Assembly instructions<br />
Tipps and tricks:<br />
For the assembly of the fresh water module you need (apart from the <strong>FriWa</strong>):<br />
- as tools: level, folding rule, power drill with 10 mm masonry drill bit (for masonry assembly), flat<br />
wrench n°13 for the fixation screws and n°31and n° 37 in order to hold against during the<br />
assembly of the tubing and if necessary in order to retightening of the connecting nuts,<br />
- a 2 nd person for the wall assembly.<br />
Security equipment – please note:<br />
The fresh water module is provided with a membrane security valve ¾“x1“ which meets the<br />
appropriate regulations. The following advices need to be taken into consideration for the assembly<br />
and the operation:<br />
• The valve may not be impaired or rendered ineffective by blockages!<br />
• Dirt collectors or other constrictions are not permitted between the collector (field) and the safety<br />
valve.<br />
• The diameter of the blow line must equal the diameter of the valve outlet; the max. length may<br />
not exceed 2m. More than 2 bends are not permitted. If these maximum values (2 bends, 2m<br />
line) are exceeded, the next largest size must be selected for the blow line. However, it must also<br />
be noted that even with the larger size more than 3 bends and 4m line length are not permitted.<br />
• If the blow line is routed in a drain pipe with a funnel, the size of the drain pipe must be at least<br />
double that of the cross section of the valve inlet. You must also ensure that the blow line is laid<br />
at a slope; the mouth must be open and visible and routed such that the blowing process does<br />
not endanger persons.<br />
Order of work steps:<br />
- Determine the location of the system – possibly near the buffer storage. Install the <strong>FriWa</strong><br />
(see wall assembly).<br />
- Connect the pipes according to the appropriate regulations (heating side at least DN25) and<br />
connect the fresh water module (see connexion plan). In order to avoid any kind of<br />
electrochemical corrosion, you absolutely need to follow the installation order while using<br />
galvanised pipes and fittings! Tighten all the nuts and screwings.<br />
- Charge qualified personell with the electrotechnical connexion of the system. (see<br />
electrotechnical connexion). The corresponding regulations (VDE 0100 etc.) need to be<br />
respected.<br />
- Pressure test und commissioning of the system (see commissioning).<br />