Réemploi et reconfiguration thermique des fenêtres bois en ... - Prebat

Réemploi et reconfiguration thermique des fenêtres bois en ... - Prebat Réemploi et reconfiguration thermique des fenêtres bois en ... - Prebat

10.07.2015 Views

PUCA - Réemploi et reconfiguration thermique des fenêtres en fin de viePARTIE 1[1.35]Juin 2012Les Bâtisseurs d’Emmaüs110

PUCA - Réemploi et reconfiguration thermique des fenêtres en fin de viePARTIE 12.17 – THEORETICAL AND EXPERIMENTAL STUDIES REGARDING THE THERMAL REHABILITATION OF ASTUDENT’S HOSTEL (ROUMANIE)The student’s hostels located in Timişoara-Romania were mostly built from 1970 to 1980 with theadoption of minimum solutions for the thermal insulation required at the time. The hostels areheated by using a district heating station. The use of the buildings without general repair work hasled to the occurrence of certain damages, especially because of the sweat on the walls.The paper presents the situation of one hostel before and after thermal rehabilitation, along with thesolutions adopted.The solutions adopted referred to the improvement of global thermal resistance of the envelopeelements in order to reduce the pollution and the energy loss. A comparative study is made betweenthe rehabilitated building using one polystyrene layer, mortar finishing for exterior walls andthermally insulated windows with the same solution but using for windows a new performingmaterial aerogel. The energetic performances and energetic classification are presented forrehabilitated hostel.Juin 2012Les Bâtisseurs d’Emmaüs111

PUCA - Réemploi <strong>et</strong> <strong>reconfiguration</strong> <strong>thermique</strong> <strong>des</strong> f<strong>en</strong>êtres <strong>en</strong> fin de viePARTIE 12.17 – THEORETICAL AND EXPERIMENTAL STUDIES REGARDING THE THERMAL REHABILITATION OF ASTUDENT’S HOSTEL (ROUMANIE)The stud<strong>en</strong>t’s hostels located in Timişoara-Romania were mostly built from 1970 to 1980 with theadoption of minimum solutions for the thermal insulation required at the time. The hostels areheated by using a district heating station. The use of the buildings without g<strong>en</strong>eral repair work hasled to the occurr<strong>en</strong>ce of certain damages, especially because of the sweat on the walls.The paper pres<strong>en</strong>ts the situation of one hostel before and after thermal rehabilitation, along with thesolutions adopted.The solutions adopted referred to the improvem<strong>en</strong>t of global thermal resistance of the <strong>en</strong>velopeelem<strong>en</strong>ts in order to reduce the pollution and the <strong>en</strong>ergy loss. A comparative study is made b<strong>et</strong>we<strong>en</strong>the rehabilitated building using one polystyr<strong>en</strong>e layer, mortar finishing for exterior walls andthermally insulated windows with the same solution but using for windows a new performingmaterial aerogel. The <strong>en</strong>erg<strong>et</strong>ic performances and <strong>en</strong>erg<strong>et</strong>ic classification are pres<strong>en</strong>ted forrehabilitated hostel.Juin 2012Les Bâtisseurs d’Emmaüs111

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!