10.10.2022 Views

Аня Колесникова

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ARCHITECTURAL PORTFOLIO<br />

ANNA KOLESNIKOVA


esume<br />

WORK EXPERIENCE<br />

MEGANOM | Lead Architect.......................................................09/2019_present time<br />

SOFT CULTURE | Tutor.............................................................09/2020_present time<br />

UNK PROJECT | Lead Architect.........................................................05/2016_08/2019<br />

UNK PROJECT | Architect.................................................................05/2015_05/2016<br />

STROYPROEKT-L | Architect...........................................................11/2012_04/2015<br />

DESIGN INSTITUTE | Junior Architect................................................01/2011_11/2012<br />

EDUCATION/ TRAINING<br />

LIPETSK STATE TECHNICAL UNIVERSITY | .......................................2005_2010<br />

Architect-Engineer | Spesialist diploma, graduated with honors<br />

LIPETSK STATE TECHNICAL UNIVERSITY | .......................................2007_2010<br />

Translator in profession-related field<br />

COURSE: REVIT FROM CONCEPT TO CONSTRUCTION | ...........................2014<br />

Autodesk certificate<br />

ANNA KOLESNIKOVA<br />

tel: +7 915 419 01 43<br />

email: arch.annakl@gmail.com<br />

RESEARCH/ COMPETITION<br />

Architectural festival «ZODCHESTVO» | Participant................................................2015<br />

Architectural festival «OPEN CITY» | Workshop’s Tutor..................................….......2018<br />

Architectural festival «GOLDEN RATIO» | «Сoncept» category’s Winner..................2021<br />

SKILLS<br />

SOFTWARE |<br />

Revit/ AutoCAD/ Enscape...................................................................................Expert<br />

Adobe Photoshop/ Abode Indesign/ Adobe Illustrator...............................Intermediate<br />

Rino+Grasshopper/ SketchUp/ Vray/ Lumion/ 3D Max.............................Intermediate<br />

LANGUAGE |<br />

Russian...............................................................................................................Native<br />

English......................................................................................................................C2<br />

German..............................................................................................currently learning<br />

02 03


content<br />

SELECTED PROJECTS<br />

..............p. 06-17<br />

..............p. 18-25 ..............p. 26-37<br />

INTRODUCTION<br />

My love for architecture is the biggest passion of mine and the main “driver” in my work. My<br />

mission is to contribute to society by designing sophisticated and sustainable architecture<br />

where function, people’s needs, and harmony with the context, climate, and culture would<br />

merge and enhance our sense of surroundings.<br />

restraunt<br />

«olimp»<br />

office and hotel<br />

building<br />

«kandinskiy<br />

bauhaus»<br />

I do strongly believe that by realizing my dream of becoming a professional architect and<br />

obtaining good professional experience, I could apply my commitment, hard-working, and<br />

self-motivation, that allow me to strive for the highest possible standards, and broaden<br />

my skills further while making a valuable contribution.<br />

..............p. 38-45 ..............p. 46-57 ..............p. 58-65<br />

water sports<br />

palace<br />

«luzhniki»<br />

headquarters<br />

«trumpf»<br />

pushkin state<br />

museum of<br />

fine arts<br />

04 05


INTRODUCTION<br />

Located on the territory adjacent to the Olympic Sports Complex with a range of buildings<br />

representing rich sports history the restaurant serves as a contemporary landmark that<br />

softly integrates into the existing silhouette. The primary conceptual decisions were to<br />

choose an elliptical shape as the main element referring to the forms of sports facilities<br />

and conjoin a parametric envelope made of ceramic elements and a vast surface of<br />

stained-glass windows. The openwork transparent shell conceals spacious room on the<br />

ground floor overlooking the river that is blocked on the third floor and terraces are formed<br />

under and above. As an architect, I was in charge of designing layout concepts and<br />

details for ceramic elements in collaboration with fabricators through concept and design<br />

development stages. Also, I was working with consultants including civil and structural<br />

engineers for coordination of architectural project decisions. I was responsible for the<br />

preparation of the presentation materials as well as putting together a drawing set for<br />

