Outil test machoires frein Isis - TEF-online
Outil test machoires frein Isis - TEF-online
Outil test machoires frein Isis - TEF-online
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 1/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
<strong>Outil</strong>lage pour <strong>test</strong> des mâchoires de<br />
<strong>frein</strong> pour appareil ISIS<br />
Brake <strong>test</strong> tool for ISIS lift<br />
Testwerkzeug für die Bremsbacken des<br />
Aufzugs ISIS<br />
Indice Date Commentaires<br />
Provisoire 14/06/06 Création<br />
A 01/12/06 Ajout d’un connecteur MR5T pour compatibilité avec BI V3 (problème de sécurité)<br />
Addition of the connector MR5T for the compatibility with the service box version 3 (safety issue)<br />
Hinzufügen eines Anschlußsteckers MR5T für die Kompatibilität mit BI V3 (Sicherheitsproblèm)<br />
B 27/03/07 Ajout de la version en Allemand<br />
Addition of the German version<br />
Zusatz der Version in Deutsch<br />
TK
!<br />
!<br />
ISIS<br />
Gearless LS<br />
Précautions à prendre :<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 2/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
Pour toute intervention en partie haute de gaine se reporter aux chapitres « règle d’accès au toit de cabine »<br />
et « règles de déplacement et de travaux sur le toit de la cabine » du manuel d’instructions fourni avec la<br />
documentation propriétaire.<br />
Porter les équipements de protection individuels.<br />
Respecter la méthode proposée.<br />
Nota : Pour des raisons d’ergonomie et facilité, il est recommandé de réaliser l’ensemble des opérations de mise en<br />
place de l’outillage et de <strong>test</strong> des deux mâchoires à deux personnes.<br />
L’outillage :<br />
1 - prise d’alimentation de l’outillage<br />
2 - commutateur 3 positions<br />
3 - connecteurs MR3T<br />
4 - connecteurs MR4T<br />
5 - connecteur MR5T<br />
Chronologie :<br />
1<br />
- Monter à l’aide la manœuvre d’inspection en partie haute de gaine, avec l’outillage de <strong>test</strong>.<br />
- Enclencher le verrou de tête d’arcade.<br />
- Couper l’interrupteur principal FT1 depuis le boîtier d’intervention (ne pas couper FT2 et FT3)<br />
I<br />
N R<br />
F<br />
(2 1<br />
A)<br />
1,6-<br />
25A<br />
ST MO<br />
NTE U<br />
AP<br />
U<br />
A<br />
DOB<br />
DESC WN<br />
ENTE<br />
F<br />
(1 2<br />
A)<br />
1<br />
A<br />
O-<br />
23 F F T<br />
(10<br />
0V T T(10 L<br />
A) A)<br />
1 10 T<br />
0<br />
L A 1<br />
A<br />
1A 1<br />
2<br />
O- O-<br />
O OF O<br />
1<br />
0<br />
Interrupteur<br />
Main<br />
Hauptsc<br />
Hoofdsch i i l<br />
halte Interruptor<br />
p<br />
k<br />
incipal<br />
l F F F<br />
(25<br />
T T T(6<br />
A) 30<br />
mA<br />
A)<br />
6A<br />
Te N1<br />
t RT 30 N2<br />
O- O- O- O- O- A O-<br />
O O O O<br />
O<br />
Po<br />
1 R<br />
S S<br />
4 8 1<br />
I C 0<br />
2<br />
I 0<br />
II<br />
4<br />
BI V2<br />
FT1<br />
MR5<br />
MR5<br />
MR5<br />
MR5<br />
0 1<br />
F2 F1<br />
1A 2A<br />
Interrupteur principal<br />
Main swi tch<br />
Hauptschalter<br />
Hoofdschakelaar<br />
Interruptor principal<br />
FT1<br />
MR5<br />
FT1<br />
25A<br />
30mA<br />
Rappel<br />
Recall<br />
Rü ckholung N Tor nen R<br />
FT3<br />
10A<br />
30mA<br />
230V FT4 FT5 TL1<br />
10A 10A 6A<br />
3<br />
5<br />
BI V3<br />
TK
!<br />
PEa<br />
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 3/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
