ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 1/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

<strong>Outil</strong>lage pour <strong>test</strong> des mâchoires de<br />

<strong>frein</strong> pour appareil ISIS<br />

Brake <strong>test</strong> tool for ISIS lift<br />

Testwerkzeug für die Bremsbacken des<br />

Aufzugs ISIS<br />

Indice Date Commentaires<br />

Provisoire 14/06/06 Création<br />

A 01/12/06 Ajout d’un connecteur MR5T pour compatibilité avec BI V3 (problème de sécurité)<br />

Addition of the connector MR5T for the compatibility with the service box version 3 (safety issue)<br />

Hinzufügen eines Anschlußsteckers MR5T für die Kompatibilität mit BI V3 (Sicherheitsproblèm)<br />

B 27/03/07 Ajout de la version en Allemand<br />

Addition of the German version<br />

Zusatz der Version in Deutsch<br />

TK


!<br />

!<br />

ISIS<br />

Gearless LS<br />

Précautions à prendre :<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 2/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

Pour toute intervention en partie haute de gaine se reporter aux chapitres « règle d’accès au toit de cabine »<br />

et « règles de déplacement et de travaux sur le toit de la cabine » du manuel d’instructions fourni avec la<br />

documentation propriétaire.<br />

Porter les équipements de protection individuels.<br />

Respecter la méthode proposée.<br />

Nota : Pour des raisons d’ergonomie et facilité, il est recommandé de réaliser l’ensemble des opérations de mise en<br />

place de l’outillage et de <strong>test</strong> des deux mâchoires à deux personnes.<br />

L’outillage :<br />

1 - prise d’alimentation de l’outillage<br />

2 - commutateur 3 positions<br />

3 - connecteurs MR3T<br />

4 - connecteurs MR4T<br />

5 - connecteur MR5T<br />

Chronologie :<br />

1<br />

- Monter à l’aide la manœuvre d’inspection en partie haute de gaine, avec l’outillage de <strong>test</strong>.<br />

- Enclencher le verrou de tête d’arcade.<br />

- Couper l’interrupteur principal FT1 depuis le boîtier d’intervention (ne pas couper FT2 et FT3)<br />

I<br />

N R<br />

F<br />

(2 1<br />

A)<br />

1,6-<br />

25A<br />

ST MO<br />

NTE U<br />

AP<br />

U<br />

A<br />

DOB<br />

DESC WN<br />

ENTE<br />

F<br />

(1 2<br />

A)<br />

1<br />

A<br />

O-<br />

23 F F T<br />

(10<br />

0V T T(10 L<br />

A) A)<br />

1 10 T<br />

0<br />

L A 1<br />

A<br />

1A 1<br />

2<br />

O- O-<br />

O OF O<br />

1<br />

0<br />

Interrupteur<br />

Main<br />

Hauptsc<br />

Hoofdsch i i l<br />

halte Interruptor<br />

p<br />

k<br />

incipal<br />

l F F F<br />

(25<br />

T T T(6<br />

A) 30<br />

mA<br />

A)<br />

6A<br />

Te N1<br />

t RT 30 N2<br />

O- O- O- O- O- A O-<br />

O O O O<br />

O<br />

Po<br />

1 R<br />

S S<br />

4 8 1<br />

I C 0<br />

2<br />

I 0<br />

II<br />

4<br />

BI V2<br />

FT1<br />

MR5<br />

MR5<br />

MR5<br />

MR5<br />

0 1<br />

F2 F1<br />

1A 2A<br />

Interrupteur principal<br />

Main swi tch<br />

Hauptschalter<br />

Hoofdschakelaar<br />

Interruptor principal<br />

FT1<br />

MR5<br />

FT1<br />

25A<br />

30mA<br />

Rappel<br />

Recall<br />

Rü ckholung N Tor nen R<br />

FT3<br />

10A<br />

30mA<br />

230V FT4 FT5 TL1<br />

10A 10A 6A<br />

3<br />

5<br />

BI V3<br />

TK


!<br />

PEa<br />

ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 3/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

- Brancher le connecteur MR5T de l’outillage sur le connecteur MR5 du coffret variateur. Attention, en cas de boîtier<br />

d’intervention version 3, il est nécessaire de débrancher au préalable le câble MR5 venant du boîtier d’intervention.<br />

- Brancher les connecteurs MR3T de l’outillage entre le câble ABIC et le connecteur MR3 du coffret variateur<br />

