pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
PA/KPA :<br />
K/L/D/I :<br />
STKER : PDAM Tirta Tandik Kabu<strong>pa</strong>ten Musi Banyuasin<br />
PPK : Azmi Julian, ST<br />
T.A : 2012<br />
PENGUMUMAN<br />
RENCANA UMUM PENGADAAN BARANG / JASA PEMERINTAH<br />
CARA<br />
RENCANA PENGANGGARAN PERKIRAAN MASA<br />
LOKASI<br />
No NAMA PAKET PEKERJAAN<br />
PENGADAA VOLUME PERKIRAAN SUMBER WAKTU MULAI PELAKSANAAN KETERANGAN<br />
PEKERJAAN<br />
N<br />
(Rp) DANA PELAKSANAAN (BULAN)<br />
1 PENGADAAN BAHAN KIMIA UNTUK UNIT PENGOLAHAN PDAM KAB. MUBA<br />
- PDAM SEKAYU, KAYUARA, LUMPATAN, MUARA TELADAN DAN BAILANGU PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />
- PDAM SUKARAMI, BABAT TOMAN, MANGUNJAYA, DAN ULAK PACEH JAYA PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />
- PDAM NGULAK, AIR BALUI, KEBAN I, PENGAGE DAN KEBAN II PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />
- PDAM TANAH ABANG, KELUANG, SUPAT, DAN SUNGAI LILIN PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />
- PDAM BAYUNG LENCIR, PENINGGALAN DAN LALAN PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />
- PDAM EPIL, LAIS, TELUK KIJING, PETALING DAN TANJUNG AGUNG BARAT PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />
- PDAM SUNGAI KERUH, JIRAK, DAN SINAR JAYA PBJ 1 Paket Sekayu 400,000,000 APBD April 2012 April-Agustus 2012<br />
- PDAM PLAKAT TINGGI, AIR PUTIH ULU, SIALANG AGUNG, DAN BUKIT INDAH PBJ 1 Paket Sekayu 343,900,000 APBD April 2012 April-Agustus 2012<br />
- Belanja Alat Tulis Kantor PBJ 1 Paket 1,150,000 APBD April 2012 April-Agustus 2012<br />
- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 300,000 APBD April 2012 April-Agustus 2012<br />
- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Agustus 2012<br />
1 PEMBANGUNAN IPA KAPASITAS 5 L/DTK. BERIKUT JARINGAN PIPA DI DESA<br />
AIR PUTIH ILIR KEC. PLAKAT TINGGI<br />
PBJ 1 Paket Plakat Tinggi 3,298,985,000 APBD Mei 2012 April-Desember 2012<br />
- Belanja Alat Tulis Kantor PBJ 1 Paket 2,790,000 APBD April 2012 April-Desember 2012<br />
- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012<br />
- Belanja Pengandaan PBJ 1 Paket 375,000 APBD April 2012 April-Desember 2012<br />
2 PEK. PEMASANGAN JARINGAN PIPA TRANSMISI DISTRIBUSI DI DESA CINTA<br />
KARYA KEC. PLAKAT TINGGI<br />
PBJ 1 Paket Plakat Tinggi 1,248,045,000 APBD Mei 2012 April-Desember 2012<br />
- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012<br />
- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012<br />
- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012<br />
3 PEK. PENAMBAHAN JARINGAN PIPA TRANSMISI DISTRIBUSI KE DESA<br />
TANJUNG KAPUTREN KEC. PLAKAT TINGGI<br />
PBJ 1 Paket Plakat Tinggi 1,601,045,000 APBD Mei 2012 April-Desember 2012<br />
- Belanja Alat Tulis Kantor PBJ 1 Paket 2,280,000 APBD April 2012 April-Desember 2012<br />
- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 180,000 APBD April 2012 April-Desember 2012<br />
- Belanja Pengandaan PBJ 1 Paket 225,000 APBD April 2012 April-Desember 2012<br />
4 PEK. PENAMBAHAN IPA BARU KAPASITAS 30 L/DTK. BERIKUT JARINGAN PIPA<br />
TRANSMISI PADA PDAM CABANG SUNGAI LILIN<br />
PBJ 1 Paket Sungai Lilin 5,715,290,000 APBD Mei 2012 April-Desember 2012<br />
- Belanja Alat Tulis Kantor PBJ 1 Paket 2,830,000 APBD April 2012 April-Desember 2012<br />
- Belanja Prangko, Metrai dan benda pos PBJ 1 Paket 240,000 APBD April 2012 April-Desember 2012<br />
- Belanja Pengandaan PBJ 1 Paket 300,000 APBD April 2012 April-Desember 2012<br />
RUP-PDAM Muba... Page 1 of 4