- Page 1 and 2:
AIR CONDITIONER (SPLIT TYPE) CLIMAT
- Page 3 and 4:
Accessory parts and Parts to be pro
- Page 5 and 6:
1 PRECAUTIONS FOR SAFETY • Ensure
- Page 7 and 8:
2 INSTALLATION PROCEDURE Installati
- Page 9 and 10:
4 INSTALLATION OF INDOOR UNIT Insta
- Page 11 and 12:
4 INSTALLATION OF INDOOR UNIT • H
- Page 13 and 14:
5 DRAIN PIPING WORK Drainage 1. Run
- Page 15 and 16:
6 REFRIGERANT PIPING Tightening con
- Page 17 and 18:
7 EVACUATING Heat insulation 1. Pro
- Page 19 and 20:
8 ELECTRICAL WORK For the air condi
- Page 21 and 22:
9 FINAL INSTALLATION CHECKS Useful
- Page 23 and 24:
MEMO 20
- Page 25 and 26:
1 MESURES DE SECURITE • Assurez-v
- Page 27 and 28:
2 PROCEDURE D’INSTALLATION Plan d
- Page 29 and 30:
4 INSTALLATION DE L’UNITE INTERIE
- Page 31 and 32:
4 INSTALLATION DE L’UNITE INTERIE
- Page 33 and 34:
5 INSTALLATION DES TUYAUX D’EVACU
- Page 35 and 36:
6 TUYAUX DE REFRIGERANT Serrage des
- Page 37 and 38:
7 EVACUATION DE L’AIR Isolation t
- Page 39 and 40:
8 INSTALLATION ELECTRIQUE Climatise
- Page 41 and 42:
9 DERNIERES VERIFICATIONS DE L’IN
- Page 43 and 44:
MÉMO 40
- Page 45 and 46:
1 SICHERHEITSVORKEHRUNGEN • Stell
- Page 47 and 48:
2 INSTALLATIONSABLAUF Einbauzeichnu
- Page 49 and 50:
4 INSTALLATION DER RAUMEINHEIT Aufs
- Page 51 and 52:
4 INSTALLATION DER RAUMEINHEIT •
- Page 53 and 54:
5 INSTALLATION DER ABLAUFROHRE Abla
- Page 55 and 56:
6 KÜHLMITTELLLEITUNGEN Festziehen
- Page 57 and 58:
7 ENTLÜFTEN DER ROHRLEITUNGEN Wär
- Page 59 and 60:
8 ELEKTROINSTALLATION Bei Klimager
- Page 61 and 62:
9 ÜBERPRÜFUNGEN NACH DER INSTALLA
- Page 63 and 64:
MEMO 60
- Page 65 and 66:
1 PRECAUZIONI PER LA SICUREZZA •
- Page 67 and 68:
2 PROCEDURA D’INSTALLAZIONE Schem
- Page 69 and 70:
4 INSTALLAZIONE DELL’UNITÀ INTER
- Page 71 and 72:
4 INSTALLAZIONE DELL’UNITÀ INTER
- Page 73 and 74:
5 LAVORO PER TUBAZIONE DI SCARICO S
- Page 75 and 76:
6 TUBAZIONI DEL REFRIGERANTE Connes
- Page 77 and 78:
7 SVUOTAMENTO Isolamento da riscald
- Page 79 and 80:
8 RETE DEI COLLEGAMENTI ELETTRICI P
- Page 81 and 82:
9 CONTRROLLI DI FINE INSTALLAZIONE
- Page 83 and 84:
MEMORIA 80
- Page 85 and 86:
1 PRECAUCIONES PARA SU SEGURIDAD
- Page 87 and 88:
2 PROCEDIMIENTO DE INSTALACIÓN Dia
- Page 89 and 90:
4 INSTALACIÓN DE LA UNIDAD INTERIO
- Page 91 and 92:
4 INSTALACIÓN DE LA UNIDAD INTERIO
- Page 93 and 94:
5 TRABAJOS DE CANALIZACIÓN DE DESA
- Page 95 and 96: 6 TUBERÍA DE REFRIGERANTE Apriete
- Page 97 and 98: 7 EVACUACIÓN Aislamiento térmico
- Page 99 and 100: 8 TRABAJOS EN EL SISTEMA ELÉCTRICO
- Page 101 and 102: 9 COMPROBACIONES FINALES Funciones
- Page 103 and 104: MEMO 100
- Page 105 and 106: 1 PRECAUÇÕES DE SEGURANÇA • Ce
- Page 107 and 108: 2 PROCEDIMENTO DE INSTALAÇÃO Esqu
- Page 109 and 110: 4 INSTALAÇÃO DA UNIDADE INTERIOR
- Page 111 and 112: 4 INSTALAÇÃO DA UNIDADE INTERIOR
- Page 113 and 114: 5 INSTALAÇÃO DA TUBAGEM DE DRENAG
- Page 115 and 116: 6 TUBAGEM DE REFRIGERANTE Apertar a
- Page 117 and 118: 7 EVACUAÇÃO Isolamento térmico 1
- Page 119 and 120: 8 LIGAÇÕES ELÉCTRICAS Para o ar
- Page 121 and 122: 9 VERIFICAÇÕES DE INSTALAÇÃO FI
- Page 123 and 124: MEMO 120
- Page 125 and 126: 1 VOORZORGSMAATREGELEN VOOR UW VEIL
- Page 127 and 128: 2 INSTALLATIEPROCEDURE Installaties
- Page 129 and 130: 4 INSTALLATIE VAN DE BINNENUNIT Ins
- Page 131 and 132: 4 INSTALLATIE VAN DE BINNENUNIT •
- Page 133 and 134: 5 AFVOERLEIDINGEN Afvoer 1. Zorg er
- Page 135 and 136: 6 KOELMIDDELLEIDINGEN De verbinding
- Page 137 and 138: 10 MILIEU Milieuaspecten Productond
- Page 139 and 140: 7 ONTLUCHTEN Samengestelde drukmete
- Page 141 and 142: 9 LAATSTE CONTROLES VAN DE INSTALLA
- Page 143 and 144: MEMORANDUM 140
- Page 145: 1 ΠΡΦΥΛΑΕΙΣ ΑΣΦΑΛΕΙ
- Page 149 and 150: 4 ΕΓΚΑΤΑΣΤΑΣΗ ΤΗΣ Ε
- Page 151 and 152: 4 ΕΓΚΑΤΑΣΤΑΣΗ ΤΗΣ Ε
- Page 153 and 154: 5 ΕΓΚΑΤΑΣΤΑΣΗ ΣΩΛΗ
- Page 155 and 156: 6 ΣΩΛΗΝΩΣΕΙΣ ΨΥΚΤΙ
- Page 157 and 158: 7 ΕΚΚΕΝΩΣΗ Θερµµνω
- Page 159 and 160: 8 ΗΛΕΚΤΡΛΓΙΚΑ Για τ
- Page 161 and 162: 9 ΤΕΛΙΚΙ ΕΛΕΓΙ ΕΓΚΑ
- Page 163 and 164: ΜNΉMH 160