- Brancher le connecteur MR5T de l’outillage sur le connecteur MR5 du coffret variateur. Attention, en cas de boîtier<br />
d’intervention version 3, il est nécessaire de débrancher au préalable le câble MR5 venant du boîtier d’intervention.<br />
- Brancher les connecteurs MR3T de l’outillage entre le câble ABIC et le connecteur MR3 du coffret variateur<br />
- Brancher les connecteurs MR4T de l’outillage entre le câble de <strong>frein</strong> et le connecteur MR4 du coffret variateur.<br />
L1<br />
L2<br />
L3<br />
PEd<br />
L1<br />
L2<br />
L3<br />
FILTRE<br />
16A<br />
2<br />
LOAD<br />
L1'<br />
L2'<br />
L3'<br />
MR3<br />
MR3<br />
MR5<br />
ABIC<br />
1L1 3L2 5L3 21NC A1<br />
1 3 5<br />
13 21 A1<br />
1 3 5<br />
13 21 A1<br />
- Vérifier que le commutateur de l’outillage est en position « 0 »<br />
- Brancher l’alimentation de l’outillage sur la prise de courant de la boite d’inspection.<br />
- Basculer le commutateur de l’outillage en position « I » et vérifier qu’une des mâchoires s’ouvre<br />
- Basculer le commutateur de l’outillage en position « II » et vérifier que la seconde mâchoire s’ouvre<br />
- Remettre le commutateur en position « 0 »<br />
FR<br />
2T1 4T2 6T3 22NC A2<br />
SP1<br />
14 22 A2<br />
2 4 6<br />
SP2<br />
I 0<br />
14 22 A2<br />
2 4 6<br />
MR5<br />
MR5<br />
MR4<br />
BM<br />
Seulement si boîtier<br />
d’intervention<br />
version 3<br />
MR5<br />
I<br />
0 II<br />
MR3T<br />
PEa<br />
L1<br />
L2<br />
L3<br />
PEd<br />
L1<br />
L2<br />
L3<br />
FILTRE<br />
16A<br />
2<br />
LOAD<br />
L1'<br />
L2'<br />
L3'<br />
MR3<br />
MR3<br />
MR5<br />
MR5<br />
ABIC<br />
I<br />
0<br />
II<br />
1L1 3L2 5L3 21NC A1<br />
FR<br />
I 0<br />
2T1 4T2 6T3 22NC A2<br />
1 3 5<br />
13 21 A1<br />
SP1<br />
14 22 A2<br />
2 4 6<br />
1 3 5<br />
13 21 A1<br />
SP2<br />
14 22 A2<br />
2 4 6<br />
I<br />
MR5 MR5T<br />
MR5<br />
MR4<br />
MR5<br />
MR4<br />
BM<br />
I<br />
0<br />
MR4T<br />
II<br />
0<br />
MR5<br />
MR5<br />
II<br />
TK
!<br />
!<br />
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 4/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
- Vérifier que le commutateur est en position « 0 » et remettre le courant principal depuis le boîtier d’intervention à<br />
l’aide du commutateur principal FT1.<br />
- Enlever le verrou de sécurité et faire cheminer les câbles de l’outillage du coffret de régulation jusqu’au palier en<br />
s’assurant que la cabine ne puisse pas les accrocher lors de son passage.<br />
- Si nécessaire dérégler le vantail fermeture de la porte palière afin de permettre son verrouillage.<br />
- Débrancher l’outillage de la boite d’inspection et le brancher au niveau du boîtier d’intervention.<br />
- Remettre l’ascenseur en mode normal. Celui-ci part se recaler vers au niveau extrême bas.<br />
- Mettre les charges dans la cabine et, à l’aide de l’outil de maintenance envoyer l’ascenseur en descente.<br />
- Basculer le commutateur de l’outillage sur « I » afin de maintenir la<br />
première mâchoire ouverte et, lorsque la cabine a atteint sa vitesse<br />
nominale, couper l’alimentation à l’aide de l’interrupteur principal FT1 du<br />
boîtier d’intervention (ne pas couper FT2 et FT3).<br />
- L’ascenseur doit s’arrêter.<br />
- Remettre le commutateur de l’outillage sur « 0 »<br />
I<br />
0<br />
II<br />
