Winter<br />
Spring Summer/Fall 2010 2010<br />
Volume Issue 41<br />
Issue 2<br />
Profile / Profil<br />
PRECAST<br />
maGineerinG<br />
Rafael & Bigauskas<br />
Architects Inc.<br />
BÉTON PRÉFABRIQUÉ<br />
<strong>Canadian</strong> <strong>Precast</strong>/Prestressed Concrete Institute • Institut canadien du béton préfabriqué et précontraint<br />
<strong>Canadian</strong> <strong>Precast</strong>/Prestressed Concrete Institute • Institut Canadien du Béton Préfabriqué et Précontraint<br />
Été/automne 2010<br />
Vol. No.<br />
St. Gabriel Village/Village Saint-Gabriel, Qualico Head Office Project, Le V<strong>is</strong>tal:<br />
Serenely Green/Le V<strong>is</strong>tal : sereinement Green, Walkerville Club Lofts, Halifax<br />
Robert L. Stanfield International Airport Parking Garage/Robert L. Stanfield de<br />
Halifax International Gladstone Airport Ridge Parking Condominiums/Les Garage, Sustainable condominiums & LEED Projects<br />
Highlighted/Durable Gladstone et des Ridge, projets The Hilton LEED Garden Actualités Inn/L’hôtel Hilton<br />
Garden Inn, The Atrium Building/ L'édifice L'Atrium<br />
4<br />
2<br />
www.cpci.ca<br />
DCYSA Architecture & Design<br />
Claridge Plaza PM#40787580
Easy cleaning Easy gives cleaning gives higher efficiency. Th<strong>is</strong> <strong>is</strong> why Haarup<br />
Easy higher cleaning gives efficiency. higher gives Th<strong>is</strong> <strong>is</strong> why Haarup<br />
have developed <strong>the</strong>ir Reliable<br />
higher efficiency.<br />
highly efficient equipment<br />
efficiency. Th<strong>is</strong><br />
wash-out character<strong>is</strong>es<br />
Th<strong>is</strong> <strong>is</strong> why <strong>is</strong> why Haarup Haarup<br />
system<br />
have developed have developed <strong>the</strong>ir have highly developed <strong>the</strong>ir efficient highly wash-out system<br />
ensuring better all Haarup <strong>the</strong>ir<br />
cleaning plants highly efficient<br />
and quicker – irrespective efficient wash-out wash-out system<br />
mixing cycles. of size. system<br />
ensuring ensuring better cleaning ensuring better and cleaning better quicker cleaning and mixing quicker and cycles. quicker mixing mixing cycles. cycles.<br />
Reliable equipment character<strong>is</strong>es<br />
all Haarup plants – irrespective of size.<br />
Efficient, Efficient, prec<strong>is</strong>e, strong, prec<strong>is</strong>e, strong reliable strong<br />
Efficient, strong, reliable<br />
Efficient, prec<strong>is</strong>e, strong<br />
To make Haarup<br />
To make<br />
a profit are<br />
a profit nowadays you must operate effi-<br />
To nowadays make special<strong>is</strong>ts a profit you in must designing, nowadays operate you manufacturing,<br />
effi- must operate efficient<br />
equipment and<br />
cient<br />
installing<br />
equipment and <strong>the</strong> Haarup counterflow mixer <strong>is</strong><br />
and cient <strong>the</strong> equipment efficient Haarup concrete counterflow and <strong>the</strong> batching Haarup mixer counterflow and <strong>is</strong> mixingmixer<br />
<strong>is</strong><br />
probably plants.<br />
probably <strong>the</strong> most efficient on <strong>the</strong> market, due to its<br />
<strong>the</strong> most probably efficient <strong>the</strong> on most <strong>the</strong> market, efficient due on to <strong>the</strong> its market, due to its<br />
Haarup strong are and special<strong>is</strong>ts prec<strong>is</strong>e design in designing, and th<strong>is</strong> <strong>is</strong> manufacturing,<br />
why <strong>the</strong> Haa-<br />
strong To and prec<strong>is</strong>e design and th<strong>is</strong> <strong>is</strong> why <strong>the</strong> Haa-<br />
and make rup installing mixer a strong profit and<br />
gearbox efficient nowadays prec<strong>is</strong>e<br />
<strong>is</strong> supplied concrete you design<br />
with batching must and<br />
a unique operate th<strong>is</strong> <strong>is</strong> why<br />
and 5 mixing years effi- <strong>the</strong> Haarup<br />
mixer Haarup gearbox manufacture <strong>is</strong> supplied all with <strong>the</strong>ir a equipment unique 5 years in <strong>the</strong>ir own<br />
cient plants. guaran equipment<br />
rup mixer<br />
tee. and <strong>the</strong><br />
gearbox<br />
Haarup<br />
<strong>is</strong> supplied<br />
counterflow<br />
with a<br />
mixer<br />
unique<br />
<strong>is</strong><br />
5 years<br />
guaran tee. factory in guaran Denmark tee. including individual mixers, skip<br />
probably <strong>the</strong> most efficient on <strong>the</strong> market, due to its<br />
ho<strong>is</strong>ts, aggregate batching and weighing systems,<br />
strong Haarup manufacture all all <strong>the</strong>ir equipment in <strong>the</strong>ir own<br />
Haarup concrete and prec<strong>is</strong>e<br />
manufacture travelling design<br />
all <strong>the</strong>ir buckets and<br />
equipment and th<strong>is</strong><br />
in <strong>the</strong>ir <strong>is</strong> why<br />
<strong>the</strong>ir own <strong>the</strong> control Haa-<br />
Haarup manufacture all <strong>the</strong>ir equipment in <strong>the</strong>ir own<br />
rup factory in in Denmark Denmark. including Haarup counterflow individual mixers, mixers skip are<br />
factory systems. mixer gearbox <strong>is</strong> supplied with a unique 5 years<br />
in Denmark. factory Haarup in Denmark. counterflow Haarup mixers counterflow are mixers are<br />
Haarup Maskinfabrik a/s<br />
ho<strong>is</strong>ts,<br />
Haarup Haarup Maskinfabrik a/s<br />
available aggregate in 11 different batching sizes and from weighing 300 litre systems,<br />
Haarup Maskinfabrik Maskinfabrik a/s a/s<br />
to 4500<br />
available guaran in tee. 11 different available sizes in 11 from different 300 litre sizes to from 4500 300 litre to 4500<br />
Haarupvej 20<br />
concrete litre. travelling buckets and <strong>the</strong>ir own control<br />
Haarupvej Haarupvej 20 Haarupvej 20 20<br />
litre. Haarup's litre. vast project experience and wide range of<br />
DK-8600 Silkeborg<br />
systems.<br />
DK-8600 Silkeborg DK-8600 DK-8600 Silkeborg Silkeborg<br />
Haarup reliable manufacture equipment all make <strong>the</strong>ir it equipment easy for you in <strong>the</strong>ir to ei<strong>the</strong>r own<br />
Fax: Haarup +45 Maskinfabrik 86 84 53 77 a/s<br />
Fax: +45 Fax: 86 84 Fax: +45 53 77 86 +45 84 53 86 77 84 53 77<br />
Tel.: +45 86 84 62 55<br />
factory modern<strong>is</strong>e in Denmark. ex<strong>is</strong>ting plants Haarup or counterflow install new ones. mixers are<br />
Tel.: +45 Tel.: Haarupvej 86 84 Tel.: +45 62 20 55 86 +45 84 62 86 55 84 62 55<br />
Haarup's vast project experience and wide range of<br />
E-mail: haarup@haarup.dk<br />
E-mail: haarup@haarup.dk<br />
E-mail:<br />
Haarup<br />
DK-8600 E-mail: haarup@haarup.dk<br />
Maskinfabrik a/s<br />
Silkeborg<br />
available in 11 different sizes from 300 litre to 4500<br />
haarup@haarup.dk<br />
reliable equipment make it easy for you to ei<strong>the</strong>r<br />
Web: www.haarup.dk<br />
Web: www.haarup.dk<br />
Web: Fax: Haarupvej Web: www.haarup.dk<br />
+45 86 20 www.haarup.dk<br />
84 53 77<br />
litre.<br />
modern<strong>is</strong>e ex<strong>is</strong>ting plants or install new ones.<br />
Tel.: DK-8600 +45 Silkeborg<br />
86 84 62 55
<strong>How</strong> to do it in <strong>Precast</strong>…<br />
Q<br />
A<br />
Q<br />
A<br />
... a <strong>moment</strong>-res<strong>is</strong>ting bridge pier or abutment.<br />
<strong>How</strong> <strong>is</strong> <strong>the</strong> <strong>moment</strong> <strong>connection</strong> <strong>made</strong>?<br />
All you need <strong>is</strong> an emulative detail,<br />
reconnect <strong>the</strong> concrete and rebar.<br />
<strong>How</strong> do you connect <strong>the</strong> rebar?<br />
Use <strong>the</strong>…<br />
NMB<br />
Splice-Sleeve ®<br />
System.<br />
cross-section<br />
Ed<strong>is</strong>on Bridge, Fort Myers, Florida<br />
Mill Street Bridge, Epping, New Hampshire<br />
Splice Sleeve North AmericA, iNc. 192 Technology Drive, Suite J • Irvine, CA 92618-2409<br />
PHONE: 949-861-8393 • FAX: 949-861-8419 • e-mail: info@splicesleeve.com • www.SpliceSleeve.com
All rights reserved. The contents<br />
of th<strong>is</strong> publication may not be<br />
reproduced by any means, in whole<br />
or in part, without <strong>the</strong> prior written<br />
consent of <strong>Canadian</strong> <strong>Precast</strong>/<br />
Prestressed Concrete Institute<br />
Publ<strong>is</strong>hed November 2010 for:<br />
<strong>Canadian</strong> <strong>Precast</strong>/<br />
Prestressed Concrete Institute<br />
196 bronson avenue<br />
suite 100, Ottawa ON K1R 6H4<br />
PH (613) 232-2619<br />
FX (613) 232-5139<br />
Publ<strong>is</strong>hed by:<br />
Publ<strong>is</strong>her: Robert Thompson<br />
Editor: Jeanne Fronda<br />
Sales Manager:<br />
Joe Strazzullo<br />
Sales Executives<br />
Les Bridgeman, Kari Morgan,<br />
Jack Smith,<br />
Steve Beauchamp<br />
Production Team Leader<br />
Adrienne N. Wilson<br />
Senior Graphic Design Special<strong>is</strong>t<br />
James T. Mitchell<br />
MediaEdge Publ<strong>is</strong>hing Inc.<br />
5255 Yonge St., Suite 1000<br />
Toronto, ON M2N 6P4<br />
Toll-Free: 1-866-216-0860 ext. 229<br />
robertt@mediaedge.ca<br />
531 Marion Street<br />
Winnipeg, MB Canada R2J 0J9<br />
Toll Free: 1-866-201-3096<br />
Fax: 204-480-4420<br />
www.mediaedgepubl<strong>is</strong>hing.com<br />
President: Kevin Brown<br />
Senior Vice-President:<br />
Robert Thompson<br />
Branch Manager: Nancie Privé<br />
Please Return Undeliverable<br />
Copies To:<br />
<strong>Canadian</strong> <strong>Precast</strong>/<br />
Prestressed Concrete Institute<br />
196 Bronson Avenue<br />
Suite 100, Ottawa ON K1R 6H4<br />
PH (613) 232-2619<br />
FX (613) 232-5139<br />
Publication Mail Agreement<br />
#40787580<br />
SUMMER/FALL • ÉTÉ/AUTOMNE 2010 VOL. 4 ISSUE 2<br />
COLUMNS / CHRONIQUES<br />
6 President’s Message<br />
Le mot du président<br />
8 Managing Director, Sustainability & Development /<br />
Executive Editor Message<br />
Message du directeur general, durabilité et<br />
développement commercial/Rédacteur en chef<br />
FEATURES / ARTICLES DE FOND<br />
10 Claridge Plaza<br />
By/par Kelly Parker<br />
16 Gladstone Ridge Condominiums<br />
Les condominiums Gladstone Ridge<br />
By/par Kelly Parker<br />
22 The Hilton Garden Inn<br />
L’hôtel Hilton Garden Inn<br />
By/par Kelly Parker<br />
28 The Atrium Building<br />
L'édifice L'Atrium<br />
By/par Kelly Parker<br />
DEPARTMENTS<br />
33 What it means to be a CPCI Member /<br />
Ce que cela signifie être membre du CPCI<br />
34 What’s New in <strong>Precast</strong>?/<br />
Quoi de neuf en préfabrication ?<br />
By/par Brian Hall<br />
36 Member Directory / Annuaire des membres<br />
38 Index to Advert<strong>is</strong>ers /<br />
Index à l’intention des annonceurs<br />
Issue 2 / 2010<br />
5
6<br />
By/par Robert Burak<br />
CPCI Embarks on a New Era of Research Commitment<br />
Facts are not science - as <strong>the</strong> dictionary <strong>is</strong> not literature. — Martin H.<br />
F<strong>is</strong>cher<br />
For every fact <strong>the</strong>re <strong>is</strong> an infinity of hypo<strong>the</strong>ses. — Robert M. Pirsig, Zen<br />
and <strong>the</strong> Art of Motorcycle Maintenance, 1974<br />
I have had my results for a long time: but I do not yet know how I am to<br />
arrive at <strong>the</strong>m. — Karl Friedrich Gauss<br />
Research <strong>is</strong> <strong>the</strong> process of going up alleys to see if <strong>the</strong>y are blind. —<br />
Marston Bates<br />
These are just a few “quotations about science” that were found on http://<br />
www.quotegarden.com/science.html. There are many more interesting<br />
and humorous quotes related to science and research and many of <strong>the</strong>m<br />
resonate in our personal and professional lives. More often than not we<br />
are presented with facts that are inferred and accepted as conclusions.<br />
Th<strong>is</strong> <strong>is</strong> too often true for our personal lives but just as true in our professional<br />
lives.<br />
The precast/prestressed concrete industry has been built on a rich body<br />
of scientific investigation and research, much of which can be found on<br />
PCI’s website by following th<strong>is</strong> direct link https://www.pci.org/find/knowledge_bank/<br />
or by linking through <strong>the</strong> “knowledge bank” link on CPCI’s<br />
home page at www.cpci.ca .<br />
We are excited to announce in th<strong>is</strong> edition of Imagineering that CPCI<br />
recently embarked on our own commitment to research — at our recent<br />
Fall Board meeting <strong>the</strong> CPCI Board of Directors approved a commitment<br />
to research funds that will be allocated annually and will be held in a<br />
research reserve. Our Technical Adv<strong>is</strong>ory Committee (TAC), annually, will<br />
conduct Requests for Proposals and consider new research that will<br />
benefit architects and engineers alike. Th<strong>is</strong> commitment <strong>is</strong> a first for our<br />
association and an important direction as we head in to our 50th year.<br />
Th<strong>is</strong> <strong>is</strong> not to say CPCI has not conducted past research or that we are<br />
not conducting current research. Our continuing Life Cycle Assessment<br />
research that was d<strong>is</strong>cussed in <strong>the</strong> spring 2010 edition of <strong>the</strong> President’s<br />
Message <strong>is</strong> a major commitment by our industry to sustainability. In addition,<br />
we have some very interesting research at <strong>the</strong> University of Manitoba<br />
