Instructions d'utilisation - Fritz Kübler GmbH Zähl- und Sensortechnik
Instructions d'utilisation - Fritz Kübler GmbH Zähl- und Sensortechnik
Instructions d'utilisation - Fritz Kübler GmbH Zähl- und Sensortechnik
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
13. Checklist for start-up<br />
Mounting (for information, see Mounting Advice)<br />
The encoder must only be installed using the fixing elements supplied by the <strong>Fritz</strong> Kübler<br />
<strong>GmbH</strong> company.<br />
The loading on the encoder shaft, as a result of mounting/installation, is to be kept as low as<br />
possible. The installation dimensions specified of the encoder, must be strictly observed. It is<br />
also important to note that the tolerance compensating elements must be mounted without<br />
pre-loading.<br />
The indicated torques for mounting the encoders and the fastening elements have been complied<br />
with.<br />
english<br />
Axial and radial offset are to be kept to a minimum during installation, so that the specified<br />
maximum values are not exceeded.<br />
The shaft tolerance of the drive shaft, onto which the encoder is fitted, is stipulated as G6<br />
(for solid shaft encoders)/G6 (for hollow shaft encoders).<br />
Electronic connections (see data sheet for terminal assignment)<br />
Controller<br />
Is the signal level and polarity of the supply voltage correct?<br />
Have the sine/cosine signals been correctly wired with respect to polarity and phase?<br />
Terminating resistor 120 Ohm (A – A ; B – B )<br />
Do the direction of rotation and count direction match?<br />
Sin 2 (x) + Cos 2 (x) = 1 monitoring been activated?<br />
19