- Brancher les connecteurs MR4T de l’outillage entre le câble de <strong>frein</strong> et le connecteur MR4 du coffret variateur.<br />

L1<br />

L2<br />

L3<br />

PEd<br />

L1<br />

L2<br />

L3<br />

FILTRE<br />

16A<br />

2<br />

LOAD<br />

L1'<br />

L2'<br />

L3'<br />

MR3<br />

MR3<br />

MR5<br />

ABIC<br />

1L1 3L2 5L3 21NC A1<br />

1 3 5<br />

13 21 A1<br />

1 3 5<br />

13 21 A1<br />

- Vérifier que le commutateur de l’outillage est en position « 0 »<br />

- Brancher l’alimentation de l’outillage sur la prise de courant de la boite d’inspection.<br />

- Basculer le commutateur de l’outillage en position « I » et vérifier qu’une des mâchoires s’ouvre<br />

- Basculer le commutateur de l’outillage en position « II » et vérifier que la seconde mâchoire s’ouvre<br />

- Remettre le commutateur en position « 0 »<br />

FR<br />

2T1 4T2 6T3 22NC A2<br />

SP1<br />

14 22 A2<br />

2 4 6<br />

SP2<br />

I 0<br />

14 22 A2<br />

2 4 6<br />

MR5<br />

MR5<br />

MR4<br />

BM<br />

Seulement si boîtier<br />

d’intervention<br />

version 3<br />

MR5<br />

I<br />

0 II<br />

MR3T<br />

PEa<br />

L1<br />

L2<br />

L3<br />

PEd<br />

L1<br />

L2<br />

L3<br />

FILTRE<br />

16A<br />

2<br />

LOAD<br />

L1'<br />

L2'<br />

L3'<br />

MR3<br />

MR3<br />

MR5<br />

MR5<br />

ABIC<br />

I<br />

0<br />

II<br />

1L1 3L2 5L3 21NC A1<br />

FR<br />

I 0<br />

2T1 4T2 6T3 22NC A2<br />

1 3 5<br />

13 21 A1<br />

SP1<br />

14 22 A2<br />

2 4 6<br />

1 3 5<br />

13 21 A1<br />

SP2<br />

14 22 A2<br />

2 4 6<br />

I<br />

MR5 MR5T<br />

MR5<br />

MR4<br />

MR5<br />

MR4<br />

BM<br />

I<br />

0<br />

MR4T<br />

II<br />

0<br />

MR5<br />

MR5<br />

II<br />

TK


!<br />

!<br />

ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 4/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

- Vérifier que le commutateur est en position « 0 » et remettre le courant principal depuis le boîtier d’intervention à<br />

l’aide du commutateur principal FT1.<br />

- Enlever le verrou de sécurité et faire cheminer les câbles de l’outillage du coffret de régulation jusqu’au palier en<br />

s’assurant que la cabine ne puisse pas les accrocher lors de son passage.<br />

- Si nécessaire dérégler le vantail fermeture de la porte palière afin de permettre son verrouillage.<br />

- Débrancher l’outillage de la boite d’inspection et le brancher au niveau du boîtier d’intervention.<br />

- Remettre l’ascenseur en mode normal. Celui-ci part se recaler vers au niveau extrême bas.<br />

- Mettre les charges dans la cabine et, à l’aide de l’outil de maintenance envoyer l’ascenseur en descente.<br />

- Basculer le commutateur de l’outillage sur « I » afin de maintenir la<br />

première mâchoire ouverte et, lorsque la cabine a atteint sa vitesse<br />

nominale, couper l’alimentation à l’aide de l’interrupteur principal FT1 du<br />

boîtier d’intervention (ne pas couper FT2 et FT3).<br />

- L’ascenseur doit s’arrêter.<br />

- Remettre le commutateur de l’outillage sur « 0 »<br />

I<br />

0<br />

II<br />

- Procéder de même avec la seconde mâchoire.<br />

- Enlever les masses de la cabine.<br />

- Débrancher l’alimentation de l’outillage depuis le boîtier d’intervention et le brancher sur la boite d’inspection.<br />

- Monter en inspection en partie haute de gaine et enclencher le verrou de sécurité.<br />

- Couper l’interrupteur principal FT1 depuis le boîtier d’intervention (ne pas couper FT2 et FT3)<br />

- Débrancher l’outillage du coffret de régulation et rebrancher les câbles sur MR3 et MR4.<br />