- Procéder de même avec la seconde mâchoire.<br />
- Enlever les masses de la cabine.<br />
- Débrancher l’alimentation de l’outillage depuis le boîtier d’intervention et le brancher sur la boite d’inspection.<br />
- Monter en inspection en partie haute de gaine et enclencher le verrou de sécurité.<br />
- Couper l’interrupteur principal FT1 depuis le boîtier d’intervention (ne pas couper FT2 et FT3)<br />
- Débrancher l’outillage du coffret de régulation et rebrancher les câbles sur MR3 et MR4.<br />
- Remettre le courant principal depuis le boîtier d’intervention à l’aide du commutateur principal FT1.<br />
- Sortir de la gaine et remettre l’ascenseur en mode normal.<br />
Nota : afin de limiter les temps de recalage, il est recommander d’effectuer tous les <strong>test</strong>s entre les 3 niveaux les plus<br />
bas.<br />
I<br />
0<br />
II<br />
I<br />
N R<br />
ST MO<br />
NTE UP<br />
AU<br />
A<br />
DOB<br />
DESC WN<br />
ENTE<br />
F F<br />
(2 1 (1 2<br />
A) A) 1 R<br />
1<br />
A S S<br />
1,6-<br />
25A<br />
4 8 1<br />
O-<br />
O I C 0<br />
23 F F T<br />
(10 T (10<br />
0V T L<br />
A) A)<br />
1 10 T<br />
0<br />
L A 1<br />
A<br />
1A 1<br />
2<br />
O- O-<br />
O OF O<br />
1<br />
0<br />
6A<br />
Te<br />
t RT<br />
30<br />
O-<br />
A O-<br />
O<br />
N1<br />
Interrupteur<br />
Main<br />
Hauptsc<br />
Hoofdsch i i l<br />
halter Interruptor<br />
principal<br />
k l F F F<br />
T T(25<br />
T(6<br />
A) 30<br />
mA<br />
A)<br />
N2<br />
O- O- O- O-<br />
O O O O<br />
Po<br />
BI V2<br />
FT1<br />
0 1<br />
F2 F1<br />
1A 2A<br />
Inte rrupt eur pr inc ipa l<br />
Ma in swi tch<br />
Hauptschalter<br />
Hoo fd sch ak ela ar<br />
Interrupt or principal<br />
FT1 FT3<br />
FT1<br />
25A 10A<br />
30m A<br />
30m A<br />
230V FT4 FT5 TL1<br />
10A 10A 6A<br />
TK<br />
R appe l<br />
Recall<br />
Rü c khol ung N To r ne n R<br />
BI V3
!<br />
!<br />
ISIS<br />
Gearless LS<br />
Precautions to be taken<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 5/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
Refer to “Rules concerning access to the car roof and shaft” and “Rules concerning movement and work on<br />
the car roof” in the Instructions manual supplied with the Owner Documentation.<br />
Wear personal safety gear.<br />
Comply with the recommended method.<br />
Note: to achieve the <strong>test</strong>s easily it is recommended to be 2 people.<br />
The brake <strong>test</strong> tool<br />
1 - Plug of the tool<br />
2 - Rotary switch<br />
3 - MR3T connectors<br />
4 - MR4T connectors<br />
5 - MR5T connector<br />
Sequence<br />
1<br />
- In inspection mode, go up to the top of the shaft with the brake <strong>test</strong> tool.<br />
- Engage the safety bolt at top of the sling<br />
- Switch off the main “POWER” with FT1 switch in the service box (don’t switch off FT2 and FT3)<br />
I<br />
N R<br />
F<br />
(2 1<br />
A)<br />
1,6-<br />
25A<br />
ST MO<br />
NTE U<br />
AP<br />
U<br />
A<br />
DOB<br />
DESC WN<br />
ENTE<br />
F<br />
(1 2<br />
A)<br />
1<br />
A<br />
O-<br />
23 F F T<br />
(10<br />
0V T T(10 L<br />
A) A)<br />
1 10 T<br />
0<br />
L A 1<br />
A<br />
1A 1<br />
2<br />
O- O-<br />
O OF O<br />
1<br />
0<br />
Interrupteur<br />
Main<br />
Hauptsc<br />
Hoofdsch i i l<br />
halte Interruptor<br />
p<br />
k<br />
incipal<br />
l F F F<br />
(25<br />
T T T(6<br />
A) 30<br />
mA<br />
A)<br />
