Mymensingh Division<br />

30.57<br />

Narayanganj Division<br />

Z1061 Madanganj -Lalgalb<strong>and</strong>h Road Km 003.20-003.30 S 0.1 1878 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 1.213 0.788<br />

Z1061 Madanganj -Lalgalb<strong>and</strong>h Road Km 003.40-003.60 S 0.2 1878 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.609 0.791<br />

Z1063 Bhaberchar-Munshiganj Road Km 000.40-000.60 S 0.2 <strong>23</strong>92 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.559 0.685<br />

Z1063 Bhaberchar-Munshiganj Road Km 000.90-002.20 S 1.3 <strong>23</strong>92 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.11 0.543 4.329<br />

Z1064 Sonargaon Museum Link Road Km 001.30-001.40 S 0.1 3077 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.885 0.542<br />

Z1066 Sonargaon College-Nabiganj Road Km 003.93-004.33 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.65 1.245 3.183<br />

Z1066 Sonargaon College-Nabiganj Road Km 005.13-005.93 S 0.8 1620 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.30 0.490 2.403<br />

Z1066 Sonargaon College-Nabiganj Road Km 006.<strong>23</strong>-006.43 S 0.2 1620 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.662 0.686<br />

Z1066 Sonargaon College-Nabiganj Road Km 006.53-006.63 S 0.1 1620 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.483 0.296<br />

Sub-total Narayanganj Division<br />

5.51<br />

Narsingdi Division<br />

Z2033 Narsingdi -B<strong>and</strong>ardia Road Km 002.50-002.70 S 0.2 1608 Zilla Carpet 40mm @ 1000-2000 2013 0.29 0.000 0.000<br />

Z2033 Narsingdi -B<strong>and</strong>ardia Road Km 003.90-004.60 S 0.7 1608 Zilla Carpet 40mm @ 1000-2000 2013 1.02 0.000 0.000<br />

Z2033 Narsingdi -B<strong>and</strong>ardia Road Km 004.60-005.30 S 0.7 1608 Zilla Carpet 40mm @ 1000-2000 2013 1.04 0.000 0.000<br />

Z2033 Narsingdi -B<strong>and</strong>ardia Road Km 005.30-007.05 S 1.75 1608 Zilla Carpet 40mm @ 1000-2000 2013 2.68 0.000 0.000<br />

Z2033 Narsingdi -B<strong>and</strong>ardia Road Km 007.05-010.86 S 3.82 1041 Zilla Carpet 40mm @ 1000-2000 2013 4.88 0.000 0.000<br />

Z2035 Shibpur-Kamrabo Road Km 010.38-011.28 S 0.9 <strong>12</strong>25 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.37 0.292 1.182<br />

Z2036 Shibpur-Palas Road Km 001.30-001.60 S 0.3 1119 Zilla Carpet 40mm @ 1000-2000 2013 0.45 0.000 0.000<br />

Z2036 Shibpur-Palas Road Km 001.60-001.90 S 0.3 1119 Zilla Carpet 40mm @ 1000-2000 2013 0.45 0.000 0.000<br />

Z2036 Shibpur-Palas Road Km 001.90-002.10 S 0.2 1119 Zilla Carpet 40mm @ 1000-2000 2013 0.30 0.000 0.000<br />

Appendix-E: Page: 30 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z2036 Shibpur-Palas Road Km 002.10-002.70 S 0.6 1119 Zilla Carpet 40mm @ 1000-2000 2013 0.90 0.000 0.000<br />

Z2036 Shibpur-Palas Road Km 002.70-003.10 S 0.4 1119 Zilla Carpet 40mm @ 1000-2000 2013 0.60 0.000 0.000<br />

Z2036 Shibpur-Palas Road Km 003.50-003.60 S 0.1 1119 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z2036 Shibpur-Palas Road Km 003.60-003.90 S 0.3 1119 Zilla Carpet 40mm @ 1000-2000 2013 0.45 0.000 0.000<br />

Z2036 Shibpur-Palas Road Km 000.70-000.80 S 0.1 1119 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.096 0.047<br />

Z2036 Shibpur-Palas Road Km 005.30-005.80 S 0.5 1119 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.351 0.706<br />

Z2036 Shibpur-Palas Road Km 003.30-003.50 S 0.2 1119 Zilla Seal Coat 2013 0.09 0.366 0.052<br />

Z2037 Gorashal -Charsindur Road Km 000.00-000.20 S 0.2 326 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.101 0.1<strong>12</strong><br />

Z2037 Gorashal -Charsindur Road Km 000.30-000.70 S 0.4 326 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.000 0.000<br />

Z2039 Palas-Gorashal Road Km 003.70-004.33 S 0.63 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.40 1.559 8.856<br />

Z2039 Palas-Gorashal Road Km 004.33-004.50 S 0.17 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.44 1.283 2.270<br />

Z2042 Monohardi -Shakerbazar Road Km 006.20-007.40 S 1.2 1353 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.84 0.701 5.096<br />

Z2042 Monohardi -Shakerbazar Road Km 007.80-007.90 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 1.547 0.899<br />

Z2044 Shibpur -Monohardi Road Km 020.50-0<strong>23</strong>.60 S 3.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.76 2.192 40.799<br />

Z2049 Manohardi Link Road Km 000.70-004.40 S 3.7 1540 Zilla Carpet 40mm @ 1000-2000 2013 5.84 0.000 0.000<br />

Z2049 Manohardi Link Road Km 000.00-000.70 S 0.7 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.10 1.507 3.929<br />

Z2115 Rupganj-Badda Road Km 000.10-000.90 S 0.8 745 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.26 0.333 1.256<br />

Z2115 Rupganj-Badda Road Km 002.60-003.00 S 0.4 745 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.357 0.673<br />

Z2115 Rupganj-Badda Road Km 003.50-003.60 S 0.1 745 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.447 0.271<br />

Sub-total Narsingdi Division<br />

34.02<br />

Netrokona Division<br />

Z3706 Netrokona-Kendua Road Km 006.51-007.21 S 0.7 2878 Zilla Carpet 40mm @ Traff >=2000 2013 1.29 1.921 3.603<br />

Z3706 Netrokona-Kendua Road Km 007.21-009.81 S 2.6 2878 Zilla Carpet 40mm @ Traff >=2000 2013 4.99 0.049 0.306<br />

Z3706 Netrokona-Kendua Road Km 010.11-011.61 S 1.5 2878 Zilla Carpet 40mm @ Traff >=2000 2013 2.43 2.194 8.458<br />

Z3706 Netrokona-Kendua Road Km 011.71-0<strong>12</strong>.51 S 0.8 2878 Zilla Carpet 40mm @ Traff >=2000 2013 1.30 2.365 4.<strong>12</strong>4<br />

Z3706 Netrokona-Kendua Road Km 0<strong>12</strong>.71-014.81 S 2.1 2878 Zilla Carpet 40mm @ Traff >=2000 2013 3.40 2.467 13.317<br />

Z3707 Netrokona-Dhobaura Road Km 000.00-000.80 S 0.8 1884 Zilla Carpet 40mm @ 1000-2000 2013 1.68 0.000 0.000<br />

Z3707 Netrokona-Dhobaura Road Km 028.79-028.89 S 0.1 1953 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 1.551 0.873<br />

Z3707 Netrokona-Dhobaura Road Km 029.79-031.19 S 1.4 1953 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.27 1.356 <strong>12</strong>.030<br />

Z3707 Netrokona-Dhobaura Road Km 031.39-031.81 S 0.42 1953 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.69 1.586 3.777<br />

Z3707 Netrokona-Dhobaura Road Km 034.14-034.99 S 0.85 1953 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.34 0.775 4.050<br />

Z3710 Netrokona-Ishwarganj Road Km 000.90-001.00 S 0.1 466 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.349 0.160<br />

Sub-total Netrokona Division<br />

19.69<br />

Sherpur Division<br />

Z4603 Sherpur -Hatipagar Road Km 009.30-009.50 S 0.2 999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.27 0.613 0.592<br />

Appendix-E: Page: 31 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z4603 Sherpur -Hatipagar Road Km 010.90-011.40 S 0.5 999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.83 0.850 2.748<br />

Z4603 Sherpur -Hatipagar Road Km 011.60-011.70 S 0.1 999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.536 0.315<br />

Z4603 Sherpur -Hatipagar Road Km 0<strong>12</strong>.00-0<strong>12</strong>.40 S 0.4 999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.67 0.504 1.185<br />

Z4603 Sherpur -Hatipagar Road Km 0<strong>12</strong>.50-0<strong>12</strong>.70 S 0.2 999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.33 0.986 1.275<br />

Z4603 Sherpur -Hatipagar Road Km 0<strong>12</strong>.90-013.30 S 0.4 999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.67 0.996 2.575<br />

Z4603 Sherpur -Hatipagar Road Km 013.50-013.87 S 0.37 999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 0.957 2.259<br />

Z4604 Sherpur -Sribardi Road Km 000.00-000.10 S 0.1 1808 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.14 0.387 0.156<br />

Z4604 Sherpur -Sribardi Road Km 000.90-001.00 S 0.1 1808 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.14 0.387 0.156<br />

Z4604 Sherpur -Sribardi Road Km 001.10-001.30 S 0.2 1808 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.33 0.222 0.218<br />

Z4604 Sherpur -Sribardi Road Km 003.10-003.40 S 0.3 1808 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.50 0.000 0.000<br />

Z4604 Sherpur -Sribardi Road Km 010.20-011.80 S 1.6 1808 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.18 0.156 0.929<br />

Sub-total Sherpur Division<br />

6.83<br />

Tangail Division<br />

Z4017 Ghatail -Sarisabari Road Km 008.00-008.70 S 0.7 1599 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.19 2.339 11.209<br />

Z4017 Ghatail -Sarisabari Road Km 013.70-014.00 S 0.3 1599 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 1.051 2.158<br />

Z4017 Ghatail -Sarisabari Road Km 014.90-015.10 S 0.2 1599 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 1.486 1.865<br />

Z4017 Ghatail -Sarisabari Road Km 015.60-018.00 S 2.4 1599 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.76 1.955 29.469<br />

Z4017 Ghatail -Sarisabari Road Km 019.90-020.40 S 0.5 1599 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 1.146 3.529<br />

Z4017 Ghatail -Sarisabari Road Km 020.50-020.70 S 0.2 1599 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 1.145 1.411<br />

Z4801 Bhuanpur-Tarak<strong>and</strong>i Road Km 016.20-017.00 S 0.8 2955 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.91 1.336 10.296<br />

Sub-total Tangail Division<br />

Total Dhaka Zone<br />

Gopalganj Zone<br />

Faridpur Division<br />

Z7002 Sasrail-Alphadanga Road Km 000.10-002.20 S 2.1 1999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.31 0.902 11.734<br />

Z7002 Sasrail-Alphadanga Road Km 002.90-003.00 S 0.1 1999 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.953 0.902<br />

Z7102 Rajbari-Madhukhali Road Km 033.60-034.80 S 1.2 1473 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.89 0.854 6.413<br />

Z7102 Rajbari-Madhukhali Road Km 034.90-035.00 S 0.1 1473 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.640 0.3<strong>23</strong><br />

Z8067 Nagark<strong>and</strong>a-Bhanga Road Km 000.00-003.00 S 3 1105 Zilla Carpet 40mm @ 1000-2000 2013 4.61 0.000 0.000<br />

Z8067 Nagark<strong>and</strong>a-Bhanga Road Km 003.00-004.40 S 1.4 1105 Zilla Carpet 40mm @ 1000-2000 2013 2.15 0.000 0.000<br />

Z8067 Nagark<strong>and</strong>a-Bhanga Road Km 005.30-006.20 S 0.9 1105 Zilla Carpet 40mm @ 1000-2000 2013 1.38 0.000 0.000<br />

Z8401 Bhanga -Sadarpur Road Km 001.18-004.08 S 2.9 1377 Zilla Carpet 40mm @ 1000-2000 2013 6.80 0.000 0.000<br />

Z8401 Bhanga -Sadarpur Road Km 004.08-004.68 S 0.6 1377 Zilla Carpet 40mm @ 1000-2000 2013 1.41 0.000 0.000<br />

Z8401 Bhanga -Sadarpur Road Km 004.68-007.78 S 3.1 1377 Zilla Carpet 40mm @ 1000-2000 2013 7.27 0.000 0.000<br />

Z8401 Bhanga -Sadarpur Road Km 007.78-011.38 S 3.6 1377 Zilla Carpet 40mm @ 1000-2000 2013 6.29 0.000 0.000<br />

8.79<br />

210.10<br />

Appendix-E: Page: 32 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Road Name<br />

No<br />

Sub-total Faridpur Division<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

35.51<br />

NPV /<br />

Cost<br />

NPV<br />

Gopalganj Division<br />

Z8414 Gopalganj-Kalia Road Km 000.00-004.00 S 4 960 Zilla Carpet 40mm @ Traff 100-1000 2013 6.26 0.000 0.000<br />

Z8429 Tungipara-Bypass Road Km 000.30-001.20 S 0.9 280 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.73 0.000 0.000<br />

Z8504 Tungipara Thana -Patgati Road Km 000.00-000.20 S 0.2 588 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.196 0.217<br />

Z8507 Bangab<strong>and</strong>hu Mazar Connecting Road Km 000.20-000.30 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.25 1.376 1.373<br />

Z8507 Bangab<strong>and</strong>hu Mazar Connecting Road Km 000.30-000.50 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.49 0.832 0.474<br />

Sub-total Gopalganj Division<br />

9.05<br />

Rajbari Division<br />

Z7102 Rajbari-Madhukhali Road Km 000.00-006.20 S 6.2 1473 Zilla Carpet 40mm @ 1000-2000 2013 9.78 0.000 0.000<br />

Z7102 Rajbari-Madhukhali Road Km 006.20-006.90 S 0.7 1473 Zilla Carpet 40mm @ 1000-2000 2013 1.10 0.000 0.000<br />

Z7102 Rajbari-Madhukhali Road Km 025.50-027.50 S 2 1473 Zilla Carpet 40mm @ 1000-2000 2013 3.16 0.000 0.000<br />

Z7102 Rajbari-Madhukhali Road Km 027.50-030.30 S 2.8 1473 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.42 0.949 16.638<br />

Z7102 Rajbari-Madhukhali Road Km 030.40-032.00 S 1.6 1473 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.52 0.941 9.419<br />

Sub-total Rajbari Division<br />

20.99<br />

Sariatpur Division<br />

Z80<strong>12</strong> Shariatpur-Kawrak<strong>and</strong>i Road Km 015.29-021.80 S 6.51 279 Zilla Carpet 40mm @ Traff 100-1000 2013 10.83 0.054 0.571<br />

Z80<strong>12</strong> Shariatpur-Kawrak<strong>and</strong>i Road Km 021.80-021.90 S 0.1 279 Zilla Carpet 40mm @ Traff 100-1000 2013 0.17 0.000 0.000<br />

Z80<strong>12</strong> Shariatpur-Kawrak<strong>and</strong>i Road Km 021.90-024.10 S 2.2 279 Zilla Carpet 40mm @ Traff 100-1000 2013 3.75 0.242 0.819<br />

Z8602 Shariatpur-Naria Road Km 000.00-004.80 S 4.8 <strong>12</strong>64 Zilla Carpet 40mm @ 1000-2000 2013 7.49 0.000 0.000<br />

Z8602 Shariatpur-Naria Road Km 004.80-006.77 S 1.97 2146 Zilla Carpet 40mm @ Traff >=2000 2013 3.08 0.000 0.000<br />

Z8606 Vojeswar Bypass Road Km 000.00-000.40 S 0.4 1424 Zilla Carpet 40mm @ 1000-2000 2013 0.61 0.000 0.000<br />

Z8606 Vojeswar Bypass Road Km 000.50-001.50 S 1 1424 Zilla Carpet 40mm @ 1000-2000 2013 1.96 0.000 0.000<br />

Z8606 Vojeswar Bypass Road Km 000.40-000.50 S 0.1 1424 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.582 0.264<br />

Sub-total Sariatpur Division<br />

Total Gopalganj Zone<br />

Khulna Zone<br />

Bagerhat Division<br />

Z7045 Terakhada-Mollahat Road Km 0<strong>12</strong>.00-0<strong>12</strong>.40 S 0.4 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 0<strong>12</strong>.90-014.20 S 1.3 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.05 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 014.80-014.90 S 0.1 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 015.00-015.10 S 0.1 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

28.06<br />

93.60<br />

Appendix-E: Page: 33 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7045 Terakhada-Mollahat Road Km 015.70-016.60 S 0.9 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.42 0.075 0.317<br />

Z7045 Terakhada-Mollahat Road Km 017.20-017.50 S 0.3 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.133 0.187<br />

Z7045 Terakhada-Mollahat Road Km 017.90-018.10 S 0.2 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 018.50-018.70 S 0.2 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 019.00-019.40 S 0.4 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.022 0.041<br />

Z7703 Bagerhat-Kachua Road Km 004.50-004.70 S 0.2 1056 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z7703 Bagerhat-Kachua Road Km 005.00-005.10 S 0.1 1056 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z7703 Bagerhat-Kachua Road Km 005.50-005.60 S 0.1 1056 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z7703 Bagerhat-Kachua Road Km 000.00-001.20 S 1.2 1056 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.91 0.452 3.308<br />

Z7703 Bagerhat-Kachua Road Km 001.70-001.80 S 0.1 1056 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.494 0.292<br />

Z7703 Bagerhat-Kachua Road Km 002.00-003.80 S 1.8 1056 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.76 0.4<strong>12</strong> 4.019<br />

Z7703 Bagerhat-Kachua Road Km 004.00-004.50 S 0.5 1056 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 0.489 1.3<strong>23</strong><br />

Z7703 Bagerhat-Kachua Road Km 004.70-005.00 S 0.3 1056 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.676 1.197<br />

Z7704 Pirojpur-Gonapara Road Km 031.51-037.41 S 5.9 2146 Zilla Carpet 40mm @ Traff >=2000 2013 9.21 0.000 0.000<br />

Z7719 Bagerhat Circuit House-Karapara Road Km 000.00-000.40 S 0.4 1309 Zilla Carpet 40mm @ 1000-2000 2013 0.51 0.000 0.000<br />

Z7719 Bagerhat Circuit House-Karapara Road Km 001.30-002.01 S 0.71 1309 Zilla Carpet 40mm @ 1000-2000 2013 0.91 0.000 0.000<br />

Sub-total Bagerhat Division<br />

<strong>23</strong>.45<br />

Jessore Division<br />

Z7031 Churamonkathi-Chaugachha Road Km 000.00-000.80 S 0.8 2955 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.71 2.3<strong>23</strong> 14.987<br />

Z7031 Churamonkathi-Chaugachha Road Km 000.80-001.40 S 0.6 2955 Zilla Carpet 40mm @ Traff >=2000 2013 1.<strong>23</strong> 0.547 1.160<br />

Z7031 Churamonkathi-Chaugachha Road Km 005.30-006.10 S 0.8 2955 Zilla Carpet 40mm @ Traff >=2000 2013 1.47 1.957 4.906<br />

Z7048 Prembag-Sundali Bazar Road Km 000.00-001.00 S 1 854 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.030 0.162<br />

Z7048 Prembag-Sundali Bazar Road Km 001.10-007.10 S 6 854 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 9.21 0.026 0.771<br />

Z7048 Prembag-Sundali Bazar Road Km 007.10-010.20 S 3.1 854 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.76 0.040 0.622<br />

Z7048 Prembag-Sundali Bazar Road Km 010.20-010.90 S 0.7 854 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 0.000 0.000<br />

Z7048 Prembag-Sundali Bazar Road Km 001.00-001.10 S 0.1 854 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 000.00-000.30 S 0.3 287 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 001.00-001.70 S 0.7 287 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.10 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 003.00-003.30 S 0.3 287 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 003.50-003.60 S 0.1 287 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.055 0.026<br />

Z7049 Prembag-Bahirghat Road Km 003.80-003.90 S 0.1 287 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 004.00-004.30 S 0.3 287 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 005.10-005.20 S 0.1 287 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 000.30-001.00 S 0.7 287 Zilla Carpet 40mm @ Traff 100-1000 2013 1.10 0.031 0.034<br />

Z7049 Prembag-Bahirghat Road Km 003.30-003.50 S 0.2 287 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 003.60-003.80 S 0.2 287 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 003.90-004.00 S 0.1 287 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.259 0.040<br />

Appendix-E: Page: 34 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7049 Prembag-Bahirghat Road Km 004.30-004.50 S 0.2 287 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 004.50-005.00 S 0.5 287 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z7049 Prembag-Bahirghat Road Km 005.00-005.10 S 0.1 287 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.051 0.008<br />

Z7049 Prembag-Bahirghat Road Km 005.20-005.55 S 0.35 287 Zilla Carpet 40mm @ Traff 100-1000 2013 0.55 0.033 0.018<br />

Z7049 Prembag-Bahirghat Road Km 002.90-003.00 S 0.1 287 Zilla Seal Coat 2013 0.05 0.194 0.034<br />

Z7057 Kaligang-Bagharpara Road Km 016.90-017.20 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.204 2.<strong>23</strong>8<br />

Z7057 Kaligang-Bagharpara Road Km 019.60-020.10 S 0.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 2.326 7.204<br />

Z7057 Kaligang-Bagharpara Road Km 022.70-033.42 S 10.72 990 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 16.92 0.042 2.509<br />

