5. Commissioning<br />
<br />
<br />
Display/indicator panel<br />
Movement keys/direction keys for guidance<br />
through the program menu<br />
<br />
<br />
<br />
<br />
Enter key/OK key<br />
Back key/ESC key<br />
Pilot lamp indicating readiness for operation<br />
Pilot lamp for malfunction message<br />
Mains power supply cable<br />
Mains connection compressor<br />
Connection compressed air sensor<br />
Connection options for external signal<br />
generator<br />
<br />
Connection for valve block<br />
<br />
<br />
Connecting socket for floating contact<br />
Instruction / hand-over<br />
The chapter "Safety instructions" must be heeded! (p. 2)<br />
Both chambers of the plant must be filled UP with clear water<br />
to a height of 1.20 m.<br />
Commissioning is carried out by a specialised firm or by an authorised<br />
<strong>KESSEL</strong> agent (at an additional charge).<br />
The following persons should be present for the hand-over:<br />
- Person authorised to perform the acceptance on behalf of the<br />
building owner<br />
- Specialised firm<br />
In addition, we recommend the participation of operating personnel/operator,<br />
waste disposal contractor<br />
0.<br />
Systemstart<br />
start<br />
System Systemdiagnose diagnostic<br />
0.1 Sprache Language<br />
deutsch<br />
französisch<br />
German<br />
englisch<br />
French<br />
English<br />
0.2 Datum/Uhrzeit<br />
Date/Time<br />
Overview instruction:<br />
5. 1. Making the plant ready for operation<br />
5. 2. Checking the plant<br />
5. 3. Instruction based on the installation and operating instructions<br />
5. 4. Drawing up the handover certificate. (see chapter 13)<br />
0.3 Klassen Classes<br />
C<br />
D<br />
Datum Date<br />
01.01.2009 Uhrzeit<br />
12:00 01.01.02009 Time<br />
12:00<br />
Once the instruction is completed, the plant must be made<br />
ready for operation.<br />
0.4 Nenngrößen Nominal Size<br />
EW4<br />
EW6<br />
EW8<br />
EW10<br />
…<br />
EW24<br />
5.1 Making the plant ready for operation<br />
Prior to commissioning, the plant must be completely cleaned<br />
(including inlets and drains); solids and coarse particles must<br />
be removed.<br />
1.5 Systeminfo information<br />
Time: Uhrzeit: 20:45 20:45<br />
Floater: Schwimmer: S1 S1<br />
S2<br />
Events Ereignisse: Main power Netzausfall failure<br />
Normalphase<br />
108