1. Safety instructions<br />
Caution! Danger of suffocation when entering the plant.<br />
The personnel for assembly, operation, maintenance and repair must possess the appropriate qualification<br />
for this type of work.<br />
The area of responsibility, the authority and the supervision of personnel must be exactly regulated<br />
by the operator.<br />
The operational security of the plant supplied is only guaranteed when it is used in accordance with<br />
the regulations. The limits of the technical specifications may not be exceeded on any account.<br />
This plant contains electric charges and controls mechanical plant components. Non-compliance<br />
with the operating instructions may result in considerable damage to property, personal injuries or<br />
fatal accidents.<br />
During assembly, operation, maintenance and repair of the plant, the regulations for the prevention<br />
of accidents, the pertinent DIN and VDE standards and directives must be heeded.<br />
These are among others:<br />
• "Regulations for the prevention of accidents - construction work" BGV C22, previously VBG 37<br />
• "Excavations and trenches - slopes, planking and strutting, breadths of working spaces“ DIN 4124<br />
• "Construction and testing of drains and sewers" DIN EN 1610<br />
• "Directives for working in tanks and narrow spaces" BGR 117, previously ZH1/77<br />
The cover on the small sewage treatment plant must be sufficiently secured against unauthorised<br />
opening (in particular by children) also during work breaks.<br />
Warning !<br />
The plant consists of several components. Please therefore also heed the individual chapters in the<br />
operating instructions. During assembly, maintenance, service and repair work on one of the components,<br />
the plant as a whole must always be put out of operation by unplugging the mains plug on the<br />
control unit and securing it against unintentional restart. Ensure that the inflow of sewage is interrupted<br />
during assembly.<br />
The control unit is live and may not be opened.<br />
Only qualified electricians may carry out work on electrical facilities.<br />
The term qualified electrician is defined in VDE 0105.<br />
Work on the compressor exceeding the scope of the activities described in the chapter "Service and<br />
Maintenance" is not permissible.<br />
It must be ensured that the electric cables as well as all other electrical plant components are in<br />
faultless condition. In case of damage, the plant may on no account be put into operation.<br />
Caution !<br />
Conversions or changes to the plant may only be carried out in agreement with the manufacturer.<br />
For safety reasons, use original spare parts and accessories approved by the manufacturer. The use<br />
of other parts may void the liability for any consequences arising thereof.<br />