Z7057 Kaligang-Bagharpara Road Km 018.50-018.60 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z7058 Sutighata-Dakuria Road Km 005.20-005.50 S 0.3 1932 Zilla Carpet 40mm @ 1000-2000 2013 0.46 0.000 0.000<br />

Z7058 Sutighata-Dakuria Road Km 000.00-000.70 S 0.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 2.165 8.800<br />

Z7058 Sutighata-Dakuria Road Km 005.10-005.20 S 0.1 1932 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.439 0.255<br />

Z7059 Bolianpur-Kuada Road Km 000.00-000.80 S 0.8 674 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.<strong>23</strong> 0.000 0.000<br />

Z7059 Bolianpur-Kuada Road Km 001.10-001.26 S 0.16 674 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.25 0.000 0.000<br />

Z7501 Bagherpara link Road Km 000.60-004.31 S 3.71 1798 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.55 0.627 16.269<br />

Z7552 keshabpur- kalarawa Road Km 007.88-011.76 S 3.88 3814 Zilla Carpet 40mm @ Cracks >25% 2013 5.65 0.690 4.391<br />

Z7552 keshabpur- kalarawa Road Km 011.86-0<strong>12</strong>.00 S 0.14 3814 Zilla Carpet 40mm @ Cracks >25% 2013 0.19 1.499 0.416<br />

Z7552 keshabpur- kalarawa Road Km 000.00-007.88 S 7.88 491 Zilla Carpet 40mm @ Traff 100-1000 2013 11.63 0.000 0.000<br />

Sub-total Jessore Division<br />

73.41<br />

Jhenaidah Division<br />

Z7024 Gopalpur-Maheshpur Road Km 005.40-005.50 S 0.1 1017 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z7024 Gopalpur-Maheshpur Road Km 007.60-007.80 S 0.2 1017 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.005 0.002<br />

Z7024 Gopalpur-Maheshpur Road Km 008.40-008.50 S 0.1 1017 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.148 0.024<br />

Z7024 Gopalpur-Maheshpur Road Km 011.30-011.50 S 0.2 <strong>12</strong>28 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z7024 Gopalpur-Maheshpur Road Km 002.20-005.40 S 3.2 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.91 0.229 3.450<br />

Z7024 Gopalpur-Maheshpur Road Km 005.50-007.60 S 2.1 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.22 0.266 3.284<br />

Z7024 Gopalpur-Maheshpur Road Km 011.20-011.30 S 0.1 <strong>12</strong>28 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.3<strong>12</strong> 0.184<br />

Z7024 Gopalpur-Maheshpur Road Km 011.50-011.70 S 0.2 <strong>12</strong>28 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.300 0.354<br />

Z7057 Kaligang-Bagharpara Road Km 004.91-005.18 S 0.26 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.42 2.318 3.822<br />

Z7057 Kaligang-Bagharpara Road Km 011.20-011.40 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.100 1.363<br />

Z7057 Kaligang-Bagharpara Road Km 015.60-016.20 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 2.096 7.791<br />

Z7057 Kaligang-Bagharpara Road Km 009.70-010.30 S 0.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.83 1.053 1.802<br />

Z7460 Dakbanglabazar-Kaliganj Road Km 006.84-007.34 S 0.5 1893 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.90 0.705 2.393<br />

Z7460 Dakbanglabazar-Kaliganj Road Km 007.64-010.34 S 2.7 1943 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.26 0.782 <strong>12</strong>.604<br />

Z7460 Dakbanglabazar-Kaliganj Road Km 010.34-0<strong>23</strong>.03 S <strong>12</strong>.7 2039 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 20.15 0.699 53.283<br />

Z7460 Dakbanglabazar-Kaliganj Road Km 006.71-006.84 S 0.13 1893 Zilla Seal Coat 2013 0.08 0.4<strong>23</strong> 0.104<br />

Sub-total Jhenaidah Division<br />

37.42<br />

Appendix-E: Page: 35 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

NPV /<br />

Cost<br />

NPV<br />

Khulna Division<br />

Z7041 Khulna -Terokhada Road Km 000.40-000.50 S 0.1 1379 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 002.50-002.60 S 0.1 1379 Zilla Carpet 40mm @ 1000-2000 2013 0.18 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 002.60-002.80 S 0.2 1379 Zilla Carpet 40mm @ 1000-2000 2013 0.36 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 002.80-003.20 S 0.4 1379 Zilla Carpet 40mm @ 1000-2000 2013 0.72 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 003.40-004.00 S 0.6 1379 Zilla Carpet 40mm @ 1000-2000 2013 1.07 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 003.20-003.40 S 0.2 1379 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.36 0.026 0.031<br />

Z7041 Khulna -Terokhada Road Km 004.00-004.10 S 0.1 1379 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.18 0.001 0.001<br />

Z7041 Khulna -Terokhada Road Km 004.30-005.00 S 0.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.19 2.085 9.775<br />

Z7041 Khulna -Terokhada Road Km 005.10-005.80 S 0.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.19 1.004 4.708<br />

Z7041 Khulna -Terokhada Road Km 006.10-007.90 S 1.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.26 1.434 18.535<br />

Z7041 Khulna -Terokhada Road Km 010.00-010.40 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.65 0.978 2.489<br />

Z7041 Khulna -Terokhada Road Km 0<strong>12</strong>.50-0<strong>12</strong>.90 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.65 1.033 2.629<br />

Z7041 Khulna -Terokhada Road Km 015.60-015.80 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.041 1.325<br />

Z7041 Khulna -Terokhada Road Km 016.40-016.80 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.72 1.160 3.293<br />

Z7041 Khulna -Terokhada Road Km 019.20-021.50 S 2.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.<strong>12</strong> 1.997 32.602<br />

Z7041 Khulna -Terokhada Road Km 000.00-000.40 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.68 1.524 1.266<br />

Z7041 Khulna -Terokhada Road Km 004.10-004.30 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.35 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 005.00-005.10 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.17 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 0<strong>12</strong>.90-013.30 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 016.80-017.20 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.72 0.000 0.000<br />

Z7041 Khulna -Terokhada Road Km 022.20-022.24 S 0.04 2146 Zilla Seal Coat 2013 0.02 0.609 0.058<br />

Z7045 Terakhada-Mollahat Road Km 003.60-004.10 S 0.5 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 004.40-004.60 S 0.2 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.26 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 005.30-005.50 S 0.2 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.26 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 006.20-006.40 S 0.2 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.26 0.047 0.036<br />

Z7045 Terakhada-Mollahat Road Km 009.00-009.10 S 0.1 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 011.00-011.20 S 0.2 225 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.000 0.000<br />

Z7045 Terakhada-Mollahat Road Km 009.20-010.20 S 1 225 Zilla Carpet 40mm @ Traff 100-1000 2013 1.58 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 041.70-041.90 S 0.2 1621 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 044.10-044.20 S 0.1 1621 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 044.30-044.50 S 0.2 1621 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 044.80-044.90 S 0.1 1621 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 000.20-001.20 S 1 920 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.35 0.336 2.781<br />

Z7604 Betgram-Koyra Road Km 001.30-001.40 S 0.1 920 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.314 0.283<br />

Z7604 Betgram-Koyra Road Km 001.50-003.30 S 1.8 920 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.97 0.198 2.354<br />

Z7604 Betgram-Koyra Road Km 003.40-007.98 S 4.58 920 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 7.04 0.404 10.900<br />

Appendix-E: Page: 36 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7604 Betgram-Koyra Road Km 007.98-008.80 S 0.82 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.91 1.<strong>12</strong>9 8.696<br />

Z7604 Betgram-Koyra Road Km 020.10-026.00 S 5.9 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 9.06 1.2<strong>12</strong> 43.087<br />

Z7604 Betgram-Koyra Road Km 029.30-030.40 S 1.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.58 1.495 15.458<br />

Z7604 Betgram-Koyra Road Km 030.50-030.70 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.<strong>12</strong>2 2.110<br />

Z7604 Betgram-Koyra Road Km 031.70-032.10 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.800 3.009<br />

Z7604 Betgram-Koyra Road Km 034.60-037.50 S 2.9 1621 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.45 1.046 17.609<br />

Z7604 Betgram-Koyra Road Km 039.60-041.70 S 2.1 1621 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.22 0.615 7.496<br />

Z7604 Betgram-Koyra Road Km 041.90-044.10 S 2.2 1621 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.38 1.082 13.818<br />

Z7604 Betgram-Koyra Road Km 044.20-044.30 S 0.1 1621 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 1.357 0.788<br />

Z7604 Betgram-Koyra Road Km 044.50-044.80 S 0.3 1621 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 1.164 2.029<br />

Z7604 Betgram-Koyra Road Km 026.00-026.20 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 030.40-030.50 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 030.70-031.70 S 1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.35 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 032.10-034.30 S 2.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 3.60 0.173 0.765<br />

Z7604 Betgram-Koyra Road Km 000.00-000.20 S 0.2 920 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 001.20-001.30 S 0.1 920 Zilla Carpet 40mm @ Traff 100-1000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 001.40-001.50 S 0.1 920 Zilla Carpet 40mm @ Traff 100-1000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7604 Betgram-Koyra Road Km 003.30-003.40 S 0.1 920 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z7606 Gollamari-Nalian Forest Road Km 001.90-006.90 S 5 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 9.94 0.319 11.183<br />

Z7606 Gollamari-Nalian Forest Road Km 007.10-009.90 S 2.8 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.62 0.300 5.318<br />

Z7606 Gollamari-Nalian Forest Road Km 010.00-011.20 S 1.2 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.84 0.378 2.451<br />

Z7606 Gollamari-Nalian Forest Road Km 011.50-011.90 S 0.4 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 0.259 0.517<br />

Z7606 Gollamari-Nalian Forest Road Km 0<strong>12</strong>.10-0<strong>12</strong>.40 S 0.3 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.380 0.671<br />

Z7606 Gollamari-Nalian Forest Road Km 0<strong>12</strong>.50-0<strong>12</strong>.80 S 0.3 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.272 0.374<br />

Z7606 Gollamari-Nalian Forest Road Km 013.30-015.30 S 2 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.70 0.<strong>12</strong>4 1.369<br />

Z7606 Gollamari-Nalian Forest Road Km 015.60-016.30 S 0.7 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 0.375 1.419<br />

Z7606 Gollamari-Nalian Forest Road Km 016.40-016.90 S 0.5 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 0.333 0.900<br />

Z7606 Gollamari-Nalian Forest Road Km 020.00-020.30 S 0.3 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.405 0.714<br />

Z7606 Gollamari-Nalian Forest Road Km 020.50-021.50 S 1 941 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.45 0.378 1.933<br />

Z7606 Gollamari-Nalian Forest Road Km 001.50-001.90 S 0.4 941 Zilla Carpet 40mm @ Traff 100-1000 2013 0.61 0.000 0.000<br />

Z7606 Gollamari-Nalian Forest Road Km 0<strong>12</strong>.40-0<strong>12</strong>.50 S 0.1 941 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z7606 Gollamari-Nalian Forest Road Km 0<strong>12</strong>.80-0<strong>12</strong>.90 S 0.1 941 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z7606 Gollamari-Nalian Forest Road Km 016.90-017.00 S 0.1 941 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z7606 Gollamari-Nalian Forest Road Km 016.30-016.40 S 0.1 941 Zilla Seal Coat 2013 0.05 1.243 0.108<br />

Sub-total Khulna Division<br />

96.62<br />

Kushtia Division<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 002.90-003.00 S 0.1 1791 Zilla Carpet 40mm @ 1000-2000 2013 0.<strong>23</strong> 0.013 0.004<br />

Appendix-E: Page: 37 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 001.70-001.80 S 0.1 1791 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.2<strong>23</strong> 0.208<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 003.00-003.10 S 0.1 1791 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.462 0.432<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 000.10-001.70 S 1.6 1791 Zilla Seal Coat 2013 1.11 0.146 0.483<br />

Z7409 Bheramara-Bheramara Ferry Ghat Road Km 001.80-002.10 S 0.3 1791 Zilla Seal Coat 2013 0.21 1.031 0.518<br />

Z7411 Bheramara-Daulatpur Road Km 000.00-000.10 S 0.1 3241 Zilla Carpet 40mm @ Cracks >25% 2013 0.25 0.199 0.061<br />

Z7411 Bheramara-Daulatpur Road Km 000.10-001.00 S 0.9 3241 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.<strong>12</strong> 0.446 3.284<br />

Z7411 Bheramara-Daulatpur Road Km 001.50-002.07 S 0.57 3241 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.33 0.502 2.328<br />

Z7411 Bheramara-Daulatpur Road Km 002.07-002.90 S 0.83 2211 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.81 0.131 0.700<br />

Z7411 Bheramara-Daulatpur Road Km 003.00-006.10 S 3.1 2211 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 7.27 0.275 5.9<strong>12</strong><br />

Z7411 Bheramara-Daulatpur Road Km 006.60-007.30 S 0.7 2211 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.64 0.322 1.561<br />

Z7411 Bheramara-Daulatpur Road Km 010.90-011.60 S 0.7 2211 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.64 0.245 1.186<br />

Z7411 Bheramara-Daulatpur Road Km 011.80-011.90 S 0.1 2211 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.215 0.149<br />

Z7411 Bheramara-Daulatpur Road Km 001.00-001.50 S 0.5 3241 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 0.211 0.409<br />

Z7411 Bheramara-Daulatpur Road Km 002.90-003.00 S 0.1 2211 Zilla Carpet 40mm @ Traff >=2000 2013 0.21 0.327 0.087<br />

Z7411 Bheramara-Daulatpur Road Km 006.10-006.60 S 0.5 2211 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 0.000 0.000<br />

Z7411 Bheramara-Daulatpur Road Km 007.30-007.50 S 0.2 2211 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z7411 Bheramara-Daulatpur Road Km 007.50-008.40 S 0.9 2211 Zilla Carpet 40mm @ Traff >=2000 2013 2.11 0.000 0.000<br />

Z7411 Bheramara-Daulatpur Road Km 008.40-009.20 S 0.8 2211 Zilla Carpet 40mm @ Traff >=2000 2013 1.88 0.000 0.000<br />

Z7411 Bheramara-Daulatpur Road Km 009.50-010.90 S 1.4 2211 Zilla Carpet 40mm @ Traff >=2000 2013 3.28 0.000 0.000<br />

Z7411 Bheramara-Daulatpur Road Km 011.90-0<strong>12</strong>.00 S 0.1 2211 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7411 Bheramara-Daulatpur Road Km 016.27-020.54 S 4.27 2211 Zilla Carpet 40mm @ Traff >=2000 2013 6.55 0.902 7.418<br />

Z7451 Kushtia Meherpur Highway-Mirpur Thana Km 000.00-001.54 S 1.54 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.99 0.000 0.000<br />

Z7463 Bheramara - Mirpur Thana Km 008.00-008.20 S 0.2 1336 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z7463 Bheramara - Mirpur Thana Km 000.10-000.60 S 0.5 1336 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 0.477 1.445<br />

Z7463 Bheramara - Mirpur Thana Km 001.10-001.90 S 0.8 1336 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.<strong>23</strong> 0.475 2.301<br />

Z7463 Bheramara - Mirpur Thana Km 004.60-004.80 S 0.2 1336 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.26 0.447 0.381<br />

Z7463 Bheramara - Mirpur Thana Km 009.10-009.37 S 0.27 1336 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.41 0.322 0.520<br />

Sub-total Kushtia Division<br />

41.37<br />

Magura Division<br />

Z7007 Ramnagar-Sripur Road Km 004.60-004.70 S 0.1 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.282 0.157<br />

Z7007 Ramnagar-Sripur Road Km 004.80-005.00 S 0.2 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.<strong>23</strong>5 0.261<br />

Z7007 Ramnagar-Sripur Road Km 005.60-005.80 S 0.2 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.353 0.360<br />

Z7007 Ramnagar-Sripur Road Km 006.50-006.80 S 0.3 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.55 0.134 0.260<br />

Z7007 Ramnagar-Sripur Road Km 006.81-009.91 S 3.1 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.89 0.337 4.929<br />

Z7007 Ramnagar-Sripur Road Km 010.01-013.01 S 3 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.73 0.319 4.5<strong>12</strong><br />

Z7007 Ramnagar-Sripur Road Km 013.81-014.31 S 0.5 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.243 0.574<br />

Z7007 Ramnagar-Sripur Road Km 014.41-014.81 S 0.4 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.339 0.692<br />

Appendix-E: Page: 38 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7007 Ramnagar-Sripur Road Km 014.91-015.01 S 0.1 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.376 0.192<br />

Z7007 Ramnagar-Sripur Road Km 015.21-015.31 S 0.1 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.268 0.149<br />

Z7007 Ramnagar-Sripur Road Km 016.11-016.38 S 0.28 778 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.43 0.214 0.327<br />

Z7007 Ramnagar-Sripur Road Km 000.00-000.40 S 0.4 778 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z7007 Ramnagar-Sripur Road Km 000.40-002.90 S 2.5 778 Zilla Carpet 40mm @ Traff 100-1000 2013 3.94 0.000 0.000<br />

Z7007 Ramnagar-Sripur Road Km 002.90-003.60 S 0.7 778 Zilla Carpet 40mm @ Traff 100-1000 2013 1.10 0.000 0.000<br />

Z7007 Ramnagar-Sripur Road Km 003.60-004.10 S 0.5 778 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z7007 Ramnagar-Sripur Road Km 005.80-006.50 S 0.7 778 Zilla Carpet 40mm @ Traff 100-1000 2013 1.16 0.000 0.000<br />

Z7007 Ramnagar-Sripur Road Km 006.80-006.81 S 0 778 Zilla Seal Coat 2013 0.00 1.738 0.021<br />

Z7008 Sripur-Wapdah More Road Km 000.00-001.50 S 1.5 862 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.37 0.<strong>12</strong>7 1.055<br />

Z7008 Sripur-Wapdah More Road Km 001.60-002.20 S 0.6 862 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 003.40-004.00 S 0.6 862 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.062 0.177<br />

Z7008 Sripur-Wapdah More Road Km 004.90-006.00 S 1.1 862 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.74 0.264 1.370<br />

Z7008 Sripur-Wapdah More Road Km 006.20-006.40 S 0.2 862 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.137 0.152<br />

Z7008 Sripur-Wapdah More Road Km 006.60-006.70 S 0.1 862 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.269 0.<strong>12</strong>7<br />

Z7008 Sripur-Wapdah More Road Km 015.30-022.20 S 6.9 515 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 10.89 0.321 <strong>12</strong>.303<br />

Z7008 Sripur-Wapdah More Road Km 022.90-031.00 S 8.1 515 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 <strong>12</strong>.78 0.158 7.098<br />

Z7008 Sripur-Wapdah More Road Km 032.30-034.10 S 1.8 515 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.84 0.298 2.527<br />

Z7008 Sripur-Wapdah More Road Km 034.30-036.20 S 1.9 515 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.00 0.324 3.153<br />

Z7008 Sripur-Wapdah More Road Km 036.40-036.42 S 0.02 515 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.04 0.146 0.019<br />

Z7008 Sripur-Wapdah More Road Km 002.20-003.40 S 1.2 862 Zilla Carpet 40mm @ Traff 100-1000 2013 1.89 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 004.00-004.10 S 0.1 862 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 004.10-004.50 S 0.4 862 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 004.50-004.90 S 0.4 862 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 006.40-006.60 S 0.2 862 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 014.70-015.30 S 0.6 515 Zilla Carpet 40mm @ Traff 100-1000 2013 0.95 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 022.20-022.40 S 0.2 515 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 022.80-022.90 S 0.1 515 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 032.20-032.30 S 0.1 515 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z7008 Sripur-Wapdah More Road Km 034.10-034.30 S 0.2 515 Zilla Seal Coat 2013 0.09 1.370 0.229<br />

Z7011 Magura-Sripur Road Km 000.10-000.30 S 0.2 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.43 0.564 0.948<br />

Z7011 Magura-Sripur Road Km 000.40-000.90 S 0.5 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.07 0.390 1.638<br />

Z7011 Magura-Sripur Road Km 001.20-001.50 S 0.3 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.64 0.555 1.401<br />

Z7011 Magura-Sripur Road Km 001.90-002.00 S 0.1 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.668 0.337<br />

Z7011 Magura-Sripur Road Km 002.20-002.70 S 0.5 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 1.073 3.202<br />

Z7011 Magura-Sripur Road Km 003.70-004.00 S 0.3 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.747 1.131<br />

Z7011 Magura-Sripur Road Km 004.30-004.60 S 0.3 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.<strong>12</strong>9 2.022<br />

Z7011 Magura-Sripur Road Km 004.80-004.90 S 0.1 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.596 0.356<br />

Appendix-E: Page: 39 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7011 Magura-Sripur Road Km 005.40-005.60 S 0.2 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 1.171 1.284<br />

Z7011 Magura-Sripur Road Km 006.90-007.00 S 0.1 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 1.378 0.822<br />

Z7011 Magura-Sripur Road Km 007.70-008.00 S 0.3 2254 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.540 0.966<br />

Z7011 Magura-Sripur Road Km 001.50-001.90 S 0.4 2254 Zilla Carpet 40mm @ Traff >=2000 2013 0.72 0.000 0.000<br />

Z7011 Magura-Sripur Road Km 002.00-002.20 S 0.2 2254 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z7011 Magura-Sripur Road Km 002.70-003.70 S 1 2254 Zilla Carpet 40mm @ Traff >=2000 2013 1.64 0.000 0.000<br />

