Manual GIS Versi Julai 2009 - JPBD
Manual GIS Versi Julai 2009 - JPBD Manual GIS Versi Julai 2009 - JPBD
METADATAKAJIAN RANCANGAN STRUKTURPERKARA UTAMA :TAJUK :SOSIALKSEJARAHKANDUNGAN : Taburan kawasan bersejarah dalam kawasan kajianSTRUKTUR PANGKALAN DATA :Field Type Index PeneranganJenis Character (50) Jenis aktiviti bangunan (Cth:Perniagaan/ Masjid/ Kuil/Kediaman dll)Nama Character (50) Nama tempat/ bangunan (Cth:Masjid Kapitan Keling/ Kelly’sCastle dll)Status Character (50) Status projek (Cth: sedia ada/komited/ cadangan)Warta Character (10) Status warta (Ya atau Tidak)Tahun Date Tahun bangunan dibinaBENTUK : TitikSISTEM UNJURAN : Cth: Cassini Soldner SelangorSUMBER DAN TAHUN : Cth: Kajian RSN Selangor, 2007TARIKH SIAP ASAL: Cth: 30/10/2007 PENYEDIA : Cth: Perunding HNBStruktur pangkalan data danmetadata rancangan strukturTARIKH KEMASKINI: Cth: 30/12/2007 PENGEMASKINI: Cth: Unit 1, PPKLSosial2-29
METADATAKAJIAN RANCANGAN STRUKTURPERKARA UTAMA :TAJUK :PENGANGKUTANJALANKANDUNGAN : Rangkaian jalan dalam kawasan kajianSTRUKTUR PANGKALAN DATA :Field Type Index PeneranganKategori Character (50) Kategori jalan (Cth: Lebuhraya/Jalan Persekutuan/ Jalan Negeri/Bandaran dll)Nama Character (50) Nama jalan/ laluan (Cth: JalanMeru/ Jalan 3/58/ Lebuhraya NPEdll)Isipadu Character (50) Isipadu lalulintas. Nyatakan unityang digunakanNo_Jln Character (50) Nombor Jalan (Cth: B22/ B05/ dllikut spesifikasi JKR)JarakJarak (km) (mengikut spesifikasiJKR)BENTUK : GarisanSISTEM UNJURAN : Cth: Cassini Soldner SelangorSUMBER DAN TAHUN : Cth: Kajian RSN Selangor, 2007TARIKH SIAP ASAL: Cth: 30/10/2007 PENYEDIA : Cth: Perunding HNBTARIKH KEMASKINI: Cth: 30/12/2007 PENGEMASKINI: Cth: Unit 1, PPKL2-30 Pengangkutan
- Page 14 and 15: Metadata Kajian Rancangan Tempatan1
- Page 16 and 17: Metadata Kajian Rancangan Tempatan7
- Page 18 and 19: 2.2 Penyelarasan Klasifikasi Gunata
- Page 20 and 21: 3.0 PENYEDIAAN PELAN GISDi dalam me
- Page 22 and 23: Sistem Unjuran MalaysiaMalaysia RSO
- Page 24 and 25: . Open file pentadbiran Daerah.tab
- Page 26 and 27: Kemasukan maklumat atau data dari P
- Page 28 and 29: c. Open file kod_warna (yangdisedia
- Page 30 and 31: h. Paparan hasil Update Column adal
- Page 32 and 33: j. Langkah yang sama juga digunakan
- Page 34 and 35: BAB 2SISTEM MAKLUMAT GEOGRAFI (GIS)
- Page 36 and 37: BAHAGIAN ISTRUKTUR PANGKALAN DATAKA
- Page 38 and 39: BIL TAJUK MUKASURAT3.0 EKONOMI3.1 E
- Page 40 and 41: BIL TAJUK MUKASURAT7.0 ALAM SEKITAR
- Page 42 and 43: 1.2 Struktur Nama Fail (Tab / Shape
- Page 44 and 45: Skop KerjaKandunganLaporan AwalKand
- Page 46 and 47: 3.4 Asas RekabentukRekabentuk pangk
- Page 48 and 49: RAJAH 2 : PROSES PENYEDIAAN RANCANG
- Page 50 and 51: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 52 and 53: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 54 and 55: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 56 and 57: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 58 and 59: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 60 and 61: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 62 and 63: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 66 and 67: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 68 and 69: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 70 and 71: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 72 and 73: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 74 and 75: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 76 and 77: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 78 and 79: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 80 and 81: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 82 and 83: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 84 and 85: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 86 and 87: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 88 and 89: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 90 and 91: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 92 and 93: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 94 and 95: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 96 and 97: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 98 and 99: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 100 and 101: BAB 3SISTEM MAKLUMAT GEOGRAFI (GIS)
- Page 102 and 103: ISI KANDUNGANBIL TAJUK MUKASURATBAH
- Page 104 and 105: BIL TAJUK MUKASURAT6.0 UTILITI6.1 B
- Page 106 and 107: BAHAGIAN ISTRUKTUR PANGKALAN DATAKA
- Page 108 and 109: 1.2 Struktur Nama Fail (Tab / Shape
- Page 110 and 111: Skop KerjaKandunganLaporan AwalSkop
- Page 112 and 113: BETUNG1BETUNG2PARIT1BKLAIR1BKLAIR2E
METADATAKAJIAN RANCANGAN STRUKTURPERKARA UTAMA :TAJUK :PENGANGKUTANJALANKANDUNGAN : Rangkaian jalan dalam kawasan kajianSTRUKTUR PANGKALAN DATA :Field Type Index PeneranganKategori Character (50) Kategori jalan (Cth: Lebuhraya/Jalan Persekutuan/ Jalan Negeri/Bandaran dll)Nama Character (50) Nama jalan/ laluan (Cth: JalanMeru/ Jalan 3/58/ Lebuhraya NPEdll)Isipadu Character (50) Isipadu lalulintas. Nyatakan unityang digunakanNo_Jln Character (50) Nombor Jalan (Cth: B22/ B05/ dllikut spesifikasi JKR)JarakJarak (km) (mengikut spesifikasiJKR)BENTUK : GarisanSISTEM UNJURAN : Cth: Cassini Soldner SelangorSUMBER DAN TAHUN : Cth: Kajian RSN Selangor, 2007TARIKH SIAP ASAL: Cth: 30/10/2007 PENYEDIA : Cth: Perunding HNBTARIKH KEMASKINI: Cth: 30/12/2007 PENGEMASKINI: Cth: Unit 1, PPKL2-30 Pengangkutan