pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
NO<br />
NAMA PAKET PEKERJAAN<br />
CARA<br />
PENGADAAN VOLUME LOKASI<br />
PEKERJAAN<br />
RENCANA PENGANGGARAN<br />
PERKIRAAN<br />
(Rp)<br />
SUMBER DANA<br />
APBN/ APBD<br />
PERKIRAAN<br />
WAKTU<br />
MULAI<br />
PELAKSANAAN<br />
WAKTU<br />
PELAKSANAAN<br />
1 2<br />
3 4 5 6 7 8 9 10<br />
20 - Pembangunan Mu<strong>sh</strong>olla di Wisma Atlet Sekayu PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - September 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
21 - Pembangunan Rumah Singgah Komisi Perlindungan Anak Indonesia Kab. Muba PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - September 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
22 - Pembangunan Gerbang dan Post Life Guard di Danau Ulak Lia Kab. Muba PBJ 1 Paket Kec. Sekayu 475,000,000.00 APBD Mei 2012 Mei - September 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 14,235,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,300,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,260,000.00 APBD<br />
23 - Pembangunan Gedung Dakwah Muhammadiyah Ulak Paceh Kab. Muba Tahap I PBJ 1 Paket Kec. Lawang Wetan 1,955,000,000.00 APBD Mei 2012 Mei - November 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 18,760,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,200,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,400,000.00 APBD<br />
24 - Pembangunan Pasar Tradisional Randik Sekayu Tahap I PBJ 1 Paket Kec. Sekayu 3,950,000,000.00 APBD Mei 2012 Mei - November 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 23,160,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,800,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,400,000.00 APBD<br />
25 - Penataan lingkungan Kantor Lurah Balai Agung Kec. Sekayu PBJ 1 Paket Kec. Sekayu 90,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 6,965,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 1,400,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,000,000.00 APBD<br />
26 - Pembangunan Pagar Masjid Al-Mutaqin Desa Muara Teladan Kec. Sekayu PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
27 -<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
Pembangunan Pagar dan Pemasangan Paving Block Mu<strong>sh</strong>ola Ababil Jl. Kol. Wahid<br />
Udin,<br />
PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
28 - Penataan Lingkungan Kantor Desa Rantau Panjang Kec. Lawang Wetan PBJ 1 Paket Kec. Lawang Wetan 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 5,955,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
KETERANGAN<br />
RUP DPU CK-Peng KAB.MUBA TA 2012<br />
27- 40