Z7011 Magura-Sripur Road Km 004.60-004.80 S 0.2 2254 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z7011 Magura-Sripur Road Km 005.60-006.10 S 0.5 2254 Zilla Carpet 40mm @ Traff >=2000 2013 0.79 0.000 0.000<br />

Z7011 Magura-Sripur Road Km 006.80-006.90 S 0.1 2254 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z7011 Magura-Sripur Road Km 007.00-007.70 S 0.7 2254 Zilla Carpet 40mm @ Traff >=2000 2013 1.10 1.624 2.251<br />

Z7021 Arpara-Kaliganj Road Km 000.20-003.30 S 3.1 1754 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.18 0.918 18.854<br />

Z7021 Arpara-Kaliganj Road Km 003.30-006.70 S 3.4 1754 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.37 1.636 30.490<br />

Z7021 Arpara-Kaliganj Road Km 006.90-009.00 S 2.1 1754 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.31 0.898 11.261<br />

Z7201 Arpara-Salikha Road Km 000.30-003.50 S 3.2 <strong>12</strong>22 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.55 0.149 3.269<br />

Z7201 Arpara-Salikha Road Km 005.80-011.51 S 5.71 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 8.74 1.134 38.929<br />

Sub-total Magura Division<br />

100.42<br />

Meherpur Division<br />

Z7452 Gangi-Kulbaria Road Km 008.30-008.80 S 0.5 1017 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 008.80-009.10 S 0.3 1017 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 009.10-011.60 S 2.5 1017 Zilla Carpet 40mm @ 1000-2000 2013 3.94 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 0<strong>12</strong>.10-0<strong>12</strong>.30 S 0.2 1017 Zilla Carpet 40mm @ 1000-2000 2013 0.40 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 0<strong>12</strong>.50-0<strong>12</strong>.90 S 0.4 1017 Zilla Carpet 40mm @ 1000-2000 2013 0.94 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 013.20-014.40 S 1.2 1017 Zilla Carpet 40mm @ 1000-2000 2013 2.81 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 014.60-016.70 S 2.1 1017 Zilla Carpet 40mm @ 1000-2000 2013 4.93 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 017.00-018.00 S 1 1017 Zilla Carpet 40mm @ 1000-2000 2013 2.35 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 018.40-020.00 S 1.6 1017 Zilla Carpet 40mm @ 1000-2000 2013 3.13 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 000.30-000.80 S 0.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 2.<strong>12</strong>6 6.584<br />

Z7452 Gangi-Kulbaria Road Km 003.90-004.30 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 1.059 2.624<br />

Z7452 Gangi-Kulbaria Road Km 007.80-008.30 S 0.5 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 011.60-0<strong>12</strong>.10 S 0.5 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.332 0.848<br />

Z7452 Gangi-Kulbaria Road Km 0<strong>12</strong>.30-0<strong>12</strong>.50 S 0.2 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.240 0.337<br />

Z7452 Gangi-Kulbaria Road Km 0<strong>12</strong>.90-013.20 S 0.3 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 014.40-014.60 S 0.2 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 016.70-017.00 S 0.3 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.189 0.398<br />

Z7452 Gangi-Kulbaria Road Km 018.00-018.40 S 0.4 1017 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 000.20-000.30 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z7452 Gangi-Kulbaria Road Km 002.10-002.70 S 0.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.95 0.000 0.000<br />

Appendix-E: Page: 40 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7452 Gangi-Kulbaria Road Km 004.30-005.30 S 1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.58 0.000 0.000<br />

Sub-total Meherpur Division<br />

28.73<br />

Narail Division<br />

Z7502 Narail-Kalia Road Km 000.10-001.70 S 1.6 614 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.46 0.291 2.141<br />

Z7502 Narail-Kalia Road Km 001.90-002.30 S 0.4 614 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 0.331 0.715<br />

Z7502 Narail-Kalia Road Km 002.70-003.10 S 0.4 614 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 0.199 0.430<br />

Z7502 Narail-Kalia Road Km 003.80-004.00 S 0.2 614 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.220 0.<strong>23</strong>8<br />

Z7502 Narail-Kalia Road Km 004.10-005.50 S 1.4 614 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.15 0.155 0.994<br />

Z7502 Narail-Kalia Road Km 005.50-006.00 S 0.5 614 Zilla Carpet 40mm @ Traff 100-1000 2013 0.77 0.000 0.000<br />

Z7502 Narail-Kalia Road Km 000.00-000.10 S 0.1 614 Zilla Seal Coat 2013 0.05 1.033 0.090<br />

Z7504 Narail-Shalika Road Km 004.70-005.10 S 0.4 664 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 0.000 0.000<br />

Z7504 Narail-Shalika Road Km 005.20-005.30 S 0.1 664 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.000 0.000<br />

Z7504 Narail-Shalika Road Km 005.40-006.00 S 0.6 664 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.55 0.000 0.000<br />

Z7504 Narail-Shalika Road Km 006.10-008.80 S 2.7 664 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 8.06 0.000 0.000<br />

Z7504 Narail-Shalika Road Km 008.90-008.97 S 0.07 664 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.21 0.306 0.191<br />

Sub-total Narail Division<br />

17.54<br />

Satkhira Division<br />

Z7552 keshabpur- kalarawa Road Km 015.46-015.66 S 0.2 3814 Zilla Carpet 40mm @ Cracks >25% 2013 0.26 1.964 0.687<br />

Z7552 keshabpur- kalarawa Road Km 018.66-018.86 S 0.2 3814 Zilla Carpet 40mm @ Cracks >25% 2013 0.26 1.938 0.678<br />

Z7552 keshabpur- kalarawa Road Km 019.26-019.66 S 0.4 3814 Zilla Carpet 40mm @ Cracks >25% 2013 0.60 2.166 1.628<br />

Z7552 keshabpur- kalarawa Road Km 0<strong>12</strong>.00-015.26 S 3.26 3814 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.<strong>23</strong> 1.153 18.464<br />

Z7552 keshabpur- kalarawa Road Km 015.26-015.46 S 0.2 3814 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.26 1.179 1.160<br />

Z7552 keshabpur- kalarawa Road Km 015.66-018.66 S 3 3814 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.90 1.015 14.976<br />

Z7552 keshabpur- kalarawa Road Km 019.66-019.76 S 0.1 3814 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.21 1.490 1.202<br />

Z7552 keshabpur- kalarawa Road Km 019.76-019.93 S 0.17 3814 Zilla Carpet 40mm @ Traff >=2000 2013 0.37 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 020.00-020.10 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.578 1.483<br />

Z7602 Satkhira-Kaliganj Road Km 022.60-022.70 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.307 1.229<br />

Z7602 Satkhira-Kaliganj Road Km 0<strong>23</strong>.80-0<strong>23</strong>.90 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.461 1.373<br />

Z7602 Satkhira-Kaliganj Road Km 027.10-027.20 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.745 0.700<br />

Z7602 Satkhira-Kaliganj Road Km 027.30-027.40 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.614 1.517<br />

Z7602 Satkhira-Kaliganj Road Km 030.40-030.60 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.489 2.799<br />

Z7602 Satkhira-Kaliganj Road Km 030.70-030.90 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.302 2.448<br />

Z7602 Satkhira-Kaliganj Road Km 034.80-034.90 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.785 0.738<br />

Z7602 Satkhira-Kaliganj Road Km 007.80-008.80 S 1 7913 Zilla Carpet 40mm @ Traff >=2000 2013 2.35 2.064 5.889<br />

Z7602 Satkhira-Kaliganj Road Km 017.60-018.50 S 0.9 7913 Zilla Carpet 40mm @ Traff >=2000 2013 2.11 2.953 8.088<br />

Appendix-E: Page: 41 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7602 Satkhira-Kaliganj Road Km 019.40-020.00 S 0.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.41 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 020.10-022.60 S 2.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.86 0.004 0.027<br />

Z7602 Satkhira-Kaliganj Road Km 022.70-0<strong>23</strong>.80 S 1.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.58 0.094 0.289<br />

Z7602 Satkhira-Kaliganj Road Km 0<strong>23</strong>.90-026.10 S 2.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.16 0.091 0.560<br />

Z7602 Satkhira-Kaliganj Road Km 026.80-026.90 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 027.00-027.10 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 027.20-027.30 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 027.40-030.40 S 3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 7.04 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 030.60-030.70 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.102 0.029<br />

Z7602 Satkhira-Kaliganj Road Km 030.90-032.10 S 1.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.81 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 032.40-032.90 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 034.50-034.80 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z7602 Satkhira-Kaliganj Road Km 034.90-035.68 S 0.78 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.83 0.027 0.060<br />

Z7602 Satkhira-Kaliganj Road Km 000.00-000.10 S 0.1 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.29 2.992 0.971<br />

Z7602 Satkhira-Kaliganj Road Km 000.40-001.80 S 1.4 7913 Zilla Overlay 50mm @ Cracking >25% 2013 4.02 2.627 11.680<br />

Z7602 Satkhira-Kaliganj Road Km 001.90-002.00 S 0.1 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.29 3.587 1.193<br />

Z7602 Satkhira-Kaliganj Road Km 003.10-003.30 S 0.2 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.57 2.953 1.918<br />

Z7602 Satkhira-Kaliganj Road Km 003.70-003.90 S 0.2 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.57 2.772 1.800<br />

Z7602 Satkhira-Kaliganj Road Km 004.10-004.80 S 0.7 7913 Zilla Overlay 50mm @ Cracking >25% 2013 2.01 2.343 5.208<br />

Z7602 Satkhira-Kaliganj Road Km 004.90-005.20 S 0.3 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.86 3.319 3.162<br />

Z7602 Satkhira-Kaliganj Road Km 005.60-007.40 S 1.8 7913 Zilla Overlay 50mm @ Cracking >25% 2013 5.17 2.448 13.996<br />

Z7602 Satkhira-Kaliganj Road Km 009.10-010.60 S 1.5 7913 Zilla Overlay 50mm @ Cracking >25% 2013 4.31 4.020 19.579<br />

Z7602 Satkhira-Kaliganj Road Km 010.80-011.00 S 0.2 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.57 3.450 2.295<br />

Z7602 Satkhira-Kaliganj Road Km 0<strong>12</strong>.50-014.40 S 1.9 7913 Zilla Overlay 50mm @ Cracking >25% 2013 5.45 4.010 25.345<br />

Z7602 Satkhira-Kaliganj Road Km 014.60-014.70 S 0.1 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.29 2.390 0.795<br />

Z7602 Satkhira-Kaliganj Road Km 014.80-015.30 S 0.5 7913 Zilla Overlay 50mm @ Cracking >25% 2013 1.44 3.572 5.941<br />

Z7602 Satkhira-Kaliganj Road Km 018.70-018.90 S 0.2 7913 Zilla Overlay 50mm @ Cracking >25% 2013 0.57 3.901 2.595<br />

Z7602 Satkhira-Kaliganj Road Km 002.30-002.40 S 0.1 7913 Zilla Overlay 50mm @ IRI 6-9 2013 0.29 2.713 1.138<br />

Z7602 Satkhira-Kaliganj Road Km 002.60-002.70 S 0.1 7913 Zilla Overlay 50mm @ IRI 6-9 2013 0.29 3.319 1.167<br />

Z7602 Satkhira-Kaliganj Road Km 005.20-005.60 S 0.4 7913 Zilla Overlay 50mm @ IRI 6-9 2013 1.15 3.724 6.480<br />

Z7602 Satkhira-Kaliganj Road Km 011.30-011.70 S 0.4 7913 Zilla Overlay 50mm @ IRI 6-9 2013 1.15 4.308 6.250<br />

Z7602 Satkhira-Kaliganj Road Km 011.90-0<strong>12</strong>.40 S 0.5 7913 Zilla Overlay 50mm @ IRI 6-9 2013 1.44 4.175 7.833<br />

Z7602 Satkhira-Kaliganj Road Km 015.40-015.60 S 0.2 7913 Zilla Overlay 50mm @ IRI 6-9 2013 0.57 3.984 2.890<br />

Z7602 Satkhira-Kaliganj Road Km 015.80-016.00 S 0.2 7913 Zilla Overlay 50mm @ IRI 6-9 2013 0.57 4.273 2.919<br />

Z7602 Satkhira-Kaliganj Road Km 016.10-016.70 S 0.6 7913 Zilla Overlay 50mm @ IRI 6-9 2013 1.72 4.495 9.482<br />

Z7602 Satkhira-Kaliganj Road Km 017.00-017.20 S 0.2 7913 Zilla Overlay 50mm @ IRI 6-9 2013 0.57 4.016 2.743<br />

Z7602 Satkhira-Kaliganj Road Km 017.40-017.50 S 0.1 7913 Zilla Overlay 50mm @ IRI 6-9 2013 0.29 3.651 1.247<br />

Z7602 Satkhira-Kaliganj Road Km 018.90-019.40 S 0.5 7913 Zilla Overlay 50mm @ IRI 6-9 2013 1.44 4.432 8.626<br />

Appendix-E: Page: 42 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7607 Satkhira -Debhata Road Km 000.30-000.90 S 0.6 4350 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.41 1.625 8.651<br />

Z7607 Satkhira -Debhata Road Km 000.90-001.10 S 0.2 4350 Zilla Overlay 50mm @ IRI 6-9 2013 0.57 1.086 0.690<br />

Z7607 Satkhira -Debhata Road Km 001.20-003.50 S 2.3 4350 Zilla Overlay 50mm @ IRI 6-9 2013 6.33 1.961 15.679<br />

Z7607 Satkhira -Debhata Road Km 003.80-003.90 S 0.1 4350 Zilla Overlay 50mm @ IRI 6-9 2013 0.19 1.103 0.221<br />

Z7607 Satkhira -Debhata Road Km 004.20-004.60 S 0.4 4350 Zilla Overlay 50mm @ IRI 6-9 2013 0.85 1.627 1.563<br />

Z7609 Banshipur-Munshiganj road Km 001.10-004.10 S 3 1603 Zilla Carpet 40mm @ 1000-2000 2013 7.04 0.000 0.000<br />

Z7609 Banshipur-Munshiganj road Km 007.10-008.70 S 1.6 1603 Zilla Carpet 40mm @ 1000-2000 2013 2.46 0.430 1.163<br />

Z7609 Banshipur-Munshiganj road Km 009.00-009.10 S 0.1 1603 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z7609 Banshipur-Munshiganj road Km 009.70-010.40 S 0.7 1603 Zilla Carpet 40mm @ 1000-2000 2013 1.07 0.384 0.455<br />

Z7609 Banshipur-Munshiganj road Km 000.10-001.10 S 1 1603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.35 0.110 0.939<br />

Z7609 Banshipur-Munshiganj road Km 005.90-006.70 S 0.8 1603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.<strong>23</strong> 0.516 2.027<br />

Z7609 Banshipur-Munshiganj road Km 007.00-007.10 S 0.1 1603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 1.105 0.642<br />

Z7609 Banshipur-Munshiganj road Km 008.70-009.00 S 0.3 1603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.557 0.757<br />

Z7609 Banshipur-Munshiganj road Km 010.40-010.60 S 0.2 1603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.851 0.988<br />

Z7609 Banshipur-Munshiganj road Km 000.00-000.10 S 0.1 1603 Zilla Seal Coat 2013 0.07 0.815 0.136<br />

Z7609 Banshipur-Munshiganj road Km 005.80-005.90 S 0.1 1603 Zilla Seal Coat 2013 0.05 0.116 0.020<br />

Z7613 Tala-Satkhira Road Km 002.80-002.90 S 0.1 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.732 0.479<br />

Z7613 Tala-Satkhira Road Km 003.20-004.10 S 0.9 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.411 2.424<br />

Z7613 Tala-Satkhira Road Km 004.60-004.90 S 0.3 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.407 0.675<br />

Z7613 Tala-Satkhira Road Km 005.00-005.80 S 0.8 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.36 0.391 2.048<br />

Z7613 Tala-Satkhira Road Km 006.20-006.60 S 0.4 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.628 1.645<br />

Z7613 Tala-Satkhira Road Km 006.60-006.90 S 0.3 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.627 1.<strong>23</strong>1<br />

Z7613 Tala-Satkhira Road Km 006.90-007.20 S 0.3 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.51 0.643 1.263<br />

Z7613 Tala-Satkhira Road Km 007.40-008.10 S 0.7 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.19 0.565 2.588<br />

Z7613 Tala-Satkhira Road Km 008.60-008.80 S 0.2 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.659 0.863<br />

Z7613 Tala-Satkhira Road Km 008.90-009.10 S 0.2 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.654 0.856<br />

Z7613 Tala-Satkhira Road Km 000.00-002.70 S 2.7 977 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.61 0.569 10.057<br />

Z7617 Kaliganj-Vetkhali Road Km 016.40-016.50 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.389 1.306<br />

Z7617 Kaliganj-Vetkhali Road Km 017.10-017.70 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.41 1.455 8.205<br />

Z7617 Kaliganj-Vetkhali Road Km 0<strong>23</strong>.30-0<strong>23</strong>.60 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 1.245 3.511<br />

Z7617 Kaliganj-Vetkhali Road Km 024.10-024.20 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.487 1.398<br />

Z7617 Kaliganj-Vetkhali Road Km 024.40-024.80 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.839 3.155<br />

Z7617 Kaliganj-Vetkhali Road Km 000.00-005.80 S 5.8 4382 Zilla Carpet 40mm @ Traff >=2000 2013 13.60 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 015.70-016.40 S 0.7 3424 Zilla Carpet 40mm @ Traff >=2000 2013 1.64 0.171 0.472<br />

Z7617 Kaliganj-Vetkhali Road Km 016.50-016.80 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 016.90-017.10 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 017.70-017.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 018.00-019.00 S 1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.35 0.000 0.000<br />

Appendix-E: Page: 43 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z7617 Kaliganj-Vetkhali Road Km 019.80-022.10 S 2.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.39 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 022.70-0<strong>23</strong>.30 S 0.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.41 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 0<strong>23</strong>.60-024.10 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 024.20-024.40 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 024.80-024.90 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z7617 Kaliganj-Vetkhali Road Km 005.90-006.00 S 0.1 4382 Zilla Overlay 50mm @ Cracking >25% 2013 0.29 0.448 0.158<br />

Z7617 Kaliganj-Vetkhali Road Km 006.20-006.30 S 0.1 4382 Zilla Overlay 50mm @ Cracking >25% 2013 0.29 0.094 0.033<br />

Z7617 Kaliganj-Vetkhali Road Km 006.40-009.60 S 3.2 4382 Zilla Overlay 50mm @ Cracking >25% 2013 9.19 0.104 1.171<br />

Z7617 Kaliganj-Vetkhali Road Km 009.70-011.30 S 1.6 4382 Zilla Overlay 50mm @ Cracking >25% 2013 4.59 0.103 0.580<br />

Z7617 Kaliganj-Vetkhali Road Km 0<strong>12</strong>.00-0<strong>12</strong>.20 S 0.2 4382 Zilla Overlay 50mm @ Cracking >25% 2013 0.57 0.<strong>12</strong>6 0.086<br />

Z7617 Kaliganj-Vetkhali Road Km 0<strong>12</strong>.70-013.20 S 0.5 4382 Zilla Overlay 50mm @ Cracking >25% 2013 1.44 0.303 0.533<br />

Z7617 Kaliganj-Vetkhali Road Km 014.10-014.20 S 0.1 4382 Zilla Overlay 50mm @ Cracking >25% 2013 0.29 0.254 0.087<br />

Z7617 Kaliganj-Vetkhali Road Km 014.30-014.80 S 0.5 4382 Zilla Overlay 50mm @ Cracking >25% 2013 1.44 0.221 0.378<br />

Z7617 Kaliganj-Vetkhali Road Km 014.90-015.60 S 0.7 4382 Zilla Overlay 50mm @ Cracking >25% 2013 2.02 0.995 2.535<br />

Z7617 Kaliganj-Vetkhali Road Km 0<strong>12</strong>.40-0<strong>12</strong>.50 S 0.1 4382 Zilla Overlay 50mm @ IRI 6-9 2013 0.29 0.842 0.296<br />

Sub-total Satkhira Division<br />

Total Khulna Zone<br />

Rajshahi Zone<br />

Naogaon Division<br />

Z5458 Matajihat-Chowmashia Road Km 000.00-001.30 S 1.3 180 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.81 0.269 2.259<br />

Z5458 Matajihat-Chowmashia Road Km 001.40-002.30 S 0.9 180 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.42 0.040 0.167<br />

Z5458 Matajihat-Chowmashia Road Km 002.80-006.44 S 3.64 180 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.74 0.000 0.000<br />

Z5464 Patnitala-Shibpur Road Km 007.80-008.40 S 0.6 <strong>12</strong>44 Zilla Carpet 40mm @ 1000-2000 2013 0.80 0.000 0.000<br />

Z5464 Patnitala-Shibpur Road Km 005.30-005.60 S 0.3 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.38 1.109 1.549<br />

Z5464 Patnitala-Shibpur Road Km 007.70-007.80 S 0.1 <strong>12</strong>44 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 1.759 0.864<br />

Z5472 Adamdighi-Raninagar Road Km 000.00-006.24 S 6.24 1153 Zilla Carpet 40mm @ 1000-2000 2013 9.85 0.000 0.000<br />

Z6810 M<strong>and</strong>a Thana link Road Km 000.50-000.90 S 0.4 1955 Zilla Carpet 40mm @ 1000-2000 2013 0.94 0.000 0.000<br />