- Remettre le courant principal depuis le boîtier d’intervention à l’aide du commutateur principal FT1.<br />

- Sortir de la gaine et remettre l’ascenseur en mode normal.<br />

Nota : afin de limiter les temps de recalage, il est recommander d’effectuer tous les <strong>test</strong>s entre les 3 niveaux les plus<br />

bas.<br />

I<br />

0<br />

II<br />

I<br />

N R<br />

ST MO<br />

NTE UP<br />

AU<br />

A<br />

DOB<br />

DESC WN<br />

ENTE<br />

F F<br />

(2 1 (1 2<br />

A) A) 1 R<br />

1<br />

A S S<br />

1,6-<br />

25A<br />

4 8 1<br />

O-<br />

O I C 0<br />

23 F F T<br />

(10 T (10<br />

0V T L<br />

A) A)<br />

1 10 T<br />

0<br />

L A 1<br />

A<br />

1A 1<br />

2<br />

O- O-<br />

O OF O<br />

1<br />

0<br />

6A<br />

Te<br />

t RT<br />

30<br />

O-<br />

A O-<br />

O<br />

N1<br />

Interrupteur<br />

Main<br />

Hauptsc<br />

Hoofdsch i i l<br />

halter Interruptor<br />

principal<br />

k l F F F<br />

T T(25<br />

T(6<br />

A) 30<br />

mA<br />

A)<br />

N2<br />

O- O- O- O-<br />

O O O O<br />

Po<br />

BI V2<br />

FT1<br />

0 1<br />

F2 F1<br />

1A 2A<br />

Inte rrupt eur pr inc ipa l<br />

Ma in swi tch<br />

Hauptschalter<br />

Hoo fd sch ak ela ar<br />

Interrupt or principal<br />

FT1 FT3<br />

FT1<br />

25A 10A<br />

30m A<br />

30m A<br />

230V FT4 FT5 TL1<br />

10A 10A 6A<br />

TK<br />

R appe l<br />

Recall<br />

Rü c khol ung N To r ne n R<br />

BI V3


!<br />

!<br />

ISIS<br />

Gearless LS<br />

Precautions to be taken<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 5/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

Refer to “Rules concerning access to the car roof and shaft” and “Rules concerning movement and work on<br />

the car roof” in the Instructions manual supplied with the Owner Documentation.<br />

Wear personal safety gear.<br />

Comply with the recommended method.<br />

Note: to achieve the <strong>test</strong>s easily it is recommended to be 2 people.<br />

The brake <strong>test</strong> tool<br />

1 - Plug of the tool<br />

2 - Rotary switch<br />

3 - MR3T connectors<br />

4 - MR4T connectors<br />

5 - MR5T connector<br />

Sequence<br />

1<br />

- In inspection mode, go up to the top of the shaft with the brake <strong>test</strong> tool.<br />

- Engage the safety bolt at top of the sling<br />

- Switch off the main “POWER” with FT1 switch in the service box (don’t switch off FT2 and FT3)<br />

I<br />

N R<br />

F<br />

(2 1<br />

A)<br />

1,6-<br />

25A<br />

ST MO<br />

NTE U<br />

AP<br />

U<br />

A<br />

DOB<br />

DESC WN<br />

ENTE<br />

F<br />

(1 2<br />

A)<br />

1<br />

A<br />

O-<br />

23 F F T<br />

(10<br />

0V T T(10 L<br />

A) A)<br />

1 10 T<br />

0<br />

L A 1<br />

A<br />

1A 1<br />

2<br />

O- O-<br />

O OF O<br />

1<br />

0<br />

Interrupteur<br />

Main<br />

Hauptsc<br />

Hoofdsch i i l<br />

halte Interruptor<br />

p<br />

k<br />

incipal<br />

l F F F<br />

(25<br />

T T T(6<br />

A) 30<br />

mA<br />

A)<br />

6A<br />

Te N1<br />

t RT 30 N2<br />

O- O- O- O- O- A O-<br />

O O O O<br />

O<br />

Po<br />

1 R<br />

S S<br />

4 8 1<br />

I C 0<br />

2<br />

I 0<br />

II<br />

4<br />

BI V2<br />

FT1<br />

MR5<br />

MR5<br />

MR5<br />

0 1<br />

F2 F1<br />

1A 2A<br />

Interrupteur principal<br />

Main swi tch<br />

Hauptschalter<br />

Hoofdschakelaar<br />

Interruptor principal<br />

FT1<br />

MR5<br />

FT1<br />

25A<br />

30mA<br />

MR5<br />

Rappel<br />

Recall<br />

Rü ckholung N Tor nen R<br />

FT3<br />

10A<br />

30mA<br />

230V FT4 FT5 TL1<br />

10A 10A 6A<br />

3<br />

5<br />

BI V3<br />

TK


!<br />

PEa<br />

L1<br />

L2<br />

L3<br />

ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 6/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