6A<br />
Te N1<br />
t RT 30 N2<br />
O- O- O- O- O- A O-<br />
O O O O<br />
O<br />
Po<br />
1 R<br />
S S<br />
4 8 1<br />
I C 0<br />
2<br />
I 0<br />
II<br />
4<br />
BI V2<br />
FT1<br />
MR5<br />
MR5<br />
MR5<br />
0 1<br />
F2 F1<br />
1A 2A<br />
Interrupteur principal<br />
Main swi tch<br />
Hauptschalter<br />
Hoofdschakelaar<br />
Interruptor principal<br />
FT1<br />
MR5<br />
FT1<br />
25A<br />
30mA<br />
MR5<br />
Rappel<br />
Recall<br />
Rü ckholung N Tor nen R<br />
FT3<br />
10A<br />
30mA<br />
230V FT4 FT5 TL1<br />
10A 10A 6A<br />
3<br />
5<br />
BI V3<br />
TK
!<br />
PEa<br />
L1<br />
L2<br />
L3<br />
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 6/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
- Plug the connector MR5T of the brake <strong>test</strong> tool to the connector MR5 in the VVVF cabinet. Attention, in case of<br />
service box version 3, the cable MR5 must be disconnected before.<br />
- Plug the connectors MR3T of the brake <strong>test</strong> tool between the wire ABIC and the connector MR3 in VVVF cabinet<br />
- Plug the connectors MR4T of the brake <strong>test</strong> tool between the wire of the brake and the connector MR3 in the VVVF<br />
cabinet.<br />
PEd<br />
L1<br />
L2<br />
L3<br />
FILTRE<br />
16A<br />
2<br />
LOAD<br />
L1'<br />
L2'<br />
L3'<br />
MR3<br />
MR3<br />
MR5<br />
ABIC<br />
1L1 3L2 5L3 21NC A1<br />
FR<br />
2T1 4T2 6T3 22NC A2<br />
1 3 5<br />
13 21 A1<br />
SP1<br />
14 22 A2<br />
2 4 6<br />
1 3 5<br />
13 21 A1<br />
SP2<br />
I 0<br />
14 22 A2<br />
2 4 6<br />
- Make sure the rotary switch of the tool is in the “0” position.<br />
- Plug the power of the tool in the lower socket of the inspection box.<br />
- Turn the rotary switch of the tool in the “I” position and control that one part of the brake is opening<br />
- Turn the rotary switch of the tool in the “II” position and control that the other part of the brake is<br />
opening<br />
- Turn back the rotary switch of the tool in the “0” position.<br />
MR5<br />
MR5<br />
MR4<br />
BM<br />
Only if service box<br />
version 3<br />
MR5<br />
I<br />
0 II<br />
MR3T<br />
PEa<br />
L1<br />
L2<br />
L3<br />
PEd<br />
L1<br />
L2<br />
L3<br />
FILTRE<br />
16A<br />
2<br />
LOAD<br />
L1'<br />
L2'<br />
L3'<br />
MR3<br />
MR3<br />
MR5<br />
MR5<br />
ABIC<br />
I<br />
1L1 3L2 5L3 21NC A1<br />
FR<br />
I 0<br />
2T1 4T2 6T3 22NC A2<br />
1 3 5<br />
1 3 5<br />
0<br />
13 21 A1<br />
SP1<br />
14 22 A2<br />
2 4 6<br />
13 21 A1<br />
SP2<br />
14 22 A2<br />
2 4 6<br />
MR5 MR5T<br />
II<br />
MR5<br />
MR4<br />
MR5<br />
MR4<br />
BM<br />
MR4T<br />
I<br />
MR5<br />
MR5<br />
0<br />
II<br />
TK
!<br />
!<br />
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 7/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
- Make sure the rotary switch of the tool is in the “0” position and switch on again the main power with the FT1<br />
switch of the service box.<br />
- Disengage the safety bolt located at top sling and route the brake <strong>test</strong> tool wires to the service box (route the wires<br />
through the bottom of the landing door and make sure the car doesn’t catch the wires during travel).<br />
- If necessary upset the adjustment of the landing door panel to allow door closing.<br />
- Unplug the tool from the socket of the inspection box and plug it in the socket of the service box.<br />