Z6810 M<strong>and</strong>a Thana link Road Km 001.50-001.60 S 0.1 1955 Zilla Carpet 40mm @ 1000-2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z6810 M<strong>and</strong>a Thana link Road Km 000.00-000.50 S 0.5 1955 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.17 0.363 1.688<br />

Z6810 M<strong>and</strong>a Thana link Road Km 000.90-001.50 S 0.6 1955 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.41 0.374 2.085<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 017.90-018.00 S 0.1 <strong>12</strong>47 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.001 0.000<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 000.00-000.40 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.69 1.047 2.742<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 013.70-014.00 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 1.064 1.977<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 018.10-018.20 S 0.1 <strong>12</strong>47 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.109 0.062<br />

Z6852 M<strong>and</strong>a-Porsha Road Km 016.50-016.60 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.154 0.047<br />

Sub-total Naogaon Division<br />

26.52<br />

170.33<br />

589.29<br />

Appendix-E: Page: 44 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

NPV /<br />

Cost<br />

NPV<br />

Natore Division<br />

Z5208 Singra-Taras Road Km 000.00-000.30 S 0.3 348 Zilla Carpet 40mm @ Traff 100-1000 2013 0.51 0.050 0.027<br />

Z5211 Natore -Gurudaspur Road Km 002.00-005.00 S 3 1680 Zilla Carpet 40mm @ 1000-2000 2013 4.68 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 005.10-005.50 S 0.4 1680 Zilla Carpet 40mm @ 1000-2000 2013 0.62 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 005.50-005.80 S 0.3 1680 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 005.80-007.40 S 1.6 1680 Zilla Carpet 40mm @ 1000-2000 2013 2.50 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 007.40-008.20 S 0.8 1680 Zilla Carpet 40mm @ 1000-2000 2013 1.25 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 008.40-008.50 S 0.1 1680 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 008.50-010.00 S 1.5 1680 Zilla Carpet 40mm @ 1000-2000 2013 2.34 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 010.00-010.30 S 0.3 1680 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.009 0.005<br />

Z5211 Natore -Gurudaspur Road Km 010.30-0<strong>12</strong>.10 S 1.8 1680 Zilla Carpet 40mm @ 1000-2000 2013 2.81 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.1 1680 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 0<strong>12</strong>.50-0<strong>12</strong>.60 S 0.1 1680 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 013.18-013.30 S 0.13 567 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.20 0.175 0.102<br />

Z5211 Natore -Gurudaspur Road Km 020.50-020.80 S 0.3 567 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 013.30-013.40 S 0.1 567 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 013.40-014.20 S 0.8 567 Zilla Carpet 40mm @ Traff 100-1000 2013 1.25 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 014.20-020.30 S 6.1 567 Zilla Carpet 40mm @ Traff 100-1000 2013 9.52 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 028.79-030.72 S 1.92 567 Zilla Carpet 40mm @ Traff 100-1000 2013 3.30 0.000 0.000<br />

Z5211 Natore -Gurudaspur Road Km 005.00-005.10 S 0.1 1680 Zilla Seal Coat 2013 0.05 0.061 0.009<br />

Z5211 Natore -Gurudaspur Road Km 020.30-020.50 S 0.2 567 Zilla Seal Coat 2013 0.09 1.019 0.168<br />

Z6011 Lalpur -Natore Road Km 002.85-005.95 S 3.1 1730 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.49 1.448 31.506<br />

Z6011 Lalpur -Natore Road Km 018.05-019.35 S 1.3 1730 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.05 1.611 <strong>12</strong>.984<br />

Z6011 Lalpur -Natore Road Km 021.05-021.15 S 0.1 1063 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.610 0.339<br />

Z6014 Bonpara-Lalpur Road Km 007.90-010.60 S 2.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 6.33 1.256 31.883<br />

Z6014 Bonpara-Lalpur Road Km 0<strong>12</strong>.30-0<strong>12</strong>.80 S 0.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.17 1.168 5.489<br />

Z6014 Bonpara-Lalpur Road Km 010.60-010.70 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z6014 Bonpara-Lalpur Road Km 0<strong>12</strong>.00-0<strong>12</strong>.30 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z6014 Bonpara-Lalpur Road Km 0<strong>12</strong>.80-013.20 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.94 0.000 0.000<br />

Z6022 Ishwardi-Kadamchilan Road Km 015.22-015.34 S 0.<strong>12</strong> 1907 Zilla Carpet 40mm @ 1000-2000 2013 0.19 0.000 0.000<br />

Z6022 Ishwardi-Kadamchilan Road Km 015.34-016.84 S 1.5 1907 Zilla Carpet 40mm @ 1000-2000 2013 2.37 0.090 0.470<br />

Z6022 Ishwardi-Kadamchilan Road Km 016.84-016.94 S 0.1 1907 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.058 0.011<br />

Sub-total Natore Division<br />

50.94<br />

Nawabganj Division<br />

Z6802 Kansat-Rohonpur Road Km 014.90-018.09 S 3.19 1154 Zilla Carpet 40mm @ 1000-2000 2013 5.88 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 018.09-021.77 S 3.68 1154 Zilla Carpet 40mm @ 1000-2000 2013 5.81 0.000 0.000<br />

Appendix-E: Page: 45 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z6802 Kansat-Rohonpur Road Km 014.40-014.90 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.79 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 000.00-002.40 S 2.4 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 4.04 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 002.40-003.20 S 0.8 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 1.26 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 003.20-005.80 S 2.6 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 4.32 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 006.40-006.60 S 0.2 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 007.20-008.90 S 1.7 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 2.68 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 008.90-009.50 S 0.6 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 0.95 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 009.50-009.60 S 0.1 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 009.60-010.10 S 0.5 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 010.10-011.30 S 1.2 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 1.89 0.000 0.000<br />

Z6802 Kansat-Rohonpur Road Km 011.50-013.20 S 1.7 7<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 2.68 0.000 0.000<br />

Z6803 Nawabganj-Amnura Road Km 000.00-001.10 S 1.1 <strong>12</strong>76 Zilla Carpet 40mm @ 1000-2000 2013 2.58 0.000 0.000<br />

Z6803 Nawabganj-Amnura Road Km 001.10-008.40 S 7.3 <strong>12</strong>76 Zilla Carpet 40mm @ 1000-2000 2013 17.<strong>12</strong> 0.000 0.000<br />

Z6803 Nawabganj-Amnura Road Km 008.40-011.76 S 3.36 <strong>12</strong>76 Zilla Carpet 40mm @ 1000-2000 2013 7.88 0.000 0.000<br />

Z6805 Rahonpur-Bholahati Road Km 0<strong>12</strong>.93-015.02 S 2.09 <strong>12</strong>06 Zilla Carpet 40mm @ 1000-2000 2013 3.29 0.000 0.000<br />

Z6806 Nawabganj-Gomastapur Road Km 011.30-011.40 S 0.1 2209 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.539 0.507<br />

Z6806 Nawabganj-Gomastapur Road Km 000.90-003.30 S 2.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 5.79 0.000 0.000<br />

Z6806 Nawabganj-Gomastapur Road Km 005.60-006.70 S 1.1 2209 Zilla Carpet 40mm @ Traff >=2000 2013 2.58 0.000 0.000<br />

Z6806 Nawabganj-Gomastapur Road Km 007.30-007.40 S 0.1 2209 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z6806 Nawabganj-Gomastapur Road Km 007.70-008.20 S 0.5 2209 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 0.000 0.000<br />

Z6806 Nawabganj-Gomastapur Road Km 010.00-010.70 S 0.7 2209 Zilla Carpet 40mm @ Traff >=2000 2013 1.64 0.000 0.000<br />

Z6806 Nawabganj-Gomastapur Road Km 010.90-011.30 S 0.4 2209 Zilla Carpet 40mm @ Traff >=2000 2013 0.78 0.000 0.000<br />

Z6816 Shibganj By-Pass Road Km 000.00-000.30 S 0.3 1781 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 0.553 1.701<br />

Z6816 Shibganj By-Pass Road Km 000.50-001.80 S 1.3 1781 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.33 0.370 4.936<br />

Z6816 Shibganj By-Pass Road Km 002.60-004.40 S 1.8 1781 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.61 0.408 7.5<strong>23</strong><br />

Z6816 Shibganj By-Pass Road Km 004.50-004.60 S 0.1 1781 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.26 0.532 0.546<br />

Z6818 Baragaria-Jadabpur Road Km 000.00-000.20 S 0.2 661 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.65 0.000 0.000<br />

Z6818 Baragaria-Jadabpur Road Km 001.00-001.40 S 0.4 661 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.226 0.426<br />

Z6818 Baragaria-Jadabpur Road Km 000.20-000.50 S 0.3 661 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z6818 Baragaria-Jadabpur Road Km 000.90-001.00 S 0.1 661 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z6818 Baragaria-Jadabpur Road Km 001.40-001.50 S 0.1 661 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Sub-total Nawabganj Division<br />

85.92<br />

Pabna Division<br />

Z6006 Baneswar-Ishwardi Road Km 050.31-054.91 S 4.6 3091 Zilla Carpet 40mm @ Traff >=2000 2013 14.69 0.000 0.000<br />

Z6017 Chinakhora-Santhia Road Km 001.33-001.73 S 0.4 785 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.62 0.000 0.000<br />

Z6017 Chinakhora-Santhia Road Km 010.53-011.03 S 0.5 785 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.78 0.179 0.417<br />

Z6021 Chatmohor-Bagabari Road Km 006.70-007.30 S 0.6 1832 Zilla Carpet 40mm @ 1000-2000 2013 1.59 0.000 0.000<br />

Appendix-E: Page: 46 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z6021 Chatmohor-Bagabari Road Km 015.50-015.70 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.53 1.086 2.110<br />

Z6021 Chatmohor-Bagabari Road Km 020.50-021.00 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.32 0.000 0.000<br />

Z6022 Ishwardi-Kadamchilan Road Km 000.00-004.00 S 4 1907 Zilla Carpet 40mm @ 1000-2000 2013 9.<strong>23</strong> 0.000 0.000<br />

Z6024 Chinakhora -Sujanagar Road Km 000.00-002.10 S 2.1 1881 Zilla Carpet 40mm @ 1000-2000 2013 3.22 0.000 0.000<br />

Z6026 Madhpur-Santhia-Bera Road Km 003.50-003.80 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.73 0.000 0.000<br />

Z6026 Madhpur-Santhia-Bera Road Km 007.70-010.20 S 2.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 6.08 0.000 0.000<br />

Z6026 Madhpur-Santhia-Bera Road Km 010.20-010.60 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.97 0.000 0.000<br />

Z6026 Madhpur-Santhia-Bera Road Km 019.00-019.10 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.24 0.113 0.033<br />

Z6026 Madhpur-Santhia-Bera Road Km 019.30-019.50 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.49 0.000 0.000<br />

Z6029 Baraigram -Chatmohor Road Km 015.00-017.20 S 2.2 1155 Zilla Carpet 40mm @ 1000-2000 2013 3.38 0.000 0.000<br />

Z6029 Baraigram -Chatmohor Road Km 017.20-018.47 S 1.27 1155 Zilla Carpet 40mm @ 1000-2000 2013 1.95 0.000 0.000<br />

Sub-total Pabna Division<br />

45.82<br />

Rajshahi Division<br />

Z6004 Puthia-Bagmara Road Km 000.10-000.40 S 0.3 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.375 0.661<br />

Z6004 Puthia-Bagmara Road Km 000.50-000.70 S 0.2 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.291 0.290<br />

Z6004 Puthia-Bagmara Road Km 000.80-001.70 S 0.9 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.38 0.257 1.062<br />

Z6004 Puthia-Bagmara Road Km 001.80-002.80 S 1 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.311 1.545<br />

Z6004 Puthia-Bagmara Road Km 003.10-003.50 S 0.4 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 0.355 0.768<br />

Z6004 Puthia-Bagmara Road Km 003.60-004.10 S 0.5 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 0.344 1.013<br />

Z6004 Puthia-Bagmara Road Km 004.70-004.90 S 0.2 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.5<strong>12</strong> 0.602<br />

Z6004 Puthia-Bagmara Road Km 005.50-006.50 S 1 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.343 1.702<br />

Z6004 Puthia-Bagmara Road Km 006.70-007.70 S 1 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.293 1.456<br />

Z6004 Puthia-Bagmara Road Km 008.30-008.70 S 0.4 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.61 0.344 0.682<br />

Z6004 Puthia-Bagmara Road Km 010.70-011.30 S 0.6 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.92 0.368 1.192<br />

Z6004 Puthia-Bagmara Road Km 011.70-011.90 S 0.2 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.334 0.393<br />

Z6004 Puthia-Bagmara Road Km 013.00-013.10 S 0.1 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.269 0.1<strong>23</strong><br />

Z6004 Puthia-Bagmara Road Km 013.30-013.40 S 0.1 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.446 0.222<br />

Z6004 Puthia-Bagmara Road Km 013.50-013.70 S 0.2 802 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.387 0.418<br />

Z6004 Puthia-Bagmara Road Km 018.80-018.90 S 0.1 725 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.089 0.041<br />

Z6004 Puthia-Bagmara Road Km 022.20-022.30 S 0.1 725 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.215 0.116<br />

Z6004 Puthia-Bagmara Road Km 022.50-022.70 S 0.2 725 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.249 0.228<br />

Z6004 Puthia-Bagmara Road Km 0<strong>23</strong>.10-0<strong>23</strong>.20 S 0.1 725 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.217 0.117<br />

Z6004 Puthia-Bagmara Road Km 0<strong>23</strong>.60-0<strong>23</strong>.70 S 0.1 725 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.217 0.117<br />

Z6004 Puthia-Bagmara Road Km 024.70-024.80 S 0.1 725 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.245 0.1<strong>12</strong><br />

Z6004 Puthia-Bagmara Road Km 024.90-025.00 S 0.1 725 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.215 0.116<br />

Z6004 Puthia-Bagmara Road Km 001.70-001.80 S 0.1 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.067 0.011<br />

Z6004 Puthia-Bagmara Road Km 002.80-003.10 S 0.3 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.46 0.000 0.000<br />

Appendix-E: Page: 47 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z6004 Puthia-Bagmara Road Km 003.50-003.60 S 0.1 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 004.10-004.70 S 0.6 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.92 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 004.90-005.50 S 0.6 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.92 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 006.50-006.70 S 0.2 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 007.70-008.30 S 0.6 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.92 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 009.30-009.50 S 0.2 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 010.30-010.70 S 0.4 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.61 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 011.30-011.70 S 0.4 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.61 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 011.90-0<strong>12</strong>.10 S 0.2 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 0<strong>12</strong>.40-013.00 S 0.6 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.92 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 013.10-013.30 S 0.2 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 013.40-013.50 S 0.1 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 013.70-014.00 S 0.3 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.46 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 014.10-015.80 S 1.7 802 Zilla Carpet 40mm @ Traff 100-1000 2013 2.61 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 015.90-016.40 S 0.5 802 Zilla Carpet 40mm @ Traff 100-1000 2013 0.77 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 016.50-018.80 S 2.3 736 Zilla Carpet 40mm @ Traff 100-1000 2013 3.53 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 019.50-019.90 S 0.4 725 Zilla Carpet 40mm @ Traff 100-1000 2013 0.61 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 019.90-022.20 S 2.3 725 Zilla Carpet 40mm @ Traff 100-1000 2013 3.53 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 025.00-025.55 S 0.55 725 Zilla Carpet 40mm @ Traff 100-1000 2013 0.84 0.000 0.000<br />

Z6004 Puthia-Bagmara Road Km 000.00-000.10 S 0.1 802 Zilla Seal Coat 2013 0.05 1.378 0.1<strong>12</strong><br />

Z6004 Puthia-Bagmara Road Km 000.40-000.50 S 0.1 802 Zilla Seal Coat 2013 0.05 1.328 0.108<br />

Z6004 Puthia-Bagmara Road Km 000.70-000.80 S 0.1 802 Zilla Seal Coat 2013 0.05 1.701 0.138<br />

Z6004 Puthia-Bagmara Road Km 008.70-009.00 S 0.3 802 Zilla Seal Coat 2013 0.14 0.918 0.224<br />

Z6004 Puthia-Bagmara Road Km 009.20-009.30 S 0.1 802 Zilla Seal Coat 2013 0.05 1.444 0.<strong>12</strong>4<br />

Z6004 Puthia-Bagmara Road Km 009.50-010.10 S 0.6 802 Zilla Seal Coat 2013 0.28 0.491 0.253<br />

Z6005 Shibpur-Taherpur Road Km 002.20-002.30 S 0.1 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 002.30-003.50 S 1.2 1943 Zilla Carpet 40mm @ 1000-2000 2013 1.98 0.102 0.445<br />

Z6005 Shibpur-Taherpur Road Km 003.50-004.70 S 1.2 1943 Zilla Carpet 40mm @ 1000-2000 2013 1.87 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 004.70-005.10 S 0.4 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.71 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 005.10-005.60 S 0.5 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.77 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 005.90-006.20 S 0.3 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.46 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 006.60-007.20 S 0.6 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.92 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 007.30-009.00 S 1.7 1943 Zilla Carpet 40mm @ 1000-2000 2013 3.36 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 009.10-009.20 S 0.1 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 009.50-009.60 S 0.1 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 009.60-009.90 S 0.3 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.52 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 009.90-010.20 S 0.3 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.46 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 0<strong>12</strong>.70-015.60 S 2.9 1943 Zilla Carpet 40mm @ 1000-2000 2013 4.45 0.<strong>12</strong>1 1.184<br />

Appendix-E: Page: 48 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z6005 Shibpur-Taherpur Road Km 019.30-019.50 S 0.2 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 019.70-019.80 S 0.1 1943 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 020.60-022.77 S 2.17 1943 Zilla Carpet 40mm @ 1000-2000 2013 3.44 0.000 0.000<br />

Z6005 Shibpur-Taherpur Road Km 002.10-002.20 S 0.1 1943 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.799 0.426<br />

Z6005 Shibpur-Taherpur Road Km 015.60-015.80 S 0.2 1943 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.729 0.778<br />

Z6005 Shibpur-Taherpur Road Km 016.10-019.20 S 3.1 1943 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.76 0.702 10.679<br />

Z6005 Shibpur-Taherpur Road Km 019.20-019.30 S 0.1 1943 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.389 0.226<br />

Z6005 Shibpur-Taherpur Road Km 019.80-020.60 S 0.8 1943 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.<strong>23</strong> 0.369 1.715<br />

Z6006 Baneswar-Ishwardi Road Km 001.20-001.30 S 0.1 3085 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.205 1.141<br />

Z6006 Baneswar-Ishwardi Road Km 002.50-002.90 S 0.4 3085 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 1.088 3.775<br />

Z6006 Baneswar-Ishwardi Road Km 007.00-007.80 S 0.8 3085 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.88 0.691 4.793<br />

Z6006 Baneswar-Ishwardi Road Km 028.01-028.21 S 0.2 <strong>12</strong>54 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.406 0.733<br />

Z6006 Baneswar-Ishwardi Road Km 028.41-028.51 S 0.1 <strong>12</strong>54 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.652 0.588<br />

Z6019 Puthia-Arani-Bagha Road Km 003.21-006.81 S 3.6 1709 Zilla Carpet 40mm @ 1000-2000 2013 6.14 0.000 0.000<br />

Z6019 Puthia-Arani-Bagha Road Km 008.51-010.54 S 2.03 1709 Zilla Carpet 40mm @ 1000-2000 2013 3.46 0.000 0.000<br />

Z6019 Puthia-Arani-Bagha Road Km 010.54-015.81 S 5.27 803 Zilla Carpet 40mm @ Traff 100-1000 2013 8.99 0.000 0.000<br />

Z6020 Arani-Bagatipara Road Km 000.70-000.80 S 0.1 755 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.352 0.175<br />

Z6020 Arani-Bagatipara Road Km 006.90-007.80 S 0.9 755 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.34 0.391 1.569<br />

Z6020 Arani-Bagatipara Road Km 008.80-008.90 S 0.1 755 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.444 0.254<br />

Z6020 Arani-Bagatipara Road Km 009.20-009.58 S 0.38 755 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.56 0.362 0.782<br />

Z6020 Arani-Bagatipara Road Km 000.60-000.70 S 0.1 755 Zilla Carpet 40mm @ Traff 100-1000 2013 0.15 0.000 0.000<br />

Z6020 Arani-Bagatipara Road Km 005.10-006.60 S 1.5 755 Zilla Carpet 40mm @ Traff 100-1000 2013 2.30 0.000 0.000<br />

Z6020 Arani-Bagatipara Road Km 008.90-009.20 S 0.3 755 Zilla Carpet 40mm @ Traff 100-1000 2013 0.45 0.000 0.000<br />

Z6020 Arani-Bagatipara Road Km 001.80-001.88 S 0.08 755 Zilla Seal Coat 2013 0.04 1.890 0.116<br />

Z6020 Arani-Bagatipara Road Km 005.00-005.10 S 0.1 755 Zilla Seal Coat 2013 0.05 2.036 0.160<br />

Z6020 Arani-Bagatipara Road Km 006.60-006.90 S 0.3 755 Zilla Seal Coat 2013 0.14 0.991 0.<strong>23</strong>1<br />

Z6851 Mohanpur-Tanor Road Km 000.00-000.90 S 0.9 2822 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.95 0.833 6.130<br />