- Plug the connector MR5T of the brake <strong>test</strong> tool to the connector MR5 in the VVVF cabinet. Attention, in case of<br />

service box version 3, the cable MR5 must be disconnected before.<br />

- Plug the connectors MR3T of the brake <strong>test</strong> tool between the wire ABIC and the connector MR3 in VVVF cabinet<br />

- Plug the connectors MR4T of the brake <strong>test</strong> tool between the wire of the brake and the connector MR3 in the VVVF<br />

cabinet.<br />

PEd<br />

L1<br />

L2<br />

L3<br />

FILTRE<br />

16A<br />

2<br />

LOAD<br />

L1'<br />

L2'<br />

L3'<br />

MR3<br />

MR3<br />

MR5<br />

ABIC<br />

1L1 3L2 5L3 21NC A1<br />

FR<br />

2T1 4T2 6T3 22NC A2<br />

1 3 5<br />

13 21 A1<br />

SP1<br />

14 22 A2<br />

2 4 6<br />

1 3 5<br />

13 21 A1<br />

SP2<br />

I 0<br />

14 22 A2<br />

2 4 6<br />

- Make sure the rotary switch of the tool is in the “0” position.<br />

- Plug the power of the tool in the lower socket of the inspection box.<br />

- Turn the rotary switch of the tool in the “I” position and control that one part of the brake is opening<br />

- Turn the rotary switch of the tool in the “II” position and control that the other part of the brake is<br />

opening<br />

- Turn back the rotary switch of the tool in the “0” position.<br />

MR5<br />

MR5<br />

MR4<br />

BM<br />

Only if service box<br />

version 3<br />

MR5<br />

I<br />

0 II<br />

MR3T<br />

PEa<br />

L1<br />

L2<br />

L3<br />

PEd<br />

L1<br />

L2<br />

L3<br />

FILTRE<br />

16A<br />

2<br />

LOAD<br />

L1'<br />

L2'<br />

L3'<br />

MR3<br />

MR3<br />

MR5<br />

MR5<br />

ABIC<br />

I<br />

1L1 3L2 5L3 21NC A1<br />

FR<br />

I 0<br />

2T1 4T2 6T3 22NC A2<br />

1 3 5<br />

1 3 5<br />

0<br />

13 21 A1<br />

SP1<br />

14 22 A2<br />

2 4 6<br />

13 21 A1<br />

SP2<br />

14 22 A2<br />

2 4 6<br />

MR5 MR5T<br />

II<br />

MR5<br />

MR4<br />

MR5<br />

MR4<br />

BM<br />

MR4T<br />

I<br />

MR5<br />

MR5<br />

0<br />

II<br />

TK


!<br />

!<br />

ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 7/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

- Make sure the rotary switch of the tool is in the “0” position and switch on again the main power with the FT1<br />

switch of the service box.<br />

- Disengage the safety bolt located at top sling and route the brake <strong>test</strong> tool wires to the service box (route the wires<br />

through the bottom of the landing door and make sure the car doesn’t catch the wires during travel).<br />

- If necessary upset the adjustment of the landing door panel to allow door closing.<br />

- Unplug the tool from the socket of the inspection box and plug it in the socket of the service box.<br />

- Put the lift back to the “normal mode”. The lift goes in the down direction to reset the positioning system.<br />

- Put the full load in the car, and with the maintenance tool (POME) make a call in the down direction.<br />

- Turn the rotary switch of the tool in the “I” position to keep one part of the brake opened.<br />

- When the lift reach its nominal speed, cut off the main power using the<br />

0<br />

FT1 switch in the service box (don’t switch off FT2 and FT3)<br />

- The lift must stop.<br />

-<br />

- Turn back the rotary switch of the tool in the “0” position.<br />

- Follow the same sequence for the second part of the brake.<br />

- Take load away from the car.<br />

- Unplug the brake <strong>test</strong> tool from the service box and plug it in the intervention box.<br />

