27.04.2013 Views

HDS 9/16-4 ST Gas HDS 9/16-4 ST Gas LPG HDS 12/14-4 ... - Kärcher

HDS 9/16-4 ST Gas HDS 9/16-4 ST Gas LPG HDS 12/14-4 ... - Kärcher

HDS 9/16-4 ST Gas HDS 9/16-4 ST Gas LPG HDS 12/14-4 ... - Kärcher

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Maintenance and care<br />

Danger<br />

Risk of injury! The main switch is to be switched off while carrying out any repairs or maintenance jobs.<br />

Maintenance schedule<br />

Time Activity Assembly affected Performance of whom<br />

daily Check hand- Hand spraygun Check whether the hand-spray gun closes tightly Operator<br />

spray gun<br />

without any leaks. Check the protection mechanism<br />

against accidental switching. Replace defective<br />

hand-spray guns.<br />

Check high pres- Outlets, hoses towards working Check hoses to see if there are damages. Re- Operator<br />

sure hoses machine<br />

place defect hoses immediately. Danger of accident!<br />

weekly or after Check oil level Oil tank at the pump If the oil is milky, it needs to be replaced. Operator<br />

40 operating Check oil level Oil tank at the pump Check oil level of the pump. Refill oil if required Operator<br />

hours<br />

(Order no. 6.288-0<strong>16</strong>)<br />

Cleaning the<br />

sieve<br />

Sieve in water inlet See section "Clean sieve". Operator<br />

monthly or after Check pump High-pressure pump Check the pump for leaks. If the leakage is more Operator<br />

200 operating<br />

than 3 drops per minute, call Customer Service.<br />

hours<br />

Check for inter- Entire plant Operate the machine using the spray pipe with- Operator<br />

nal deposits<br />

out the high pressure nozzle. If the operating trained in de-<br />

pressure on the manometer of the machine increases<br />

to more than 3 MPa, then the plant<br />

needs to be decalcified. The same is applicable<br />

when an operating pressure of more than 0.7 - 1<br />

MPa is detected while operating the machine<br />

without high pressure pipe (water comes out<br />

freely at the high pressure outlet).<br />

calcification<br />

Cleaning the Sieve in the water shortage See section "Clean sieve". Operator<br />

sieve<br />

safe guard<br />

after 500 - 700 Replace Electric igniter, ionisation elec- Replace electric igniter and/or the ionisation Customer<br />

operating hours<br />

trode<br />

electrode.<br />

Service<br />

half-yearly or af- Oil change High-pressure pump Drain off oil. Fill in 1 l new oil (Order no. 6.288- Operator<br />

ter 1000 operat-<br />

0<strong>16</strong>). Check oil level in the oil tank.<br />

ing hours check, clean Entire plant Visual inspection of the plant, check high pres- Customer<br />

sure connections to see that they are not leaking, Service<br />

check that the over-flow valves are not leaking,<br />

check high pressure hoses, check pressure<br />

tanks, remove calcium deposits from the heating<br />

coil, clean/ replace ionisation electrodes, adjust<br />

burner.<br />

Replace the Hose to exhaust pushbutton Install new hose. Customer<br />

hose<br />

switch<br />

Service<br />

annual Safety check Entire plant Safety check according to the guidelines for fluid Technical<br />

spraying equipment.<br />

expert<br />

English 31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!