that <strong>is</strong> expected to influence some important <strong>Canadian</strong> code changes,<br />
on Shear Capacity of Dry-Cast Extruded <strong>Precast</strong>/Prestressed Hollow-Core<br />
Slabs. We hope to report more on <strong>the</strong>se in future editions of Imagineering.<br />
Issue 2 / 2010<br />
PRESIDENT’S MESSAGE<br />
MESSAGE DU PRÉSIDENT<br />
Une nouvelle ère de recherche pour le CPCI<br />
Les faits ne sont pas science et le dictionnaire n’est pas littérature. —<br />
Martin H. F<strong>is</strong>cher<br />
Pour chaque fait un nombre infini d’hypothèses ex<strong>is</strong>tent — Robert<br />
Pirsig « Traité du Zen et de l’entretien des motocyclettes » 1974<br />
[Traduction libre]<br />
J’ai les resultants depu<strong>is</strong> longtemps ma<strong>is</strong> je ne sa<strong>is</strong> pas comment y<br />
arriver. — Karl Friedrich Gauss<br />
La recherche cons<strong>is</strong>te à explorer des ruelles pour voir si ce sont des<br />
culs-de-sac. — Marston Bates<br />
Ce ne sont que quelques-unes des « citations sur la science » répertoriées<br />
au http://www.quotegarden.com/science.html. On en trouve<br />
plusieurs autres tout aussi intéressantes et rigolotes, dont plusieurs font<br />
écho à notre vie personnelle et professionnelle. La plupart du temps, on<br />
nous présente des faits comme des conclusions. C’est trop souvent le<br />
cas dans notre vie personnelle, ma<strong>is</strong> cela s’applique aussi à notre sphère<br />
professionnelle.<br />
L’industrie du béton préfabriqué et précontraint s’est bâtie sur de riches<br />
recherches scientifiques qu’on trouve réunies pour la plupart sur le site du<br />
PCI (util<strong>is</strong>ez ce lien : https://www.pci.org/find/knowledge_bank/) ou via<br />
le lien « knowledge bank » sur la page d’accueil du CPCI (www.cpci.ca).<br />
Dans ce numéro d’Imagineering, nous sommes heureux d’annoncer que<br />
le CPCI s’est récemment engagé dans la recherche. À sa réunion automnale,<br />
son conseil d’admin<strong>is</strong>tration a approuvé l’engagement de fonds de<br />
recherche qui seront alloués annuellement et gardés dans une réserve<br />
pour la recherche. Notre comité-conseil technique (CCT) émettra des<br />
demandes de propositions une fo<strong>is</strong> l’an et évaluera les projets dont architectes<br />
et ingénieurs pourraient tirer profit. Cet engagement constitue<br />
une première pour notre association. C’est une orientation importante à<br />
l’approche de notre 50e anniversaire.<br />
Cela ne signifie pas que le CPCI n’avait jama<strong>is</strong> mené de recherches ou<br />
que nous ne le fa<strong>is</strong>ons pas en ce <strong>moment</strong>. Notre recherche en cours<br />
sur l’évaluation du cycle de vie, dont il a été question dans le mot du<br />
président du printemps 2010, représente un engagement majeur de<br />
notre industrie envers le développement durable. Et n’oublions pas notre<br />
recherche très intéressante à l’Université du Manitoba, intitulée « Shear<br />
Capacity of Dry-Cast Extruded <strong>Precast</strong>/Prestressed Hollow-Core Slabs »,<br />
dont les résultats devraient influencer des modifications importantes au
What th<strong>is</strong> new direction does mean <strong>is</strong> a commitment to <strong>the</strong><br />
industry towards continuous improvement and innovation. In<br />
th<strong>is</strong> <strong>is</strong>sue, like o<strong>the</strong>r <strong>is</strong>sues, you are exposed to some of <strong>the</strong><br />
most innovative precast/prestressed concrete construction<br />
projects in <strong>the</strong> country. None of <strong>the</strong>se were possible without<br />
past research efforts, but to innovate fur<strong>the</strong>r we need a<br />
commitment to future research.<br />
The CPCI TAC <strong>is</strong> considering new research ideas for 2011.<br />
We are also interested in your ideas as professionals. What<br />
research needs do you see that would help you in your dec<strong>is</strong>ion<br />
making? We invite your comments to info@cpci.ca. After all:<br />
A fact <strong>is</strong> a simple statement that everyone believes. It <strong>is</strong> innocent,<br />
unless found guilty. A hypo<strong>the</strong>s<strong>is</strong> <strong>is</strong> a novel suggestion<br />
that no one wants to believe. It <strong>is</strong> guilty, until found effective.<br />
— Edward Teller<br />
Code du bâtiment. Nous espérons vous en apprendre plus sur ces recherches dans<br />
un prochain numéro d’Imagineering.<br />
Cette nouvelle orientation signifie que nous nous engageons dans un processus<br />
d’innovation et d’amélioration continue au bénéfice de l’industrie. Dans ce numéro,<br />
comme dans les autres, vous verrez certains des projets de construction en béton<br />
préfabriqué et/ou précontraint les plus novateurs au pays. Ces projets seraient<br />
impensables sans les recherches effectuées par le passé. Pourtant, pour innover<br />
plus encore, il faut s’engager dans les recherches futures.<br />
Le CCT du CPCI évalue aussi des projets de recherche pour 2011. Nous souhaitons<br />
connaître vos idées à titre de professionnels. Selon vous, quelles recherches vous<br />
aideraient à prendre des déc<strong>is</strong>ions? Faites-nous part de vos commentaires à info@<br />
cpci.ca. Après tout :<br />
Un fait n’est qu’un énoncé cru par tous; il est innocent jusqu’à ce qu’on démontre sa<br />
culpabilité. Une hypothèse n’est qu’une proposition nouvelle que personne ne croit;<br />
elle est coupable jusqu’à ce qu’on démontre son efficacité. — Edward Teller<br />
CPCI Welcomes Amanda Airey to our Office Team<br />
We would like you to join us in welcoming Amanda Airey to our team as CPCI Admin<strong>is</strong>trator. In addition to<br />
her past experience in office admin<strong>is</strong>tration and client relations, she brings an enthusiastic, personable and<br />
dedicated approach to her work. Amanda looks forward to working with our members and industry clients<br />
with <strong>the</strong> same high level of customer service and dedication.<br />
Le CPCI accueille Amanda Airey dans son équipe admin<strong>is</strong>trative<br />
Veuillez vous joindre à nous pour souhaiter la bienvenue à Amanda Airey au sein de l’équipe admin<strong>is</strong>trative<br />
du CPCI. En plus de son expérience en admin<strong>is</strong>tration et en relations avec la clientèle, elle aborde<br />
Amanda Airey,<br />
CPCI Admin<strong>is</strong>trator / ses tâches avec enthousiasme, dévouement et une approche personnal<strong>is</strong>ée. Amanda a bien hâte de<br />
l’équipe CPCI_winter_spring2011_ad_out.pdf admin<strong>is</strong>trative du CPCI 2010-10-29 travailler 13:15:18 avec nos membres et les clients de l’industrie avec le même degré de serviabilité et de sérieux.<br />
Issue 2 / 2010<br />
7
By/par Brian J. Hall<br />
The new <strong>is</strong>sues of Imagineering magazine create a lot of excitement in our<br />
offices, not only because we view <strong>the</strong> exciting projects that make it into <strong>the</strong><br />
magazine, but we also see <strong>the</strong> many great entries that didn’t make <strong>the</strong> cut.<br />
The quality of <strong>the</strong> designs we see in Imagineering magazine, celebrating its<br />
four-year anniversary th<strong>is</strong> year, continues to r<strong>is</strong>e. Th<strong>is</strong> <strong>is</strong> due to designers<br />
facing more challenges with sites that are tighter, owners that are more<br />
prec<strong>is</strong>e in <strong>the</strong>ir ideas, and a growing requirement for shorter construction<br />
schedules (and smaller budgets). <strong>Precast</strong>ers respond to <strong>the</strong>se pressures<br />
by finding new mixes, new techniques and new ways to cut time from <strong>the</strong><br />
design, casting, delivery and erection processes.<br />
Even as we review past accompl<strong>is</strong>hments and congratulate <strong>the</strong> designers<br />
and construction teams, we also want to look forward to greater triumphs.<br />
To that end, I’m pleased to say that we have many key reference publications<br />
and manuals that can help in your design. The first are CPCI technical<br />
guides from our new Insulated Wall Panel Technical Guide to our Joint and<br />
Sealant Guide to a guide on Total <strong>Precast</strong> Structures and many more. V<strong>is</strong>it<br />
our website for a complete l<strong>is</strong>t and downloads that are available at: http://<br />
www.cpci.ca/?sc=publications<br />
Ano<strong>the</strong>r great resource <strong>is</strong> <strong>the</strong> third edition of PCI Architectural <strong>Precast</strong><br />
Concrete Manual, <strong>the</strong> “Bible for designers”. In addition to ass<strong>is</strong>ting you<br />
with incorporating architectural precast concrete components into your<br />
projects, th<strong>is</strong> version has been thoroughly rev<strong>is</strong>ed and updated with<br />
information on every aspect of architectural precast including; designing<br />
to blast-res<strong>is</strong>tance standards, sustainable-design concepts, and new<br />
approaches for energy conservation and mo<strong>is</strong>ture control.<br />
Th<strong>is</strong> <strong>is</strong>sue highlights <strong>the</strong> four unique architectural cladding projects, from<br />
<strong>the</strong> very ingenious Ductal precast concrete on <strong>the</strong> Atrium at 800 Yates<br />
Street in Victoria, B.C., to <strong>the</strong> beautiful limestone inspired 200 Rideau<br />
Street Claridge Plaza in Ottawa or <strong>the</strong> slender walled Hilton Garden Inn<br />
in Montreal and <strong>the</strong> elegant design of <strong>the</strong> Gladstone Ridge Condominiums<br />
that used different sandblasting techniques to achieve different textures<br />
throughout <strong>the</strong> building.<br />
8<br />
Donna White<br />
Issue 2 / 2010<br />
MANAGING DIRECTOR,<br />
SUSTAINABILITY & DEVELOPMENT<br />
EXECUTIVE EDITOR MESSAGE<br />
MESSAGE DU DIRECTEUR GENERAL,<br />
DURABILITÉ ET DÉVELOPPEMENT<br />
COMMERCIAL/RÉDACTEUR EN CHEF<br />
The Passing of one of our own Donna White<br />
Les nouveaux numéros du magazine Imagineering suscitent beaucoup<br />
d’intérêt dans nos bureaux : non seulement nous pouvons voir les merveilleux<br />
projets qu’on y publie, ma<strong>is</strong> aussi les splendides propositions qui ne sont pas<br />
retenues.<br />
On note une qualité cro<strong>is</strong>sante des dessins publiés dans Imagineering, qui<br />
célèbre son quatrième anniversaire cette année. Pourquoi? Parce que les<br />
concepteurs doivent travailler avec des chantiers de plus en plus exigus, des<br />
propriétaires aux idées de plus en plus préc<strong>is</strong>es et des calendriers de construction<br />
toujours plus courts (sans parler des budgets plus petits). Les préfabricants<br />
répondent à ces besoins à l'aide de nouveaux mélanges, nouvelles techniques<br />
et nouvelles économies de temps à chaque étape du processus.<br />
Tout en étudiant les réussites passées et en félicitant les concepteurs et leurs<br />
équipes de constructions, nous aspirons à de plus grands succès. Je su<strong>is</strong> donc<br />
heureux d’annoncer que nous avons publié plusieurs ouvrages de référence<br />
pour vous aider à concevoir. À commencer par les nombreux guides techniques<br />
du CPCI, dont nos nouveaux « Insulated Wall Panel Technical Guide<br />
» et « Joint and Sealant Guide », en passant par un guide sur les structures<br />
entièrement préfabriquées. Pour consulter la l<strong>is</strong>te exhaustive des guides et<br />
téléchargements, rendez-vous au : http://www.cpci.ca/?sc=publications<br />
Autre ouvrage très utile : la tro<strong>is</strong>ième édition du « PCI Architectural <strong>Precast</strong><br />
Concrete Manual » la bible des concepteurs ». Outre vous aider à intégrer<br />
des éléments de béton préfabriqué dans vos projets, cette version a fait<br />
l’objet d’une profonde m<strong>is</strong>e à jour dans chaque aspect du béton architectural<br />
préfabriqué, dont la conception, conformément aux normes de rés<strong>is</strong>tances<br />
aux explosions, les concepts durables et les nouvelles avenues concernant<br />
l’économie d’énergie et le contrôle de l’humidité.<br />
Le présent numéro souligne quatre projets originaux de bardage architectural :<br />
l’ingénieux béton préfabriqué Ductal sur l’Atrium du 800, rue Yates à Victoria<br />
(C.-B.); le splendide Clardige Plaza s’inspirant de la pierre à chaux, au 200, rue<br />
Rideau à Ottawa; la figure élancée de l’hôtel Hilton Garden à Montréal; enfin,<br />
les élégants condos Gladstone Ridge, où on a util<strong>is</strong>é diverses techniques de<br />
sablage par jet pour obtenir des textures variées.<br />
Dear Members and Friends:<br />
It <strong>is</strong> with deep regret and sadness that we remember <strong>the</strong> passing of Donna White on September 28, 2010. For over<br />
22 years many of you knew Donna as a friend and colleague who had a great impact on us all in her role as CPCI<br />
Admin<strong>is</strong>trator. She will be remembered for her thoughtfulness, enthusiasm and dedication. Our thoughts are with<br />
her husband Brian and her family.<br />
Décès de Donna White<br />
Chers membres et am<strong>is</strong>,<br />
Nous sommes au regret de vous annoncer le décès de Donna White le 28 septembre 2010. Depu<strong>is</strong> plus de 22 ans,<br />
plusieurs d’entre vous conna<strong>is</strong>siez Donna comme une amie et une collègue qui a eu un grand impact sur nous<br />
tous dans son rôle comme admin<strong>is</strong>tratrice du CPCI. On se souviendra de sa sollicitude, de son enthousiasme et de<br />
son dévouement. Nous offrons nos sympathies à son mari Brian et à la famille.