Z6851 Mohanpur-Tanor Road Km 001.20-001.40 S 0.2 2822 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.48 0.692 1.321<br />

Z6851 Mohanpur-Tanor Road Km 001.60-003.60 S 2 2822 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.16 0.692 8.263<br />

Z6851 Mohanpur-Tanor Road Km 004.40-004.80 S 0.4 2822 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.722 1.584<br />

Z6851 Mohanpur-Tanor Road Km 001.40-001.60 S 0.2 2822 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 1.577 0.725<br />

Z6851 Mohanpur-Tanor Road Km 003.60-004.40 S 0.8 2822 Zilla Carpet 40mm @ Traff >=2000 2013 1.26 1.941 3.572<br />

Z6851 Mohanpur-Tanor Road Km 010.31-0<strong>12</strong>.05 S 1.74 2822 Zilla Carpet 40mm @ Traff >=2000 2013 4.09 0.387 2.621<br />

Z6855 Bagshara-Gunigram Road Km 000.30-000.40 S 0.1 401 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z6855 Bagshara-Gunigram Road Km 000.80-001.90 S 1.1 401 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.74 0.000 0.000<br />

Z6855 Bagshara-Gunigram Road Km 003.60-003.70 S 0.1 401 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z6855 Bagshara-Gunigram Road Km 005.90-008.00 S 2.1 401 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.31 0.000 0.000<br />

Z6855 Bagshara-Gunigram Road Km 014.00-015.70 S 1.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.68 0.960 10.107<br />

Appendix-E: Page: 49 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z6855 Bagshara-Gunigram Road Km 019.40-021.00 S 1.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.52 0.963 9.547<br />

Z6855 Bagshara-Gunigram Road Km 021.80-0<strong>23</strong>.60 S 1.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.27 0.951 11.759<br />

Z6855 Bagshara-Gunigram Road Km 015.70-015.80 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z6855 Bagshara-Gunigram Road Km 018.50-018.90 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.63 0.000 0.000<br />

Z6855 Bagshara-Gunigram Road Km 005.00-005.10 S 0.1 401 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.222 0.036<br />

Z6855 Bagshara-Gunigram Road Km 005.10-005.70 S 0.6 401 Zilla Carpet 40mm @ Traff 100-1000 2013 0.95 0.000 0.000<br />

Sub-total Rajshahi Division<br />

113.98<br />

Sirajganj Division<br />

Z5042 Sirajganj-Raiganj Road Km 006.60-006.80 S 0.2 2865 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.636 0.751<br />

Z5042 Sirajganj-Raiganj Road Km 011.00-011.60 S 0.6 2865 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.00 0.732 2.337<br />

Z5042 Sirajganj-Raiganj Road Km 013.80-014.00 S 0.2 2865 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.33 0.675 0.779<br />

Z5042 Sirajganj-Raiganj Road Km 017.50-017.70 S 0.2 2865 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.33 0.579 0.616<br />

Z5042 Sirajganj-Raiganj Road Km 001.20-002.<strong>12</strong> S 0.92 2865 Zilla Carpet 40mm @ Traff >=2000 2013 1.43 0.733 1.314<br />

Z5042 Sirajganj-Raiganj Road Km 002.42-003.04 S 0.62 2865 Zilla Carpet 40mm @ Traff >=2000 2013 0.97 0.8<strong>12</strong> 1.017<br />

Z5042 Sirajganj-Raiganj Road Km 006.50-006.60 S 0.1 2865 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z5042 Sirajganj-Raiganj Road Km 006.80-007.10 S 0.3 2865 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.085 0.044<br />

Z5042 Sirajganj-Raiganj Road Km 007.50-010.20 S 2.7 2865 Zilla Carpet 40mm @ Traff >=2000 2013 4.49 0.304 1.537<br />

Z5042 Sirajganj-Raiganj Road Km 010.20-011.00 S 0.8 2865 Zilla Carpet 40mm @ Traff >=2000 2013 1.33 0.965 1.796<br />

Z5042 Sirajganj-Raiganj Road Km 011.60-0<strong>12</strong>.20 S 0.6 2865 Zilla Carpet 40mm @ Traff >=2000 2013 1.00 0.416 0.491<br />

Z5042 Sirajganj-Raiganj Road Km 013.20-013.80 S 0.6 2865 Zilla Carpet 40mm @ Traff >=2000 2013 1.00 0.962 1.342<br />

Z5042 Sirajganj-Raiganj Road Km 014.00-015.10 S 1.1 2865 Zilla Carpet 40mm @ Traff >=2000 2013 1.83 1.045 2.673<br />

Z5042 Sirajganj-Raiganj Road Km 015.60-017.50 S 1.9 2865 Zilla Carpet 40mm @ Traff >=2000 2013 3.16 0.886 4.082<br />

Z5042 Sirajganj-Raiganj Road Km 017.70-018.00 S 0.3 2865 Zilla Carpet 40mm @ Traff >=2000 2013 0.50 0.703 0.557<br />

Z5042 Sirajganj-Raiganj Road Km 018.30-020.10 S 1.8 2865 Zilla Carpet 40mm @ Traff >=2000 2013 2.99 0.720 3.016<br />

Z5042 Sirajganj-Raiganj Road Km 020.40-021.43 S 1.03 2865 Zilla Carpet 40mm @ Traff >=2000 2013 1.71 0.499 0.985<br />

Z5046 Ullahpara-Taras Road Km 000.90-001.10 S 0.2 1858 Zilla Carpet 40mm @ 1000-2000 2013 0.31 0.000 0.000<br />

Z5046 Ullahpara-Taras Road Km 000.10-000.90 S 0.8 1858 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.25 0.573 2.708<br />

Z5046 Ullahpara-Taras Road Km 001.10-003.40 S 2.3 1858 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.59 0.337 4.573<br />

Z5046 Ullahpara-Taras Road Km 003.60-003.80 S 0.2 1858 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.366 0.432<br />

Z5046 Ullahpara-Taras Road Km 007.70-008.36 S 0.66 1858 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.03 0.544 2.114<br />

Z5046 Ullahpara-Taras Road Km 000.00-000.10 S 0.1 1858 Zilla Seal Coat 2013 0.05 0.772 0.100<br />

Z5047 Shahazadpur-Chauhali Road Km 002.10-002.20 S 0.1 1001 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5047 Shahazadpur-Chauhali Road Km 002.20-002.60 S 0.4 1001 Zilla Carpet 40mm @ 1000-2000 2013 0.63 0.000 0.000<br />

Z5047 Shahazadpur-Chauhali Road Km 002.70-003.70 S 1 1001 Zilla Carpet 40mm @ 1000-2000 2013 1.58 0.000 0.000<br />

Z5047 Shahazadpur-Chauhali Road Km 005.20-005.30 S 0.1 1001 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.084 0.014<br />

Z5047 Shahazadpur-Chauhali Road Km 000.44-000.50 S 0.06 1001 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.10 0.475 0.187<br />

Z5047 Shahazadpur-Chauhali Road Km 005.30-008.70 S 3.4 1001 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.37 0.342 7.038<br />

Appendix-E: Page: 50 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5047 Shahazadpur-Chauhali Road Km 009.00-009.10 S 0.1 1001 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.427 0.258<br />

Z5047 Shahazadpur-Chauhali Road Km 009.30-009.50 S 0.2 1001 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.169 0.159<br />

Z5047 Shahazadpur-Chauhali Road Km 009.80-010.28 S 0.48 1001 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.76 0.348 1.013<br />

Z5049 Taras-Raniraht-Sherpur Road Km 001.10-002.40 S 1.3 815 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.05 0.000 0.000<br />

Z5049 Taras-Raniraht-Sherpur Road Km 010.20-010.40 S 0.2 815 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.257 0.243<br />

Z5049 Taras-Raniraht-Sherpur Road Km 013.20-013.40 S 0.2 815 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.295 0.279<br />

Z5049 Taras-Raniraht-Sherpur Road Km 014.17-016.00 S 1.84 815 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.91 0.000 0.000<br />

Z5049 Taras-Raniraht-Sherpur Road Km 000.30-000.80 S 0.5 815 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z5049 Taras-Raniraht-Sherpur Road Km 000.80-001.10 S 0.3 815 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z5049 Taras-Raniraht-Sherpur Road Km 002.40-003.20 S 0.8 815 Zilla Carpet 40mm @ Traff 100-1000 2013 1.26 0.000 0.000<br />

Z5049 Taras-Raniraht-Sherpur Road Km 005.90-006.00 S 0.1 815 Zilla Carpet 40mm @ Traff 100-1000 2013 0.13 0.000 0.000<br />

Z5049 Taras-Raniraht-Sherpur Road Km 006.00-008.30 S 2.3 815 Zilla Carpet 40mm @ Traff 100-1000 2013 3.46 0.000 0.000<br />

Z5402 Sirajganj-Samespur Road Km 000.00-000.20 S 0.2 1578 Zilla Carpet 40mm @ 1000-2000 2013 0.65 0.343 0.262<br />

Z5402 Sirajganj-Samespur Road Km 000.50-000.60 S 0.1 1578 Zilla Carpet 40mm @ 1000-2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z5402 Sirajganj-Samespur Road Km 000.80-001.10 S 0.3 1578 Zilla Carpet 40mm @ 1000-2000 2013 0.70 0.000 0.000<br />

Z5402 Sirajganj-Samespur Road Km 001.80-003.10 S 1.3 1578 Zilla Carpet 40mm @ 1000-2000 2013 3.05 0.000 0.000<br />

Z5402 Sirajganj-Samespur Road Km 000.20-000.50 S 0.3 1578 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.661 1.846<br />

Z5402 Sirajganj-Samespur Road Km 000.60-000.80 S 0.2 1578 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.857 1.595<br />

Z5402 Sirajganj-Samespur Road Km 006.60-006.90 S 0.3 1578 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.97 0.536 2.069<br />

Z5402 Sirajganj-Samespur Road Km 007.00-007.20 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 0.165 0.100<br />

Z5402 Sirajganj-Samespur Road Km 007.30-011.57 S 4.27 2146 Zilla Carpet 40mm @ Traff >=2000 2013 6.66 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 001.79-003.89 S 2.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 3.31 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 004.09-004.59 S 0.5 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 004.59-005.69 S 1.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 1.74 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 005.69-006.09 S 0.4 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 006.09-006.29 S 0.2 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.021 0.007<br />

Z5404 Sirajganj -Dhunat Road Km 006.29-006.39 S 0.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 006.39-006.49 S 0.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.<strong>23</strong>7 0.039<br />

Z5404 Sirajganj -Dhunat Road Km 006.49-006.59 S 0.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 006.59-006.69 S 0.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.220 0.036<br />

Z5404 Sirajganj -Dhunat Road Km 006.69-007.09 S 0.4 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 007.09-007.39 S 0.3 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 007.39-007.49 S 0.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 007.49-008.19 S 0.7 853 Zilla Carpet 40mm @ Traff 100-1000 2013 1.10 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 008.19-008.99 S 0.8 853 Zilla Carpet 40mm @ Traff 100-1000 2013 1.26 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 008.99-009.09 S 0.1 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 009.09-009.29 S 0.2 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 009.29-009.89 S 0.6 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.94 0.000 0.000<br />

Appendix-E: Page: 51 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5404 Sirajganj -Dhunat Road Km 010.91-014.19 S 3.28 853 Zilla Carpet 40mm @ Traff 100-1000 2013 5.18 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 014.19-014.79 S 0.6 853 Zilla Carpet 40mm @ Traff 100-1000 2013 0.95 0.000 0.000<br />

Z5404 Sirajganj -Dhunat Road Km 014.79-015.02 S 0.<strong>23</strong> 853 Zilla Seal Coat 2013 0.11 1.057 0.200<br />

Z5408 Kadda-Belkuchi Road Km 000.00-000.10 S 0.1 327 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z5408 Kadda-Belkuchi Road Km 000.20-000.30 S 0.1 327 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.000 0.000<br />

Z5408 Kadda-Belkuchi Road Km 003.30-003.90 S 0.6 327 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.90 0.000 0.000<br />

Z5408 Kadda-Belkuchi Road Km 005.30-005.50 S 0.2 327 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.27 0.000 0.000<br />

Z5408 Kadda-Belkuchi Road Km 005.60-005.70 S 0.1 327 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.14 0.039 0.019<br />

Z5408 Kadda-Belkuchi Road Km 005.80-005.90 S 0.1 327 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.14 0.034 0.016<br />

Z5408 Kadda-Belkuchi Road Km 001.50-001.80 S 0.3 327 Zilla Carpet 40mm @ Traff 100-1000 2013 0.47 0.000 0.000<br />

Z5408 Kadda-Belkuchi Road Km 003.90-005.30 S 1.4 327 Zilla Carpet 40mm @ Traff 100-1000 2013 1.91 0.000 0.000<br />

Z5408 Kadda-Belkuchi Road Km 005.50-005.60 S 0.1 327 Zilla Carpet 40mm @ Traff 100-1000 2013 0.14 0.000 0.000<br />

Z5408 Kadda-Belkuchi Road Km 000.10-000.20 S 0.1 327 Zilla Seal Coat 2013 0.05 0.136 0.025<br />

Z5408 Kadda-Belkuchi Road Km 000.30-000.60 S 0.3 327 Zilla Seal Coat 2013 0.14 0.949 0.215<br />

Z5408 Kadda-Belkuchi Road Km 001.00-001.50 S 0.5 327 Zilla Seal Coat 2013 0.<strong>23</strong> 0.565 0.214<br />

Z5408 Kadda-Belkuchi Road Km 002.60-003.30 S 0.7 327 Zilla Seal Coat 2013 0.33 0.827 0.9<strong>12</strong><br />

Z5408 Kadda-Belkuchi Road Km 005.70-005.80 S 0.1 327 Zilla Seal Coat 2013 0.04 1.298 0.094<br />

Z5408 Kadda-Belkuchi Road Km 005.90-007.96 S 2.06 327 Zilla Seal Coat 2013 0.84 0.614 0.836<br />

Z5410 Enayetpur-Shahazadpur Road Km 007.20-010.40 S 3.2 1426 Zilla Carpet 40mm @ 1000-2000 2013 4.93 0.000 0.000<br />

Z5410 Enayetpur-Shahazadpur Road Km 000.30-000.50 S 0.2 1426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.173 0.166<br />

Z5410 Enayetpur-Shahazadpur Road Km 004.10-004.20 S 0.1 1426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.333 0.153<br />

Z5410 Enayetpur-Shahazadpur Road Km 013.80-013.90 S 0.1 1426 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 0.180 0.100<br />

Z6032 Taras-Hamkuria Road Km 000.00-000.30 S 0.3 1<strong>12</strong>5 Zilla Carpet 40mm @ 1000-2000 2013 0.39 0.000 0.000<br />

Z6032 Taras-Hamkuria Road Km 000.30-000.90 S 0.6 1<strong>12</strong>5 Zilla Carpet 40mm @ 1000-2000 2013 0.77 0.000 0.000<br />

Z6032 Taras-Hamkuria Road Km 000.90-001.31 S 0.41 1<strong>12</strong>5 Zilla Carpet 40mm @ 1000-2000 2013 0.53 0.000 0.000<br />

Z6032 Taras-Hamkuria Road Km 001.90-002.00 S 0.1 1<strong>12</strong>5 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z6032 Taras-Hamkuria Road Km 003.50-003.60 S 0.1 1<strong>12</strong>5 Zilla Carpet 40mm @ 1000-2000 2013 0.15 0.000 0.000<br />

Z6032 Taras-Hamkuria Road Km 006.17-009.99 S 3.82 1<strong>12</strong>5 Zilla Carpet 40mm @ 1000-2000 2013 5.86 0.000 0.000<br />

Z6032 Taras-Hamkuria Road Km 001.82-001.90 S 0.08 1<strong>12</strong>5 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 0.<strong>23</strong>7 0.092<br />

Z6032 Taras-Hamkuria Road Km 002.00-002.60 S 0.6 1<strong>12</strong>5 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.92 0.384 1.358<br />

Z6032 Taras-Hamkuria Road Km 003.20-003.50 S 0.3 1<strong>12</strong>5 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 0.405 0.716<br />

Z6032 Taras-Hamkuria Road Km 002.60-003.20 S 0.6 1<strong>12</strong>5 Zilla Seal Coat 2013 0.28 0.029 0.017<br />

Sub-total Sirajganj Division<br />

Total Rajshahi Zone<br />

Rangpur Zone<br />

Bogra Division<br />

105.03<br />

428.<strong>23</strong><br />

Appendix-E: Page: 52 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 006.18-006.38 S 0.2 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 006.38-006.98 S 0.6 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 006.98-007.08 S 0.1 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 007.18-007.28 S 0.1 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 008.08-008.18 S 0.1 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 008.98-009.38 S 0.4 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.63 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 009.38-009.68 S 0.3 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 009.68-009.98 S 0.3 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 009.98-0<strong>12</strong>.38 S 2.4 1809 Zilla Carpet 40mm @ 1000-2000 2013 3.79 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 0<strong>12</strong>.38-0<strong>12</strong>.78 S 0.4 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.63 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 0<strong>12</strong>.78-013.08 S 0.3 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 014.28-014.88 S 0.6 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 014.88-015.08 S 0.2 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 015.08-015.68 S 0.6 1809 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 007.08-007.18 S 0.1 1809 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.675 0.403<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 015.68-016.89 S 1.21 1809 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.90 0.274 1.538<br />

Z5034 Sherpur-N<strong>and</strong>igram Road Km 013.08-013.18 S 0.1 1809 Zilla Seal Coat 2013 0.05 0.402 0.041<br />

Z5040 Sultanganj -Gabtali Road Km 001.20-001.40 S 0.2 <strong>23</strong>63 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z5040 Sultanganj -Gabtali Road Km 003.20-003.50 S 0.3 <strong>23</strong>63 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Z5040 Sultanganj -Gabtali Road Km 004.60-005.00 S 0.4 <strong>23</strong>63 Zilla Carpet 40mm @ Traff >=2000 2013 0.94 0.000 0.000<br />

Z5040 Sultanganj -Gabtali Road Km 005.00-005.60 S 0.6 <strong>23</strong>63 Zilla Carpet 40mm @ Traff >=2000 2013 1.41 0.000 0.000<br />

Z5040 Sultanganj -Gabtali Road Km 005.60-008.48 S 2.88 <strong>23</strong>63 Zilla Carpet 40mm @ Traff >=2000 2013 6.30 0.000 0.000<br />

Z5053 Kahalu Thana Connecting Road Km 007.60-008.50 S 0.9 3222 Zilla Carpet 40mm @ Cracks >25% 2013 1.27 0.013 0.018<br />

Z5053 Kahalu Thana Connecting Road Km 001.70-002.50 S 0.8 3222 Zilla Carpet 40mm @ Traff >=2000 2013 1.43 1.780 3.891<br />

Z5053 Kahalu Thana Connecting Road Km 002.50-004.10 S 1.6 3222 Zilla Carpet 40mm @ Traff >=2000 2013 2.63 0.559 1.906<br />

Z5053 Kahalu Thana Connecting Road Km 004.70-005.30 S 0.6 3222 Zilla Carpet 40mm @ Traff >=2000 2013 0.95 0.633 0.806<br />

Z5053 Kahalu Thana Connecting Road Km 005.90-006.80 S 0.9 3222 Zilla Carpet 40mm @ Traff >=2000 2013 1.35 0.584 1.027<br />

Z5053 Kahalu Thana Connecting Road Km 008.50-009.30 S 0.8 3222 Zilla Carpet 40mm @ Traff >=2000 2013 1.13 1.196 2.054<br />

Z5053 Kahalu Thana Connecting Road Km 009.30-010.10 S 0.8 3222 Zilla Carpet 40mm @ Traff >=2000 2013 1.13 0.983 1.613<br />

Z5071 Borobila-V<strong>and</strong>erbari Road Km 000.00-004.40 S 4.4 943 Zilla Carpet 40mm @ Traff 100-1000 2013 7.02 0.402 5.822<br />

Z5072 Dhunot-Mokamtala Road Km 024.83-028.43 S 3.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 6.34 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 033.43-034.83 S 1.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.97 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 036.13-039.<strong>23</strong> S 3.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 6.37 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 039.33-051.46 S <strong>12</strong>.13 2146 Zilla Carpet 40mm @ Traff >=2000 2013 28.34 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 004.80-004.90 S 0.1 467 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 004.90-005.30 S 0.4 467 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.114 0.071<br />

Z5072 Dhunot-Mokamtala Road Km 005.30-005.50 S 0.2 467 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 005.50-005.70 S 0.2 467 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Appendix-E: Page: 53 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5072 Dhunot-Mokamtala Road Km 005.70-006.60 S 0.9 467 Zilla Carpet 40mm @ Traff 100-1000 2013 1.42 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 006.60-007.50 S 0.9 467 Zilla Carpet 40mm @ Traff 100-1000 2013 1.42 0.000 0.000<br />

Z5072 Dhunot-Mokamtala Road Km 007.50-008.30 S 0.8 467 Zilla Carpet 40mm @ Traff 100-1000 2013 1.26 0.097 0.<strong>12</strong>1<br />

Z5072 Dhunot-Mokamtala Road Km 008.30-008.80 S 0.5 467 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z5207 N<strong>and</strong>igram -Raninagar Road Km 001.90-004.00 S 2.1 951 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.31 0.183 2.133<br />

Z5207 N<strong>and</strong>igram -Raninagar Road Km 005.20-005.80 S 0.6 <strong>12</strong>84 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 0.185 0.634<br />

