Flush Floor Aeration
Installation Recommendations
312 SOUTH HWY. 73, PO BOX 398
FALLS CITY, NE 68355-0398
800-500-9777
Revision Date 06/25/08
800-500-9777
NOTE: These are strictly suggestions for the installation of the flush floor
aeration system. There are many methods to get to the same end result,
this is just one method. Contractor or installer may have experience with
another method.
CORRUGATED
PERFORATED
SHEETS
SHEET
SUPPORTS
S STRIP
CORRUGATED
SOLID SHEETS
TUNNEL TRANSITION
FAN INLET
System Plan View
CORRUGATED
SHEET
SHEET
SUPPORT
Tunnel Cross Section
FAX 402-245-5196
2
www.airlanco.com
800-500-9777
INSTALL AERATION FLOOR SUPPORTS
Reference manufacturer’s tank aeration drawing for general construction
guidelines and details. See also the example on the following page and
drawing #12682 on page 7 for additional suggested flush floor support
details. Cut ½” stabilizing rod into suitable lengths to join the supports
together. This length will depend on the number of supports and the
width of the tunnel. Field weld every four feet alternating top and bottom.
See “Typical Support Layout” drawing #12682 for details. Contractor or
installer may have experience with another cut schedule that works
better.
NOTE: Field weld all support joints.
NOTE: Supports will need to be trimmed to fit around the Tunnel
Stiffener (if required). DO NOT WELD SUPPORTS TO TUNNEL
STIFFENER.
FAX 402-245-5196
3
www.airlanco.com
FLUSH FLOOR SUPPORT LAYOUT
(Example)
800-500-9777
CUT FLOOR SUPPORTS TO FIT
*
BETWEEN END WALL AND
SUPPORT AT END OF TUNNEL
FIELD WELD ALL
SUPPORT JOINTS
(TYPICAL)
TYPICAL AT
ALL TUNNEL
INTERSECTIONS
**
CENTER FLOOR
SUPPORTS
IN TUNNEL
*
**
*
**
CUT FLOOR
SUPPORT TO FIT
BETWEEN
TUNNEL WALLS.
POSITION FLUSH
WITH THIS WALL.
1/2" ROD
REFERENCE MANUFACTURER'S
DRAWING FOR ROD PLACEMENT
FAX 402-245-5196
4
www.airlanco.com
800-500-9777
FLOOR PANEL INSTALLATION
Install floor panels using self drilling screws.
See manufacturer’s Steel Tank Aeration drawing and attached drawing #12682 for
fastening instruction and S-Strip details & locations.
Some tunnel designs are angled to match bin curvature. Field trimming of floor panel
is required in such designs.
LAST FLOOR PANEL MAY NEED
TO BE TRIMMED IF IT INTERFERES
WITH THE PANELS IN THE
MAIN TUNNEL.
FAX 402-245-5196
5
www.airlanco.com
800-500-9777
INSTALL TUNNEL TRANSITION AND FAN
Field trim tunnel adapter section as required to clear floor supports and any tunnel
stiffeners (see detail below). Once installed, seal tunnel transition to tunnel with tar or
other sealing method.
Trim tunnel
as required
TRIM TUNNEL
AS REQUIRED
3
Sealant
SEALANT
Tunnel TUNNEL Adapter ADAPTER
SECTION
Section
3
TUNNEL TRANSITION
NOT LOAD BEARING
Tunnel Transition
not load bearing.
Fan Base Support
by others.
FAN BASE SUPPORT
BY OTHERS
NOTE: Tunnel transition and adapter section are not load bearing.
Consult AIRLANCO Centrifugal Fan Manual for installation and support.
FAX 402-245-5196
6
www.airlanco.com