Solution structurale<br />
novatrice<br />
Le nouvel hôtel de 11 étages en construction dans la ville<br />
de Saskatoon est le premier projet majeur en Amérique<br />
du Nord à être conçu avec la poutre Delta. Largement<br />
util<strong>is</strong>é en Europe, ce type de système a récemment été<br />
introduit au Canada. Le système est unique en ce sens<br />
qu’il combine effi cacement l’acier et le béton.<br />
L’util<strong>is</strong>ation d’un système de plancher mixte mince<br />
était la meilleure solution pour augmenter la vitesse<br />
d’érection du projet tout en maintenant le niveau élevé<br />
de qualité inhérente aux constructions en béton. «Nous<br />
voulions augmenter la vitesse de construction sans pour<br />
autant réduire la qualité de la structure», a déclaré Doug<br />
Young, Gestionnaire de projet senior chez Stuart Olsen<br />
Dominion Construction.<br />
Le nouvel hôtel du centre-ville de Saskatoon n’a pas une<br />
structure comme les autres. La combina<strong>is</strong>on de l’acier<br />
et du béton créant un plancher mince fait de l’édifi ce<br />
un bon exemple d’innovation et de développement durable.<br />
Certaines poutres Delta livrées ont une portée jusqu’à 9m (30’-0”)<br />
Some Deltabeams delivered span up to 9m (30’ -0”)<br />
Peikko Canada Inc.<br />
955 Fernand Dufour<br />
Québec City, QC<br />
888-734-5561<br />
Rendu gracieuseté de Calnitsky Associates Architects<br />
Render courtesy of Calnitsky Associates Architects<br />
Innovative Structural<br />
Solution<br />
The 11 storey hotel under construction in <strong>the</strong> city of Saskatoon<br />
<strong>is</strong> <strong>the</strong> fi rst major project in North-America to be<br />
designed with <strong>the</strong> Deltabeam. Widely used in Europe,<br />
th<strong>is</strong> type of system was recently introduced in Canada.<br />
The Deltabeam effi ciently combines steel and concrete<br />
(speed of steel and benefi ts of concrete) to create a uniform<br />
slim fl oor.<br />
Using a composite slim fl oor system was <strong>the</strong> best solution<br />
to increase <strong>the</strong> erection speed of <strong>the</strong> project while<br />
maintaining <strong>the</strong> high level of quality inherent to concrete<br />
structures. “We wanted to increase <strong>the</strong> speed of construction<br />
without reducing <strong>the</strong> quality of <strong>the</strong> structure”<br />
said Doug Young, Senior Project Manager at Stuart Olsen<br />
Dominion Construction.<br />
The Saskatoon Holiday Inn Hotel may seem like just ano<strong>the</strong>r<br />
building, though th<strong>is</strong> <strong>is</strong> not <strong>the</strong> case. The project <strong>is</strong><br />
in fact paving <strong>the</strong> way for more innovative and sustainable<br />
buildings in Canada.<br />
La poutre Delta et les dalles évidées ont la même épa<strong>is</strong>seur<br />
Deltabeams and hollow core slabs both have <strong>the</strong> same thickness<br />
Épa<strong>is</strong>seur / Thickness : 300 mm (12”)
10<br />
Issue 2 / 2010<br />
Claridge Plaza By/par<br />
At 200 Rideau Street in <strong>the</strong> nation’s capital stands<br />
a new addition to <strong>the</strong> Ottawa real estate inventory in <strong>the</strong><br />
two phases of <strong>the</strong> Claridge Homes-owned Claridge Plaza.<br />
At 25 stories apiece — and with a v<strong>is</strong>ual juxtaposition<br />
of blue-green glass and limestone-coloured façades —<br />
<strong>the</strong>se two buildings add an imposing and impressive<br />
feature to <strong>the</strong> Ottawa skyline.<br />
One thousand pieces of precast were used in <strong>the</strong> building<br />
envelope, predominantly 140 mm thick — <strong>the</strong> largest<br />
being roughly 4.29 m x 2.85 m, and weighing in at 5,000<br />
Kelly Parker<br />
Au 200 Rideau, dans la capitale nationale, se dresse<br />
une nouvelle addition au parc immobilier d’Ottawa dans<br />
les deux phases de Claridge Plaza, qui appartient à<br />
Claridge Homes. Avec leur juxtaposition de verre turquo<strong>is</strong>e<br />
et de façades en tons de calcaire, les deux tours de 25<br />
étages forment un ajout imposant et impressionnant à la<br />
silhouette d’Ottawa.<br />
Leurs enveloppes ont nécessité mille panneaux de béton<br />
préfabriqué, la plupart ayant une épa<strong>is</strong>seur de 140 mm et<br />
le plus grand ayant des dimensions de 4,29 mètres sur
kilos – except for <strong>the</strong> cornice, for which special forms were<br />
<strong>made</strong>. The colour of <strong>the</strong> precast was accompl<strong>is</strong>hed without<br />
using pigments, which helped to maintain cons<strong>is</strong>tency.<br />
Instead, a combination of locally sourced sands and<br />
stones, coupled with a light sandblasting, resulted in a look<br />
described by Magda Zakarian, partner with DCYSA Architecture<br />
and Design, as “traditional Montreal limestone.”<br />
Those are <strong>the</strong> specs, but th<strong>is</strong> project posed several challenges<br />
for designer, precaster and contractor.<br />
As <strong>the</strong> lead architect, Zakarian “had a field day” drawing<br />
inspiration from similar-looking buildings that DCYSA<br />
2,85 et un poids de cinq tonnes, sauf pour la corniche<br />
qui a nécessité des moules spéciaux. La couleur du béton<br />
préfabriqué a été obtenue sans l’aide de pigments, ce qui<br />
a contribué à maintenir la cohérence. On a plutôt util<strong>is</strong>é<br />
une combina<strong>is</strong>on de sable et de pierres d’origine locale,<br />
légèrement poncés, ce qui a donné un style d’édifice de<br />
« calcaire montréala<strong>is</strong> traditionnel » selon les paroles de<br />
Magda Zakarian, associée chez DCYSA.<br />
Ce sont là les spécifications, ma<strong>is</strong> ce projet a posé<br />
plusieurs déf<strong>is</strong> pour le concepteur, le préfabricant et<br />
l’entrepreneur.<br />
DCYSA<br />
• DCYSA Architecture & Design will celebrate its 40th anniversary in 2011.<br />
• Partner Magda Zakarian describes it as “a very diversified firm, but we are very strongly into <strong>the</strong> residential<br />
sector, especially in large-scale downtown condominium developments. We really specialize in working with<br />
private sector developments.”<br />
• Zakarian says that <strong>the</strong> firm’s principal forte <strong>is</strong> that it understands working with <strong>the</strong> private sector. “It’s especially<br />
important,” she says, “to deliver everything on time and on budget for <strong>the</strong> client. We have to be very<br />
efficient.”<br />
• With 10 partners and 70 people working in <strong>the</strong> office, DCYSA <strong>is</strong> quite diversified, offering a full l<strong>is</strong>t of client<br />
services, with a very quick turnaround time from <strong>the</strong> first design sketches to detailed construction plans and<br />
site superv<strong>is</strong>ion.<br />
• Asked to describe <strong>the</strong> DCYSA philosophy, Zakarian says, “We want to be part of our clients’ success. We don’t<br />
just want to have one-shot clients. If we keep our clients happy, <strong>the</strong>y will come back to us, and that creates<br />
continuity for <strong>the</strong>m. It’s also very important to l<strong>is</strong>ten to your clients because <strong>the</strong>y know <strong>the</strong>ir markets better than<br />
we do — whe<strong>the</strong>r it’s commercial or residential — so it’s very important to understand <strong>the</strong>ir needs and <strong>the</strong>n<br />
to deliver what <strong>the</strong>y really want and need.”<br />
Issue 2 / 2010<br />
CLARIDGE PLAZA<br />
11
12<br />
CLARIDGE PLAZA<br />
Issue 2 / 2010<br />
designed for Montreal, she env<strong>is</strong>ioned what she calls a<br />
“prestigious and noble” look for <strong>the</strong> structure, akin to <strong>the</strong><br />
look of buildings from <strong>the</strong> 1920s, allowing for much more<br />
detailing than a brick tower would employ. “There are a<br />
lot of cornices and details,” she says, “especially at <strong>the</strong><br />
podium level, and in <strong>the</strong> crowning of <strong>the</strong> building that<br />
you’re not able to do with brick. You are able to create<br />
more articulations in <strong>the</strong> walls; you’re able to do bull noses<br />
and a lot of things that you wouldn’t be able to do with<br />
a brick building. It’s also a huge complex — especially<br />
À titre d’architecte en chef, Mme Zacharian a eu « son jour<br />
de chance ». S’inspirant de bâtiments que DCYSA avait<br />
conçus à Montréal, elle a imaginé ce qu’elle appelle un style<br />
« noble et prestigieux », inspiré des années vingt, ce qui<br />
permet beaucoup plus de détails qu’une tour en briques.<br />
« Il y a beaucoup de corniches et de détails impossibles à<br />
obtenir avec de la brique, dit-elle, en particulier au niveau<br />
du podium et dans le couronnement de l’édifice. Vous êtes<br />
en mesure de créer plus d’articulations dans les murs et<br />
de faire des blocs de coin arrond<strong>is</strong>. C’est aussi un énorme<br />
DCYSA<br />
• DCYSA Architecture & Design fêtera son 40 ème anniversaire en 2011.<br />
• L’associée Mme Magda Zakarian la décrit comme « une entrepr<strong>is</strong>e très diversifiée, ma<strong>is</strong> concentrée dans<br />
l’habitation et les grands immeubles en copropriété du centre-ville. Nous sommes vraiment spécial<strong>is</strong>és dans<br />
les complexes d’habitation du secteur privé. »<br />
• Mme Zakarian dit que la firme a pour principal atout une bonne compréhension du secteur privé. « C’est<br />
important, dit-elle, de respecter les budgets et les échéanciers. Nous devons être très efficaces. »<br />
• Avec 10 partenaires et 70 personnes travaillant dans le bureau, DCYSA est très diversifiée, offrant une l<strong>is</strong>te<br />
complète des services avec un délai d’exécution très rapide commençant par croqu<strong>is</strong> et allant jusqu’à la<br />
superv<strong>is</strong>ion du chantier.<br />
• Invitée à décrire la philosophie de DCYSA, Mme Zakarian déclare : « Nous voulons contribuer à la réussite<br />
de nos clients. Nous ne cherchons pas de simples contrats ponctuels. Si nos clients sont sat<strong>is</strong>faits, ils nous<br />
reviendront, et cela leur apportera de la continuité. Il est également très important d’écouter vos clients, car ils<br />
conna<strong>is</strong>sent leurs marchés mieux que nous — que ce soit commercial ou résidentiel. Il est donc très important<br />
de comprendre leurs besoins. »
From precast planks integrated in design to radiant heating and cooling,<br />
it’s technology fueled by Mo<strong>the</strong>r Nature, built by Termobuild.<br />
TM<br />
www.termobuild.com<br />
1 905 764 1878<br />
hollow core slabs • <strong>the</strong>rmal storage • green schools • green colleges • green universities
14<br />
CLARIDGE PLAZA<br />
Issue 2 / 2010<br />
because of it’s two towers with <strong>the</strong> <strong>connection</strong> in between.<br />
We really needed all of <strong>the</strong>se details to make <strong>the</strong> whole<br />
thing look richer and articulated.”<br />
All of that articulation created a challenge for Central<br />
<strong>Precast</strong>, according to Lead Estimator Todd Vine. “They<br />
had beaks on some of <strong>the</strong>se cornice pieces that stuck out<br />
about two feet,” he says, “and in each piece, <strong>the</strong>re were<br />
two or three different curves, including some pieces where<br />
<strong>the</strong> curve went <strong>the</strong> o<strong>the</strong>r way.” Vine says <strong>the</strong>y overcame<br />
that challenge by creating concrete moulds in lieu of <strong>the</strong><br />
typical wooden ones. “We actually had to get a product<br />
<strong>made</strong> that was <strong>the</strong> shape of <strong>the</strong> piece,” he explains, “and<br />
<strong>the</strong>n we poured <strong>the</strong> concrete around it to make our mould,<br />
<strong>the</strong>n we played with it to smooth it all out so that no<br />
imperfections would come through.”<br />
There was ano<strong>the</strong>r wrinkle for <strong>the</strong> precaster to overcome,<br />
according to Joe Zito, Project Manager for Central <strong>Precast</strong>.<br />
“We had some 45-degree corners at <strong>the</strong> main residential<br />
entrance, and that was a little challenging because <strong>the</strong>re<br />
was a column immediately behind that was <strong>the</strong> same<br />
width or length as <strong>the</strong> precast, but <strong>connection</strong>s were<br />
designed accordingly to suit that area.”<br />
complexe — notamment en ra<strong>is</strong>on de ses deux tours et<br />
du raccord entre les deux. Nous avions vraiment besoin de<br />
tous ces détails pour donner de l’éclat à l’ensemble. »<br />
Toute cette articulation a créé un défi pour Central <strong>Precast</strong>,<br />
selon l’estimateur principal Todd Vine. « Certaines corniches<br />
avaient des saillies de deux pieds, dit-il, et dans chaque<br />
pièce, il y avait deux ou tro<strong>is</strong> courbes différentes, dont<br />
certaines pièces où la courbe « …allait dans l’autre sens. »<br />
M. Vine explique que l’on a surmonté le défi en constru<strong>is</strong>ant<br />
des moules en béton plutôt que des coffrages en bo<strong>is</strong>. «<br />
Nous avons dû obtenir un produit qui avait la forme de la<br />
pièce, explique-t-il, pu<strong>is</strong> nous l’avons coulé dans le béton<br />
pour faire un moule et nous avons poli le tout pour éliminer<br />
les imperfections. »<br />
Il y avait un autre obstacle à surmonter, selon M. Joe Zito,<br />
chef de projet pour Central <strong>Precast</strong>. « Nous avions des coins<br />
à 45 degrés autour du hall d’entrée, ce qui était difficile à<br />
réal<strong>is</strong>er, car il y avait juste derrière une colonne de mêmes<br />
dimensions que l’élément préfabriqué, ma<strong>is</strong> nous avons<br />
conçu des joints spéciaux convenant à cette partie. »<br />
En fait, ces joints ont également pr<strong>is</strong> en compte la log<strong>is</strong>tique<br />
de suspension de plus de 1000 panneaux préfabriqués sur
In fact, those <strong>connection</strong>s also factored into <strong>the</strong> log<strong>is</strong>tics of<br />
hanging over 1,000 precast panels on an infill site where<br />
working time was reduced to a 9 a.m. to 3 p.m. schedule<br />
- between rush hours, since no streets could be closed for<br />
construction. “We had to make <strong>the</strong> fasteners so that you could<br />
quickly pre-hang one panel and <strong>the</strong>n go on to <strong>the</strong> next,” says<br />
Vine. “It’s bolted onto <strong>the</strong> structure,” adds Zito, “but not into<br />
its final position in terms of plumb and level; <strong>the</strong> <strong>connection</strong>s<br />
are designed so that <strong>the</strong> panel can be adjusted after initially<br />
pre-hanging it. The actual final adjustment and welding into<br />
place might happen a few hours later or even <strong>the</strong> next day.”<br />
Th<strong>is</strong> system allowed crews to hang a typical complement of<br />
15 panels per day, versus <strong>the</strong> eight or nine that might have<br />
been possible within those restricted hours using traditional<br />
fasteners.<br />
Construction was also quickened because precast allowed<br />
crews to work through <strong>the</strong> winter, which of course, would<br />
have been impossible with masonry.<br />
The result could be described as majestic. As Zakarian<br />
says, precast allowed Claridge designers to “play at ano<strong>the</strong>r<br />
scale and do something impressive in all levels of <strong>the</strong><br />
building.”<br />
un terrain où l’on ne pouvait travailler que de 9 à 15 heures,<br />
soit entre les heures de pointe, étant donné qu’aucune rue<br />
ne pouvait être fermée. « Nous avons dû concevoir les<br />
attaches de sorte que l’on pu<strong>is</strong>se rapidement accrocher<br />
un panneau, pu<strong>is</strong> passer au suivant », explique M. Vine.<br />
« Tout est boulonné à la structure, ajoute M. Zito, ma<strong>is</strong> pas<br />
dans sa position finale; les joints sont conçus de telle sorte<br />
que le panneau peut être ajusté après la pose préliminaire.<br />
L’ajustement final et le soudage en place pouvaient se<br />
faire quelques heures plus tard voire le lendemain. »<br />
Ce système a perm<strong>is</strong> aux équipes de poser 15 panneaux<br />
par jour, au lieu des 8 ou 9 que l’on aurait pu poser avec les<br />
attaches conventionnelles et les heures d’accès limitées.<br />
La construction a également été accélérée, car le béton<br />
préfabriqué permettait aux équipes de travailler pendant<br />
l’hiver, ce qui bien sûr, aurait été impossible avec la<br />
maçonnerie.<br />
Le résultat pourrait être décrit comme majestueux. Comme<br />
le dit Mme Zakarian, le béton préfabriqué a perm<strong>is</strong> aux<br />
concepteurs de Claridge de « jouer à une autre échelle et<br />
faire quelque chose d’impressionnant à tous les niveaux<br />
du bâtiment. »<br />
Issue 2 / 2010<br />
CLARIDGE PLAZA<br />
15
16<br />
Gladstone Ridge<br />
Condominiums By<br />
Issue 2 / 2010<br />
Les condominiums<br />
Gladstone Ridge<br />
Gladstone, in <strong>the</strong> heart of Halifax, <strong>is</strong> a<br />
mixed use development by Westwood<br />
Developments Limited, with two storey<br />
houses built close to <strong>the</strong> street and yards<br />
in <strong>the</strong> back.<br />
Kelly Parker<br />
Par Kelly Parker<br />
Gladstone, au coeur de Halifax, est un<br />
complexe à usage mixte de Westwood<br />
Developments Limited, avec des ma<strong>is</strong>ons<br />
à étage construites près de la rue et des<br />
cours à l’arrière.