- Go in inspection mode up to the top of the shaft and engage the safety bolt at top of the sling<br />

- Switch off the main power with the FT1 switch in the service box (don’t switch off FT2 and FT3)<br />

- Unplug the brake <strong>test</strong> tool from the VVVF cabinet and plug the wires in the MR3 and MR4 connectors.<br />

- Switch again the main power with the FT1 switch in the service box.<br />

- Exit from the shaft and put back the lift in “normal mode”.<br />

Note: in order to reduce the lift repositioning time, it is recommended to make all the <strong>test</strong>s between the 3 lower<br />

floors.<br />

I<br />

0<br />

II<br />

I<br />

II<br />

I<br />

N R<br />

ST MO<br />

NTE UP<br />

AU<br />

A<br />

DOB<br />

DESC WN<br />

ENTE<br />

F F<br />

(2 1 (1 2<br />

A) A) 1 R<br />

1<br />

A S S<br />

1,6-<br />

25A<br />

4 8 1<br />

O-<br />

O I C 0<br />

23 F F T<br />

(10 T (10<br />

0V T L<br />

A) A)<br />

1 10 T<br />

0<br />

L A 1<br />

A<br />

1A 1<br />

2<br />

O- O-<br />

O OF O<br />

1<br />

0<br />

6A<br />

Te<br />

t RT<br />

30<br />

O-<br />

A O-<br />

O<br />

N1<br />

Interrupteur<br />

Main<br />

Hauptsc<br />

Hoofdsch i i l<br />

halter Interruptor<br />

principal<br />

k l F F F<br />

T T(25<br />

T(6<br />

A) 30<br />

mA<br />

A)<br />

N2<br />

O- O- O- O-<br />

O O O O<br />

Po<br />

BI V2<br />

FT1<br />

0 1<br />

F2 F1<br />

1A 2A<br />

Inte rrupt eur pr inc ipa l<br />

Ma in swi tch<br />

Hauptschalter<br />

Hoo fd sch ak ela ar<br />

Interrupt or principal<br />

FT1 FT3<br />

FT1<br />

25A 10A<br />

30m A<br />

30m A<br />

230V FT4 FT5 TL1<br />

10A 10A 6A<br />

TK<br />

R appe l<br />

Recall<br />

Rü c khol ung N To r ne n R<br />

BI V3


!<br />

ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

Zu treffende Vorsichtsmassnahmen:<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 8/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

"Das Kapitel "Anweisungen für den Zugang auf das Kabinendach" und Arbeiten auf dem Kabinendach", die<br />

mit dem Handbuch und den Besitzerunterlagen ausgehändigt wurden einsehen."<br />

Immer Individuelle Schutzkleidung anlegen.<br />

Die empfohlene Vorgehensweise genau beachten.<br />

HINWEIS: Aus Ergonomie- und Einfachheitsgründen wird empfohlen alle Vorgänge für das Einsetzen und die<br />

Nutzung des Testwerkzeuges der Bremsbacken zu Zweit durchzuführen.<br />

Das Werkzeug:<br />

1- Stromversorgung des Werkzeugs<br />

2 –Schalter 3 Positionen<br />

3- Stecker MR3T<br />

4- Stecker MR4T<br />

5 – Stecker MR5T<br />

Vorgehensreihenfolge.<br />

1<br />

- Mit der Inspektionssteuerung mit dem Testwerkzeug nach oben in den Schacht fahren.<br />

- Den Sicherheitsriegel einlegen der sich oben auf dem Fahrkorbrahmen befindet,<br />

- Den Hauptstrom im Wartungskasten mit dem Hauptstromschalter FT1 ausschalten (POS. FT2 und FT3),<br />

