NO NAMA PAKET PEKERJAAN CARA PENGADAAN VOLUME LOKASI PEKERJAAN RENCANA PENGANGGARAN PERKIRAAN (Rp) SUMBER DANA APBN/ APBD PERKIRAAN WAKTU MULAI PELAKSANAAN WAKTU PELAKSANAAN 1 2 3 4 5 6 7 8 9 10 16 - Pembangunan Jalan Setapak di Desa Kasmaran Kec. Babat Toman PBJ 1 Paket Kec. Babat Toman 158,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,705,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 17 - Pembangunan Jalan Setapak Menuju PKU Kel. Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 18 - Pembangunan Jalan Setapak di RT.08 RW.06 Kelurahan Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 19 - Pembangunan Jalan Setapak di RT.39 RW.04 Kelurahan Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 20 - Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD Pembangunan Jalan Setapak di Lrg. Ajo Anai RT.14 RW.04 Kelurahan Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 138,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 21 - Pembangunan Jalan Setapak di Desa Panca Tunggal (C.5) Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 22 - Pembangunan Jalan Setapak Kebun Kelapa Kel. Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 23 - Pembangunan Jalan Setapak di Desa Sumber Rezeki (B.1) Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 24 - Pembangunan Jalan Setapak di Desa Mulyo Rejo (B.4) Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 25 - Pembangunan Jalan Setapak Desa Suka Damai Baru (B.5) Kec.Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD KETERANGAN RUP DPU CK-Peng KAB.MUBA TA 2012 33- 40
NO NAMA PAKET PEKERJAAN CARA PENGADAAN VOLUME LOKASI PEKERJAAN RENCANA PENGANGGARAN PERKIRAAN (Rp) SUMBER DANA APBN/ APBD PERKIRAAN WAKTU MULAI PELAKSANAAN WAKTU PELAKSANAAN 1 2 3 4 5 6 7 8 9 10 26 - 27 - 28 - Pembangunan Lanjutan Jalan Setapak dari Masjid Al-Hilal ke Pasar Inpres Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD Pembangunan Jalan Setapak di Rt. 07 Lk. I Kelurahan Bayung Lencir Kec. Bayung PBJ 1 Paket Kec. Bayung Lencir 158,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Lencir Belanja Alat Tulis Kantor PBJ 1 Paket 3,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD Pembangunan Jalan Setapak di Rt. 03 Lk. I Kelurahan Bayung Lencir Kec. Bayung PBJ 1 Paket Kec. Bayung Lencir 138,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Lencir Belanja Alat Tulis Kantor PBJ 1 Paket 3,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 29 - Pembangunan Jalan Setapak di Desa Kali Berau Kec. Bayung Lincir PBJ 1 Paket Kec. Bayung Lencir 138,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 3,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 30 - Pembangunan Jalan Setapak Dusun Lubuk Harjo Kec. Bayung Lencir PBJ 1 Paket Kec. Bayung Lencir 138,000,000.00 APBD Mei 2012 Mei - Agustus 2012 31 - 32 - Belanja Alat Tulis Kantor PBJ 1 Paket 3,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD Pembangunan Jalan Lingkungan RT.12 Lingkungan II Kelurahan Bayung Lencir Kec. Bayung lencir PBJ 1 Paket Kec. Bayung Lencir 238,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 3,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD Pembangunan Jalan Lingkungan dari Dusun Tebing Merana ke Dusun Palbintang Desa Mekar jaya Kec. Bayung Lencir PBJ 1 Paket Kec. Bayung Lencir 430,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 5,490,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,600,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,000,000.00 APBD 33 - Pembangunan Jalan Setapak di Desa Nganti Kec. Sanga Desa PBJ 1 Paket Kec. Sanga Desa 158,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 34 - Pembangunan Jalan Setapak di Desa Ngunang Kec. Sanga Desa PBJ 1 Paket Kec. Sanga Desa 158,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD KETERANGAN RUP DPU CK-Peng KAB.MUBA TA 2012 34- 40
- Page 121 and 122: No. Kegiatan / Nama Paket Pekerjaan
- Page 123 and 124: Cara Perkiraan Lokal Rencana Pengan
- Page 125 and 126: PENGUMUMAN RENCANA UMUM PENGADAAN B