Just behind <strong>the</strong>m, stand two luxury condos, St. Alban’s<br />
Mews and Wellington Court. After witnessing first-hand<br />
<strong>the</strong> benefits of architectural precast in earlier projects,<br />
Westwood decided precast was <strong>the</strong> material of choice<br />
for <strong>the</strong> exterior envelope on <strong>the</strong> two towers — and for<br />
a number of reasons such as speed, aes<strong>the</strong>tics, and<br />
reduced maintenance.<br />
Speed - It seems that word <strong>is</strong> getting around about <strong>the</strong><br />
speed with which precast panels can enclose <strong>the</strong> envelope<br />
of a building, and Canada’s short outdoor construction<br />
season makes that a major advantage. “<strong>Precast</strong> played a<br />
very important role for us in <strong>the</strong> delivery of <strong>the</strong> project,”<br />
says Daniel Chedrawe, Principal with The Westwood<br />
Group, “because we built <strong>the</strong> two 12-storey buildings —<br />
a total of 300 units — in 30 months from excavation to<br />
Juste derrière elles, se dressent deux condos de luxe,<br />
le St. Alban’s Mews et le Wellington Cour. Après avoir<br />
constaté les avantages du béton préfabriqué architectural<br />
dans des projets antérieurs, Westwood a décidé de<br />
l’util<strong>is</strong>er pour l’enveloppe extérieure sur les deux tours<br />
– et ce, pour un certain nombre de ra<strong>is</strong>ons telles que la<br />
rapidité, l’esthétique, et une maintenance réduite.<br />
Rapidité – Les panneaux préfabriqués semblent pouvoir<br />
sceller l’enveloppe d’un bâtiment et moins de temps qu’il<br />
n’en faut pour le dire, ce qui représente un avantage majeur<br />
compte tenu de la courte sa<strong>is</strong>on de construction extérieure.<br />
« Le béton préfabriqué a joué un rôle très important<br />
pour nous dans la réal<strong>is</strong>ation du projet », explique Daniel<br />
Chedrawe, associé du Groupe Westwood. « Nous avons<br />
construit en 30 mo<strong>is</strong> les deux bâtiments de 12 étages et<br />
GLADSTONE RIDGE CONDOMINIUMS<br />
Issue 2 / 2010<br />
Photos by<br />
Strescon Limited<br />
Images gracieuseté<br />
de Strescon Limited<br />
17
18<br />
LES CONDOMINIUMS GLADSTONE RIDGE<br />
completion. Our wea<strong>the</strong>r in Halifax means that we have a building season<br />
of about seven months, and about six months of those are inclement<br />
wea<strong>the</strong>r.”<br />
When it comes to any building over six storeys, Chedrawe says, using<br />
precast helps immensely with scheduling, citing <strong>the</strong> fact that crews were<br />
able to erect <strong>the</strong> precast on <strong>the</strong> 12-storey building, that <strong>is</strong> over 200 feet<br />
long, in just 40 days. “Had we been doing a masonry building,” he empha-<br />
Issue 2 / 2010<br />
de 300 unités. La sa<strong>is</strong>on de construction d’Halifax<br />
sure environ sept mo<strong>is</strong>, dont six d’intempéries. »<br />
Le préfabriqué facilite la planification des travaux<br />
sur les immeubles de plus de six étages, selon<br />
M. Chedrawe, et la pose des panneaux sur<br />
l’édifice de 12 étages et 200 pieds de longueur<br />
n’a pr<strong>is</strong> que 40 jours. « Si nous avions construit<br />
en maçonnerie, souligne-t-il, il aurait fallu beaucoup<br />
plus de temps pour sceller le bâtiment et le<br />
rendre étanche à l’eau, ma<strong>is</strong> le béton préfabriqué<br />
nous a perm<strong>is</strong> de passer à la finition beaucoup<br />
plus vite. »<br />
Le fabricant de béton préfabriqué Strescon a<br />
fourni 475 panneaux de tro<strong>is</strong> types différents<br />
pour le revêtement extérieur et les murs-rideaux :<br />
un panneau architectural de base de sept pouces<br />
et demi, des panneaux de six pouces montant<br />
jusqu’au sommet et un panneau de corniche qui<br />
termine le toit.<br />
Esthétique – Les bâtiments Gladstone sont<br />
v<strong>is</strong>uellement sa<strong>is</strong><strong>is</strong>sants, grâce à l’util<strong>is</strong>ation<br />
massive du béton préfabriqué. « Nous avons<br />
util<strong>is</strong>é beaucoup de tableaux de baie pour créer<br />
une base articulée qui couvre les deux premiers<br />
étages », explique Dan Goodspeed, associé des<br />
architectes Kassner/Goodspeed. « Nous avons<br />
intégré un groupe de bandes horizontales qui est<br />
devenu une partie de l’esthétique du bâtiment,<br />
avec la base de tro<strong>is</strong> étages qui ressort, pu<strong>is</strong><br />
quelques bandes et détails en porte à faux qui<br />
courent autour du douzième étage afin de coiffer<br />
l’édifice, pu<strong>is</strong> le dernier étage, tout ça en béton<br />
préfabriqué. »
The Innovation<br />
Leader in<br />
Cement<br />
Chemical Admixtures<br />
TX Active Photocatalytic Cement<br />
Self-Consolidating Concrete<br />
Essroc Cement: Axim Admixtures:<br />
David Fleming Angie Lu<strong>is</strong> Reinhard Nittel Dale Denn<strong>is</strong><br />
519.270.9045 416.859.4130 519.622.5940 416.931.1283<br />
essroc.com • txactive.us aximconcrete.com
20<br />
LES CONDOMINIUMS GLADSTONE RIDGE<br />
Issue 2 / 2010<br />
sizes, “it would have taken a lot longer to close in <strong>the</strong> building and make<br />
it watertight, but precast enabled us to move on to fin<strong>is</strong>hing a lot faster<br />
to deliver <strong>the</strong> product to <strong>the</strong> market.”<br />
<strong>Precast</strong> manufacturer Strescon provided 475 pieces of architectural<br />
precast panels for <strong>the</strong> external cladding and curtainwall of each of <strong>the</strong><br />
project’s two buildings, including three different types of panel; a seven<br />
and a half-inch thick architectural base panel, six-inch panels running<br />
up <strong>the</strong> building to <strong>the</strong> roof, and a cornice panel that fin<strong>is</strong>hes off <strong>the</strong> roof.<br />
Aes<strong>the</strong>tics - The Gladstone buildings are v<strong>is</strong>ually striking, thanks to<br />
extensive use of precast. “We used a lot of reveals to create an articulated<br />
base that runs up for <strong>the</strong> first two floors,” explains Dan Goodspeed,<br />
Partner with Kassner/Goodspeed Architects. “We incorporated a bunch<br />
of horizontal banding that became part of <strong>the</strong> v<strong>is</strong>ual of <strong>the</strong> building,”<br />
he says, “with <strong>the</strong> three-storey base expressed, and <strong>the</strong>n some strong<br />
banding and cantilevered details that run around <strong>the</strong> 12th floor to kind<br />
of put a top to <strong>the</strong> building mass, and <strong>the</strong>n <strong>the</strong> top floor fin<strong>is</strong>h <strong>is</strong> beyond<br />
that, all of which were done in precast.”<br />
Although limited to one colour, Goodspeed says <strong>the</strong>y used a variety<br />
of sandblast techniques to achieve different textures throughout <strong>the</strong><br />
building. “It’s a pigmented fin<strong>is</strong>h using local materials in grey cement,”<br />
says Strescon Plant Manager John Fraser. “There was a pigment added<br />
to <strong>the</strong> mix to give it a yellow<strong>is</strong>h-golden colour,” he adds, “and <strong>the</strong>re are<br />
two different depths of sandblasting and a combination of reveals to<br />
give it some added character.”<br />
Less maintenance - Beyond its aes<strong>the</strong>tic merits, <strong>the</strong>re was one o<strong>the</strong>r<br />
Bien que limité à une seule couleur,<br />
Goodspeed révèle qu’on a util<strong>is</strong>é une variété<br />
de techniques de sablage pour obtenir des<br />
textures différentes. « C’est une finition<br />
pigmentée util<strong>is</strong>ant des matériaux locaux<br />
dans du ciment gr<strong>is</strong>, » explique le directeur<br />
de l’usine Strescon, John Fraser. « Nous<br />
avons ajouté un pigment au mélange<br />
donner une couleur dorée, ajoute-t-il, et il<br />
y a deux profondeurs de sablage de même<br />
qu’une combina<strong>is</strong>on de tableaux de baie qui<br />
donnent plus de cachet. »<br />
Moins d’entretien – Au-delà de sa valeur<br />
esthétique, le béton préfabriqué avait une<br />
autre caractér<strong>is</strong>tique qui a plu aux gens de<br />
Westwood : la durabilité. « Avec la brique,<br />
explique Chedrawe, on doit faire la réfection<br />
des joints et ce genre de choses au bout<br />
de 20 à 25 ans, et les infiltrations d’eau<br />
sont très difficiles à local<strong>is</strong>er. On a moins<br />
de problèmes avec le béton préfabriqué<br />
qui présente moins de joints. Ces derniers<br />
durent plus longtemps que le mortier si on<br />
les a construits correctement.<br />
Il n’est pas surprenant que M. Chedrawe<br />
soit devenu un inconditionnel, étant donné<br />
le succès du projet Gladstone — en plus de
more pragmatic feature of precast that appealed to<br />
<strong>the</strong> Westwood people for th<strong>is</strong> project: durability. “With<br />
brick,” says Chedrawe, “after 20 or 25 years you’re into<br />
re-pointing and those sorts of things, and if you do have<br />
<strong>is</strong>sues with water penetration, it’s a lot more difficult to<br />
find <strong>the</strong>m in a brick exterior — or any o<strong>the</strong>r exterior for<br />
that matter. With precast, it’s a much easier problem to<br />
solve partly because of <strong>the</strong> limited number of joints, and<br />
if properly detailed and constructed, most joints will last a<br />
lot longer than mortar between brick.”<br />
Not surpr<strong>is</strong>ingly, given <strong>the</strong> success of <strong>the</strong> Gladstone<br />
project — in addition to several o<strong>the</strong>r Westwood Group<br />
projects over <strong>the</strong> past few years that employed precast<br />
— Chedrawe has become a big fan. “<strong>Precast</strong> has come<br />
a long way aes<strong>the</strong>tically,” he says, “and <strong>the</strong>re are a<br />
lot of things that you can do <strong>the</strong>se days with it, if you<br />
use a bit of imagination and if you have a good design<br />
team. Previously, precast panels were kind of dull and<br />
grey whereas <strong>the</strong>se days we have a lot more architectural<br />
features like cornices and brick and stone patterns.<br />
In addtion, <strong>the</strong> sand-blasting you can do to expose <strong>the</strong><br />
aggregate can give it a completely different look — <strong>the</strong>re<br />
<strong>is</strong> a lot more variety in terms of what you can do.”<br />
And <strong>the</strong> Halifax skyline benefits from two new condo<br />
towers to prove it.<br />
GLADSTONE RIDGE CONDOMINIUMS<br />
plusieurs autres projets du<br />
groupe Westwood qui util<strong>is</strong>ent<br />
le béton préfabriqué.<br />
« Le béton préfabriqué a<br />
fait de grands progrès sur<br />
le plan esthétique, dit-il.<br />
On peut en faire bien<br />
des choses avec un peu<br />
d’imagination et une bonne<br />
équipe de conception.<br />
Auparavant, les panneaux<br />
préfabriqués étaient ternes<br />
et gr<strong>is</strong> alors qu’aujourd’hui,<br />
nous avons beaucoup plus<br />
de caractér<strong>is</strong>tiques architecturales<br />
comme des<br />
corniches et des imitations<br />
de briques ou de pierres.<br />
En outre, le sablage permet<br />
d’exposer le granulat pour<br />
donner un look complètement<br />
différent – on a beaucoup<br />
plus de possibilités. »<br />
L’horizon d’Halifax a maintenant<br />
deux tours à condo<br />
pour le prouver.<br />
BIK Hydraulics <strong>is</strong> a leader in Quality Unloading Solutions. For over<br />
20 years BIK has built its name on service and continually strives<br />
to be <strong>the</strong> best choice for truck mounted cranes and truck mounted<br />
forklifts. With a new 25,000-square-foot facility located only five<br />
minutes from <strong>the</strong> Toronto International Airport and an extensive<br />
network service providers, BIK <strong>is</strong> working hard because we know<br />
you are, too. Industries we specialize in include, but are not limited<br />
to, Oil Field, Utility Vaults, Pre-cast, Block/Brick, Drywall, Forming,<br />
Roofing and Building Materials. Serving Canada and <strong>the</strong> U.S., BIK <strong>is</strong><br />
<strong>the</strong> only stop you’ll need to make for all of your BOOM TRUCK needs.<br />
Issue 2 / 2010 21
22<br />
Issue 2 / 2010
The Hilton Garden Inn<br />
By Kelly Parker<br />
L’hôtel Hilton<br />
