Flush Floor Aeration

Installation Recommendations

312 SOUTH HWY. 73, PO BOX 398

FALLS CITY, NE 68355-0398

800-500-9777

Revision Date 06/25/08


800-500-9777

NOTE: These are strictly suggestions for the installation of the flush floor

aeration system. There are many methods to get to the same end result,

this is just one method. Contractor or installer may have experience with

another method.

CORRUGATED

PERFORATED

SHEETS

SHEET

SUPPORTS

S STRIP

CORRUGATED

SOLID SHEETS

TUNNEL TRANSITION

FAN INLET

System Plan View

CORRUGATED

SHEET

SHEET

SUPPORT

Tunnel Cross Section

FAX 402-245-5196

2

www.airlanco.com


800-500-9777

INSTALL AERATION FLOOR SUPPORTS

Reference manufacturer’s tank aeration drawing for general construction

guidelines and details. See also the example on the following page and

drawing #12682 on page 7 for additional suggested flush floor support

details. Cut ½” stabilizing rod into suitable lengths to join the supports

together. This length will depend on the number of supports and the

width of the tunnel. Field weld every four feet alternating top and bottom.

See “Typical Support Layout” drawing #12682 for details. Contractor or

installer may have experience with another cut schedule that works

better.

NOTE: Field weld all support joints.

NOTE: Supports will need to be trimmed to fit around the Tunnel

Stiffener (if required). DO NOT WELD SUPPORTS TO TUNNEL

STIFFENER.

FAX 402-245-5196

3

www.airlanco.com


FLUSH FLOOR SUPPORT LAYOUT

(Example)

800-500-9777

CUT FLOOR SUPPORTS TO FIT

*

BETWEEN END WALL AND

SUPPORT AT END OF TUNNEL

FIELD WELD ALL

SUPPORT JOINTS

(TYPICAL)

TYPICAL AT

ALL TUNNEL

INTERSECTIONS

**

CENTER FLOOR

SUPPORTS

IN TUNNEL

*

**

*

**

CUT FLOOR

SUPPORT TO FIT

BETWEEN

TUNNEL WALLS.

POSITION FLUSH

WITH THIS WALL.

1/2" ROD

REFERENCE MANUFACTURER'S

DRAWING FOR ROD PLACEMENT

FAX 402-245-5196

4

www.airlanco.com


800-500-9777

FLOOR PANEL INSTALLATION

Install floor panels using self drilling screws.

See manufacturer’s Steel Tank Aeration drawing and attached drawing #12682 for

fastening instruction and S-Strip details & locations.

Some tunnel designs are angled to match bin curvature. Field trimming of floor panel

is required in such designs.

LAST FLOOR PANEL MAY NEED

TO BE TRIMMED IF IT INTERFERES

WITH THE PANELS IN THE

MAIN TUNNEL.

FAX 402-245-5196

5

www.airlanco.com


800-500-9777

INSTALL TUNNEL TRANSITION AND FAN

Field trim tunnel adapter section as required to clear floor supports and any tunnel

stiffeners (see detail below). Once installed, seal tunnel transition to tunnel with tar or

other sealing method.

Trim tunnel

as required

TRIM TUNNEL

AS REQUIRED

3

Sealant

SEALANT

Tunnel TUNNEL Adapter ADAPTER

SECTION

Section

3

TUNNEL TRANSITION

NOT LOAD BEARING

Tunnel Transition

not load bearing.

Fan Base Support

by others.

FAN BASE SUPPORT

BY OTHERS

NOTE: Tunnel transition and adapter section are not load bearing.

Consult AIRLANCO Centrifugal Fan Manual for installation and support.

FAX 402-245-5196

6

www.airlanco.com