KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design
KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design
KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table of contents<br />
1. Safety instructions .......... .............................................................................................. Page 88<br />
2. General 2.1 Area of application ................................................................. Page 91<br />
2.2 Description of system ............................................................... Page 91<br />
2.3 Plant configuration .................................................................. Page 92<br />
2.4 Dimensions and useful volume .............................................. Page 97<br />
2.5 Functional description ............................................................ Page 98<br />
3. Packaging, transport and storage 3.1 Packaging ................................................................................ Page 100<br />
3.2 Transport................................................................................. Page 100<br />
3.3 Storage.................................................................................... Page 100<br />
4. Installation and assembly 4.1 Place of installation ................................................................. Page 101<br />
4.2 Excavation pit.......................................................................... Page 101<br />
4.3 Blinding layer ......................................................................... Page 101<br />
4.4 Placing .................................................................................... Page 102<br />
4.5 Filling the tank ........................................................................ Page 102<br />
4.6 Backfilling the excavation pit ................................................... Page 102<br />
4.7 Pipework ................................................................................. Page 102<br />
4.8 Laying the connecting lines .................................................... Page 103<br />
4.9 Assembly of the attachment pieces ....................................... Page 103<br />
4.10 Filling ...................................................................................... Page 104<br />
4.11 Installation control unit and compressor ................................ Page 105<br />
5. Commissioning 5.1 Making the plant ready for operation ...................................... Page 108<br />
5.2 Operator's duties..................................................................... Page 109<br />
5.3 Instruction of the Customer .................................................... Page 109<br />
6. Operation and disposal 6.1 Operation ................................................................................ Page 110<br />
6.2 Self-inspection by the operator ............................................... Page 110<br />
6.3 Things that do not belong into a septic system ....................... Page 111<br />
6.4 Disposal................................................................................... Page 112<br />
7. Maintenance 7.1 Preliminary sedimentation and aeration ................................. Page 113<br />
7.2 Compressor............................................................................. Page 114<br />
8. Control of the septic system 8.0 ............................................................................................... Page 115<br />
8.1 System menu ......................................................................... Page 117<br />
8.2 Information menu .................................................................. Page 117<br />
8.3 Maintenance menu ................................................................. Page 117<br />
9. Malfunctions and remedial measures ............................................. ................................................... Page 119<br />
10. Warranty ..... ................................................................................................. Page 122<br />
11. Plant passport and factory approval ....................................................................................................... Page 123<br />
12. Declaration of conformity ....................................................................................................... Page 124<br />
13. Operations diary ....................................................................................................... Page 125<br />
14. Maintenance checklist ....................................................................................................... Page 126<br />
15. Technical specifications ....................................................................................................... Page 127<br />
16. Important contacts/info ....................................................................................................... Page 129<br />