Garden Inn<br />
Par Kelly Parker<br />
The skyline of Montreal <strong>is</strong> home to a<br />
new member of <strong>the</strong> Hilton Hotels family, <strong>the</strong><br />
Hilton Garden Inn, with 37 above-grade floors<br />
that employ a variety of colours on two colour<br />
precast panels — light beige, with both heavy<br />
and light sandblasts, and black-pigmented with<br />
acid wash. The 36-month construction schedule<br />
saw <strong>the</strong> precast panels erected in six months in<br />
<strong>the</strong> $67-million combination hotel and residential<br />
structure. But <strong>the</strong> real story was in <strong>the</strong> use of<br />
Slenderwall ® studcast panels that reduced <strong>the</strong><br />
dead load of <strong>the</strong> structure by some 50 per cent!<br />
The plan from <strong>the</strong> beginning was always to design<br />
<strong>the</strong> building for precast and glass, and <strong>the</strong>re are<br />
traditional precast panels as well as lightweight<br />
panels on <strong>the</strong> building. In some locations —<br />
mostly near <strong>the</strong> base of <strong>the</strong> structure — traditional,<br />
heavier precast was used for log<strong>is</strong>tical<br />
and structural reasons. For example, according<br />
to Construction Canada magazine (Jan. 2010, Vol.<br />
52, No.1) panels near <strong>the</strong> ground floor had granite<br />
veneers cast into <strong>the</strong>m, and it was felt that <strong>the</strong><br />
thicker panel would hold <strong>the</strong> stone better. Thicker<br />
panels were also used beneath windows where <strong>the</strong><br />
windows rest on <strong>the</strong> curtainwall panel. In <strong>the</strong> end,<br />
however, of <strong>the</strong> 10,700 square metres (115,000<br />
square feet) of panels cast, fewer than 20 per cent<br />
of <strong>the</strong>m were conventional thick panels.<br />
The remainder of <strong>the</strong> building was clad using<br />
Slenderwall panels. “We had a certain limitation<br />
on <strong>the</strong> site because it <strong>is</strong> an infill site,” says Eric<br />
Huot, Partner with Geiger & Huot Architects, “and<br />
because of <strong>the</strong> technical constraints of <strong>the</strong> location<br />
for <strong>the</strong> tower crane, we had to go to a very lightweight<br />
precast panel — because I think that at <strong>the</strong><br />
end of <strong>the</strong> boom, we had something like a 12,000<br />
pound capacity and a traditional panel would have<br />
La silhouette de Montréal accueille un nouveau membre<br />
de la famille des hôtels Hilton. Avec ses 37 étages au-dessus<br />
du sol, le Hilton Garden Inn util<strong>is</strong>e diverses couleurs sur deux<br />
panneaux de préfabriqué de couleur : beige pâle à sablages pâles<br />
et foncés, ainsi qu’un pigmenté noir lavé à l’acide. Le calendrier de<br />
construction de 36 mo<strong>is</strong> de cette structure hôtelière-résidentielle<br />
combinée de 67 millions de $ prévoyait six mo<strong>is</strong> pour l’érection<br />
des panneaux préfabriqués. Ma<strong>is</strong> ce qu’il faut souligner, c’est le<br />
recours à des panneaux « studcast » Slenderwall qui rédu<strong>is</strong>ent de<br />
moitié le poids mort de la structure!<br />
Issue 2 / 2010<br />
THE HILTON GARDEN INN<br />
23
24<br />
L’HÔTEL HILTON GARDEN INN<br />
Photos by Betons<br />
Prefabrique du Lac<br />
(BPDL)<br />
Images gracieuseté de<br />
Betons Prefabrique du<br />
Lac (BPDL)<br />
Issue 2 / 2010<br />
A mock up sample of a Slender Wall panel at BPDL plant<br />
Un échantillon maquette d'un panneau mince mur à BPDL usine<br />
been way over that.” That requirement<br />
led to a relationship with<br />
Montreal’s Betons Prefabrique du<br />
Lac (BPDL) to supply <strong>the</strong> Slenderwall<br />
studcast product.<br />
It wasn’t just weight considerations<br />
that <strong>made</strong> <strong>the</strong> studcast panels<br />
an ideal fit for th<strong>is</strong> project; <strong>the</strong>re<br />
were time considerations as well.<br />
“The precast allowed us to close<br />
<strong>the</strong> building (quickly)”, explains<br />
Richard Varadi, Project Manager for<br />
contractor Groupe Canvar. “It’s a<br />
high building and we couldn’t wait<br />
until (<strong>the</strong> frame) has gotten all <strong>the</strong><br />
way to <strong>the</strong> top to start closing it off<br />
so precast really became our only<br />
option. So, as we were going up <strong>the</strong><br />
building, we were able to close it off<br />
floor-by-floor, and <strong>the</strong>n follow pretty<br />
quickly with windows, insulation and<br />
so on. It was a good match between<br />
our needs and what <strong>the</strong> precast<br />
offers.”<br />
Still ano<strong>the</strong>r advantage that <strong>the</strong><br />
Slenderwall studcast brought to bear<br />
on <strong>the</strong> Hilton project <strong>is</strong> <strong>the</strong> space<br />
saving realized within <strong>the</strong> envelope<br />
Dès le départ, le plan cons<strong>is</strong>tait à dessiner un édifice de préfabriqué et de verre.<br />
On y trouve donc des panneaux de préfabriqué traditionnel et des panneaux<br />
légers. À certains endroits, surtout près de la base, on a util<strong>is</strong>é du préfabriqué<br />
traditionnel plus lourd pour des ra<strong>is</strong>ons log<strong>is</strong>tiques et structurelles. Par exemple,<br />
selon le magazine Construction Canada (janv. 2010, vol. 52, n° 1), on a coulé<br />
des placages de granite dans les panneaux près du rez-de-chaussée pour que<br />
ceux-ci, plus épa<strong>is</strong>, retiennent mieux la pierre. On a aussi posé des panneaux<br />
plus épa<strong>is</strong> sous les fenêtres, là où elles reposent sur le panneau du mur-rideau.<br />
Ma<strong>is</strong> en tout, seuls 20 % des 10 700 mètres carrés de panneaux sont épa<strong>is</strong> et<br />
traditionnels.<br />
Des panneaux Slenderwall recouvrent le reste du bâtiment. « Le site était intercalaire,<br />
ce qui amenait des contraintes, affirme Eric Huot, partenaire chez Geiger<br />
& Huot Architects, sans parler des contraintes techniques pour l’emplacement<br />
de la grue. Il a fallu opter pour un panneau de préfabriqué ultraléger, parce<br />
que nous avions une capacité de 12 000 livres au bout de la grue. Un panneau<br />
traditionnel dépasse largement ce poids. » Cette exigence a été le prélude à une<br />
association avec Bétons préfabriqués du Lac (BPDL) de Montréal qui a fourni le<br />
produit Slenderwall.<br />
Si ces panneaux convenaient parfaitement au projet, ce n’est pas seulement<br />
en ra<strong>is</strong>on de leur poids. D’autres éléments sont entrés en considération. « Le<br />
préfabriqué permet de fermer l’édifice rapidement, explique Richard Varadi,<br />
chargé de projet chez l’entrepreneur Groupe Canvar. C’est un grand édifice;<br />
nous ne pouvions pas attendre que la structure se rende tout en haut avant<br />
de commencer à le fermer. Dans les faits, le préfabriqué représentait notre<br />
seule option. Nous avons pu fermer l’édifice étage par étage, à mesure que<br />
nous progressions en hauteur, pour amener peu après les fenêtres, l’<strong>is</strong>olation<br />
et tout le reste. Il y avait une bonne adéquation entre nos besoins et ce que le<br />
préfabriqué offrait. »
Hydraulic Cranes<br />
800-331-7959<br />
"Serving <strong>the</strong> PreCast industry since 1977, QMC remains <strong>the</strong> leader in custom built truck cranes.<br />
Made in <strong>the</strong> U.S.A."<br />
QMC Hydraulic Cranes I 800-331-7959 I 714-754-0337 I www.QMCcranes.com<br />
January 2009 Crane - BL<br />
The new 30 series crane handles 40,000 lbs at<br />
10 ft through a full 360 degree of rotation. The solid<br />
platform <strong>is</strong> greatly improved by <strong>the</strong> newly designed 20<br />
ft spread rear outriggers. The 30 series efficient design<br />
still allows for up to 20,000 lbs payload capacity on a<br />
standard 3-axle truck.<br />
"Call today to d<strong>is</strong>cuss how we can build a truck<br />
crane tailored to your needs."<br />
"Come v<strong>is</strong>it us at <strong>the</strong> NCPA show in Houston.<br />
Booth 701"<br />
Issue 2 / 2010 25
26<br />
L’HÔTEL HILTON GARDEN INN<br />
11<br />
H A M I L T O N F O R M C R E A T E S F U N C T I O N<br />
C A S E S T U D Y<br />
W A F F L E S L A B F O R M S<br />
The Project: When Un<strong>is</strong>tress Corporation of Pittsfield, MA<br />
needed formwork for some unusual floor slabs, <strong>the</strong>y called on<br />
Hamilton Form. The slabs have holes for ventilation pipes and<br />
wire chases for <strong>the</strong> floor of a clean room for a semiconductor<br />
foundry. Each slab weighs as much as 24 tons.<br />
The Solution: The formwork <strong>is</strong> extremely efficient for set-up<br />
and stripping. Steel alignment plates prec<strong>is</strong>ely place <strong>the</strong> voids<br />
for <strong>the</strong> cylindrical holes. The upper d<strong>is</strong>c assembly positively<br />
pulls out of <strong>the</strong> product and void by turning its mounting bolt<br />
and sideforms pivot back for stripping.<br />
The Results: Innovative features simplified what could have<br />
been a complex set-up and stripping process. The formwork<br />
performed perfectly.<br />
When your precast plant needs new formwork or equipment<br />
to automate production, call on Hamilton Form to deliver.<br />
Call 817-590-2111 or v<strong>is</strong>it www.hamiltonform.com<br />
Issue 2 / 2010<br />
itself; “keeping dimension,” as Robert Bouchard, Vice President and<br />
General Director of precast contractor BPDL puts it. “They sprayed <strong>the</strong><br />
insulation directly between <strong>the</strong> sill-ed stud and <strong>the</strong> Slenderwall product,<br />
and <strong>the</strong>n <strong>the</strong>y put <strong>the</strong> drywall on that frame,” he explains, “and that<br />
saved space because normally for a job like that, we’d need to use 150<br />
mm (six-inch) concrete precast and <strong>the</strong>y’d also need to build a 100 mm<br />
(four-inch) drywall stud. With th<strong>is</strong> system, <strong>the</strong>y use <strong>the</strong> stud as well as<br />
part of <strong>the</strong> mechan<strong>is</strong>m to insulate <strong>the</strong> panel.” Bouchard notes that <strong>the</strong><br />
initial cost <strong>is</strong> a little bit more expensive, but <strong>the</strong> larger size of <strong>the</strong> panel<br />
reduces <strong>the</strong> overall cost per square meter, with costs fur<strong>the</strong>r offset by<br />
reduced transportation costs.<br />
Beyond <strong>the</strong> mechanical and log<strong>is</strong>tical advantages of using precast,<br />
<strong>the</strong> most obvious reason to use it <strong>is</strong> simply that it can do things that<br />
no o<strong>the</strong>r cladding material can. “There <strong>is</strong> a very slight curve to both<br />
sides of <strong>the</strong> building,” notes Huot, “and it cantilevers out at ei<strong>the</strong>r end,<br />
and in deciding on <strong>the</strong> cladding of th<strong>is</strong> building, we knew we wanted a<br />
masonry look, and <strong>the</strong> precast was our number one choice because it<br />
gave us <strong>the</strong> opportunity to create th<strong>is</strong> curve in a very standardized way,<br />
and it gave us <strong>the</strong> appearance of having a stone cladding on <strong>the</strong> building<br />
— in texture and colour as well.”<br />
In short, precast means possibilities. “As a designer,” concludes Huot,<br />
“we want to have every possible tool to work with because sometimes<br />
you scribble an idea down on paper, but <strong>the</strong>n you have to make it<br />
happen, and because of precast, <strong>the</strong> more choices you have, <strong>the</strong> easier<br />
that <strong>is</strong> to do.”<br />
“Hamilton Form delivered a series of forms that were both<br />
functional and efficient. Twelve self-contained forms were<br />
unloaded, leveled, mounted and ready for production in three<br />
days with a small crew. Their knack for simplifying complex<br />
projects has benefitted us many times over <strong>the</strong> years.”<br />
Ralph Schwarzer<br />
Manufacturing Manager<br />
Un<strong>is</strong>tress Corporation<br />
Hamilton Form Company, Ltd.<br />
7009 Midway Road • Fort Worth, Texas 76118<br />
Custom forms. Custom equipment. Practical solutions.