obtaining permission from the expert council.<br />

programme<br />

category<br />

location<br />

size, status<br />

position<br />

workshop<br />

public catering<br />

new construction<br />

moscow, russia<br />

2 000 m 2 , idea 2015-16<br />

architect<br />

unk project<br />

DESIGN DEVELOPMENT<br />

RESTAURANT «OLIMP»<br />

06 07


estraunt «olimp»<br />

big sports arena<br />

adding elliptical shape<br />

water sports palace<br />

creating welcome area<br />

moskva river<br />

M<br />

luzhniki complex<br />

roof terrace<br />

ground terraces<br />

service entrance<br />

oval glass-roof bar<br />

luzhneckaya embankment<br />

visitors entrance<br />

ceramic decorative elements<br />

site and master plans<br />

8 conceptual design 9


estraunt «olimp»<br />

decorative ceramic elements<br />

stained-glass windows<br />

conceptual design 10 conceptual design 11


estraunt «olimp»<br />

+20,300<br />

+15,750<br />

+4,300<br />

0,000<br />

58 000 58 000<br />

1 FRAGMENT 1<br />

6 6 1<br />

front elevation<br />

12 back elevation 13


estraunt «olimp»<br />

open terraces dining room underground floor with utilities<br />

S<br />

N<br />

cross section<br />

14 bim model 15


third floor plan<br />

restraunt «olimp»<br />

cornice section<br />

second floor plan<br />

metal frame<br />

ceramic element<br />

first floor plan<br />

covering<br />

wood flooring<br />

lobby<br />

service rooms<br />

escape stairs<br />

kitchen rooms<br />

dining halls<br />

terraces<br />

scheme floor plans<br />

16 fragment 1 17


INTRODUCTION<br />

The facades of the 15-story triangle in the plan building designed as a mix of vast surfaces<br />

of stained glass windows and diagonal shell made of the aluminum frame with vertical<br />

facade greenery such as maiden grape. The combination makes it possible to create an<br />

elegant openwork facade that becomes a unique contemporary landmark. The prototype<br />

of the decorative shell was the work of engineer Shukhov. The lobby of the office and<br />

hotel part as well as retail are located on the first and second floors. From the third to the<br />

eleventh floor there are office premises and from the twelfth to the fifteenth floors, there<br />

are the hotel rooms. The building also has a 3-story stylobate in which the conference hall<br />

and canteen are located. As an architect under the supervision of the senior architect, I<br />

was involved in the project on the schematic design stage. I was in charge of the facades’<br />

modeling and designing of the detailed hotel rooms’ and offices layouts as well as the<br />

calculation of the main technical and economic parameters. I was responsible for the<br />

preparation of the presentation materials.<br />

programme<br />

category<br />

location<br />

size, status<br />

position<br />

workshop<br />

offices/ hotel/ retail<br />

new construction<br />

moscow, russia<br />

39 200 m 2 , completed 2016-19<br />

architect<br />

unk project<br />

SCHEMATIC DESIGN<br />

OFFICE AND HOTEL BUILDING<br />

18 19


office and hotel building<br />

triangular mesh covering<br />

greening<br />

service entrance<br />

stained glass windows<br />

retail entrance<br />

zemelniy lane<br />

offices entrance<br />

parking entrance<br />

galleries for greening<br />

columns holding cantilever<br />

site and master plans<br />

20<br />

conceptual design 21


office and hotel building<br />

+73,900<br />

+15,360<br />

+15,360<br />

0,000<br />

42 500<br />

24 8<br />

main elevation<br />

22 street view 23


first floor plan<br />

office and hotel building<br />

+73,900<br />

typical office plan<br />

+15,360<br />

+4,000<br />

0,000<br />

greening<br />

curtain wall<br />

glass railing<br />

typical hotel plan<br />

planter box<br />

open gallery<br />

aluminum profile<br />

metal covering<br />

back-painted glass<br />

offices<br />

retail/conference room<br />

service premises<br />

escape staircase<br />

hotel rooms<br />

lobby<br />

parking<br />

technical rooms<br />

section and detail<br />

24 scheme floor plans 25


Фасад в осях 1с-16с<br />

М 1 : 200<br />

Блок 6<br />

+101.800<br />

INTRODUCTION<br />

Блок 5<br />

Taking the advantage of the steep slope the common stylobate is shaped. It protects the<br />

complex from noise and environmental highway impacts and serves the operated roof<br />

