You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
PT TUNAS BARU LAMPUNG Tbk DAN<br />
ENTITAS ANAK<br />
Catatan atas Laporan Keuangan Konsolidasian<br />
Untuk Tahun-tahun yang Berakhir<br />
31 Desember 2013 dan 2012<br />
(Angka-angka dalam Jutaan Rupiah,<br />
kecuali Dinyatakan Lain)<br />
PT TUNAS BARU LAMPUNG Tbk AND<br />
ITS SUBSIDIARIES<br />
Notes to Consolidated Financial Statements<br />
For the Years Ended<br />
December 31, 2013 and 2012<br />
(Figures are in millions of Rupiah,<br />
unless Otherwise Stated)<br />
e. PT Bank Rakyat Indonesia (Persero) Tbk<br />
(BRI)<br />
Perusahaan memperoleh fasilitas SBLC dari<br />
BRI sebesar US$ 40.000 ribu. Fasilitas ini<br />
digunakan untuk menjamin uang muka yang<br />
diterima dari Pembeli atas perdagangan<br />
Crude Palm Oil (CPO), Palm Kernel Oil<br />
(PKO), Minyak Kelapa (CCO), dan Stearin<br />
(Catatan 38c). Fasilitas ini jatuh tempo pada<br />
tanggal 22 Maret 2014. Perusahaan akan<br />
dikenakan komisi sebesar 1% per tahun dari<br />
nilai SBLC yang diterbitkan dan setoran<br />
jaminan dengan blokir rekening giro<br />
Perusahaan sebesar 5% dari nilai SBLC<br />
yang diterbitkan.<br />
Fasilitas SBLC ini dijamin dengan agunan<br />
yang sama terkait dengan fasilitas kredit<br />
modal kerja yang diterima oleh Perusahaan<br />
dari BRI (Catatan 17).<br />
Saldo SBLC yang pada tanggal<br />
31 Desember 2013 dan 2012 masingmasing<br />
sebesar US$ 36.000 ribu dengan<br />
nilai setoran jaminan sebesar US$ 1.800<br />
ribu.<br />
Perjanjian kredit dari BRI mencakup<br />
persyaratan yang membatasi hak<br />
Perusahaan antara lain untuk melakukan<br />
merger dan akuisisi, menerima pinjaman,<br />
mengadakan transaksi dengan suatu pihak<br />
dengan cara-cara yang di luar kebiasaan<br />
yang wajar. Perjanjian tersebut juga<br />
mencakup berbagai kondisi pelanggaran<br />
perjanjian.<br />
f. Kontrak Sewa Tangki Penyimpanan<br />
(Sewa Tangki)<br />
Perusahaan dan Pembeli menandatangani<br />
Kontrak Sewa Tangki, dimana Perusahaan<br />
menyewakan kepada Pembeli sebanyak<br />
2 tangki milik Perusahaan yang berlokasi di<br />
Lampung dengan kapasitas masing-masing<br />
5.000 metrik ton. Periode sewa tangki<br />
tersebut dari 3 Juli 2012 sampai 2 Juli 2013<br />
dan telah diperpanjang sampai tanggal 3 Juli<br />
2014, dengan pembayaran dimuka sebesar<br />
Rp 5.400 (atau Rp 450 per bulan).<br />
e. PT Bank Rakyat Indonesia (Persero) Tbk<br />
(BRI)<br />
The Company obtained SBLC facility from<br />
BRI amounting to US$ 40,000 thousand.<br />
This facility was used to secure the<br />
advance payment received from buyers on<br />
trading of Crude Palm Oil (CPO), Palm<br />
Kernel Oil (PKO), Crude Coconut Oil<br />
(CCO), and Stearine (Note 38c). This<br />
facility matured on March 22, 2014. The<br />
Company is charged with 1% commission<br />
per annum based on the amount of the<br />
issuance of SLBC and margin deposits<br />
through the escrow of the Company’s<br />
current account amounted to 5% of the<br />
amount of the issuance of SBLC.<br />
This SBLC facility is secured with the same<br />
collaterals which are related to working<br />
capital loan facility which was obtained by<br />
the Company from BRI (Note 17).<br />
The outstanding SBLC as of December 31,<br />
2013 and 2012, amounted to US$ 36,000<br />
thousand with margin deposits amounted to<br />
US$ 1,800 thousand.<br />
The loan agreements with BRI contain<br />
covenants which, among others, restrict the<br />
rights of the Company to conduct merger<br />
and acquisition, obtain loans, and engaged<br />
in the unusual transactions with other<br />
parties. The agreements also provide<br />
various events of default.<br />
f. Storage Tanks Rental Contract (Tanks<br />
Rental)<br />
The Company and the Buyer entered into<br />
a Tanks Rental Contract, whereas the<br />
Company rented its 2 storage tanks which<br />
are located in Lampung with capacity of<br />
5,000 metric tons each. The tanks rental<br />
period covers from July 3, 2012 to July 2,<br />
2013, and the rental agreement has been<br />
extended up to July 2, 2014 with upfront<br />
payment of Rp 5,400 (or Rp 450 per<br />
month).<br />
- 111 -