- Put the lift back to the “normal mode”. The lift goes in the down direction to reset the positioning system.<br />
- Put the full load in the car, and with the maintenance tool (POME) make a call in the down direction.<br />
- Turn the rotary switch of the tool in the “I” position to keep one part of the brake opened.<br />
- When the lift reach its nominal speed, cut off the main power using the<br />
0<br />
FT1 switch in the service box (don’t switch off FT2 and FT3)<br />
- The lift must stop.<br />
-<br />
- Turn back the rotary switch of the tool in the “0” position.<br />
- Follow the same sequence for the second part of the brake.<br />
- Take load away from the car.<br />
- Unplug the brake <strong>test</strong> tool from the service box and plug it in the intervention box.<br />
- Go in inspection mode up to the top of the shaft and engage the safety bolt at top of the sling<br />
- Switch off the main power with the FT1 switch in the service box (don’t switch off FT2 and FT3)<br />
- Unplug the brake <strong>test</strong> tool from the VVVF cabinet and plug the wires in the MR3 and MR4 connectors.<br />
- Switch again the main power with the FT1 switch in the service box.<br />
- Exit from the shaft and put back the lift in “normal mode”.<br />
Note: in order to reduce the lift repositioning time, it is recommended to make all the <strong>test</strong>s between the 3 lower<br />
floors.<br />
I<br />
0<br />
II<br />
I<br />
II<br />
I<br />
N R<br />
ST MO<br />
NTE UP<br />
AU<br />
A<br />
DOB<br />
DESC WN<br />
ENTE<br />
F F<br />
(2 1 (1 2<br />
A) A) 1 R<br />
1<br />
A S S<br />
1,6-<br />
25A<br />
4 8 1<br />
O-<br />
O I C 0<br />
23 F F T<br />
(10 T (10<br />
0V T L<br />
A) A)<br />
1 10 T<br />
0<br />
L A 1<br />
A<br />
1A 1<br />
2<br />
O- O-<br />
O OF O<br />
1<br />
0<br />
6A<br />
Te<br />
t RT<br />
30<br />
O-<br />
A O-<br />
O<br />
N1<br />
Interrupteur<br />
Main<br />
Hauptsc<br />
Hoofdsch i i l<br />
halter Interruptor<br />
principal<br />
k l F F F<br />
T T(25<br />
T(6<br />
A) 30<br />
mA<br />
A)<br />
N2<br />
O- O- O- O-<br />
O O O O<br />
Po<br />
BI V2<br />
FT1<br />
0 1<br />
F2 F1<br />
1A 2A<br />
Inte rrupt eur pr inc ipa l<br />
Ma in swi tch<br />
Hauptschalter<br />
Hoo fd sch ak ela ar<br />
Interrupt or principal<br />
FT1 FT3<br />
FT1<br />
25A 10A<br />
30m A<br />
30m A<br />
230V FT4 FT5 TL1<br />
10A 10A 6A<br />
TK<br />
R appe l<br />
Recall<br />
Rü c khol ung N To r ne n R<br />
BI V3
!<br />
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
Zu treffende Vorsichtsmassnahmen:<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 8/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
"Das Kapitel "Anweisungen für den Zugang auf das Kabinendach" und Arbeiten auf dem Kabinendach", die<br />
mit dem Handbuch und den Besitzerunterlagen ausgehändigt wurden einsehen."<br />
Immer Individuelle Schutzkleidung anlegen.<br />
Die empfohlene Vorgehensweise genau beachten.<br />
HINWEIS: Aus Ergonomie- und Einfachheitsgründen wird empfohlen alle Vorgänge für das Einsetzen und die<br />
Nutzung des Testwerkzeuges der Bremsbacken zu Zweit durchzuführen.<br />
Das Werkzeug:<br />
1- Stromversorgung des Werkzeugs<br />
2 –Schalter 3 Positionen<br />
3- Stecker MR3T<br />
4- Stecker MR4T<br />
5 – Stecker MR5T<br />
Vorgehensreihenfolge.<br />
1<br />
