13.10.2013 Views

Rapport annuel 2010 - (PDF - 5837 Ko) - FFEM

Rapport annuel 2010 - (PDF - 5837 Ko) - FFEM

Rapport annuel 2010 - (PDF - 5837 Ko) - FFEM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

LES PROJETS COFINANCÉS PAR LE <strong>FFEM</strong><br />

Date Titre du projet Pays Secteur État Type Total en $ Parted’enga-<br />

après naires<br />

gement ajustement<br />

07/01 Establishing a halon bank and umbrella project Syrie Halons Financièrement clos Assist. tech. 169 050<br />

for 63 manufacturers<br />

12/03 National CFC phase-out plan: 2004 annual Iran Plan national de gestion de Terminé Investissement 1 117 348 GTZ<br />

implementation programme l'élimination finale de CFC<br />

04/04 CTC phase-out plan for the consumption and Inde Plan national de gestion de Terminé Investissement 1 085 000 GTZ<br />

production sectors: 2004 work programme l'élimination finale de CFC<br />

04/05 CTC phase-out plan for the consumption and Inde Plan national de gestion de En cours Investissement 1 085 000 GTZ<br />

production sectors: 2005 annual programme l'élimination finale de CFC<br />

04/05 National CFC phase-out plan: 2005 annual Iran Plan national de gestion de En cours Investissement 555 000 GTZ<br />

implementation programme l'élimination finale de CFC<br />

07/06 CTC phase-out plan for the consumption and Inde Plan national de gestion de En cours Investissement 585 000 GTZ<br />

production sectors: 2006 annual programme l'élimination finale de CFC<br />

07/06 Project preparation for a terminal phase-out Laos Plan national de gestion de Financièrement clos Préparation 33 900<br />

management plan for CFCs l'élimination finale de CFC<br />

through the technical promotion of no clean processes<br />

07/07 CTC phase-out plan for the consumption and Inde Plan national de gestion de En cours Assistance 585 000 GTZ<br />

production sectors: 2007 annual programme l'élimination finale de CFC technique<br />

04/08 Terminal phase-out management plan (first tranche) Laos Plan national de gestion de En cours Investissement 205 095<br />

l'élimination finale de CFC<br />

07/10 Terminal phase-out management plan (second tranche) Laos Plan national de gestion de En cours Investissement 156 505<br />

l'élimination finale de CFC<br />

Total Asie 39 projets et préparation de projets 8 146 406<br />

Projets “couche d’ozone” identifiés ou engagés en Méditerranée<br />

05/96 Projects preparation and technical assistance in the foam sector Liban Mousse Financièrement clos Assist. tech. 19 505<br />

05/96 Project preparation for the formulation of a project to Maroc Réfrigération Financièrement clos Préparation 20 000<br />

implement a recycling network for CFC-11, CFC-12 and HCFC-22<br />

10/96 Conversion to non-CFC technology in the manufacture of Liban Mousse Financièrement clos Investissement 55 465<br />

polyurethane flexible molded foam at Meuble Mode Sarl<br />

10/96 Conversion to non-CFC technology in the manufacture Liban Mousse Financièrement clos Investissement 128 700<br />

of flexible foam (slabstock) at Furniture and Plastic Sarl (FAP)<br />

10/96 Conversion to non-CFC technology in the manufacture Liban Mousse Financièrement clos Investissement 146 776<br />

of flexible foam (slabstock) at Plastiflex Sarl<br />

10/96 Conversion to non-CFC technology in the manufacture Liban Mousse Financièrement clos Investissement 107 222<br />

of flexible foam (slabstock) at Merza Foam Sarl<br />

10/96 Conversion to non-CFC technology in the manufacture Liban Mousse Financièrement clos Investissement 141 000<br />

of rigid foam (sandwich panels) at Kilzi and Co. Sarl<br />

10/96 Conversion to non-CFC technology in the manufacture Liban Mousse Financièrement clos Investissement 151 742<br />

of flexible foam (slabstock) at Fomaco Sarl<br />

10/96 Project preparation for the commercial refrigeration sector Liban Réfrigération Financièrement clos Préparation 30 000<br />

10/96 Project preparation to establish a CFC and HCFC Liban Réfrigération Financièrement clos Préparation 30 000<br />

10/96 Technical assistance on alternative technologies for cold storage facilities Maroc Réfrigération Financièrement clos Assist. tech. 40 000<br />

recovery and recycling centre<br />

11/97 Conversion of refrigeration industrial facilities Liban Réfrigération Financièrement clos Investissement 153 162<br />

11/97 Implementation of an ODS recovery and recycling network Liban Réfrigération En cours Assist. tech. 425 289<br />

11/97 Training of refrigeration technicians on recovery and Liban Réfrigération Financièrement clos Formation 52 668<br />

recycling methodologies<br />

11/97 Implementation of an ODS recovery and recycling network Maroc Réfrigération En cours Assist. tech. 355 867<br />

11/97 Training of refrigeration technicians on recovery and recycling Maroc Réfrigération Financièrement clos Formation 53 361<br />

methodologies<br />

07/99 Remaining issues for a RMP and preparation of strategy and Liban Réfrigération Terminé Assistance 45 750<br />

projects for reduction of CFC emissions in centrifugal chillers technique<br />

11/99 Phase-out of methyl bromide use in the cut flower and Maroc Fumigation Terminé Investissement 1 127 384<br />

banana production<br />

12/00 Technical assistance for cold storage equipment Maroc Réfrigération Terminé Assist. tech. 120 054 ONUDI<br />

(training and demonstration project)<br />

Total Méditerranée 19 projets et préparation de projets 3 203 945<br />

Total couche d’ozone 107 projets 14 869 824<br />

A N N E x E S<br />

<strong>FFEM</strong> - RAPPORT ANNUEL <strong>2010</strong> • 71

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!