5. Commissioning<br />

<br />

<br />

Display/indicator panel<br />

Movement keys/direction keys for guidance<br />

through the program menu<br />

<br />

<br />

<br />

<br />

Enter key/OK key<br />

Back key/ESC key<br />

Pilot lamp indicating readiness for operation<br />

Pilot lamp for malfunction message<br />

Mains power supply cable<br />

Mains connection compressor<br />

Connection compressed air sensor<br />

Connection options for external signal<br />

generator<br />

<br />

Connection for valve block<br />

<br />

<br />

Connecting socket for floating contact<br />

Instruction / hand-over<br />

The chapter "Safety instructions" must be heeded! (p. 2)<br />

Both chambers of the plant must be filled UP with clear water<br />

to a height of 1.20 m.<br />

Commissioning is carried out by a specialised firm or by an authorised<br />

<strong>KESSEL</strong> agent (at an additional charge).<br />

The following persons should be present for the hand-over:<br />

- Person authorised to perform the acceptance on behalf of the<br />

building owner<br />

- Specialised firm<br />

In addition, we recommend the participation of operating personnel/operator,<br />

waste disposal contractor<br />

0.<br />

Systemstart<br />

start<br />

System Systemdiagnose diagnostic<br />

0.1 Sprache Language<br />

deutsch<br />

französisch<br />

German<br />

englisch<br />

French<br />

English<br />

0.2 Datum/Uhrzeit<br />

Date/Time<br />

Overview instruction:<br />

5. 1. Making the plant ready for operation<br />

5. 2. Checking the plant<br />

5. 3. Instruction based on the installation and operating instructions<br />

5. 4. Drawing up the handover certificate. (see chapter 13)<br />

0.3 Klassen Classes<br />

C<br />

D<br />

Datum Date<br />

01.01.2009 Uhrzeit<br />

12:00 01.01.02009 Time<br />

12:00<br />

Once the instruction is completed, the plant must be made<br />

ready for operation.<br />

0.4 Nenngrößen Nominal Size<br />

EW4<br />

EW6<br />

EW8<br />

EW10<br />

…<br />

EW24<br />

5.1 Making the plant ready for operation<br />

Prior to commissioning, the plant must be completely cleaned<br />

(including inlets and drains); solids and coarse particles must<br />

be removed.<br />

1.5 Systeminfo information<br />

Time: Uhrzeit: 20:45 20:45<br />

Floater: Schwimmer: S1 S1<br />

S2<br />

Events Ereignisse: Main power Netzausfall failure<br />

Normalphase<br />

108