I<br />

N R<br />

F<br />

(2 1<br />

A)<br />

1,6-<br />

25A<br />

ST MO<br />

NTE U<br />

AP<br />

U<br />

A<br />

DOB<br />

DESC WN<br />

ENTE<br />

F<br />

(1 2<br />

A)<br />

1<br />

A<br />

O-<br />

23 F F T<br />

(10<br />

0V T T(10 L<br />

A) A)<br />

1 10 T<br />

0<br />

L A 1<br />

A<br />

1A 1<br />

2<br />

O- O-<br />

O OF O<br />

1<br />

0<br />

Interrupteur<br />

Main<br />

Hauptsc<br />

Hoofdsch i i l<br />

halte Interruptor<br />

p<br />

k<br />

incipal<br />

l F F F<br />

(25<br />

T T T(6<br />

A) 30<br />

mA<br />

A)<br />

6A<br />

Te N1<br />

t RT 30 N2<br />

O- O- O- O- O- A O-<br />

O O O O<br />

O<br />

Po<br />

1 R<br />

S S<br />

4 8 1<br />

I C 0<br />

2<br />

I 0<br />

II<br />

4<br />

BI V2<br />

FT1<br />

MR5<br />

MR5<br />

MR5<br />

MR5<br />

0 1<br />

F2 F1<br />

1A 2A<br />

Interrupteur principal<br />

Main swi tch<br />

Hauptschalter<br />

Hoofdschakelaar<br />

Interruptor principal<br />

FT1<br />

MR5<br />

FT1<br />

25A<br />

30mA<br />

Rappel<br />

Recall<br />

Rü ckholung N Tor nen R<br />

FT3<br />

10A<br />

30mA<br />

230V FT4 FT5 TL1<br />

10A 10A 6A<br />

3<br />

5<br />

BI V3<br />

TK


!<br />

PEa<br />

ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 9/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

- Den Anschlußstecker MR5T des Werkzeugs an den Stecker MR5 des Frequezumrichterkastens anschließen.<br />

Achtung, bei einem Wartungskasten Version 3, il ist es erforderlich vorher das vom Wartungskasten kommende<br />

Kable MR5 abzuklemmenDie Anschlußstecker MR3T des Werkzeugs zwischen dem Kabel ABIC und dem Stecker<br />

MR3 im Schaltschrank des Frequenzumrichters anschließen.<br />

- Die Anschlußstecker MR4T des Werkzeugs zwischen dem Kabel der Bremse und dem Stecker MR4 im<br />

Schaltschrank des Frequenzumrichters anschließen.<br />

L1<br />

-<br />

L2<br />

L3<br />

PEd<br />

L1<br />

L2<br />

L3<br />

FILTRE<br />

16A<br />

2<br />

LOAD<br />

L1'<br />

L2'<br />

L3'<br />

MR3<br />

MR3<br />

MR5<br />

ABIC<br />

1L1 3L2 5L3 21NC A1<br />

1 3 5<br />

13 21 A1<br />

1 3 5<br />

13 21 A1<br />

- Die Stromversorgung des Werkzeugs an die Steckdose im Inspektionskasten anschließen.<br />

- Den Schalter des Werkzeugs auf « I » stellen und überprüfen ob sich eine der Backen öffnet.<br />

- Den Schalter des Werkzeugs auf « I I » stellen und überprüfen ob sich die zweite Backe öffnet.<br />

- Den Schalter wieder auf die Position « 0 » stellen.<br />

FR<br />

2T1 4T2 6T3 22NC A2<br />

SP1<br />

14 22 A2<br />

2 4 6<br />

SP2<br />

I 0<br />

14 22 A2<br />

2 4 6<br />

MR5<br />

MR5<br />

MR4<br />

BM<br />

Seulement si boîtier<br />

d’intervention<br />

version 3<br />

MR5<br />

I<br />

0 II<br />

MR3T<br />

PEa<br />

L1<br />

L2<br />

L3<br />

PEd<br />

L1<br />

L2<br />

L3<br />

FILTRE<br />

16A<br />

2<br />

LOAD<br />

L1'<br />

L2'<br />

L3'<br />

MR3<br />

MR3<br />

MR5<br />

MR5<br />

ABIC<br />

1L1 3L2 5L3 21NC A1<br />

FR<br />

I 0<br />

2T1 4T2 6T3 22NC A2<br />

1 3 5<br />

13 21 A1<br />

SP1<br />

14 22 A2<br />

2 4 6<br />

1 3 5<br />

13 21 A1<br />

SP2<br />

14 22 A2<br />

2 4 6<br />

I<br />

MR5 MR5T<br />

MR5<br />

MR4<br />

MR5<br />

MR4<br />

BM<br />

I<br />

0<br />

MR4T<br />

II<br />

0<br />

MR5<br />

MR5<br />

II<br />

TK


!<br />

!<br />

ISIS<br />

Gearless LS<br />

Mises à jour<br />

A : 01/12/06<br />

B : 27/03/07<br />

TE DOC 141-03/01<br />

N° 91 7A8 000<br />

Page : 10/10<br />

Le : 01 / 12 / 06<br />

Par : Sce Développement<br />

ThyssenKrupp Elevator<br />

Manufacturing France<br />

- Überprüfen ob der Schalter auf der Position « 0 » steht, und den Hauptptstrom mit dem Hauptschalter FT1 vom<br />