+94.650<br />

on it. On the stylobate, six blocks of the office and residential use lie on top of each other<br />

forming the closed courtyard for residents overlooking the river and closed for cars. Also,<br />

retail and fitness with a pool are situated in the stylobate. The facades of the blocks are<br />

an architectural collage so each one has its own patterns. At the same time, they are<br />

+87.750<br />

combined by cladding in two main colors such as black and white, making such variability<br />

that doesn’t break the overall compositional integrity. I was involved as a lead architect<br />

in a large project team from concept to the issue of design development documents<br />

+80.850<br />

for obtaining permission from the experts. I took part in designing models, details, and<br />

layouts, and also coordinating and providing architectural decisions at meetings with a<br />

range of consultants. I supervised the architects as well as I was responsible for meeting<br />

deadlines and the quality of issued documents.<br />

+73.950<br />

programme<br />

category<br />

location<br />

size, status<br />

position<br />

workshop<br />

residence/ offices/ retail<br />

new construction<br />

moscow, russia<br />

188 000 m 2 , idea 2017-18<br />

lead architect<br />

unk project<br />

+67.050<br />

+60.150<br />

+55.000<br />

DESIGN DEVELOPMENT<br />

«KANDINSKIY BAUHAUS»<br />

1 17 14 10<br />

26<br />

+55.000<br />

27<br />

Блок 6


«kandinskiy bauhaus»<br />

moskva river<br />

retail entrance<br />

residents entrance<br />

offices entrance<br />

embankment<br />

prichalniy highway<br />

parking entrance<br />

site and master plans<br />

28 conceptual design 29


«kandinskiy bauhaus»<br />

residential part<br />

offices part<br />

undergroung parking<br />

retail part<br />

balconies<br />

lines<br />

diagonals<br />

randomness<br />

operated roof<br />

transparency<br />

transparency<br />

waves<br />

transparency<br />

steep slope<br />

conceptual design<br />

30 conceptual design 31


«kandinskiy bauhaus»<br />

+106,450<br />

+101,800<br />

+55,000<br />

0,000<br />

-9,000<br />

99 000<br />

128 300<br />

Э Д<br />

1 31<br />

145 200<br />

128 300<br />

А АА<br />

31<br />

1<br />

elevations 32 elevations 33


«kandinskiy bauhaus»<br />

+106,450<br />

+101,800<br />

roof pool<br />

+55,000<br />

apartments<br />

offices with atrium<br />

0,000<br />

-18,150<br />

fitness with pool<br />

parking<br />

main view and section<br />

offices<br />

parking<br />

1-bedroom apartment<br />

retail<br />

canteen<br />

2-bedroom apartment<br />

premises for residents<br />

fitness<br />

3-bedroom apartment<br />

escape staircase<br />

pool<br />

4-bedroom apartment<br />

service premises<br />

technical rooms<br />

atrium<br />

34 first floor plan 35


«kandinskiy bauhaus»<br />

second-fifteenth plans<br />

offices<br />

pool<br />

premises for residents<br />

evacuation staircase<br />

service premises<br />

1-bedroom apartment<br />

2-bedroom apartment<br />

3-bedroom apartment<br />

4-bedroom apartment<br />

technical rooms<br />

36 sixteenth-twenty-eight plans 37


programme<br />

category<br />

location<br />

size, status<br />

position<br />

workshop<br />

INTRODUCTION<br />

The project was selected as the winner of the competition for the concept of reconstruction<br />

of the Luzhniki swimming pool. Keeping the overall style and individual elements of the<br />

existing building, the authors of the project increase the building in length and height.<br />

The lower part repeats the forms of the historical building and the individual elements<br />

that decorated the facade are to be reproduced. The southern and northern walls<br />

with authentic elements and colonnades stretch out recreating balance with the Small<br />

