pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC pa/kpa : mufasirin abdullah, sh k/l/d/i : badan keluarga ... - INAPROC
NO NAMA PAKET PEKERJAAN CARA PENGADAAN VOLUME LOKASI PEKERJAAN RENCANA PENGANGGARAN PERKIRAAN (Rp) SUMBER DANA APBN/ APBD PERKIRAAN WAKTU MULAI PELAKSANAAN WAKTU PELAKSANAAN 1 2 3 4 5 6 7 8 9 10 9 - Pembuatan MCK Umum Pangkalan Burlian Kec. Batang Hari Leko PBJ 1 Paket Kec. Batang Hari Leko 266,820,000.00 APBD Mei 2012 Mei - September 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,373,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 10 - Pembuatan MCK Umum Desa Bukit Sejahtera Kec. Batang Hari Leko PBJ 1 Paket Kec. Batang Hari Leko 266,828,800.00 APBD Mei 2012 Mei - September 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,373,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD KETERANGAN I PROGRAM PENGEMBANGAN WILAYAH STRATEGIS DAN CEPAT TUMBUH I.1 Perencanaan pengembangan infrastruktur 1 - DED Renovasi Kantor Dinas PU Bina Marga Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 2 - DED Renovasi Kantor Inspektorat Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 3 - DED Renovasi Kantor BKKBN Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 4 - DED Renovasi Kantor Badan Lingkungan Hidup dan Penelitian Pengembangan (BLHPP) Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 5 - DED Kantor Badan Perpustakaan, Arsip dan Dokumentasi Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 6 - DED Renovasi Kantor PDAM Tirta Randik Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD RUP DPU CK-Peng KAB.MUBA TA 2012 23- 40
NO NAMA PAKET PEKERJAAN CARA PENGADAAN VOLUME LOKASI PEKERJAAN RENCANA PENGANGGARAN PERKIRAAN (Rp) SUMBER DANA APBN/ APBD PERKIRAAN WAKTU MULAI PELAKSANAAN WAKTU PELAKSANAAN 1 2 3 4 5 6 7 8 9 10 7 - DED Taman Kota Sekayu Kec. Sekayu PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 8 - DED Perencanaan Masjid Agung Sekayu Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 670,000,000.00 APBD Mei 2012 Mei - September 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 19,460,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 9 - DED Pengembangan Asrama Haji Kabupaten Musi Banyuasin PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 10 - DED Gedung Serba Guna Sekayu Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 670,000,000.00 APBD Mei 2012 Mei - September 2012 11 - Belanja Alat Tulis Kantor PBJ 1 Paket 19,460,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD DED Jalur Hijau Koridor Jl. Kol. Wahid Udin Depan Rumah Dinas Bupati ke Jembatan Musi PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 12 - DED Renovasi Kantor PMD Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 13 - Perencanaan Master Plan Sanitasi Kota Sekayu PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - September 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD 14 - Penyusunan Masterplan CBD (Central Business District) Kota Sekayu PBJ 1 Paket Kec. Sekayu 430,000,000.00 APBD Mei 2012 Mei - September 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 9,490,000.00 APBD Belanja Penggandaan PBJ 1 Paket 3,600,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,000,000.00 APBD 15 - Penyusunan Data Base Infrastruktur Cipta Karya dan Pengairan Kab. Muba PBJ 1 Paket Kab. Musi Banyuasin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012 Belanja Alat Tulis Kantor PBJ 1 Paket 6,175,000.00 APBD Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD Biaya Makanan dan Minuman Rapat PBJ 1 Paket 1,200,000.00 APBD KETERANGAN RUP DPU CK-Peng KAB.MUBA TA 2012 24- 40
- Page 111 and 112: NO NAMA PAKET PEKERJAAN RENCANA PEN
- Page 113 and 114: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 115 and 116: SATUAN KERJA : DINAS KOPERASI, UMKM
- Page 117 and 118: No. Kegiatan / Nama Paket Pekerjaan
- Page 119 and 120: No. Kegiatan / Nama Paket Pekerjaan
- Page 121 and 122: No. Kegiatan / Nama Paket Pekerjaan
- Page 123 and 124: Cara Perkiraan Lokal Rencana Pengan
- Page 125 and 126: PENGUMUMAN RENCANA UMUM PENGADAAN B
- Page 127 and 128: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 129 and 130: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 131 and 132: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 133 and 134: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 135 and 136: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 137 and 138: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 139 and 140: No. NAMA PAKET PEKERJAAN RENCANA PE