- Mit der Inspektionssteuerung mit dem Testwerkzeug nach oben in den Schacht fahren.<br />
- Den Sicherheitsriegel einlegen der sich oben auf dem Fahrkorbrahmen befindet,<br />
- Den Hauptstrom im Wartungskasten mit dem Hauptstromschalter FT1 ausschalten (POS. FT2 und FT3),<br />
I<br />
N R<br />
F<br />
(2 1<br />
A)<br />
1,6-<br />
25A<br />
ST MO<br />
NTE U<br />
AP<br />
U<br />
A<br />
DOB<br />
DESC WN<br />
ENTE<br />
F<br />
(1 2<br />
A)<br />
1<br />
A<br />
O-<br />
23 F F T<br />
(10<br />
0V T T(10 L<br />
A) A)<br />
1 10 T<br />
0<br />
L A 1<br />
A<br />
1A 1<br />
2<br />
O- O-<br />
O OF O<br />
1<br />
0<br />
Interrupteur<br />
Main<br />
Hauptsc<br />
Hoofdsch i i l<br />
halte Interruptor<br />
p<br />
k<br />
incipal<br />
l F F F<br />
(25<br />
T T T(6<br />
A) 30<br />
mA<br />
A)<br />
6A<br />
Te N1<br />
t RT 30 N2<br />
O- O- O- O- O- A O-<br />
O O O O<br />
O<br />
Po<br />
1 R<br />
S S<br />
4 8 1<br />
I C 0<br />
2<br />
I 0<br />
II<br />
4<br />
BI V2<br />
FT1<br />
MR5<br />
MR5<br />
MR5<br />
MR5<br />
0 1<br />
F2 F1<br />
1A 2A<br />
Interrupteur principal<br />
Main swi tch<br />
Hauptschalter<br />
Hoofdschakelaar<br />
Interruptor principal<br />
FT1<br />
MR5<br />
FT1<br />
25A<br />
30mA<br />
Rappel<br />
Recall<br />
Rü ckholung N Tor nen R<br />
FT3<br />
10A<br />
30mA<br />
230V FT4 FT5 TL1<br />
10A 10A 6A<br />
3<br />
5<br />
BI V3<br />
TK
!<br />
PEa<br />
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 9/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
- Den Anschlußstecker MR5T des Werkzeugs an den Stecker MR5 des Frequezumrichterkastens anschließen.<br />
Achtung, bei einem Wartungskasten Version 3, il ist es erforderlich vorher das vom Wartungskasten kommende<br />
Kable MR5 abzuklemmenDie Anschlußstecker MR3T des Werkzeugs zwischen dem Kabel ABIC und dem Stecker<br />
MR3 im Schaltschrank des Frequenzumrichters anschließen.<br />
- Die Anschlußstecker MR4T des Werkzeugs zwischen dem Kabel der Bremse und dem Stecker MR4 im<br />
Schaltschrank des Frequenzumrichters anschließen.<br />
L1<br />
-<br />
L2<br />
L3<br />
PEd<br />
L1<br />
L2<br />
L3<br />
FILTRE<br />
16A<br />
2<br />
LOAD<br />
L1'<br />
L2'<br />
L3'<br />
MR3<br />
MR3<br />
MR5<br />
ABIC<br />
1L1 3L2 5L3 21NC A1<br />
1 3 5<br />
13 21 A1<br />
1 3 5<br />
13 21 A1<br />
- Die Stromversorgung des Werkzeugs an die Steckdose im Inspektionskasten anschließen.<br />
- Den Schalter des Werkzeugs auf « I » stellen und überprüfen ob sich eine der Backen öffnet.<br />
- Den Schalter des Werkzeugs auf « I I » stellen und überprüfen ob sich die zweite Backe öffnet.<br />
- Den Schalter wieder auf die Position « 0 » stellen.<br />
FR<br />
2T1 4T2 6T3 22NC A2<br />
SP1<br />
14 22 A2<br />
2 4 6<br />
SP2<br />
I 0<br />
14 22 A2<br />
2 4 6<br />
MR5<br />
MR5<br />
MR4<br />
BM<br />
Seulement si boîtier<br />
d’intervention<br />
version 3<br />
MR5<br />
I<br />
0 II<br />
MR3T<br />
PEa<br />
L1<br />
L2<br />
L3<br />
PEd<br />
L1<br />
L2<br />
L3<br />
FILTRE<br />
16A<br />
2<br />
LOAD<br />
L1'<br />
L2'<br />
L3'<br />
MR3<br />
MR3<br />
MR5<br />
MR5<br />
ABIC<br />
1L1 3L2 5L3 21NC A1<br />
FR<br />
I 0<br />
2T1 4T2 6T3 22NC A2<br />
1 3 5<br />
13 21 A1<br />
SP1<br />
14 22 A2<br />
2 4 6<br />
1 3 5<br />
13 21 A1<br />
SP2<br />
14 22 A2<br />
2 4 6<br />
I<br />
MR5 MR5T<br />
MR5<br />
MR4<br />
MR5<br />
MR4<br />
BM<br />
I<br />
0<br />