Autre avantage du panneau Slenderwall : l’espace économ<strong>is</strong>é dans<br />
l’enveloppe même : « respecter les dimensions », selon l’expression de<br />
Robert Bouchard, vice-président et directeur général de l’entrepreneur en<br />
préfabriqué BPDL : « Ils ont giclé l’<strong>is</strong>olation directement entre le montant et<br />
le produit Slenderwall, pu<strong>is</strong> ils ont posé le gypse sur ce cadre. Cela a économ<strong>is</strong>é<br />
de l’espace, pu<strong>is</strong>que pour un projet de ce genre, le béton préfabriqué<br />
occuperait 150 mm, en plus d’un montant de 100 mm pour le gypse. Avec<br />
ce système, le montant ainsi qu’une partie du mécan<strong>is</strong>me servent à <strong>is</strong>oler<br />
le panneau. » M. Bouchard souligne que, si le coût initial est légèrement<br />
supérieur, la largeur plus importante du panneau réduit le coût total par<br />
mètre carré, sans compter les coûts de transport également moindres.<br />
Au-delà des avantages mécaniques et log<strong>is</strong>tiques du préfabriqué, on l’a<br />
cho<strong>is</strong>i parce qu’il permet des choses que les autres matériaux de parement<br />
ne permettent pas : « L’édifice présente une courbure très d<strong>is</strong>crète sur deux<br />
faces qui se termine en encorbellement, explique M. Huot. Nous voulions<br />
un fini maçonnerie pour le revêtement. C’est pourquoi nous avons cho<strong>is</strong>i le<br />
préfabriqué : il permettait de créer cette courbure de manière très uniforme<br />
et de donner l’apparence d’un revêtement en pierre, pour la texture et la<br />
couleur. »<br />
Autrement dit, préfabriqué est synonyme de possibilités. « Comme dessinateur,<br />
conclut M. Huot, je veux d<strong>is</strong>poser de tous les outils possibles, parce<br />
que c’est une chose de faire un croqu<strong>is</strong> sur papier, c’en est une autre de<br />
concrét<strong>is</strong>er cette idée. Le préfabriqué apporte du choix, et plus on a de<br />
choix, plus c’est facile de faire en sorte que ça marche. »<br />
Issue 2 / 2010<br />
THE HILTON GARDEN INN<br />
27
28<br />
The Atrium<br />
Building<br />
L’édifice Atrium<br />
Par Kelly Parker<br />
Issue 2 / 2010<br />
The skyline of Victoria <strong>is</strong> home to a<br />
striking new piece or architecture that<br />
appears, from some angles, to be modern<br />
sculpture – The Atrium Building.<br />
<strong>Precast</strong> technology played a large role in accompl<strong>is</strong>hing<br />
<strong>the</strong> seven-floor, 18,600 square meter (200,000-squarefoot)<br />
structure - mechanically, technically and aes<strong>the</strong>tically-<br />
but pure log<strong>is</strong>tics also played a large role for <strong>the</strong><br />
developer. “We were fast-tracking th<strong>is</strong> project,” explains<br />
Lorne Gavinchuk, Development Manager for Jawl<br />
By Kelly Parker<br />
La silhouette de Victoria est désorma<strong>is</strong><br />
ponctuée d’une oeuvre architecturale<br />
frappante aux allures de sculpture<br />
contemporaine : l’édifice Atrium.<br />
La technologie du béton préfabriqué a joué un rôle<br />
important dans la réal<strong>is</strong>ation mécanique, technique et<br />
esthétique de l’édifice de sept étages et de 18 600 mètres<br />
carrés (200 000 pieds carrés), ma<strong>is</strong> la log<strong>is</strong>tique a aussi<br />
compté pour beaucoup. « Nous avons exécuté ce projet<br />
en accéléré », explique M. Lorne Gavinchuk, directeur du
Properties, “digging for foundations and blasting rock<br />
while we were still designing.”<br />
For Franc D’ambrosio, Principal with D’ambrosio<br />
Architecture + Urban<strong>is</strong>m, precast provided advantages<br />
on a number of fronts. “We used it in unitized curtainwall<br />
panels — which <strong>is</strong> a fairly unique thing to do, especially<br />
in Canada,” he notes, “which allowed for a number of<br />
materials to be developed as a unit, <strong>the</strong>n prefabricated,<br />
brought to <strong>the</strong> site and hung. We chose concrete because<br />
we could get <strong>the</strong> colour that we wanted, and fur<strong>the</strong>r, we<br />
chose Lafarge’s Ductal ® product, which we could make<br />
développement pour Jawl Properties. « Les plans n’étaient<br />
pas terminés que nous creusions déjà. »<br />
Pour Franc D’Ambrosio, associé principal de D’Ambrosio<br />
Architecture + Urban<strong>is</strong>m, le béton préfabriqué a rapporté<br />
des avantages multiples. « Nous l’avons util<strong>is</strong>é dans les<br />
panneaux de murs-rideaux, ce qui est assez unique,<br />
surtout au Canada, dit-il. C’est ce qui a perm<strong>is</strong> de réal<strong>is</strong>er<br />
des unités préfabriquées que nous n’avions plus qu’à<br />
transporter au chantier et installer. Nous avons cho<strong>is</strong>i le<br />
béton afin d’obtenir la couleur que nous voulions, et de<br />
plus, nous avons cho<strong>is</strong>i le Ductal Lafarge, dont nous pouv-<br />
Issue 2 / 2010<br />
THE ATRIUM BUILDING<br />
29
30<br />
THE ATRIUM BUILDING<br />
FRP (Fiber Reinforced Polymer) Reinforcing Bar in Pre-cast<br />
V-ROD®, <strong>the</strong> premier composite rebar manufactured in Canada by Pultrall Inc., <strong>is</strong> now widely<br />
used across <strong>the</strong> country as <strong>the</strong> premium corrosion res<strong>is</strong>tant reinforcing material on infrastructure and<br />
building projects. The pre-cast sector <strong>is</strong> rapidly becoming one of <strong>the</strong> largest applications with numerous<br />
successful bridge decks, slabs, girders, sidewalks, curbs, wall panels and architectural precast.<br />
Benefits of V-ROD® FRP in Pre-cast<br />
● Non-corrosive and non-conductive with superior tensile strength<br />
● Value engineering – cover could be reduced as corrosion not an <strong>is</strong>sue<br />
● Lightweight – ¼ <strong>the</strong> weight of steel making handling/lifting much easier<br />
● Meets current design Codes/Standards including <strong>the</strong> CHBDC S-6/06, CSA S-806, ISIS Canada<br />
Design Manuals and <strong>the</strong> CSA S-807 Specification<br />
● Excellent bond with concrete (25 Mpa) and high performance concrete<br />
● Available in Grade I (60Gpa) and Grade II (40GPa) with standard bends, custom stirrups & ties or<br />
option of headed reinforcement in lieu of bends<br />
● Carbon (CFRP) bar also available for pre-stressing<br />
along with U of Waterloo anchor system<br />
Issue 2 / 2010<br />
109 Bayfield St. Suite 203<br />
Barrie, ON L4M 3A9<br />
Ph : (705) 734-2340<br />
Toll-free : 1-888-726-2357<br />
Fax : (705) 734-2341<br />
Web : www.trancels-pultrall.com<br />
very thin and relatively light to preassemble<br />
as panels; we were also able to customize<br />
<strong>the</strong> casting itself.”<br />
The weight <strong>is</strong>sue looms large in Victoria,<br />
which has one of <strong>the</strong> highest se<strong>is</strong>mic ratings<br />
in Canada; higher even, than Vancouver.<br />
“The ability to control <strong>the</strong> manufacture and<br />
assembly of a wall in a factory setting <strong>is</strong> very<br />
beneficial,” emphasizes D’ambrosio, “especially<br />
in a high-se<strong>is</strong>mic area, because we’re<br />
not swinging big slabs of marble or concrete<br />
through <strong>the</strong> air to pin <strong>the</strong>m to a wall; we<br />
were able to do all of that under strict<br />
quality control in a [precast manufacturing]<br />
factory, and <strong>the</strong>n ra<strong>is</strong>e <strong>the</strong>m into place.”<br />
The high-tech aspect of <strong>the</strong> Ductal ® precast<br />
meant that <strong>the</strong> walls could be significantly<br />
thinner, giving designers more interior<br />
space to create a perimeter plenum for<br />
<strong>the</strong> d<strong>is</strong>placement ventilation used in <strong>the</strong><br />
building. “Normally,” explains D’ambrosio,<br />
“d<strong>is</strong>placement ventilation would be done<br />
under <strong>the</strong> floors, and in th<strong>is</strong> temperate<br />
Victoria climate, <strong>the</strong> ROI wouldn’t be worth<br />
it, but <strong>the</strong> thin Ductal ® skin of th<strong>is</strong> building<br />
allowed us to be able to do it without using<br />
floor area.”<br />
While <strong>the</strong> results for owner and designer<br />
are nothing short of stunning, <strong>the</strong> process
ions faire des panneaux relativement mince et<br />
léger. Cela nous a perm<strong>is</strong> de personnal<strong>is</strong>er le<br />
moulage. »<br />
Le problème du poids occupe une place<br />
importante à Victoria, qui a l’une des plus<br />
hautes cotes s<strong>is</strong>miques au Canada, plus<br />
élevée encore que Vancouver. « La capacité<br />
de contrôler la fabrication et l’assemblage<br />
d’un mur en usine est très bénéfique, souligne<br />
M. D’Ambrosio, en particulier dans une zone<br />
s<strong>is</strong>mique active, parce que nous ne sommes<br />
pas en train de balancer de grandes dalles de<br />
marbre ou de béton dans l’air pour les épingler<br />
au mur; nous avons pu faire tout cela en usine<br />
(de préfabrication), sous un stricte contrôle de<br />
la qualité et les installer par la suite.<br />
La haute technologie Ductal permettait que<br />
les murs pu<strong>is</strong>sent être sensiblement plus<br />
minces, ce qui donnait aux concepteurs plus<br />
d’espace intérieur de créer un espacement<br />
servant à la ventilation par air pulsé util<strong>is</strong>ée<br />
dans le bâtiment. « Normalement, explique<br />
M. D’Ambrosio, la ventilation par air pulsé<br />
déplacement se ferait sous les planchers, et<br />
dans le climat tempéré de Victoria, le retour<br />
sur invest<strong>is</strong>sement ne serait pas suff<strong>is</strong>ant,<br />
ma<strong>is</strong> la fine enveloppe en Ductal de ce bâtiment<br />
nous a perm<strong>is</strong> de le faire sans passer<br />
par le plancher. »<br />
Issue 2 / 2010<br />
THE ATRIUM BUILDING<br />
The weight <strong>is</strong>sue looms large in Victoria, which has one of <strong>the</strong><br />
highest se<strong>is</strong>mic ratings in Canada; higher even, than Vancouver.<br />
Le problème du poids occupe une place importante à<br />
Victoria, qui a l’une des plus hautes cotes s<strong>is</strong>miques au<br />
Canada, plus élevée encore que Vancouver.<br />
31
32<br />
THE ATRIUM BUILDING<br />
Issue 2 / 2010<br />
“Architects are really art<strong>is</strong>ts, and it’s always a challenge to recreate <strong>the</strong><br />
look that <strong>the</strong>y want to have in a cost-effective manner." – Don Zakariasen,<br />
Director of Marketing for Concrete Products, Lafarge Western Canada.<br />
"Les architectes sont vraiment des art<strong>is</strong>tes, et c’est toujours<br />
un défi de recréer l’apparence qu’ils veulent à prix économique."<br />
– Don Zakariasen, directeur du marketing de Lafarge Ouest du Canada<br />
was not without challenges for precast contractor Lafarge.<br />
“It was kind of interesting because we had never incorporated<br />
precast into a glass curtainwall,” says Don Zakariasen,<br />
Director of Marketing for Concrete Products, Lafarge Western<br />
Canada. “Th<strong>is</strong> posed some challenges for us because we<br />
have to work within <strong>the</strong> tolerances of <strong>the</strong> curtainwall system;<br />
your prec<strong>is</strong>ion has to be at least twice what it would be for<br />
typical precast.”<br />
That process might have been slightly easier had <strong>the</strong> panels<br />
been simple rectangles, but being an atrium building, <strong>the</strong>re<br />
are lots of curves on it. “That’s ano<strong>the</strong>r aspect where <strong>the</strong><br />
precast worked really well,” says Zakariasen, “because we<br />
<strong>made</strong> those panels curved instead of taking flat panels and<br />
making a series of facets. There are a number of different radii<br />
to it, so we custom <strong>made</strong> those and that reduced <strong>the</strong> number<br />
of joints within <strong>the</strong> curtainwall system, which obviously helps<br />
with sealing, allowing <strong>the</strong> whole thing to perform better.”<br />
Perhaps <strong>the</strong> most challenging bit of technology on <strong>the</strong> project<br />
involved creating an aes<strong>the</strong>tic that appears lower-tech. “We<br />
actually had a devil of a time because you’re dealing with<br />
something nebulous,” Zakariasen explains, “so it was really<br />
hard for us to get a feel for what <strong>the</strong> architect wanted, so<br />
finally, we actually set up what I think was an ingenious way<br />
to do it. We set up clay beds, and got <strong>the</strong> architect to come<br />
from Victoria to our plant, roll up h<strong>is</strong> sleeves, and actually<br />
work with <strong>the</strong> clay to carve <strong>the</strong> exact profile that he was<br />
looking for.”<br />
Zakariasen says that <strong>the</strong> technique was something that<br />
an art<strong>is</strong>t would do ra<strong>the</strong>r than something created electronically.<br />
“Architects are really art<strong>is</strong>ts, and it’s always a<br />
challenge to recreate <strong>the</strong> look that <strong>the</strong>y want to have in<br />
a cost-effective manner. When <strong>the</strong> architect worked with<br />
<strong>the</strong> clay himself and got <strong>the</strong> look that he wanted,” he says,<br />
“we used that as <strong>the</strong> plug for our mould and just pulled our<br />
moulds off of that carving.”<br />
Ultimately, what Jawl Properties was looking for was a piece<br />
of art. “(<strong>Precast</strong>) gave my architect <strong>the</strong> freedom to express h<strong>is</strong><br />
art<strong>is</strong>tic v<strong>is</strong>ion,” emphasizes Gavinchuk, “and precast gave us<br />
<strong>the</strong> flexibility to develop a building that would be unique; <strong>the</strong><br />
lines of <strong>the</strong> building are just amazing, and we’ll be looking at<br />
it again for future projects.”<br />
Bien que les résultats pour le propriétaire et le<br />
concepteur soient tout simplement stupéfiants, le<br />
processus n’a pas été sans difficulté pour Lafarge.<br />
« C’était assez intéressant parce que nous n’avions<br />
jama<strong>is</strong> intégré du béton préfabriqué dans des mursrideaux<br />
en verre », déclare M. Don Zakariasen, directeur<br />
du marketing de Lafarge Ouest du Canada. « Cela<br />
nous a posé des déf<strong>is</strong> car nous avons à travailler<br />
avec les tolérances du système de murs-rideaux; la<br />
préc<strong>is</strong>ion doit être au moins deux fo<strong>is</strong> supérieure à la<br />
préfabrication typique. »<br />
Ce processus aurait pu être légèrement plus facile<br />
si les panneaux avaient été de simples rectangles,<br />
ma<strong>is</strong> il y avait beaucoup de courbes. « C’est un autre<br />
aspect où le béton préfabriqué a très bien fonctionné,<br />