Sports Arena. An ornamental grade of connecting circles grows out of the classical style<br />

structure. I was involved in the project as a lead architect whithin the project team at the<br />

stage of construction documents design. In the process, I was in charge of participating<br />

in meetings with the client and a range of consultants, including civil, structural engineers,<br />

and fabricators to coordinate and provide architectural decisions as well as designing<br />

models and preparing drafts. I supervised the architects and I was responsible for meeting<br />

deadlines and the quality of issued documents.<br />

sport/ leisure/ retail<br />

reconstruction<br />

moscow, russia<br />

51 750 m 2 , completed 2016-19<br />

lead architect<br />

unk project<br />

CONSTRUCTION DOCUMENTS<br />

WATER SPORTS PALACE «LUZHNIKI»<br />

38 39


water sports palace «luzhniki»<br />

decorative facade covering<br />

preserved scenic bas-relief 50 meter swimming pool wave pool roller coasters attraction «Lazy River» fitness center<br />

bim model 40 bim model 41


Д-01<br />

+27,100 **<br />

+26,635 **<br />

+28,610<br />

А<br />

Г<br />

Г-01<br />

Г-02 Г-03<br />

Д<br />

+28,610<br />

+27,100 **<br />

+26,635 **<br />

+25,125<br />

1<br />

2<br />

water sports palace «luzhniki»<br />

+20,250<br />

5 этаж<br />

Ф1-31/О-1<br />

+20,250<br />

5 этаж<br />

+17,125<br />

+17,125<br />

+16,500<br />

4 этаж<br />

+16,500<br />

4 этаж<br />

Д-02<br />

+16,470<br />

+15,000<br />

+15,000<br />

+16,470<br />

3<br />

+12,300<br />

3 этаж<br />

Ф1-31/О-2<br />

+12,300<br />

3 этаж<br />

+10,000<br />

+10,000<br />

+10,000<br />

+8,875<br />

+8,875<br />

+8,875<br />

+7,095<br />

Дн-9Л*<br />

Дн-9*<br />

Дн-9Л*<br />

+7,095<br />

+7,300<br />

+6,000<br />

2 этаж<br />

Д-04(2)<br />

+5,450<br />

+6,000<br />

+6,000<br />

+6,060<br />

+6,000<br />

2 этаж<br />

Д-03<br />

+4,806<br />

+5,590<br />

+4,805<br />

+5,590<br />

+0,000<br />

1 этаж<br />

+3,660<br />

+2,350<br />

+1,940<br />

Д-04(1)<br />

+3,970<br />

+3,600<br />

Вр-1<br />

+3,300<br />

+4,000<br />

Д-05 Д-05<br />

Д-05<br />

Д-05<br />

Д-05 Д-05<br />

Д-05<br />

Д-05<br />

+3,300<br />

Д-05 Д-05<br />

Д-05<br />

Д-05<br />

Д-05 Д-05<br />

Д-05<br />

Д-05<br />

Д-05 Д-05<br />

Д-05<br />

Д-05<br />

Д-05<br />

Д-05<br />

Д-05<br />

+3,906<br />

+2,930<br />

+3,000<br />

+3,905<br />

+3,300<br />

+2,930<br />

+2,930<br />

Др-2<br />

Дн-3Л Дн-3Л Дн-3 Дн-3Л Дн-3 Дн-3Л Дн-3 Дн-3Л* Дн-3 Дн-2Л<br />

Дн-2<br />

Дн-3Л Дн-3<br />

Дн-3* Дн-3Л Дн-3 Дн-3<br />

Дн-3Л Дн-3Л Дн-3* Дн-3Л* Дн-3Л Дн-3Л Дн-3Л Дн-3 Дн-3Л Дн-3 Дн-3Л Дн-3 Дн-3Л Дн-3*<br />

Л<br />

*<br />

4<br />

+0,000<br />

1 этаж<br />

А<br />

Г<br />

Температурный<br />

шов<br />

Д<br />

Д-09<br />

1<br />

Д-06(2)<br />

Д-06 В-17 Д-18 Д-06 В-17 Д-18 Д-06 В-19 Д-18 Д-06 В-17 Д-18 Д-06 В-19 Д-18 Д-06 В-13 Д-18 Д-06 В-13 Д-18 Д-06 В-20 Д-18 В-9 Д-11<br />

Д-06 В-13 Д-18 Д-06 В-19 Д-18 Д-06 В-17 Д-18 Д-06 В-17 Д-18 Д-06 В-13 Д-18 Д-06 В-13 Д-18 Д-06 В-17 Д-18 Д-06 В-19 Д-18 Д-06 В-12 Д-18 Д-06 В-12 Д-18 Д-06 В-12<br />