MR4T<br />
II<br />
0<br />
MR5<br />
MR5<br />
II<br />
TK
!<br />
!<br />
ISIS<br />
Gearless LS<br />
Mises à jour<br />
A : 01/12/06<br />
B : 27/03/07<br />
TE DOC 141-03/01<br />
N° 91 7A8 000<br />
Page : 10/10<br />
Le : 01 / 12 / 06<br />
Par : Sce Développement<br />
ThyssenKrupp Elevator<br />
Manufacturing France<br />
- Überprüfen ob der Schalter auf der Position « 0 » steht, und den Hauptptstrom mit dem Hauptschalter FT1 vom<br />
Wartungskasten aus einschalten.<br />
- Den Sicherheitsriegel entfernen und die Kabel des Werkzeugs des Regulierungskastens bis zum Stockwerk<br />
verlegen, sich sie bei der Vorbeifahrt der Kabine nicht berührt werden.<br />
- Falls erforderlich das Schließtürblatt der Schachttür verstellen um seine Verriegelung zu ermöglichen.<br />
- Das Werkzeug des Inspektionskastens abklemmen und in Höhe des Wartungskastens anschließen.<br />
- Den Aufzug auf Normal stellen. Die Kabine wird sich in Richtung der untersten Hal<strong>test</strong>elle nachstellen.<br />
- Die Last in die Kabine stellen und die Kabine mit dem Wartungswerkzeug nach unten schicken.<br />
- Den Schalter des Werkzeugs auf « I » stellen, um die erste Backe geöffnet<br />
zu halten, dann, wen die Kabine ihre Nenngeschwindigkeit erreicht hat die<br />
Stromversorgung mit dem Hauptschalter FT1 im Wartungskasten<br />
abschalten (FT2 und FT3 nicht abschalten).<br />
- Der Aufzug muss anhalten.<br />
- Den Schalter des Werkzeugs au « 0 » stellen<br />
I<br />
0<br />
II<br />
- Auf die gleiche Weise für die zweite Bremsbacke<br />
vorgehen.<br />
- Die Last aus der Kabine entfernen.<br />
- Die Stromversorgung des Werkzeugs vom Wartungskasten aus abschalten und an den Inspektionskasten<br />
anschließen.<br />
- Mit Inspektion nach oben in den Schacht fahren und den Sicherheitsriegel auslösen.<br />
- Den Hauptstrom im Wartungskasten mit dem Hauptstromschalter FT1 ausschalten (FT2 und FT3 nicht<br />
abschalten),<br />
- Das Werkzeug des Regulierungskastens abnehmen und die Kabel an MR3 und MR4 anschließen<br />
- Die Stromversorgung des Werkzeugs vom Wartungskasten aus mit dem Hauptschalter FT1 einschalten.<br />
- Den Schacht verlassen und den Aufzug auf Normal stellen.<br />
HINWEIS: Um die Nachstellzeit zu begrenzen wird empfohlen alle Tests zwischen den 3 untersten Hal<strong>test</strong>ellen<br />
vorzunehmen.<br />
I<br />
0<br />
II<br />
I<br />
N R<br />
ST MO<br />
NTE UP<br />
AU<br />
A<br />
DOB<br />
DESC WN<br />
ENTE<br />
F F<br />
(2 1 (1 2<br />
A) A) 1 R<br />
1<br />
A S S<br />
1,6-<br />
25A<br />
4 8 1<br />
O-<br />
O I C 0<br />
23 F F T<br />
(10 T (10<br />
0V T L<br />
A) A)<br />
1 10 T<br />
0<br />
L A 1<br />
A<br />
1A 1<br />
2<br />
O- O-<br />
O OF O<br />
1<br />
0<br />
6A<br />
Te<br />
t RT<br />
30<br />
O-<br />
A O-<br />
O<br />
N1<br />
Interrupteur<br />
Main<br />
Hauptsc<br />
Hoofdsch i i l<br />
halter Interruptor<br />
principal<br />
k l F F F<br />
T T(25<br />
T(6<br />
A) 30<br />
mA<br />
A)<br />
N2<br />
O- O- O- O-<br />
O O O O<br />
Po<br />
BI V2<br />
FT1<br />
0 1<br />
F2 F1<br />
1A 2A<br />
Inte rrupt eur pr inc ipa l<br />
Ma in swi tch<br />
Hauptschalter<br />
Hoo fd sch ak ela ar<br />
Interrupt or principal<br />
FT1 FT3<br />
FT1<br />
25A 10A<br />
30m A<br />
30m A<br />
230V FT4 FT5 TL1<br />
10A 10A 6A<br />
TK<br />
R appe l<br />
Recall<br />
Rü c khol ung N To r ne n R<br />
BI V3