- Page 127 and 128: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 129 and 130: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 131 and 132: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 133 and 134: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 135 and 136: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 137 and 138: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 139 and 140: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 141 and 142: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 143 and 144: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 145 and 146: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 147 and 148: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 149 and 150: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 151 and 152: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 153 and 154: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 155 and 156: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 157 and 158: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 159 and 160: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 161 and 162: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 163 and 164: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 165 and 166: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 167 and 168: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 169 and 170: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 171: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 175 and 176: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 177 and 178: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 179 and 180: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 181 and 182: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 183 and 184: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 185 and 186: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 187 and 188: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 189 and 190: 7 PENGADAAN MOBIL JABATAN PBJ 1 Pak
- Page 191 and 192: SDN 2 Pinang Banjar Kec. Sungai Lil
- Page 193 and 194: SDN 1 Bangun Harja Kec. Plakat Ting
- Page 195 and 196: ATK Pengelola Kegiatan PBJ 1 Paket
- Page 197 and 198: Pengadaan white board (Hibah) PBJ 6
- Page 199 and 200: 52 PENYELENGGARAAN SEKOLAH LUAR BIA
- Page 201 and 202: 69 PENYELENGGARAN SMP NEGERI 6 UNGG
- Page 203 and 204: 75 PENYELENGGARAAN JARINGAN PENDIDI
- Page 205 and 206: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 207 and 208: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 209 and 210: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 211 and 212: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 213 and 214: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 215 and 216: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 217 and 218: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 219 and 220: NO NAMA KEGIATAN/ PAKET PEKERJAAN C
- Page 221 and 222: NO NAMA KEGIATAN/ PAKET PEKERJAAN C
NO<br />
NAMA PAKET PEKERJAAN<br />
CARA<br />
PENGADAAN VOLUME LOKASI<br />
PEKERJAAN<br />
RENCANA PENGANGGARAN<br />
PERKIRAAN<br />
(Rp)<br />
SUMBER DANA<br />
APBN/ APBD<br />
PERKIRAAN<br />
WAKTU<br />
MULAI<br />
PELAKSANAAN<br />
WAKTU<br />
PELAKSANAAN<br />
1 2<br />
3 4 5 6 7 8 9 10<br />
16 - Pembangunan Jalan Seta<strong>pa</strong>k di Desa Kasmaran Kec. Babat Toman PBJ 1 Paket Kec. Babat Toman 158,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,705,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
17 - Pembangunan Jalan Seta<strong>pa</strong>k Menuju PKU Kel. Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
18 - Pembangunan Jalan Seta<strong>pa</strong>k di RT.08 RW.06 Kelurahan Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
19 - Pembangunan Jalan Seta<strong>pa</strong>k di RT.39 RW.04 Kelurahan Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
20 -<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
Pembangunan Jalan Seta<strong>pa</strong>k di Lrg. Ajo Anai RT.14 RW.04 Kelurahan Sungai Lilin<br />
Kec. Sungai Lilin<br />
PBJ 1 Paket Kec. Sungai Lilin 138,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
21 - Pembangunan Jalan Seta<strong>pa</strong>k di Desa Panca Tunggal (C.5) Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
22 - Pembangunan Jalan Seta<strong>pa</strong>k Kebun Kela<strong>pa</strong> Kel. Sungai Lilin Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
23 - Pembangunan Jalan Seta<strong>pa</strong>k di Desa Sumber Rezeki (B.1) Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
24 - Pembangunan Jalan Seta<strong>pa</strong>k di Desa Mulyo Rejo (B.4) Kec. Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
25 - Pembangunan Jalan Seta<strong>pa</strong>k Desa Suka Damai Baru (B.5) Kec.Sungai Lilin PBJ 1 Paket Kec. Sungai Lilin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 4,385,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
KETERANGAN<br />
RUP DPU CK-Peng KAB.MUBA TA 2012<br />