Д-06 В-13 Д-18 Д-06 В-13 Д-18<br />

Д-06 В-13 Д-18 Д-06 В-13 Д-18<br />

Д-09<br />

4400 4400 6500 5500 6000 1000 5000 6000 6000<br />

Д-08<br />

6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 6000 5500 6500 6000<br />

176800<br />

2<br />

3 4 5 6 6/1<br />

7 8 9 10 11 12 13<br />

14 15 16 17 18 19 20 21 22 23 24<br />

25 26 27 28 29 30 31<br />

longitudinal elevation and wave pool<br />

42 section and details 43


+20,250<br />

5 этаж<br />

Д-01<br />

+27,100 *<br />

+26,635 *<br />

5500 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 2000 5500<br />

Г-01 Г-02 В<br />

Б<br />

Г-03<br />

2430<br />

+26,635 *<br />

+27,100 *<br />

1<br />

2<br />

ФА-Т/О-1<br />

+20,250<br />

5 этаж<br />

before reconstruction<br />

water sports palace «luzhniki»<br />

+17,125<br />

+17,125<br />

+16,500<br />

4 этаж<br />

Д-02<br />

+16,500<br />

4 этаж<br />

+16,470<br />

+15,000<br />

+16,470<br />

+15,000<br />

3<br />

+12,300<br />

3 этаж<br />

+11,970<br />

+11,970<br />

ФА-Т/О-2<br />

+12,300<br />

3 этаж<br />

Д-12<br />

Д-12<br />

+7,300<br />

+7,300<br />

+6,000<br />

2 этаж<br />

+6,060<br />

Д-04(1)<br />

+6,000<br />

2 этаж<br />

Д-03<br />

Д-15<br />

+3,300<br />

+5,590<br />

+4,750<br />

+2,870<br />

+4,000<br />

+4,750<br />

+3,300<br />

Д-16<br />

+3,000<br />

Д-14<br />

+0,900<br />

+0,900 +1,050<br />

Дн-1<br />

Дк-1<br />

Дн-1<br />

+1,050<br />

Д-14<br />

+0,900<br />

Д-13<br />

+0,000<br />

1 этаж<br />

Д-09<br />

4<br />

Д-09<br />

+0,000<br />

1 этаж<br />

8000 5000 5500 6000 6000 6000 16000 6000 6000 5500 1000 4000 8000<br />

83000<br />

А Б В Г<br />

Г1 Д Е Ж И К<br />

Л М Н<br />

П Р<br />

С Т<br />

В<br />

Б<br />

after reconstruction<br />

cross elevation and swimming bath<br />

44 photos 45


INTRODUCTION<br />

The main aim of the project was to design a new building with offices and exhibition<br />

space with a stunning and modern appearance that is supposed to house a headquarters<br />

of the “Trumpf’’. The main feature of the pentagonal building in plan is to combine the<br />

vast surfaces of stained glass windows, that are clad in u-glass panels, with the convexconcave<br />

roof supported by timber beams. The coalition makes it possible to design the<br />

unique facades that are strived to become a contemporary architectural landmark of the<br />

company. The layout of the areas inside provides the arrangement of multi-light spaces<br />

with interesting functional and visual connections between them, as well as the inner<br />

courtyard. I was involved in the project as a lead architect in an international project team<br />

on concept and design development stages. I took part in designing details and layouts,<br />

coordinating and providing architectural decisions by participating in meetings with a<br />

client and consultants. I supervised the architects and I was responsible for meeting<br />