Z5207 N<strong>and</strong>igram -Raninagar Road Km 006.10-007.50 S 1.4 <strong>12</strong>84 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.21 0.253 2.203<br />

Z5207 N<strong>and</strong>igram -Raninagar Road Km 000.00-000.40 S 0.4 951 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z5207 N<strong>and</strong>igram -Raninagar Road Km 000.40-000.60 S 0.2 951 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 002.00-003.00 S 1 1068 Zilla Carpet 40mm @ 1000-2000 2013 1.58 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 005.50-005.60 S 0.1 1068 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 005.70-005.90 S 0.2 1068 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 006.30-006.50 S 0.2 1068 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 007.30-007.40 S 0.1 1068 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 007.50-008.10 S 0.6 1068 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 008.10-008.50 S 0.4 1068 Zilla Carpet 40mm @ 1000-2000 2013 0.63 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 008.70-010.11 S 1.41 1068 Zilla Carpet 40mm @ 1000-2000 2013 2.<strong>23</strong> 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 001.00-001.50 S 0.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 1.014 3.142<br />

Z5459 Nasratpur-Beragram Road Km 003.00-005.50 S 2.5 1068 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.94 0.<strong>23</strong>1 2.788<br />

Z5459 Nasratpur-Beragram Road Km 005.60-005.70 S 0.1 1068 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.186 0.103<br />

Z5459 Nasratpur-Beragram Road Km 005.90-006.30 S 0.4 1068 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.094 0.210<br />

Z5459 Nasratpur-Beragram Road Km 006.50-007.30 S 0.8 1068 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.26 0.225 0.869<br />

Z5459 Nasratpur-Beragram Road Km 007.40-007.50 S 0.1 1068 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.168 0.093<br />

Z5459 Nasratpur-Beragram Road Km 008.50-008.70 S 0.2 1068 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.073 0.081<br />

Z5459 Nasratpur-Beragram Road Km 000.00-000.20 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 000.30-000.60 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 000.90-001.00 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 001.50-001.70 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z5459 Nasratpur-Beragram Road Km 013.11-016.02 S 2.91 2146 Zilla Carpet 40mm @ Traff >=2000 2013 4.59 0.000 0.000<br />

Z5467 Raikali-Tilokpur Road Km 000.15-001.75 S 1.6 1303 Zilla Carpet 40mm @ 1000-2000 2013 2.52 0.000 0.000<br />

Z5467 Raikali-Tilokpur Road Km 001.75-004.75 S 3 1303 Zilla Carpet 40mm @ 1000-2000 2013 4.73 0.000 0.000<br />

Z5467 Raikali-Tilokpur Road Km 004.75-008.26 S 3.52 1303 Zilla Carpet 40mm @ 1000-2000 2013 5.55 0.000 0.000<br />

Z5505 Mahashastan -Amtoli Road Km 000.00-002.72 S 2.72 3377 Zilla Carpet 40mm @ Traff >=2000 2013 4.42 0.<strong>23</strong>7 1.206<br />

Z5505 Mahashastan -Amtoli Road Km 002.72-004.42 S 1.7 3377 Zilla Carpet 40mm @ Traff >=2000 2013 2.68 1.217 4.978<br />

Z5505 Mahashastan -Amtoli Road Km 004.92-006.52 S 1.6 3377 Zilla Carpet 40mm @ Traff >=2000 2013 2.52 1.505 6.280<br />

Z5505 Mahashastan -Amtoli Road Km 008.92-009.02 S 0.1 3377 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z5505 Mahashastan -Amtoli Road Km 009.32-009.41 S 0.09 3377 Zilla Carpet 40mm @ Traff >=2000 2013 0.19 0.000 0.000<br />

Z5507 Mokamtala-Shibganj Road Km 000.00-000.50 S 0.5 1445 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Appendix-E: Page: 54 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5507 Mokamtala-Shibganj Road Km 000.50-000.80 S 0.3 1445 Zilla Carpet 40mm @ 1000-2000 2013 0.47 0.000 0.000<br />

Z5507 Mokamtala-Shibganj Road Km 000.80-002.74 S 1.94 1445 Zilla Carpet 40mm @ 1000-2000 2013 3.06 0.000 0.000<br />

Z5507 Mokamtala-Shibganj Road Km 005.80-006.30 S 0.5 1445 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Z5507 Mokamtala-Shibganj Road Km 006.30-009.50 S 3.2 1445 Zilla Carpet 40mm @ 1000-2000 2013 5.05 0.000 0.000<br />

Sub-total Bogra Division<br />

149.38<br />

Dinajpur Division<br />

Z5007 Birganj-Kaharol Road Km 006.10-008.00 S 1.9 1335 Zilla Carpet 40mm @ 1000-2000 2013 3.00 0.000 0.000<br />

Z5007 Birganj-Kaharol Road Km 008.00-009.36 S 1.36 1335 Zilla Carpet 40mm @ 1000-2000 2013 2.15 0.000 0.000<br />

Z5007 Birganj-Kaharol Road Km 000.00-000.10 S 0.1 1335 Zilla Seal Coat 2013 0.02 0.861 0.034<br />

Z5008 Birganj-Darwani Road Km 006.80-007.30 S 0.5 2613 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.879 2.217<br />

Z5008 Birganj-Darwani Road Km 014.89-016.19 S 1.3 2613 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.05 1.447 11.703<br />

Z5008 Birganj-Darwani Road Km 000.00-000.70 S 0.7 2613 Zilla Carpet 40mm @ Traff >=2000 2013 1.36 0.000 0.000<br />

Z5008 Birganj-Darwani Road Km 000.80-001.30 S 0.5 2613 Zilla Carpet 40mm @ Traff >=2000 2013 0.79 1.927 1.907<br />

Z5008 Birganj-Darwani Road Km 010.40-0<strong>12</strong>.30 S 1.9 2613 Zilla Carpet 40mm @ Traff >=2000 2013 3.27 0.985 5.160<br />

Z5008 Birganj-Darwani Road Km 018.89-019.19 S 0.3 2613 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 1.333 1.025<br />

Z5008 Birganj-Darwani Road Km 019.29-019.69 S 0.4 2465 Zilla Carpet 40mm @ Traff >=2000 2013 0.63 1.685 2.510<br />

Z5025 Rangpur-Dinajpur Road Km 039.80-039.90 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.785 0.743<br />

Z5025 Rangpur-Dinajpur Road Km 062.85-063.05 S 0.2 845 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.31 0.918 1.099<br />

Z5025 Rangpur-Dinajpur Road Km 063.05-063.25 S 0.2 845 Zilla Seal Coat 2013 0.10 0.101 0.074<br />

Z5025 Rangpur-Dinajpur Road Km 063.35-063.45 S 0.1 845 Zilla Seal Coat 2013 0.05 0.072 0.0<strong>23</strong><br />

Z5801 Kholahati Cantonment Road Km 000.00-000.90 S 0.9 1520 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.11 0.306 2.361<br />

Z5802 Dinajpur-Khanpur Road Km 010.00-010.90 S 0.9 1727 Zilla Carpet 40mm @ 1000-2000 2013 1.54 0.000 0.000<br />

Z5802 Dinajpur-Khanpur Road Km 010.90-011.80 S 0.9 1727 Zilla Carpet 40mm @ 1000-2000 2013 2.11 0.000 0.000<br />

Z5803 Dinajpur-Birol Road Km 001.90-002.20 S 0.3 4046 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 2.452 2.138<br />

Z5803 Dinajpur-Birol Road Km 000.00-000.40 S 0.4 4046 Zilla Overlay 50mm @ IRI 6-9 2013 0.77 2.653 3.421<br />

Z5803 Dinajpur-Birol Road Km 002.40-002.80 S 0.4 4046 Zilla Overlay 50mm @ IRI 6-9 2013 0.77 3.527 4.473<br />

Z5803 Dinajpur-Birol Road Km 004.20-007.20 S 3 4046 Zilla Overlay 50mm @ IRI 6-9 2013 5.79 6.133 55.972<br />

Z5803 Dinajpur-Birol Road Km 011.40-011.50 S 0.1 4046 Zilla Overlay 50mm @ IRI 6-9 2013 0.19 3.358 1.049<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 000.00-000.40 S 0.4 1592 Zilla Carpet 40mm @ 1000-2000 2013 0.75 0.039 0.034<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 000.50-000.60 S 0.1 1592 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.026 0.005<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 000.70-000.80 S 0.1 1592 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.000 0.000<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 000.80-001.20 S 0.4 1592 Zilla Carpet 40mm @ 1000-2000 2013 0.68 0.000 0.000<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 007.10-007.20 S 0.1 1592 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 000.40-000.50 S 0.1 1592 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.741 0.373<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 000.60-000.70 S 0.1 1592 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.802 0.437<br />

Z5804 Chirirb<strong>and</strong>ar-Amtali Road Km 0<strong>12</strong>.50-013.70 S 1.2 1592 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.89 0.815 4.558<br />

Z5851 Birampur-Bhaduria Road Km 017.60-018.40 S 0.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.26 1.006 4.984<br />

Appendix-E: Page: 55 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5851 Birampur-Bhaduria Road Km 000.00-002.50 S 2.5 4097 Zilla Carpet 40mm @ Traff >=2000 2013 5.67 0.000 0.000<br />

Z5851 Birampur-Bhaduria Road Km 008.80-011.20 S 2.4 2800 Zilla Carpet 40mm @ Traff >=2000 2013 3.95 2.194 14.197<br />

Z5851 Birampur-Bhaduria Road Km 014.10-014.80 S 0.7 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.10 0.060 0.<strong>12</strong>8<br />

Z5851 Birampur-Bhaduria Road Km 021.50-022.53 S 1.03 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.63 0.554 1.859<br />

Z5851 Birampur-Bhaduria Road Km 002.70-002.80 S 0.1 4097 Zilla Overlay 50mm @ Cracking >25% 2013 0.19 2.683 0.573<br />

Z5851 Birampur-Bhaduria Road Km 002.90-003.20 S 0.3 4097 Zilla Overlay 50mm @ IRI 6-9 2013 0.58 3.716 2.814<br />

Z5851 Birampur-Bhaduria Road Km 004.00-004.80 S 0.8 4097 Zilla Overlay 50mm @ IRI 6-9 2013 1.54 3.6<strong>12</strong> 7.051<br />

Z5851 Birampur-Bhaduria Road Km 005.00-005.30 S 0.3 4097 Zilla Overlay 50mm @ IRI 6-9 2013 0.58 3.583 2.405<br />

Z5851 Birampur-Bhaduria Road Km 005.30-007.70 S 2.4 4097 Zilla Overlay 50mm @ IRI 6-9 2013 4.63 3.810 <strong>23</strong>.945<br />

Z5851 Birampur-Bhaduria Road Km 007.70-008.50 S 0.8 4097 Zilla Overlay 50mm @ IRI 6-9 2013 1.54 3.922 7.420<br />

Z5851 Birampur-Bhaduria Road Km 013.20-013.30 S 0.1 2146 Zilla Seal Coat 2013 0.05 0.750 0.304<br />

Z5854 Birampur -Hakimpur Road Km 000.00-002.40 S 2.4 2246 Zilla Carpet 40mm @ Traff >=2000 2013 5.63 0.000 0.000<br />

Z5854 Birampur -Hakimpur Road Km 002.90-003.30 S 0.4 2246 Zilla Carpet 40mm @ Traff >=2000 2013 0.63 1.832 2.729<br />

Z5854 Birampur -Hakimpur Road Km 004.00-004.40 S 0.4 2246 Zilla Carpet 40mm @ Traff >=2000 2013 0.94 0.000 0.000<br />

Z5857 Fulbari-Parbatipur Road Km 001.20-001.60 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.667 2.508<br />

Z5857 Fulbari-Parbatipur Road Km 002.50-002.90 S 0.4 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.94 0.664 2.499<br />

Z5857 Fulbari-Parbatipur Road Km 000.00-001.20 S 1.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.81 0.000 0.000<br />

Z5857 Fulbari-Parbatipur Road Km 001.60-002.10 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 0.000 0.000<br />

Z5857 Fulbari-Parbatipur Road Km 002.20-002.50 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 0.000 0.000<br />

Sub-total Dinajpur Division<br />

69.67<br />

Gaib<strong>and</strong>a Division<br />

Z5476 Dhupni-Belka Road Km 003.10-003.20 S 0.1 341 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.353 0.166<br />

Z5476 Dhupni-Belka Road Km 002.60-003.10 S 0.5 341 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z5551 Dariapur-Kamarzani Road Km 000.00-000.10 S 0.1 449 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5551 Dariapur-Kamarzani Road Km 000.10-000.60 S 0.5 449 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 015.30-017.50 S 2.2 3503 Zilla Carpet 40mm @ Cracks >25% 2013 3.46 1.763 9.516<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 019.00-019.30 S 0.3 3503 Zilla Carpet 40mm @ Cracks >25% 2013 0.47 1.432 1.056<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 022.10-022.40 S 0.3 3503 Zilla Carpet 40mm @ Cracks >25% 2013 0.47 1.488 1.037<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 022.50-022.60 S 0.1 3503 Zilla Carpet 40mm @ Cracks >25% 2013 0.16 0.611 0.137<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 024.20-024.40 S 0.2 3503 Zilla Carpet 40mm @ Cracks >25% 2013 0.32 1.170 0.575<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 000.60-000.80 S 0.2 3503 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.852 1.056<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 022.60-0<strong>23</strong>.30 S 0.7 3503 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.10 1.485 6.441<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 008.60-009.00 S 0.4 3503 Zilla Carpet 40mm @ Traff >=2000 2013 0.63 1.800 1.801<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 009.40-009.50 S 0.1 3503 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 1.283 0.254<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 010.10-010.20 S 0.1 3503 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 1.396 0.296<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 010.30-010.70 S 0.4 3503 Zilla Carpet 40mm @ Traff >=2000 2013 0.63 1.394 1.104<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 021.60-021.80 S 0.2 3503 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 1.281 0.595<br />

Appendix-E: Page: 56 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 025.90-026.40 S 0.5 3503 Zilla Carpet 40mm @ Traff >=2000 2013 0.79 1.576 2.146<br />

Z5552 Gaib<strong>and</strong>ha-Saghata Road Km 026.60-028.72 S 2.<strong>12</strong> 3503 Zilla Carpet 40mm @ Traff >=2000 2013 3.34 2.022 8.756<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 000.60-000.70 S 0.1 2480 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 2.255 1.<strong>23</strong>6<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 002.00-003.30 S 1.3 2480 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.05 1.<strong>12</strong>9 7.403<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 000.70-002.00 S 1.3 2480 Zilla Carpet 40mm @ Traff >=2000 2013 2.05 0.292 0.881<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 003.30-003.40 S 0.1 2480 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.020 0.004<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 007.80-008.10 S 0.3 2480 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.210 0.146<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 009.50-010.00 S 0.5 2480 Zilla Carpet 40mm @ Traff >=2000 2013 0.79 0.357 0.379<br />

Z5553 Gaib<strong>and</strong>ha-Sadullahpur Road Km 010.10-011.13 S 1.03 2480 Zilla Carpet 40mm @ Traff >=2000 2013 1.62 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 001.20-001.30 S 0.1 932 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.356 0.182<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 004.40-004.50 S 0.1 932 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.356 0.182<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 011.40-011.90 S 0.5 932 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.358 0.996<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 015.10-015.90 S 0.8 932 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.26 0.364 1.489<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 010.20-010.60 S 0.4 932 Zilla Carpet 40mm @ Traff 100-1000 2013 0.63 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 011.90-0<strong>12</strong>.10 S 0.2 932 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 013.10-013.30 S 0.2 932 Zilla Carpet 40mm @ Traff 100-1000 2013 0.32 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 014.30-014.40 S 0.1 932 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 014.70-014.80 S 0.1 932 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 015.00-015.10 S 0.1 932 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 015.90-016.60 S 0.7 932 Zilla Carpet 40mm @ Traff 100-1000 2013 1.10 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 017.30-017.80 S 0.5 932 Zilla Carpet 40mm @ Traff 100-1000 2013 0.79 0.000 0.000<br />

Z5554 Gaib<strong>and</strong>ha-Gobindaganj Road Km 019.10-026.80 S 7.7 932 Zilla Carpet 40mm @ Traff 100-1000 2013 <strong>12</strong>.15 0.000 0.000<br />

Z5555 Gaib<strong>and</strong>ha-Balashighat Road Km 004.10-004.80 S 0.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.10 1.057 4.416<br />

Z5555 Gaib<strong>and</strong>ha-Balashighat Road Km 004.80-005.10 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 1.363 1.422<br />

Z5613 Gaib<strong>and</strong>ah-Pirgachha Road Km 008.45-008.52 S 0.07 1609 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.19 0.135 0.079<br />

Z5852 Palashbari-Goraghat Road Km 000.60-001.50 S 0.9 2659 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.02 0.422 2.727<br />

Z5852 Palashbari-Goraghat Road Km 001.60-001.90 S 0.3 2659 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.675 1.208<br />

Z5852 Palashbari-Goraghat Road Km 002.00-003.20 S 1.2 2659 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.89 1.251 8.963<br />

Z5852 Palashbari-Goraghat Road Km 001.50-001.60 S 0.1 2659 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z5852 Palashbari-Goraghat Road Km 001.90-002.00 S 0.1 2659 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.538 0.114<br />

Z5855 Joypurhat-Gobindaganj Road Km 029.20-030.80 S 1.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.52 0.000 0.000<br />

Sub-total Gaib<strong>and</strong>a Division<br />

48.66<br />

Joypurhat Division<br />

Z5452 Joypurhat-Badalgachhi-Road Km 000.00-001.10 S 1.1 1982 Zilla Carpet 40mm @ 1000-2000 2013 2.58 0.008 0.029<br />

Z5452 Joypurhat-Badalgachhi-Road Km 001.10-003.00 S 1.9 1982 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.46 0.946 17.005<br />

Z5452 Joypurhat-Badalgachhi-Road Km 003.50-006.30 S 2.8 1982 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.30 0.776 13.364<br />

Z5452 Joypurhat-Badalgachhi-Road Km 006.30-006.80 S 0.5 1982 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.77 0.773 2.379<br />

Appendix-E: Page: 57 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5452 Joypurhat-Badalgachhi-Road Km 008.50-011.80 S 3.3 1982 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 5.07 1.317 22.190<br />

Z5501 Joypurhat-Khetlal Road Km 003.60-004.20 S 0.6 1326 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z5503 Joypurhat-Hili Road Km 000.00-000.40 S 0.4 1158 Zilla Carpet 40mm @ 1000-2000 2013 0.94 0.000 0.000<br />

Z5503 Joypurhat-Hili Road Km 003.00-003.60 S 0.6 1158 Zilla Carpet 40mm @ 1000-2000 2013 1.41 0.000 0.000<br />

Z5503 Joypurhat-Hili Road Km 002.90-003.00 S 0.1 1158 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.361 0.299<br />

Z5503 Joypurhat-Hili Road Km 011.80-0<strong>12</strong>.10 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.894 2.539<br />

Z5503 Joypurhat-Hili Road Km 0<strong>12</strong>.20-0<strong>12</strong>.80 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.41 0.791 4.493<br />

Z5503 Joypurhat-Hili Road Km 0<strong>12</strong>.90-013.50 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.41 0.758 4.304<br />

Z5503 Joypurhat-Hili Road Km 014.30-014.50 S 0.2 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.931 1.615<br />

Z5503 Joypurhat-Hili Road Km 015.00-015.30 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.882 2.294<br />

Z5503 Joypurhat-Hili Road Km 018.00-018.30 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.70 0.874 2.480<br />

Z5503 Joypurhat-Hili Road Km 003.60-004.10 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.17 1.579 2.490<br />

Z5503 Joypurhat-Hili Road Km 006.60-006.80 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 1.425 0.909<br />

Z5503 Joypurhat-Hili Road Km 008.00-010.10 S 2.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 4.93 1.699 11.250<br />

Z5503 Joypurhat-Hili Road Km 0<strong>12</strong>.10-0<strong>12</strong>.20 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 1.172 0.325<br />

Z5503 Joypurhat-Hili Road Km 0<strong>12</strong>.80-0<strong>12</strong>.90 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 1.891 0.540<br />

Z5503 Joypurhat-Hili Road Km 018.30-021.80 S 3.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 8.21 1.389 13.869<br />

Z5508 Khetlal-Akkelpur Road Km 009.00-009.10 S 0.1 2629 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.803 0.479<br />

Z5508 Khetlal-Akkelpur Road Km 000.00-000.30 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.47 0.000 0.000<br />

Z5508 Khetlal-Akkelpur Road Km 0<strong>12</strong>.10-0<strong>12</strong>.90 S 0.8 2225 Zilla Carpet 40mm @ Traff >=2000 2013 1.26 0.000 0.000<br />

Z5508 Khetlal-Akkelpur Road Km 014.40-015.40 S 1 2225 Zilla Carpet 40mm @ Traff >=2000 2013 1.58 0.000 0.000<br />

Z5508 Khetlal-Akkelpur Road Km 015.40-017.80 S 2.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 3.79 0.000 0.000<br />

Z5855 Joypurhat-Gobindaganj Road Km 007.80-008.10 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.46 2.294 3.997<br />

Z5855 Joypurhat-Gobindaganj Road Km 008.20-008.30 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.15 1.078 0.626<br />

Z5855 Joypurhat-Gobindaganj Road Km 008.40-009.30 S 0.9 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.28 1.<strong>23</strong>8 6.004<br />