Wartungskasten aus einschalten.<br />

- Den Sicherheitsriegel entfernen und die Kabel des Werkzeugs des Regulierungskastens bis zum Stockwerk<br />

verlegen, sich sie bei der Vorbeifahrt der Kabine nicht berührt werden.<br />

- Falls erforderlich das Schließtürblatt der Schachttür verstellen um seine Verriegelung zu ermöglichen.<br />

- Das Werkzeug des Inspektionskastens abklemmen und in Höhe des Wartungskastens anschließen.<br />

- Den Aufzug auf Normal stellen. Die Kabine wird sich in Richtung der untersten Hal<strong>test</strong>elle nachstellen.<br />

- Die Last in die Kabine stellen und die Kabine mit dem Wartungswerkzeug nach unten schicken.<br />

- Den Schalter des Werkzeugs auf « I » stellen, um die erste Backe geöffnet<br />

zu halten, dann, wen die Kabine ihre Nenngeschwindigkeit erreicht hat die<br />

Stromversorgung mit dem Hauptschalter FT1 im Wartungskasten<br />

abschalten (FT2 und FT3 nicht abschalten).<br />

- Der Aufzug muss anhalten.<br />

- Den Schalter des Werkzeugs au « 0 » stellen<br />

I<br />

0<br />

II<br />

- Auf die gleiche Weise für die zweite Bremsbacke<br />

vorgehen.<br />

- Die Last aus der Kabine entfernen.<br />

- Die Stromversorgung des Werkzeugs vom Wartungskasten aus abschalten und an den Inspektionskasten<br />

anschließen.<br />

- Mit Inspektion nach oben in den Schacht fahren und den Sicherheitsriegel auslösen.<br />

- Den Hauptstrom im Wartungskasten mit dem Hauptstromschalter FT1 ausschalten (FT2 und FT3 nicht<br />

abschalten),<br />

- Das Werkzeug des Regulierungskastens abnehmen und die Kabel an MR3 und MR4 anschließen<br />

- Die Stromversorgung des Werkzeugs vom Wartungskasten aus mit dem Hauptschalter FT1 einschalten.<br />

- Den Schacht verlassen und den Aufzug auf Normal stellen.<br />

HINWEIS: Um die Nachstellzeit zu begrenzen wird empfohlen alle Tests zwischen den 3 untersten Hal<strong>test</strong>ellen<br />

vorzunehmen.<br />

I<br />

0<br />

II<br />

I<br />

N R<br />

ST MO<br />

NTE UP<br />

AU<br />

A<br />

DOB<br />

DESC WN<br />

ENTE<br />

F F<br />

(2 1 (1 2<br />

A) A) 1 R<br />

1<br />

A S S<br />

1,6-<br />

25A<br />

4 8 1<br />

O-<br />

O I C 0<br />

23 F F T<br />

(10 T (10<br />

0V T L<br />

A) A)<br />

1 10 T<br />

0<br />

L A 1<br />

A<br />

1A 1<br />

2<br />

O- O-<br />

O OF O<br />

1<br />

0<br />

6A<br />

Te<br />

t RT<br />

30<br />

O-<br />

A O-<br />

O<br />

N1<br />

Interrupteur<br />

Main<br />

Hauptsc<br />

Hoofdsch i i l<br />

halter Interruptor<br />

principal<br />

k l F F F<br />

T T(25<br />

T(6<br />

A) 30<br />

mA<br />

A)<br />

N2<br />

O- O- O- O-<br />

O O O O<br />

Po<br />

BI V2<br />

FT1<br />

0 1<br />

F2 F1<br />

1A 2A<br />

Inte rrupt eur pr inc ipa l<br />

Ma in swi tch<br />

Hauptschalter<br />

Hoo fd sch ak ela ar<br />

Interrupt or principal<br />

FT1 FT3<br />

FT1<br />

25A 10A<br />

30m A<br />

30m A<br />

230V FT4 FT5 TL1<br />

10A 10A 6A<br />

TK<br />

R appe l<br />

Recall<br />

Rü c khol ung N To r ne n R<br />

BI V3