08.11.2014 Views

dee12b10ad_fdefc47428

dee12b10ad_fdefc47428

dee12b10ad_fdefc47428

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PT TUNAS BARU LAMPUNG Tbk DAN<br />

ENTITAS ANAK<br />

Catatan atas Laporan Keuangan Konsolidasian<br />

Untuk Tahun-tahun yang Berakhir<br />

31 Desember 2013 dan 2012<br />

(Angka-angka dalam Jutaan Rupiah,<br />

kecuali Dinyatakan Lain)<br />

PT TUNAS BARU LAMPUNG Tbk AND<br />

ITS SUBSIDIARIES<br />

Notes to Consolidated Financial Statements<br />

For the Years Ended<br />

December 31, 2013 and 2012<br />

(Figures are in millions of Rupiah,<br />

unless Otherwise Stated)<br />

e. PT Bank Rakyat Indonesia (Persero) Tbk<br />

(BRI)<br />

Perusahaan memperoleh fasilitas SBLC dari<br />

BRI sebesar US$ 40.000 ribu. Fasilitas ini<br />

digunakan untuk menjamin uang muka yang<br />

diterima dari Pembeli atas perdagangan<br />

Crude Palm Oil (CPO), Palm Kernel Oil<br />

(PKO), Minyak Kelapa (CCO), dan Stearin<br />

(Catatan 38c). Fasilitas ini jatuh tempo pada<br />

tanggal 22 Maret 2014. Perusahaan akan<br />

dikenakan komisi sebesar 1% per tahun dari<br />

nilai SBLC yang diterbitkan dan setoran<br />

jaminan dengan blokir rekening giro<br />

Perusahaan sebesar 5% dari nilai SBLC<br />

yang diterbitkan.<br />

Fasilitas SBLC ini dijamin dengan agunan<br />

yang sama terkait dengan fasilitas kredit<br />

modal kerja yang diterima oleh Perusahaan<br />

dari BRI (Catatan 17).<br />

Saldo SBLC yang pada tanggal<br />

31 Desember 2013 dan 2012 masingmasing<br />

sebesar US$ 36.000 ribu dengan<br />

nilai setoran jaminan sebesar US$ 1.800<br />

ribu.<br />

Perjanjian kredit dari BRI mencakup<br />

persyaratan yang membatasi hak<br />

Perusahaan antara lain untuk melakukan<br />

merger dan akuisisi, menerima pinjaman,<br />

mengadakan transaksi dengan suatu pihak<br />

dengan cara-cara yang di luar kebiasaan<br />

yang wajar. Perjanjian tersebut juga<br />

mencakup berbagai kondisi pelanggaran<br />

perjanjian.<br />

f. Kontrak Sewa Tangki Penyimpanan<br />

(Sewa Tangki)<br />

Perusahaan dan Pembeli menandatangani<br />

Kontrak Sewa Tangki, dimana Perusahaan<br />

menyewakan kepada Pembeli sebanyak<br />

2 tangki milik Perusahaan yang berlokasi di<br />

Lampung dengan kapasitas masing-masing<br />

5.000 metrik ton. Periode sewa tangki<br />

tersebut dari 3 Juli 2012 sampai 2 Juli 2013<br />

dan telah diperpanjang sampai tanggal 3 Juli<br />

2014, dengan pembayaran dimuka sebesar<br />

Rp 5.400 (atau Rp 450 per bulan).<br />

e. PT Bank Rakyat Indonesia (Persero) Tbk<br />

(BRI)<br />

The Company obtained SBLC facility from<br />

BRI amounting to US$ 40,000 thousand.<br />

This facility was used to secure the<br />

advance payment received from buyers on<br />

trading of Crude Palm Oil (CPO), Palm<br />

Kernel Oil (PKO), Crude Coconut Oil<br />

(CCO), and Stearine (Note 38c). This<br />

facility matured on March 22, 2014. The<br />

Company is charged with 1% commission<br />

per annum based on the amount of the<br />

issuance of SLBC and margin deposits<br />

through the escrow of the Company’s<br />

current account amounted to 5% of the<br />

amount of the issuance of SBLC.<br />

This SBLC facility is secured with the same<br />

collaterals which are related to working<br />

capital loan facility which was obtained by<br />

the Company from BRI (Note 17).<br />

The outstanding SBLC as of December 31,<br />

2013 and 2012, amounted to US$ 36,000<br />

thousand with margin deposits amounted to<br />

US$ 1,800 thousand.<br />

The loan agreements with BRI contain<br />

covenants which, among others, restrict the<br />

rights of the Company to conduct merger<br />

and acquisition, obtain loans, and engaged<br />

in the unusual transactions with other<br />

parties. The agreements also provide<br />

various events of default.<br />

f. Storage Tanks Rental Contract (Tanks<br />

Rental)<br />

The Company and the Buyer entered into<br />

a Tanks Rental Contract, whereas the<br />

Company rented its 2 storage tanks which<br />

are located in Lampung with capacity of<br />

5,000 metric tons each. The tanks rental<br />

period covers from July 3, 2012 to July 2,<br />

2013, and the rental agreement has been<br />

extended up to July 2, 2014 with upfront<br />

payment of Rp 5,400 (or Rp 450 per<br />

month).<br />

- 111 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!