Z5855 Joypurhat-Gobindaganj Road Km 009.40-010.30 S 0.9 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.19 1.438 6.472<br />

Z5855 Joypurhat-Gobindaganj Road Km 010.50-0<strong>12</strong>.80 S 2.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.04 1.328 15.274<br />

Z5855 Joypurhat-Gobindaganj Road Km 016.60-018.40 S 1.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.76 1.184 <strong>12</strong>.378<br />

Z5855 Joypurhat-Gobindaganj Road Km 000.00-000.30 S 0.3 3959 Zilla Carpet 40mm @ Traff >=2000 2013 0.70 2.150 2.786<br />

Z5855 Joypurhat-Gobindaganj Road Km 009.30-009.40 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.13 0.146 0.035<br />

Z5855 Joypurhat-Gobindaganj Road Km 010.30-010.50 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.26 0.000 0.000<br />

Z5855 Joypurhat-Gobindaganj Road Km 0<strong>12</strong>.80-013.60 S 0.8 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.06 0.000 0.000<br />

Z5855 Joypurhat-Gobindaganj Road Km 015.40-016.00 S 0.6 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.92 0.000 0.000<br />

Z5855 Joypurhat-Gobindaganj Road Km 016.50-016.60 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.15 0.000 0.000<br />

Z5855 Joypurhat-Gobindaganj Road Km 014.00-014.20 S 0.2 2146 Zilla Seal Coat 2013 0.08 0.137 0.084<br />

Sub-total Joypurhat Division<br />

60.80<br />

Kurigram Division<br />

Appendix-E: Page: 58 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5611 Rajarhat-Teesta Road Km 003.80-003.90 S 0.1 1035 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.479 0.290<br />

Z5614 Kurigram-Rajarhat Road Km 007.10-007.20 S 0.1 2704 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 1.757 1.663<br />

Z5614 Kurigram-Rajarhat Road Km 000.00-000.70 S 0.7 2704 Zilla Carpet 40mm @ Traff >=2000 2013 1.64 0.000 0.000<br />

Z5614 Kurigram-Rajarhat Road Km 007.20-007.44 S 0.24 2704 Zilla Carpet 40mm @ Traff >=2000 2013 0.56 0.000 0.000<br />

Z5616 Nageswari-Lalmonirhat Road Km 016.20-016.40 S 0.2 1461 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.695 0.431<br />

Z5616 Nageswari-Lalmonirhat Road Km 016.50-017.10 S 0.6 1461 Zilla Carpet 40mm @ 1000-2000 2013 0.96 0.636 1.183<br />

Z5616 Nageswari-Lalmonirhat Road Km 018.60-040.00 S 21.4 1461 Zilla Carpet 40mm @ 1000-2000 2013 34.<strong>23</strong> 0.578 29.486<br />

Z5616 Nageswari-Lalmonirhat Road Km 000.90-003.00 S 2.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.36 0.979 <strong>12</strong>.906<br />

Z5616 Nageswari-Lalmonirhat Road Km 005.20-005.90 S 0.7 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.<strong>12</strong> 1.025 4.506<br />

Z5616 Nageswari-Lalmonirhat Road Km 007.80-008.40 S 0.6 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.96 1.102 4.151<br />

Z5616 Nageswari-Lalmonirhat Road Km 008.60-009.10 S 0.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.80 1.040 3.265<br />

Z5616 Nageswari-Lalmonirhat Road Km 009.60-010.90 S 1.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.08 1.<strong>12</strong>7 9.200<br />

Z5616 Nageswari-Lalmonirhat Road Km 011.90-013.40 S 1.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.40 0.947 8.914<br />

Z5616 Nageswari-Lalmonirhat Road Km 015.00-015.30 S 0.3 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.48 0.942 1.775<br />

Z5616 Nageswari-Lalmonirhat Road Km 015.40-016.20 S 0.8 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.28 1.856 9.324<br />

Z5616 Nageswari-Lalmonirhat Road Km 016.40-016.50 S 0.1 1461 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.494 0.288<br />

Z5616 Nageswari-Lalmonirhat Road Km 004.50-004.60 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.281 0.087<br />

Z5616 Nageswari-Lalmonirhat Road Km 004.90-005.20 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.48 0.045 0.042<br />

Z5616 Nageswari-Lalmonirhat Road Km 005.90-006.70 S 0.8 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.28 0.000 0.000<br />

Z5616 Nageswari-Lalmonirhat Road Km 007.30-007.80 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.80 0.000 0.000<br />

Z5616 Nageswari-Lalmonirhat Road Km 008.40-008.60 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z5616 Nageswari-Lalmonirhat Road Km 009.10-009.20 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.000 0.000<br />

Z5616 Nageswari-Lalmonirhat Road Km 009.40-009.60 S 0.2 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.32 0.000 0.000<br />

Z5616 Nageswari-Lalmonirhat Road Km 010.90-011.00 S 0.1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 0.680 0.224<br />

Z5616 Nageswari-Lalmonirhat Road Km 011.50-011.90 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.64 0.902 1.272<br />

Z5616 Nageswari-Lalmonirhat Road Km 014.60-015.00 S 0.4 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.64 0.000 0.000<br />

Z5616 Nageswari-Lalmonirhat Road Km 015.30-015.40 S 0.1 2146 Zilla Seal Coat 2013 0.05 0.493 0.166<br />

Z5617 Nageswari-Fulbari Road Km 000.00-001.38 S 1.38 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 2.18 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 001.38-002.28 S 0.9 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 1.42 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 002.28-002.48 S 0.2 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 004.58-005.38 S 0.8 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 1.26 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 005.78-006.18 S 0.4 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 0.63 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 007.48-010.48 S 3 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 4.73 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 010.48-010.98 S 0.5 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 010.98-013.48 S 2.5 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 3.94 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 015.78-018.71 S 2.93 <strong>12</strong>52 Zilla Carpet 40mm @ 1000-2000 2013 4.62 0.000 0.000<br />

Z5617 Nageswari-Fulbari Road Km 002.48-004.58 S 2.1 <strong>12</strong>52 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.31 0.270 2.644<br />

Z5617 Nageswari-Fulbari Road Km 005.38-005.78 S 0.4 <strong>12</strong>52 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.373 0.752<br />

Appendix-E: Page: 59 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5621 Kurigram-Chillmari Road Km 005.30-005.40 S 0.1 4753 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 1.684 0.718<br />

Z5621 Kurigram-Chillmari Road Km 007.40-007.50 S 0.1 4753 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 1.224 0.522<br />

Z5621 Kurigram-Chillmari Road Km 027.71-028.11 S 0.4 2078 Zilla Carpet 40mm @ Traff >=2000 2013 0.62 1.<strong>23</strong>5 1.820<br />

Z5621 Kurigram-Chillmari Road Km 028.21-028.71 S 0.5 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.78 1.249 2.149<br />

Z5621 Kurigram-Chillmari Road Km 029.11-030.32 S 1.21 2146 Zilla Carpet 40mm @ Traff >=2000 2013 2.83 0.000 0.000<br />

Z5621 Kurigram-Chillmari Road Km 000.00-001.30 S 1.3 4948 Zilla Overlay 50mm @ Cracking >25% 2013 3.79 2.1<strong>12</strong> 10.628<br />

Z5621 Kurigram-Chillmari Road Km 001.40-001.70 S 0.3 4948 Zilla Overlay 50mm @ Cracking >25% 2013 0.86 3.768 4.526<br />

Z5621 Kurigram-Chillmari Road Km 001.90-002.00 S 0.1 4948 Zilla Overlay 50mm @ Cracking >25% 2013 0.26 2.166 0.788<br />

Z5621 Kurigram-Chillmari Road Km 004.10-004.20 S 0.1 4753 Zilla Overlay 50mm @ Cracking >25% 2013 0.19 1.972 0.573<br />

Z5621 Kurigram-Chillmari Road Km 006.00-006.10 S 0.1 4753 Zilla Overlay 50mm @ Cracking >25% 2013 0.19 2.<strong>23</strong>4 0.641<br />

Z5621 Kurigram-Chillmari Road Km 007.10-007.20 S 0.1 4753 Zilla Overlay 50mm @ Cracking >25% 2013 0.19 1.716 0.498<br />

Z5621 Kurigram-Chillmari Road Km 009.60-010.80 S 1.2 4753 Zilla Overlay 50mm @ IRI 6-9 2013 2.41 4.162 <strong>12</strong>.681<br />

Z5621 Kurigram-Chillmari Road Km 011.90-013.40 S 1.5 4753 Zilla Overlay 50mm @ IRI 6-9 2013 2.87 3.491 15.954<br />

Z5621 Kurigram-Chillmari Road Km 013.50-016.81 S 3.31 4753 Zilla Overlay 50mm @ IRI 6-9 2013 6.33 8.225 61.938<br />

Z5622 Kurigram-Bhurungamari Road Km 000.00-001.60 S 1.6 1953 Zilla Carpet 40mm @ 1000-2000 2013 4.29 0.092 0.467<br />

Z5622 Kurigram-Bhurungamari Road Km 001.80-005.50 S 3.7 1953 Zilla Carpet 40mm @ 1000-2000 2013 9.42 0.000 0.000<br />

Z5622 Kurigram-Bhurungamari Road Km 022.87-025.98 S 3.11 4592 Zilla Overlay 50mm @ IRI 6-9 2013 6.<strong>23</strong> 7.479 58.826<br />

Z5622 Kurigram-Bhurungamari Road Km 025.98-028.98 S 3 4592 Zilla Overlay 50mm @ IRI 6-9 2013 5.73 5.769 46.674<br />

Z56<strong>23</strong> Ulipur-Chillmari Road Km 000.10-000.30 S 0.2 2108 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.651 0.713<br />

Z5901 Lalmonirhat-Phulbari Road Km 010.20-014.00 S 3.8 1<strong>12</strong>1 Zilla Carpet 40mm @ 1000-2000 2013 7.29 0.000 0.000<br />

Sub-total Kurigram Division<br />

134.50<br />

Lalmonirhat Division<br />

Z5901 Lalmonirhat-Phulbari Road Km 000.00-000.50 S 0.5 1<strong>12</strong>1 Zilla Carpet 40mm @ 1000-2000 2013 1.07 0.000 0.000<br />

Z5901 Lalmonirhat-Phulbari Road Km 000.60-002.90 S 2.3 1<strong>12</strong>1 Zilla Carpet 40mm @ 1000-2000 2013 4.37 0.000 0.000<br />

Z5901 Lalmonirhat-Phulbari Road Km 004.20-004.70 S 0.5 1<strong>12</strong>1 Zilla Carpet 40mm @ 1000-2000 2013 0.85 0.000 0.000<br />

Z5901 Lalmonirhat-Phulbari Road Km 006.30-009.17 S 2.87 1<strong>12</strong>1 Zilla Carpet 40mm @ 1000-2000 2013 4.67 0.000 0.000<br />

Z5901 Lalmonirhat-Phulbari Road Km 002.90-003.80 S 0.9 1<strong>12</strong>1 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.345 2.082<br />

Z5901 Lalmonirhat-Phulbari Road Km 004.00-004.20 S 0.2 1<strong>12</strong>1 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.298 0.399<br />

Z5901 Lalmonirhat-Phulbari Road Km 004.70-006.30 S 1.6 1<strong>12</strong>1 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.73 0.359 3.851<br />

Z5901 Lalmonirhat-Phulbari Road Km 009.80-010.20 S 0.4 1<strong>12</strong>1 Zilla Seal Coat 2013 0.<strong>23</strong> 1.146 0.557<br />

Z5903 Patgram-Angarpota Road Km 001.45-001.75 S 0.3 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.51 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 002.15-002.25 S 0.1 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 002.35-002.65 S 0.3 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.51 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 006.85-006.95 S 0.1 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 007.85-008.05 S 0.2 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.34 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 008.65-008.85 S 0.2 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.34 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 008.85-009.05 S 0.2 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.34 0.000 0.000<br />

Appendix-E: Page: 60 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5903 Patgram-Angarpota Road Km 009.05-009.15 S 0.1 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.17 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 009.25-009.55 S 0.3 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.51 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 010.15-010.35 S 0.2 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.34 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 010.45-010.65 S 0.2 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.34 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 011.75-011.95 S 0.2 1174 Zilla Carpet 40mm @ 1000-2000 2013 0.34 0.000 0.000<br />

Z5903 Patgram-Angarpota Road Km 001.25-001.45 S 0.2 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.34 0.243 0.275<br />

Z5903 Patgram-Angarpota Road Km 001.75-002.15 S 0.4 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.68 0.390 1.040<br />

Z5903 Patgram-Angarpota Road Km 002.25-002.35 S 0.1 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.276 0.184<br />

Z5903 Patgram-Angarpota Road Km 002.65-006.85 S 4.2 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 7.16 0.431 <strong>12</strong>.083<br />

Z5903 Patgram-Angarpota Road Km 006.95-007.85 S 0.9 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.54 0.475 2.855<br />

Z5903 Patgram-Angarpota Road Km 008.05-008.65 S 0.6 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.02 0.378 1.513<br />

Z5903 Patgram-Angarpota Road Km 009.55-010.15 S 0.6 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.02 0.241 0.889<br />

Z5903 Patgram-Angarpota Road Km 011.95-014.65 S 2.7 1174 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.61 0.213 2.996<br />

Z5903 Patgram-Angarpota Road Km 000.03-001.25 S 1.22 1174 Zilla Seal Coat 2013 0.63 0.711 0.937<br />

Z5903 Patgram-Angarpota Road Km 014.65-014.75 S 0.1 1174 Zilla Seal Coat 2013 0.05 2.387 0.185<br />

Z5903 Patgram-Angarpota Road Km 015.95-015.96 S 0 1174 Zilla Seal Coat 2013 0.00 6.913 0.052<br />

Z5904 Patgram Bypass Km 000.00-000.50 S 0.5 1039 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Z5904 Patgram Bypass Km 000.50-000.60 S 0.1 1039 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.6<strong>12</strong> 0.370<br />

Z5904 Patgram Bypass Km 001.60-002.10 S 0.5 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.17 0.903 3.919<br />

Z5904 Patgram Bypass Km 002.10-002.17 S 0.07 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.16 1.255 0.251<br />

Z5907 Lalmonirhat-Mogalhat Road Km 000.30-000.60 S 0.3 1690 Zilla Carpet 40mm @ 1000-2000 2013 0.70 0.000 0.000<br />

Z5907 Lalmonirhat-Mogalhat Road Km 001.80-002.70 S 0.9 1690 Zilla Carpet 40mm @ 1000-2000 2013 1.42 0.000 0.000<br />

Z5907 Lalmonirhat-Mogalhat Road Km 002.80-005.80 S 3 1690 Zilla Carpet 40mm @ 1000-2000 2013 4.73 0.000 0.000<br />

Z5907 Lalmonirhat-Mogalhat Road Km 005.80-008.80 S 3 1690 Zilla Carpet 40mm @ 1000-2000 2013 4.73 0.000 0.000<br />

Z5907 Lalmonirhat-Mogalhat Road Km 008.80-011.30 S 2.5 1690 Zilla Carpet 40mm @ 1000-2000 2013 3.76 0.000 0.000<br />

Z5907 Lalmonirhat-Mogalhat Road Km 000.00-000.10 S 0.1 1690 Zilla Seal Coat 2013 0.07 0.498 0.085<br />

Sub-total Lalmonirhat Division<br />

54.84<br />

Nilphamari Division<br />

Z5008 Birganj-Darwani Road Km 026.39-027.39 S 1 2146 Zilla Carpet 40mm @ Traff >=2000 2013 1.58 0.017 0.051<br />

Z5011 Sayedpur-Parbatipur Road Km 000.00-000.40 S 0.4 3082 Zilla Carpet 40mm @ Traff >=2000 2013 0.99 0.278 0.489<br />

Z5015 Taxerhat-Kishoreganj Road Km 022.85-022.95 S 0.1 1565 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 022.95-025.95 S 3 1565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 4.73 0.670 10.591<br />

Z5015 Taxerhat-Kishoreganj Road Km 025.95-027.45 S 1.5 1565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.37 0.675 6.302<br />

Z5022 Nilphamari -Kishoreganj Road Km 005.70-007.80 S 2.1 805 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 3.28 0.507 5.857<br />

Z5022 Nilphamari -Kishoreganj Road Km 008.30-009.00 S 0.7 805 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.09 0.443 1.560<br />

Z5022 Nilphamari -Kishoreganj Road Km 000.00-001.80 S 1.8 805 Zilla Carpet 40mm @ Traff 100-1000 2013 2.81 0.000 0.000<br />

Z5022 Nilphamari -Kishoreganj Road Km 001.80-002.40 S 0.6 805 Zilla Carpet 40mm @ Traff 100-1000 2013 0.94 0.000 0.000<br />

Appendix-E: Page: 61 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5022 Nilphamari -Kishoreganj Road Km 002.40-002.60 S 0.2 805 Zilla Carpet 40mm @ Traff 100-1000 2013 0.31 0.000 0.000<br />

Z5022 Nilphamari -Kishoreganj Road Km 005.60-005.70 S 0.1 805 Zilla Carpet 40mm @ Traff 100-1000 2013 0.16 0.000 0.000<br />

Z5022 Nilphamari -Kishoreganj Road Km 007.80-008.30 S 0.5 805 Zilla Carpet 40mm @ Traff 100-1000 2013 0.78 0.000 0.000<br />

Z5022 Nilphamari -Kishoreganj Road Km 009.00-009.30 S 0.3 805 Zilla Carpet 40mm @ Traff 100-1000 2013 0.46 0.000 0.000<br />

Z5022 Nilphamari -Kishoreganj Road Km 009.50-009.54 S 0.04 805 Zilla Seal Coat 2013 0.02 0.073 0.005<br />

Z5701 Nilphamari-Jaldhaka Road Km 017.97-021.06 S 3.09 1426 Zilla Carpet 40mm @ 1000-2000 2013 4.92 0.000 0.000<br />

Z5706 Domar-Volaganj Road Km 0<strong>23</strong>.03-0<strong>23</strong>.<strong>23</strong> S 0.2 4682 Zilla Carpet 40mm @ Traff >=2000 2013 0.31 2.114 0.790<br />

Z5706 Domar-Volaganj Road Km 000.00-003.39 S 3.39 966 Zilla Carpet 40mm @ Traff 100-1000 2013 5.20 0.000 0.000<br />

Z5706 Domar-Volaganj Road Km 011.43-011.63 S 0.2 4682 Zilla Overlay 50mm @ Cracking >25% 2013 0.38 1.671 0.657<br />

Z5706 Domar-Volaganj Road Km 0<strong>12</strong>.03-0<strong>12</strong>.13 S 0.1 4682 Zilla Overlay 50mm @ Cracking >25% 2013 0.19 3.524 0.705<br />

Z5706 Domar-Volaganj Road Km 013.03-013.<strong>23</strong> S 0.2 4682 Zilla Overlay 50mm @ Cracking >25% 2013 0.38 3.<strong>23</strong>7 1.319<br />

Z5706 Domar-Volaganj Road Km 013.73-013.93 S 0.2 4682 Zilla Overlay 50mm @ Cracking >25% 2013 0.38 3.350 1.340<br />

Z5706 Domar-Volaganj Road Km 016.43-017.13 S 0.7 4682 Zilla Overlay 50mm @ Cracking >25% 2013 1.32 0.867 1.160<br />

Z5706 Domar-Volaganj Road Km 018.83-019.13 S 0.3 4682 Zilla Overlay 50mm @ Cracking >25% 2013 0.56 1.496 0.858<br />

Z5706 Domar-Volaganj Road Km 0<strong>23</strong>.53-026.00 S 2.47 4682 Zilla Overlay 50mm @ Cracking >25% 2013 4.64 0.883 4.162<br />

Z5706 Domar-Volaganj Road Km 010.33-010.43 S 0.1 4682 Zilla Overlay 50mm @ IRI 6-9 2013 0.19 5.427 1.182<br />

Z5706 Domar-Volaganj Road Km 010.63-010.83 S 0.2 4682 Zilla Overlay 50mm @ IRI 6-9 2013 0.38 6.4<strong>23</strong> 3.273<br />

Z5706 Domar-Volaganj Road Km 0<strong>12</strong>.<strong>23</strong>-0<strong>12</strong>.33 S 0.1 4682 Zilla Overlay 50mm @ IRI 6-9 2013 0.19 5.584 1.187<br />

Z5706 Domar-Volaganj Road Km 017.43-017.83 S 0.4 4682 Zilla Overlay 50mm @ IRI 6-9 2013 0.75 6.042 5.403<br />

Z5706 Domar-Volaganj Road Km 019.63-019.93 S 0.3 4682 Zilla Overlay 50mm @ IRI 6-9 2013 0.56 4.588 2.861<br />

Z5706 Domar-Volaganj Road Km 020.43-020.73 S 0.3 4682 Zilla Overlay 50mm @ IRI 6-9 2013 0.56 7.744 4.829<br />

Z5706 Domar-Volaganj Road Km 020.83-021.93 S 1.1 4682 Zilla Overlay 50mm @ IRI 6-9 2013 2.07 7.304 16.368<br />

Z5706 Domar-Volaganj Road Km 028.29-028.64 S 0.36 4682 Zilla Overlay 50mm @ IRI 6-9 2013 0.67 7.455 5.641<br />

