Manual GIS Versi Julai 2009 - JPBD
Manual GIS Versi Julai 2009 - JPBD Manual GIS Versi Julai 2009 - JPBD
METADATAKAJIAN RANCANGAN TEMPATANPERKARA UTAMA :TAJUK :UTILITIELEKTRIK1KANDUNGAN : Maklumat laluan rentis elektrik dalam kawasan kajianSTRUKTUR PANGKALAN DATA :Fields Type Index CatatanJenis Character (50)Spek Character (50) Spesifikasi utilitiJenis utiliti (cth: Talian Rentis 500kvdll – rujuk klasifikasi gunatanah)Fizikal Character (50)Power Character (10)Method Character (50)Status Character (50)BENTUK : GarisanSISTEM UNJURAN : Cth : Cassini Soldner PerakSUMBER DAN TAHUN : Cth : TNB, 2007Keadaan fizikal utiliti (Baik/Sederhana/ Buruk)Kuasa bekalan dalam unit kV (cth:275/132 dll)Kaedah letakkan (cth: Over Head/Underground)Status (Sedia Ada/ Komited/Cadangan)TARIKH SIAP ASAL : PENYEDIA : Cth : Perunding XXXTARIKH KEMASKINI : PENYEDIA : Cth : Perunding XXXStruktur pangkalan data danmetadata rancangan tempatanUtiliti3-47
METADATAKAJIAN RANCANGAN TEMPATANPERKARA UTAMA :TAJUK :UTILITIELEKTRIK2KANDUNGAN : Maklumat sistem bekalan elektrik dalam kawasan kajianSTRUKTUR PANGKALAN DATA :Fields Type Index CatatanJenis Character (50)Jenis utiliti (cth: Loji JanakuasaElektrik dll – rujuk klasifikasigunatanah)Spek Character (50) Spesifikasi utilitiFizikal Character (50)Power Character (10)Status Character (20)Nama Character (50)BENTUK : GarisanKeadaan fizikal utiliti (Baik/Sederhana/ Buruk)Kuasa bekalan (cth: 132/66 kV s/s/400MW dll)Status (Sedia Ada/ Komited/Cadangan)Nama Tempat (cth: Kenyir PowerStation)SISTEM UNJURAN : Cth : Cassini Soldner PerakSUMBER DAN TAHUN : Cth : TNB, 2007TARIKH SIAP ASAL : PENYEDIA : Cth : Perunding XXXTARIKH KEMASKINI : PENYEDIA : Cth : Perunding XXX3-48 Utiliti
- Page 98 and 99: METADATAKAJIAN RANCANGAN STRUKTURPE
- Page 100 and 101: BAB 3SISTEM MAKLUMAT GEOGRAFI (GIS)
- Page 102 and 103: ISI KANDUNGANBIL TAJUK MUKASURATBAH
- Page 104 and 105: BIL TAJUK MUKASURAT6.0 UTILITI6.1 B
- Page 106 and 107: BAHAGIAN ISTRUKTUR PANGKALAN DATAKA
- Page 108 and 109: 1.2 Struktur Nama Fail (Tab / Shape
- Page 110 and 111: Skop KerjaKandunganLaporan AwalSkop
- Page 112 and 113: BETUNG1BETUNG2PARIT1BKLAIR1BKLAIR2E
- Page 114 and 115: BAHAGIAN IIFORMAT METADATA KAJIANRA
- Page 116 and 117: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 118 and 119: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 120 and 121: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 122 and 123: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 124 and 125: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 126 and 127: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 128 and 129: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 130 and 131: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 132: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 135 and 136: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 137: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 141 and 142: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 143 and 144: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 145 and 146: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 147: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 151 and 152: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 153 and 154: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 155 and 156: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 157 and 158: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 159 and 160: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 161 and 162: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 163 and 164: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 165 and 166: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 167 and 168: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 169 and 170: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 171 and 172: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 173 and 174: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 175 and 176: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 177 and 178: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 179 and 180: METADATAKAJIAN RANCANGAN TEMPATANPE
- Page 181 and 182: PENGENALANMuka Surat1.0 KEDIAMAN 4-
- Page 183 and 184: TPD Perniagaan dan Perkhidmatan X X
- Page 185 and 186: TIS Institusi dan Kemudahan Masyara
- Page 187 and 188: 4-6IFU Infrastruktur dan Utiliti X
- Page 189 and 190: 4-8PT Pertanian Pertanian Pertanian
- Page 191 and 192: BAB 5PENERANGAN KLASIFIKASI DANKOD
- Page 193 and 194: PENERANGAN KLASIFIKASI DAN KOD GUNA
- Page 195 and 196: T Tepubina/Semasa Aktiviti Aktiviti
- Page 197 and 198: T Tepubina/Semasa Aktiviti Aktiviti
METADATAKAJIAN RANCANGAN TEMPATANPERKARA UTAMA :TAJUK :UTILITIELEKTRIK1KANDUNGAN : Maklumat laluan rentis elektrik dalam kawasan kajianSTRUKTUR PANGKALAN DATA :Fields Type Index CatatanJenis Character (50)Spek Character (50) Spesifikasi utilitiJenis utiliti (cth: Talian Rentis 500kvdll – rujuk klasifikasi gunatanah)Fizikal Character (50)Power Character (10)Method Character (50)Status Character (50)BENTUK : GarisanSISTEM UNJURAN : Cth : Cassini Soldner PerakSUMBER DAN TAHUN : Cth : TNB, 2007Keadaan fizikal utiliti (Baik/Sederhana/ Buruk)Kuasa bekalan dalam unit kV (cth:275/132 dll)Kaedah letakkan (cth: Over Head/Underground)Status (Sedia Ada/ Komited/Cadangan)TARIKH SIAP ASAL : PENYEDIA : Cth : Perunding XXXTARIKH KEMASKINI : PENYEDIA : Cth : Perunding XXXStruktur pangkalan data danmetadata rancangan tempatanUtiliti3-47