01.02.2015 Views

LTO rapport Tihange Versie 2 dd 30.06.2012

LTO rapport Tihange Versie 2 dd 30.06.2012

LTO rapport Tihange Versie 2 dd 30.06.2012

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Méthodologie<br />

43<br />

Phase 2 : Screening<br />

Une fois le processus de Scoping terminé, le processus de Screening identifie – au sein du<br />

Scope <strong>LTO</strong>-Ageing – les composants qui devront être soumis à une analyse de la gestion du<br />

vieillissement (Ageing Management Review, AMR).<br />

AME standard<br />

Scoping<br />

Screening<br />

Ageing<br />

Management<br />

Review (AMR)<br />

Condition<br />

Assessment<br />

(CA)<br />

Ageing Management<br />

Program Review<br />

(AMP Review)<br />

Définir: Ageing Management Programs (AMP)<br />

Déterminer: Time Limited Ageing Analyses (TLAAs)<br />

Apport AIEA pour le Screening<br />

L’AIEA résume le Screening et les étapes ultérieures comme suit :<br />

SSC is subject to <strong>LTO</strong><br />

review<br />

Is SSC<br />

subject to<br />

TLAA<br />

review<br />

NO<br />

Is an ageing<br />

effect<br />

identified for<br />

<strong>LTO</strong><br />

NO<br />

YES<br />

YES<br />

Is TLAA<br />

reconfirmed<br />

for period of<br />

<strong>LTO</strong><br />

YES<br />

NO<br />

Is the effect<br />

of ageing<br />

managed by<br />

acceptable<br />

AMP<br />

YES<br />

NO<br />

Action required.<br />

Modification of<br />

the plant’s<br />

existing<br />

programmes or<br />

introduction of<br />

new programmes<br />

approved by the<br />

regulator<br />

TLAA confirmed,<br />

no further action<br />

Ageing effects on SSC<br />

are adequately managed<br />

for <strong>LTO</strong><br />

No ageing effects<br />

identified as a<br />

result of review<br />

TLAA<br />

AGEING MANAGEMENT<br />

Source: IAEA schematic about scoping for <strong>LTO</strong> evaluation<br />

Figure 9 : schéma AIEA de Screening pour l’évaluation <strong>LTO</strong><br />

Rapport <strong>LTO</strong> – version 2.0 – 30 juin 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!