poursuit M. Zakariasen, car nous avons fait panneaux<br />
courbes plutôt que des panneaux plats avec des<br />
séries de facettes. Les rayons varient, alors nous les<br />
avons fait sur mesure, ce qui a réduit nombre des<br />
joints dans le système de mur rideau et qui de toute<br />
évidence a aidé à l’étanchéité. »<br />
Le plus grand défi a peut-être été celui de recréer<br />
l’esthétique des techniques plus anciennes. « Nous<br />
avons eu beaucoup de mal, car nous avions affaire à<br />
quelque chose de nébuleux, explique M. Zakariasen.<br />
C’était vraiment difficile pour nous d’avoir une idée de<br />
ce que l’architecte désirait, et finalement, nous avons<br />
trouvé un ingénieux moyen de le réal<strong>is</strong>er. Nous avons<br />
fait des moulages en argile, et nous avons fait venir<br />
l’architecte de Victoria à notre usine pour les sculpter<br />
exactement comme il le voulait. »<br />
M. Zakariasen dit que la technique était celle d’un<br />
art<strong>is</strong>te plutôt que quelque chose de créé par voie électronique.<br />
« Les architectes sont vraiment des art<strong>is</strong>tes,<br />
et c’est toujours un défi de recréer,à prix économique,<br />
ce qu’ils veulent. Une fo<strong>is</strong> que l’architecte a eu<br />
fini de sculpter l’argile comme il le voulait, dit-il, nous<br />
n’avons eu qu’à util<strong>is</strong>er le modèle pour réal<strong>is</strong>er nos<br />
coffrages. »<br />
En fin de compte, ce que Jawl Propriétés recherchait<br />
était une œuvre d’art. « Le béton préfabriqué a donné<br />
à mon architecte la liberté d’exprimer sa v<strong>is</strong>ion art<strong>is</strong>tique,<br />
souligne M. Gavinchuck, et il nous a donné la<br />
flexibilité nécessaire pour développer un bâtiment
What It Means<br />
To Be A CPCI Member<br />
INSTITUTE: The <strong>Canadian</strong> <strong>Precast</strong>/Prestressed Concrete<br />
Institute (CPCI) <strong>is</strong> a non-profit corporation founded in 1961 for <strong>the</strong><br />
purpose of advancing <strong>the</strong> design, manufacture and use of structural<br />
and architectural precast/prestressed concrete in Canada.<br />
• CPCI <strong>is</strong> unique: a combination of a trade and professional association,<br />
with a representative mix of companies and individuals.<br />
• Membership includes precast producers (Active Members),<br />
industry suppliers (Associate and Supporting Members), engineers<br />
and architects (Professional Members), plus affiliate and<br />
student members.<br />
• These members receive CPCI & PCI technical information and<br />
d<strong>is</strong>counts on industry publications, conventions, etc.<br />
• Consult www.cpci.ca for more information.<br />
TECHNOLOGY: CPCI members are committed to developing<br />
innovative solutions to meet <strong>the</strong> demands of <strong>the</strong> construction<br />
industry. Technical committee meetings are held to collect<br />
and d<strong>is</strong>seminate knowledge, stat<strong>is</strong>tics, ideas and information<br />
relating to <strong>the</strong> design, manufacture, and use of precast/<br />
prestressed concrete. Through investigations and research, new<br />
engineering processes are establ<strong>is</strong>hed to ensure quality and<br />
aid in product design. CPCI <strong>is</strong> <strong>the</strong> publ<strong>is</strong>her of <strong>the</strong> CPCI Design<br />
Manual, 4th Edition.<br />
PROFESSIONAL DEVELOPMENT: CPCI Pathway to Our<br />
Future seminars and workshops study systems and procedures<br />
to improve <strong>the</strong> coordination and d<strong>is</strong>semination of information<br />
relevant to our members’ manufacturing processes. In addition,<br />
<strong>the</strong>se seminars seek to improve managerial aspects of precast<br />
manufacturing and marketing through education and professional<br />
development. CPCI’s aim <strong>is</strong> to improve <strong>the</strong> efficiency and effectiveness<br />
of <strong>the</strong> industry as a whole.<br />
CPCI MEMBERS: CPCI member companies are precast<br />
professionals capable and willing to help you successfully<br />
complete your next project. Involve your CPCI partner at <strong>the</strong> early<br />
stages of project planning. Whe<strong>the</strong>r <strong>the</strong> challenges are structural,<br />
aes<strong>the</strong>tic, timing or economic, CPCI members can provide invaluable<br />
input. You will find CPCI members are dedicated, committed<br />
and competent to contribute to <strong>the</strong> realization of <strong>the</strong> standards<br />
you have set for your projects. They will be <strong>the</strong>re to adv<strong>is</strong>e and<br />
ass<strong>is</strong>t you from concept to completion. Consult www.cpci.ca for<br />
<strong>the</strong> members near you.<br />
Ce que cela signifie<br />
être membre du CPCI<br />
L’INSTITUT : L’institut canadien du béton préfabriqué précontraint (CPCI) est<br />
un organ<strong>is</strong>me sans but lucratif (OSBL) qui fut fondé en 1961 ayant pour objectif<br />
de promouvoir l’avancement de la conception, de la fabrication et de l’util<strong>is</strong>ation<br />
du béton préfabriqué précontraint au Canada :<br />
• le CPCI est unique : c’est une association amalgame regroupant un secteur<br />
d’activités et des professionnels; elle est donc représentée par des entrepr<strong>is</strong>es<br />
et des individus;<br />
• l’effectif est composé de préfabricants (membres actifs), de fourn<strong>is</strong>seurs<br />
industriels (associés et membres supporteurs), d’ingénieurs et d’architectes<br />
(membres professionnels) ainsi que d’affiliés et de membres étudiants.<br />
• ces membres reçoivent l’information technique du CPCI et du PCI et bénéficient<br />
d’un raba<strong>is</strong> lors de colloques ou à l’achat de publications de l’industrie;<br />
• Pour plus d’information, consultez notre site au www.cpci.ca.<br />
TECHNOLOGIE : Les membres du CPCI se sont engagés à développer<br />
des solutions innovatrices afin de répondre aux demandes de l’industrie de la<br />
construction. Des rencontres du comité technique ont lieu afin de recueillir et de<br />
diffuser des conna<strong>is</strong>sances, des stat<strong>is</strong>tiques, des idées ainsi que de l’information<br />
relativement à la conception, à la fabrication et à l’util<strong>is</strong>ation du béton préfabriqué<br />
précontraint. Par le bia<strong>is</strong> d’expert<strong>is</strong>es et de recherches, de nouveaux processus<br />
d’ingénierie sont m<strong>is</strong> au point afin d’assurer la qualité et supporter la conception<br />
de produits. Le CPCI est l’éditeur de la quatrième édition du « Manuel de conception<br />
du CPCI »<br />
DÉVELOPPEMENT PROFESSIONNEL : Les séminaires « Les<br />
sentiers de notre futur » du CPCI ainsi que les ateliers étudient les systèmes<br />
et les procédures permettant l’amélioration de la coordination et la diffusion<br />
d’informations pertinentes aux processus manufacturiers de nos membres.<br />
De plus, ces séminaires v<strong>is</strong>ent à améliorer les processus de la gestion de<br />
la préfabrication et de la m<strong>is</strong>e en marché par le bia<strong>is</strong> de la formation et du<br />
développement professionnel. Le CPCI v<strong>is</strong>e donc l’amélioration de l’efficacité et<br />
de l’efficience de toute l’industrie.<br />
LES MEMBRES DU CPCI : Les entrepr<strong>is</strong>es membres du CPCI sont des<br />
professionnels de la de la préfabrication, capables et engagés; ils vous aideront à<br />
compléter avec succès votre prochain projet. Impliquez votre partenaire du CPCI<br />
lors des premières étapes de la planification de votre projet. Que les déf<strong>is</strong> soient<br />
de nature structurale, esthétique, d’échéancier ou économique, les membres du<br />
CPCI peuvent apporter une contribution inestimable. Vous découvrirez que les<br />
membres du CPCI, par leur dévouement, leur engagement et leurs compétences<br />
contribueront à l’atteinte des normes que vous vous êtes fixées pour vos projets.<br />
Ils seront là pour vous conseiller et vous ass<strong>is</strong>ter de la conception à la réal<strong>is</strong>ation.<br />
Consultez le site www.cpci.ca afin d’identifier les membres près de chez-vous.<br />
Issue 2 / 2010 33
ut Canadien du Béton Préfabriqué et Précontraint<br />
34<br />
Graffiti Prevention Easy<br />
A Graffiti tag <strong>made</strong> has always meant a tag<br />
to stay — until now.<br />
Attempts to remove graffiti can leave a building defaced or<br />
with structural damage but a new technology eliminates<br />
that problem before it even starts.<br />
Professional Water Sealant Graffiti Remover (PWS) protects<br />
buildings from permanent blem<strong>is</strong>hes with just one clear,<br />
environmentally friendly coat that simultaneously guards<br />
against wea<strong>the</strong>r damage and forms a barrier between<br />
your building and potential taggers.<br />
“No longer are we forced to stare at unsightly blem<strong>is</strong>hes,”<br />
says Jason Alsip, VP National Sales and Marketing for<br />
Alsip’s. “With a little proactivity, building owners, property<br />
managers and contractors can pretty much guarantee <strong>the</strong>y<br />
will never have to deal with difficult-to-remove graffiti.”<br />
The dual-purpose rubber-based sealant makes getting<br />
rid of unsightly tags a snap – once a building or surface<br />
<strong>is</strong> professionally treated with two coats, all it takes to<br />
ban<strong>is</strong>h graffiti <strong>is</strong> a wash. Just spray and <strong>the</strong> unwanted<br />
paint <strong>is</strong> gone.<br />
Issue 2 / 2010<br />
La prévention des graffit<strong>is</strong><br />
Depu<strong>is</strong> toujours, un graffiti fait était un graffiti<br />
qui restait… ma<strong>is</strong> plus maintenant.<br />
Les tentatives d’effacer des graffit<strong>is</strong> peuvent défigurer un édifice<br />
ou même endommager sa structure, ma<strong>is</strong> une nouvelle technologie<br />
permet d’éliminer le problème avant qu’il n’appara<strong>is</strong>se.<br />
L’effaceur de graffit<strong>is</strong> Professional Water Sealant (PWS) préserve<br />
les bâtiments des marques permanentes par l’application d’une<br />
seule couche écologique qui protège des intempéries et forme<br />
une barrière entre votre bâtiment et les graffiteurs.<br />
« Plus besoin d’endurer ces marques enlaid<strong>is</strong>santes, soutient<br />
Jason Alsip, v.-p. à la vente et au marketing national chez Alsip’s.<br />
Il suffit d’être un peu proactif. Propriétaires, gestionnaires et<br />
entrepreneurs peuvent maintenant garantir, ou presque, que le<br />
client n’aura jama<strong>is</strong> à affronter des graffit<strong>is</strong> difficiles à effacer. »<br />
Le scellant double emploi à base de caoutchouc permet<br />
d’éliminer les « tags » en un tournemain. Après une application<br />
professionnelle de deux couches sur le bâtiment, ou toute<br />
autre surface, tout ce qu’il faudra faire pour que les graffit<strong>is</strong><br />
s’en aillent c’est laver. Vapor<strong>is</strong>ez et les peintures indésirables<br />
d<strong>is</strong>para<strong>is</strong>sent.
When applied by a certified applicator to precast concrete,<br />
brick, stucco, concrete block or o<strong>the</strong>r porous building surfaces,<br />
<strong>the</strong> inorganic sealant <strong>is</strong> even guaranteed, stands up to repeated<br />
cleaning and bends to allow for shifting over time.<br />
“As an industry we’ve been waiting a long time for something<br />
like th<strong>is</strong> product to come along,” says Jason Alsip. “It’s fantastic<br />
to see that in an age when — unfortunately — so many of our<br />
beautiful buildings are being tagged <strong>the</strong>re <strong>is</strong> an inexpensive,<br />
effective solution.”<br />
But <strong>the</strong> benefits don’t stop at graffiti.<br />
PWS has proven itself as a protector of substrates from urban<br />
environments, so h<strong>is</strong>torical buildings can be shielded from<br />
fur<strong>the</strong>r damage to <strong>the</strong> surface from wind, rain and pollution.<br />
A double coat of Professional Water Sealant stands up to rilem<br />
tests (90 m.p.h. wind) without any absorption, so buildings can<br />
be cleaner and more protected right from surface to pilling —<br />
reduced absorption <strong>is</strong> less stress on <strong>the</strong> piles.<br />
It’s ideal for a variety of commercial users — school div<strong>is</strong>ions,<br />
retail businesses, sport and entertainment venues, government<br />
agencies, community development organizations and property<br />
managers.<br />
O<strong>the</strong>r benefits include:<br />
• Capability to bridge cracks and o<strong>the</strong>r defects up to 1/32 of<br />
an inch<br />
• Applicable to even <strong>the</strong> most porous, lightweight concrete<br />
• Inorganic<br />
• Penetrating<br />
• Breathable<br />
• Transparent<br />
• Freeze and thaw damage prevention agent<br />
• Capability to eliminate efflorescence, mould and mildew<br />
• VOC compliant<br />
<strong>How</strong> it works<br />
In testing a new water and wea<strong>the</strong>r sealant, developers realized<br />
two coats of <strong>the</strong>ir product not only stopped water damage — it<br />
also formed an erasable surface for spray paint. Essentially<br />
anything applied atop it slides right off when attacked. To<br />
protect against graffiti damage, a certified applicator must<br />
apply TWO coats of Professional Water Sealant to a structure.<br />
Once <strong>the</strong> solution takes hold, all you do <strong>is</strong> wait for taggers to<br />
come to you.<br />
Just call your certified Professional Water Sealant Graffiti<br />
Remover professional when you spot a tag and he will apply <strong>the</strong><br />
Phase II (natural citric acid base) productor attack straightaway<br />
with a low-pressure power washer. With nothing more than a<br />
light scrub with a cleaning brush, <strong>the</strong> graffiti <strong>is</strong> gone — and <strong>the</strong><br />
substrate remains whole and undamaged.<br />
For more information contact:<br />
Alsip’s Building Products and Services<br />
Tel: 800.665.8441<br />
www.alsips.com<br />
Si une personne accréditée l’applique sur du béton préfabriqué,<br />
de la brique, du stucco, un bloc de béton ou une autre surface<br />
de construction poreuse, le scellant inorganique est même<br />
garanti : il rés<strong>is</strong>tera à plusieurs lavages et épousera le jeu des<br />
surfaces dans le temps.<br />
« Notre industrie espérait un produit de ce genre depu<strong>is</strong><br />
longtemps, poursuit M. Alsip. Quoi de mieux que de trouver<br />
une solution efficace et peu coûteuse, à une époque où les<br />
graffiteurs défigurent tant de nos beaux édifices. »<br />
Ma<strong>is</strong> ses avantages s’étendent au-delà des<br />
graffit<strong>is</strong>.<br />
Le PWS s’avère un sérieux protecteur des substrats contre les<br />