Z5707 Nilphamari-Domar Road Km 018.60-018.80 S 0.2 1454 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5707 Nilphamari-Domar Road Km 019.10-019.30 S 0.2 1454 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5707 Nilphamari-Domar Road Km 019.40-020.10 S 0.7 1454 Zilla Carpet 40mm @ 1000-2000 2013 1.10 0.000 0.000<br />

Z5707 Nilphamari-Domar Road Km 019.30-019.40 S 0.1 1454 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.675 0.421<br />

Z5707 Nilphamari-Domar Road Km 020.10-021.20 S 1.1 1454 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 1.74 0.844 5.780<br />

Z5709 Nilphamari Bypass Road Km 000.60-001.20 S 0.6 2298 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.95 2.203 7.889<br />

Z5709 Nilphamari Bypass Road Km 001.70-003.30 S 1.6 2298 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.81 0.720 7.324<br />

Sub-total Nilphamari Division<br />

50.67<br />

Panchgarh Division<br />

Z5001 Panchagarh-Ruhea Road Km 007.80-007.90 S 0.1 334 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.13 0.309 0.140<br />

Z5001 Panchagarh-Ruhea Road Km 016.38-017.18 S 0.8 334 Zilla Carpet 40mm @ Traff 100-1000 2013 1.<strong>23</strong> 0.000 0.000<br />

Z5001 Panchagarh-Ruhea Road Km 017.18-018.68 S 1.5 334 Zilla Carpet 40mm @ Traff 100-1000 2013 2.30 0.000 0.000<br />

Z5001 Panchagarh-Ruhea Road Km 021.18-021.88 S 0.7 334 Zilla Carpet 40mm @ Traff 100-1000 2013 1.04 0.000 0.000<br />

Z5001 Panchagarh-Ruhea Road Km 021.88-0<strong>23</strong>.08 S 1.2 334 Zilla Carpet 40mm @ Traff 100-1000 2013 1.54 0.000 0.000<br />

Appendix-E: Page: 62 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5003 Boda-Domar Road Km 000.00-020.25 S 20.25 1330 Zilla Carpet 40mm @ 1000-2000 2013 43.53 0.000 0.000<br />

Sub-total Panchgarh Division<br />

49.76<br />

Rangpur Division<br />

Z5010 Rangpur-Pirgachha Road Km 001.70-001.80 S 0.1 2146 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.<strong>23</strong> 0.699 0.657<br />

Z5010 Rangpur-Pirgachha Road Km 001.80-002.10 S 0.3 2146 Zilla Carpet 40mm @ Traff >=2000 2013 0.53 0.085 0.099<br />

Z5010 Rangpur-Pirgachha Road Km 009.41-025.82 S 16.41 2291 Zilla Carpet 40mm @ Traff >=2000 2013 39.55 0.000 0.000<br />

Z5010 Rangpur-Pirgachha Road Km 007.01-007.21 S 0.2 4465 Zilla Overlay 50mm @ Cracking >25% 2013 0.39 1.772 1.054<br />

Z5010 Rangpur-Pirgachha Road Km 008.91-009.11 S 0.2 4465 Zilla Overlay 50mm @ Cracking >25% 2013 0.39 2.327 1.434<br />

Z5010 Rangpur-Pirgachha Road Km 006.71-006.91 S 0.2 4465 Zilla Overlay 50mm @ IRI 6-9 2013 0.39 1.822 1.138<br />

Z5010 Rangpur-Pirgachha Road Km 008.11-008.71 S 0.6 4465 Zilla Overlay 50mm @ IRI 6-9 2013 1.16 2.325 4.4<strong>23</strong><br />

Z5014 Rangpur Cantt-Ghagat Bridge Road Km 000.10-000.90 S 0.8 964 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.61 0.386 3.864<br />

Z5015 Taxerhat-Kishoreganj Road Km 000.72-001.22 S 0.5 1442 Zilla Carpet 40mm @ 1000-2000 2013 0.79 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 006.97-007.72 S 0.75 1442 Zilla Carpet 40mm @ 1000-2000 2013 1.18 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 009.42-010.02 S 0.6 1442 Zilla Carpet 40mm @ 1000-2000 2013 0.95 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 013.02-016.05 S 3.03 1444 Zilla Carpet 40mm @ 1000-2000 2013 4.78 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 016.65-016.75 S 0.1 1565 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 017.05-020.05 S 3 1565 Zilla Carpet 40mm @ 1000-2000 2013 4.73 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 020.75-020.95 S 0.2 1565 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 021.55-021.75 S 0.2 1565 Zilla Carpet 40mm @ 1000-2000 2013 0.32 0.000 0.000<br />

Z5015 Taxerhat-Kishoreganj Road Km 021.75-022.00 S 0.25 1565 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.40 0.698 0.934<br />

Z50<strong>23</strong> Rangapur-Gangachhara Road Km 005.70-005.80 S 0.1 3591 Zilla Carpet 40mm @ Cracks >25% 2013 0.17 2.276 0.522<br />

Z50<strong>23</strong> Rangapur-Gangachhara Road Km 000.00-000.40 S 0.4 3591 Zilla Carpet 40mm @ Traff >=2000 2013 1.21 0.000 0.000<br />

Z50<strong>23</strong> Rangapur-Gangachhara Road Km 002.80-003.20 S 0.4 3591 Zilla Carpet 40mm @ Traff >=2000 2013 0.68 2.707 3.149<br />

Z50<strong>23</strong> Rangapur-Gangachhara Road Km 006.30-006.80 S 0.5 3591 Zilla Carpet 40mm @ Traff >=2000 2013 0.84 1.728 1.771<br />

Z50<strong>23</strong> Rangapur-Gangachhara Road Km 007.80-008.70 S 0.9 3591 Zilla Carpet 40mm @ Traff >=2000 2013 1.40 3.7<strong>23</strong> 7.625<br />

Z5024 Modhupur-Shampur Road Km 000.10-002.20 S 2.1 5<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 3.99 0.000 0.000<br />

Z5024 Modhupur-Shampur Road Km 007.50-007.96 S 0.46 5<strong>23</strong> Zilla Carpet 40mm @ Traff 100-1000 2013 0.73 0.000 0.000<br />

Z5024 Modhupur-Shampur Road Km 000.00-000.10 S 0.1 5<strong>23</strong> Zilla Seal Coat 2013 0.05 1.004 0.089<br />

Z5074 N5 to Pirganj Road Km 001.40-002.00 S 0.6 531 Zilla Carpet 40mm @ Traff 100-1000 2013 0.95 0.000 0.000<br />

Z56<strong>12</strong> Shahebganj-Haragachha Road Km 005.91-007.90 S 1.99 2144 Zilla Carpet 40mm @ Traff >=2000 2013 4.67 0.929 6.067<br />

Z56<strong>12</strong> Shahebganj-Haragachha Road Km 000.00-002.21 S 2.21 2144 Zilla Seal Coat 2013 1.05 0.819 6.624<br />

Sub-total Rangpur Division<br />

74.60<br />

Thakurgaon Division<br />

Z5004 Ranishankoil-Haripur Road Km 000.00-001.30 S 1.3 1550 Zilla Carpet 40mm @ 1000-2000 2013 3.05 0.000 0.000<br />

Z5004 Ranishankoil-Haripur Road Km 002.50-004.20 S 1.7 1550 Zilla Carpet 40mm @ 1000-2000 2013 2.68 0.000 0.000<br />

Appendix-E: Page: 63 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

Cway Length<br />

Road Name<br />

Chainage<br />

AADT Road<br />

Fin Cost NPV /<br />

Work Name<br />

Year<br />

No<br />

Side (km) Class<br />

(Mill Taka) Cost<br />

NPV<br />

Z5004 Ranishankoil-Haripur Road Km 004.50-004.60 S 0.1 1550 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5004 Ranishankoil-Haripur Road Km 008.40-008.50 S 0.1 1550 Zilla Carpet 40mm @ 1000-2000 2013 0.16 0.000 0.000<br />

Z5004 Ranishankoil-Haripur Road Km 010.70-017.06 S 6.36 1550 Zilla Carpet 40mm @ 1000-2000 2013 10.03 0.000 0.000<br />

Z5004 Ranishankoil-Haripur Road Km 004.20-004.50 S 0.3 1550 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.47 0.600 1.038<br />

Z5029 Nekm<strong>and</strong>-Dharmagarh Road Km 000.00-010.20 S 10.19 2582 Zilla Carpet 40mm @ Traff >=2000 2013 16.09 1.469 36.548<br />

Z5055 Thakurgaon-Pirganj Road Km 000.00-000.10 S 0.1 2695 Zilla Carpet 40mm @ Traff >=2000 2013 0.<strong>23</strong> 0.000 0.000<br />

Z5055 Thakurgaon-Pirganj Road Km 003.30-006.61 S 3.31 2695 Zilla Carpet 40mm @ Traff >=2000 2013 7.33 0.000 0.000<br />

Z5055 Thakurgaon-Pirganj Road Km 020.81-021.92 S 1.11 2695 Zilla Carpet 40mm @ Traff >=2000 2013 1.75 0.146 0.271<br />

Sub-total Thakurgaon Division<br />

Total Rangpur Zone<br />

Sylhet Zone<br />

Sunamganj Division<br />

Z2802 Gobindaganj-Dwarabazar Road Km 000.00-0<strong>12</strong>.89 S <strong>12</strong>.89 <strong>23</strong>36 Zilla Carpet 40mm @ Traff >=2000 2013 30.22 0.0<strong>23</strong> 0.000<br />

Z2802 Gobindaganj-Dwarabazar Road Km 0<strong>12</strong>.89-016.00 S 3.<strong>12</strong> <strong>23</strong>36 Zilla Carpet 40mm @ Traff >=2000 2013 5.98 1.772 13.290<br />

Z2811 Dowarabazar-Sunamganj Road Km 004.10-004.14 S 0.04 149 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.06 6.324 0.000<br />

Z2811 Dowarabazar-Sunamganj Road Km 006.45-006.70 S 0.25 149 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.42 1.191 0.000<br />

Z2811 Dowarabazar-Sunamganj Road Km 008.10-008.20 S 0.1 149 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.173 0.000<br />

Z2811 Dowarabazar-Sunamganj Road Km 008.90-009.00 S 0.1 149 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.006 0.003<br />

Z2811 Dowarabazar-Sunamganj Road Km 009.30-009.40 S 0.1 149 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.010 0.000<br />

Z2811 Dowarabazar-Sunamganj Road Km 010.00-010.10 S 0.1 149 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.056 0.000<br />

Z2811 Dowarabazar-Sunamganj Road Km 010.40-010.50 S 0.1 149 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.17 0.686 0.000<br />

Sub-total Sunamganj Division<br />

37.51<br />

Sylhet Division<br />

Z2013 Sylhet -Balaganj Road Km 020.50-020.90 S 0.4 3765 Zilla Carpet 40mm @ Traff >=2000 2013 1.02 2.171 3.463<br />

Z2014 Seola-Sutark<strong>and</strong>i Road Km 000.00-004.15 S 4.14 4025 Zilla Overlay 50mm @ IRI 6-9 2013 11.90 3.824 57.490<br />

Z2020 Fenchuganj Link Road Km 000.00-001.50 S 1.5 1600 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.76 1.022 11.049<br />

Z2020 Fenchuganj Link Road Km 002.10-003.64 S 1.54 1600 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 2.40 0.883 8.025<br />

Z2022 Tajpur-Balaganj Road Km 003.20-013.10 S 9.9 2095 Zilla Carpet 40mm @ Traff >=2000 2013 16.26 0.364 0.000<br />

Z2810 Companiganj-Chhatak Road Km 000.50-000.90 S 0.4 603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.63 0.2<strong>12</strong> 0.399<br />

Z2810 Companiganj-Chhatak Road Km 004.30-004.50 S 0.2 603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.32 0.332 0.000<br />

Z2810 Companiganj-Chhatak Road Km 004.90-005.40 S 0.5 603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.79 0.173 0.000<br />

Z2810 Companiganj-Chhatak Road Km 006.30-006.40 S 0.1 603 Zilla Carpet 40mm @ IRI><strong>12</strong> 2013 0.16 0.282 0.000<br />

Z2832 Daudabad-Vadeswar Road Km 000.00-006.20 S 6.2 1876 Zilla Carpet 40mm @ 1000-2000 2013 9.78 0.856 0.000<br />

Z2832 Daudabad-Vadeswar Road Km 006.50-0<strong>12</strong>.80 S 6.3 1876 Zilla Carpet 40mm @ 1000-2000 2013 9.94 0.067 0.000<br />

Sub-total Sylhet Division<br />

55.96<br />

41.95<br />

734.81<br />

Appendix-E: Page: 64 of 65


Appendix-E<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

1st Year Periodic Works of Zilla Roads<br />

(Excluding Ongoing Projects)<br />

Million Taka<br />

Road<br />

No<br />

Total Sylhet Zone<br />

Total Bangladesh<br />

Road Name<br />

Chainage<br />

Cway<br />

Side<br />

Length<br />

(km)<br />

AADT Road<br />

Class<br />

Work Name<br />

Year<br />

Fin Cost<br />

(Mill Taka)<br />

93.47<br />

3698.78<br />

NPV /<br />

Cost<br />

NPV<br />

Appendix-E: Page: 65 of 65


Appendix-F<br />

Recurrent Costs by Zone <strong>and</strong> Division.


Appendix-F<br />

Recurrent Costs by Zone Nad Division<br />

Million Taka<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zone Division<br />

Crack Edge<br />

Prep. Edge Prep.<br />

Patching<br />

Sealing repair<br />

Repair Patching Routine Gr<strong>and</strong><br />

Total<br />

Barisal Barguna 2.47 0.00 2.83 0.02 5.64 10.96<br />

Barisal 0.00 1.31 0.01 3.52 0.01 9.66 14.51<br />

Bhola 0.00 1.10 0.00 3.04 0.02 8.53 <strong>12</strong>.69<br />

Jhalokati 0.59 0.00 3.11 0.01 6.59 10.30<br />

Patuakhali 0.00 6.96 0.00 3.06 0.00 8.59 18.63<br />

Pirojpur 6.31 0.01 5.91 0.03 7.94 20.20<br />

Barisal Total 0.00 18.75 0.02 21.48 0.09 46.95 87.29<br />

ChittagongB<strong>and</strong>arban 0.07 0.72 0.00 1.00 0.00 10.31 <strong>12</strong>.10<br />

Chittagong 0.31 5.69 0.00 22.69 0.00 15.93 44.63<br />

Cox's Baza 0.14 4.83 0.00 25.00 0.01 13.79 43.78<br />

Dohazari 0.04 4.77 0.00 22.28 0.00 11.47 38.56<br />

Khagracha 0.35 1.27 0.00 5.91 0.01 11.43 18.97<br />

Rangamati 0.08 1.10 0.00 2.06 0.00 7.46 10.70<br />

Chittagong Total 0.99 18.38 0.01 78.95 0.03 70.39 168.74<br />

Comilla Brahmanba 0.24 0.67 18.46 0.02 <strong>12</strong>.17 31.56<br />

Ch<strong>and</strong>pur 0.70 6.18 0.00 36.09 0.01 24.66 67.65<br />

Comilla 0.28 4.47 0.00 45.74 0.01 <strong>23</strong>.75 74.25<br />

Feni 0.42 1.65 0.00 24.65 0.01 15.07 41.80<br />

Laxmipur 0.20 11.42 0.00 69.96 0.03 <strong>23</strong>.92 105.53<br />

Noakhali 0.21 6.35 0.00 42.31 0.01 20.02 68.89<br />

Comilla Total 2.05 30.74 0.01 <strong>23</strong>7.21 0.08 119.58 389.67<br />

Dhaka Dhaka 1.22 <strong>12</strong>.87 0.00 8.03 0.01 <strong>12</strong>.35 34.47<br />

Gazipur 0.05 5.95 0.00 27.21 0.01 15.28 48.49<br />

Jamalpur 0.00 7.41 2.68 0.00 8.39 18.49<br />

Kishoregan 0.26 9.19 0.00 4.90 0.00 14.51 28.86<br />

Manikganj 0.05 5.03 0.00 2.98 0.00 7.86 15.92<br />

Munshigan 0.22 7.35 0.00 6.96 0.01 <strong>12</strong>.03 26.57<br />

Mymensing 0.84 6.85 0.00 4.26 0.01 17.14 29.10<br />

Narayanga 0.03 3.78 0.00 10.27 0.00 10.47 24.54<br />

Narsingdi 0.17 5.28 10.82 0.01 13.93 30.19<br />

Netrokona 0.08 5.52 0.00 4.11 0.00 11.74 21.45<br />

Sherpur 1.17 7.10 2.99 0.00 8.53 19.78<br />

Tangail 0.02 6.35 0.00 5.03 0.00 14.50 25.90<br />

Dhaka Total 4.09 82.67 0.01 90.<strong>23</strong> 0.04 146.72 3<strong>23</strong>.76<br />

Gopalganj Faridpur 0.03 4.01 0.00 3.42 0.00 8.33 15.80<br />

Gopalganj 0.51 3.41 0.00 1.69 0.00 9.48 15.09<br />

Madaripur 0.00 0.39 3.<strong>12</strong> 0.00 5.78 9.30<br />

Rajbari 0.20 3.07 0.00 2.32 0.00 4.76 10.35<br />

Sariatpur 0.81 0.00 6.52 0.01 5.29 <strong>12</strong>.63<br />

Gopalganj Total 0.74 11.70 0.01 17.07 0.02 33.64 63.17<br />

Khulna Bagerhat 0.13 3.34 0.01 8.64 0.03 11.47 <strong>23</strong>.62<br />

Chuadanga 0.14 5.02 0.00 9.64 0.00 5.60 20.39<br />

Jessore 0.03 0.85 0.00 19.59 0.16 <strong>12</strong>.72 33.36<br />

Jhenaidah 0.09 7.07 0.01 8.93 0.01 14.45 30.55<br />

Khulna 0.18 3.38 0.01 7.11 0.00 <strong>12</strong>.57 <strong>23</strong>.24<br />

Kushtia 0.11 2.00 0.00 6.86 0.01 7.64 16.61<br />

Magura 0.06 1.97 0.00 3.21 0.00 9.20 14.44<br />

Meherpur 0.15 0.73 0.00 3.52 0.00 3.79 8.20<br />

Narail 0.00 1.56 0.00 0.78 0.00 4.57 6.92<br />

Satkhira 0.14 3.89 0.01 25.03 0.06 8.68 37.82<br />

Khulna Total 1.03 29.81 0.03 93.32 0.28 90.69 215.17<br />

Rajshahi Naogaon 0.13 7.84 0.00 11.36 0.02 17.08 36.43<br />

Natore 0.00 2.07 0.00 5.29 0.00 11.60 18.96<br />

Appendix-F: Page: 1 of 2


Appendix-F<br />

Recurrent Costs by Zone Nad Division<br />

Million Taka<br />

<strong>Annual</strong> <strong>Needs</strong> <strong>Report</strong><br />

20<strong>12</strong>-2013<br />

Zone Division<br />

Crack Edge<br />

Prep. Edge Prep.<br />

Patching<br />

Sealing repair<br />

Repair Patching Routine Gr<strong>and</strong><br />

Total<br />

Nawabganj 0.00 2.03 0.00 3.84 0.00 8.<strong>23</strong> 14.10<br />

Pabna 0.33 5.<strong>23</strong> 0.01 2.18 0.00 17.01 24.75<br />

Rajshahi 0.15 6.37 0.00 8.65 0.10 17.00 32.28<br />

Sirajganj 0.07 5.29 0.01 7.55 0.01 14.11 27.04<br />

Rajshahi Total 0.68 28.82 0.02 38.88 0.14 85.02 153.55<br />

Rangpur Bogra 0.<strong>12</strong> 7.16 0.01 13.93 0.02 21.00 42.<strong>23</strong><br />

Dinajpur 0.02 10.54 0.00 10.<strong>23</strong> 0.01 14.54 35.34<br />

Gaib<strong>and</strong>a 0.32 4.71 0.01 6.53 0.00 10.42 21.99<br />

Joypurhat 0.09 3.64 0.00 4.66 0.01 7.42 15.82<br />

Kurigram 0.00 6.53 0.00 <strong>12</strong>.45 0.00 9.03 28.02<br />

Lalmonirha 0.00 0.24 10.18 0.00 6.88 17.31<br />

Nilphamari 0.38 3.72 0.00 8.20 0.00 7.09 19.39<br />

Panchgarh 0.00 7.92 0.00 1.58 0.00 6.08 15.58<br />

Rangpur 0.54 3.85 0.00 5.36 0.00 <strong>12</strong>.83 22.59<br />

Thakurgao 0.27 6.55 0.00 2.08 0.00 6.61 15.51<br />

Rangpur Total 1.75 54.86 0.02 75.20 0.05 101.89 <strong>23</strong>3.77<br />

Sylhet Habiganj 0.66 5.<strong>23</strong> 0.00 3.09 0.00 11.80 20.79<br />

Moulavi Ba 0.27 3.92 4.44 0.00 10.51 19.15<br />

Sunamganj 0.00 1.63 0.00 1.03 0.00 6.98 9.64<br />

Sylhet 1.70 8.75 0.00 6.98 0.01 19.07 36.51<br />

Sylhet Total 2.64 19.53 0.00 15.55 0.01 48.36 86.09<br />

Gr<strong>and</strong> Total 13.97 295.25 0.13 667.88 0.74 743.25 1721.22<br />

Appendix-F: Page: 2 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!