- Page 141 and 142: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 143 and 144: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 145 and 146: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 147 and 148: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 149 and 150: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 151 and 152: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 153 and 154: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 155 and 156: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 157 and 158: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 159 and 160: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 161: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 165 and 166: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 167 and 168: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 169 and 170: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 171 and 172: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 173 and 174: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 175 and 176: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 177 and 178: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 179 and 180: NO NAMA PAKET PEKERJAAN CARA PENGAD
- Page 181 and 182: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 183 and 184: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 185 and 186: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 187 and 188: CARA LOKASI RENCANA PENGGANGGARAN P
- Page 189 and 190: 7 PENGADAAN MOBIL JABATAN PBJ 1 Pak
- Page 191 and 192: SDN 2 Pinang Banjar Kec. Sungai Lil
- Page 193 and 194: SDN 1 Bangun Harja Kec. Plakat Ting
- Page 195 and 196: ATK Pengelola Kegiatan PBJ 1 Paket
- Page 197 and 198: Pengadaan white board (Hibah) PBJ 6
- Page 199 and 200: 52 PENYELENGGARAAN SEKOLAH LUAR BIA
- Page 201 and 202: 69 PENYELENGGARAN SMP NEGERI 6 UNGG
- Page 203 and 204: 75 PENYELENGGARAAN JARINGAN PENDIDI
- Page 205 and 206: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 207 and 208: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 209 and 210: RENCANA PENGANGGARAN PERKIRAAN CARA
- Page 211 and 212: RENCANA PENGANGGARAN PERKIRAAN CARA
NO<br />
NAMA PAKET PEKERJAAN<br />
CARA<br />
PENGADAAN VOLUME LOKASI<br />
PEKERJAAN<br />
RENCANA PENGANGGARAN<br />
PERKIRAAN<br />
(Rp)<br />
SUMBER DANA<br />
APBN/ APBD<br />
PERKIRAAN<br />
WAKTU<br />
MULAI<br />
PELAKSANAAN<br />
WAKTU<br />
PELAKSANAAN<br />
1 2<br />
3 4 5 6 7 8 9 10<br />
7 - DED Taman Kota Sekayu Kec. Sekayu PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
8 - DED Perencanaan Masjid Agung Sekayu Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 670,000,000.00 APBD Mei 2012 Mei - September 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 19,460,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
9 - DED Pengembangan Asrama Haji Kabu<strong>pa</strong>ten Musi Banyuasin PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
10 - DED Gedung Serba Guna Sekayu Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 670,000,000.00 APBD Mei 2012 Mei - September 2012<br />
11 -<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 19,460,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
DED Jalur Hijau Koridor Jl. Kol. Wahid Udin De<strong>pa</strong>n Rumah Dinas Bu<strong>pa</strong>ti ke Jembatan<br />
Musi<br />
PBJ 1 Paket Kec. Sekayu 285,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 10,125,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,000,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
12 - DED Renovasi Kantor PMD Kab. Musi Banyuasin PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
13 - Perencanaan Master Plan Sanitasi Kota Sekayu PBJ 1 Paket Kec. Sekayu 188,000,000.00 APBD Mei 2012 Mei - September 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 7,425,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
14 - Penyusunan Masterplan CBD (Central Business District) Kota Sekayu PBJ 1 Paket Kec. Sekayu 430,000,000.00 APBD Mei 2012 Mei - September 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 9,490,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 3,600,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,000,000.00 APBD<br />
15 - Penyusunan Data Base Infrastruktur Cipta Karya dan Pengairan Kab. Muba PBJ 1 Paket Kab. Musi Banyuasin 188,000,000.00 APBD Mei 2012 Mei - Agustus 2012<br />
Belanja Alat Tulis Kantor PBJ 1 Paket 6,175,000.00 APBD<br />
Belanja Penggandaan PBJ 1 Paket 2,700,000.00 APBD<br />
Biaya Makanan dan Minuman Ra<strong>pa</strong>t PBJ 1 Paket 1,200,000.00 APBD<br />
KETERANGAN<br />
RUP DPU CK-Peng KAB.MUBA TA 2012<br />
24- 40