20.03.2014 Views

KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design

KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design

KESSEL-Kleinkläranlagen INNO-CLEAN® - Kessel Design

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Installation and assembly<br />

cable conduit between valve block and control unit (see-<br />

Procedure)<br />

Air hose to the compressor<br />

Concrete sealing<br />

Cable conduit<br />

seal Item No.<br />

97 711<br />

Basement<br />

wall<br />

KG-pipe DN 100<br />

Seal item<br />

No. 860 116<br />

Seal for pipe duct<br />

Quick-action coupling<br />

Valve block<br />

Locking bracket<br />

Ventil Valve<br />

Inno-Clean<br />

Wall duct customary<br />

in trade e.g.<br />

by Steelter or<br />

DOYMA DN 100<br />

Gradient at least<br />

2° sloping towards<br />

the tank<br />

Tank wall<br />

<strong>INNO</strong>-<strong>CLEAN®</strong><br />

Adapter plate<br />

Lug to hook<br />

in the control line<br />

Changes in direction should be carried out by means of curved<br />

fittings with a maximum bend of 30°.<br />

Caution: Up to their final connection, all pipes should be<br />

temporarily sealed with adhesive tape to prevent the ingress<br />

of dirt while the pipes are pushed through.<br />

Remark:<br />

The tanks may be drilled open in the area of the domes to<br />

produce additional connecting and ventilation lines. For this,<br />

original drill bits and pipe duct seals by <strong>KESSEL</strong> must be<br />

used (<strong>KESSEL</strong> drill bits DN 50 - DN 150, item No. 50100,<br />

<strong>KESSEL</strong> pipe duct seals:<br />

DN 50 item No. 850114<br />

DN 70 item No. 850116<br />

DN 100 item No. 850117<br />

DN 125 item No. 850118<br />

DN 150 item No. 850119<br />

Drilling should be carried out on surfaces that are as plane<br />

as possible.<br />

To provide an optimum seal for the drilled hole, the clearance<br />

between the edge of the drilled hole and uneven contour<br />

should amount to at least 15 mm so that the seal circumferentially<br />

butts evenly against the drill hole.<br />

Control line<br />

Air hoses to the compressed air syphons<br />

Procedure:<br />

- Open the locking bracket on the valve block inside the tank<br />

- Remove the valve block from the adapter plate<br />

- Pull the grey ventilation hose and control line through the<br />

cable conduit<br />

- Connect the ventilation hose on the valve block using a<br />

quick-action coupling (see 4.11 Point 5)<br />

- Insert valve block on adapter plate<br />

- Caution: Control line must be clipped into the lug provided<br />

for that purpose (see illustration) to ensure a correct locking<br />

with the adapter plate.<br />

- Check valve block for correct seat and close the locking<br />

lever<br />

4.9 Assembly of the attachment pieces<br />

First of all, place the seal (see drawing 4.9) into the bead provided<br />

inside the dome.<br />

Telescopic attachment piece<br />

• Ventilation<br />

Plants with closed cover are aerated and ventilated via the<br />

penstock of the drainage plant. An additional ventilation line<br />

in DN 100 can be connected to the dome. For this purpose,<br />

the appropriate drill bit and pipe duct seal by <strong>KESSEL</strong> must<br />

be used (see illustration page 5). <strong>KESSEL</strong> recommends the<br />

use of an activated carbon filter to avoid any unpleasant<br />

odours.<br />

4.8 Laying the connecting lines to the control unit<br />

(ventilation hose and control line)<br />

The control line and the ventilation hose must be laid in the<br />

Lip seal DN 600<br />

Clamping ring<br />

Tank dome<br />

Minimum insertion<br />

depth 100 mm<br />

103

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!