milieux urbains. Il peut donc protéger les bâtiments h<strong>is</strong>toriques<br />
contre de nouveaux dommages qu’entraînent vent, pluie et<br />
pollution. Une double couche de PWS rés<strong>is</strong>te aux tests rilem<br />
(145 km/h) sans absorption. Le bâtiment demeure donc plus<br />
propre et mieux protégé, de la surface jusqu’au pieutage (une<br />
absorption réduite cause moins de stress sur les pieux).<br />
Ce produit convient à divers secteurs commerciaux : comm<strong>is</strong>sions<br />
scolaires, commerces de détail, installations sportives et<br />
culturelles, gestionnaires immobiliers et organ<strong>is</strong>mes gouvernementaux<br />
et communautaires.<br />
De plus :<br />
• il comble les f<strong>is</strong>sures et autres défauts de 1/32 de pouce<br />
ou moins;<br />
• il s’applique même sur les bétons les plus légers et<br />
poreux;<br />
• il est inorganique;<br />
• il pénètre;<br />
• il respire;<br />
• il est transparent;<br />
• il protège des dommages du gel et du dégel;<br />
• il peut éliminer l’efflorescence et la mo<strong>is</strong><strong>is</strong>sure;<br />
• il respecte les règles sur les COV.<br />
Comment ça marche<br />
En testant un nouveau scellant contre l’eau et les intempéries,<br />
des développeurs ont constaté qu’appliquer deux couches<br />
de leur produit formait une surface permettant d’effacer la<br />
peinture en aérosol. En deux mots, toute matière étalée sur<br />
cette surface s’en détache facilement lorsqu’on l’attaque. Pour<br />
protéger votre bâtiment des graffit<strong>is</strong>, un applicateur accrédité<br />
doit mettre DEUX couches de Professional Water Sealant.<br />
Une fo<strong>is</strong> la solution bien pr<strong>is</strong>e, vous n’avez plus qu’à attendre<br />
l’arrivée des graffiteurs.<br />
Lorsque vous remarquez un « tag », appelez votre effaceur<br />
certifié de graffit<strong>is</strong> Professional Water Sealant. Celui-ci appliquera<br />
sur « l’œuvre » le produit Phase II (à base d’acide citrique<br />
naturel) à l’aide d’un pulvér<strong>is</strong>ateur à basse pression. Un coup de<br />
brosse et le graffiti partira, sans endommager le substrat.<br />
Pour en savoir plus :<br />
Alsip’s Building Products and Services<br />
Tél. : 800-665-8441<br />
www.alsips.com<br />
QUOI DE NEUF EN PRÉFABRICATION<br />
Issue 2 / 2010<br />
35
36<br />
MEMBER DIRECTORY / ANNUAIRE DES MEMBRES<br />
ACTIVE MEMBERS / MEMBRES ACTIFS<br />
APS ARCHITECTURAL PRECAST STRUCTURES LTD.<br />
Tel: (604) 888-1968 Fax: (604) 888-6522<br />
9844 199A Street<br />
Langley, Brit<strong>is</strong>h Columbia V1M 2X7<br />
Ebrahim Moradi (1,2,4,5,6,7,9)<br />
ARTEX SYSTEMS INC.<br />
Tel: (905) 669-1425 Fax: (905) 669-1572<br />
P.O. Box 149, 523 Bowes Road<br />
Concord, Ontario L4K 1B2<br />
Jim Farwell (1,4,5,9)<br />
BÉTONS PRÉFABRIQUÉS DU LAC INC.<br />
Tel: (418) 668-6161 Fax: (418) 668-4404<br />
890 des Pins, Ouest<br />
Alma, Québec G8B 7R3<br />
Robert Bouchard (1,4,5,6,8)<br />
ARMTEC I CON-FORCE ALBERTA<br />
Tel: (403) 248-3171 Fax: (403) 248-0711<br />
4300 50th Avenue S.E.<br />
Calgary, Alberta T2B 2T7<br />
John Moody (1,2,3,4,5,6,7,9)<br />
ARMTEC I CON-FORCE EDMONTON<br />
Tel: (780) 960-3204 Fax: (780) 960-2899<br />
205, 26229 TWP Road, Zone 2<br />
Acheson, Alberta T5X 5A4<br />
Larry Hancock (1, 2, 3, 4, 5, 6, 7, 9)<br />
ARMTEC I CON-FORCE MANITOBA<br />
Tel: (204) 338-9311 Fax: (204) 334-0306<br />
Box 3599, RPO Redwood Centre<br />
Winnipeg, Manitoba R2W 3R4<br />
Guy Bernuy (1,2,3,4,5,6,7,9)<br />
ARMTEC I CON-FORCE BRITISH COLUMBIA<br />
Tel: (604) 278-9766 Fax: (604) 278-3537<br />
7900 Nelson Road<br />
Richmond, Brit<strong>is</strong>h Columbia V6W 1G4<br />
Ken Pensack (1,2,3,4,5,6,7,9)<br />
CENTRAL PRECAST INC.<br />
Tel: (613) 225-9510 Fax: (613) 225-5318<br />
23 Bongard Avenue<br />
Nepean, Ontario K2E 6V2<br />
John Mion (1,4,5,9)<br />
CO-PIPE PRODUCTS INC.<br />
Tel: (734) 287-1000 Fax: (734) 287-8132<br />
20501 Goodard Road<br />
Taylor, MI 48180<br />
Div<strong>is</strong>ion of: Coco Group of Companies<br />
949 Wilson Avenue Toronto, ON M3K 1G2<br />
Jenny Coco (9)<br />
CORESLAB INTERNATIONAL INC.<br />
Tel: (905) 643-0220 Fax: (905) 643-0233<br />
332 Jones Road, Unit #1<br />
Stoney Creek, Ontario L8E 5N2<br />
Mario Franciosa<br />
See www.coreslab.com for US Plant Locations<br />
CORESLAB STRUCTURES (ONT) INC.<br />
Tel: (905) 689-3993 Fax: (905) 689-0708<br />
91 Hwy #5, West<br />
Dundas, Ontario L9H 7L6<br />
Anthony Franciosa (1,3,4,6,9)<br />
EXPOCRETE CONCRETE PRODUCTS LTD<br />
Tel: (306) 652-7232 Fax: (306) 665-3211<br />
1800 11th Street, West<br />
Saskatoon, Saskatchewan S7M 1H9<br />
Bruce Dick, COO (1,2,3,4,5,9)<br />
Issue 2 / 2010<br />
GRANITE PRESTRESSED CONCRETE LIMITED/<br />
RAINBOW CONCRETE INDUSTRIES LIMITED<br />
Tel: (705) 566-1740 Fax: (705) 566-4813<br />
2477 Maley Drive<br />
Sudbury, Ontario P3A 4R7<br />
Bor<strong>is</strong> Naneff (1,2,3,4,5,6,7,9,10)<br />
ARMTEC I GROUPE TREMCA<br />
Tel: (800) 363-1458 Fax: (450) 346-7447<br />
800, boul., Pierre-Tremblay<br />
Sainte-Jean-sur-Richelieu, Québec J2X 4W8<br />
Eric Caron (1,4,5,9)<br />
HANSON PIPE AND PRECAST LTD.<br />
Tel: (905) 640-5151 Fax: (905) 640-5154<br />
5387 Be<strong>the</strong>sda Road<br />
Stouffville, Ontario L4A 7X3<br />
Allen Hejazi (6,9)<br />
INTERNATIONAL PRECAST SOLUTIONS LLC—A DIVISION OF PSI<br />
Tel: (313) 843-0073 Fax: (313) 297-7646<br />
60 Haltiner Avenue<br />
River Rouge, MI 48218<br />
Mark A. Fusani (1,2,4,5,9)<br />
P. KRUGER CONCRETE PRODUCTS LTD.<br />
Tel: (780) 438-2072 Fax: (780) 435-0842<br />
6131 - 97 Street<br />
Edmonton, Alberta T6E 3J3<br />
Paul Kruger / Bruce Blackett (1,4,5,9)<br />
LAFARGE CONSTRUCTION MATERIALS<br />
<strong>Precast</strong> Div<strong>is</strong>ion<br />
Tel: (780) 468-5910 Fax: (780) 465-6443<br />
4425 - 92 Avenue<br />
Edmonton, Alberta T6B 2J4<br />
Peter Yurkiw (1,2,3,4,5,6,7,9)<br />
LAFARGE CONSTRUCTION MATERIALS<br />
<strong>Precast</strong> Div<strong>is</strong>ion<br />
Tel: (403) 292-9220 Fax: (403) 236-7554<br />
9028 44th Street, South East<br />
Calgary, Alberta T2C 2P6<br />
Don Zakariasen (1,2,3,4,5,6,9)<br />
LAFARGE CANADA INC.<br />
<strong>Precast</strong> Div<strong>is</strong>ion<br />
Tel: (204) 958-6333 Fax: (204) 233-5644<br />
185 Dawson Road<br />
Winnipeg, Manitoba R2J 0S6<br />
Peter Schuster (1,2,3,4,5,6,7,8,9)<br />
ARMTEC I PRE-CON<br />
Tel: (905) 457-4140 Fax: (905) 457-5323<br />
35 Ru<strong>the</strong>rford Road, South<br />
Brampton, Ontario L6W 3J4<br />
Shane Sherar (1,4,5,9)<br />
ARMTEC I PRE-CON<br />
Tel: (519) 537-6288 Fax: (519) 537-7741<br />
1100 Dundas Street, R.R. #5<br />
Woodstock, Ontario N4S 7V9 (1,2,4,5,6,9)<br />
PRESTRESSED SYSTEMS INCORPORATED<br />
Tel: (519) 737-1216 Fax: (519) 737-6464<br />
P.O. Box 517<br />
Windsor, Ontario N9A 6M6<br />
Paul Phillips (1,2,3,4,6,9)<br />
RES PRECAST INC.<br />
Tel: (705) 436-7383 Fax: (705) 436-7386<br />
3450 Thomas Street<br />
Inn<strong>is</strong>fil, Ontario L9S 3W6<br />
Joe Di Leo (1,5,9)
MEMBER DIRECTORY / ANNUAIRE DES MEMBRES<br />
ACTIVE MEMBERS / MEMBRES ACTIFS<br />
SCHOKBÉTON QUÉBEC, INC.<br />
Tel: (450) 473-6831 Fax: (450) 473-2285<br />
430, Arthur Sauve, Bur. 6030<br />
St-Eustache, Québec J7R 6V7<br />
Benoit Fradet (1,2,3,4,5,6,7,9)<br />
STRESCON LIMITED Corporate Office<br />
Tel: (506) 632-2600 Fax: (506) 632-7689<br />
P.O. Box 3187, 400 Chesley Drive<br />
Saint John, New Brunswick E2K 5L6<br />
Hans O. Klohn<br />
STRESCON LIMITED<br />
Tel: (506) 633-8877 Fax: (506) 632-7576<br />
P.O. Box 3187, Station B<br />
400 Chesley Drive<br />
Saint John, New Brunswick E2K 5L6<br />
D. Isnor (1,2,3,4,5,6,7,9)<br />
STRESCON LIMITED<br />
Tel: (902) 494-7400 Fax: (902) 494-7401<br />
P.O. Box 44205, Bedford Industrial Park<br />
Bedford, Nova Scotia B4A 3Z8<br />
Andrew LeVatte (1,2,3,4,5,6,7,9)<br />
STRESS-CON INDUSTRIES INC.<br />
Tel: (586) 731-1628 Fax: (586) 731-7007<br />
50500 Design Lane<br />
Shelby Twp., MI USA 48315<br />
Malek Eljizi (1,4,6)<br />
SURESPAN CONTRACTING<br />
Tel: (250) 748-8888 Fax: (250) 746-8011<br />
#3–3721 Drink Water Road<br />
Duncan, Brit<strong>is</strong>h Columbia V9L 6P2<br />
Jason Kearns (1,2,3,4,5,6,7,9)<br />
TRI-KRETE LIMITED<br />
Tel: (416) 746-2479 Fax: (416) 746-6218<br />
152 Toryork Drive<br />
Weston, Ontario M9L 1X6<br />
Tony Bombini (1,4,5,9)<br />
BLACK MINT SOFTWARE INC.<br />
Tel: (613) 230-3001 Fax: (613) 230-4693<br />
675 Cooper Street<br />
Ottawa, ON K1R 5J3<br />
Dave Marshall<br />
website: www.blackmint.com<br />
HGS LIMITED<br />
Tel: 519-944-3040 Fax: 519-944-5636<br />
3100 Temple Drive<br />
Windsor, ON<br />
Medhat M. Ghabrial, PE, P.Eng, Ph.D.<br />
website: www.hgslimited.com<br />
KASSIAN DYCK & ASSOCIATES<br />
Tel: 403-255-6040 Fax: 403-255-6043<br />
1475-10655 Southport Road SW<br />
Calgary, AB T2W 4Y1<br />
Wayne Kassian<br />
website: www.kdassociates.com<br />
N A ENGINEERING ASSOCIATES<br />
Tel: (519) 273-3205 Fax: (519) 273-7133<br />
107 Erie Street, Suite #2<br />
Stratford, ON N5A 2M5<br />
Nick Aroutzid<strong>is</strong><br />
website: www.naeng.com<br />
WELLS CONCRETE—GRAND FORKS<br />
Tel: (450) 473-6831 Fax: (450) 473-2285<br />
5000 Demers Avenue<br />
Grand Forks, ND 58201<br />
Mike Mortensen (1,2,4,5,9)<br />
KEY TO PRODUCT CODES / LEGENDE DE LA CODIFICATION<br />
1. Beams, Columns, Jo<strong>is</strong>ts /<br />
Poutres, Colonnes, Solives<br />
2. Stemmed Units, Double T, Simple T<br />
3. Hollow-Core slabs / Dalles à âmes creuses<br />
4. Solid Slabs, Salles pleines<br />
5. Architectural precast concrete units /<br />
Unites de béton préfabriqué architectural<br />
6. Bridge beams / Poutres de pont<br />
7. Piles / Pieux<br />
8. G.F.R.C. / Béton armé de fibre de verre<br />
9. M<strong>is</strong>cellaneous Products / Produits divers<br />
10. Post-Tensioning / Post-constrainte<br />
MEMBER IN GOOD STANDING WITH THE CANADIAN PRECAST/<br />
PRESTRESSED CONCRETE INSTITUTE (CPCI)<br />
Member certified by <strong>the</strong> CPCI <strong>Precast</strong> Concrete Certification Program<br />
for Architectural and Structural <strong>Precast</strong> Concrete Products and<br />
System to fabricate architectural and structural precast concrete to<br />
meet <strong>the</strong> requirements of CSA Standard A23.4, including Appendices<br />
A and B www.precastcertification.ca<br />
MEMBRES EN RÈGLE AUPRÈS DE L’INSTITUT CANADIEN DU<br />
BÉTON PRÉFABRIQUÉ PRÉCONTRAINT (CPCI)<br />
Membres qui sont certifiés par le « Programme de certification de<br />
produits et de systèmes de béton préfabriqué architectural et structural<br />
du CPCI » pour la fabrication de béton préfabriqué architectural<br />
et structural, respectant les exigences de la norme CSA A23.4,<br />
y compr<strong>is</strong> les annexes A et B. www.precastcertification.ca<br />
PROFESSIONAL FIRMS/<br />
ENTREPRISES PROFESSIONNELLES<br />
NORR LIMITED<br />
Tel: 416-929-0200 Fax: 416-929-3635<br />
175 Bloor Street East<br />
North Tower, 15th Floor<br />
Toronto, Ontario, Canada M4W 3R8<br />
Contact: Rolfe Kaartinen<br />
website: www.norr.com<br />
TOWER ENGINEERING<br />
Tel: (204) 925-1150 Fax: (204) 925-1155<br />
208 - 897 Corydon Avenue<br />
Winnipeg, MB T3M 0W7<br />
David Poole<br />
website: www.towereng.ca<br />
CPCI Professional Firm membership: CPCI has developed th<strong>is</strong> new member category so that professional firms and precast members can fur<strong>the</strong>r<br />
streng<strong>the</strong>n relationships, providing an opportunity for improved collaboration within <strong>the</strong> precast industry.<br />
Some of <strong>the</strong> unique benefits of Professional Firm membership include:<br />
1. A link to your company’s website from <strong>the</strong> CPCI website<br />
2. Your company l<strong>is</strong>ted in <strong>the</strong> CPCI Imagineering Magazine<br />
3. Unique sponsorship and advert<strong>is</strong>ing opportunities for your firm<br />
Membership <strong>is</strong> only $500 annually. For fur<strong>the</strong>r information on o<strong>the</strong>r benefits, and to apply, contact us at info@cpci.ca.<br />
Issue 2 / 2010<br />
37
38<br />
Index to Advert<strong>is</strong>ers / Index à L’intention des Annonceurs<br />
Issue 2 / 2010<br />
Advanced Concrete Technologies Inc. .......... 18<br />
www.concretebiz.com<br />
Axim Italcementi Group & Essroc Canada .... 19<br />
www.aximconcrete.com<br />
www.essroc.com<br />
BIK Hydraulics Ltd. ...................................... 21<br />
www.bikboomtrucks.com<br />
Coloured Aggregates ................................... 31<br />
www.colouredaggregates.com<br />
Dufferin Aggregates/A Div<strong>is</strong>ion of Holcim<br />
(Canada) Ltd. ................................................ 3<br />
www.holcim.ca<br />
Easi-Set/BPDL .................Outside Back Cover/<br />
....................................... Dos de la couverture<br />
www.bpdl.com<br />
Euclid Admixture Canada Inc ....................... 27<br />
www.euclidchemical.com<br />
Haarup Maskinfabrik A/S ... Inside Front Cover/<br />
............................ Verso de la page couverture<br />
www.haarup.com<br />
Hamilton Form Company ............................. 26<br />
www.hamiltonform.com<br />
JVI Inc. ........................................................ 25<br />
www.jvi-inc.com<br />
PEIKKO Canada Inc. ...................................... 9<br />
www.peikko.com<br />
QMC Hydraulic Cranes ................................ 25<br />
www.qmccranes.com<br />
Sika Canada Inc. ........................................... 7<br />
www.sika.ca<br />
Splice Sleeve North America ......................... 4<br />
www.splicesleeve.com<br />
TermoBuild Canada ..................................... 13<br />
www.termobuild.com<br />
Trancels-Pultrall Canada Inc. ....................... 30<br />
www.trancels-pultrall.com
IT’S YOUR MESSAGE.<br />
GIVE IT<br />
THE EDGE.<br />
Give yourself <strong>the</strong> EDGE<br />
After twenty-three years in <strong>the</strong> associationpubl<strong>is</strong>hing<br />
fi eld, Kevin Brown and I decided<br />
eight years ago to establ<strong>is</strong>h MediaEdge Publ<strong>is</strong>hing.<br />
We wanted to use our skills, knowledge and love<br />
of publ<strong>is</strong>hing to build a business with a focus on<br />
providing exemplary customer service and leading<br />
edge association communication solutions.<br />
Today, MediaEdge <strong>is</strong> <strong>the</strong> leader in quality custom<br />
publ<strong>is</strong>hing for associations. We treat every client<br />
like our only client, and <strong>the</strong>ir agenda <strong>is</strong> our agenda.<br />
These have remained our guiding principles since<br />
we fi rst opened our doors.<br />
Customer service <strong>is</strong> our number one priority.<br />
Robert Thompson<br />
Senior Vice-President<br />
Toronto 1.866.216.0860 ext. 229<br />
Fax: 416.512.8344<br />
Toronto 1.866.216.0860<br />
Winnipeg 1.866.201.3096<br />
Vancouver 1.604.739.2115<br />
Gainesville 1.877.234.1863 w w w. m e d i a e d g e p u b l i s h i n g . c o m