15.11.2014 Views

pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC

pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC

pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

PA/KPA :<br />

K/L/D/I :<br />

STKER : PDAM Tirta Tandik Kabu<strong>pa</strong>ten Musi Banyuasin<br />

PPK : Azmi Julian, ST<br />

T.A : 2012<br />

PENGUMUMAN<br />

RENCANA UMUM PENGADAAN BARANG / JASA PEMERINTAH<br />

CARA<br />

RENCANA PENGANGGARAN PERKIRAAN MASA<br />

LOKASI<br />

No NAMA PAKET PEKERJAAN<br />

PENGADAA VOLUME PERKIRAAN SUMBER WAKTU MULAI PELAKSANAAN KETERANGAN<br />

PEKERJAAN<br />

N<br />

(Rp) DANA PELAKSANAAN (BULAN)<br />

1 PENGADAAN BAHAN KIMIA UNTUK UNIT PENGOLAHAN PDAM KAB. MUBA<br />

- PDAM SEKAYU, KAYUARA, LUMPATAN, MUARA TELADAN DAN BAILANGU PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />

- PDAM SUKARAMI, BABAT TOMAN, MANGUNJAYA, DAN ULAK PACEH JAYA PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />

- PDAM NGULAK, AIR BALUI, KEBAN I, PENGAGE DAN KEBAN II PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />

- PDAM TANAH ABANG, KELUANG, SUPAT, DAN SUNGAI LILIN PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />

- PDAM BAYUNG LENCIR, PENINGGALAN DAN LALAN PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />

- PDAM EPIL, LAIS, TELUK KIJING, PETALING DAN TANJUNG AGUNG BARAT PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />

- PDAM SUNGAI KERUH, JIRAK, DAN SINAR JAYA PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />

- PDAM PLAKAT TINGGI, AIR PUTIH ULU, SIALANG AGUNG, DAN BUKIT INDAH PBJ 1 Paket Sekayu 343,900,000 APBD April 2012 April-Agustus 2012<br />

- Belanja Alat Tulis Kantor PBJ 1 Paket 1,150,000 APBD April 2012 April-Agustus 2012<br />

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 300,000 APBD April 2012 April-Agustus 2012<br />

- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Agustus 2012<br />

1 PEMBANGUNAN IPA KAPASITAS 5 L/DTK. BERIKUT JARINGAN PIPA DI DESA<br />

AIR PUTIH ILIR KEC. PLAKAT TINGGI<br />

PBJ 1 Paket Plakat Tinggi 3,298,985,000 APBD Mei 2012 April-Desember 2012<br />

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,790,000 APBD April 2012 April-Desember 2012<br />

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012<br />

- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Desember 2012<br />

2 PEK. PEMASANGAN JARINGAN PIPA TRANSMISI DISTRIBUSI DI DESA CINTA<br />

KARYA KEC. PLAKAT TINGGI<br />

PBJ 1 Paket Plakat Tinggi 1,248,045,000 APBD Mei 2012 April-Desember 2012<br />

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012<br />

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012<br />

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012<br />

3 PEK. PENAMBAHAN JARINGAN PIPA TRANSMISI DISTRIBUSI KE DESA<br />

TANJUNG KAPUTREN KEC. PLAKAT TINGGI<br />

PBJ 1 Paket Plakat Tinggi 1,601,045,000 APBD Mei 2012 April-Desember 2012<br />

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012<br />

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012<br />

- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012<br />

4 PEK. PENAMBAHAN IPA BARU KAPASITAS 30 L/DTK. BERIKUT JARINGAN PIPA<br />

TRANSMISI PADA PDAM CABANG SUNGAI LILIN<br />

PBJ 1 Paket Sungai Lilin 5,715,290,000 APBD Mei 2012 April-Desember 2012<br />

- Belanja Alat Tulis Kantor PBJ 1 Paket 2,830,000 APBD April 2012 April-Desember 2012<br />

- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012<br />

- Belanja Pengandaan PBJ 1 Paket 300,000 APBD April 2012 April-Desember 2012<br />

RUP-PDAM Muba... Page 1 of 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!