20.03.2014 Views

KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design

KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design

KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

14. Maintenance Checklist<br />

Master data<br />

Name of operator: ____________________________<br />

Plant model:<br />

____________________________<br />

Purification class: ____________________________<br />

Number of connected residents / population equivalent:<br />

Date:<br />

____________________________<br />

Location:<br />

Plant size:<br />

Serial number:<br />

Time:<br />

____________________________<br />

____________________________<br />

____________________________<br />

____________________________<br />

Plant component / function<br />

First impression<br />

Installation location tank<br />

Installation location syphons / pumps<br />

Installation situation hoses + cables<br />

Ventilation line<br />

Control unit<br />

Are there/Were are malfunction messages?<br />

Inspection operations diary<br />

Display --> economy phase<br />

Operating time clear water syphon<br />

Operating time feed syphon<br />

Operating time ventilation<br />

Total operating time<br />

Preliminary sedimentation<br />

Is it possible for external water to enter?<br />

Are pumps / syphons functional?<br />

Is the feed pipe free of dirt?<br />

Is there any floating sludge?<br />

Height sludge level (if possible)<br />

Height water level (if possible)<br />

Aeration<br />

Is it possible for external water to enter?<br />

Are pumps / syphons functional?<br />

Is the sludge syphon open / closed?<br />

Function oxygen supply?<br />

Function floating switch at Hmax.<br />

Function floating switch at Hmin.<br />

Freedom of movement floating switch?<br />

Is there any floating sludge?<br />

Has plant overflown?<br />

Check Defect Comment<br />

yes no yes no<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Sewage analysis (parameters as far as measurable)<br />

Odour<br />

Colour<br />

Temperature<br />

Activated sludge volume<br />

Sedimentable substances<br />

pH value<br />

Oxygen concentration<br />

Other remarks<br />

Date<br />

Sign<br />

NH 4 -N-ammonia nitrogen<br />

NH 3 -N-nitrate nitrogen<br />

NH 2 -N-nitrite nitrogen<br />

N tot -total nitrogen<br />

P ges -Gesamtphosphat<br />

CSB Ptot total phosphate<br />

BSB 5<br />

126

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!