deadlines and the quality of issued documents.<br />

programme<br />

category<br />

location<br />

size, status<br />

position<br />

workshop<br />

headquarters<br />

new construction<br />

moscow, russia<br />

4 300 m 2 , ongoing 2018-19<br />

lead architect<br />

unk project *in collaboration with «Barkow Leibinger» (Germany)<br />

DESIGN DEVELOPMENT<br />

HEADQUATERS «TRUMPF»<br />

46 47


headquarters «trumpf»<br />

big sports arena<br />

water sports palace<br />

luzhniki complex<br />

vavilova street<br />

parking entrance<br />

offices entrance<br />

nahimovskiy pr.<br />

service entrance<br />

site and master plans<br />

48 conceptual design 49


convex-concave roof<br />

headquarters «trumpf»<br />

timber beams<br />

stained glass windows and u-glasses<br />

50 conceptual design 51


headquarters «trumpf»<br />

+14,000<br />

+12,500<br />

+5,100<br />

+7,500<br />

+2,500<br />

+2,500<br />

0,000 0,000<br />

34 800 33 400<br />

3.3 1 B2<br />

A1<br />

elevation 52 elevation 53


headquarters «trumpf»<br />

+14,000 +14,000<br />

+12,500<br />

+7,500<br />

+7,500<br />

+2,500<br />

+5,100<br />

0,000 0,000<br />

stained glass windows clad in u-glass open courtyard underground parking<br />

reinforced concrete floor<br />

roof terrace<br />

timber beams<br />

section 54 section 55


4<br />

third floor plan<br />

a<br />

headquarters «trumpf»<br />

b<br />

mezzanine floor plan<br />

60 120<br />

second floor plan<br />

a<br />

different<br />

50<br />

150<br />

u-glass made of clear glass<br />

double-glazed windows<br />

450<br />

aluminum stained glass mullions<br />

60 120<br />

50<br />

a<br />

first floor plan<br />

b<br />

exhibition space<br />

lobby<br />

u-glass<br />

holder<br />

support T-element<br />

inclined stained glass mullion<br />

crossbar<br />

load-bearing structure<br />

offices<br />

escape stairs<br />

storage rooms<br />

service rooms<br />

technical rooms<br />

60 120 50 150 50<br />

450<br />

scheme floor plans<br />

56 facade detail 57


INTRODUCTION<br />

The process, that involves the complex reconstruction and restoration of the main building<br />

and the old masters’ gallery, as well as the construction of new buildings, is aimed to<br />

create a new museum village. Ensuring the preservation of the main building as an<br />

architectural monument of federal significance, its reconstruction is supposed to create the<br />

underground level that is a vast universal space. It is designed as a monumental hypostyle<br />

hall that can be used as a covered city square or an exhibition space and connected<br />

with the other museum’s buildings through the underground passages. The restoration<br />

of the main building includes its adaptation to modern museum climate technologies.<br />

I was involved in the project as a lead architect at the stage of design development of<br />

the main museum’s building. In the process of work, I was in charge of participating in<br />

meetings with civil, structural engineers, and museum curators to coordinate and provide<br />

architectural decisions. I took part in the building’s inspection to estimate its adjustment<br />

to modern technologies as well as the desining models and drafts.<br />

programme<br />

category<br />

location<br />

size, status<br />

position<br />

workshop<br />

museum/ public space<br />

reconstruction<br />

moscow, russia<br />

26 000 m 2 , ongoing 2014-21<br />

lead architect<br />

meganom<br />

DESIGN DEVELOPMENT<br />

PUSHKIN STATE MUSEUM OF FINE ARTS<br />

58 59


old masters’ gallery<br />

pushkin state museum of fine arts<br />

new additional entrance<br />

main building<br />

main entrance to main building<br />

new derository restoration and exhibitioncenter<br />

galalery of 19th and 20th centery european and american art<br />

60 conceptual design 61


pushkin state museum of fine arts<br />

+29,680<br />

+17,460<br />

+12,080<br />

0,000<br />

-2,300<br />

74 000<br />

1 17<br />

transparent storages<br />

underground passage<br />

monumental hypostyle hall<br />

main elevation<br />

62 cross section 63


first floor plan<br />

stairs - amphitheater<br />

view of the first floor with new climatic vitrines<br />

pushkin state museum of fine arts<br />

new climatic vitrines<br />

semi-basement floor plan<br />

view of the semi-basement floor<br />

space for workshops<br />

multi-storied space<br />

underground floor plan<br />

view of the undeground floor<br />

monumental hypostyle hall<br />

underground passage<br />

scheme floor plans<br />

64 photomontage and renderings 65


ANNA KOLESNIKOVA<br />

tel: +7 915 419 01 43<br />

email: arch.annakl@gmail.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!